The Electricity and Gas (Energy Company Obligation) Order 2022

Type Statutory-Instrument
Publication 2022-07-26
Last updated 2026-03-26
State In force
Department King's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API

Made: 26th July 2022

Coming into force: 27th July 2022

A draft of this instrument has been approved by a resolution of each House of Parliament pursuant to section 33BC(12) of the Gas Act 1986[^f00006], as applied by section 33BD(4) of that Act, section 41A(12) of the Electricity Act 1989[^f00007], as applied by section 41B(4) of that Act and section 103A(6) of the Utilities Act 2000.

PART 1 — Introduction

Citation, commencement and extent

1
  • (1) This Order may be cited as the Electricity and Gas (Energy Company Obligation) Order 2022 and comes into force on the day after the day on which this Order is made.
  • (2) This Order extends to England and Wales and Scotland.

Interpretation

2
  • (1) In this Order—
  • 2018 Order” means the Electricity and Gas (Energy Company Obligation) Order 2018[^f00008];
  • annual cost savings” means—in relation to a measure—the money that would be saved by the measure annually in heating domestic premises to 21 degrees Celsius in the main living areas and 18 degrees Celsius in all other areas; andwhere the measure also results in the generation of electricity or savings in the cost of heating water—the money that would be saved by the measure annually in generating electricity wholly or partly for use at the premises, excluding any electricity generated for the purpose of heating the premises or for heating water; andthe money that would be saved by the measure annually in heating water in the premises;in relation to an ECO4 project, the annual cost savings of the qualifying actions in the ECO4 project;
  • biofuel” means liquid or gaseous fuel which is produced wholly or mainly from biomass;
  • biomass” has the same meaning as in section 100(3) of the Energy Act 2008[^f00009];
  • cavity wall insulation” means insulation between the internal and external leaves of a cavity wall;
  • “central heating system”—means a system which provides heat for the purpose of space heating through a boiler or other heat source connected to one or more separate heat emitters; anddoes not include a district heating connection;
  • certificate of lodgement” means a document entitled “TrustMark Certificate of Lodgement” which sets out the address at which a measure has been installed and the type of measure;
  • commencement date” means the date on which this Order comes into force;
  • “completed”—in relation to a measure, has the meaning given in paragraph (2)(a);in relation to an ECO4 project, has the meaning given in paragraph (2)(b);
  • data light measure” has the meaning given in article 42(a);
  • demonstration action” has the meaning given in article 20(5) of the 2018 Order;
  • district heating connection” means a connection of domestic premises to a district heating system;
  • district heating system” means a system that delivers heat through pipes or conduits to—at least two domestic premises in at least two separate buildings; orat least three domestic premises located in a single building;
  • domestic customer” means a person living in domestic premises in Great Britain who is supplied with electricity or gas at those premises wholly or mainly for domestic purposes;
  • domestic premises” includes a mobile home;
  • ECO3 cost savings” means cost savings within the meaning of article 2 of the 2018 Order, and as determined in accordance with Part 7 of that Order;
  • ECO3 innovation measure” means an innovation measure within the meaning of article 21(5) of the 2018 Order;
  • ECO3 interim delivery action” means a measure which is a qualifying action by virtue of meeting Condition B in article 11(3);
  • ECO3 qualifying action” means a qualifying action within the meaning of article 13(1) of the 2018 Order;
  • ECO4 eligible measure” means, in relation to a domestic premises, a measure that would be capable of satisfying Condition A in article 11(2) if installed at the premises;
  • ECO4 project” means a project consisting of one or more ECO4 eligible measures installed at the same domestic premises and promoted by the same participant;
  • efficient boiler” means a condensing boiler;
  • efficient electric storage heater” means an electric storage heater which has a responsiveness rating of more than 0.2 when assessed against the Standard Assessment Procedure[^f00010];
  • efficient heating system” means—a central heating system;a district heating connection; oran electric storage heater,which is not an inefficient heating system;
  • EFG minimum requirement” means the amount determined under article 6(2)(b) for a participant in respect of a phase;
  • electric heating system” means a central heating system or district heating connection which provides heat generated wholly or mainly from electricity;
  • “energy performance certificate”—in respect of domestic premises in England and Wales, has the meaning given in regulation 2 of the Energy Performance of Buildings (England and Wales) Regulations 2012[^f00011];in respect of domestic premises in Scotland, has the meaning given in regulation 2 of the Energy Performance of Buildings (Scotland) Regulations 2008[^f00012];
  • “energy performance rating”—in respect of domestic premises in England and Wales, has the meaning given in regulation 11 of the Energy Performance of Buildings (England and Wales) Regulations 2012[^f00013];in respect of domestic premises in Scotland, has the same meaning as “energy performance indicator” in regulation 2 of the Energy Performance of Buildings (Scotland) Regulations 2008;
  • first time heating system” means a wet central heating system installed as part of an ECO4 project at domestic premises—which at no point prior to that installation were heated by a wet central heating system; andwhich at no point during the period beginning with 1st April 2022 and ending with the day on which the installation of the wet central heating system is completed, contain an electric storage heater which—has a responsiveness rating of more than 0.2 when assessed against the Standard Assessment Procedure; andis not broken down or, if it is broken down, can be economically repaired;
  • flat in-fill measure” means a measure that meets the condition in article 22 (see paragraph (1) of that article);
  • floor area” has the same meaning as in the Standard Assessment Procedure;
  • gross income”, in relation to a household, means the combined income of the adult members of that household from all sources before deductions for, or relief from, tax or other statutory charge;
  • ground source heat pump” means equipment which generates heat—using the heat energy provided by a shared ground loop; orby absorbing energy stored in the form of heat in the ground, including water in the ground, or in surface water;
  • “group”, except in the definition of “help to heat group”, means a group of companies that includes as members of the group at least two companies that are licence-holders, and for the purpose of this definition—“company” includes any body corporate; and“group of companies” means a holding company and the wholly-owned subsidiaries of that holding company where “holding company” and “wholly-owned subsidiary” have the same meaning as in section 1159 of the Companies Act 2006[^f00014];
  • heating controls” means—a thermostat that is connected to a system which provides heat for the purposes of space heating; ora type of control listed in section 9.4 of the Standard Assessment Procedure;
  • heating measure” means the installation of equipment for the generation of heat, and includes the installation of—a central heating system;a district heating connection;heating controls; related electricity generation equipment;
  • help to heat group” means a group of persons where each person in the group is awarded at least one of the benefits set out in paragraph 1 of Schedule 1 and meets any condition in relation to that benefit which is specified in that Schedule;
  • house in-fill measure” means a measure that meets the condition in article 23 (see paragraph (1) of that article);
  • hydronic heat pump” means—equipment which generates heat by absorbing energy stored in the form of heat in the ambient air; ora ground source heat pump,that heats fluid circulated in a wet central heating system;
  • inefficient heating system” means a central heating system, district heating connection or electric storage heater which—in the case of a central heating system other than an electric heating system—includes a non-condensing boiler; orhas a peak energy efficiency that is no better than a central heating system falling within sub-paragraph (i);in the case of a district heating connection other than an electric heating system, is a connection to a district heating system that—includes a non-condensing boiler; orhas a peak energy efficiency that is no better than a central heating system falling within paragraph (a)(i); andin the case of an electric heating system or an electric storage heater, has a responsiveness rating equal to or less than 0.2 when assessed against the Standard Assessment Procedure;
  • in-fill measure” means a flat in-fill measure or a house in-fill measure;
  • “innovation measure”, except in the definition of “ECO3 innovation measure”, means a standard innovation measure or a substantial innovation measure;
  • “installation”, except where otherwise stated, includes the carrying out of a repair, and cognate expressions are to be construed accordingly;
  • insulation measure” means a measure installed to improve the insulating properties of domestic premises;
  • licence-holder” means a person holding one or both of the following—a licence under section 6(1)(d) of the Electricity Act 1989[^f00015];a licence under section 7A(1) of the Gas Act 1986[^f00016];
  • local authority” means—a county council;a combined authority established under section 103 of the Local Democracy, Economic Development and Construction Act 2009[^f00017];a district council;a London borough council;the Greater London Authority;the Common Council of the City of London;the Council of the Isles of Scilly;a county borough council;a corporate joint committee established by regulations made under Part 5 of the Local Government and Elections (Wales) Act 2021[^f00018]; ora council constituted under section 2 of the Local Government etc. (Scotland) Act 1994[^f00019];
  • MCS” means—the scheme of that name operated by the MCS Service Company Limited, a company registered in England and Wales with company number 07759366; orany equivalent scheme which—is operated by a person accredited to ISO/IEC 17065:2012[^f00020]; andcertifies microgeneration products to consistent standards, and for the purposes of this sub-paragraph, “microgeneration” has the same meaning as in the Climate Change and Sustainable Energy Act 2006[^f00021];
  • measure description” means, in relation to a measure, a description of the characteristics of the measure;
  • mobile home” means a caravan—within the meaning of Part 1 of the Caravan Sites and Control of Development Act 1960[^f00022] (disregarding the modification made by section 13(2) of the Caravan Sites Act 1968[^f00023]); andwhich is a dwelling for the purposes of—Part 1 of the Local Government Finance Act 1992[^f00024] if it is located in England or Wales;Part 2 of the Local Government Finance Act 1992[^f00025] if it is located in Scotland;
