The Sunnica Energy Farm Order 2024
| (1) District | (2) Street | (3) Description of the street works |
|---|---|---|
| West Suffolk District | Beck Road | Cable works beneath the width of the highway for the length shown in purple on sheet 4 of the access and rights of way plans, reference SW-1. |
| West Suffolk District | Ferry Lane | Cable works beneath the width of the highway for the length shown in purple on sheet 4 of the access and rights of way plans, reference SW-2. |
| West Suffolk District | Freckenham Road | Cable works beneath the width of the highway for the length shown in purple on sheets 4 and 5 of the access and rights of way plans, reference SW-3. |
| West Suffolk District | U6006 | Cable works beneath the width of the highway for the length shown in purple on sheet 5 of the access and rights of way plans, reference SW-4. |
| West Suffolk District | U6006 | Cable works beneath the width of the highway for the length shown in purple on sheet 5 of the access and rights of way plans, reference SW-5. |
| West Suffolk District | Newmarket Road | Cable works beneath the width of the highway for the length shown in purple on sheet 6 of the access and rights of way plans, reference SW-6. |
| West Suffolk District | Elms Road | Cable works beneath the width of the highway for the length show in purple on sheet 7 of the access and rights of way plans, reference SW-7. |
| West Suffolk District | W-257/003/0 | Cable works beneath the width of the highway for the length shown in purple on sheet 8 of the access and rights of way plans, reference SW-8. |
| East Cambridgeshire District | 49/7 | Cable works beneath the width of the highway for the length shown in purple on sheet 8 of the access and rights of way plans, reference SW-9. |
| East Cambridgeshire District | B1085 | Cable works beneath the width of the highway for the length shown in purple on sheet 9 of the access and rights of way plans, reference SW-10. |
| East Cambridgeshire District | A11 | Cable works beneath the width of the highway for the length shown in purple on sheet 10 of the access and rights of way plans, reference SW-13. |
| East Cambridgeshire District | A11 | Cable works beneath the width of the highway for the length shown in purple on sheets 10 and 11 of the access and rights of way plans, reference SW-14. |
| East Cambridgeshire District | La Hogue Road | Cable works beneath the width of the highway for the length shown in purple on sheets 10 and 11 of the access and rights of way plans, reference SW-12. |
| East Cambridgeshire District | La Hogue Road | Cable works beneath the width of the highway for the length shown in purple on sheet 11 of the access and rights of way plans, reference SW-11. |
| East Cambridgeshire District | Chippenham Road | Cable works beneath the width of the highway for the length shown in purple on sheet 14 of the access and rights of way plans, reference SW-15. |
| East Cambridgeshire District | 204/1 | Cable works beneath the width of the highway for the length shown in purple on sheet 15 of the access and rights of way plans, reference SW-16. |
| East Cambridgeshire District | Newmarket Road | Cable works beneath the width of the highway for the length shown in purple on sheet 16 of the access and rights of way plans, reference SW-17. |
| East Cambridgeshire District | A142 | Cable works beneath the width of the highway within Order limits, including its roundabout junction with Newmarket Road, for the length shown in purple on sheet 16 of the access and rights of way plans, reference SW-18. |
| East Cambridgeshire District | 92/19 | Cable works beneath the width of the highway for the length shown in purple on sheet 16 of the access and rights of way plans, reference SW-19. |
| East Cambridgeshire District | 92/19 | Cable works beneath the width of the highway for the length shown in purple on sheet 16 of the access and rights of way plans, reference SW-20. |
| East Cambridgeshire District | Ness Road | Cable works beneath the width of the highway for the length shown in purple on sheets 17 and 18 of the access and rights of way plans, reference SW-21. |
| East Cambridgeshire District | Broads Road | Cable works beneath the width of the highway for the length shown in purple on sheet 18 of the access and rights of way plans, reference SW-22. |
| East Cambridgeshire District | First Drove and 35/10 | Cable works beneath the width of the boundary the highway for the length shown in purple on sheet 18 of the access and rights of way plans, reference SW-23. |
| East Cambridgeshire District | 35/11 | Cable works beneath the width of the highway for the length shown in purple on sheet 18 of the access and rights of way plans, reference SW-24. |
| East Cambridgeshire District | Little Fen Drove | Cable works beneath the width of the highway for the length shown in purple on sheet 19 of the access and rights of way plans, reference SW-25. |
| East Cambridgeshire District | 35/6 | Cable works beneath the width of the highway for the length shown in purple on sheet 19 of the access and rights of way plans, reference SW-26. |
| East Cambridgeshire District | 35/7 | Cable works beneath the width of the highway for the length shown in purple on sheets 19 and 20 of the access and rights of way plans, reference SW-27. |
| East Cambridgeshire District | Newnham Drove | Cable works beneath the width of the highway for the length shown in purple on sheet 20 of the access and rights of way plans, reference SW-28. |
| East Cambridgeshire District | Weirs Drove | Cable works beneath the width of the highway for the length shown in purple on sheet 20 of the access and rights of plans, reference SW-29. |
SCHEDULE 5 — ALTERATION OF STREETS
PART 1 — PERMANENT ALTERATION OF LAYOUT
| (1) District | (2) Street name and maintenance | (3) Description of alteration |
|---|---|---|
| West Suffolk District | C603 Freckenham Road (part publicly maintained part privately maintained) | Works for the provision of a permanent means of access to the authorised development within the area shown hatched orange on sheets 1 and 4 of the access and rights of way plans, reference AS-4. |
| West Suffolk District and East Cambridgeshire District | Beck Road (publicly maintained) | Works for the provision of a permanent means of access to the authorised development within the area shown hatched orange on sheets 2 and 3 of the access and rights of way plans, reference AS-1. |
| West Suffolk District | Beck Road (publicly maintained) | Works for the provision of a permanent means of access to the authorised development within the area shown hatched orange on sheets 2 and 3 of the access and rights of way plans, reference AS-2. |
| West Suffolk District | Beck Road (publicly maintained) | Works for the provision of a permanent means of access to the authorised development within the area shown hatched orange on sheets 3 and 4 of the access and rights of way plans, reference AS-3. |
| West Suffolk District | U6006 (publicly maintained) | Works for the provision of a permanent crossing of the U6006 within the area shown hatched orange on the sheet 5 of the access and rights of way plans, reference AS-8. |
| West Suffolk District | U6006 (publicly maintained) | Works for the provision of a permanent crossing of the U6006 within the area shown hatched orange on sheet 5 of the access and rights of way plans, reference AS-9 |
| West Suffolk District | Newmarket Road (publicly maintained) | Works for the provision of a permanent means of access to the authorised development within the area shown hatched orange on sheet 6 of the access and rights of way plans, reference AS-10 |
| West Suffolk District | Elms Road (part publicly maintained part privately maintained) | Works for the provision of two permanent means of access to the authorised development and for the widening of Elms Road within the area shown hatched orange on sheet 7 of the access and rights of way plans, reference AS-13. |
