The Norfolk Vanguard Offshore Wind Farm (Amendment) Order 2022
Made: 28th September 2022
Coming into force: 29th September 2022
Accordingly, the Secretary of State, in exercise of the powers in paragraph 2(1) and (9) of Schedule 6 to the Planning Act 2008, makes the following Order:
Citation and commencement
1
This Order may be cited as the Norfolk Vanguard Offshore Wind Farm (Amendment) Order 2022 and comes into force on 29th September 2022.
Amendment to the Norfolk Vanguard Offshore Wind Farm Order 2022
2
The Norfolk Vanguard Offshore Wind Farm Order 2022 is amended in accordance with this Order.
Amendments to Part 1 (Authorised Development) of Schedule 1 (Authorised Project)
3
In Part 1 (Authorised development) of Schedule 1 (Authorised project), in paragraph (a) of the description of Work No. 1—
- (a) for “with an electrical export capacity of up to 1,800 MW at the point of connection to the offshore electrical platform(s) referred to at Work No. 2” substitute “with a gross electrical output of over 100 MW”; and
- (b) for “up to 158 wind turbine generators” substitute “up to 145 wind turbine generators”.
Amendments to Part 3 (Requirements) of Schedule 1 (Authorised Project)
4
Part 3 (Requirements) of Schedule 1 (Authorised project), is amended as follows—
- (a) in paragraph 3(1), for “158” substitute “145”;
- (b) in paragraph 13(2)(a), for “Trimingham” substitute “Neatishead”; and
- (c) in paragraph 13(2)(c), for “Kington Road, Sutton Coldfield, B75 7RL” substitute “St George’s House, DIO Head Office, DMS Whittington, Lichfield, Staffordshire WS14 9PY”.
Signed
Signed by authority of the Secretary of State for Business, Energy and Industrial Strategy
Gareth Leigh — Head of Energy Infrastructure Planning Delivery — Department for Business, Energy and Industrial Strategy — 28th September 2022
Explanatory note
(This note is not part of the Order)
EXPLANATORY NOTE
This Order amends the Norfolk Vanguard Offshore Wind Farm Order 2022, a development consent order under the Planning Act 2008, following an application made in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011 for a non-material change under paragraph 2 of Schedule 6 to the Planning Act 2008. This Order removes the limit on the maximum export capacity and reduces the number of turbines. This Order also makes a change to the address of the Defence Infrastructure Organisation and amends the location of the remote radar head following consultation feedback.
Footnotes
[^f00001]: 2008 c. 29. Paragraph 2 was amended by paragraph 4 of Schedule 8 to the Marine and Coastal Access Act 2009 (c. 23), by paragraphs 1 and 72 of Schedule 13 to the Localism Act 2011 (c. 20), and by section 28 of the infrastructure Act 2015 (c. 7). There are other amendments to the Act that are not relevant to this Order.
[^f00002]: S.I. 2011/2055, as amended by S.I. 2012/635, S.I. 2013/522, S.I. 2015/760, S.I. 2017/314, S.I. 2017/524, S.I. 2018/378, S.I. 2019/734, S.I. 2020/1534 and S.I. 2020/764.
[^f00003]: S.I. 2022/138.
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.