The Thurrock Flexible Generation Plant Development Consent Order 2022

Type Statutory-Instrument
Publication 2022-02-16
Last updated 2024-09-13
State In force
Department King's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API
  • (3) The undertaker must give RWE not less than 28 days’ notice of any exercise of powers under article 11 (Street works), article 13 (Temporary restriction of use of streets), article 14 (access to works) and article 15 (traffic regulation) which would restrict access by RWE, its successors in title, occupiers, tenants and invitees to the road and/or the proposed road. Where access to the road along an existing route is prevented or restricted by the undertaker, the undertaker must ensure that suitable alternative is available for use by RWE, its successors in title, occupiers, tenants and invitees for the whole period of the closure or restriction before exercising any power.
  • (4) Save in the case of emergency, the undertaker may not prevent or restrict RWE from using the road (or any alternative access provided under these protective provisions).
  • (5) The undertaker must ensure that the road or a suitable alternative is open for emergency access to the site at all times.
  • (6) If the undertaker requires to undertake any specified works which will break open the surface of the road or involve any temporary closure of the road then the undertaker must provide 7 days written notice of such works to RWE and acting reasonably must have regard to (and accommodate so far as reasonably practicable) any requests from RWE in respect of this period of works, including measures, where practicable to minimise disruption and facilitate access to the site.
  • (7) Where any temporary closure of the road is required, a suitable alternative access to the site must be provided to RWE, its occupiers, tenants and invitees which is no less convenient to access the site than the road for the whole period of the closure. The undertaker must have regard to any requests from RWE (acting reasonably) in relation to the location of the alternative access road.
  • (8) The undertaker must keep the road (or alternative access if one is provided) clean and tidy and free of obstructions at all times.
  • (9) If at any time RWE requires the relocation, variation or alteration of the road or the proposed road, then RWE shall serve written notice on the undertaker informing them of this fact and identifying the proposed relocation, alteration or variation of the road or the proposed road within the Site.
  • (10) Subject to—
  • (a) agreement by the undertaker (not to be unreasonably withheld or delayed) that the proposed relocation, alteration or variation of the road or the proposed road within the site is acceptable; and
  • (b) RWE meeting any costs of the undertaker associated with the proposed relocation, alteration or variation of the road and/or the proposed road within the site including alterations of connections to access roads outside the Site; and
  • (c) RWE granting the necessary rights for the proposed relocation, alteration or variation of the road or the proposed road within the Site; and
  • (d) the undertaker seeking and being granted, the necessary rights for the proposed relocation, alteration or variation of the road or the proposed road as is necessary to connect to the altered or varied road or proposed road.

General

6

Any difference or dispute arising between the undertaker and RWE under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and RWE, be determined by arbitration in accordance with article 42 of this Order.

7

The undertaker and RWE must each act reasonably in connection with the implementation of this Part of this Schedule.

Notices

8

Any plans or notices submitted to RWE by the undertaker pursuant to this Part must be sent to RWE c/o the Company Secretary at its registered address on Windmill Hill Business Park, Whitehill Way, Swindon, SN5 6PB or such other address as RWE may from time to time appoint instead for that purpose and notify to the undertaker in writing.

PART 10 — FOR THE PROTECTION OF THURROCK BOROUGH COUNCIL

1

The provisions of this Part of this Schedule have effect unless otherwise agreed in writing between the undertaker and Thurrock Council.

2

In this Part of this Schedule—

  • “costs” will include the reasonable costs to the Council of the time of its own officers as well as costs expended;
  • “illuminated signage” means two illuminated highway signs to be installed within the boundary of the local highway (Station Road) to the south of the Station Road Level Crossing to provide warning of the level crossing, and any associated works including provision of an electrical connection;
  • “Consents” means approvals, consents, licences, permissions, or registrations;
  • “RSA” or “Road Safety Audit” means a review of the proposed design or any works and any road safety impacts carried out in accordance with the Design Manual for Roads and Bridges or such other standard as the undertaker and the Council may agree;
  • “the Council” means Thurrock Borough Council;
  • “highway” means a highway vested in or maintainable by the Council as highway authority under the 1980 Act; and
  • “specified work” means the works under the Order to create new junctions to the public highway at Station Road and Fort Road, and the installation of Work no. 4 (the gas pipeline) in or under Station Road.

