The London Luton Airport Expansion Development Consent Order 2025
SCHEDULE 7 — LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
| (1) Plot Reference Number shown on Land Plans | (2) Purpose for which temporary possession may be taken | (3) Relevant part of the authorised development |
|---|---|---|
| 1-01, 1-02, 1-03, 1-04, 1-05, 1-06, 1-07, 1-08, 1-09, 1-10, 1-11, 1-12, 1-13, 1-14, 1-15, 1-16, 1-17, 1-20, 1-21, 1-26, 1-28, 1-29, 1-35 | Offsite highway works, including works to A1081 New Airport Way, B653 and Gipsy Lane. To include, the realignment and widening of A1081 New Airport Way (to provide additional traffic lanes), the realignment and widening of A505 Gispsy Lane (to provide additional traffic lanes), the reshaping of the A1081 New Airport Way central reserve islands including the realignment of barriers, the replacement or relocation of signage, lighting and gantries, the reprovision of cycle lanes, the reprovision of roadside barriers, and the reshaping of the A505 Gipsy Lane splitter island | Work No. 6e(b) |
| 1-27 1-31, 1-32, 1-33 | Airport support facilities, including construction of a multi-storey car park associated laydown areas, access, working space to support construction | Work No. 4g |
| 1-34, 1-37, 1-43, 1-49, 1-50, 1-53, 1-54, 1-57, 1-59, 1-61, 1-63 | Airport support facilities, including a surface car park associated laydown areas, access, working space to support construction | Work No. 4h |
| 1-58, 1-60, 1-62, 1-63, 1-64, 1-65, 1-66, 1-67 | Offsite highway works, including works at A1081 New Airport Way, A505 Kimpton Road and Vauxhall Way, associated laydown areas, access, working space to support construction | Work No. 6e(c) |
| 1-68, 1-69, 1-69a, 1-71a, 1-87, 1-92 | Airport support facilities, including works to modify an existing car park and associated laydown areas, access, working space to support construction | Work No. 4i |
| 1-68, 1-69, 1-69a, 1-70, 1-78, 1-80, 1-81, 1-82, 1-85, 1-87, 1-90, 1-92, 1-93, 2-1139 | Works in connection with Airport Access Road, associated laydown areas, access, working space to support construction | Work No. 6a(01) |
| 1-68, 1-69, 1-69a, 1-70, 1-71a, 1-74, 1-74a, 1-75, 1-76, 1-77, 1-77a, 1-78, 1-80, 1-81, 1-82, 1-85, 1-87, 1-88, 1-90, 1-92, 1-93, 1-94, 1-95, 1-99, 1-100, 2-05, 2-08, 2-09, 2-16, 2-27, 2-66, 2-67, 2-68, 2-84, 2-87, 2-90, 2-96, 2-96a, 2-101, 2-114, 2-117, 2-128, 2-133, 2-134, 3-02, 3-04, 3-05, 3-06, 3-08, 3-11, 5-11 | Works in connection with Airport Access Road, associated laydown areas, access, working space to support construction | Work No. 6a(02) |
| 1-95, 2-05, 2-08, 2-09, 2-16 | Landscape and mitigation works including the provision of structural landscaping, associated laydown areas, access, working space to support construction | Work No. 5a |
| 2-27 | Airport Access Road permanent car parking replacement provision, associated laydown areas, access, working space to support construction | Work No. 4t(01), Work No. 4t(02) |
| 2-62, 2-65, 2-70, 2-79, 2-80 | Offsite highway works, including works at A505 Vauxhall Way/Eaton Green Road, associated laydown areas, access, working space to support construction | Work No. 6e(r) |
| 2-68, 2-71 | Construction of new hangar aprons, associated laydown areas, access, working space to support construction | Work No. 2c(03) |
| 2-84, 2-87, 2-90, 2-96, 2-96a, 2-101, 2-117 | Works in connection with Airport Access Road, associated laydown areas, access, working space to support construction | Work No. 6a(03) |
| 2-93, 2-99, 2-101, 2-108, 2-114, 2-133 | Works in connection with Airport Access Road replacement car parking provision, associated laydown areas, access, working space to support construction | Work No. 4t(03) |
| 2-96a, 2-113, 2-116, 2-120, 2-121, 2-126 | Offsite highway works, including works at Eaton Green Road/Frank Lester Way, associated laydown areas, access, working space to support construction | Work No. 6e(q) |
| 2-114, 2-133 | Works in connection with Airport Access Road, including replacement car parking provision and substation works, associated laydown areas, access, working space to support construction | Work No. 4t(04), Work No. 4w |
| 2-144 | Offsite highway works, including works at Eaton Green Road and Lalleford Road, associated laydown areas, access, working space to support construction | Work No. 6e(d) |
| 3-04, 3-05, 3-06, 3-08, 3-11, 3-15, 3-17, 5-11 | Sitewide works to enable development including earthworks, associated laydown areas, access, working space to support construction | Work No. 1a |
| 3-04, 3-06, 5-11 | Sitewide works to enable development including landfill remediation works, associated laydown areas, access, working space to support construction | Work No. 1b |
| 3-05, 3-06, 3-11, 3-14, 3-15, 3-17, 3-18, 3-22, 3-23, 3-24, 3-25, 3-26, 3-27, 3-28, 3-29 | Offsite highway works, including works to Eaton Green Road and Wigmore Lane, including works to the junction of Wigmore Lane and existing Asda, the removal of the existing roundabout junction and conversion to a signalised junction, the provision of signalised pedestrian crossings and the realignment and widening of the carriageway | Work No. 6e(f) |
| 3-18 | Landscape and mitigation works including enhancements to Wigmore Valley Park, associated laydown areas, access, working space to support construction | Work No. 5b(01) |
| 3-19, 3-20, 3-21, 7-02 | Landscape and mitigation works including the provision of structural landscaping, associated laydown areas, access, working space to support construction | Work No. 5b(02) |
| 3-19, 3-20, 3-21 | Landscape and mitigation works including works to Replacement Open Space and upgrade of footpath, associated laydown areas, access, working space to support construction | Work No. 5b(07) |
| 3-27, 3-28, 3-29, 3-30, 3-36, 3-37, 3-38, 3-39, | Offsite highway works, including works at Wigmore Lane and Crawley Green Road, associated laydown areas, access, working space to support construction | Work No. 6e(e) |
| 3-31, 3-33, 3-34, 3-35 | Offsite highway works, including works at Crawley Green Road/Lalleford Road, associated laydown areas, access, working space to support construction | Work No. 6e(j) |
| 8-01, 8-02, 8-03, 8-04, 8-05, 8-06, 8-07, 8-08, 8-09, 8-10, 8-11, 8-12, 8-13, 8-14, 8-15, 8-16, 8-17, 8-18, 8-19, 8-22, 8-23 | Offsite highway works, including works at M1 J10, including widening to the A1081 westbound carriageway, associated laydown areas, access, working space to support construction | Work No. 6e(o) |
| 8-01, 8-02, 8-03, 8-04, 8-05, 8-06, 8-07, 8-08, 8-09, 8-10, 8-11, 8-12, 8-13, 8-14, 8-15, 8-16, 8-17, 8-18, 8-19, 8-21, 8-22, 8-23 | Offsite highway works, including works at M1 J10, including widening of the western circulatory carriageway, associated laydown areas, access, working space to support construction | Work No. 6e(p) |
| 8-03, 8-05, 8-06, 8-07, 8-08, 8-09, 8-10, 8-11, 8-12, 8-13, 8-14, 8-15, 8-16, 8-17, 8-18, 8-19, 8-22, 8-23 | Offsite highway works, including works at M1 J10, including widening to the northbound off-slip, associated laydown areas, access, working space to support construction | Work No. 6e(n) |
| 8-20 | Offsite highway works, including works at A1081/London Road (South), associated laydown areas, access, working space to support construction | Work No. 6e(h) |
| 8-24, 8-25, 8-26, 8-27 | Offsite highway works, including works at A1081/London Road (North), associated laydown areas, access, working space to support construction | Work No. 6e(g) |
| 9-01, 9-02, 9-03, 9-04, 9-05, 9-06, 9-07, 9-08, 9-09 | Offsite highway works, including works at Windmill Road and Kimpton Road, associated laydown areas, access, working space to support construction | Work No. 6e(a) |
| 9-10, 9-11, 9-13, 9-15, 9-17, 9-18, 9-19, 9-20, 9-21, 9-22, 9-23, 9-24, 9-25 | Offsite highway works, including works at Windmill Road/Manor Road/St. Mary’s Road/Crawley Green Road, associated laydown areas, access, working space to support construction | Work No. 6e(i) |
| 10-01, 10-02, 10-03, 10-04, 10-05, 10-06 | Offsite highway works, including works at A602 Park Way/Stevenage Road, associated laydown areas, access, working space to support construction | Work No. 6e(m) |
| 10-07 | Offsite highway works, including works at A505 Moormead Hill/B655 Pirton Road/Upper Tilehouse Street, associated laydown areas, access, working space to support construction | Work No. 6e(l) |
| 10-08, 10-09 | Offsite highway works, including works at A602 Park Way/A505 Upper Tilehouse Street, associated laydown areas, access, working space to support construction | Work No. 6e(k) |
SCHEDULE 8 — PROTECTIVE PROVISIONS
PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWAGE UNDERTAKERS
1
For the protection of the utility undertakers referred to in this Part of this Schedule the following provisions have effect, unless otherwise agreed in writing between the undertaker and the utility undertaker concerned.