  • non-renewable source” means a source of energy or technology not mentioned in section 100(4) of the Energy Act 2008[^f00026];
  • novel data light measure” means a data light measure which is not—a type of measure listed in Table A.1, A.2 or A.3 in Annex A to 2030:2023; ora certified product under MCS;
  • off-gas premises” means premises which are not on-gas premises;
  • oil” means liquid hydrocarbons;
  • on-gas premises” means premises which are connected to a pipe-line system operated by a gas transporter[^f00027] on 31st March 2022;
  • owner” includes any person who under the Lands Clauses Acts[^f00028] would be enabled to sell and convey land to promoters of an undertaking;
  • owner-occupied premises” means domestic premises other than—private rented premises; orsocial housing;
  • participant” has the meaning given in article 4(1) and (2);
  • ...
  • ...
  • PAS 2030:2023” means Publicly Available Specification 2030:2023;
  • PAS 2035:2023” means Publicly Available Specification 2035:2023;
  • peak energy efficiency” means the maximum efficiency at which a central heating system or district heating system, as the case may be, is designed to produce heat;
  • phase” means one of the four phases as follows—the period beginning with the commencement date and ending with 31st March 2023 (“phase 1”);the twelve months ending with 31st March 2024 (“phase 2”);the twelve months ending with 31st March 2025 (“phase 3”); the twenty-one months ending with 31st December 2026 (“phase 4”);
  • pre-installation EPC” means—in relation to an ECO4 project, an energy performance certificate that is the most recent of any energy performance certificate issued for the domestic premises within the period of two years and three months ending with the day immediately preceding the day on which the first measure in the project to be installed at the premises is completed;in relation to an in-fill measure, an energy performance certificate that is the most recent of any energy performance certificate issued for the domestic premises within the period of two years and three months ending with the day immediately preceding the day on which the installation of the in-fill measure at the premises is completed;
  • pre-project energy efficiency assessment” means, in relation to an ECO4 project, a SAP assessment or an RdSAP assessment, performed before the day on which the first measure in the project is completed;
  • pre-project SAP band” means, in relation to domestic premises where a pre-project energy efficiency assessment is performed, the SAP band which is determined for the premises pursuant to that assessment;
  • pre-project SAP rating” means, in relation to domestic premises where a pre-project energy efficiency assessment is performed, the SAP rating which is determined for the premises pursuant to that assessment;
  • private domestic premises” means domestic premises other than social housing;
  • private rented premises” means—in respect of domestic premises in England and Wales, private domestic premises which are a domestic PR property within the meaning of regulation 19 of the Energy Efficiency (Private Rented Property) (England and Wales) Regulations 2015[^f00031];in respect of domestic premises in Scotland, private domestic premises let under a tenancy to which Chapter 4 of Part 1 of the Housing (Scotland) Act 2006[^f00032] applies;
  • qualification year” means—for phase 1, the year 2021;for phase 2, the year 2022;for phase 3, the year 2023;for phase 4, the year 2024;
  • “qualifying action”, except in the definition of “ECO3 qualifying action” has the meaning given in article 11;
  • qualifying supply” means, for each phase—300 gigawatt hours of electricity; or700 gigawatt hours of gas;
  • RdSAP assessment” means an assessment of the energy efficiency of domestic premises using the Reduced Data Standard Assessment Procedure;
  • “Reduced Data Standard Assessment Procedure” means the methodology set out in the document titled “BRE RdSAP10 Specification (February 2024);
  • related electricity generation equipment” means equipment for the generation of electricity at domestic premises where—the electricity is generated wholly or mainly by renewable means; andthe electricity so generated is used wholly or partly by equipment that generates heat at domestic premises;
  • relevant authority” means—in relation to domestic premises in England, a local authority in whose area the premises are situated;in relation to domestic premises in Scotland—the local authority in whose area the premises are situated; orthe Scottish Government;in relation to domestic premises in Wales—a local authority in whose area the premises are situated; orthe Welsh Government;
  • renewable heating system” means—equipment for the generation of heat wholly or partly by renewable means; orrelated electricity generation equipment;
  • renewable means” means by means of a source of energy or technology which—is mentioned in section 100(4)(a) or (c) to (h) of the Energy Act 2008; andis not used to generate electricity that is supplied by a licence-holder;
  • rural area” means—in respect of an area in England and Wales, an area classified as rural in the “2021 rural-urban classification of output areas” published by the Office for National Statistics in March 2025;in respect of an area in Scotland, an area classified as rural in the “Scottish Government Urban Renewal Classification 2022” published by the Scottish Government in December 2024;
  • “SAP10.2” means the Government’s Standard Assessment Procedure for Energy Rating of Dwellings (2023 Edition, version 10.2);
  • “SAP2012” means the Government’s Standard Assessment Procedure for Energy Rating of Dwellings (2012 Edition, version 9.92);
  • SAP assessment” means an assessment of the energy efficiency of domestic premises using the Standard Assessment Procedure;
  • SAP band” means the band running from A to G which is assigned to a SAP rating under the Standard Assessment Procedure or the Reduced Data Standard Assessment Procedure;
  • SAP rating” means the energy efficiency rating of a building determined in accordance with the Standard Assessment Procedure or the Reduced Data Standard Assessment Procedure;
  • score” means the contribution made towards a participant’s total home-heating cost reduction obligation by—the qualifying actions in an ECO4 project that meets the requirements of article 49;a qualifying action which is part of an ECO4 project that does not meet the requirements of article 49;a qualifying action which is an in-fill measure, ECO3 interim delivery action or surplus action;
  • shared ground loop” means equipment that—absorbs energy stored in the form of heat in the ground, including water in the ground, or in surface water; anddelivers heat through a hydraulic connection to two or more ground source heat pumps, where each ground source heat pump is installed at separate domestic premises;
  • social housing” means domestic premises described in Schedule 2;
  • social landlord” has the meaning given in paragraph 3 of Schedule 2;
  • solid wall” includes a metal or timber frame wall or a wall of pre-fabricated concrete construction;
  • solid wall action” means a qualifying action that is the internal or external insulation of the exterior facing solid walls of uninsulated solid wall premises;
  • solid wall insulation” means internal or external insulation of a solid wall, but does not include insulation applied to the walls of a mobile home;
  • solid wall minimum requirement” means the amount determined under article 6(2)(a) for a participant in respect of a phase;
  • standard alternative methodology measure” has the meaning given in article 42(b);
  • “Standard Assessment Procedure”, except in articles 39 and 70, means either of— SAP2012, or SAP10.2;
  • standard innovation measure” has the meaning given in article 37(a);
  • statement of intent” means, in relation to a relevant authority, a statement that the authority intends to identify households that may benefit from the installation of a measure as part of an ECO4 project;
  • substantial innovation measure” has the meaning given in article 37(b).
  • surplus action” means an ECO3 qualifying action recognised by the Administrator[^f00037] as a surplus action under article 45(4);
  • total EFG minimum requirement” means, in relation to a participant and subject to article 81 (transfer of obligations), the sum of the EFG minimum requirements which are determined for the participant under article 6(2)(b) (see article 10(4)(b) which provides that this is the minimum amount of the participant’s total home-heating cost reduction obligation which must be achieved by promoting qualifying actions which are installed at private domestic premises that have a SAP band of E, F or G, and are not surplus actions, in-fill measures or ECO3 interim delivery actions);
  • “total home-heating cost reduction obligation”, except in article 45, means, in relation to a participant and subject to article 81, the sum of the home-heating cost reduction obligations[^f00038] which are determined for the participant under article 6(1);
  • total solid wall minimum requirement” means, in relation to a participant and subject to article 81, the sum of the solid wall minimum requirements which are determined for the participant under article 6(2)(a) (see article 10(4)(a) which provides that this is the minimum number of domestic premises at which the participant must promote a solid wall action);
  • TrustMark” means the scheme of that name operated by TrustMark (2005) Limited, a company registered in England and Wales with company number 05480144;
  • TrustMark Data Warehouse” means the repository of information of that name[^f00039]—held by the operator of TrustMark; andholding information about—assessments of domestic premises made in accordance with PAS 2035:2023; andwork undertaken to improve the energy efficiency of domestic premises;
  • uninsulated solid wall premises” means, in relation to premises at which a qualifying action is installed, domestic premises—with at least one exterior facing wall, where—at least 50%, by area, of the exterior facing walls are solid walls; andbefore the installation of the qualifying action takes place, at least 50%, by area, of the exterior facing solid walls do not have internal or external insulation; andwhich are not a mobile home;
  • wet central heating system” means a central heating system in which heated fluid circulates between a boiler or other heat source and one or more separate heat emitters.
  • (2) For the purposes of this Order—
  • (a) a measure is completed when the installation of the measure is completed;
  • (b) an ECO4 project is completed when, of the measures that are notified to the Administrator in accordance with article 43, the last measure in the project to be completed is completed.
  • (3) For the purposes of this Order, an efficient heating system or a renewable heating system is of the same kind as another efficient heating system or renewable heating system if—
  • (a) they are—
  • (i) both central heating systems;
  • (ii) both district heating connections;
  • (iii) both electric storage heaters; or
  • (iv) both renewable heating systems not referred to in paragraphs (i) to (iii);
  • (b) both generate electricity, generate heat, or distribute heat that has been generated, by means of the same source of energy or technology; and
  • (c) in the case of an electric heating system or electric storage heater, both have a responsiveness rating greater than 0.2 when assessed against the Standard Assessment Procedure.