Road condition surveys

3

The Council will, at the cost of the undertaker, procure or undertake road conditions surveys on the following highways—

  • (a) St Andrews Road, between Tilbury Port Gate 1 and Ferry Road junction;
  • (b) Port Access Road between Ferry Road Junction and Fort Road (including connection road);
  • (c) Fort Road, between Port Access Road and Coopers Shaw Road/Gunn Hill Junction;
  • (d) Coopers Shaw Road between Fort Road and Station Road, and
  • (e) Station Road between Cooper Shaw Road and the site entrance.

4

  • (1) The undertaker will notify the Council of—
  • (a) the anticipated date of commencement of development under this Order; and
  • (b) the anticipated construction programme and date of completion of the authorised development;

not less than 3 months prior to that anticipated date of commencement of development under this Order.

  • (2) The Council will provide a proposed scope setting out the number (having regard to the construction programme notified to it by the undertaker), content and format of road conditions surveys to the undertaker for comment no later than 4 weeks after being notified under sub-paragraph (1). The proposed scope will include live data monitoring to provide 24/7 speed and volume counts. The Council must have regard to any reasonable comments made by the undertaker within 2 weeks of receipt of that proposed scope in finalising the scope of the road conditions surveys.
  • (3) The first road condition survey must be undertaken prior to the anticipated commencement of HGV movements for the authorised development, and further surveys must be undertaken at 3 month intervals from the date of the first surveys until the completion of the construction phase of the authorised development. A final survey must be undertaken within 28 days of the Council being notified by the undertaker that the construction of the authorised development has been completed.

5

  • (1) The Council will invoice the undertaker for the reasonable anticipated costs of all of the planned road conditions surveys set out in the scope following the finalisation of the scope.
  • (2) Where the costs incurred by the Council exceed the sum invoiced under sub-paragraph (1) because the development did not complete in accordance with the programme notified to the Council under paragraph 4(1)(b), the Council may, following the carrying out of the final survey under sub-paragraph 4(3), invoice the undertaker for the costs incurred in excess of the sum invoiced under sub-paragraph (1).

HGV route remediation

6

The undertaker must maintain and provide to the Council at 3 month intervals from the date of commencement of development under this Order until the authorised development is completed, records of the number of HGVs using the local highway to access the authorised development and details of which route such HGVs used.

7

  • (1) The Council will, having regard to the road condition surveys, identify any need for remediation of the highway on the following roads—
  • (a) St Andrews Road, between Tilbury Port Gate 1 and Ferry Road junction;
  • (b) Port Access Road between Ferry Road Junction and Fort Road (including connection road);
  • (c) Fort Road, between Port Access Road and Coopers Shaw Road/Gunn Hill Junction;
  • (d) Coopers Shaw Road between Fort Road and Station Road, and
  • (e) Station Road between Cooper Shaw Road and the site entrance.
  • (2) Where a need for remediation works or measures is identified under sub-paragraph (1), the Council must prepare a schedule of the works or measures required and of the cost of the delivery of those works or measures.
  • (3) The Council will invoice the undertaker for a portion of the costs of the works or measures identified under sub-paragraph (2) proportionally with the undertaker’s HGV use of the roads as compared to the overall HGV movements in percentage terms as established by the road conditions surveys. For example, where the undertaker’s HGV use is 10% of all HGV use of the highways listed in sub-paragraph (1), the undertaker will be liable to the Council for 10% of the costs of the identified remediation works and measures.

8

  • (1) Where the undertaker’s HGV use deviates from the anticipated route (being the highways listed in paragraph (3)), the Council may, acting reasonably, take such action by way of the making of traffic regulation orders or traffic management, as it considers is necessary to prevent HGV use of unsuitable highways or to protect the safety or amenity of other highway users and properties adjacent to highways.
  • (2) Where the Council takes action under sub-paragraph (1) it may invoice the undertaker for the reasonably incurred costs of that action.
  • (3) Reasonably incurred costs under sub-paragraph (2) will include the costs of promoting and making any traffic regulation order.