| West Suffolk District | Elms Road (part publicly maintained part privately maintained) | Works for the provision of a permanent means of access to the authorised development and for the widening of Elms Road within the area shown hatched orange on sheet 7 of the access and rights of way plans, reference AS-14. |
| East Cambridgeshire District | Dane Hill Road (part publicly maintained part privately maintained) | Works for the provision of a permanent means of access to the authorised development within the area shown hatched orange on sheet 10 of the access and rights of way plans, reference AS-17. |
| East Cambridgeshire District | La Hogue Road (part publicly maintained part privately maintained) | Works for the provision of a permanent means of access to the authorised development within the area shown hatched orange on sheets 11 and 12 of the access and rights of way plans, reference AS-19. |
| East Cambridgeshire District | Chippenham Road (publicly maintained) | Works for the provision of a permanent means of access to the authorised development within the area shown hatched orange on sheet 14 of the access and rights of way plans, reference AS-21. |
| East Cambridgeshire District | Newnham Drove (publicly maintained) | Works for the provision of a permanent means of access to the authorised development within the area shown hatched orange on sheet 20 of the access and rights of way plans, reference AS-34. |
| East Cambridgeshire District | Weirs Drove (publicly maintained) | Works for the provision of a permanent means of access to the authorised development within the area shown hatched orange on sheet 20 of the access and rights of way plans, reference AS-35. |
PART 2 — TEMPORARY ALTERATION OF LAYOUT
| (1) District | (2) Street | (3) Description of alteration |
|---|---|---|
| West Suffolk District | Junction of Freckenham Road and Beck Road (publicly maintained) | Works to enable the passage to the authorised development of abnormal indivisible loads, including the temporary removal of street signs and street furniture, within the area shown hatched orange on sheet 4 of the access and rights of way plans, reference AS-5. |
| West Suffolk District | Isleham Road (publicly maintained) | Works for the provision of a temporary means of access to the authorised development within the area shown hatched orange on sheet 4 of the access and rights of way plans, reference AS-6. |
| West Suffolk District | B1102 Freckenham Road (publicly maintained) | Works for the provision of two temporary means of access to the authorised development within the area shown hatched orange on sheets 4 and 5 of the access and rights of way plans, reference AS-7. |
| West Suffolk District | Newmarket Road (publicly maintained) | Works for the provision of a temporary means of access to the authorised development within the area shown hatched orange on sheet 6 of the access and rights of way plans, reference AS-10. |
| West Suffolk District | Newmarket Road (part publicly maintained part privately maintained) | Works for the provision of a temporary means of access to the authorised development within the area shown hatched orange on sheet 6 of the access and rights of way plans, reference AS-11. |
| West Suffolk District | A11 (publicly maintained) | Works to enable the passage to the authorised development of abnormal indivisible loads, including the temporary removal of street signs and street furniture, within the area shown hatched orange on sheet 6 of the rights of way and access plans, reference AS-12. |
| West Suffolk District | Junction of A11 and Elms Road (publicly maintained) | Works to enable the passage to the authorised development of abnormal indivisible loads, including the temporary removal of streets signs and street furniture, within the area shown hatched orange on sheet 7 of the access and rights of way plans, reference AS-15. |
| East Cambridgeshire District | B1085 (part publicly maintained part privately maintained) | Works for the provision of two temporary means of access to the authorised development within the area shown hatched orange on sheet 9 of the access and rights of way plans, reference AS-16. |
| East Cambridgeshire District | La Hogue Road (publicly maintained) | Works for the provision of a temporary means of access to the authorised development within the area shown hatched orange on sheet 11 of the access and rights of way plans, reference AS-18. |
| East Cambridgeshire District | A11 (publicly maintained) | Works to enable the passage to the authorised development of abnormal indivisible loads, including the temporary removal of streets signs and street furniture, within the area shown hatched orange on sheet 10 of the access and rights of way plans, reference AS-20. |
| East Cambridgeshire District | Chippenham Road (part publicly maintained part privately maintained) | Works for the provision of two temporary means of access to the authorised development within the area shown hatched orange on sheet 14 of the access and rights of way plans, reference AS-22. |
| East Cambridgeshire District | Newmarket Road (publicly maintained) | Works for the provision of a temporary means of access to the authorised development within the area shown hatched orange on sheet 16 of the access and rights of way plans, reference AS-25. |
| East Cambridgeshire District | A142 (publicly maintained) | Works for the provision of a temporary means of access to the authorised development within the area shown hatched orange on sheet 16 of the access and rights of way plans, reference AS-26. |
| East Cambridgeshire District and West Suffolk District | Private access (privately maintained) | Works for the provision of access to, and within, the authorised development within the area shown hatched orange on sheets 16 and 17 of the access and rights of way plans, reference AS-27. |
| East Cambridgeshire District | Ness Road (publicly maintained) | Works for the provision of a temporary means of access to the authorised development within the area shown hatched orange on sheets 17 and 18 of the access and rights of way plans, reference AS-28. |
| East Cambridgeshire District | Ness Road (publicly maintained) | Works for the provision of a temporary means of access to the authorised development within the area shown hatched orange on sheets 17 and 18 of the access and rights of way plans, reference AS-29. |
| East Cambridgeshire District | Broads Road (publicly maintained) | Works for the provision of a temporary means of access to the authorised development within the area shown hatched orange on sheet 18 of the access and rights of way plans, reference AS-30. |
| East Cambridgeshire District | First Drove (privately maintained) | Works for the provision of a temporary means of access to the authorised development within the area shown hatched orange on sheet 18 of the access and rights of way plans, reference AS-31. |
| East Cambridgeshire District | Little Fen Drove (publicly maintained) | Works for the provision of two temporary means of access to the authorised development within the area shown hatched orange on sheet 19 of the access and rights of way plans, reference AS-32. |
| East Cambridgeshire District | Weirs Drove (privately maintained) | Works for the provision of a temporary means of access to the authorised development within the area shown hatched orange on sheets 19 and 20 of the access and rights of way plans, reference AS-33. |
| West Suffolk District | Junction of B1102 and Church Lane (publicly maintained) | Works to enable the passage to the authorised development of abnormal indivisible loads, including the temporary removal of street signs and street furniture, within the area shown hatched orange on sheet 21 of the access and rights of way plans, reference AS-36. |
