§ 6115. Major warhead refurbishment program
§ 6115. Major warhead refurbishment program
(1) a full description of alternatives considered prior to the award of Phase 6.3;
(2) a comparison of the costs and benefits of each of those alternatives, to include an analysis of trade-offs among cost, schedule, and performance objectives against each alternative considered;
(3) identification of the cost and risk of critical technology elements associated with each alternative, including technology maturity, integration risk, manufacturing feasibility, and demonstration needs;
(4) identification of the cost and risk of additional capital asset and infrastructure capabilities required to support production and certification of each alternative;
(5) a comparative analysis of the risks, costs, and scheduling needs for any military requirement intended to enhance warhead safety, security, or maintainability, including any requirement to consolidate and/or integrate warhead systems or mods as compared to at least one other feasible refurbishment alternative the Nuclear Weapons Council considers appropriate; and
(6) a life-cycle cost estimate for the alternative selected that details the overall cost, scope, and schedule planning assumptions.
(Added Pub. L. 119–60, div. C, title XXXI, § 3111(a), Dec. 18, 2025, 139 Stat. 1352.)
Editorial Notes
Prior Provisions
A prior section 6115, act Aug. 10, 1956, ch. 1041, 70A Stat. 382, prescribed a time limit for filing claims for drill pay and for the uniform gratuity. Section was also amended by Pub. L. 85–861, § 33(a)(31), which amended catchline by substituting “uniform gratuity” for “unform gratuity”, prior to repeal by Pub. L. 85–861, § 36B(17), Sept. 2, 1958, 72 Stat. 1571.
Provisions similar to those in this section were contained in section 2523c of Title 50, War and National Defense, prior to repeal by Pub. L. 119–60, § 3111(b)(3).