2
In this Part of this Schedule—
- “alternative apparatus” means alternative apparatus adequate to enable the utility undertaker in question to fulfil its statutory functions in a manner no less efficient than previously;
- “apparatus” means— in the case of an electricity undertaker, electric lines or electrical plant (as defined in the Electricity Act 1989[^f00112]), belonging to or maintained by that undertaker; in the case of a gas undertaker, any mains, pipes or other apparatus belonging to or maintained by a gas transporter within the meaning of Part 1 (gas supply) of the Gas Act 1986[^f00113] for the purposes of gas supply; in the case of a water undertaker, mains, pipes or other apparatus belonging to or maintained by that utility undertaker for the purposes of water supply; and in the case of a sewerage undertaker— any drain or works vested in the utility undertaker under the Water Industry Act 1991[^f00114]; and any sewer which is so vested or is the subject of a notice of intention to adopt given under section 102(4)[^f00115] (adoption of sewers and disposal of works) of that Act or an agreement to adopt made under section 104[^f00116] (agreements to adopt sewer, drain or sewage disposal works, at a future date) of that Act, and includes a sludge main, disposal main (within the meaning of section 219 (general interpretation) of that Act) or sewer outfall and any manholes, ventilating shafts, pumps or other accessories forming part of any such sewer, drain or works, and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;
- “functions” includes powers and duties;
- “in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land;
- “plan” includes all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe the works to be executed; and
- “utility undertaker” means— any licence holder within the meaning of Part 1 (electricity supply) of the Electricity Act 1989; a gas transporter within the meaning of Part 1 (gas supply) of the Gas Act 1986; a water undertaker within the meaning of the Water Industry Act 1991; and a sewerage undertaker within the meaning of Part 1 (preliminary) of the Water Industry Act 1991, for the area of the authorised development, and in relation to any apparatus, means the undertaker to whom it belongs or by whom it is maintained.
On street apparatus
3
This Part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and the utility undertaker are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act.
Apparatus in stopped up public rights of way
4
- (1) Where any public right of way is stopped up under article 14 (permanent stopping up of public rights of way), any utility undertaker whose apparatus is in the land in which the public right of way subsists has the same powers and rights in respect of that apparatus in the land in which the public right of way subsists as it enjoyed immediately before the stopping up and the undertaker must grant to the utility undertaker legal easements reasonably satisfactory to the utility undertaker in respect of such apparatus and access to it, but nothing in this paragraph affects any right of the undertaker or of the utility undertaker to require the removal of that apparatus under paragraph 7 or the power of the undertaker to carry out works under paragraph 9.
- (2) Regardless of the temporary alteration, diversion or restriction of any street under the powers conferred by article 13 (temporary stopping up and restriction of use of streets), a utility undertaker is at liberty at all times to take all necessary access across any such stopped up street and to execute and do all such works and things in, upon or under any such street as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the stopping up or diversion was in that street.
Protective works to buildings
5
The undertaker, in the case of the powers conferred by article 20 (protective work to buildings), must exercise those powers so as not to obstruct or render less convenient the access to any apparatus.
Acquisition of land
6
Regardless of any provision in this Order or anything shown on the land plans, the undertaker must not acquire any apparatus otherwise than by agreement.
Removal of apparatus
7
- (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or requires that the utility undertaker’s apparatus is relocated or diverted, that apparatus must not be removed under this Part of this Schedule, and any right of a utility undertaker to maintain that apparatus in that land must not be extinguished, until alternative apparatus has been constructed and is in operation to the reasonable satisfaction of the utility undertaker in question in accordance with sub-paragraphs (2) to (6).
- (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, the undertaker must give to the utility undertaker in question 28 days’ written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order a utility undertaker reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to the utility undertaker the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus.
- (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2) in the land in which the alternative apparatus or part of such apparatus is to be constructed the utility undertaker must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably possible use its best endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.
- (4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between the utility undertaker in question and the undertaker or in default of agreement settled by arbitration in accordance with article 52 (arbitration).
- (5) The utility undertaker in question must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 52 (arbitration), and after the grant to the utility undertaker of any such facilities and rights as are referred to in sub-paragraphs (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.
- (6) Regardless of anything in sub-paragraph (5), if the undertaker gives notice in writing to the utility undertaker in question that the undertaker desires itself to execute any work, or part of any work in connection with the construction or removal of apparatus in any land of the undertaker, that work, instead of being executed by the utility undertaker, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of the utility undertaker.
- (7) If the utility undertaker fails either reasonably to approve, or to provide reasons for its failure to approve along with an indication of what would be required to make acceptable, any proposed details relating to required removal works under sub-paragraph (2) within 28 days of receiving a notice of the required works from the undertaker, then such details are deemed to have been approved, provided that the undertaker has first taken all reasonable steps to contact the relevant representatives of the utility undertaker in order to elicit such a response.
- (8) Any deemed approval under sub-paragraph (7) does not extend to the actual undertaking of the removal works, which remains the sole responsibility of the utility undertaker or its contractors.
Facilities and rights for alternative apparatus
8
- (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to a utility undertaker facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights are to be granted upon such terms and conditions as may be agreed between the undertaker and the utility undertaker in question or in default of agreement settled by arbitration in accordance with article 52 (arbitration).
- (2) In settling those terms and conditions in respect of alternative apparatus to be constructed in the land of the undertaker, the arbitrator will—
- (a) give effect to all reasonable requirements of the undertaker for ensuring the safety and efficient operation of the authorised development and for securing any subsequent alterations or adaptions of the alternative apparatus which may be required to prevent interference with the proposed works of the undertaker; and
- (b) so far as it may be reasonable and practicable to do so in the circumstances of the particular case, give effect to the terms and conditions, if any, applicable to the apparatus constructed in or on the land for which the alternative apparatus is to be substituted.
- (3) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to the utility undertaker in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to that utility undertaker as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.
Retained apparatus
9
- (1) Not less than 28 days before starting the execution of any works in, on or under any land purchased, held, appropriated or used under this Order that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 7(2), the undertaker must submit to the utility undertaker in question a plan of the works to be executed.
- (2) Those works must be executed only in accordance with the plan submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by the utility undertaker for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker is entitled to watch and inspect the execution of those works.