PART 2 — Overall home-heating cost reduction target

Overall home-heating cost reduction target

3
  • (1) For the period beginning with the commencement date and ending with 31st December 2026 the overall home-heating cost reduction target[^f00040] is £224.3 million in annual cost savings.
  • (2) The overall home-heating cost reduction target is to be apportioned between licence-holders who are participants in relation to a phase in accordance with article 6.

Definition of a participant

4
  • (1) A licence-holder is a participant in relation to a phase if—
  • (a) the licence-holder or, where the licence-holder is a member of a group, the group—
  • (i) supplies 300 gigawatt hours or more of electricity in the qualification year for that phase; and
  • (ii) supplies electricity or gas to 150,000 or more domestic customers at the end of that qualification year;
  • (b) the licence-holder or, where the licence-holder is a member of a group, the group—
  • (i) supplies 700 gigawatt hours or more of gas in the qualification year for that phase; and
  • (ii) supplies electricity or gas to 150,000 or more domestic customers at the end of that qualification year; or
  • (c) in the case of phase 2, 3 or 4, the licence-holder was a participant in relation to the preceding phase.
  • (2) Where a dual licence-holder is a participant by virtue of paragraph (1), that licence-holder is to be treated under this Order as two participants, of which—
  • (a) one is a participant in respect of the supply of electricity; and
  • (b) the other is a participant in respect of the supply of gas.
  • (3) For the purposes of this article—
  • (a) whether or not a licence-holder is a member of a group is to be determined according to whether the licence-holder was a member of a group at the end of the qualification year for the phase in question; and
  • (b) where a licence-holder is a member of a group, the amount of electricity or gas supplied by the group in a qualification year is the amount supplied in that year by all licence-holders in the group, whether or not they were members of the group throughout the whole of that year.
  • (4) For the purpose of determining the number of domestic customers of a licence-holder under this Order, a domestic customer who receives electricity and gas from a dual licence-holder is a separate domestic customer under each licence.
  • (5) In this article, “dual licence-holder” means a person holding a licence under section 6(1)(d) of the Electricity Act 1989 and a licence under section 7A(1) of the Gas Act 1986.

Notification by participants of domestic customers and energy supplied

5
  • (1) For the purposes of this Order, a licence-holder who is a participant in relation to a phase must notify the Administrator of the number of that participant’s domestic customers as at the end of the qualification year for that phase.
  • (2) That participant must also notify the Administrator—
  • (a) where it supplied electricity to domestic customers in that qualification year, of the amount of electricity it so supplied; or
  • (b) where it supplied gas to domestic customers in that qualification year, of the amount of gas it so supplied.
  • (3) Where a participant (“P”) is a member of a group, P must also notify the Administrator—
  • (a) where P supplied electricity to domestic customers in that qualification year, of—
  • (i) the name and company registration number of any other participant in the group that supplied electricity to domestic customers in that year; and
  • (ii) the amount of electricity supplied to domestic customers by the group in that year; or
  • (b) where P supplied gas to domestic customers in that qualification year, of—
  • (i) the name and company registration number of any other participant in the group that supplied gas to domestic customers in that year; and
  • (ii) the amount of gas supplied to domestic customers by the group in that year.
  • (4) The notifications referred to in paragraphs (1) to (3) must be made in writing on or before—
  • (a) for phase 1, the 21st day after the commencement date;
  • (b) for phase 2, 1st February 2023;
  • (c) for phase 3, 1st February 2024;
  • (d) for phase 4, 1st February 2025.
  • (5) Where a participant fails to provide the information in paragraphs (1) to (3), or the Administrator considers any of the information notified by the participant under those paragraphs is inaccurate, the Administrator may determine the matters in those paragraphs.
  • (6) Anything determined by the Administrator under paragraph (5) is to be treated for the purposes of this Order as if it were notified by the participant.
  • (7) For the purposes of this article—
  • (a) whether or not a participant is a member of a group is to be determined according to whether the participant was a member of a group at the end of the qualification year for the phase in question; and
  • (b) where a participant is a member of a group, the amount of electricity or gas supplied by the group in a qualification year is the amount supplied in that year by all participants in the group, whether or not they were members of the group throughout the whole of that year.

PART 3 — Determining obligations and minimum requirements

Determining a participant’s obligations and minimum requirements

6
  • (1) The Administrator must determine for each participant in relation to a phase the participant’s home-heating cost reduction obligation for that phase.
  • (2) The Administrator must also determine for each participant in relation to a phase—
  • (a) the participant’s solid wall minimum requirement for that phase; and
  • (b) the participant’s EFG minimum requirement for that phase.
  • (3) For the purposes of paragraphs (1) and (2), the Administrator must—
  • (a) in the case of a participant who is not a member of a group at the end of the qualification year for the phase, make the determination in accordance with article 7;
  • (b) in the case of a participant who is a member of a group at the end of the qualification year for the phase, make the determination in accordance with article 8.
  • (4) The Administrator must notify a participant of its home-heating cost reduction obligation, solid wall minimum requirement and EFG minimum requirement in writing—
  • (a) for phase 1, within the period of 6 weeks beginning with the commencement date;
  • (b) for phases 2, 3 and 4, on or before the 7th March prior to the commencement of the phase.

