Compulsory Purchase (Vesting Declarations) Act 1981
Compulsory Purchase (Vesting Declarations) