(b) where the counterfactual scenario consists in carrying out the same investment at a later point in time, the eligible costs shall consist in the difference between the costs of the investment for which State aid is granted and the Net Present Value of the costs of the later investment, discounted to the point in time when the aided investment would be undertaken;

(c) where the counterfactual scenario consists in maintaining the existing installations and equipment in operation, the eligible costs shall consist in the difference between the costs of the investment for which State aid is granted and the Net Present Value of the investments in the maintenance, repair and modernisation of the existing installations and equipment, discounted to the point in time when the aided investment would be undertaken;

(d) in the case of equipment subject to leasing agreements, the eligible costs shall consist in the difference in Net Present Value between the leasing of equipment for which State aid is granted and the leasing of the less environmentally-friendly equipment that would be leased in the absence of the aid; the leasing costs shall not include costs relating to the operation of the equipment or installation (fuel costs, insurance, maintenance, other consumables), irrespective of whether they are part of the leasing contract.

In all situations listed in the first subparagraph, points (a) to (d), the counterfactual scenario shall correspond to an investment with comparable output capacity and lifetime that complies with Union standards already in force. The counterfactual scenario shall be credible in the light of legal requirements, market conditions and incentives generated by the EU ETS system.

Where the investment for which State aid is granted consists in the installation of an add-on component to an already existing facility, for which there is no less environmentally-friendly counterfactual investment, the eligible costs shall be the total investment costs.

Where the investment for which State aid is granted consists in the construction of dedicated infrastructure referred to in Article 2, point (130), last sentence, for hydrogen within the meaning of paragraph 1b, waste heat or CO2, that is necessary to enable the increase in the level of environmental protection as referred to in paragraphs 2 and 2a, the eligible costs shall be the total investment costs. Costs for the construction or upgrade of storage facilities, with the exception of storage facilities for renewable hydrogen and hydrogen covered by paragraph 1b, second subparagraph, shall not be eligible.

The costs not directly linked to the achievement of a higher level of environmental protection shall not be eligible.

The aid intensity may reach 100 % of the investment costs where aid is granted in a competitive bidding process, which fulfils all of the following conditions in addition to those laid down in Article 2, point (38):

(a) the aid award shall be based on objective, clear, transparent and non-discriminatory eligibility and selection criteria, defined ex ante and published at least 6 weeks in advance of the deadline for submitting applications, to enable effective competition;

(b) during the implementation of a scheme, in case of a bidding process where all bidders receive aid, the design of said process shall be corrected to restore effective competition in the subsequent bidding processes, for example, by reducing the budget or volume;

(c) ex post adjustments to the bidding process outcome (such as subsequent negotiations on bid results) shall be excluded;

(d) at least 70 % of the total selection criteria used for ranking bids and, ultimately, for allocating the aid in the competitive bidding process shall be defined in terms of aid in relation to the project’s contribution to the environmental objectives of the measure, for example the aid requested per unit of environmental protection to be delivered.

Article 36a

Investment aid for recharging or refuelling infrastructure

The eligible costs may also cover the investment costs of on-site production of renewable electricity or renewable hydrogen, and the investment costs of storage units for storing renewable electricity or hydrogen. The nominal production capacity of the on-site renewable electricity or renewable hydrogen production installation shall not exceed the maximum rated output or refuelling capacity of the recharging or refuelling infrastructure to which it is connected.

Aid under this Article shall be granted in a competitive bidding process, which fulfils all of the following conditions in addition to those laid down in Article 2, point (38):

(a) the aid award shall be based on objective, clear, transparent and non-discriminatory eligibility and selection criteria, defined ex ante and published at least 6 weeks in advance of the deadline for submitting applications, to enable effective competition;

(b) during the implementation of a scheme, in case of a bidding process where all bidders receive aid, the design of said process shall be corrected to restore effective competition in the subsequent bidding processes, for example, by reducing the budget or volume;

(c) ex post adjustments to the bidding process outcome (such as subsequent negotiations on bid results) shall be excluded;

(d) at least 70 % of the total selection criteria used for ranking bids and, ultimately, for allocating the aid in the competitive bidding process shall be defined in terms of aid in relation to the project’s contribution to the environmental objectives of the measure for example aid requested per recharging or refuelling point.

The obligation to conduct an ex ante open public consultation or an independent market study laid down in the first subparagraph shall not apply to aid for the construction, installation, upgrade or extension of recharging or refuelling infrastructure that is not accessible to the public.

Article 36b

Investment aid for the acquisition of clean vehicles or zero-emission vehicles and for the retrofitting of vehicles

The eligible costs shall be the following:

(a) for investments consisting in the purchase of clean vehicles or zero-emission vehicles, the extra costs of purchasing the clean vehicle or the zero-emission vehicle. Those shall be calculated as the difference between the investment costs of purchasing the clean vehicle or the zero-emission vehicle and the investment costs of purchasing a vehicle of the same category that complies with applicable Union standards already in force and would have been acquired without the aid;

(b) for investments consisting in the leasing of clean vehicles or zero-emission vehicles, the extra costs of leasing the clean vehicle or the zero-emission vehicle. Those shall be calculated as the difference between the net present value of leasing the clean vehicle or the zero-emission vehicle and the net present value of leasing a vehicle of the same category that complies with applicable Union standards already in force and would have been leased without the aid. For the purposes of determining the eligible costs, the operating costs linked to the operation of the vehicle, including energy costs, insurance costs and maintenance costs, shall not be taken into account, irrespective of whether they are included in the leasing contract;

(c) for investments consisting in the retrofitting of vehicles allowing them to qualify as clean vehicles or zero-emission vehicles, the costs of the investment in the retrofitting.

Aid under this Article shall be granted in a competitive bidding process, which fulfils all of the following conditions in addition to those laid down in Article 2, point (38):

(a) the aid award shall be based on objective, clear, transparent and non-discriminatory eligibility and selection criteria, defined ex ante and published at least 6 weeks in advance of the deadline for submitting applications, to enable effective competition;

(b) during the implementation of a scheme, in case of a bidding process where all bidders receive aid, the design of said process shall be corrected to restore effective competition in the subsequent bidding processes, for example, by reducing the budget or volume;

(c) ex post adjustments to the bidding process outcome (such as subsequent negotiations on bid results) shall be excluded;

(d) at least 70 % of the total selection criteria used for ranking bids and, ultimately, for allocating the aid in the competitive bidding process shall be defined in terms of aid in relation to the project’s contribution to the environmental objectives of the measure for example aid requested per clean or zero-emission vehicle.

Where the aid is granted in a competitive bidding process complying with the conditions of paragraph 4, the aid intensity shall not exceed:

(a) 100 % of the eligible costs for the purchase or the leasing of zero-emission vehicles or the retrofitting of vehicles allowing them to qualify as zero-emission vehicles;

(b) 80 % of the eligible costs for the purchase or the leasing of clean vehicles, or of the retrofitting of vehicles allowing them to qualify as clean vehicles.

In those cases, the aid intensity shall not exceed 20 % of the eligible cost. The aid intensity may be increased by 10 percentage points for zero-emission vehicles and by 20 percentage points for medium-sized enterprises or by 30 percentage points for small enterprises.

In this case, the aid intensity shall not exceed 40 % of the eligible cost. The aid intensity may be increased by 10 percentage points for zero-emission vehicles.

Article 38

Investment aid for energy efficiency measures other than in buildings

The eligible costs shall be the extra investment costs necessary to achieve the higher level of energy efficiency. They shall be determined by comparing the costs of the investment to those of the counterfactual scenario that would occur in the absence of the aid, as follows:

(a) where the counterfactual scenario consists in carrying out a less energy-efficient investment that corresponds to normal commercial practice in the sector or for the activity concerned, the eligible costs shall consist in the difference between the costs of the investment for which State aid is granted and the costs of the less energy-efficient investment;

(b) where the counterfactual scenario consists in carrying out the same investment at a later point in time, the eligible costs shall consist in the difference between the costs of the investment for which State aid is granted and the Net Present Value of the costs of the later investment, discounted to the point in time when the aided investment would be undertaken;

(c) where the counterfactual scenario consists in maintaining the existing installations and equipment in operation, the eligible costs shall consist in the difference between the costs of the investment for which State aid is granted and the Net Present Value of the investment in the maintenance, repair and modernisation of the existing installation and equipment, discounted to the point in time when the aided investment would be undertaken;

(d) In the case of equipment subject to leasing agreements, the eligible costs shall consist in the difference in Net Present Value between the leasing of the equipment for which State aid is granted and the leasing of the less energy-efficient equipment that would be leased in the absence of aid; the leasing costs shall not include costs relating to the operation of the equipment or installation (fuel costs, insurance, maintenance, other consumables), irrespective of whether they are part of the leasing contract.