Determining obligations and minimum requirements for a participant who is not a member of a group

7
  • (1) Where a participant is not a member of a group at the end of the qualification year for the phase—
  • (a) if the participant has notified the Administrator under article 5(2) of an amount of electricity or gas supplied in the qualification year for the phase which is less than the qualifying supply, the Administrator must determine the participant’s home-heating cost reduction obligation, solid wall minimum requirement and EFG minimum requirement for the phase to be zero;
  • (b) if the participant has notified the Administrator under article 5(2) of an amount of electricity or gas supplied in the qualification year for the phase which is equal to or greater than the qualifying supply—
  • (i) the Administrator must determine the participant’s home-heating cost reduction obligation and EFG minimum requirement for the phase in accordance with the following formula—

A x Tp / T;

  • (ii) the Administrator must determine the participant’s solid wall minimum requirement for the phase, as the number of domestic premises equal to the result of the following formula—

Hp / 2,492, expressed as the nearest integer, rounding 0.5 up to the next integer.

  • (2) In paragraph (1)(b)(i)—
  • (a) “A” is the value given for the obligation or requirement in the following table—
Obligation or requirement Value
Home-heating cost reduction obligation £28,037,500
EFG minimum requirement £19,487,500
  • (b) “Tp” is the amount of electricity or gas supplied in the qualification year for the phase by the participant as determined, for each phase, in accordance with article 9(2);
  • (c) “T” is the total amount of electricity or gas, as applicable, supplied in the qualification year for the phase by all participants as determined, for each phase, in accordance with article 9(4).
  • (3) In paragraph (1)(b)(ii), “Hp” is the participant’s home-heating cost reduction obligation for the phase.

Determining obligations and minimum requirements for a participant who is a member of a group

8
  • (1) Where a participant is a member of a group at the end of the qualification year for the phase—
  • (a) if the participant has notified the Administrator under article 5(3) of an amount of electricity or gas supplied by the group in the qualification year for the phase which is less than the qualifying supply, the Administrator must determine the participant’s home-heating cost reduction obligation, solid wall minimum requirement and EFG minimum requirement for the phase to be zero;
  • (b) if the participant has notified the Administrator under article 5(3) of an amount of electricity or gas supplied by the group in the qualification year for the phase which is equal to or greater than the qualifying supply—
  • (i) the Administrator must determine the participant’s home-heating cost reduction obligation and EFG minimum requirement for the phase in accordance with the following formula—

(A x Tg / T) x (B / C);

  • (ii) the Administrator must determine the participant’s solid wall minimum requirement for the phase, as the number of domestic premises equal to the result of the following formula—

Hp / 2,492, expressed as the nearest integer, rounding 0.5 up to the next integer.

  • (2) In paragraph (1)(b)(i)—
  • (a) “A” and “T” have the same meaning as in article 7;
  • (b) “Tg” is the amount of electricity or gas, as applicable, supplied in the qualification year for the phase by the group of which the participant is a member as determined, for each phase, in accordance with article 9(3);
  • (c) “B” is the amount of electricity or gas notified by the participant under article 5(2) for the qualification year for the phase;
  • (d) “C” is the amount of electricity or gas notified by the participant under article 5(3) as supplied in the qualification year for the phase by the group of which the participant is a member.
  • (3) In paragraph (1)(b)(ii), “Hp” is the participant’s home-heating cost reduction obligation for the phase.

Determining supply of gas or electricity

9
  • (1) This article applies for the purposes of articles 7 and 8 (determining obligations and minimum requirements).
  • (2) The amount of electricity or gas supplied by a participant in a qualification year for each phase is the amount of electricity or gas notified by the participant under article 5(2) for the qualification year, but deducting an amount equal to 50% of the qualifying supply for the phase.
  • (3) The amount of electricity or gas supplied by a group in a qualification year for each phase is the amount of electricity or gas notified by a participant under article 5(3) as supplied in the qualification year by the group of which the participant is a member, but deducting an amount equal to 50% of the qualifying supply for the phase.
  • (4) The total amount of electricity or gas supplied in a qualification year for each phase by all participants is the sum of—
  • (a) all the electricity or gas supplied in the qualification year by participants that are not members of a group at the end of the qualification year, as determined in accordance with paragraph (2); and
  • (b) all the electricity or gas supplied in the qualification year by groups, as determined in accordance with paragraph (3).
  • (5) In paragraph (4)—
  • (a) in sub-paragraph (a), the reference to “participants” does not include those participants where the amount of electricity or gas, as applicable, notified under article 5(2) as supplied by the participant in the qualification year is less than the qualifying supply for the phase;
  • (b) in sub-paragraph (b), the reference to “groups” does not include those groups where the amount of electricity or gas, as applicable, notified under article 5(3) as supplied by the group in the qualification year is less than the qualifying supply for the phase.

PART 4 — Achievement of obligations

Achievement of total home-heating cost reduction obligation

10
  • (1) A participant must achieve its total home-heating cost reduction obligation by no later than 31st December 2026.
  • (2) A participant must achieve its total home-heating cost reduction obligation by promoting qualifying actions.
  • (3) But a participant may not rely on a qualifying action for the purpose of achieving its total home-heating cost reduction obligation if doing so would result in—
  • (a) more than 50% of the participant’s total home-heating cost reduction obligation being achieved by qualifying actions which are—
  • (i) qualifying actions by virtue of meeting any of the conditions in articles 17 to 21;
  • (ii) qualifying actions by virtue of satisfying Condition B in article 11(3) of this Order and which meet the condition in article 17 of the 2018 Order; or
  • (iii) ECO3 qualifying actions by virtue of meeting the condition in article 17 of the 2018 Order; or
  • (b) more than 12.5% of the participant’s total home-heating cost reduction obligation being achieved by qualifying actions which are part of an ECO4 project that does not meet the requirements of article 49 (requirements for a full project score).
  • (4) In achieving its total home-heating cost reduction obligation, a participant must also—
  • (a) subject to paragraph (5), promote solid wall actions at sufficient domestic premises to meet its total solid wall minimum requirement; and
  • (b) promote sufficient qualifying actions, other than surplus actions, in-fill measures and ECO3 interim delivery actions, at private domestic premises that have a SAP band of E, F or G to meet its total EFG minimum requirement.
  • (5) For the purposes of paragraph (4)(a), where the participant has promoted one or more ECO3 solid wall insulation actions which are surplus actions (“the relevant surplus actions”), the total number of domestic premises at which the relevant surplus actions are to be treated as having been installed is the number of domestic premises equal to the result of the following formula[^f00041]—

T / £12,000.

  • (6) For the purposes of paragraph (5)—
  • (a) the result of the formula is to be expressed to the nearest £1, rounding 50 pence up to the next £1;
  • (b) in respect of the result of the formula, each £1 equates to one domestic premises;
  • (c) “ECO3 solid wall insulation action” means an ECO3 qualifying action falling within paragraph (a) of the definition of “solid wall action” in article 11(5) of the 2018 Order;
  • (d) “T” is the sum of the ECO3 cost savings attributable to each relevant surplus action.