Specified works

9

  • (1) The undertaker will allow and facilitate an appropriately qualified officer of the Council acting as highway authority to participate in the design process for any Work authorised by this Order which involves a specified work, and will have reasonable regard to any views of that officer in finalising the detailed design of that Work, provided always that any such view shared by the officer will not be an instruction, requirement or authorisation under this Order.
  • (2) The undertaker must, before commencing any specified work, provide to the Council for approval the proposed details for the specified works and a total estimate of the cost for all of the specified works.
  • (3) Following approval under sub-paragraph (2), the Council will issue to the undertaker an invoice for 6% of the total estimate of the costs for all of the specified works as approved, which sum will be used to cover the Council’s reasonable fees, costs, charges and expenses in approving the plans for and in supervising construction of the specified works.

10

  • (1) Any officer of the Council duly appointed for the purpose may at all reasonable times, on giving to the undertaker such notice as may in the circumstances be reasonable, enter upon and inspect any part of the authorised development which—
  • (a) is in, on, over or under any highway; or
  • (b) which may affect any highway;

during the carrying out of the work, and the undertaker will give to such officer all reasonable facilities for such inspection and, if the officer is of the opinion that the construction of the work poses danger to any highway or to any property of the relevant highway authority or danger to persons or vehicles or other property in relation to which the highway authority might be liable on, in, over or under any highway, the undertaker will adopt such measures and precautions as may be reasonably practicable for the purpose of preventing any damage or injury to the highway or persons or vehicles or other property aforesaid.

  • (2) Any officer of the Council exercising the right to inspect works under sub-paragraph (1) must comply with all reasonable health and safety requirements and instructions of the undertaker in doing so.

11

The undertaker must, if reasonably required by the Council, provide and maintain during such time as the undertaker may occupy any part of a highway for the purpose of the construction of any part of the authorised development, temporary ramps for vehicular or pedestrian traffic and any other traffic measures required to protect the safety of road users in accordance with chapter 8 of the Traffic Signs Manual as may be necessary.

Level crossing warning illuminated signage

12

  • (1) The illuminated signage is to be located in the vicinity of the new junction to be formed from the new access road (Work no. 6 authorised by this Order) on to Station Road.
  • (2) The Council will prepare a design for the illuminated signage in consultation with Network Rail within 8 weeks of being requested to do so by the undertaker, or 8 weeks from the date of receipt of the notice of commencement of the authorised development, whichever is the earlier.
  • (3) The Council must obtain any Consents required to install the illuminated signage.
  • (4) The Council is responsible for approving, procuring, carrying out, supervising and, inspecting any works associated with installing the illuminated signage.
  • (5) The Council must carry out any RSAs which are required in relation to the design and installation of the illuminated signage.
  • (6) The Council must use best endeavours to carry out the works to install the illuminated signage no later than 6 months from the date of commencement of the authorised development.
  • (7) The Council will invoice the undertaker for its reasonably incurred costs under this paragraph as soon as reasonably practicable following installation of the illuminated signage.

Payment of invoices

13

Any invoice issued by the Council under this Part of this Schedule is payable by the undertaker within 30 days of issue.

Disputes

14

Any difference in arising between the undertaker and the Council under this Part of this Schedule (other than in difference as to the meaning or construction of this Part of this Schedule) will be resolved by arbitration under article 42(arbitration).

Indemnity

15

The undertaker indemnifies the Council as highway authority in relation to all costs, damages, losses or claims reasonably incurred by the Council in relation to any works by the undertaker in, on, over or under the highway.

Signed

Signed by authority of the Secretary of State for Business, Energy and Industrial Strategy

Gareth Leigh — Head of Energy Infrastructure Planning — Department for Business, Energy and Industrial Strategy — 16th February 2022

Explanatory note

(This note is not part of the Order)

EXPLANATORY NOTE

This Order authorises Thurrock Power Limited to construct, operate and maintain a new gas fired generating station and battery storage facility at Tilbury, Thurrock, Essex and carry out all associated works.

The Order also makes provision in connection with the maintenance of the authorised development.

The Order would permit Thurrock Power Limited to acquire, compulsorily or by agreement, land and rights in land and to use land for this purpose.

A copy of the plans, environmental statement and other documents mentioned in this Order and certified in accordance with article 38 of this Order (certification of plans, etc.) may be inspected free of charge during working hours at Thurrock Power Limited, 145 Kensington Church St, Kensington, London W8 7LP.