| West Suffolk District | Junction of B1102 Mildenhall Road and Ferry Lane (part publicly maintained part privately maintained) | Works to enable the passage to the authorised development of abnormal indivisible loads, including the temporary removal of streets signs and street furniture, within the area shown hatched orange on sheet 21 of the access and rights of way plans, reference AS-37. |
| East Cambridgeshire District | Junction of B1085 High Street and B1104 (publicly maintained) | Works to enable the passage to the authorised development of abnormal indivisible loads including the temporary removal of street signs and street furniture, within the area shown hatched orange on sheet 22 of the access and rights of way plans, reference AS-38. |
SCHEDULE 6 — PUBLIC RIGHTS OF WAY
PART 1 — PUBLIC RIGHTS OF WAY TO BE TEMPORARILY CLOSED
| (1) District | (2) Public right of way | (3) Measure |
|---|---|---|
| East Cambridgeshire District | 35/10 From the point shown as reference PRoWC1A on sheet 3 of the traffic regulation measures plans – temporary road closures, for a distance of 90 metres in a generally north-westerly direction to the point shown as reference PRoWC1B on sheet 3 of the traffic regulation measures plans – temporary road closures. | Temporarily closed to all traffic save for traffic under the direction of the undertaker. |
| East Cambridgeshire District | 92/19 From the point shown as reference PRoWC2A on sheet 4 of the traffic regulation measures plans – temporary road closures, for a distance of 215 metres in a generally southerly direction to the point shown as reference PRoWC2B on sheet 4 of the traffic regulation measures plans – temporary road closures. | Temporarily closed to all traffic save for traffic under the direction of the undertaker. |
| East Cambridgeshire District | 204/1 From the point shown as reference PRoWC3A on sheet 5 of the traffic regulation measures plans – temporary road closures, for a distance of 125 metres in a generally north-easterly direction to the point shown as reference PRoWC3B on sheet 5 of the traffic regulation measures plans – temporary road closures. | Temporarily closed to all traffic save for traffic under the direction of the undertaker. |
| East Cambridgeshire District | 49/7 From the point shown as reference PRoWC4A on sheet 11 of the traffic regulation measures plans – temporary road closures, for a distance of 115 metres in a generally north-westerly direction to the point shown as reference PRoWC4B on sheet 11 of the traffic regulation measures plans – temporary road closures. | Temporarily closed to all traffic save for traffic under the direction of the undertaker. |
| West Suffolk District | W-257/003/0 From the point shown as reference PRoWC5A on sheet 12 of the traffic regulation measures plans – temporary road closures, for a distance of 115 metres in a generally north-westerly direction to the point shown as reference PRoWC5B, on sheet 12 of the traffic regulation measures plans – temporary road closures. | Temporarily closed to all traffic save for traffic under the direction of the undertaker. |
| East Cambridgeshire District | W-257/007/0, W-257/002/X, W-257/002/0 From the point shown as reference ProWC6A on sheet 20 of the traffic regulation measures plans – temporary road closures, for a distance of 505 metres in a generally southerly direction to the point shown as reference PRoWC6B on sheet 20 of the traffic regulation measures plans – temporary road closures. | Temporarily closed to all traffic save for traffic under the direction of the undertaker. |
PART 2 — TEMPORARY USE OF MOTOR VEHICLES ON PUBLIC RIGHTS OF WAY
| (1) District | (2) Road name, number and length | (3) Measure |
|---|---|---|
| West Suffolk District | W-257/007/0 Between the points marked MV1A- and MV2-A on sheets 2 and 3 of the access and rights of way plans. | Motor vehicles under the direction of the undertaker may cross the public right of way. |
| West Suffolk District | W-257/002/X Between the points marked MV2-A and MV2-B on sheets 2 and 3 of the access and rights of way plans. | Motor vehicles under the direction of the undertaker may cross the public right of way. |
| West Suffolk District | W-257/003/0 Between the points marked MV3-A and MV3-B on sheet 8 of the access and rights of way plans. | Motor vehicles under the direction of the undertaker may cross the public right of way. |
| East Cambridgeshire District | 49/7 Between the points marked MV-4A and MV4-B on sheet 8 of the access and rights of way plans. | Motor vehicles under the direction of the undertaker may cross the public right of way. |
| East Cambridgeshire District | 204/1 Between the points marked MV5-A and MV5-B on sheet 15 of the access and rights of way plans. | Motor vehicles under the direction of the undertaker may cross the public right of way. |
| East Cambridgeshire District | 92/19 Between the points marked MV6-A and MV6-B on sheet 16 of the access and rights of way plans. | Motor vehicles under the direction of the undertaker may cross the public right of way. |
| East Cambridgeshire District | 35/10 Between the points marked MV7-A and MV7-B on sheet 18 of the access and rights of way plans. | Motor vehicles under the direction of the undertaker may cross the public right of way. |
| East Cambridgeshire District | 35/11 Between the points marked MV8-A and MV8-B on sheet 18 of the access and rights of way plans. | Motor vehicles under the direction of the undertaker may cross the public right of way. |
| East Cambridgeshire District | 35/6 Between the points marked MV9-A and MV9-B on sheets 19 and 20 of the access and rights of way plans. | Motor vehicles under the direction of the undertaker may cross the public right of way. |
| East Cambridgeshire District | 35/7 Between the points marked MV10-A and MV10-B on sheets 19 and 20 of the access and rights of way plans. | Motor vehicles under the direction of the undertaker may cross the public right of way. |
SCHEDULE 7 — ACCESS TO WORKS
PART 1 — PERMANENT MEANS OF ACCESS TO WORKS
| (1) District | (2) Street | (3) Description of means of access |
|---|---|---|
| West Suffolk District | Ferry Lane | The provision of a permanent means of access to the authorised development from the western side of Ferry Lane between the points marked SE-E1 and SE-E2 on sheets 1 and 2 of the access and rights of way plans. |
| West Suffolk District and East Cambridgeshire District | Beck Road | The provision of a permanent means of access to the authorised development from the northern side of Beck Road between the points marked SE-F1 and SE-F2 on sheets 2 and 3 of the access and rights of way plans. |
| West Suffolk District | Beck Road | The provision of a permanent means of access to the authorised development from the southern side of Beck Road between the points marked SE-G1 and SE-G2 on sheets 2 and 3 of the access and rights of way plans. |
| West Suffolk District | Beck Road | The provision of a permanent means of access to the authorised development from the northern side of Beck Road between the points marked SE-K1 and SE-K2 on sheets 3 and 4 of the access and rights of way plans. |
| West Suffolk District | Newmarket Road | The provision of a permanent means of access to the authorised development from the western side of Newmarket Road between the points marked SE-D1 and SE-D2 on sheet 6 of the access and rights of way plans. |
| West Suffolk District | Golf Links Road | The provision of a permanent means of access to the authorised development from the southern side of Golf Links Road between the points marked SE-J1 and SE-J2 on sheet 6 of the access and rights of way plans. |
| West Suffolk District | Elms Road | The provision of a permanent means of access to the authorised development from the northern side of Elms Road between the points marked SE-C1 and SE-C2 on sheet 7 of the access and rights of way plans. |
| West Suffolk District | Elms Road | The provision of a permanent means of access to the authorised development from the southern side of Elms Road between the points marked SE-B1 and SE-B2 on sheet 7 of the access and rights of way plans. |