PART 5 — Qualifying actions

CHAPTER 1 — General criteria for qualifying actions

Qualifying actions: overview

11
  • (1) A qualifying action is a measure which satisfies Condition A, B or C in this article.
  • (2) Condition A is that the Administrator is satisfied that the measure—
  • (a) meets the requirements of article 12 (general requirements);
  • (b) meets the condition—
  • (i) in any one of articles 13 to 21 (ECO4 project measures); or
  • (ii) in article 22 or 23 (in-fill measures);
  • (c) where it is a heating measure—
  • (i) other than where it is a measure falling within sub-paragraph (b)(ii), meets the minimum insulation requirement in article 24 or 25; and
  • (ii) meets the requirements of article 26 (additional requirements to be met by heating measures);
  • (d) meets the requirements of article 31 (installation standards, consumer protection and smart meter advice); and
  • (e) is notified to the Administrator in accordance with article 43.
  • (3) Condition B (which relates to ECO3 interim delivery actions) is that the Administrator is satisfied that the measure—
  • (a) is completed on or after 1st April 2022 and before 1st July 2022;
  • (b) meets the requirements set out in article 13(1)(a), (b), (d), (e) and (g) of the 2018 Order;
  • (c) meets the requirements of article 31(1)(b) or (c);
  • (d) is not—
  • (i) a demonstration action;
  • (ii) the installation of equipment for the generation of heat wholly or partly from biofuel, oil or liquefied petroleum gas, unless the measure is a repair;
  • (iii) the installation of a connection to a district heating system that delivers heat generated wholly or partly from biofuel, oil or liquefied petroleum gas; or
  • (iv) a repair other than—
  • (aa) a repair of a renewable heating system;
  • (bb) a repair of an efficient boiler or an efficient electric storage heater; or
  • (cc) a repair of equipment for the generation of heat wholly or partly from biofuel, oil or liquefied petroleum gas; and
  • (e) is notified to the Administrator in accordance with article 43.
  • (4) Condition C is that the measure is a surplus action.

Qualifying actions: general requirements relating to Condition A

12
  • (1) The requirements referred to in article 11(2)(a) in relation to Condition A are that the measure—
  • (a) is installed at domestic premises;
  • (b) results in the reduction in the cost of heating those premises to 21 degrees Celsius in the main living areas and 18 degrees Celsius in all other areas, or in the case of a data light measure, is reasonably expected to result in such a reduction;
  • (c) is completed on or after 1st April 2022 and before 1st January 2027;
  • (d) except in the case of a repair, is installed at—
  • (i) premises erected before 1st April 2022; or
  • (ii) premises which were first occupied as domestic premises before the day on which the installation is completed;
  • (e) is not funded by any grant from public funds ... given under—
1.

the Social Housing Decarbonisation Fund,

2.

the Boiler Upgrade Scheme,

3.

the Home Upgrade Grant,

4.

the Green Homes Grant: Local Authority Delivery,

5.

the Green Homes Grant: Voucher Scheme,

6.

the Warm Homes: Local Grant,

7.

the Warm Homes: Social Housing Fund,

8.

the Scottish Government’s Home Energy Scotland Grant and Loan Scheme,

9.

the Scottish Government’s Warmer Homes Scotland Scheme,

10.

the Scottish Government’s Area Based Schemes,

11.

the Scottish Government’s Social Housing Net Zero Heat Fund,

12.

the Welsh Government’s Optimised Retrofit Programme,

13.

the Welsh Government’s Warm Homes Nest Scheme

  • (f) either—
  • (i) forms part of an ECO4 project which—
  • (aa) meets the requirement concerning the assessment of energy efficiency in paragraph (2); and
  • (bb) does not include an in-fill measure, ECO3 interim delivery action or surplus action; or
  • (ii) is an in-fill measure which meets the requirement concerning the assessment of energy efficiency in paragraph (3) ; and
  • (g) is not a measure notified to the Administrator in accordance with article 25 of the Electricity and Gas (Energy Company Obligation) Order 2023.
  • (2) An ECO4 project meets the requirement concerning the assessment of energy efficiency if—
  • (a) where the project is an ECO4 project which consists of a district heating connection only or a district heating connection and one or more novel data light measures only—
  • (i) a SAP assessment is performed before the day on which the first measure in the project is completed for the purpose of calculating the SAP rating of the premises; and
  • (ii) a pre-installation EPC is issued for the premises;
  • (b) where the project is an ECO4 project which consists of one or more novel data light measures only—
  • (i) an RdSAP assessment is performed before the day on which the first measure in the project is completed for the purpose of calculating the SAP rating of the premises; and
  • (ii) a pre-installation EPC is issued for the premises;
  • (c) where the project is an ECO4 project which does not fall within sub-paragraph (a) or (b), an RdSAP assessment is performed before the day on which the first measure in the project is completed for the purpose of calculating the SAP rating of the premises.
  • (3) An in-fill measure meets the requirement concerning the assessment of energy efficiency if—
  • (a) where the in-fill measure is a district heating connection—
  • (i) a SAP assessment is performed before the day on which the in-fill measure is completed for the purpose of calculating the SAP rating of the premises; and
  • (ii) a pre-installation EPC is issued for the premises;
  • (b) where the in-fill measure does not fall within sub-paragraph (a), an RdSAP assessment is performed before the day on which the in-fill measure is completed for the purpose of calculating the SAP rating of the premises.
  • (4) In paragraphs (2) and (3), references to a “district heating connection” do not include a connection to a district heating system that uses a shared ground loop.
  • (5) In this article, “grant from public funds” means a grant made by a public authority or by any person distributing funds on behalf of a public authority.

CHAPTER 2 — Measures which are part of ECO4 projects

SECTION 1 — Projects at domestic premises occupied by help to heat group member or social housing

Measures installed at owner-occupied premises

13
  • (1) A measure meets the condition in this article if—
  • (a) the measure is installed as part of an ECO4 project at owner-occupied premises for which the pre-project SAP band is band D, E, F or G; and
  • (b) the premises meet the household eligibility requirement specified in paragraph (2).
  • (2) The household eligibility requirement is that the premises are occupied by a member of the help to heat group at any time within the 12 month period ending with the day on which the measure is completed.

Measures installed at private rented premises

14
  • (1) A measure meets the condition in this article if—
  • (a) the measure is installed as part of an ECO4 project at private rented premises for which the pre-project SAP band is band E, F or G;
  • (b) the premises meet the household eligibility requirement specified in article 13(2); and
  • (c) the measure is—
  • (i) solid wall insulation;
  • (ii) a renewable heating system, except where it replaces a renewable heating system of the same kind at the domestic premises;
  • (iii) a first time heating system;
  • (iv) a district heating connection; or
  • (v) an insulation measure installed in order to meet the minimum insulation requirement in article 24 or 25 in relation to a heating measure falling within paragraphs (ii) to (iv).
  • (2) A measure also meets the condition in this article if—
  • (a) the measure is installed as part of the same ECO4 project as a measure which is a qualifying action by virtue of meeting the condition in paragraph (1); and
  • (b) the measure is not the repair or replacement of—
  • (i) a boiler;
  • (ii) a central heating system; or
  • (iii) an electric storage heater.

Measures installed at band D social housing

15

A measure meets the condition in this article if—

  • (a) the measure is installed as part of an ECO4 project at social housing for which the pre-project SAP band is band D; and
  • (b) the measure is—
  • (i) an innovation measure; or
  • (ii) an insulation measure installed in order to meet the minimum insulation requirement in article 24 or 25 in relation to a heating measure falling within sub-paragraph (i).

Measures installed at band E, F or G social housing

16

A measure meets the condition in this article if—

  • (a) the measure is installed as part of an ECO4 project at social housing for which the pre-project SAP band is band E, F or G; and
  • (b) the measure is—
  • (i) an insulation measure;
  • (ii) a renewable heating system, except where it replaces a renewable heating system of the same kind at the domestic premises;
  • (iii) a first time heating system;
  • (iv) a district heating connection; or
  • (v) an innovation measure.

SECTION 2 — Projects accompanied by declaration from a relevant authority or participant

Measures accompanied by a declaration from a relevant authority: household income below £31,000

17
  • (1) A measure meets the condition in this article if—
  • (a) the measure is installed as part of an ECO4 project at private domestic premises;
  • (b) before the day on which the measure is completed, a relevant authority is consulted on the carrying out of the project at the premises;
  • (c) the relevant authority makes a declaration which—
  • (i) meets the validity requirement specified in paragraph (2); and
  • (ii) certifies that, having exercised all due diligence, it is satisfied that—
  • (aa) the premises are occupied by a household living on a gross income of less than £31,000 per year; and
  • (bb) the amount of the gross income of that household has been verified by the relevant authority; and
  • (d) the measure would have met the condition in article 13 or 14 if paragraph (1)(b) in each of those articles were omitted (the household eligibility requirement).
  • (2) The validity requirement is that the declaration is made—
  • (a) on or after the day on which the relevant authority has published a statement of intent on its website; and
  • (b) within the 12 month period ending with the day immediately preceding the day on which the measure is completed.
  • (3) For the purposes of paragraph (1), the relevant authority may verify the amount of a household’s gross income in any way the relevant authority considers to be appropriate provided that it does not rely on a self-declaration given by any member of that household.