Footnotes

1

2008 c. 29. Section 37 was amended by section 137(5) of, and paragraph 5 of Schedule 13(1) to, the Localism Act 2011 (c. 20). Section 83(1) was amended by paragraph 35 of that Schedule. Section 114 was amended by paragraph 55 of that Schedule. Section 120 was amended by section 140 of, and paragraph 60 of Schedule 13(1) to, that Act.

2

S.I. 2009/2264, as amended by the Localism Act 2011 (Infrastructure Planning) (Consequential Amendments) Regulations 2012 (S.I. 2012/635) and the Infrastructure Planning (Prescribed Consultees and Interested Parties etc.) (Amendment) Regulations 2013 (S.I. 2013/522). There are other amendments to the Regulations which are not relevant to this Order.

5

Section 104 was amended by section 58(5) of the Marine and Coastal Access Act 2009 (c. 23) and by section 128(2) and Schedule 13, paragraphs 1 and 49(1) to (6) of the Localism Act 2011 (c. 20).

17

1986 c. 44. Section 7(1) was amended by section 76 of the Utilities Act 2000 (c. 27) and section 197 of, and part 1 of Schedule 23 to, the Energy Act 2004 (c. 20).

18

1990 c. 43. Section 82(1) was amended by paragraph 6 of Schedule 17 to the Environment Act 1995 (c. 25). There are amendments to this Act which are not relevant to this Order.

19

1974 c. 40. Section 61 was amended by Schedule 7 to the Building Act 1984 (c. 55), paragraph 15 of Schedule 3 to the Environmental Protection Act 1990 and Schedule 24 to the Environment Act 1995.

21

1991 c. 57. Paragraph 5 was amended by section 100(1) and (2) of the Natural Environment and Rural Communities Act 2006 (c. 16), section 84 of, and paragraph 3 of Schedule 11 to, the Marine and Coastal Access Act 2009 (c. 23), paragraphs 40 and 49 of Schedule 25 to the Flood and Water Management Act 2010 (c. 29) and S.I. 2013/755. Paragraph 6 was amended by paragraph 26 of Schedule 15 to the Environment Act 1995 (c. 25), section 224 of, and paragraphs 20 and 24 of Schedule 16, and Part 5(B) of Schedule 22, to, the Marine and Coastal Access Act 2009 and S.I. 2013/755. Paragraph 6A was inserted by section 103(3) of the Environment Act 1995.

22

As substituted by section 31 of, and paragraphs 25 and 38 of Schedule 2 to the Water Management Act 2010 (c. 29) and section 86(1) and (3) of the Water Act 2014 (c. 21).

26

Section 86(3) defines what highway works are major highway works.

27

As amended by section 102 of, and Schedule 17 to, the Local Government Act 1985 (c. 51) and section 168(2) of, and Schedule 9 to, the New Roads and Street Works Act 1991 (c. 22).

28

As amended by section 4 of, and paragraph 45 of Schedule 2 to, the Planning (Consequential Provisions) Act 1990 (c. 11); and section 18 of and Schedule 8 to, the New Roads and Street Works Act 1991 (c. 22).

29

As amended by sections 40 and 43 of the Traffic Management Act 2004 (c. 18).

30

Inserted by section 44 of the Traffic Management Act 2004 (c. 18).

31

As amended by section 51 of the Traffic Management Act 2004.

32

Inserted by section 52 of the Traffic Management Act 2004.

33

Inserted by section 52 of, and Schedule 4 to, the Traffic Management Act 2004.

34

All as amended by the Traffic Management Act 2004.

37

S.I. 2016/1154. “Groundwater activity” is defined in paragraph 3 of Schedule 22. “Water discharge activity” is defined in paragraph 3 of Schedule 21.

40

1857 c. 81. Section 25 Substituted by Church of England (Miscellaneous Provisions) Measure 2014 (No. 1) section 2. There are other amendments to this Act which are not relevant to this Order.

50

Section 11A was inserted by section 186(3) of the Housing and Planning Act 2016 (c. 22).

51

Section 11B was inserted by section 187(2) of the above Act.

55

Section 104 was amended by section 42(3) of the Flood and Water Management Act 2010 (c. 29).