In all situations listed in the first subparagraph, the counterfactual shall correspond to an investment with comparable output capacity and lifetime that complies with Union standards already in force. The counterfactual shall be credible in the light of legal requirements, market conditions and incentives generated by the EU ETS system.

Where the investment consists in a clearly identifiable investment solely aimed at improving energy efficiency, for which there is no less energy efficient counterfactual investment, the eligible costs shall be the total investment costs.

The costs not directly linked to the achievement of a higher level of energy efficiency shall not be eligible.

The aid intensity may reach 100 % of the total investment costs where aid is granted in a competitive bidding process, which fulfils all of the following conditions in addition to those laid down in Article 2, point (38):

(a) the aid award shall be based on objective, clear, transparent and non-discriminatory eligibility and selection criteria, defined ex ante and published at least 6 weeks in advance of the deadline for submitting applications, to enable effective competition;

(b) during the implementation of a scheme, in case of a bidding process where all bidders receive aid, the design of said process shall be corrected to restore effective competition in the subsequent bidding processes, for example, by reducing the budget or volume;

(c) ex post adjustments to the bidding process outcome (such as subsequent negotiations on bid results) shall be excluded;

(d) at least 70 % of the total selection criteria used for ranking bids and, ultimately, for allocating the aid in the competitive bidding process shall be defined in terms of aid in relation to the project’s contribution to the environmental objectives of the measure, for example aid requested per unit of energy saved or of energy efficiency gained. Those criteria shall not account for less than 70 % of the weighting of all the selection criteria.

Article 38a

Investment aid for energy efficiency measures in buildings

The aid granted for the improvement of the energy efficiency of the building may be combined with aid for any or all of the following measures:

(a) the installation of integrated on-site equipment generating electricity, heating or cooling from renewable energy sources, including but not limited to photovoltaic panels and heat pumps;

(b) the installation of equipment for the storage of the energy generated by the on-site renewable energy installations. The storage equipment shall absorb at least 75 % of its energy from a directly connected renewable energy generation installation, on an annual basis;

(c) the connection to an energy efficient district heating and/or cooling system and related equipment;

(d) the construction and installation of recharging infrastructure for use by the building users, and related infrastructure, such as ducting, where the parking facilities are located either inside the building or are physically adjacent to the building;

(e) the installation of equipment for the digitalisation of the building in particular to increase its smart-readiness, including passive in-house wiring or structured cabling for data networks and the ancillary part of the broadband infrastructure on the property to which the building belongs, but excluding wiring or cabling for data networks outside the property;

(f) investments in green roofs and equipment for the retention and use of rain water.

In case of any such combined works, as set out in points (a) to (f), the entire investment cost of the various installations and equipment shall constitute the eligible costs. The costs not directly linked to the achievement of a higher level of energy or environmental performance shall not be eligible.

Article 38b

Aid for the facilitation of energy performance contracting

Article 39

Investment aid for energy efficiency projects in buildings in the form of financial instruments

The aid granted for the improvement of the energy efficiency of the building may be combined with aid for any or all of the following measures:

(a) the installation of integrated on-site equipment generating electricity, heating or cooling from renewable energy sources, including but not limited to photovoltaic panels and heat pumps;

(b) the installation of equipment for the storage of the energy generated by the on-site renewable energy installations. The storage equipment shall absorb at least 75 % of its energy from a directly connected renewable energy generation installation, on an annual basis;

(c) investments in the connection to an energy efficient district heating and/or cooling system and related equipment;

(d) the construction and installation of recharging infrastructure for use by the building users, and related infrastructure, such as ducting, where the car park is located either inside the building or is physically adjacent to the building;

(e) the installation of equipment for the digitalisation of the building, in particular to increase its smart-readiness. Eligible investments may include interventions limited to passive in-house wiring or structured cabling for data networks and the ancillary part of the broadband infrastructure on the property to which the building belongs, but excluding wiring or cabling for data networks outside the property;

(f) investments in green roofs and equipment for the retention and use of rain water.

Member States can set up energy efficiency funds and/or can use financial intermediaries when providing energy efficiency aid. The following conditions must then be fulfilled:

(a) Financial intermediary managers, as well as energy efficiency fund managers shall be selected through an open, transparent and non-discriminatory call in accordance with applicable Union and national laws. In particular, there shall be no discrimination on the basis of their place of establishment or incorporation in any Member State. Financial intermediaries and energy efficiency fund managers may be required to fulfil predefined criteria objectively justified by the nature of the investments;

(b) The independent private investors shall be selected through an open, transparent and non-discriminatory call in accordance with applicable Union and national laws aimed at establishing the appropriate risk-reward sharing arrangements whereby, for investments other than guarantees, asymmetric profit-sharing shall be given preference over downside protection. If the private investors are not selected by such a call, the fair rate of return to the private investors shall be established by an independent expert selected via an open, transparent and non-discriminatory call;

(c) In the case of asymmetric loss-sharing between public and private investors, the first loss assumed by the public investor shall be capped at 25 % of the total investment;

(d) In the case of guarantees, the guarantee rate shall be limited to 80 % and total losses assumed by a Member State shall be capped at 25 % of the underlying guaranteed portfolio. Only guarantees covering the expected losses of the underlying guaranteed portfolio can be provided for free. If a guarantee also comprises coverage of unexpected losses, the financial intermediary shall pay, for the part of the guarantee covering unexpected losses, a market-conform guarantee premium;

(e) The investors shall be allowed to be represented in the governance bodies of the energy efficiency fund or financial intermediary, such as the supervisory board or the advisory committee;

(f) The energy efficiency fund or financial intermediary shall be established in accordance with the applicable laws and the Member State shall ensure a due diligence process in order to verify that commercially sound investment strategy will be applied for the purpose of implementing the energy efficiency aid measure.

Financial intermediaries, including energy efficiency funds shall be managed on a commercial basis and shall ensure profit-driven financing decisions. This is considered to be the case when the financial intermediary and, as the case may be, the managers of the energy efficiency fund fulfil the following conditions:

(a) they are obliged by law or contract to act with the diligence of a professional manager in good faith and avoiding conflicts of interest; best practices and regulatory supervision shall apply;

(b) their remuneration conforms with market practices. This requirement is considered to be met where the manager is selected through an open, transparent and non-discriminatory call, based on objective criteria linked to experience, expertise and operational and financial capacity;

(c) they shall receive a remuneration linked to performance, or shall share part of the investment risks by co-investing own resources so as to ensure that their interests are permanently aligned with the interests of the public investor;

(d) they shall set out an investment strategy, criteria and the proposed timing of investments in energy efficiency projects, establishing the ex-ante financial viability and their expected impact on energy efficiency.

(e) a clear and realistic exit strategy shall exist for the public funds invested in the energy efficiency fund or granted to the financial intermediary, allowing the market to finance energy efficiency projects when the market is ready to do so.

Article 41

Investment aid for the promotion of energy from renewable sources, of renewable hydrogen and of high-efficiency cogeneration

The aid intensity shall not exceed:

(a) 45 % of the eligible costs for investments in the production of renewable energy sources, including heat pumps compliant with Annex VII to Directive 2018/2001, renewable hydrogen and high-efficiency cogeneration based on renewable energy sources;

(b) 30 % of the eligible costs for any other investment covered by this Article.

The aid intensity may reach 100 % of the eligible costs where aid is granted in a competitive bidding process, which fulfils all of the following conditions in addition to those laid down in Article 2, point (38):

(a) the aid award shall be based on objective, clear, transparent and non-discriminatory eligibility and selection criteria, defined ex ante and published at least 6 weeks in advance of the deadline for submitting applications, to enable effective competition;

(b) during the implementation of a scheme, in case of a bidding process where all bidders receive aid, the design of said process shall be corrected to restore effective competition in the subsequent bidding processes, for example, by reducing the budget or volume;

(c) ex post adjustments to the bidding process outcome (such as subsequent negotiations on bid results or rationing) shall be excluded;

(d) at least 70 % of the total selection criteria used for ranking bids and, ultimately, for allocating the aid in the competitive bidding process shall be defined in terms of aid per unit of energy capacity from renewable sources or high efficiency-cogeneration.