Measures accompanied by a declaration from a relevant authority: premises meeting specified criteria

18
  • (1) A measure meets the condition in this article if—
  • (a) the measure is installed as part of an ECO4 project at private domestic premises for which the pre-project SAP band is band E, F or G;
  • (b) before the day on which the measure is completed, a relevant authority is consulted on the carrying out of the project at the premises;
  • (c) the relevant authority makes a declaration which—
  • (i) meets the validity requirement specified in article 17(2); and
  • (ii) subject to paragraph (3), certifies that, having exercised all due diligence, it is satisfied that the premises meets at least two of the criteria specified in paragraph (2); and
  • (d) the measure would have met the condition in article 13 or 14 if paragraph (1)(b) in each of those articles were omitted (the household eligibility requirement).
  • (2) The criteria specified in this paragraph are—
  • (a) the premises are in—
  • (i) in the case of premises in England, an area which is identified as a “Lower-layer Super Output Area” in the first, second or third decile on the English Indices of Deprivation 2019 published in September 2019 by the Ministry of Housing, Communities and Local Government[^f00042];
  • (ii) in the case of premises in Wales, an area which is identified as a “Lower-layer Super Output Area” in the first, second or third decile on the Welsh Index of Multiple Deprivation 2019 published in November 2019 by the Welsh Government[^f00043];
  • (iii) in the case of premises in Scotland, an area which is identified as a “data zone” in the first, second or third decile on the Scottish Index of Multiple Deprivation 2020 published in April 2020 by the Scottish Government[^f00044];
  • (b) a person living at the premises is considered to be vulnerable to the cold—
  • (i) under the guideline entitled “Excess winter deaths and illness and the health risks associated with cold homes” published by the National Institute for Health and Care Excellence on 5th March 2015[^f00045] (“NICE Guideline NG6”); and
  • (ii) for a reason other than their low income (see recommendation 2 of NICE Guideline NG6);
  • (c) a person living at the premises is entitled to a council tax reduction on the grounds of low income;
  • (d) a child living at the premises is eligible for free school meals under—
  • (i) section 512ZB(4) of the Education Act 1996[^f00046]; or
  • (ii) section 53 of the Education (Scotland) Act 1980[^f00047];
  • (e) a person living at the premises is supported by a scheme established by the relevant authority to support people living on a low income and who would be considered to be vulnerable to the cold under NICE Guideline NG6;
  • (f) a person living at the premises has been referred to the relevant authority for support by their electricity or gas supplier, Citizens Advice or Citizens Advice Scotland[^f00048] because they have been identified by the referrer as struggling to pay their electricity or gas bills.
  • (3) For the purposes of the declaration referred to in paragraph (1)(c)—
  • (a) where the relevant authority is relying on only two criteria specified in paragraph (2), those two criteria must not be the criteria specified in paragraph (2)(a) and (b); and
  • (b) where the relevant authority is relying on the criterion specified in paragraph (2)(e), the statement of intent published by the Authority must describe the scheme relied on for the purpose of meeting that criterion.

Measures accompanied by a declaration from a relevant authority: referral from a relevant health provider

19
  • (1) A measure meets the condition in this article if—
  • (a) the measure is installed as part of an ECO4 project at private domestic premises;
  • (b) before the day on which the measure is completed, a relevant authority is consulted on the carrying out of the project at the premises;
  • (c) the relevant authority makes a declaration which certifies that it has received a referral from a relevant health provider, in relation to a person living at the premises, on the grounds that—
  • (i) the person is suffering from severe or long-term ill-health due to—
  • (aa) a cardiovascular condition;
  • (bb) a respiratory disease;
  • (cc) immunosuppression; or
  • (dd) limited mobility; and
  • (ii) the health of the person is adversely affected by living in a cold home;
  • (d) the declaration referred to in sub-paragraph (c) meets the validity requirement specified in article 17(2); and
  • (e) the measure would have met the condition in article 13 or 14 if paragraph (1)(b) in each of those articles were omitted (the household eligibility requirement).
  • (2) In paragraph (1)(c), “relevant health provider” means—
  • (a) a person registered in the General Practitioner Register kept by the General Medical Council under section 34C of the Medical Act 1983[^f00049];
  • (b) a Health Board constituted by an order made under section 2(1)(a) of the National Health Service (Scotland) Act 1978[^f00050];
  • (c) a Local Health Board established by an order made under section 11 of the National Health Service (Wales) Act 2006[^f00051];
  • (d) an NHS foundation trust within the meaning given in section 30 of the National Health Service Act 2006[^f00052];
  • (e) an NHS trust established by order under section 25 of the National Health Service Act 2006.

Measures accompanied by a declaration from a participant: debt, discretionary credit and self-disconnection

20
  • (1) A measure meets the condition in this article if—
  • (a) the measure is installed as part of an ECO4 project at private domestic premises for which the pre-project SAP band is band E, F or G;
  • (b) the participant promoting the measure makes a declaration which certifies that, having exercised all due diligence, it is satisfied that—
  • (i) the requirements specified in paragraph (2) are met; and
  • (ii) at least one of the criteria specified in article 18(2)(a) to (d) is met;
  • (c) the declaration referred to in sub-paragraph (b) is made within the 12 month period ending with the day immediately preceding the day on which the measure is completed; and
  • (d) the measure would have met the condition in article 13 or 14 if paragraph (1)(b) in each of those articles were omitted (the household eligibility requirement).
  • (2) The specified requirements are—
  • (a) where consumption of gas or electricity at the premises in question is paid for by a pre-payment meter—
  • (i) the pre-payment meter has, on at least one occasion during the period of 13 weeks ending with the day on which the declaration referred to in paragraph (1)(b) is made, held no credit with which to pay for the supply of gas or electricity; or
  • (ii) a person living at the premises—
  • (aa) has received discretionary credit from the participant on at least one occasion during the period of 13 weeks ending with the day on which the declaration referred to in paragraph (1)(b) is made;
  • (bb) is in a debt repayment plan with the participant; or
  • (cc) is repaying debt owed to the participant through third party deductions;
  • (b) where consumption of gas or electricity at the premises is paid for otherwise than by a pre-payment meter—
  • (i) a person living at the premises has been in debt to the participant for a period of more than 13 weeks ending with the day on which the declaration referred to in paragraph (1)(b) is made; and
  • (ii) that person is—
  • (aa) in a debt repayment plan with the participant; or
  • (bb) repaying debt owed to the participant through third party deductions.
  • (3) In paragraph (2)—
  • discretionary credit” means, in relation to a pre-payment meter, a payment which— is intended to allow the consumption of gas or electricity at the domestic premises to resume or continue; and is to be repaid;
  • “third party deductions” are deductions made from benefit in accordance with paragraph 6 of Schedule 9 to the Social Security (Claims and Payments) Regulations 1987[^f00053].