Editorial notes

60

Art. 1 in force at 10.3.2022, see art. 1

61

Art. 2 in force at 10.3.2022, see art. 1

62

Art. 3 in force at 10.3.2022, see art. 1

63

Art. 4 in force at 10.3.2022, see art. 1

64

Art. 5 in force at 10.3.2022, see art. 1

65

Art. 6 in force at 10.3.2022, see art. 1

66

Art. 7 in force at 10.3.2022, see art. 1

67

Art. 8 in force at 10.3.2022, see art. 1

68

Art. 9 in force at 10.3.2022, see art. 1

69

Art. 10 in force at 10.3.2022, see art. 1

70

Art. 11 in force at 10.3.2022, see art. 1

71

Art. 12 in force at 10.3.2022, see art. 1

72

Art. 13 in force at 10.3.2022, see art. 1

73

Art. 14 in force at 10.3.2022, see art. 1

74

Art. 15 in force at 10.3.2022, see art. 1

75

Art. 16 in force at 10.3.2022, see art. 1

76

Art. 17 in force at 10.3.2022, see art. 1

77

Art. 18 in force at 10.3.2022, see art. 1

78

Art. 19 in force at 10.3.2022, see art. 1

79

Art. 20 in force at 10.3.2022, see art. 1

80

Art. 21 in force at 10.3.2022, see art. 1

81

Art. 22 in force at 10.3.2022, see art. 1

82

Art. 23 in force at 10.3.2022, see art. 1

83

Art. 24 in force at 10.3.2022, see art. 1

84

Art. 25 in force at 10.3.2022, see art. 1

85

Art. 26 in force at 10.3.2022, see art. 1

86

Art. 27 in force at 10.3.2022, see art. 1

87

Art. 28 in force at 10.3.2022, see art. 1

88

Art. 29 in force at 10.3.2022, see art. 1

89

Art. 30 in force at 10.3.2022, see art. 1

90

Art. 31 in force at 10.3.2022, see art. 1

91

Art. 32 in force at 10.3.2022, see art. 1

92

Art. 33 in force at 10.3.2022, see art. 1

93

Art. 34 in force at 10.3.2022, see art. 1

94

Art. 35 in force at 10.3.2022, see art. 1

95

Art. 36 in force at 10.3.2022, see art. 1

96

Art. 37 in force at 10.3.2022, see art. 1

97

Art. 38 in force at 10.3.2022, see art. 1

98

Art. 39 in force at 10.3.2022, see art. 1

99

Art. 40 in force at 10.3.2022, see art. 1

100

Art. 41 in force at 10.3.2022, see art. 1

101

Art. 42 in force at 10.3.2022, see art. 1

102

Sch. 2 para. 1 in force at 10.3.2022, see art. 1

103

Sch. 2 para. 2 in force at 10.3.2022, see art. 1

104

Sch. 2 para. 3 in force at 10.3.2022, see art. 1

105

Sch. 2 para. 4 in force at 10.3.2022, see art. 1

106

Sch. 2 para. 5 in force at 10.3.2022, see art. 1

107

Sch. 2 para. 6 in force at 10.3.2022, see art. 1

108

Sch. 2 para. 7 in force at 10.3.2022, see art. 1

109

Sch. 2 para. 8 in force at 10.3.2022, see art. 1

110

Sch. 2 para. 9 in force at 10.3.2022, see art. 1

111

Sch. 2 para. 10 in force at 10.3.2022, see art. 1

112

Sch. 2 para. 11 in force at 10.3.2022, see art. 1

113

Sch. 2 para. 12 in force at 10.3.2022, see art. 1

114

Sch. 2 para. 13 in force at 10.3.2022, see art. 1

115

Sch. 2 para. 14 in force at 10.3.2022, see art. 1

116

Sch. 2 para. 15 in force at 10.3.2022, see art. 1

117

Sch. 2 para. 16 in force at 10.3.2022, see art. 1

118

Sch. 2 para. 17 in force at 10.3.2022, see art. 1