| West Suffolk District | Elms Road | The provision of a permanent means of access to the authorised development from the northern side of Elms Road between the points marked SE-A1 and SE-A2 on sheet 7 of the access and rights of way plans. |
| East Cambridgeshire District | Dane Hill Road | The provision of a permanent means of access to the authorised development from the southern side of Dane Hill Road between the points marked SW-C1 and SW-C2 on sheet 10 of the access and rights of way plans. |
| East Cambridgeshire District | La Hogue Road | The provision of a permanent means of access to the authorised development from the western side of La Hogue Road between the points marked SW-A1 and SW-A2 on sheet 11 of the access and rights of way plans. |
| East Cambridgeshire District | Chippenham Road | The provision of a permanent means of access to the authorised development from the southern side of Chippenham between the points marked SW-B1 and SW-B2 on sheet 14 of the access and rights of way plans. |
| East Cambridgeshire District | Weirs Drove | The provision of a permanent means of access to the authorised development from the northern side of Weirs Drove between the points marked CR-A1 and CR-A2 on sheet 20 of the access and rights of way plans. |
| East Cambridgeshire District | Newnham Drove | The provision of a permanent means of access to the authorised development from the northern side of Newnham Drove between the points marked CR-B1 and CR-B2 on sheet 20 of the access and rights of way plans. |
PART 2 — TEMPORARY MEANS OF ACCESS TO WORKS
| (1) District | (2) Street | (3) Description of means of access |
|---|---|---|
| West Suffolk District | Isleham Road | The provision of a temporary means of access to the authorised development from the southern side of Isleham Road between the points marked CR-T1 and CR-T2 on sheet 4 of the access and rights of way plans. |
| West Suffolk District | B1102 | The provision of a temporary means of access to the authorised development from the northern side of B1102 between the points marked CR-S1 and CR-S2 on sheets 4 and 5 of the access and rights of way plans. |
| West Suffolk District | B1102 | The provision of a temporary means of access to the authorised development from the southern side of B1102 between the points marked CR-R1 and CR-R2 on sheets 4 and 5 of the access and rights of way plans. |
| West Suffolk District | Newmarket Road | The provision of a temporary means of access to the authorised development from the eastern side of Newmarket Road between the points marked SE-H1 and SE-H2 on sheet 6 of the access and rights of way plans. |
| West Suffolk District | Newmarket Road | The provision of a temporary means of access to the authorised development from the western side of Newmarket Road between the points marked SE-I1 and SE-I2 on sheet 6 of the access and rights of way plans. |
| East Cambridgeshire District | B1085 | The provision of a temporary means of access to the authorised development from the southern side of B1085 between the points marked CR-P1 and CR-P2 on sheets 9 and 11 of the access and rights of way plans. |
| East Cambridgeshire District | B1085 | The provision of a temporary means of access to the authorised development from the northern side of B1085 between the points of marked CR-Q1 and CR-Q2 on sheet 9 of the access and rights of way plans. |
| East Cambridgeshire District | La Hogue Road | The provision of a temporary means of access to the authorised development from the eastern side of La Hogue Road between the points marked CR-O1 and CR-O2 on sheet 11 of the access and rights of way plans. |
| East Cambridgeshire District | Chippenham Road | The provision of a temporary means of access to the authorised development from the northern side of the Chippenham Road between the points marked CR-M1 and CR-M2 on sheet 14 of the access and rights of way plans. |
| East Cambridgeshire District | Chippenham Road | The provision of a temporary means of access to the authorised development from the southern side of Chippenham Road between the points marked CR-N1 and CR-N2 on sheet 14 of the access and rights of way plans. |
| East Cambridgeshire District | A142 | The provision of a temporary means of access to the authorised development from the northern side of A142 between the points marked CR-J1 and CR-J2 on sheet 16 of the access and rights of way plans. |
| East Cambridgeshire District | Newmarket Road | The provision of a temporary means of access to the authorised development from the eastern side of Newmarket Road between the points marked CR-K1 and CR-K2 on sheet 16 of the access and rights of way plans. |
| East Cambridgeshire District | Ness Road | The provision of a temporary means of access to the authorised development from the western side of Ness Road between the points marked CR-I1 and CR-I2 on sheets 17 and 18 of the access and rights of way plans. |
| East Cambridgeshire District | Ness Road | The provision of a temporary means of access to the authorised development from the eastern side of Ness Road between the points marked CR-H1 and CR-H2 on sheets 17 and 18 of the access and rights of way plans. |
| East Cambridgeshire District | Broads Road | The provision of a temporary means of access to the authorised development from the southern side of Broads Road between the points marked CR-G1 and CR-G2 on sheet 18 of the access and rights of way plans. |
| East Cambridgeshire District | First Drove | The provision of a temporary means of access to the authorised development from the western side of First Drove between the points marked CR-F1 and CR-F2 on sheet 18 of the access and rights of way plans. |
| East Cambridgeshire District | Weirs Drove | The provision of a temporary means of access to the authorised development from the western side of Weirs Drove between the points marked CR-C1 and CR-C2 on sheets 19 and 20 of the access and rights of way plans. |
| East Cambridgeshire District | Little Fen Drove | The provision of a temporary means of access to the authorised development from the southern side of Little Fen Drove between the points marked CR-D1 and CR-D2 on sheet 19 of the access and rights of way plans. |
| East Cambridgeshire District | Little Fen Drove | The provision of a temporary means of access to the authorised development from the northern side of Little Fen Drove between the points marked CR-E1 and CR-E2 on sheet 19 of the access and rights of way plans. |
SCHEDULE 8 — LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
Interpretation
1
In this Schedule—
- “access rights” means rights over land to—alter, improve, form, maintain, retain, use (with or without vehicles, plant and machinery), remove, reinstate means of access to the authorised development including visibility splays and to remove impediments to such access; andpass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface) for all purposes in connection with the authorised development;
- “cable rights” means rights over land to—install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures;remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with the authorised development; andrestrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development;
- “crane rights” means rights over land to pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface) and to temporarily remove impediments to such a passage for all purposes in connection with the authorised development;