Article 42

Operating aid for the promotion of electricity from renewable sources

Aid shall be granted in a competitive bidding process, which fulfils all of the following conditions in addition to those laid down in Article 2, point (38):

(a) the aid award shall be based on objective, clear, transparent and non-discriminatory eligibility and selection criteria, defined ex ante and published at least 6 weeks in advance of the deadline for submitting applications, to enable effective competition;

(b) during the implementation of a scheme, in case of a bidding process where all bidders receive aid, the design of said process shall be corrected to restore effective competition in the subsequent bidding processes, for example, by reducing the budget or volume;

(c) ex post adjustments to the bidding process outcome (such as subsequent negotiations on bid results or rationing) shall be excluded;

(d) at least 70 % of the total selection criteria used for ranking bids and, ultimately, for allocating the aid in the competitive bidding process shall be defined in terms of aid per unit of electricity output or capacity from renewable sources.

The bidding process shall be open to all generators producing electricity from renewable energy sources on a non-discriminatory basis.

The bidding process can be limited to specific technologies where:

(a) a measure aims specifically to support demonstration projects;

(b) a measure aims to address not only decarbonisation but also air quality or other pollution;

(c) a Member State identifies reasons to expect that eligible sectors or innovative technologies have the potential to make an important and cost-effective contribution to environmental protection and deep decarbonisation in the longer term;

(d) a measure is required to achieve diversification necessary to avoid exacerbating issues related to network stability;

(e) a more selective approach can be expected to lead to lower costs of achieving environmental protection (for example through reduced system integration costs as a result of diversification, including between renewables, which could also include demand response and/or storage), and/or result in less distortion of competition.

Member States shall carry out a detailed assessment of the applicability of such conditions and report it to the Commission according to the modalities described in Article 11(1), point (a).

Article 43

Operating aid for the promotion of energy from renewable sources and of renewable hydrogen in small projects and renewable energy communities

For the purposes of this Article small projects are defined as follows:

(i) for electricity generation or storage – projects below or equal to 1 MW of installed capacity;

(ii) for electricity consumption – projects with a maximum demand below or equal to 1 MW;

(iii) for heat generation and gas production technologies – projects below or equal to 1 MW of installed capacity or equivalent;

(iv) for the production of renewable hydrogen – projects below or equal to 3 MW of installed capacity or equivalent;

(v) for the production of biofuels, bioliquids, biogas (including biomethane) and biomass fuels – projects below or equal to an installed capacity of 50 000 tonnes/year;

(vi) for 100 % SME-owned projects and demonstration projects – projects below or equal to 6 MW installed capacity or maximum demand;

(vii) for projects 100 % owned by micro or small enterprises for wind generation only – projects below or equal to 18 MW of installed capacity.

Article 44

Aid in the form of reductions in taxes under Directive 2003/96/EC

The beneficiaries of the tax reduction shall pay at least the minimum level of taxation laid down in Annex I to Directive 2003/96/EC, except for reductions:

(a) granted on the basis of Article 15(1), point (a), of Directive 2003/96/EC, for taxable products used under fiscal control in the field of pilot projects for the technological development of more environmentally-friendly products or in relation to fuels from renewable resources;

(b) granted on the basis of of Article 15(1), point (b), first, second, fourth and fifth indents, of Directive 2003/96/EC, for electricity (i) of solar, wind, wave, tidal or geothermal origin, (ii) of hydraulic origin produced in hydroelectric installations, (iii) generated from methane emitted by abandoned coalmines, and (iv) generated from fuel cells;

(c) granted on the basis of Article 15(1), point (b), third indent, of Directive 2003/96/EC, for electricity generated from biomass or from products produced from biomass, to the extent that biomass is compliant with the sustainability and greenhouse gases emissions saving criteria of Directive (EU) 2018/2001 and its implementing or delegated acts;

(d) granted on the basis of Article 15(1), point (d) of Directive 2003/96/EC, for electricty produced from combined heat and power generation, provided that cogeneration by the combined generators is high-efficiency cogeneration as defined in Article 2, point (34), of Directive 2012/27/EU;

(e) granted on the basis of Article 15(1), point (l), of Directive 2003/96/EC, for products falling within CN code 2705 used for heating purposes;

(f) granted on the basis of Article 16(1) of Directive 2003/96/EC.

Article 44a

Aid in the form of reductions in environmental taxes or parafiscal levies

Article 45

Investment aid for the remediation of environmental damage, the rehabilitation of natural habitats and ecosystems, the protection or restoration of biodiversity and the implementation of nature-based solutions for climate change adaptation and mitigation

Aid under this Article may be granted for the following activities :

(a) the remediation of environmental damage, including damage to the quality of the soil, surface water or groundwater or to the marine environment;

(b) the rehabilitation of natural habitats and ecosystems from a degraded state;

(c) the protection or restoration of biodiversity or of ecosystems to contribute to achieving the good condition of ecosystems or to protect ecosystems that are already in good condition;

(d) the implementation of nature-based solutions for climate change adaptation and mitigation.

The aid intensity shall not exceed:

(a) 100 % of the eligible costs for investments in the remediation of environmental damage or the rehabilitation of natural habitats and ecosystems;

(b) 70 % of the eligible costs for investments in the protection or restoration of biodiversity and in nature-based solutions for climate change adaptation and mitigation.

Article 46

Investment aid for energy efficient district heating and/or cooling

Aid for upgrades of storage and distribution networks that transmit heating and cooling generated based on fossil fuels may only be granted where all of the following conditions are met:

(a) the distribution network is or becomes suitable for the transmission of heating or cooling generated from renewable energy sources and/or waste heat;

(b) the upgrade does not result in an increased generation of energy from fossil fuels except for natural gas. In case of an upgrade to the storage or network distributing heating and cooling generated from natural gas, in as far as the upgrade results in an increased generation of energy from natural gas, those generation facilities need to be in compliance with the 2030 and 2050 climate targets, in accordance with Annex 1, section 4.31, to Delegated Regulation (EU) 2021/2139.

Article 47

Investment aid for resource efficiency and for supporting the transition towards a circular economy

The aid shall be granted for the following types of investments:

(a) investments improving resource efficiency through one or both of the following: (i) a net reduction in the resources consumed in the production of a given quantity of output compared to a pre-existing production process used by the beneficiary or to alternative projects or activities listed under paragraph 7. The resources consumed shall include all material resources consumed, with the exception of energy, and the reduction shall be determined by measuring or estimating consumption before and after the implementation of the aid measure, taking into account any adjustment for external conditions that may affect resource consumption; (ii) the replacement of primary raw materials or feedstock with secondary (re-used or recovered, including recycled) raw materials or feedstock;

(b) investments for the prevention and reduction of waste generation, preparing for re-use, decontaminating and recycling of waste generated by the beneficiary or investments for the preparing for re-use, decontaminating and recycling of waste generated by third parties and which would otherwise be unused, disposed of, or be treated based on a treatment operation that is situated lower in the priority order of the waste hierarchy referred to in Article 4(1), of Directive 2008/98/EC or in a less resource-efficient manner, or would lead to a lower quality of recycling output;

(c) investments for the collection, sorting, decontamination, pre-treatment and treatment of other products, materials or substances generated by the beneficiary or by third parties and which would otherwise be unused or used in a less resource-efficient manner;

(d) investments for the separate collection and sorting of waste with a view to its preparing for re-use or recycling.

The eligible costs shall be the extra investment costs determined by comparing the total investment costs of the project with those of a less environmentally-friendly project or activity that shall be one of the following:

(a) a counterfactual scenario consisting in a comparable investment that would credibly be realised in a new or pre-existing production process without aid and which does not achieve the same level of resource efficiency;

(b) a counterfactual scenario consisting in treating the waste based on a treatment operation that is situated lower in the priority order of the waste hierarchy referred to in Article 4(1), of Directive 2008/98/EC or treating the waste, other products, materials or substances in a less resource-efficient way;

(c) a counterfactual scenario consisting in a comparable investment in a conventional production process using primary raw material, or feedstock, if the obtained secondary (re-used or recovered) product is technically and economically substitutable with the primary product.

In all situations listed in the first subparagraph, points (a) and (c), the counterfactual scenario shall correspond to an investment with comparable output capacity and lifetime that complies with Union standards already in force. The counterfactual scenario shall be credible in the light of legal requirements, market conditions and incentives.

Where the investment consists in installing an add-on component to an already existing facility, for which there is no less environmentally-friendly equivalent, or where the aid applicant can demonstrate that no investment would take place in the absence of aid, the eligible costs shall be the total investment costs.

Article 48

Investment aid for energy infrastructure

Article 49

Aid for studies and consultancy services on environmental protection and energy matters

SECTION 8

Aid to make good the damage caused by certain natural disasters

Article 50

Aid schemes to make good the damage caused by certain natural disasters

Aid shall be granted subject to the following conditions:

(a) the competent public authorities of a Member State have formally recognised the character of the event as a natural disaster; and

(b) there is a direct causal link between the natural disaster and the damages suffered by the affected undertaking.