- (3) Any requirements made by a utility undertaker under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which a plan under sub-paragraph (1) is submitted to it.
- (4) If a utility undertaker in accordance with sub-paragraph (3) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 1 to 3 and 6 to 8 apply as if the removal of the apparatus had been required by the undertaker under paragraph 7(2).
- (5) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works unless otherwise agreed with the utility undertaker, a new plan instead of the plan previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan.
- (6) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency but in that case must give to the utility undertaker in question notice as soon as is reasonably practicable and a plan of those works as soon as reasonably practicable subsequently and must comply with sub-paragraph (3) in so far as is reasonably practicable in the circumstances.
Expenses and costs
10
- (1) Subject to the following provisions of this paragraph, the undertaker must repay to a utility undertaker all expenses reasonably incurred by that utility undertaker in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in paragraph 7(2).
- (2) There must be deducted from any sum payable under subparagraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule that value being calculated after removal.
- (3) If in accordance with the provisions of this Part of this Schedule—
- (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
- (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,
and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 52 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the utility undertaker in question by virtue of sub-paragraph (1) must be reduced by the amount of that excess.
- (4) For the purposes of sub-paragraph (3)—
- (a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
- (b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.
- (5) An amount which apart from this sub-paragraph would be payable to a utility undertaker in respect of works by virtue of sub-paragraph (1), if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the utility undertaker any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, is to be reduced by the amount which represents that benefit.
11
- (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any such works referred to in paragraphs 5 or 7(2), or by reason of any subsidence resulting from such development or works, any damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of a utility undertaker, or there is any interruption in any service provided, or in the supply of any goods, by any utility undertaker, the undertaker must—
- (a) bear and pay the cost reasonably incurred by that utility undertaker in making good such damage or restoring the supply; and
- (b) make reasonable compensation to that utility undertaker for any other expenses, loss, damages, penalty or costs incurred by the undertaker,
by reason or in consequence of any such damage or interruption.
- (2) The fact that any act or thing may have been done by a utility undertaker on behalf of the undertaker or in accordance with a plan approved by a utility undertaker or in accordance with any requirement of a utility undertaker or under its supervision does not, subject to sub-paragraph (3), excuse the undertaker from liability under the provisions of sub-paragraph (1) unless a utility undertaker fails to carry out and execute the works properly with due care and attention and in a skilful and professional like manner or in a manner that does not accord with the approved plan.
- (3) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of a utility undertaker, its officers, servants, contractors or agents.
- (4) A utility undertaker must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of the undertaker who, if withholding such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
Cooperation
12
Where in consequence of the proposed construction of any of the authorised development, the undertaker or a utility undertaker requires the removal of apparatus under paragraph 7(2) or a utility undertaker makes requirements for the protection or alteration of apparatus under paragraph 9, the undertaker must use best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of the utility undertaker’s undertaking and each utility undertaker must use its best endeavours to co-operate with the undertaker for that purpose.
13
Where, under this Part, the utility undertaker is required to give its consent or approval in respect of any matter, that consent or approval must not be unreasonably withheld or delayed.
14
Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and a utility undertaker in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.
PART 2 — FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
15
For the protection of any operator, the following provisions have effect, unless otherwise agreed in writing between the undertaker and the operator.
16
In this Part of this Schedule—
- “the 2003 Act” means the Communications Act 2003[^f00117];
- “electronic communications apparatus” has the same meaning as in the electronic communications code;
- “the electronic communications code” has the same meaning as in Chapter 1 (electronic communications networks and services) of Part 2 (networks, services and the radio spectrum) of the 2003 Act[^f00118];
- “electronic communications code network” means— so much of an electronic communications network or infrastructure system provided by an electronic communications code operator as is not excluded from the application of the electronic communications code by a direction under section 106 (application of the electronic communications code) of the 2003 Act; and an electronic communications network which the undertaker is providing or proposing to provide;
- “electronic communications code operator” means a person in whose case the electronic communications code is applied by a direction under section 106 (application of the electronic communications code) of the 2003 Act; and
- “operator” means the operator of an electronic communications code network.
17
The exercise of the powers conferred by article 36 (statutory undertakers) is subject to Part 10 (undertaker’s works affecting electronic communications apparatus) of the electronic communications code.
18
- (1) Subject to sub-paragraphs (2) to (4), if as the result of the authorised development or its construction, or of any subsidence resulting from any of those works—
- (a) any damage is caused to any electronic communications apparatus belonging to an operator (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works), or other property of an operator; or
- (b) there is any interruption in the supply of the service provided by an operator,
the undertaker must bear and pay the cost reasonably incurred by the operator in making good such damage or restoring the supply and make reasonable compensation to that operator for any other expenses, loss, damages, penalty or costs incurred by it, by reason, or in consequence of, any such damage or interruption.
- (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of an operator, its officers, servants, contractors or agents.
- (3) The operator must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise of the claim or demand is to be made without the consent of the undertaker who, if withholding such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
- (4) Any difference arising between the undertaker and the operator under this Part of this Schedule must be referred to and settled by arbitration under article 52 (arbitration).
- (5) This Part of this Schedule does not apply to—
- (a) any apparatus in respect of which the relations between the undertaker and an operator are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act; or
- (b) any damages, or any interruptions, caused by electro-magnetic interference arising from the construction or use of the authorised development.
- (6) In respect of the acquisition of rights under or over or use of the operator’s property, the operator must co-operate with the undertaker with a view to avoiding undue delay
- (7) Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and an operator in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.
PART 3 — FOR THE PROTECTION OF LONDON LUTON AIRPORT OPERATIONS LIMITED
19
- (1) The provisions of this Part of this Schedule—
- (a) have effect unless otherwise agreed in writing between the undertaker and LLAOL; and
- (b) cease to have effect where LLAOL is no longer the airport operator.
- (2) For the period that LLAOL is the airport operator, the undertaker must not—
- (a) in relation to land shown within the airport boundary plan (existing), exercise any power under this Order except with the consent of LLAOL (including, for the avoidance of doubt, the service of notice to Luton Borough Council in accordance with article 44(1) (interaction with LLAOL planning permission) of the Order); and
- (b) exercise any power under this Order in a manner which would compromise the safe and efficient commercial operation of the airport by LLAOL except with the consent of LLAOL; or
- (c) commence the construction of Works Nos. 6b(01), 6b(02) and 6b(03), until a written notice of the works comprising Works Nos. 6b(01), 6b(02) and 6b(03) has been given to LLAOL at least 56 days prior to commencement.
PART 4 — FOR THE PROTECTION OF CADENT GAS LIMITED
Application
20
For the protection of Cadent the following provisions will, unless otherwise agreed in writing between the undertaker and Cadent, have effect.
Interpretation
21
In this Part of this Schedule—
- “alternative apparatus” means appropriate alternative apparatus to the reasonable satisfaction of Cadent to enable Cadent to fulfil its statutory functions in a manner no less efficient than previously;
- “apparatus” means gas mains, pipelines, pipes, pressure governors, ventilators, cathodic protection (including transformed rectifiers and associated groundbeds or cables), cables, marker posts, block valves, hydrogen above ground installations or other apparatus belonging to, or maintained by, Cadent for the purposes of Cadent’s undertaking together with any replacement apparatus and such other apparatus constructed pursuant to this Order that becomes operational apparatus of Cadent for the purposes of Cadent’s undertaking and includes any structure in which apparatus is or will be lodged or which gives or will give access to apparatus;
- “Cadent” means Cadent Gas Limited (company number 10080864), whose registered office is at Pilot Way, Ansty, Coventry, CV7 9JU), and includes its successors in title or any successor as a gas transporter within the meaning of Part 1 of the Gas Act 1986[^f00119];
- “Cadent’s undertaking” means the rights, duties and obligations of Cadent as a public gas transporter within the meaning of section 7 (licensing of public gas transporters) of the Gas Act 1986 (as amended by the Gas Act 1995[^f00120]);
- “commence” and “commencement” include any below ground or intrusive surveys, monitoring, work operations or remedial work in respect of any contamination or other adverse ground condition, the receipt and erection of construction plant and equipment, and intrusive investigations for the purpose of assessing ground conditions;
- “deed of consent” means a deed of consent, crossing agreement, deed of variation or new deed of grant agreed between the parties acting reasonably in order to vary or replace existing easements, agreements, enactments and other such interests so as to secure land rights and interests as are necessary to carry out, maintain, operate and use the apparatus in a manner consistent with the terms of this Part of this Schedule;
- “facilities and rights” for construction and for maintenance include any appropriate working areas required to reasonably and safely undertake that construction or maintenance, and any necessary rights of access;
- “functions” includes powers and duties;
- “ground mitigation scheme” means a scheme approved by Cadent (such approval not to be unreasonably withheld or delayed) setting out the necessary measures (if any) for a ground subsidence event;
- “ground monitoring scheme” means a scheme for monitoring ground subsidence which sets out the apparatus which is to be subject to such monitoring, the extent of land to be monitored, the manner in which ground levels are to be monitored, the timescales of any monitoring activities and the extent of ground subsidence which, if exceeded, require the undertaker to submit for Cadent’s approval a ground mitigation scheme;
- “ground subsidence event” means any ground subsidence identified by the monitoring activities set out in the ground monitoring scheme that has exceeded the level described in the ground monitoring scheme as requiring a ground mitigation scheme;
- “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over, across, along or upon such land;
- “maintain” and “maintenance” have effect as if Cadent’s existing apparatus was authorised development and as if the term maintain includes protect and use;
- “plan” or “plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe and assess the works to be executed;
- “rights” includes restrictive covenants and, in relation to decommissioned apparatus, the surrender of rights, release of liabilities and transfer of decommissioned apparatus; and
- “specified works” means any of the authorised development or activities (including maintenance) undertaken in association with the authorised development which— will or may be situated over, or within 15 metres measured in any direction of any apparatus the removal of which has not been required by the undertaker under sub-paragraph 26(2) or otherwise; or may in any way adversely affect any apparatus the removal of which has not been required by the undertaker under sub-paragraph 26(2) or otherwise.
On street apparatus
22
- (1) This Part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and Cadent are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act, except for—
- (a) paragraphs 23 (apparatus of Cadent in stopped up rights of way), 28 (retained apparatus: protection of Cadent), 29 (expenses) and 30 (indemnity); and
- (b) where sub-paragraph (2) applies, paragraphs 26 (removal of apparatus) and 27 (facilities and rights for alternative apparatus).
- (2) This sub-paragraph applies where any apparatus is diverted from an alignment within the existing adopted public highway but not wholly replaced within the existing public highway, notwithstanding that any diversion may be carried out under the provisions of Part 3 of the 1991 Act.
- (3) Paragraph 29 (expenses) does not apply to any part of the authorised development that affects Cadent’s apparatus in a street and which constitutes major highway works, major bridge works or major transport works for the purposes of Part 3 of the 1991 Act, but instead—
- (a) any allowable costs of the measures needing to be taken in relation to that apparatus in consequence of the authorised development, or in order to facilitate their execution, is to be determined in accordance with Part 3 and section 85 (sharing of cost of necessary measures) of that Act, and any regulations for the time being having effect under that section; and
- (b) any allowable costs are to be borne by the undertaker and Cadent in such proportions as may be prescribed by any such regulations.
Apparatus of Cadent in stopped up rights of way
23
- (1) Where any public right of way is stopped up under article 14 (permanent stopping up of public rights of way), if Cadent has any apparatus in the public right of way or accessed via that public right of way Cadent is entitled to the same rights in respect of such apparatus as it enjoyed immediately before the stopping up and the undertaker must grant to Cadent, or procure the granting to Cadent of, legal easements reasonably satisfactory to Cadent in respect of such apparatus and access to it prior to the stopping up of any such public right of way, but nothing in this paragraph affects any right of the undertaker or of Cadent to require the removal of that apparatus under paragraph 26 (removal of apparatus).
- (2) Notwithstanding the temporary stopping up, alteration, diversion or restriction of use of any street under the powers of article 13 (temporary stopping up and restriction of use of streets), Cadent will be at liberty at all times to take all necessary access across any such street and to execute and do all such works and things in, upon or under any such street as it would have been entitled to do immediately before such temporary stopping up, alteration, diversion or restriction in respect of any apparatus which at the time of the stopping up, alteration, diversion or restriction of use was in that street.
Protective works to buildings
24
The undertaker must exercise the powers conferred by article 20 (protective work to buildings) so as not to obstruct or render less convenient the access to any apparatus without the written consent of Cadent (such consent not to be unreasonably withheld or delayed).
Acquisition of land
25
- (1) Regardless of any provision in this Order or anything shown on the land plans or contained in the book of reference to the Order, the undertaker may not appropriate or acquire any interest in land or appropriate, acquire, extinguish, interfere with or override any easement or other interest in land of Cadent otherwise than by agreement.
- (2) As a condition of agreement between the parties in sub-paragraph (1), prior to the carrying out or maintenance of any part of the authorised development (or in such other timeframe as may be agreed between Cadent and the undertaker) that is subject to the requirements of this Part of this Schedule that will cause any conflict with or breach the terms of any easement or other legal or land interest of Cadent or affect the provisions of any enactment or agreement regulating the relations between Cadent and the undertaker in respect of any apparatus laid or erected in land belonging to or secured by the undertaker, the undertaker must as Cadent reasonably requires enter into such deeds of consent upon such terms and conditions as may be agreed between Cadent and the undertaker acting reasonably and which must be no less favourable on the whole to Cadent unless otherwise agreed by Cadent, and it will be the responsibility of the undertaker to procure or secure the consent to and entering into of such deeds and variations by all other third parties with an interest in the land at that time who are affected by such authorised development or maintenance thereof.
- (3) The undertaker and Cadent agree that where there is any inconsistency or duplication between the provisions set out in this Part of this Schedule relating to the relocation or removal of apparatus, including but not limited to the payment of costs and expenses relating to such relocation or removal of apparatus and the provisions of any existing easement, rights, agreements and licences granted, used, enjoyed or exercised by Cadent and other enactments relied upon by Cadent as of right or other use in relation to the apparatus, then the provisions in this Part of this Schedule prevail.
- (4) Any agreement or consent granted by Cadent under paragraph 28 (retained apparatus: protection of Cadent) or any other paragraph of this Part of this Schedule, is not to be taken to constitute agreement under sub-paragraph (1).
- (5) As a condition of an agreement under sub-paragraph (1) that involves de-commissioned apparatus being left in situ the undertaker must accept a surrender of any existing easement or other interest of Cadent in such decommissioned apparatus and release Cadent from all liabilities in respect of such de-commissioned apparatus from the date of such surrender.
- (6) Where the undertaker acquires land which is subject to any right or interest of Cadent (including, without limitation, easements and agreements relating to rights or other interests) and the provisions of paragraph 26 (removal of apparatus) do not apply, the undertaker must, unless Cadent agrees otherwise—
- (a) retain any notice of Cadent’s easement, right or other interest on the title to the relevant land when registering the undertaker’s title to such acquired land; and
- (b) (where no such notice of Cadent’s easement, right or other interest exists in relation to such acquired land or any such notice is registered only on the Land Charges Register) include (with its application to register title to the undertaker’s interest in such acquired land at the Land Registry) a notice of Cadent’s easement, right or other interest in relation to such acquired land.