- “substation connection rights” means rights over land to—install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain electrical cables, earthing cables, optical fibre cables, data cables, telecommunications cables and other services, works associated with such cables including bays, ducts, protection and safety measures and equipment, and other apparatus and structures and to connect such cables and services to the National Grid Burwell substation;install, use, support, protect, inspect, alter, remove, replace retain, renew, improve and maintain watercourses, public sewers and drains and drainage apparatus and equipment;remain, pass and repass on foot, with or without vehicles, plant and machinery (including rights to lay and use any temporary surface or form a temporary compound) for all purposes in connection with Work Nos. 4;restrict and remove the erection of buildings or structures, restrict the altering of ground levels, restrict and remove the planting of trees or carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt or interfere with the exercise of the rights or damage the authorised development; andinstall, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain soft landscaping and biodiversity measures; and
- “vegetation maintenance rights” means rights over land to install, use, support, protect, inspect, alter, remove, replace, retain, renew, improve and maintain vegetation for all purposes in connection with the authorised development.(1)Plot reference number shown on the land plans(2)Purposes for which rights over land may be acquired and restrictive covenants imposed. . .. . .. . .. . .1-04Access rights1-05Access rights1-06Access rights1-07Cable rights2-01Cable rights3-02Access rights3-07Access rights3-08Access rights3-09Access rights3-10Cable rights4-02Access rights4-03Cable rights4-04Access rights4-05Cable rights5-01Cable rights5-02Cable rights and access rights5-04Cable rights and access rights5-08Cable rights and access rights5-09Cable rights5-10Cable rights and access rights. . .. . .6-02Cable rights and access rights6-07Access rights6-08Access rights6-09Access rights7-06Cable rights and access rights7-07Access rights7-09Access rights7-10Access rights7-11Access rights7-12Access rights8-02Cable rights8-03Cable rights8-04Cable rights8-05Cable rights8-06Cable rights9-01Cable rights9-02Cable rights9-03Access rights9-04Cable rights and access rights9-05Access rights9-06Cable rights10-01Access rights10-02Access rights10-03Access rights10-04Access rights10-05Access rights10-12Cable rights10-13Cable rights10-14Cable rights10-15Cable rights10-16Cable rights10-17Cable rights10-18Cable rights10-19Cable rights10-20Cable rights10-23Access rights10-24Access rights10-25Access rights10-26Access rights10-27Access rights10-28Access rights10-29Cable rights10-30Cable rights10-31Cable rights10-32Cable rights10-33Cable rights11-01Cable rights11-02Access rights11-03Cable rights and access rights11-04Access rights14-04Access rights14-05Access rights14-06Access rights14-07Cable rights14-08Cable rights and access rights14-09Cable rights15-01Cable rights15-02Cable rights and access rights15-03Cable rights15-04Cable rights15-05Cable rights15-12Cable rights16-01Cable rights16-02Cable rights16-03Cable rights16-04Cable rights16-07Cable rights16-08Cable rights16-09Cable rights16-10Cable rights16-11Cable rights16-12Access rights16-13Access rights16-14Cable rights ...16-15Cable rights and access rights 16-16Cable rights16-17Cable rights16-18Cable rights16-19Cable rights16-20Access rights17-01Cable rights17-02Access rights17-03Cable rights18-01Cable rights18-02Cable rights and access rights18-03Cable rights and access rights18-04Cable rights and access rights18-05Access rights18-06Access rights18-07Cable rights18-08Cable rights18-09Cable rights18-10Cable rights18-11Cable rights and access rights18-12Cable rights and access rights18-13Cable rights18-14Cable rights18-15Cable rights18-16Cable rights and access rights18-17Cable rights18-18Cable rights18-19Cable rights19-01Cable rights19-02Cable rights19-03Cable rights19-04Cable rights19-05Cable rights19-06Cable rights19-07Cable rights19-08Cable rights19-09Cable rights19-10Cable rights19-11Cable rights19-12Cable rights and access rights19-13Cable rights and access rights19-14Access rights19-15Access rights20-01Cable rights20-02Cable rights20-03Cable rights20-04Cable rights20-05Access rights20-06Access rights20-07Access rights20-08Cable rights20-09Cable rights20-10Cable rights20-11Cable rights20-12Cable rights20-13Substation connection rights and access rights20-14Substation connection rights20-15Substation connection rights and access rights20-16Substation connection rights20-17Substation connection rights20-18Substation connection rights20-19Substation connection rights20-20Substation connection rights20-21Substation connection rights and access rights20-22Substation connection rights20-23Substation connection rights20-24Substation connection rights20-25Substation connection rights20-26Substation connection rights20-27Substation connection rights20-28Substation connection rights20-29Substation connection rights20-30Substation connection rights21-01Crane rights21-02Crane rights21-03Crane rights22-01Crane rights
SCHEDULE 9 — MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR THE CREATION OF NEW RIGHTS AND IMPOSITION OF NEW RESTRICTIVE COVENANTS
Compensation enactments
1
The enactments for the time being in force with respect to compensation for the compulsory purchase of land apply, with the necessary modifications as respects compensation, in the case of a compulsory acquisition under this Order of a right by the creation of a new right or the imposition of a restrictive covenant as they apply as respects compensation on the compulsory purchase of land and interests in land.
2
- (1) Without limitation on the scope of paragraph 1, the Land Compensation Act 197368 has effect subject to the modifications set out in sub-paragraph (2).
- (2) In section 44(1) (compensation for injurious affection), as it applies to compensation for injurious affection under section 7 (measure of compensation in case of severance) of the 1965 Act as substituted by paragraph 5—
- (a) for the words “land is acquired or taken from” substitute “a right or restrictive covenant over land is purchased from or imposed on”; and
- (b) for the words “acquired or taken from him” substitute “over which the right is exercisable or the restrictive covenant enforceable”.
3
- (1) Without limitation on the scope of paragraph 1, the 1961 Act has effect subject to the modification set out in sub-paragraph (2).
- (2) In section 5A(5A) (relevant valuation date), omit the words after “If—” and substitute—
(a) the acquiring authority enters on land for the purpose of exercising a right in pursuance of a notice of entry under section 11(1) of the 1965 Act (as modified by paragraph 5(5) of Schedule 9 to the Sunnica Energy Farm Order 2024); (b) the acquiring authority is subsequently required by a determination under paragraph 12 of Schedule 2A to the 1965 Act (as substituted by paragraph 5(8) of Schedule 9 to the Sunnica Energy Farm Order 2024) to acquire an interest in the land; and (c) the acquiring authority enters on and takes possession of that land, the authority is deemed for the purposes of subsection (3)(a) to have entered on that land where it entered on that land for the purpose of exercising that right.
Application of Part 1 of the 1965 Act
4
Part 1 (compulsory purchase under Acquisition of Land Act 1946) of the 1965 Act, as applied by section 125 (application of compulsory acquisition provisions) of the 2008 Act to the acquisition of land under article 17 (compulsory acquisition of land) and as modified by article 24 (modification of Part 1 of the Compulsory Purchase Act 1965)), applies to the compulsory acquisition of a right by the creation of a new right under article 19 (compulsory acquisition of rights)—
- (a) with the modifications specified in paragraph 5; and
- (b) with such other modifications as may be necessary.
5
- (1) The modifications referred to in paragraph 4(a) are as follows—
- (2) References in the 1965 Act to land are, in the appropriate contexts, to be read (according to the requirements of the particular context) as referring to, or as including references to—
- (a) the right acquired or to be acquired, or the restriction imposed or to be imposed; or
- (b) the land over which the right is or is to be exercisable, or the restriction is to be enforceable.