Measures accompanied by a declaration from a relevant authority or participant: Secretary of State approval

21
  • (1) A measure meets the condition in this article if—
  • (a) the measure is installed as part of an ECO4 project at private domestic premises;
  • (b) before the day on which the measure is completed—
  • (i) a relevant authority is consulted on the carrying out of the project at the premises;
  • (ii) the relevant authority makes an application to the Secretary of State in respect of the measure;
  • (iii) the application includes the information specified in paragraph (3);
  • (iv) the application is approved by the Secretary of State; and
  • (v) the relevant authority makes a declaration which meets the requirements of paragraph (4); and
  • (c) the measure would have met the condition in article 13 or 14 if paragraph (1)(b) in each of those articles were omitted (the household eligibility requirement).
  • (2) A measure also meets the condition in this article if—
  • (a) the measure is installed as part of an ECO4 project at private domestic premises for which the pre-project SAP band is band E, F or G;
  • (b) before the day on which the measure is completed—
  • (i) the participant promoting the measure makes an application to the Secretary of State in respect of the measure;
  • (ii) the application includes the information specified in paragraph (3);
  • (iii) the application is approved by the Secretary of State; and
  • (iv) the participant makes a declaration which meets the requirements of paragraph (4); and
  • (c) the measure would have met the condition in article 13 or 14 if paragraph (1)(b) in each of those articles were omitted.
  • (3) The information specified in this paragraph is—
  • (a) a description of the measure;
  • (b) the criteria used by the relevant authority or the participant to identify domestic premises at which the installation of the measure may be promoted (“the criteria”);
  • (c) evidence that over 50% of the premises that meet the criteria are not occupied by a member of the help to heat group, and that—
  • (i) at least 75% of the premises that meet the criteria are owner-occupied premises occupied by at least one person living in fuel poverty; or
  • (ii) at least 90% of the premises that meet the criteria are private rented premises occupied by at least one person living in fuel poverty;
  • (d) evidence that the criteria are more effective at identifying premises in which a person is living in fuel poverty than—
  • (i) a requirement that the premises are occupied by a household living on a gross income of less than £31,000 per year;
  • (ii) any combination of two of the criteria specified in article 18(2); and
  • (iii) the requirements specified in article 20(2).
  • (4) A declaration meets the requirements of this paragraph if—
  • (a) it certifies that, having exercised all due diligence, the person making the declaration is satisfied that the premises at which the measure is installed meet the criteria set out in the application approved by the Secretary of State;
  • (b) it is made within the 12 month period ending with the day immediately preceding the day on which the measure is completed; and
  • (c) in the case of a declaration made by a relevant authority, it is made on or after the day on which the relevant authority has published a statement of intent on its website.
  • (5) In paragraph (3), references to a person living in fuel poverty are to be construed in accordance with section 15(2) of the Energy Act 2010[^f00054].

CHAPTER 3 — In-fill measures

In-fill measures in flats

22
  • (1) A measure is a “flat in-fill measure” and meets the condition in this article if—
  • (a) it is installed at a domestic premises which is a flat;
  • (b) it is one of the following measures—
  • (i) solid wall insulation;
  • (ii) insulation of a cavity wall;
  • (iii) a district heating connection;
  • (c) it is linked with one other measure (“the primary measure”) which is—
  • (i) the same kind of measure as the flat in-fill measure;
  • (ii) promoted by the same participant that promoted the flat in-fill measure; and
  • (iii) installed at separate domestic premises in the same block of flats (that is, a building which contains two or more flats) as the flat in-fill measure; and
  • (d) the primary measure with which the flat in-fill measure is linked is a qualifying action by virtue of any of articles 13 to 21.
  • (2) For the purposes of paragraph (1)(c)—
  • (a) a flat in-fill measure is linked with a primary measure if—
  • (i) the flat in-fill measure is completed during the three month period beginning with the day on which the primary measure is completed;
  • (ii) the flat in-fill measure is notified under article 43 on the same day as, or after, the notification of the primary measure under that article;
  • (iii) when notifying the flat in-fill measure under article 43, the participant includes information sufficient to enable the Administrator to identify the primary measure with which it is to be linked; and
  • (iv) the ECO4 project containing the primary measure does not include any primary measure that is already linked with another in-fill measure;
  • (b) a primary measure is the same kind of measure as a flat in-fill measure if—
  • (i) both are solid wall insulation;
  • (ii) both are insulation of a cavity wall; or
  • (iii) both are district heating connections.
  • (3) In this article, “flat”—
  • (a) in respect of domestic premises in England and Wales, has the same meaning as in the Building Regulations 2010[^f00055];
  • (b) in respect of domestic premises in Scotland, has the same meaning as in the Building (Scotland) Regulations 2004[^f00056] and also includes a maisonette, as defined in those Regulations.

In-fill measures in houses

23
  • (1) A measure is a “house in-fill measure” and meets the condition in this article if—
  • (a) it is installed at a house which is a domestic premises to which paragraph (2) applies;
  • (b) it is either—
  • (i) solid wall insulation; or
  • (ii) a district heating connection;
  • (c) it is linked with three other measures (“the primary measures”) which are—
  • (i) the same kind of measure as the house in-fill measure;
  • (ii) promoted by the same participant that promoted the house in-fill measure; and
  • (iii) installed at three separate domestic premises on the same street as the house in-fill measure; and
  • (d) the primary measures with which the house in-fill measure is linked are qualifying actions by virtue of any of articles 13 to 21.
  • (2) This paragraph applies to domestic premises if—
  • (a) where the measure installed is solid wall insulation, the pre-installation SAP band is band D, E, F or G; or
  • (b) where the measure installed is a district heating connection—
  • (i) a pre-installation EPC expresses the energy performance rating of the premises as band D, E, F or G; and
  • (ii) a relevant person confirms in writing that, to the best of that person’s knowledge and belief, no changes were made to the premises, after that pre-installation EPC was issued and before the measure was completed, which would increase the energy performance rating of the premises to band A, B or C.
  • (3) For the purposes of paragraph (1)(c)—
  • (a) a house in-fill measure is linked with the primary measures if—
  • (i) the house in-fill measure is completed during the three month period beginning with the day on which the last of the primary measures is completed;
  • (ii) the house in-fill measure is notified under article 43 on the same day as, or after, the notification of the primary measures under that article;
  • (iii) when notifying the house in-fill measure under article 43, the participant includes information sufficient to enable the Administrator to identify the primary measures with which it is to be linked; and
  • (iv) the ECO4 projects containing the primary measures do not include any primary measures that are already linked with another in-fill measure;
  • (b) a primary measure is the same kind of measure as a house in-fill measure if—
  • (i) both are solid wall insulation; or
  • (ii) both are district heating connections.
  • (4) In this article—
  • house” means a domestic premises that is not a flat, where “flat” has the same meaning as in article 22(3);
  • pre-installation SAP band” means, in relation to domestic premises where a measure is installed, the SAP band which is determined for the premises pursuant to the RdSAP assessment performed in accordance with article 12(3)(b) before the day on which the measure is completed;
  • relevant person” means— in relation to private domestic premises, an owner or occupier of the premises; in relation to social housing, the social landlord of the premises.

CHAPTER 4 — Requirements for heating measures

SECTION 1 — Minimum insulation requirement for heating measures

Minimum insulation requirement for certain band D premises

24
  • (1) This article applies where a heating measure—
  • (a) is installed as part of an ECO4 project at domestic premises for which the pre-project SAP band is band D; and
  • (b) is not a first time heating system or a district heating connection.
  • (2) Where this article applies, the minimum insulation requirement is met in respect of the heating measure if—
  • (a) at least one insulation measure specified in paragraph (3) is installed—
  • (i) as part of the same ECO4 project as the heating measure;
  • (ii) before the day on which the heating measure is completed; and
  • (iii) in accordance with the prescribed standards; or
  • (b) all the insulation measures specified in paragraph (3), so far as relevant to the premises, are installed at the premises—
  • (i) before the day on which the heating measure is completed; and
  • (ii) in a manner that would meet the prescribed standards applicable if the insulation measures had been first installed on the day immediately preceding the day on which the heating measure is completed.
  • (3) The insulation measures specified in this paragraph are—
  • (a) insulation of the floor area of the lowest storey of the premises containing a habitable room;
  • (b) insulation of a cavity wall which divides the premises from other premises under different occupation;
  • (c) insulation of the exterior facing walls of the premises;
  • (d) where the premises include the top floor of the building in which they are located—
  • (i) insulation of the walls and ceiling of a room in the roof space of the premises; or
  • (ii) insulation of the roof area of the premises, by means of pitched roof or flat roof insulation;
  • (e) where the premises are a mobile home, insulation of the floor, walls and ceiling of the mobile home.
  • (4) For the purposes of paragraph (2)(b), an insulation measure that attracts an exemption under Part 11 in relation to the premises is to be treated as not being relevant to the premises.
  • (5) In this article, “prescribed standards” means—
  • (a) in respect of domestic premises—
  • (i) in England and Wales, the requirements set out in the Building Regulations 2010[^f00057];
  • (ii) in Scotland, the requirements set out in the Building (Scotland) Regulations 2004[^f00058]; and
  • (b) where an insulation measure is installed as part of an ECO4 project, the requirement that either—
  • (i) the insulation measure is installed by, or under the responsibility of, a person who is registered with TrustMark for the purposes of that measure and—
  • (aa) a certificate of lodgement is issued by the operator of TrustMark in respect of that measure; and
  • (bb) the installation adheres to the relevant TrustMark requirements for quality assurance and consumer protection, including installation standards and arrangements for repairs and other remedies, required by virtue of the TrustMark registration; or
  • (ii) the insulation measure—
  • (aa) is installed subject to arrangements for quality assurance and consumer protection, including installation standards and arrangements for repairs and other remedies, which are equivalent to the requirements under TrustMark; and
  • (bb) adheres to those requirements.
  • (6) For the purposes of paragraph (5)(b) the installation is deemed to adhere to the relevant TrustMark or equivalent requirements unless—
  • (a) the measure is referred for failing to meet the relevant requirements to the Administrator by TrustMark or the equivalent person; and
  • (b) that referral is not withdrawn before 1st April 2027.