Removal of apparatus
26
- (1) If, in the exercise of the powers conferred by this Order, including pursuant to any agreement reached in accordance with paragraph 25 (acquisition of land), the undertaker acquires any interest in any land in which any apparatus is placed, that apparatus must not be decommissioned or removed under this Part of this Schedule and any right of Cadent to maintain that apparatus in that land must not be extinguished until alternative apparatus has been constructed, is in operation, and the facilities and rights referred to in sub-paragraph (2) have been provided, to the reasonable satisfaction of Cadent and in accordance with sub-paragraphs (2) to (5) inclusive.
- (2) If, for the purpose of executing any works in, on, under or over any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it must give to Cadent advance written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order Cadent reasonably needs to move or remove any of its apparatus) the undertaker must afford to Cadent to its satisfaction (taking into account paragraph 27(1) (facilities and rights for alternative apparatus) the necessary facilities and rights—
- (a) for the construction of alternative apparatus (including appropriate working areas required to reasonably and safely undertake necessary works by Cadent in respect of the apparatus);
- (b) subsequently for the maintenance of that apparatus (including appropriate working areas required to reasonably and safely undertake necessary maintenance by Cadent in respect of the apparatus); and
- (c) to allow access to that apparatus.
- (3) If the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2), in the land in which the alternative apparatus or part of such apparatus is to be constructed, Cadent must, on receipt of a written notice to that effect from the undertaker, take such steps as are reasonable in the circumstances in an endeavour to assist the undertaker in obtaining the necessary facilities and rights in the land in which the alternative apparatus is to be constructed as soon as reasonably practicable save that this obligation does not extend to the requirement for Cadent to use its compulsory purchase powers to this end unless it (in its absolute discretion) elects to so do.
- (4) Any alternative apparatus to be constructed in land of or land secured by the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between Cadent and the undertaker.
- (5) Cadent must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration, and subject to the prior grant to Cadent of such facilities and rights as are referred to in sub-paragraph (2) or (3), then proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to decommission or remove any apparatus required by the undertaker to be decommissioned or removed under the provisions of this Part of this Schedule.
Facilities and rights for alternative apparatus
27
- (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to or secures for Cadent facilities and rights in land for the access to, construction and maintenance of alternative apparatus in substitution for apparatus to be decommissioned or removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and Cadent and must be no less favourable on the whole to Cadent than the facilities and rights enjoyed by it in respect of the apparatus to be decommissioned or removed unless otherwise agreed by Cadent.
- (2) If the facilities and rights to be afforded by the undertaker and agreed with Cadent under sub-paragraph (1) in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are less favourable on the whole to Cadent than the facilities and rights enjoyed by it in respect of the apparatus to be decommissioned or removed, then the terms and conditions to which those facilities and rights are subject may be referred to arbitration in accordance with paragraph 34 (arbitration) of this Part of this Schedule and the arbitrator must make such provision for the payment of compensation by the undertaker to Cadent as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.
Retained apparatus: protection of Cadent
28
- (1) Not less than 56 days before the commencement of any specified works the undertaker must submit to Cadent a plan and, if reasonably required by Cadent, a ground monitoring scheme in respect of those works.
- (2) The plan to be submitted to Cadent under sub-paragraph (1) must include a method statement and describe—
- (a) the exact position of the works;
- (b) the level at which these are proposed to be constructed or renewed;
- (c) the manner of their construction or renewal including details of excavation, positioning of plant etc.;
- (d) the position of all apparatus;
- (e) by way of detailed drawings, every alteration proposed to be made to or close to any such apparatus; and
- (f) any intended maintenance regimes.
- (3) The undertaker must not commence any specified works until Cadent has given written approval of the plan so submitted (and the ground monitoring scheme if required).
- (4) Any approval of Cadent given under sub-paragraph (3)—
- (a) may be given subject to reasonable conditions for any purpose mentioned in sub-paragraph (5); and
- (b) must not be unreasonably withheld or delayed and Cadent must meaningfully engage with the undertaker within 28 days of the date of submission of the plan under sub-paragraph (1).
- (5) Cadent may require such modifications to be made to the plan as may be reasonably necessary for the purpose of securing its apparatus against interference or risk of damage or for the purpose of providing or securing proper and convenient means of access to any apparatus.
- (6) Specified works must only be executed in accordance with—
- (a) the plan submitted under sub-paragraph (1) (and ground monitoring scheme if required), as approved or as amended from time to time by agreement between the undertaker and Cadent; and
- (b) all conditions imposed under sub-paragraph (4)(a),
and Cadent will be entitled to watch and inspect the execution of those works where reasonably practicable to do so and in accordance with any relevant health and safety legislation.
- (7) Where Cadent requires any protective works to be carried out by itself or by the undertaker (whether of a temporary or permanent nature) such protective works, inclusive of any measures or schemes required and approved as part of the plan approved pursuant to this paragraph, must be carried out to Cadent’s satisfaction prior to the commencement of any specified works (or any relevant part thereof) for which protective works are required prior to commencement.
- (8) If Cadent, in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 20 to 22 and 25 to 27 apply as if the removal of the apparatus had been required by the undertaker under sub-paragraph 26(2).
- (9) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 56 days before commencing the execution of the specified works, a new plan (and the ground monitoring scheme if required), instead of the plan previously submitted, and having done so the provisions of this paragraph will apply to and in respect of the new plan (and the ground monitoring scheme if required).
- (10) As soon as reasonably practicable after any ground subsidence event attributable to the authorised development (including such an event attributable to its maintenance)—
- (a) the undertaker must implement an appropriate ground mitigation scheme; and
- (b) Cadent retains the right to carry out any further necessary protective works for the safeguarding of its apparatus and can recover any such costs in line with paragraph 29 (expenses).
- (11) The undertaker is not required to comply with sub-paragraph (1) where it needs to carry out emergency works but in that case it must give to Cadent notice as soon as is reasonably practicable and a plan of those works and must comply with the conditions imposed under sub-paragraph (4)(a) insofar as is reasonably practicable in the circumstances.
- (12) In this paragraph, “emergency works” means works whose execution at the time when they are executed is required in order to put an end to, or to prevent the occurrence of, circumstances then existing or imminent (or which the person responsible for the works believes on reasonable grounds to be existing or imminent) which are likely to cause danger to persons or property.
Expenses
29
- (1) Subject to the following provisions of this paragraph, the undertaker must pay to Cadent within 28 days of receipt of an invoice all charges, costs and expenses reasonably anticipated or reasonably incurred by Cadent in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of any apparatus or the construction of any new or alternative apparatus which may be required in consequence of the execution of any authorised development including without limitation—
- (a) any costs reasonably incurred by or compensation properly paid by Cadent in connection with the acquisition of rights or the exercise of statutory powers for such apparatus including without limitation all costs (including professional fees) incurred by Cadent as a consequence of Cadent—
- (i) using its own compulsory purchase powers to acquire any necessary rights under paragraph 26(3) if it elects to do so; or
- (ii) exercising any compulsory purchase powers under this Order transferred to or benefitting Cadent;
- (b) in connection with the cost of the carrying out of any diversion work or the provision of any alternative apparatus;
- (c) the cutting off of any apparatus from any other apparatus or the making safe of redundant apparatus;
- (d) the approval of plans;
- (e) the carrying out of protective works, plus a capitalised sum to cover the cost of maintaining and renewing permanent protective works;
- (f) the survey of any land, apparatus or works, the inspection and monitoring of works or the installation or removal of any temporary works reasonably necessary in consequence of the execution of any such works referred to in this Part of this Schedule;
- (g) any watching brief pursuant to sub-paragraph 28(6).
- (2) There will be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule and which is not re-used as part of the alternative apparatus, that value being calculated after removal.
- (3) If in accordance with the provisions of this Part of this Schedule—
- (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
- (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated, and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with paragraph 34 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to Cadent by virtue of sub-paragraph (1) will be reduced by the amount of that excess save to the extent that it is not possible in the circumstances (or it would be unlawful due to a statutory or regulatory change) to obtain the existing type of apparatus at the same capacity and dimensions or place at the existing depth in which case full costs will be borne by the undertaker.