- (3) For section 7 (measure of compensation in case of severance) of the 1965 Act substitute—
(7) In assessing the compensation to be paid by the acquiring authority under this Act, regard must be had not only to the extent (if any) to which the value of the land over which the right is to be acquired or the restrictive covenant is to be imposed is depreciated by the acquisition of the right or the imposition of the covenant but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act.
- (4) The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say—
- (a) section 9(4) (refusal to convey, failure to make title, etc.);
- (b) paragraph 10(3) of Schedule 1 (conveyance of the land or interest);
- (c) paragraph 2(3) of Schedule 2 (absent and untraced owners); and
- (d) paragraphs 2(3) and 7(2) of Schedule 4 (common land),
are modified to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily acquired or the restrictive covenant which is to be imposed is vested absolutely in the acquiring authority.
- (5) Section 11 (powers of entry)69 of the 1965 Act is modified to secure that, as from the date on which the acquiring authority has served notice to treat in respect of any right or restrictive covenant, as well as the notice of entry required by subsection (1) of that section (as it applies to compulsory acquisition under article 17 (compulsory acquisition of land)), it has power, exercisable in equivalent circumstances and subject to equivalent conditions, to enter for the purpose of exercising that right or enforcing that restrictive covenant (which is deemed for this purpose to have been created on the date of service of the notice); and sections 11A (powers of entry: further notices of entry)70, 11B (counter-notice requiring possession to be taken on specified date)71, 12 (unauthorised entry)72 and 13 (refusal to give possession to acquiring authority)73 of the 1965 Act are modified correspondingly.
- (6) Section 20 (tenants at will, etc.)74 of the 1965 Act applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right or the enforcement of the restrictive covenant in question.
- (7) Section 22 (interests omitted from purchase) of the 1965 Act as modified by article 24(4) (modification of Part 1 of the Compulsory Purchase Act 1965) is so modified as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired or restrictive covenant imposed, subject to compliance with that section as respects compensation.
- (8) For Schedule 2A (counter notice requiring purchase of land not in notice to treat) to the 1965 Act substitute—
SCHEDULE2A (1) (1) This Schedule applies where an acquiring authority serve a notice to treat in respect of a right over, or restrictive covenant affecting, the whole or part of a house, building or factory and have not executed a general vesting declaration under section 4 of the 1981 Act as applied by article 21 (application of the 1981 Act) of the Sunnica Energy Farm Order 2024 in respect of the land to which the notice to treat relates. (2) But see article 22(3) (acquisition of subsoil only) of the Sunnica Energy Farm Order 2024 which excludes the acquisition of subsoil only from this Schedule. (2) In this Schedule, “house” includes any park or garden belonging to a house. (3) A person who is able to sell the house, building or factory (“the owner”) may serve a counter-notice requiring the authority to purchase the owner’s interest in the house, building or factory. (4) A counter-notice under paragraph 3 must be served within the period of 28 days beginning with the day on which the notice to treat was served. (5) On receiving a counter-notice, the acquiring authority must decide whether to— (a) withdraw the notice to treat, (b) accept the counter-notice, or (c) refer the counter-notice to the Upper Tribunal. (6) The authority must serve notice of their decision on the owner within the period of three months beginning with the day on which the counter-notice is served (“the decision period”). (7) If the authority decides to refer the counter-notice to the Upper Tribunal they must do so within the decision period. (8) If the authority does not serve notice of a decision within the decision period they are to be treated as if they had served notice of a decision to withdraw the notice to treat at the end of that period. (9) If the authority serves notice of a decision to accept the counter-notice, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in the house, building or factory. (10) On a referral under paragraph 7, the Upper Tribunal must determine whether the acquisition of the right or the imposition of the restrictive covenant would— (a) in the case of a house, building or factory, cause material detriment to the house, building or factory, or (b) in the case of a park or garden, seriously affect the amenity or convenience of the house to which the park or garden belongs. (11) In making its determination, the Upper Tribunal must take into account— (a) the effect of the acquisition of the right or the imposition of the covenant, (b) the use to be made of the right or covenant proposed to be acquired or imposed, and (c) if the right or covenant is proposed to be acquired or imposed for works or other purposes extending to other land, the effect of the whole of the works and the use of the other land. (12) If the Upper Tribunal determines that the acquisition of the right or the imposition of the covenant would have either of the consequences described in paragraph 10, it must determine how much of the house, building or factory the authority ought to be required to take. (13) If the Upper Tribunal determines that the authority ought to be required to take some or all of the house, building or factory, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in that land. (14) (1) If the Upper Tribunal determines that the authority ought to be required to take some or all of the house, building or factory, the authority may at any time within the period of six weeks beginning with the day on which the Upper Tribunal makes its determination withdraw the notice to treat in relation to that land. (2) If the acquiring authority withdraws the notice to treat under this paragraph they must pay the person on whom the notice was served compensation for any loss or expense caused by the giving and withdrawal of the notice. (3) Any dispute as to the compensation is to be determined by the Upper Tribunal.