SECTION 9

Social aid for transport for residents of remote regions

Article 51

Social aid for transport for residents of remote regions

SECTION 10

Aid for broadband infrastructures

Article 52

Aid for fixed broadband networks

The following alternative types of investment are eligible:

(a) fixed broadband network deployment to connect households and socioeconomic drivers in areas where there is no network providing a speed of at least 100 Mbps download under peak-time conditions (threshold speed) existing or credibly planned to be deployed within the relevant time horizon. This shall be verified by mapping and public consultation in accordance with paragraph 4;

(b) fixed broadband network deployment to connect socio-economic drivers in areas where there is only one network providing a speed of at least 100 Mbps download under peak time conditions but below 300 Mbps download under peak-time conditions (threshold speed) existing or credibly planned to be deployed within the relevant time horizon. This shall be verified by mapping and public consultation in accordance with paragraph 5.

The mapping and public consultation for the purposes of paragraph 3 shall meet the following requirements cumulatively:

(a) the mapping shall identify the geographic target areas planned to be covered under the State intervention and shall take into account all existing fixed broadband networks. The mapping shall be performed: (i) for fixed wired networks, at address level on the basis of premises passed; (ii) for fixed wireless access networks, at address level on the basis of premises passed or on the basis of maximum 100x100 metre grids. Where a network deployment includes, at the same time, the deployment of an access network and a limited deployment of the necessary ancillary backhaul network to enable the functioning of the access network, a mapping of backhaul networks is not required. All the elements of the methodology and the underlying technical criteria used to map the target areas must be made publicly available. Mapping shall always be verified through a public consultation;

(b) the public consultation shall be carried out by the competent public authority through the publication of the main characteristics of the planned State intervention and the list of geographic target areas identified in the mapping exercise in accordance with point (a). That information must be made available on a publicly accessible website at regional and national level. The public consultation shall invite interested parties to comment on the planned State intervention and to submit substantiated information in accordance with point (a) regarding their networks providing the threshold speeds set out in paragraph 3 existing or credibly planned to be deployed in the target area within the relevant time horizon. The public consultation shall last at least 30 days.

The intervention shall bring a significant improvement (step change) compared to the networks existing or credibly planned to be deployed within the relevant time horizon, as identified through the mapping and public consultation carried out in accordance with paragraph 5. Credibly planned networks shall be taken into account for the assessment of the step-change only if they would, on their own, provide similar performance to that of the planned State funded network in the target areas within the relevant time horizon. A step change takes place if, as a result of the subsidised intervention, a significant new investment in the broadband network is undertaken and the subsidised network brings significant new capabilities to the market in terms of broadband service availability, capacity, speeds and competition compared to the existing or credibly planned networks within the relevant time horizon. The intervention shall include more than 70 % investments in broadband infrastructure. In any case, an eligible intervention, as laid down in paragraph 3, must result at least in the following improvements:

(a) for interventions under paragraph 3, point (a), the State funded network shall at least triple the download speed compared to the existing networks (target speed);

(b) for interventions under paragraph 3, point (b), the State funded network shall at least triple the download speed compared to the existing networks and shall provide a speed of at least 1 Gbps download under peak-time conditions (target speed).

The aid shall be granted as follows:

(a) the aid shall be allocated on the basis of an open, transparent and non-discriminatory competitive selection procedure in line with the principles of public procurement rules and respecting the principle of technology neutrality, based on the most economically advantageous offer;

(b) when the aid is granted without a competitive selection procedure to a public authority to deploy and manage, directly or through an in-house entity, a fixed broadband network, the public authority or the in-house entity, as the case may be, shall provide only wholesale services using the subsidised network. Any concession or other entrustment to a third party to build or operate the network shall be allocated through an open, transparent and non-discriminatory competitive selection procedure, in line with the principles of public procurement rules and respecting the principle of technology neutrality, based on the most economically advantageous offer.

The wholesale access price shall be based on one of the following benchmarks and pricing principles:

(a) the average published wholesale prices that prevail in other comparable and more competitive areas of the Member State;

(b) the regulated prices already set or approved by the national regulatory authority for the markets and services concerned; or

(c) cost orientation or a methodology mandated in accordance with the sectorial regulatory framework.

Without prejudice to the competences of the national regulatory authority under the regulatory framework, the national regulatory authority shall be consulted on wholesale access products, the terms and conditions for access, including on prices, and on disputes related to the application of this Article.

Article 52a

Aid for 4G and 5G mobile networks

The mapping and public consultation for the purposes of paragraph 3 shall meet the following requirements cumulatively:

(a) the mapping shall clearly identify the geographic target areas planned to be covered under the State intervention and shall take into account all existing mobile networks. Mapping shall be performed on the basis of maximum 100x100 metre grids. All the elements of the methodology and the underlying technical criteria used to map the target areas must be made publicly available. Mapping shall always be verified through a public consultation; Where a network deployment includes, at the same time, the deployment of an access network and a limited deployment of the necessary ancillary backhaul network to enable the functioning of the access network, a separate mapping of backhaul networks is not required;

(b) the public consultation shall be carried out by the competent public authority through the publication of the main characteristics of the planned State intervention and the list of geographic target areas identified in the mapping exercise in accordance with point (a). That information must be made available on a publicly accessible website at regional and national level. The public consultation shall invite interested parties to comment on the planned State intervention and to submit substantiated information in accordance with point (a) regarding their mobile networks with the characteristics set out in paragraph 3 that are existing or credibly planned to be deployed in the target area within the relevant time horizon. The public consultation shall last at least 30 days.

The aid shall be granted as follows:

(a) the aid shall be allocated on the basis of an open, transparent and non-discriminatory competitive selection procedure in line with the principles of public procurement rules and respecting the principle of technology neutrality, based on the most economically advantageous offer;

(b) when the aid is granted without a competitive selection procedure to a public authority to deploy and manage, directly or through an in-house entity, a mobile network, the public authority or the in-house entity, as the case may be, shall provide only wholesale services using the subsidised network. Any concession or other entrustment to a third party to build or operate the network shall be allocated through an open, transparent and non-discriminatory competitive selection process, in line with the principles of public procurement rules and respecting the principle of technology neutrality, based on the most economically advantageous offer.

The wholesale access price shall be based on one of the following benchmarks and pricing principles:

(a) the average published wholesale prices that prevail in other comparable and more competitive areas of the Member State;

(b) the regulated prices already set or approved by the national regulatory authority for the markets and services concerned;

(c) cost orientation or a methodology mandated in accordance with the sectorial regulatory framework.

Without prejudice to the competences of the national regulatory authority under the regulatory framework, the national regulatory authority shall be consulted on the wholesale access products, the terms and conditions for access, including on prices, and on disputes related to the application of this Article.

The use of the State funded mobile 4G or 5G network to provide fixed wireless access services shall only be allowed in areas where there is no network providing speeds of at least 100 Mbps download under peak-time conditions existing or credibly planned to be deployed within the relevant time horizon, if the following cumulative conditions are met:

(a) the mapping and public consultation exercise take into account the fixed broadband networks existing or credibly planned determined according to Article 52(5);

(b) the supported 4G or 5G fixed wireless access network shall at least triple the download speed compared to the existing or credibly planned networks (target speed) according to Article 52(5).

Article 52b

Aid for projects of common interest in the area of trans-European digital connectivity infrastructure

The general cumulative compatibility conditions shall be the following:

(a) the beneficiary must provide a financial contribution of at least 25 % of the eligible costs through its own resources or through external financing not containing any public financial support. When the 25 % contribution of the beneficiary is provided through external financing via an investment platform combining different sources of financing, the condition that external financing must not contain any public financial support laid down in the previous sentence is replaced by the requirement of a presence in the platform of at least 30 % of private investment;

(b) only costs that are eligible investment costs under Regulation (EU) 2021/1153 for the deployment of the infrastructure are eligible for aid;

(c) the project must be selected in compliance with Regulation (EU) 2021/1153 in one of the following ways: (i) by an independent financial intermediary appointed by the Commission on the basis of commonly agreed investment guidelines; (ii) by the Commission through a competitive bidding process based on clear, transparent and non-discriminatory criteria; (iii) by independent experts appointed by the Commission;

(d) the project must enable connectivity capabilities going beyond the requirements relating to any existing legal obligations, such as those attached to a right to use spectrum;

(e) the project must ensure third party open wholesale access including unbundling under fair, reasonable and non-discriminatory conditions in accordance with Article 52(7) and (8) or Article 52a(8) and (9) as appropriate.