- (4) For the purposes of sub-paragraph (3)—
- (a) an extension of apparatus to a length greater than the length of existing apparatus will not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
- (b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole will be treated as if it also had been agreed or had been so determined.
- (5) An amount which apart from this sub-paragraph would be payable to Cadent in respect of works by virtue of sub-paragraph (1) will, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on Cadent any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.
Indemnity
30
- (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any such works authorised by this Part of this Schedule (including without limitation relocation, diversion, decommissioning, construction and maintenance of apparatus or alternative apparatus) or in consequence of the construction, use, maintenance or failure of any of the authorised development (including works carried out under article 20 (protective work to buildings)) by or on behalf of the undertaker or in consequence of any act or default of the undertaker (or any person employed or authorised by the undertaker) in the course of carrying out such works, including without limitation works carried out by the undertaker under this Part of this Schedule or any subsidence resulting from any of these works, any damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of the authorised development) or property of Cadent, or there is any interruption in any service provided, or in the supply of any goods, by Cadent, or Cadent becomes liable to pay any amount to any third party, the undertaker will—
- (a) bear and pay on demand accompanied by an invoice or claim from Cadent, the cost reasonably incurred by Cadent in making good such damage or restoring the supply; and
- (b) indemnify Cadent for any other expenses, loss, demands, proceedings, damages, claims, penalty, compensation or costs properly incurred by, paid by or recovered from Cadent, by reason or in consequence of any such damage or interruption or Cadent becoming liable to any third party as aforesaid other than arising from any default of Cadent.
- (2) The fact that any act or thing may have been done by Cadent on behalf of the undertaker or in accordance with a plan approved by Cadent or in accordance with any requirement of Cadent or under its supervision including under any watching brief will not (unless sub-paragraph (3) applies) excuse the undertaker from liability under the provisions of this sub-paragraph (1) unless Cadent fails to carry out and execute the works properly with due care and attention and in a skilful and workman like manner or in a manner that does not accord with the approved plan.
- (3) Nothing in sub-paragraph (1) imposes any liability on the undertaker in respect of—
- (a) any damage or interruption to the extent that it is attributable to the neglect or default of Cadent, its officers, servants, contractors or agents;
- (b) any part of the authorised development carried out by Cadent in the exercise of any functions conferred by this Order pursuant to a grant or transfer under article 8 (consent to transfer benefit of Order); and
- (c) any indirect or consequential loss of any third party (including but not limited to loss of use, revenue, profit, contract, production, increased cost of working or business interruption) arising from any such damage or interruption, which is not reasonably foreseeable at the commencement of the relevant works referred to in sub-paragraph (1).
- (4) Cadent must give the undertaker reasonable notice of any such third party claim or demand and no settlement, admission of liability or compromise must, unless payment is required in connection with a statutory compensation scheme, be made without first consulting the undertaker and considering their representations.
Enactments and agreements
31
Except where this Part of this Schedule provides otherwise, nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and Cadent in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.
Co-operation
32
- (1) Where in consequence of the proposed construction of any part of the authorised development, the undertaker or Cadent requires the removal of apparatus under paragraph 26(2) (removal of apparatus) or Cadent makes requirements for the protection or alteration of apparatus under paragraph 28 (retained apparatus: protection of Cadent), the undertaker must use its best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of Cadent’s undertaking and Cadent must use its best endeavours to co-operate with the undertaker for that purpose.
- (2) For the avoidance of doubt whenever Cadent’s consent, agreement or approval is required in relation to plans, documents or other information submitted by the undertaker or the taking of action by the undertaker, it must not be unreasonably withheld or delayed.
Access
33
If in consequence of any agreement reached in accordance with paragraph 25(1) (acquisition of land) or the powers conferred by this Order the access to any apparatus is materially obstructed, the undertaker must provide such alternative rights and means of access to such apparatus as will enable Cadent to maintain or use the apparatus no less effectively than was possible before such obstruction.
Arbitration
34
Save for differences or disputes arising under sub-paragraphs 26(2) (removal of apparatus) any difference or dispute arising between the undertaker and Cadent under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and Cadent, be determined by arbitration in accordance with article 52 (arbitration).
Notices
35
Notwithstanding article 51 (service of notices) any plans submitted to Cadent by the undertaker pursuant to paragraph 28(1) (retained apparatus: protection of Cadent) must be sent via email and post to such email and postal addresses as Cadent may from time to time appoint for that purpose and notify to the undertaker in writing.
PART 5 — FOR THE PROTECTION OF NATIONAL HIGHWAYS LIMITED
Application, etc.
36
- (1) The provisions of this Part of this Schedule apply for the protection of National Highways of Bridge House, 1 Walnut Tree Close, Guildford, Surrey, GU1 4LZ (company registration number 09346363) and all successors in title and have effect unless otherwise agreed in writing between the undertaker and National Highways.
- (2) An agreement for the purpose of sub-paragraph (1) includes, but is not limited to, an agreement made under article 17 (agreements with street authorities) of this Order, or under the 1980 Act provided that the agreement expressly refers to paragraph 36 of this Schedule.
- (3) Nothing in this Order affects or prejudices the operation of the powers and duties of National Highways or the Secretary of State under the 1980 Act, the 1984 Act, the 1991 Act, the Transport Act 2000[^f00121], or Town and Country Planning (General Permitted Development) (England) Order 2015[^f00122] which continues to apply in respect of the exercise of all National Highways’ statutory functions.
Interpretation
37
- (1) Where the terms defined in article 2 (interpretation) of this Order are inconsistent with subparagraph (2) the latter prevail.
