Wijzigingsgeschiedenis

Administratief Akkoord tussen het Koninkrijk der Nederlanden en de Volksrepubliek Bangladesh inzake het project “Support to the Implementation of the Bangladesh Delta Plan 2100”

8 versions · 2025-12-24
2025-12-24
Administratief Akkoord tussen het Koninkrijk der Nederlanden en de Volk

Wijzigingen op 2025-12-24

@@ -16,21 +16,19 @@
2. The aim of the Project is to support effective implementation of the Bangladesh Delta Plan 2100 (BDP 2100) by strengthening the capacity of the coordination and implementing organisation of the BDP 2100, facilitating the formulation and implementation of fast track projects, the establishment of mid-term investment plans and their integration in the 8th Five Year Plan and reviewing the implementation of the BDP 2100 on an annual basis.
3. The aforesaid co-operation between the two Parties is planned to last from 1 October 2018 to 31 December 2025 or shall expire on the date on which the Project has been completed in conformity with the provisions of the Administrative Arrangement and of the Revised Project Document (Revised TAPP), whichever date is the later.
3. The aforesaid co-operation between the two Parties is planned to last from 1 October 2018 to 31 December 2026 or shall expire on the date on which the Project has been completed in conformity with the provisions of the Administrative Arrangement and of the Revised Project Document (Revised TAPP), whichever date is the later.
##### Article II. (The contribution by the Netherlands Party)
The Netherlands Party shall make an additional contribution of BDT 47,896,000 (top-up to accommodate the extension of the original Reimbursable Project Aid (RPA) on top of BDT 85,000,000 (the original RPA budget, as concluded on 13 May 2019) and an additional contribution of Euro 346,000 (top-up to accommodate the extension of the original TA budget, as concluded on 13 May 2019), Euro 5,420,326 in total (five million four hundred and twenty thousand three hundred and twenty six euros) in the form of a grant to the project in the following manner:
The Netherlands Party shall make an additional contribution of BDT 31,902,000.00 (top-up to accommodate the extension of the revised Reimbursable Project Aid (RPA) on top of BDT 132,896,000.00 (as amended on 23 January 2024), in the form of a grant to the project in the following manner:
- –. A total of BDT 132,896,000 (one hundred thirty two million eight hundred and ninety six thousand BDT) of grant financing to be administered by the general Economics Division (GED);
- –. A total of BDT 164,798,000 (one hundred sixty four million seven hundred and ninety eight thousand BDT) of grant financing to be administered by the General Economics Division (GED).
- –. A total of € 4,304,000 (EUR four million three hundred and four thousand) for Technical Assistance, through direct contracting by the Netherlands party.
The Netherlands Party's contribution will become available on the condition that:
The Netherlands Party’s contribution will become available on the condition that:
- –. The Bangladeshi Partner shall have approved the Revised Technical Assistance Project Proposal (TAPP) for the project as per agreed Project Extension and Top-up Proposal;
- –. The Bangladeshi Partner shall have approved the Technical Assistance Project Proposal (TAPP) for the project as per agreed Project Extension Proposal;
- –. The general Economics Division (GED) has appointed a Project Director and established the Delta Wing.
- –. The General Economics Division (GED) has appointed the Project Director and Strengthen the Delta Wing with adequate capacity to complete the Project.
##### Article III. (The contribution by the Bangladesh Party)
@@ -98,7 +96,7 @@
##### Article XIII. (Entry into force and duration)
This Administrative Arrangement shall enter into force on the day of signature by both Parties with retrospective effect to 1 October 2018, and shall expire at the end of the period mentioned in [Article I, paragraph 3](https://wetten.overheid.nl/jci1.3:c:BWBV0006821&artikel=I&z=2024-11-12&g=2024-11-12), of this Administrative Arrangement or on the date on which the Project has been completed in conformity with the provisions of this Administrative Arrangement and of the Project Document (TAPP), whichever date is the later.
This Administrative Arrangement shall enter into force on the day of signature by both Parties with retrospective effect to 1 October 2018, and shall expire at the end of the period mentioned in [Article I, paragraph 3](https://wetten.overheid.nl/jci1.3:c:BWBV0006821&artikel=I&z=2025-12-24&g=2025-12-24), of this Administrative Arrangement or on the date on which the Project has been completed in conformity with the provisions of this Administrative Arrangement and of the Project Document (TAPP), whichever date is the later.
The Minister for Foreign Trade and Development Cooperation of the Netherlands, being the competent Netherlands Authority for the purpose of the Administrative Arrangement, hereinafter referred to as “the Netherlands Party”, represented in this matter by the Ambassador of the Kingdom of the Netherlands in Dhaka, Bangladesh
2024-11-12
Administratief Akkoord tussen het Koninkrijk der Nederlanden en de Volk
2024-01-23
Administratief Akkoord tussen het Koninkrijk der Nederlanden en de Volk
2023-07-01
Administratief Akkoord tussen het Koninkrijk der Nederlanden en de Volk
2023-02-22
Administratief Akkoord tussen het Koninkrijk der Nederlanden en de Volk
2022-10-02
Administratief Akkoord tussen het Koninkrijk der Nederlanden en de Volk
2019-05-13
Administratief Akkoord tussen het Koninkrijk der Nederlanden en de Volk
2018-10-01
Administratief Akkoord tussen het Koninkrijk der Nederlanden en de V
original version Tekst op deze datum