119

Sch. 2 para. 18 in force at 10.3.2022, see art. 1

120

Sch. 2 para. 19 in force at 10.3.2022, see art. 1

121

Sch. 2 para. 20 in force at 10.3.2022, see art. 1

122

Sch. 2 para. 21 in force at 10.3.2022, see art. 1

123

Sch. 2 para. 22 in force at 10.3.2022, see art. 1

124

Sch. 2 para. 23 in force at 10.3.2022, see art. 1

125

Sch. 2 para. 24 in force at 10.3.2022, see art. 1

126

Sch. 2 para. 25 in force at 10.3.2022, see art. 1

127

Sch. 2 para. 26 in force at 10.3.2022, see art. 1

128

Sch. 2 para. 27 in force at 10.3.2022, see art. 1

129

Sch. 2 para. 28 in force at 10.3.2022, see art. 1

130

Sch. 2 para. 29 in force at 10.3.2022, see art. 1

131

Sch. 2 para. 30 in force at 10.3.2022, see art. 1

132

Sch. 7 para. 1 in force at 10.3.2022, see art. 1

133

Sch. 7 para. 2 in force at 10.3.2022, see art. 1

134

Sch. 7 para. 3 in force at 10.3.2022, see art. 1

135

Sch. 7 para. 4 in force at 10.3.2022, see art. 1

136

Sch. 8 Pt. 1 para. 1 in force at 10.3.2022, see art. 1

137

Sch. 8 Pt. 1 para. 2 in force at 10.3.2022, see art. 1

138

Sch. 8 Pt. 1 para. 3 in force at 10.3.2022, see art. 1

139

Sch. 8 Pt. 1 para. 4 in force at 10.3.2022, see art. 1

140

Sch. 8 Pt. 1 para. 5 in force at 10.3.2022, see art. 1

141

Sch. 8 Pt. 1 para. 6 in force at 10.3.2022, see art. 1

142

Sch. 8 Pt. 1 para. 7 in force at 10.3.2022, see art. 1

143

Sch. 8 Pt. 1 para. 8 in force at 10.3.2022, see art. 1

144

Sch. 8 Pt. 1 para. 9 in force at 10.3.2022, see art. 1

145

Sch. 8 Pt. 1 para. 10 in force at 10.3.2022, see art. 1

146

Sch. 8 Pt. 1 para. 11 in force at 10.3.2022, see art. 1

147

Sch. 8 Pt. 1 para. 12 in force at 10.3.2022, see art. 1

148

Sch. 8 Pt. 1 para. 13 in force at 10.3.2022, see art. 1

149

Sch. 8 Pt. 2 para. 1 in force at 10.3.2022, see art. 1

150

Sch. 8 Pt. 2 para. 2 in force at 10.3.2022, see art. 1

151

Sch. 8 Pt. 2 para. 3 in force at 10.3.2022, see art. 1

152

Sch. 8 Pt. 2 para. 4 in force at 10.3.2022, see art. 1

153

Sch. 8 Pt. 2 para. 5 in force at 10.3.2022, see art. 1

154

Sch. 8 Pt. 2 para. 6 in force at 10.3.2022, see art. 1

155

Sch. 8 Pt. 2 para. 7 in force at 10.3.2022, see art. 1

156

Sch. 8 Pt. 2 para. 8 in force at 10.3.2022, see art. 1

157

Sch. 8 Pt. 2 para. 9 in force at 10.3.2022, see art. 1

158

Sch. 8 Pt. 2 para. 10 in force at 10.3.2022, see art. 1

159

Sch. 8 Pt. 2 para. 11 in force at 10.3.2022, see art. 1

160

Sch. 8 Pt. 3 para. 1 in force at 10.3.2022, see art. 1

161

Sch. 8 Pt. 3 para. 2 in force at 10.3.2022, see art. 1

162

Sch. 8 Pt. 3 para. 3 in force at 10.3.2022, see art. 1

163

Sch. 8 Pt. 3 para. 4 in force at 10.3.2022, see art. 1

164

Sch. 8 Pt. 3 para. 5 in force at 10.3.2022, see art. 1

165

Sch. 8 Pt. 3 para. 6 in force at 10.3.2022, see art. 1

166

Sch. 8 Pt. 4 para. 1 in force at 10.3.2022, see art. 1

167

Sch. 8 Pt. 4 para. 2 in force at 10.3.2022, see art. 1

168