SCHEDULE 10 — DOCUMENTS AND PLANS TO BE CERTIFIED
| (1)Document name | (2)Document reference | (3)Revision number | (4)Date |
|---|---|---|---|
| access and rights of way plans | 2.3 | 6 | 24/03/2023 |
| arboricultural impact assessment | 8.46 | 2 | 03/03/2023 |
| book of reference | 4.3 | 9 | 30/08/2023 |
| Campus plan | 8.88 | 1 | 21/03/2023 |
| crash site exclusion area plan | 8.89 | 0 | 03/02/2023 |
| Deed of Obligation | 8.123 | 0 | 24/03/2023 |
| design principles | 8.87 | 0 | 30/01/2023 |
| detailed archaeology mitigation strategy | 8.79 | 1 | 24/03/2023 |
| drainage technical note | 8.83 | 1 | 24/03/2023 |
| environmental statement | environmental statement 6.1 (excluding chapters 0, 3 and 16), 6.2 (excluding appendix 7H, 8M, 9C, 10I, 13C, 16C, 16D, 16E and 16F), 6.3 (excluding figures 3-1, 3-2, 3-17a-e, 3-20, 3-25a-d, 3-28a, 3-28b, 3-29, 3-30a, 3-30b, 3-31, 3-32, 9-1, 10-11a-f, 10-12) and 6.4 | 0 | 18/11/2021 |
| environmental statement 6.1 (chapter 0) | 1 | 30/08/2022 | |
| environmental statement 6.1 (chapter 3) | 2 | 11/11/2022 | |
| environmental statement 6.1 (chapter 16) | 1 | 11/11/2022 | |
| environmental statement 6.2 (appendix 7H) | 1 | 13/07/2022 | |
| environmental statement 6.2 (appendix 8M) | 2 | 13/01/2023 | |
| environmental statement 6.3 (figure 3-17a-e) | 1 | 03/03/2023 | |
| environmental statement 6.3 (figures 3-1, 3-2) | 2 | 24/03/2023 | |
| environmental statement 6.3 (figures 3-28a, 3-28b, 3-30a, 3-30b) | 1 | 14/09/2022 | |
| environmental statement 6.3 (figures 3-31, 3-32) | 0 | 30/08/2022 | |
| environmental statement 6.3 (figures 3-20, 3-25a-d, 3-29) | 1 | 30/08/2022 | |
| environmental statement 6.3 (figure 9-1) | 1 | 21/01/2022 | |
| environmental statement 6.3 (figures 10-11a-f, 10-12) | 1 | 19/10/2022 | |
| flood risk assessment | Appendix 9C contained in volume 2 of the environmental statement (document reference 6.2) – Part 1 | 2 | 24/03/2023 |
| flood risk assessment | Appendix 9C contained in volume 2 of the environmental statement (document reference 6.2) – Parts 2-4 | 1 | 21/01/2022 |
| flood risk assessment | Appendix 9C flood risk assessment addendum – Part 1 | 1 | 24/03/2023 |
| flood risk assessment | drainage technical note | 1 | 24/03/2023 |
| flood risk assessment | FRA clarification document in light of proposed Scheme changes | 2 | 24/03/2023 |
| framework construction environmental management plan | Appendix 16C contained in volume 2 of the environmental statement (document reference 6.2) | 8 | 13/09/2023 |
| framework construction traffic management plan and travel plan | Appendix 13C contained in volume 2 of the environmental statement (document reference 6.2) | 5 | 03/03/2023 |
| unplanned atmospheric emissions from battery energy storage systems | Appendix 16D contained in volume 2 of the environmental statement (document reference 6.2) | 1 | 11/11/2022 |
| framework decommissioning environmental management plan | Appendix 16E contained in volume 2 of the environmental statement (document reference 6.2) | 4 | 13/03/2023 |
| framework operational environmental management plan | Appendix 16F contained in volume 2 of the environmental statement (document reference 6.2) | 5 | 24/03/2023 |
| land and Crown land plans | 2.1 | 6 | 30/01/2023 |
| outline battery fire safety management plan | 7.6 | 4 | 24/03/2023 |
| outline landscape and ecology management plan | Appendix 10I contained in volume 2 of the environmental statement (document reference 6.2) | 5 | 13/09/2023 |
| outline skills, supply chain and employment plan | 7.7 | 4 | 24/03/2022 |
| potential expanded crash site exclusion area plan | 8.90 | 0 | 03/02/2023 |
| restoration overlap plan | 2.9 | 0 | 18/11/2021 |
| traffic regulation measures plans – temporary measures | 2.4 | 3 | 30/01/2023 |
| traffic regulation measures plans – temporary road closures | 2.4 | 3 | 30/01/2023 |
| tree preservation order trees location plans | 8.48 | 2 | 24/03/2023 |
| works plans | 2.2 | 5 | 03/03/2023 |
SCHEDULE 11 — ARBITRATION RULES
Commencing an arbitration
1
The arbitration is deemed to have commenced when a party (“the claimant”) serves a written notice of arbitration on the other party (“the respondent”).
Time periods
2
- (1) All time periods in these arbitration rules are measured in days and include weekends, but not bank or public holidays.
- (2) Time periods are calculated from the day after the arbitrator is appointed which is either—
- (a) the date the arbitrator notifies the parties in writing of his/her acceptance of an appointment by agreement of the parties; or
- (b) the date the arbitrator is appointed by the Secretary of State.
Timetable
3
- (1) The timetable for the arbitration is that which is set out in sub-paragraphs (2) to (4) below unless amended in accordance with paragraph 5(3).
- (2) Within 14 days of the arbitrator being appointed, the claimant must provide both the respondent and the arbitrator with—
- (a) a written statement of claim which describes the nature of the difference between the parties, the legal and factual issues, the claimant’s contentions as to those issues, the amount of its claim or the remedy it is seeking; and
- (b) all statements of evidence and copies of all documents on which it relies, including contractual documentation, correspondence (including electronic documents), legal precedents and expert witness reports.
- (3) Within 14 days of receipt of the claimant’s statements under sub-paragraph (2) by the arbitrator and respondent, the respondent must provide the claimant and the arbitrator with—
- (a) a written statement of defence consisting of a response to the claimant’s statement of claim, its statement in respect of the nature of the difference, the legal and factual issues in the claimant’s claim, its acceptance of any elements of the claimant’s claim and its contentions as to those elements of the claimant’s claim it does not accept;
- (b) all statements of evidence and copies of all documents on which it relies, including contractual documentation, correspondence (including electronic documents), legal precedents and expert witness reports; and
- (c) any objections it wishes to make to the claimant’s statements, comments on the claimant’s expert reports (if submitted by the claimant) and explanations of the objections.
- (4) Within seven days of the respondent serving its statements under sub-paragraph (3), the claimant may make a statement of reply by providing both the respondent and the arbitrator with—
- (a) a written statement responding to the respondent’s submissions, including its reply in respect of the nature of the difference, the issues (both factual and legal) and its contentions in relation to the issues;
- (b) all statements of evidence and copies of documents in response to the respondent’s submissions;
- (c) any expert report in response to the respondent’s submissions;
- (d) any objections to the statements of evidence, expert reports or other documents submitted by the respondent; and
- (e) its written submissions in response to the legal and factual issues involved.
Procedure
4
- (1) The parties’ pleadings, witness statements and expert reports (if any) must be concise. A single pleading must not exceed 30 single-sided A4 pages using 10pt Arial font.
- (2) The arbitrator will make an award on the substantive differences based solely on the written material submitted by the parties unless the arbitrator decides that a hearing is necessary to explain or resolve any matters.
- (3) Either party may, within two days of delivery of the last submission, request a hearing giving specific reasons why it considers a hearing is required.
- (4) Within seven days of receiving the last submission, the arbitrator must notify the parties whether a hearing is to be held and the length of that hearing.
- (5) Within 10 days of the arbitrator advising the parties that a hearing is to be held, the date and venue for the hearing are to be fixed by agreement with the parties, save that if there is no agreement the arbitrator must direct a date and venue which the arbitrator considers is fair and reasonable in all the circumstances. The date for the hearing must not be less than 35 days from the date of the arbitrator’s direction confirming the date and venue of the hearing.
- (6) A decision must be made by the arbitrator on whether there is any need for expert evidence to be submitted orally at the hearing. If oral expert evidence is required by the arbitrator, then any experts attending the hearing may be asked questions by the arbitrator.