Minimum insulation requirement for band E, F and G and other band D premises

25
  • (1) This article applies where a heating measure—
  • (a) is installed as part of an ECO4 project at domestic premises for which the pre-project SAP band is band E, F or G; or
  • (b) is—
  • (i) installed as part of an ECO4 project at domestic premises for which the pre-project SAP band is band D; and
  • (ii) is a first time heating system or a district heating connection.
  • (2) Where this article applies, the minimum insulation requirement is met in respect of the heating measure if—
  • (a) before the day on which the heating measure is completed all the insulation measures specified in paragraph (3), so far as relevant to the premises, are installed at the premises; and
  • (b) those insulation measures are installed—
  • (i) where the insulation measures are part of the same ECO4 project as the heating measure, in accordance with the prescribed standards; or
  • (ii) where the insulation measures are not part of the same ECO4 project as the heating measure, in a manner that would meet the prescribed standards applicable if the insulation measures had been first installed on the day immediately preceding the day on which the heating measure is completed.
  • (3) The insulation measures specified in this paragraph are—
  • (a) where the premises are a mobile home, insulation of the floor, walls and ceiling of the mobile home;
  • (b) where the premises are not a mobile home—
  • (i) insulation of the exterior facing cavity walls of the premises; and
  • (ii) where the premises include the top floor of the building in which they are located—
  • (aa) insulation of the walls and ceiling of a room in the roof space of the premises; or
  • (bb) insulation of the roof area of the premises, by means of loft, pitched roof or flat roof insulation.
  • (4) For the purposes of paragraph (2), an insulation measure that attracts an exemption under Part 11 in relation to the premises is to be treated as not being relevant to the premises.
  • (5) In this article, “prescribed standards” has the same meaning as in article 24.

SECTION 2 — Additional requirements for heating measures

Additional requirements to be met by heating measures

26

A heating measure meets the requirements of this article if—

  • (a) it meets the requirements of article 27 (general requirements relating to heating measures); and
  • (b) where the measure is—
  • (i) installed at on-gas premises, it meets the requirements of article 28 (requirements specific to on-gas premises);
  • (ii) installed at off-gas premises, it meets the requirements of article 29 (requirements specific to off-gas premises).

General requirements relating to heating measures

27
  • (1) A heating measure meets the requirements of this article if—
  • (a) the measure is not—
  • (i) the installation of equipment for the generation of heat wholly or partly from coal; or
  • (ii) the installation of a connection to a district heating system that delivers heat generated wholly or partly from coal;
  • (b) where the measure is the installation of equipment for the generation of heat wholly or partly from biofuel, oil or liquefied petroleum gas, the measure—
  • (i) is installed at off-gas premises;
  • (ii) is a repair of a central heating system; and
  • (iii) complies with the off-gas heating hierarchy in article 30;
  • (c) where the measure is the installation of a connection to a district heating system that delivers heat generated wholly or partly from biofuel, oil or liquefied petroleum gas, the measure—
  • (i) is installed at off-gas premises;
  • (ii) is a repair of the district heating connection; and
  • (iii) complies with the off-gas heating hierarchy in article 30;
  • (d) where the measure is the installation of equipment for the generation of heat wholly or partly from mains gas, ... the measure is installed at on-gas premises;
  • (e) where the measure is the installation of an electric storage heater, but is not a repair—
  • (i) the measure has a responsiveness rating equal to, or greater than, 0.8 when assessed against the Standard Assessment Procedure; and
  • (ii) the measure—
  • (aa) replaces an electric heating system at on-gas premises;
  • (bb) is installed at on-gas premises where one or more electric storage heaters are already installed;
  • (cc) is installed at on-gas premises which, immediately prior to the installation of the measure, have neither an efficient heating system nor an inefficient heating system; or
  • (dd) is installed at off-gas premises;
  • (f) where the measure is the installation of an electric heating system, but is not a repair—
  • (i) the measure has a responsiveness rating equal to, or greater than, 0.8 when assessed against the Standard Assessment Procedure; and
  • (ii) the measure—
  • (aa) replaces an electric heating system at on-gas premises;
  • (bb) is installed at on-gas premises where one or more electric storage heaters are already installed;
  • (cc) is installed at on-gas premises which, immediately prior to the installation of the measure, have neither an efficient heating system nor an inefficient heating system; or
  • (dd) is installed at off-gas premises;
  • (g) where the measure is the installation of a central heating system or a district heating connection not referred to in sub-paragraph (f), but is not a repair, the measure is an efficient heating system;
  • (h) where the measure is the installation of a boiler, but is not a repair—
  • (i) it is an efficient boiler; and
  • (ii) where the boiler forms part of a wet central heating system, hydraulic balancing of the central heating system is carried out following the installation of the boiler;
  • (i) where the measure includes the installation of equipment for the generation of electricity by renewable means, the measure is installed at domestic premises—
  • (i) at which there is already installed—
  • (aa) a hydronic heat pump; or
  • (bb) an electric storage heater or an electric heating system that in either case has a responsiveness rating equal to, or greater than, 0.8 when assessed against the Standard Assessment Procedure; or
  • (ii) at which there is installed as part of the same ECO4 project as the measure—
  • (aa) a hydronic heat pump;
  • (bb) an electric storage heater, that meets the requirements of sub-paragraph (e)(i) and (ii); or
  • (cc) an electric heating system, that meets the requirements of sub-paragraph (f)(i) and (ii);
  • (j) where the measure is the installation of equipment for the generation of heat wholly or partly from biomass, the measure—
  • (i) is installed at premises which are in a rural area; and
  • (ii) generates heat from biomass which is wholly woodfuel; and
  • (k) where the measure is the replacement of an efficient boiler with another efficient boiler, the boiler being replaced is broken down and is not economically repairable.
  • (2) In paragraph (1)—
  • hydraulic balancing” means the carrying out of steps to ensure the temperature difference is the same between the inlet and outlet of each radiator, or other heat emitter, in a heating system;
  • mains gas” means a supply of the kind mentioned in section 5(1)(b) of the Gas Act 1986[^f00059];
  • woodfuel” has the same meaning as in paragraph 6 of Schedule 4A to the Renewable Heat Incentive Scheme Regulations 2018[^f00060].

Requirements specific to heating measures installed at on-gas premises

28
  • (1) A heating measure installed at on-gas premises meets the requirements of this article if—
  • (a) where the measure is installed at premises which, immediately prior to the installation of the measure, have an efficient heating system which is not broken down, the measure—
  • (i) is—
  • (aa) a renewable heating system;
  • (bb) a district heating connection;
  • (cc) the installation of heating controls; or
  • (dd) an innovation measure; and

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.