- (2) In this Part of this Schedule—
- “as built information” means one electronic copy of the following information— as constructed drawings in both PDF and AutoCAD DWG formats for anything designed by the undertaker; in compliance with Interim Advice Note 184 or any successor document; list of suppliers and materials used, as well as any relevant test results and CCTV surveys (if required to comply with DMRB standards); product data sheets and technical specifications for all materials used; as constructed information for any utilities discovered or moved during the works; method statements for the works carried out; in relation to road lighting, signs, and traffic signals any information required by Series 1300 and 1400 of the Specification for Highway Works or any replacement or modification of it; organisation and methods manuals for all products used; as constructed programme; test results and records as required by the detailed design information and during construction phase of the project; a stage 3 road safety audit subject to any exceptions to the road safety audit standard as agreed by the undertaker and National Highways; the health and safety file; and such other information as is reasonably required by National Highways to be used to update all relevant databases and to ensure compliance with National Highway’s Asset Data Management Manual as is in operation at the relevant time;
- “the bond sum” means the sum equal to 200% of the cost of carrying out the specified works (to include all costs plus any commuted sum) or such other sum agreed between the undertaker and National Highways;
- “the cash surety” means the sum agreed between the undertaker and National Highways;
- “commuted sum” means such sum calculated as provided for in paragraph 48 (commuted sums) of this Part of this Schedule to be used to fund the future cost of maintaining the specified works;
- “condition survey” means a survey of the condition of National Highways structures and assets within the Order limits that in the reasonable opinion of National Highways may be affected by the specified works;
- “contractor” means any contractor or subcontractor appointed by the undertaker to carry out the specified works;
- “defects period” means the period from the date of the provisional certificate to the date of the final certificate which is to be no less than 12 months from the date of the provisional certificate;
- “detailed design information” means such of the following drawings specifications and calculations as are relevant to the development— site clearance details; boundary, environmental and mitigation fencing; road restraints systems and supporting road restraint risk appraisal process assessment; drainage and ducting as required by DMRB CD 535 Drainage asset data and risk management and DMRB CS551 Drainage surveys – standards for Highways earthworks including supporting geotechnical assessments required by DMRB CD622 Managing geotechnical risk and any required strengthened earthworks appraisal form certification; pavement, pavement foundations, kerbs, footways and paved areas; traffic signs and road markings; traffic signal equipment and associated signal phasing and timing detail; road lighting (including columns and brackets); regime of California Bearing Ratio testing; electrical work for road lighting, traffic signs and signals; motorway communications as required by DMRB; highway structures and any required structural approval in principle; landscaping; proposed departures from DMRB standards; walking, cycling and horse riding assessment and review report; stage 1 and stage 2 road safety audits and exceptions agreed; utilities diversions; topographical survey; maintenance and repair strategy in accordance with DMRB GD304 Designing health and safety into maintenance or any replacement or modification of it; health and safety information including any asbestos survey required by GG105 or any successor document; and other such information that may be reasonably required by National Highways to be used to inform the detailed design of the specified works;
- “DBFO contract” means the contract between National Highways and the highway operations and maintenance contractor for the maintenance and operation of parts of the strategic road network which are within the Order Limits or any successor or replacement contract that may be current at the relevant time;
- “DMRB” means the Design Manual for Roads and Bridges or any replacement or modification of it;
- “final certificate” means the certificate relating to those aspects of the specified works that have resulted in any alteration to the strategic road network to be issued by National Highways pursuant to paragraph 46;
- “the health and safety file” means the file or other permanent record containing the relevant health and safety information for the authorised development required by the Construction (Design and Management) Regulations 2015 (or such updated or revised regulations as may come into force from time to time);
- “highway operations and maintenance contractor” means the contractor appointed by National Highways under the DBFO contract;
- “nominated persons” means the undertaker’s representatives or the contractor’s representatives on site during the carrying out of the specified works as notified to National Highways from time to time;
- “programme of works” means a document setting out the sequence and timetabling of the specified works;
- “provisional certificate” means the certificate of provisional completion relating to those aspects of the specified works that have resulted in any alteration to the strategic road network to be issued by National Highways in accordance with paragraph 42 when it considers the specified works are substantially complete and may be opened for traffic;
- “road safety audit” means an audit carried out in accordance with the road safety audit standard;
- “road safety audit standard” means DMRB Standard HD GG119 or any replacement or modification of it;
- “road space booking” means road space bookings in accordance with National Highways’ Asset Management Operational Requirements (AMOR) including Network Occupancy Management System (NOMS) used to manage road space bookings and network occupancy;
- “Specification for Highways Works” means the specification for highways works forming part of the manual of contract documents for highway works published by National Highways and setting out the requirements and approvals procedures for work, goods or materials used in the construction, improvement or maintenance of the strategic road network;
- “specified works” means so much of any work, including highway works and signalisation, authorised by this Order including any maintenance of that work, as is on, in, under or over the strategic road network for which National Highways is the highway authority;
- “strategic road network” means any part of the road network including trunk roads, special roads or streets for which National Highways is the highway authority including drainage infrastructure, street furniture, verges and vegetation and all other land, apparatus and rights located in, on, over or under the highway;
- “utilities” means any pipes wires cables or equipment belonging to any person or body having power or consent to undertake street works under the 1991 Act; and
- “winter maintenance” means maintenance of the road surface to deal with snow and ice.
- (3) References to any standards, manuals, contracts, Regulations and Directives including to specific standards forming part of the DMRB are, for the purposes of this Part of this Schedule, to be construed as a reference to the same as amended, substituted or replaced, and with such modifications as are required in those circumstances.
- (4) For the purposes of its obligations to procure a bond under this Part of this Schedule, the undertaker may procure a bond in relation to the specified works, and a separate bond in relation to the commuted sums, and in those circumstances references in this Part to “bond” and “bond sum” means both bonds together.
General
38
The undertaker acknowledges that parts of the works authorised by this Order affect or may affect parts of the strategic road network in respect of which National Highways have appointed the highway operations and maintenance contractor.
Prior approvals and security
39
- (1) The specified works must not commence until—
- (a) a stage 1 and stage 2 road safety audit has been carried out and all recommendations raised by them or any exceptions are approved by National Highways;
- (b) the programme of works has been approved by National Highways;
- (c) the detailed design of the specified works comprising of the following details, insofar as considered relevant by National Highways, has been submitted to and approved by National Highways—
- (i) the detailed design information, incorporating all recommendations and any exceptions approved by National Highways under sub-paragraph (a);
- (ii) details of the proposed road space bookings with National Highways;
- (iii) the identity of the contractor and nominated persons;
- (iv) to the extent that this is not provided for in the Construction and Traffic Management Plan, a process for stakeholder liaison, with key stakeholders to be identified and agreed between National Highways and the undertaker;
- (v) information demonstrating that the walking, cycling and horse riding assessment and review process undertaken by the undertaker in relation to the specified works has been adhered to in accordance with DMRB GG142 – Designing for walking, cycling and horse riding;
- (d) to the extent that this is not provided for in the Construction and Traffic Management Plan, a scheme of traffic management relating to traffic management on the strategic road network has (where relevant) been submitted by the undertaker and approved by National Highways such scheme to be capable of amendment by agreement between the undertaker and National Highways from time to time;
- (e) stakeholder liaison has (where relevant) taken place in accordance with the process for such liaison agreed between the undertaker and National Highways under sub-paragraph (c)(iv);
- (f) National Highways has approved the audit brief and CVs for all road safety audits and exceptions to items raised in accordance with the road safety audit standard;
- (g) the undertaker has agreed the estimate of the commuted sum with National Highways;
- (h) the scope of all maintenance operations (routine inspections, incident management, reactive and third party damage) to be carried out by the undertaker during the construction of the specified works (which must include winter maintenance) has been agreed in writing by National Highways;
- (i) the undertaker has procured to National Highways collateral warranties in a form reasonably approved by National Highways from the contractor and designer of the specified works in favour of National Highways to include covenants requiring the contractor and designer to exercise all reasonable skill care and diligence in designing and constructing the specified works, including in the selection of materials, goods, equipment and plant; and
- (j) a condition survey and regime of monitoring of any National Highways assets or structures that National Highways reasonably considers will be affected by the specified works, has been agreed in writing by National Highways.
- (2) The undertaker must not exercise—
- (a) article 4 (maintenance of authorised development);
- (b) article 10 (street works);
- (c) article 11 (power to alter layout, etc., of streets);
- (d) article 12 (construction and maintenance of new, altered or diverted streets);
- (e) article 13 (temporary stopping up and restriction of use of streets);
- (f) article 14 (permanent stopping up or public rights of way);
- (g) article 15 (access to works);
- (h) article 16 (traffic regulation);
- (i) article 19 (discharge of water);
- (j) article 20 (protective works to buildings) insofar as this relates to buildings owned or operated by National Highways;
- (k) article 21 (authority to survey and investigate the land);
- (l) article 22 (felling, lopping and removal of trees, shrubs and hedgerows);
- (m) article 33 (temporary use of land for carrying out the authorised development); or
- (n) article 34 temporary use of land for maintaining the authorised development),
of this Order, over any part of the strategic road network without the consent of National Highways, and National Highways may in connection with any such exercise require the undertaker to provide details of any proposed road space bookings and/or submit a scheme of traffic management for National Highways’ approval.
- (3) National Highways must prior to the commencement of the specified works or the exercise of any power referenced in sub-paragraph (2) inform the undertaker of the identity of the person who will act as a point of contact on behalf of National Highways for consideration of the information required under sub-paragraph (1) or (2).
- (4) National Highways must provide the undertaker with a list of all the structures, assets and pavements to be subject to both a condition survey and regime of monitoring pursuant to sub-paragraph (1)(i) and paragraph 44(1) (final condition survey) of this Part of this Schedule before the first condition survey is conducted and the regime of monitoring is implemented.
- (5) Any approval or consent of National Highways required under this paragraph—
- (a) must not be unreasonably withheld or delayed;
- (b) must be given in writing;
- (c) in the case of a refusal must be accompanied by a statement of grounds for refusal;
- (d) shall be deemed to have been refused if neither given nor refused within 2 months of the receipt of the information for approval or, where further particulars are requested by National Highways within 2 months of receipt of the information to which the request for further particulars relates; and
- (e) may be subject to any conditions as National Highways reasonably considers necessary.