Sch. 8 Pt. 4 para. 3 in force at 10.3.2022, see art. 1

169

Sch. 8 Pt. 4 para. 4 in force at 10.3.2022, see art. 1

170

Sch. 8 Pt. 4 para. 5 in force at 10.3.2022, see art. 1

171

Sch. 8 Pt. 4 para. 6 in force at 10.3.2022, see art. 1

172

Sch. 8 Pt. 4 para. 7 in force at 10.3.2022, see art. 1

173

Sch. 8 Pt. 4 para. 8 in force at 10.3.2022, see art. 1

174

Sch. 8 Pt. 4 para. 9 in force at 10.3.2022, see art. 1

175

Sch. 8 Pt. 4 para. 10 in force at 10.3.2022, see art. 1

176

Sch. 8 Pt. 4 para. 11 in force at 10.3.2022, see art. 1

177

Sch. 8 Pt. 4 para. 12 in force at 10.3.2022, see art. 1

178

Sch. 8 Pt. 5 para. 1 in force at 10.3.2022, see art. 1

179

Sch. 8 Pt. 5 para. 2 in force at 10.3.2022, see art. 1

180

Sch. 8 Pt. 5 para. 3 in force at 10.3.2022, see art. 1

181

Sch. 8 Pt. 5 para. 4 in force at 10.3.2022, see art. 1

182

Sch. 8 Pt. 5 para. 5 in force at 10.3.2022, see art. 1

183

Sch. 8 Pt. 5 para. 6 in force at 10.3.2022, see art. 1

184

Sch. 8 Pt. 5 para. 7 in force at 10.3.2022, see art. 1

185

Sch. 8 Pt. 5 para. 8 in force at 10.3.2022, see art. 1

186

Sch. 8 Pt. 5 para. 9 in force at 10.3.2022, see art. 1

187

Sch. 8 Pt. 5 para. 10 in force at 10.3.2022, see art. 1

188

Sch. 8 Pt. 5 para. 11 in force at 10.3.2022, see art. 1

189

Sch. 8 Pt. 5 para. 12 in force at 10.3.2022, see art. 1

190

Sch. 8 Pt. 5 para. 13 in force at 10.3.2022, see art. 1

191

Sch. 8 Pt. 5 para. 14 in force at 10.3.2022, see art. 1

192

Sch. 8 Pt. 5 para. 15 in force at 10.3.2022, see art. 1

193

Sch. 8 Pt. 6 para. 1 in force at 10.3.2022, see art. 1

194

Sch. 8 Pt. 6 para. 2 in force at 10.3.2022, see art. 1

195

Sch. 8 Pt. 6 para. 3 in force at 10.3.2022, see art. 1

196

Sch. 8 Pt. 6 para. 4 in force at 10.3.2022, see art. 1

197

Sch. 8 Pt. 6 para. 5 in force at 10.3.2022, see art. 1

198

Sch. 8 Pt. 6 para. 6 in force at 10.3.2022, see art. 1

199

Sch. 8 Pt. 6 para. 7 in force at 10.3.2022, see art. 1

200

Sch. 8 Pt. 6 para. 8 in force at 10.3.2022, see art. 1

201

Sch. 8 Pt. 6 para. 9 in force at 10.3.2022, see art. 1

202

Sch. 8 Pt. 6 para. 10 in force at 10.3.2022, see art. 1

203

Sch. 8 Pt. 6 para. 11 in force at 10.3.2022, see art. 1

204

Sch. 8 Pt. 6 para. 12 in force at 10.3.2022, see art. 1

205

Sch. 8 Pt. 6 para. 13 in force at 10.3.2022, see art. 1

206

Sch. 8 Pt. 6 para. 14 in force at 10.3.2022, see art. 1

207

Sch. 8 Pt. 6 para. 15 in force at 10.3.2022, see art. 1

208

Sch. 8 para. 16 in force at 10.3.2022, see art. 1

209

Sch. 8 para. 17 in force at 10.3.2022, see art. 1

210

Sch. 8 para. 18 in force at 10.3.2022, see art. 1

211

Sch. 8 para. 19 in force at 10.3.2022, see art. 1

212

Sch. 8 para. 20 in force at 10.3.2022, see art. 1

213

Sch. 8 para. 21 in force at 10.3.2022, see art. 1

214

Sch. 8 Pt. 7 para. 1 in force at 10.3.2022, see art. 1

215

Sch. 8 Pt. 7 para. 2 in force at 10.3.2022, see art. 1

216