The categories of eligible projects and the specific cumulative compatibility conditions applicable to them shall be the following:

(a) investments in the deployment of a cross-border section of a 5G corridor along a transport corridor identified in the trans-European transport network guidelines as laid down in Regulation (EU) No 1315/2013 (TEN-T corridors) that meet the following specific cumulative conditions: (i) the project consists of a cross-border section of a 5G corridor which crosses the border between two or more Member States, or crosses the border of at least one Member State and at least one European Economic Area country; (ii) the total cross-border sections of 5G corridors located in a Member State shall not represent more than 15 % of the total length of the 5G corridors along the trans-European transport core network in that Member State that are not covered by any existing legal obligations, such as those attached to a right to use spectrum. Exceptionally, if a Member State supports the deployment of cross-border 5G corridors along its trans-European transport comprehensive network, the total cross-border sections of 5G corridors located in that Member State shall not represent more than 15 % of the total length of the 5G corridors along the trans-European transport comprehensive network in that Member State that are not covered by any existing legal obligations, such as those attached to a right to use spectrum; (iii) the project ensures a significant new investment in the 5G mobile network suitable for connected and automated mobility services going beyond marginal investments related merely to the upgrade of the active elements of the network; (iv) the project supports the deployment of new passive infrastructure only if existing passive infrastructure cannot be reused;

(b) investments in the deployment of a cross-border section of a pan-European terabit backbone network supporting the objectives of the European High-Performance Computing Joint Undertaking by interconnecting certain computing facilities, supercomputing facilities and data infrastructures that meet the following specific cumulative conditions: (i) the project shall deploy or acquire connectivity assets, including Indefeasible Rights of Use, dark fibre or equipment, for building a cross-border section of a pan-European backbone network that supports the interconnection with unconstrained end to end connectivity of a minimum of 1 Tbps, of at least two computing facilities, supercomputing facilities or data infrastructures that: (1) are hosting entities of the European High Performance Computing Joint Undertaking established in accordance with Council Regulation (EU) 2018/1488 (65), or are research infrastructures and other computing and data infrastructures supporting research flagships and missions set out in Regulation (EU) 2021/695 of the European Parliament and of the Council (66) and Council Regulation (EC) No 723/2009 that contribute to the objectives of the European High-Performance Computing Joint Undertaking; and (2) are located in at least two Member States or at least one Member State and at least one member of the European Research Area; (ii) the project ensures a significant new investment in the backbone network going beyond marginal investments, such as investments related to mere software upgrades or licensing; (iii) the acquisition of connectivity assets is carried out through public procurement; (iv) the project supports the deployment of new passive infrastructure only if existing passive infrastructure cannot be reused;

(c) investments in the deployment of a cross-border section of a backbone network interconnecting cloud infrastructures of certain socioeconomic drivers that meet the following specific cumulative conditions: (i) the project interconnects cloud infrastructures of socioeconomic drivers that are public administrations or public or private entities entrusted with the operation of services of general interest or of services of general economic interest within the meaning of Article 106(2) of the Treaty; (ii) the project consists of a cross-border section of the deployment of new cross-border backbone networks or a significant upgrade of existing ones that (1) crosses the border between two or more Member States; or (2) crosses the border between at least one Member State and at least one European Economic Area country; (iii) the project covers at least two eligible socioeconomic drivers under point (i), each operating in a different Member State or in one Member State and one European Economic Area country; (iv) the project ensures a significant new investment in the backbone network going beyond marginal investments, such as investments related to mere software upgrades or licensing. The project shall be able to reliably provide symmetric download and upload speeds of at least multiples of 10 Gbps; (v) the project supports the deployment of new passive infrastructure only if existing passive infrastructure cannot be reused;

(d) investments in the deployment of a submarine cable network that meet the following specific cumulative conditions: (i) the project consists of a cross-border section of a submarine cable network which (1) crosses the border between two or more Member States; or (2) crosses the border of at least one Member State and at least one European Economic Area country. Alternatively, the entity receiving aid shall only ensure the provision of wholesale services and the supported infrastructure shall improve the connectivity of European outermost regions, overseas territories, or island regions, even within a single Member State; (ii) the project must not concern routes served already by at least two present or credibly planned backbone infrastructures; (iii) the project ensures a significant new investment in the submarine cable network, by rolling-out a new submarine cable or connection to an existing submarine cable, addressing redundancy issues and going beyond marginal investments. The project shall be able to reliably provide symmetric download and upload speeds of at least 1 Gbps; (iv) the project supports the deployment of new passive infrastructure only if existing passive infrastructure cannot be reused.

Article 52c

Connectivity vouchers

The following categories of vouchers shall be eligible:

(a) vouchers available to consumers and SMEs for subscribing to a new broadband service or upgrading the existing subscription to a service providing speeds of at least 30 Mbps download under peak-time conditions, provided that all providers of electronic communications services providing speeds of at least 30 Mbps download under peak-time conditions are eligible under the scheme. Vouchers shall not be awarded for switching providers providing the same speeds as the speeds already available under the existing subscription or for upgrades of an existing subscription of at least 30 Mbps download under peak-time conditions;

(b) vouchers available to SMEs for subscribing to a new broadband service or upgrading the existing subscription to a service providing speeds of at least 100 Mbps download under peak-time conditions, provided that all providers of electronic communications services providing speeds of at least 100 Mbps download under peak-time conditions are eligible under the scheme. Vouchers shall not be awarded for switching providers providing the same speeds as the speeds already available under the existing subscription or for upgrades of an existing subscription of at least 100 Mbps download under peak-time conditions.

The wholesale access price shall be set on one of the following benchmarks and pricing principles:

(a) the average published wholesale prices that prevail in other comparable and more competitive areas of the Member State;

(b) the regulated prices already set or approved by the national regulatory authority for the markets and services concerned;

(c) costs orientation or a methodology mandated in accordance with the sectoral regulatory framework.

Without prejudice to the competences of the national regulatory authority under the regulatory framework, the national regulatory authority shall be consulted on on wholesale access products, the terms and conditions for access, including on prices, and on disputes related to the application of this Article.

Article 52d

Aid for backhaul networks

The mapping and public consultation for the purposes of paragraph 3 shall meet the following requirements cumulatively:

(a) the mapping shall identify the target areas for the backhaul State intervention and shall take into account all existing backhaul networks. All the elements of the methodology and the underlying technical criteria used to map the target areas must be made publicly available. Mapping shall always be verified through a public consultation;

(b) the public consultation shall be carried out by the competent public authority through the publication of the main characteristics of the planned State intervention and the list of areas identified in the mapping exercise in accordance with point (a). That information must be made available on a publicly accessible website at regional and national level. The public consultation shall invite interested parties to comment on the planned State intervention and to submit substantiated information in accordance with point (a) regarding the backhaul networks existing or credibly planned to be deployed within the relevant time horizon. The public consultation shall last at least 30 days.

The aid shall be granted as follows:

(a) the aid shall be allocated on the basis of an open, transparent and non-discriminatory competitive selection procedure in line with the principles of public procurement rules and respecting the principle of technology neutrality, based on the most economically advantageous offer;

(b) when the aid is granted without a competitive selection procedure to a public authority to deploy and manage, directly or through an in-house entity, a backhaul network, the public authority or the in-house entity, as the case may be, shall provide only wholesale services using the subsidised network. Any concession or other entrustment to a third party to build or operate the network shall be allocated through an open, transparent and non-discriminatory competitive selection procedure, in line with the principles of public procurement rules and respecting the principle of technology neutrality, based on the most economically advantageous offer.

The wholesale access price shall be based on one of the following benchmarks and pricing principles:

(a) the average published wholesale prices that prevail in other comparable, more competitive areas of the Member State;

(b) the regulated prices already set or approved by the national regulatory authority for the markets and services concerned; or

(c) cost orientation or a methodology mandated in accordance with the sectorial regulatory framework.

Without prejudice to the competences of the national regulatory authority under the regulatory framework, the national regulatory authority shall be consulted on wholesale access products, the terms and conditions for access, including on prices, and on disputes related to the application of this Article.

SECTION 11

Aid for culture and heritage conservation

Article 53

Aid for culture and heritage conservation

The aid shall be granted for the following cultural purposes and activities:

(a) museums, archives, libraries, artistic and cultural centres or spaces, theatres, cinemas, opera houses, concert halls, other live performance organisations, film heritage institutions and other similar artistic and cultural infrastructures, organisations and institutions;

(b) tangible heritage including all forms of movable or immovable cultural heritage and archaeological sites, monuments, historical sites and buildings; natural heritage linked to cultural heritage or if formally recognized as cultural or natural heritage by the competent public authorities of a Member State;

(c) intangible heritage in any form, including folklorist customs and crafts;

(d) art or cultural events and performances, festivals, exhibitions and other similar cultural activities;

(e) cultural and artistic education activities as well as promotion of the understanding of the importance of protection and promotion of the diversity of cultural expressions through educational and greater public awareness programs, including with the use of new technologies;

(f) writing, editing, production, distribution, digitisation and publishing of music and literature, including translations.

