The M4 Motorway (Junction 41, Westbound Exit Slip Road, Sunnycroft Roundabout, Baglan, Neath Port Talbot) (50 MPH Speed Limit) Regulations 2010
Made: 25 October 2010
Laid before the National Assembly for Wales: 28 October 2010
Coming into force: 18 November 2010
The Welsh Ministers, in exercise of the powers conferred upon them by section 17(2) and (3) of the Road Traffic Regulation Act 1984[^f00001] and after consultation with such representative bodies as were thought fit in accordance with section 134(2) of that Act[^f00002], make the following Regulations.
Title, commencement and interpretation
1
These Regulations come into force on 18 November 2010 and their title is The M4 Motorway (Junction 41, Westbound Exit Slip Road, Sunnycroft Roundabout, Baglan, Neath Port Talbot) (50 MPH Speed Limit) Regulations 2010.
2
In these Regulations—
- “the M4 motorway” means the M4 London to South Wales Motorway.
Imposition of a speed limit
3
No person shall drive a vehicle at a speed exceeding 50 miles per hour on that length of the westbound exit slip road from Junction 41 of the M4 motorway that extends from a point 330 metres south east of its junction with the circulatory carriageway at Sunnycroft Roundabout, Baglan in the County Borough of Neath Port Talbot to a point where it merges with that circulatory carriageway.
Signed
Ieuan Wyn Jones — Minister for the Economy and Transport , one of the Welsh Ministers — 25 October 2010
Explanatory note
(This note is not part of the Regulations)
The power to make regulations with respect to the use of special roads under section 17(2) and (3) of the Road Traffic Regulation Act 1984 (except with respect to special roads generally) lies with the Welsh Ministers so far as they are exercisable in relation to Wales.
In exercise of the above power, the Welsh Ministers make these Regulations which impose a maximum speed limit of 50 miles per hour (instead of the general 70 miles per hour speed limit imposed on motorways by the Motorways Traffic (Speed Limit) Regulations 1974 (S.I.1974/502)) on the length of the M4 motorway specified in the Regulations.
A full regulatory impact assessment has not been produced for this instrument as it is made for highway safety reasons and it has no impact on the costs of business.
Footnotes
[^f00001]: 1984 c. 27. By virtue of S.I. 1999/672, article 2 and Schedule 1, and section 162 of, and paragraph 30 of, Schedule 11 of the Government of Wales Act 2006 (c. 32), these powers are now exercisable by the Welsh Ministers in relation to Wales.
[^f00002]: Section 134(2) was amended by the New Roads and Street Works Act 1991 (c. 22), Schedule 8, paragraph 77.
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.