- (7) There is to be no examination or cross-examination of experts, but the arbitrator must invite the parties to ask questions of the experts by way of clarification of any answers given by the experts in response to the arbitrator’s questions. Prior to the hearing in relation to the experts—
- (a) at least 28 days before a hearing, the arbitrator must provide a list of issues to be addressed by the experts;
- (b) if more than one expert is called, they will jointly confer and produce a joint report or reports within 14 days of the issues being provided; and
- (c) the form and content of a joint report must be as directed by the arbitrator and must be provided at least seven days before the hearing.
- (8) Within 14 days of a hearing or a decision by the arbitrator that no hearing is to be held the parties may by way of exchange provide the arbitrator with a final submission in connection with the matters in dispute and any submissions on costs. The arbitrator must take these submissions into account in the award.
- (9) The arbitrator may make other directions or rulings as considered appropriate in order to ensure that the parties comply with the timetable and procedures to achieve an award on the substantive difference within four months of the date on which the arbitrator is appointed, unless both parties otherwise agree to an extension to the date for the award.
- (10) If a party fails to comply with the timetable, procedure or any other direction then the arbitrator may continue in the absence of a party or submission or document, and may make a decision on the information before the arbitrator attaching the appropriate weight to any evidence submitted beyond any timetable or in breach of any procedure or direction.
- (11) The arbitrator’s award must include reasons. The parties must accept that the extent to which reasons are given must be proportionate to the issues in dispute and the time available to the arbitrator to deliver the award.
Arbitrator’s powers
5
- (1) The arbitrator has all the powers of the Arbitration Act 1996, save where modified in this Schedule.
- (2) There must be no discovery or disclosure, except that the arbitrator is to have the power to order the parties to produce such documents as are reasonably requested by another party no later than the statement of reply, or by the arbitrator, where the documents are manifestly relevant, specifically identified and the burden of production is not excessive. Any application and orders should be made by way of a Redfern Schedule without any hearing.
- (3) Any time limits fixed in accordance with this procedure or by the arbitrator may be varied by agreement between the parties, subject to any such variation being acceptable to and approved by the arbitrator. In the absence of agreement, the arbitrator may vary the timescales or procedure—
- (a) if the arbitrator is satisfied that a variation of any fixed time limit is reasonably necessary to avoid a breach of the rules of natural justice and then; and
- (b) only for such a period that is necessary to achieve fairness between the parties.
- (4) On the date the award is made, the arbitrator will notify the parties that the award is completed, signed and dated, and that it will be issued to the parties on receipt of cleared funds for the arbitrator’s fees and expenses.
Costs
6
- (1) The costs of the arbitration must include the fees and expenses of the arbitrator, the reasonable fees and expenses of any experts and the reasonable legal and other costs incurred by the parties for the arbitration.
- (2) Where the difference involves connected or interrelated issues, the arbitrator must consider the relevant costs collectively.
- (3) The final award must fix the costs of the arbitration and decide which of the parties are to bear them or in what proportion they are to be borne by the parties.
- (4) The arbitrator must award recoverable costs on the general principle that each party should bear its own costs, having regard to all material circumstances, including such matters as exaggerated claims or defences, the degree of success for different elements of the claims, claims that have incurred substantial costs, the conduct of the parties and the degree of success of a party.
Confidentiality
7
- (1) Hearings in this arbitration are to take place in private.
- (2) Materials, documents, awards, expert reports and any matters relating to the arbitration are confidential and must not be disclosed to any third party without prior written consent of the other party, save for any application to the courts or where disclosure is required under any legislative or regulatory requirement.
SCHEDULE 12 — PROTECTIVE PROVISIONS
PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
1
For the protection of the utility undertakers referred to in this Part of this Schedule, the following provisions have effect, unless otherwise agreed in writing between the undertaker and the utility undertakers concerned.
2
In this Part of this Schedule—
- “alternative apparatus” means alternative apparatus adequate to enable the utility undertaker in question to fulfil its statutory functions in a manner not less efficient than previously;
- “apparatus” means— in the case of an electricity undertaker, electric lines or electrical plant (as defined in the Electricity Act 198975), belonging to or maintained by that utility undertaker; in the case of a gas undertaker, any mains, pipes or other apparatus belonging to or maintained by a gas transporter for the purposes of gas supply; in the case of a water undertaker— mains, pipes or other apparatus belonging to or maintained by that utility undertaker for the purposes of water supply; and any water mains or service pipes (or part of a water main or service pipe) that is the subject of an agreement to adopt made under section 51A of the Water Industry Act 1991; in the case of a sewerage undertaker— any drain or works vested in the utility undertaker under the Water Industry Act 199176; and any sewer which is so vested or is the subject of a notice of intention to adopt given under section 102(4) of that Act or an agreement to adopt made under section 104 of that Act, and includes a sludge main, disposal main (within the meaning of section 219 of that Act) or sewer outfall and any manholes, ventilating shafts, pumps or other accessories forming part of any such sewer, drain or works, and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;
- “functions” includes powers and duties;
- “in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land; and
- “utility undertaker” means— any licence holder within the meaning of Part 1 of the Electricity Act 1989; a gas transporter within the meaning of Part 1 of the Gas Act 198677; water undertaker within the meaning of the Water Industry Act 1991; and a sewerage undertaker within the meaning of Part 1 of the Water Industry Act 1991, for the area of the authorised development, and in relation to any apparatus, means the utility undertaker to whom it belongs or by whom it is maintained.
3
This part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and the utility undertaker are regulated by the provisions of Part 3 of the 1991 Act.
4
Regardless of the temporary prohibition or restriction of use of streets under the powers conferred by article 11 (temporary closure of public rights of way), a utility undertaker is at liberty at all times to take all necessary access across any such street and to execute and do all such works and things in, upon or under any such street as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the prohibition or restriction was in that street.
5
Regardless of any provision in this Order or anything shown on the land and Crown land plans, the undertaker must not acquire any apparatus otherwise than by agreement.
6
- (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or over which access to any apparatus is enjoyed or requires that the utility undertaker’s apparatus is relocated or diverted, that apparatus must not be removed under this Part of this Schedule, and any right of a utility undertaker to maintain that apparatus in that land and to gain access to it must not be extinguished, until alternative apparatus has been constructed and is in operation, and access to it has been provided, to the reasonable satisfaction of the utility undertaker in question in accordance with sub-paragraphs (2) to (7).
- (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, the undertaker must give to the utility undertaker in question written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order a utility undertaker reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to the utility undertaker the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus.
- (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2), in the land in which the alternative apparatus or part of such apparatus is to be constructed, the utility undertaker in question must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably possible use reasonable endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.
- (4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between the utility undertaker in question and the undertaker or in default of agreement settled by arbitration in accordance with article 38 (arbitration).
- (5) The utility undertaker in question must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 38 (arbitration), and after the grant to the utility undertaker of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.