The aid may take the form of:

(a) investment aid, including aid for the construction or upgrade of culture infrastructure;

(b) operating aid.

For investment aid, the eligible costs shall be the investment costs in tangible and intangible assets, including:

(a) costs for the construction, upgrade, acquisition, conservation or improvement of infrastructure, if at least 80 % of either the time or the space capacity per year is used for cultural purposes;

(b) costs for the acquisition, including leasing, transfer of possession or physical relocation of cultural heritage;

(c) costs for safeguarding, preservation, restoration and rehabilitation of tangible and intangible cultural heritage, including extra costs for storage under appropriate conditions, special tools, materials and costs for documentation, research, digitalisation and publication;

(d) costs for improving the accessibility of cultural heritage to the public, including costs for digitisation and other new technologies, costs to improve accessibility for persons with special needs (in particular, ramps and lifts for disabled persons, braille indications and hands-on exhibits in museums) and for promoting cultural diversity with respect to presentations, programmes and visitors;

(e) costs for cultural projects and activities, cooperation and exchange programmes and grants including costs for selection procedures, costs for promotion and costs incurred directly as a result of the project;

For operating aid, the eligible costs shall be the following:

(a) the cultural institution's or heritage site's costs linked to continuous or periodic activities including exhibitions, performances and events and similar cultural activities that occur in the ordinary course of business;

(b) costs of cultural and artistic education activities as well as promotion of the understanding of the importance of protection and promotion of the diversity of cultural expressions through educational and greater public awareness programs, including with the use of new technologies;

(c) costs of the improvement of public access to the cultural institution or heritage sites and activities including costs of digitisation and of use of new technologies as well as costs of improving accessibility for persons with disabilities;

(d) operating costs directly relating to the cultural project or activity, such as rent or lease of real estate and cultural venues, travel expenses, materials and supplies directly related to the cultural project or activity, architectural structures for exhibitions and stage sets, loan, lease and depreciation of tools, software and equipment, costs for access rights to copyright works and other related intellectual property rights protected contents, costs for promotion and costs incurred directly as a result of the project or activity; depreciation charges and the costs of financing are only eligible if they have not been covered by investment aid;

(e) costs for personnel working for the cultural institution or heritage site or for a project;

(f) costs for advisory and support services provided by outside consultants and service providers, incurred directly as a result of the project.

Article 54

Aid schemes for audiovisual works

Aid may take the form of:

(a) aid to the production of audiovisual works;

(b) pre-production aid; and

(c) distribution aid.

Where a Member States makes the aid subject to territorial spending obligations, aid schemes for the production of audiovisual works may either:

(a) require that up to 160 % of the aid granted to the production of a given audiovisual work is spent in the territory of the Member State granting the aid; or

(b) calculate the aid granted to the production of a given audiovisual work as a percentage of the expenditure on production activities in the granting Member State, typically in case of aid schemes in the form of tax incentives.

In both cases, the maximum expenditure subject to territorial spending obligations shall in no case exceed 80 % of the overall production budget.

For projects to be eligible for aid, a Member State may also require a minimum level of production activity in the territory concerned, but that level shall not exceed 50 % of the overall production budget.

The eligible costs shall be the following:

(a) for production aid: the overall costs of production of audiovisual works including costs to improve accessibility for persons with disabilities.

(b) for pre-production aid: the costs of script-writing and the development of audiovisual works.

(c) for distribution aid: the costs of distribution and promotion of audiovisual works.

The aid intensity may be increased as follows:

(a) to 60 % of the eligible costs for cross-border productions funded by more than one Member State and involving producers from more than one Member State;

(b) to 100 % of the eligible costs for difficult audiovisual works and co-productions involving countries from the Development Assistance Committee (DAC) List of the OECD.

SECTION 12

Aid for sport and multifunctional recreational infrastructures

Article 55

Aid for sport and multifunctional recreational infrastructures

The aid may take the form of:

(a) investment aid, including aid for the construction or upgrade of sport and multifunctional recreational infrastructure;

(b) operating aid for sport infrastructure;

SECTION 13

Aid for local infrastructures

Article 56

Investment aid for local infrastructures

SECTION 14

Aid for regional airports

Article 56a

Aid for regional airports

The investment aid amount shall not exceed:

(a) 50 % of eligible costs for airports with an average annual passenger traffic of one to three million passengers during the two financial years preceding the year in which aid is actually granted;

(b) 75 % of the eligible costs for airports with average annual passenger traffic of up to one million passengers during the two financial years preceding the year in which aid is actually granted.

SECTION 15

Aid for ports

Article 56b

Aid for maritime ports

The eligible costs shall be the costs, including planning costs, of:

(a) investments for the construction, replacement or upgrade of port infrastructures;

(b) investments for the construction, replacement or upgrade of access infrastructure;

(c) dredging.

The eligible costs may also cover the investment costs of on-site production of renewable electricity or renewable hydrogen and the investment costs of storage units for storing renewable electricity or hydrogen. The nominal production capacity of the on-site renewable electricity or renewable hydrogen production installation shall not exceed the maximum rated output or refuelling capacity of the recharging or refuelling infrastructure to which it is connected.

The aid intensity per investment referred to in paragraph 2, point (a), shall not exceed:

(a) 100 % of the eligible costs where total eligible costs of the project are up to EUR 22 million;

(b) 80 % of the eligible costs where total eligible costs of the project are above EUR 22 million and up to EUR 55 million;

(c) 60 % of the eligible costs where total eligible costs of the project are above EUR 55 million and up to the amount laid down in Article 4(1), point (ee).

The aid intensity shall not exceed 100 % of the eligible costs determined in paragraph 2, points (b) and (c), up to the amount laid down in Article 4(1), point (ee).

Article 56c

Aid for inland ports

The eligible costs shall be the costs, including planning costs, of:

(a) investments for the construction, replacement or upgrade of port infrastructures;

(b) investments for the construction, replacement or upgrade of access infrastructure;

(c) dredging.

The eligible costs may also cover the investment costs of on-site production of renewable electricity or renewable hydrogen and the investment costs of storage units for storing renewable electricity or hydrogen. The nominal production capacity of the on-site renewable electricity or renewable hydrogen production installation shall not exceed the maximum rated output or refuelling capacity of the recharging or refuelling infrastructure to which it is connected.

SECTION 16

Aid involved in financial products supported by the InvestEU Fund

Article 56d

Scope and common conditions

The maximum thresholds laid down in Articles 56e and 56f shall apply to the total outstanding financing, in so far as that financing provided under any financial product supported by the InvestEU Fund contains aid. The maximum thresholds shall apply:

(a) per project in the case of aid with identifiable eligible costs covered by Article 56e(2), (3) and (4), Article 56e(5), point (a)(i), and Article 56e(6), (7), (8) and (9);

(b) per final beneficiary in the case of aid without identifiable eligible costs covered by Article 56e(5), points (a)(ii), (iii) and (iv), Article 56e(10) and Article 56f.

Article 56e

Conditions for aid involved in financial products supported by the InvestEU Fund

Aid to the final beneficiary under a financial product supported by the InvestEU Fund shall:

(a) comply with the conditions set out in one of paragraphs 2 to 9; and

(b) where the financing is provided in the form of loans to the final beneficiary, have an interest rate that corresponds at least to the base rate of the reference rate applicable at the time of the granting of the loan.