Sch. 8 Pt. 7 para. 3 in force at 10.3.2022, see art. 1

217

Sch. 8 Pt. 7 para. 4 in force at 10.3.2022, see art. 1

218

Sch. 8 Pt. 7 para. 5 in force at 10.3.2022, see art. 1

219

Sch. 8 Pt. 7 para. 6 in force at 10.3.2022, see art. 1

220

Sch. 8 Pt. 7 para. 7 in force at 10.3.2022, see art. 1

221

Sch. 8 Pt. 7 para. 8 in force at 10.3.2022, see art. 1

222

Sch. 8 Pt. 7 para. 9 in force at 10.3.2022, see art. 1

223

Sch. 8 Pt. 7 para. 10 in force at 10.3.2022, see art. 1

224

Sch. 8 Pt. 7 para. 11 in force at 10.3.2022, see art. 1

225

Sch. 8 Pt. 7 para. 12 in force at 10.3.2022, see art. 1

226

Sch. 8 Pt. 7 para. 13 in force at 10.3.2022, see art. 1

227

Sch. 8 Pt. 7 para. 14 in force at 10.3.2022, see art. 1

228

Sch. 8 Pt. 7 para. 15 in force at 10.3.2022, see art. 1

229

Sch. 8 Pt. 8 para. 1 in force at 10.3.2022, see art. 1

230

Sch. 8 Pt. 8 para. 2 in force at 10.3.2022, see art. 1

231

Sch. 8 Pt. 8 para. 3 in force at 10.3.2022, see art. 1

232

Sch. 8 Pt. 8 para. 4 in force at 10.3.2022, see art. 1

233

Sch. 8 Pt. 8 para. 5 in force at 10.3.2022, see art. 1

234

Sch. 8 Pt. 8 para. 6 in force at 10.3.2022, see art. 1

235

Sch. 8 Pt. 8 para. 7 in force at 10.3.2022, see art. 1

236

Sch. 8 Pt. 9 para. 1 in force at 10.3.2022, see art. 1

237

Sch. 8 Pt. 9 para. 2 in force at 10.3.2022, see art. 1

238

Sch. 8 Pt. 9 para. 3 in force at 10.3.2022, see art. 1

239

Sch. 8 Pt. 9 para. 4 in force at 10.3.2022, see art. 1

240

Sch. 8 Pt. 9 para. 5 in force at 10.3.2022, see art. 1

241

Sch. 8 Pt. 9 para. 6 in force at 10.3.2022, see art. 1

242

Sch. 8 Pt. 9 para. 7 in force at 10.3.2022, see art. 1

243

Sch. 8 Pt. 9 para. 8 in force at 10.3.2022, see art. 1

244

Sch. 8 Pt. 10 para. 1 in force at 10.3.2022, see art. 1

245

Sch. 8 Pt. 10 para. 2 in force at 10.3.2022, see art. 1

246

Sch. 8 Pt. 10 para. 3 in force at 10.3.2022, see art. 1

247

Sch. 8 Pt. 10 para. 4 in force at 10.3.2022, see art. 1

248

Sch. 8 Pt. 10 para. 5 in force at 10.3.2022, see art. 1

249

Sch. 8 Pt. 10 para. 6 in force at 10.3.2022, see art. 1

250

Sch. 8 Pt. 10 para. 7 in force at 10.3.2022, see art. 1

251

Sch. 8 Pt. 10 para. 8 in force at 10.3.2022, see art. 1

252

Sch. 8 Pt. 10 para. 9 in force at 10.3.2022, see art. 1

253

Sch. 8 Pt. 10 para. 10 in force at 10.3.2022, see art. 1

254

Sch. 8 Pt. 10 para. 11 in force at 10.3.2022, see art. 1

255

Sch. 8 Pt. 10 para. 12 in force at 10.3.2022, see art. 1

256

Sch. 8 Pt. 10 para. 13 in force at 10.3.2022, see art. 1

257

Sch. 8 Pt. 10 para. 14 in force at 10.3.2022, see art. 1

258

Sch. 8 Pt. 10 para. 15 in force at 10.3.2022, see art. 1

259

Sch. 1 in force at 10.3.2022, see art. 1

260

Sch. 3 in force at 10.3.2022, see art. 1

261

Sch. 4 in force at 10.3.2022, see art. 1

262

Sch. 5 in force at 10.3.2022, see art. 1

263

Sch. 6 in force at 10.3.2022, see art. 1

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.