- (6) Any change to the identity of the contractor and/or designer of the specified works will be notified to National Highways immediately along with collateral warranties in a form agreed by National Highways acting reasonably.
- (7) Any change to the detailed design of the specified works must be approved by National Highways in accordance with sub-paragraph (1) of this Part of this Schedule.
Construction of the specified works
40
- (1) The undertaker must—
- (a) as soon as reasonably practicable following service of notice under article 44(1) (interaction with LLAOL planning permission), inform National Highways that such notice has been served;
- (b) give National Highways 28 days’ notice in writing of the date on which the specified works will start unless otherwise agreed by National Highways; and
- (c) give National Highways as much notice as is reasonably practicable of any element of the authorised development that the undertaker reasonably considers would significantly affect the strategic road network or the level of traffic on the strategic road network.
- (2) The undertaker must comply with National Highways’ road space booking procedures prior to and during the carrying out of the specified works and no specified works for which a road space booking is required is to commence without a road space booking having first been secured from National Highways, such road space booking not to be unreasonably withheld or delayed.
- (3) The specified works must be carried out by the undertaker to the reasonable satisfaction of National Highways in accordance with—
- (a) the relevant detailed design information and programme of works approved pursuant to paragraph 39(1) (prior approvals and security) or as subsequently varied by agreement between the undertaker and National Highways;
- (b) the DMRB, the Manual of Contract Documents for Highway Works, including the Specification for Highway Works, together with all other relevant standards as required by National Highways to include, inter alia; all relevant interim advice notes, the Traffic Signs Manual and the Traffic Signs Regulations and General Directions 2016[^f00123] save to the extent that exceptions from those standards apply which have been approved by National Highways; and
- (c) all aspects of the Construction (Design and Management) Regulations 2015[^f00124] or any statutory amendment or variation of the same and in particular the undertaker, as client, must ensure that all client duties (as defined in the said regulations) are undertaken to the reasonable satisfaction of National Highways.
- (4) The undertaker must permit and must require the contractor to permit at all reasonable times persons authorised by National Highways (whose identity must have been previously notified to the undertaker by National Highways) to gain access to the specified works for the purposes of inspection and supervision of the specified works.
- (5) If any part of the specified works is constructed—
- (a) other than in accordance with the requirements of this Part of this Schedule; or
- (b) in a way that causes damage to the highway, highway structure or asset or any other land of National Highways,
National Highways may by notice in writing require the undertaker, at the undertaker’s own expense, to comply promptly with the requirements of this Part of this Schedule or remedy any damage notified to the undertaker under this Part of this Schedule, to the reasonable satisfaction of National Highways.
- (6) If during the carrying out of the authorised development the undertaker or its appointed contractors or agents causes damage to the strategic road network then National Highways may by notice in writing require the undertaker, at its own expense, to remedy the damage.
- (7) If within 28 days on which a notice under sub-paragraph (5) or sub-paragraph (6) is served on the undertaker (or in the event of there being, in the opinion of National Highways, a danger to road users of the strategic road network, within such lesser period as National Highways may stipulate), the undertaker has failed to take the steps required by that notice, National Highways may carry out the steps required of the undertaker and may recover any expenditure incurred by National Highways in so doing, such sum to be payable within 30 days of demand.
- (8) Nothing in this Part of this Schedule prevents National Highways from carrying out any work or taking any such action as it reasonably believes to be necessary as a result of or in connection with the carrying out or maintenance of the authorised development without prior notice to the undertaker in the event of an emergency or to prevent the occurrence of danger to the public and National Highways may recover any expenditure it reasonably incurs in so doing.
- (9) In constructing the specified works, the undertaker must at its own expense divert or protect all utilities and all agreed alterations and reinstatement of highway over existing utilities must be constructed to the reasonable satisfaction of National Highways.
- (10) During the construction of the specified works the undertaker must carry out all maintenance (including winter maintenance) in accordance with the scope of maintenance operations agreed by National Highways pursuant to paragraph 39(1)(h) (prior approvals and security) and the undertaker must carry out such maintenance at its own cost.
- (11) The undertaker must notify National Highways if it fails to complete the specified works in accordance with the agreed programme pursuant to paragraph 39(1)(b) of this Part of this Schedule or suspends the carrying out of any specified work beyond a reasonable period of time and National Highways reserves the right to withdraw any road space booking granted to the undertaker to ensure compliance with its network occupancy requirements.
Payments
41
- (1) The undertaker must pay to National Highways a sum equal to the whole of any costs and expenses which National Highways reasonably incurs (including costs and expenses for using internal or external staff and costs relating to any work which becomes abortive) in relation to the specified works and in relation to any approvals sought under this Order, or otherwise incurred under this Part of this Schedule, including—
- (a) the checking and approval of the information required under paragraph 40(1) (construction of the specified works) and any advice given to the undertaker relating to the design, specification and programme of the specified works generally;
- (b) the supervision of the specified works;
- (c) the checking and approval of the information required to determine approvals under this Order;
- (d) all reasonable legal, technical and administrative costs and disbursements incurred by National Highways in connection with sub-paragraphs (a)-(c); and
- (e) any value added tax which is payable by National Highways in respect of such costs and expenses and for which it cannot obtain reinstatement from HM Revenue and Customs,
together comprising “the NH costs”.
- (2) The undertaker must pay to National Highways upon demand and prior to such costs being incurred the total costs that National Highways reasonably believe will be properly and necessarily incurred by National Highways in undertaking any statutory procedure or preparing and bringing into force any traffic regulation order or orders necessary to carry out or for effectively implementing the authorised development.
- (3) National Highways must provide the undertaker with a fully itemised schedule showing its estimate of the NH costs prior to the commencement of the specified works and the undertaker must pay to National Highways the estimate of the NH costs attributable to the specified works prior to commencing the specified works and in any event prior to National Highways incurring any cost.
- (4) If at any time after the payment referred to in sub-paragraph (3) has become payable, National Highways reasonably believes that the NH costs will exceed the estimated NH costs it may give notice to the undertaker of the amount that it believes the NH costs will exceed the estimate of the NH costs (the excess) and the undertaker must pay to National Highways within 28 days of the date of the notice a sum equal to the excess.
- (5) National Highways must give the undertaker a final account of the NH costs referred to in sub-paragraph (1) to (4) within 30 days of the issue of the provisional certificate issued pursuant to paragraph 42(4).
- (6) Within 28 days of the issue of the final account—
- (a) if the final account shows a further sum as due to National Highways the undertaker must pay to National Highways the sum shown due to it;
- (b) if the account shows that the payment or payments previously made by the undertaker have exceeded the costs incurred by National Highways, National Highways must refund the difference to the undertaker.
- (7) If any payment due under any of the provisions of this Part of this Schedule is not made on or before the date on which it falls due the party from whom it was due must at the same time as making the payment pay to the other party interest at 1% above the Bank of England base lending rate from time to time being in force for the period starting on the date upon which the payment fell due and ending with the date of payment of the sum on which interest is payable together with that interest.
Provisional certificate
42
- (1) Following any closure or partial closure of any of the strategic road network for the purposes of carrying out the specified works, National Highways will carry out a site inspection to satisfy itself that the strategic road network is, in its opinion, safe for traffic and the undertaker must comply with any reasonable requirements of National Highways prior to reopening the strategic road network.
- (2) As soon as the undertaker considers that the provisional certificate may be properly issued it must apply to National Highways for the provisional certificate.
- (3) Following an application for a provisional certificate, National Highways must as soon as reasonably practicable—
- (a) inspect the specified works; and
- (b) provide the undertaker with a written list of works that are required for the provisional certificate to be issued or confirmation that no further works are required for this purpose.
- (4) When—
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.