Aid for fixed broadband network deployment and aid for 4G and 5G mobile network deployment to connect certain eligible socioeconomic drivers shall comply with the following conditions:

(a) aid shall only be granted to projects fulfilling all compatibility conditions laid down respectively in Articles 52 and 52a unless indicated otherwise in points (c) and (d) of this paragraph;

(b) the nominal amount of total financing provided to any final beneficiary per project under the support of the InvestEU Fund shall not exceed EUR 150 million;

(c) the project connects socioeconomic drivers that are public administrations or public or private entities entrusted with the operation of services of general interest or of services of general economic interest within the meaning of Article 106(2) of the Treaty. Projects including elements or entities other than those specified under this point are excluded;

(d) by way of derogation from Article 52(4), the identified market failure must be verified either by available appropriate mapping or, when such mapping is not available, by a public consultation, as follows: (i) the mapping can be considered appropriate if it is not older than 18 months. The mapping shall clearly identify the socio economic drivers envisaged to be covered under the public intervention and shall include all networks providing, under peak time conditions, speeds of at least 100 Mbps download but below 300 Mbps download (threshold speeds) existing or credibly planned to be deployed in the relevant time horizon that pass the premises of the identified eligible socioeconomic driver as refered to in point (c). The mapping shall be carried out by the competent public authority. The mapping shall be performed (1) for purely fixed networks at address level on the basis of premises passed; (2) for fixed wireless access networks at address level on the basis of premises passed or on the basis of maximum 100x100 metre grids; (3) for mobile networks on the basis of maximum 100x100 metre grids. All the elements of the methodology and the underlying technical criteria used to map the target areas must be made publicly available. To foster synergies and simplification for the public administration, a geographical survey conducted pursuant to Article 22 of Directive (EU) 2018/1972 may be considered to constitute an appropriate mapping in the meaning of this point, provided that the conditions laid down in this point are met; (ii) the public consultation shall be carried out by the competent public authority through the publication on a publicly accessible website at regional and national level of the main characteristics of the planned State intervention. The public consultation shall invite interested parties to comment on the planned State intervention and to submit substantiated information regarding networks providing, under peak time conditions, speeds of at least 100 Mbps download but below 300 Mbps download (threshold speeds) existing or credibly planned to be deployed in the relevant time horizon and that pass the premises of an eligible socioeconomic driver as refered to in point (c) and identified in accordance with point (i), based on information: (1) for purely fixed networks, at address level on the basis of premises passed; (2) for fixed wireless access networks, at address level on the basis of premises passed or on the basis of maximum 100x100 metre grids; (3) for mobile networks on the basis of maximum 100x100 metre grids. The public consultation shall last at least 30 days.

Aid for energy generation and energy infrastructure shall comply with the following conditions:

(a) Aid shall be granted only for investments in energy infrastructure which are not exempted from third party access, tariff regulation and unbundling, based on the internal energy market legislation, for the following categories of projects: (i) as regards gas infrastructure, projects included in the prevailing Union list of Projects of Common Interest in Annex VII to Regulation (EU) No 347/2013; and (ii) all projects with regards to electricity infrastructure, hydrogen infrastructure and carbon dioxide infrastructure.

(b) investment aid for generation of energy from renewable energy sources shall comply with the following requirements: (i) aid shall only be granted for new installations selected on a competitive, transparent, objective and non-discriminatory basis in accordance with Article 41(10); (ii) aid may be granted to combined renewable and electricity or thermal storage projects, provided that the requirements set out in Article 41(1a) are fulfilled; (iii) aid may be granted to combined biofuels, bioliquids, biogas (including biomethane) and biomass fuels storage projects, provided that the requirements set out in Article 41(2) are fulfilled; (iv) in case of installations producing renewable hydrogen, aid shall only be granted for installation compliant with the requirements set out in Article 41(3); (v) in case of installations producing biofuels, aid shall only be granted for installations producing biofuels compliant with the sustainability and greenhouse gases emissions saving criteria referred to in Article 29 of Directive (EU) 2018/2001 and its implementing or delegated acts and are made from the feedstock listed in Annex IX to that Directive.

(c) The nominal amount of total financing provided to any final beneficiary per project referred to in point (a) under the support of the InvestEU Fund shall not exceed EUR 150 million. The nominal amount of total financing provided to any final beneficiary per project referred to in point (b) under the support of the InvestEU Fund shall not exceed EUR 75 million.

Aid for social, educational, cultural and natural heritage infrastructure and activities shall comply with the following conditions:

(a) the nominal amount of total financing provided to any final beneficiary under the support of the InvestEU Fund shall not exceed: (i) EUR 110 million per project for investments in infrastructure used for the provision of social services and for education; EUR 165 million per project for cultural and heritage conservation purposes and activities set out in Article 53(2), including natural heritage; (ii) EUR 33 million for activities related to social services; (iii) EUR 82.5 million for activities related to culture and heritage conservation; and (iv) EUR 5.5 million for education and training.

(b) aid shall not be granted for training aimed at complying with mandatory national training requirements.

Aid for transport and transport infrastructures shall comply with the following conditions:

(a) aid for infrastructure, except ports, shall be provided only to the following projects: (i) projects of common interest as defined in Article 3, point (a), of Regulation (EU) No 1315/2013, except for projects concerning port or airport infrastructure; (ii) connections to Trans-European transport network urban nodes; (iii) rolling stock only for the provision of rail transport services not covered by a public service contract within the meaning of Regulation (EC) No 1370/2007 of the European Parliament and of the Council (68), provided the beneficiary is a new entrant; (iv) urban transport; (v) recharging or refuelling infrastructure that supplies vehicles with electricity or hydrogen. For aided refuelling infrastructure supplying hydrogen, the beneficiary shall give a commitment that by 31 December 2035 at the latest, the refuelling infrastructure will solely supply renewable hydrogen. This paragraph does not apply to aid for investments relating to recharging and refuelling infrastructure in ports.

(b) aid for port infrastructure projects shall comply with the following requirements: (i) aid may only be provided for investments in access infrastructure and port infrastructure that are made available to interested users on an equal and non-discriminatory basis on market terms; (ii) any concession or other entrustment to a third party to construct, upgrade, operate or rent aided port infrastructure shall be assigned on a competitive, transparent, non-discriminatory and unconditional basis; (iii) aid shall not be granted for investments in port superstructures. (iv) When aid is granted for refuelling infrastructure supplying hydrogen, the beneficiary shall give a commitment that by 31 December 2035 at the latest, the refuelling infrastructure will solely supply renewable hydrogen. When aid is granted for the construction, installation or upgrade of a refuelling infrastructure supplying ammonia or methanol, the beneficiary shall give a commitment that by 31 December 2035 at the latest the aided refuelling infrastructure will supply solely ammonia or methanol the energy content of which is derived from renewable sources other than biomass and that have been produced in accordance with the methodologies set out for renewable liquid and gaseous transport fuels of non-biological origin in Directive (EU) 2018/2001 and its implementing or delegated acts.

(c) the nominal amount of total financing provided under point (a) or (b) to any final beneficiary per project under the support of the InvestEU Fund shall not exceed EUR 165 million.

Aid for other infrastructures shall comply with the following conditions:

(a) aid shall be provided only to the following projects: (i) investment in water supply and waste water infrastructure for the general public; (ii) investment for resource efficiency and circularity in accordance with Article 47(1) to (6) and (10); (iii) investment in research infrastructure; (iv) investment in the construction or upgrade of innovation cluster facilities; (v) investment in testing and experimentation infrastructures;

(b) the nominal amount of total financing provided to any final beneficiary per project under the support of the InvestEU Fund shall not exceed EUR 110 million.

Aid for environmental protection, including climate protection, shall comply with the following conditions:

(a) aid shall be provided only to the following projects: (i) investments enabling undertakings to remedy or prevent damage to physical surroundings (including climate change) or natural resources by a beneficiary’s own activities or by activities of another entity participating in the same project, provided that (i) the investments do not concern equipment, machinery or industrial production facilities using fossil fuels, including natural gas, without prejudice to the possibility to grant aid for the installation of add-on components improving the level of environmental protection of existing equipment, machinery and industrial production facilities, in which case the investment costs shall not relate to CO2-emitting installations; and (ii) in case of investments in equipment, machinery and industrial production facilities using hydrogen, the beneficiary commits to exclusively use renewable hydrogen throughout the lifetime of the investment. Aid shall not be granted under this point for investments undertaken to comply with Union standards that have been adopted, except if the investment is implemented and finalised at least 18 months before the standard enters into force; (ii) measures improving the energy efficiency of a building or an undertaking, provided that the investments do not concern equipment, machinery or industrial production using fossil fuels, including natural gas. Aid shall not be granted under this point for investments undertaken to comply with Union standards that have been adopted, except if the investment is implemented and finalised at least 18 months before the standard enters into force. By way of derogation, aid may be granted under this point for investments in buildings undertaken to comply with minimum energy performance standards qualifying as Union standards, provided that the aid is granted before the standards become mandatory for the undertaking concerned; (iii) remediation of contaminated sites, insofar as no legal or physical person liable for the environmental damage under the applicable law is identified in line with the ‘polluter pays’ principle as referred to in Article 45(3); (iv) environmental studies; (v) enhancement and restoration of biodiversity and ecosystems where that activity contributes to protecting, conserving or restoring biodiversity and to achieving the good condition of ecosystems, or to protecting ecosystems that are already in good condition; (vi) investment aid for the acquisition of clean vehicles powered at least partially by electricity or by hydrogen, or zero-emission vehicles for road, railway, inland waterway and maritime transport and for the retrofitting of vehicles to qualify as clean vehicles or as zero-emission vehicles;

(b) without prejudice to point (a), the aid granted for the improvement of the energy efficiency of the building may be combined with aid for any or all of the following measures: (i) the installation of integrated on-site equipment generating electricity, heating or cooling from renewable energy sources, including but not limited to photovoltaic panels and heat pumps; (ii) the installation of equipment for the storage of the energy generated by the on-site renewable energy installations; (iii) the connection to an energy efficient district heating and/or cooling system and related equipment; (iv) the construction and installation of recharging infrastructure for use by the building users, and related infrastructure, such as ducting, where car parking facilities are located either inside the building or are physically adjacent to the building; (v) the installation of equipment for the digitalisation of the building, in particular to increase its smart-readiness, including passive in-house wiring or structured cabling for data networks and the ancillary part of the broadband infrastructure on the property to which the building belongs, but excluding wiring or cabling for data networks outside the property; (vi) investments in green roofs and equipment for the retention and use of rain water. The aid measure shall not support the installation of energy equipment using fossil fuels, including natural gas. The aid may be granted either to the building owner(s) or tenant(s), depending on who obtains the financing for the project.

(c) the nominal amount of total financing provided to any final beneficiary per project referred to in point (a) under the support of the InvestEU Fund shall not exceed EUR 50 million;

(d) the nominal amount of total financing provided per project referred to in point (b) under the support of the InvestEU Fund shall not exceed EUR 50 million per final beneficiary and building;

(e) aid for energy efficiency improvement measures may also relate to the facilitation of energy performance contracting, subject to the following cumulative conditions: (i) the support is provided to SMEs or small mid-caps that are providers of energy performance improvement measures, and which are the final beneficiaries of the aid; (ii) the aid is provided for the facilitation of energy performance contracting within the meaning of Article 2, point (27), of Directive 2012/27/EU; (iii) the aid takes the form of a senior loan or guarantee to the provider of the energy efficiency improvement measures under an energy performance contract, or consists in a financial product aimed at financing the provider (for example, factoring or forfaiting); (iv) the nominal amount of total outstanding financing provided under this point per beneficiary does not exceed EUR 30 million.

Aid for research, development, innovation and digitalisation shall comply with the following conditions:

(a) aid may be granted for: (i) fundamental research; (ii) industrial research; (iii) experimental development; (iv) process innovation or organisational innovation for SMEs; (v) innovation advisory services and innovation support services for SMEs; (vi) digitalisation for SMEs;

(b) for projects falling under points (a) (i), (ii) and (iii), the nominal amount of total financing provided to any final beneficiary per project under the support of the InvestEU Fund shall not exceed EUR 75 million. For projects falling under point (a) (iv), (v) and (vi), the nominal amount of total financing provided to any final beneficiary per project under the support of the InvestEU Fund shall not exceed EUR 30 million.

SMEs or, where applicable, small mid-caps may, in addition to the categories of aid provided for in paragraphs 2 to 9, also receive aid in the form of financing supported by the InvestEU Fund provided that the respective conditions are fulfilled:

(a) the nominal amount of total financing provided per final beneficiary under the support of the InvestEU Fund does not exceed EUR 16.5 million and is provided to: (i) unlisted SMEs that have not yet been operating in any market or have been operating for less than 10 years following their registration or less than 7 years after their first commercial sale; where either the period of operating for less than 10 years following their registration or less than 7 years after their first commercial sale has been applied to a given undertaking, only that period can be applied also to any subsequent aid under the present Article to the same undertaking. For undertakings that have acquired another undertaking or were formed through a merger, the eligibility period applied shall also encompass the operations of the acquired undertaking or the merged undertakings, respectively, except for such acquired or merged undertakings whose turnover accounts for less than 10 % of the turnover of the acquiring undertaking in the financial year preceding the acquisition or, in case of undertakings formed through a merger, less than 10 % of the combined turnover that the merging undertakings had in the financial year preceding the merger. Concerning the registration-related eligibility period, if used, for eligible undertakings that are not subject to registration, the ten-year eligibility period is considered to start from the earlier of either the moment when the undertaking starts its economic activity or the moment when it becomes liable to tax with regard to its economic activity. The financing under the support of the InvestEU Fund may also cover follow-on investments in unlisted SMEs after the eligibility period referred to in this point if the following cumulative conditions are fulfilled: (1) the nominal amount of total financing referred to in point (a) is not exceeded, (2) the possibility of follow-on investments was provided for in the original business plan and (3) the final beneficiary receiving the follow-on investment has not become a ‘linked enterprise’, within the meaning of Article 3(3) of Annex I, with another undertaking other than the financial intermediary or an independent private investor providing financing under the support of the InvestEU Fund, unless the new entity is an SME; (ii) unlisted SMEs starting a new economic activity, where the initial investment shall be higher than 50 % of the average annual turnover in the preceding 5 years. By derogation from the first sentence, the following shall be considered investments for new economic activities, if the related initial investment, based on a business plan, is higher than 30 % of the average annual turnover in the preceding 5 years: (1) investments significantly improving the environmental performance of the activity beyond mandatory Union standards in accordance with Article 36(2) of this Regulation, (2) other environmentally sustainable investments as defined in Article 2(1) of Regulation (EU) 2020/852, and (3) investments aiming at increasing capacity for the extraction, separation, refining, processing or recycling of a critical raw material listed in Annex IV. The environmentally sustainable character of the investment shall be demonstrated in accordance with Article 3 of Regulation (EU) 2020/852, including the ‘do no significant harm’ principle, or through other comparable methodologies, including, among others, the sustainability proofing for the InvestEU Fund. For measures which are identical to measures within Recovery and Resilience Plans as approved by the Council, their compliance with the ‘do no significant harm’ principle is considered fulfilled as this has already been verified; (iii) SMEs and small mid-caps that are innovative enterprises as defined in Article 2, point (80);

(b) the nominal amount of total financing provided per final beneficiary under the support of the InvestEU Fund does not exceed EUR 16.5 million and is provided to SMEs or small mid-caps whose principal activities are located in assisted areas provided that the financing is not used for relocation of activities as defined in Article 2, point (61a);

(c) the nominal amount of total financing provided per final beneficiary under the support of the InvestEU Fund does not exceed EUR 2.2 million and is provided to SMEs or small mid-caps.

Article 56f

Conditions for aid involved in intermediated commercially-driven financial products supported by the InvestEU Fund

CHAPTER IV

FINAL PROVISIONS

Article 57

Repeal

Regulation (EC) No 800/2008 shall be repealed.

Article 58

Transitional provisions

Article 59

This Regulation shall enter into force on 1 July 2014.

It shall apply until 31 December 2026.

This Regulation shall be binding in its entirety and directly applicable in all Member States.

ANNEX I

Article 1

Enterprise

An enterprise is considered to be any entity engaged in an economic activity, irrespective of its legal form. This includes, in particular, self-employed persons and family businesses engaged in craft or other activities, and partnerships or associations regularly engaged in an economic activity.

Article 2

Staff headcount and financial thresholds determining enterprise categories

Article 3

Types of enterprise taken into consideration in calculating staff numbers and financial amounts

However, an enterprise may be ranked as autonomous, and thus as not having any partner enterprises, even if this 25 % threshold is reached or exceeded by the following investors, provided that those investors are not linked, within the meaning of paragraph 3, either individually or jointly to the enterprise in question:

(a) public investment corporations, venture capital companies, individuals or groups of individuals with a regular venture capital investment activity who invest equity capital in unquoted businesses (business angels), provided the total investment of those business angels in the same enterprise is less than EUR 1 250 000 ;

(b) universities or non-profit research centres;

(c) institutional investors, including regional development funds;

(d) autonomous local authorities with an annual budget of less than EUR 10 million and less than 5 000 inhabitants.

‘Linked enterprises’ are enterprises which have any of the following relationships with each other:

(a) an enterprise has a majority of the shareholders' or members' voting rights in another enterprise;

(b) an enterprise has the right to appoint or remove a majority of the members of the administrative, management or supervisory body of another enterprise;

(c) an enterprise has the right to exercise a dominant influence over another enterprise pursuant to a contract entered into with that enterprise or to a provision in its memorandum or articles of association;

Reading this document does not replace reading the official text published in the Official Journal of the European Union. We assume no responsibility for any inaccuracies arising from the conversion of the original to this format.

This text is published under EUR-Lex's own terms of reuse, not a Legalize or public-domain licence. EUR-Lex
Creative Commons Attribution 4.0 International (CC BY 4.0)
© European Union, https://eur-lex.europa.eu — Source: EUR-Lex (Publications Office of the European Union). Reused under the Creative Commons Attribution 4.0 International (CC BY 4.0) licence. Only EU legislation published in the printed Official Journal of the European Union is deemed authentic; consolidated texts are reproduced here for documentation purposes and have been reformatted to Markdown.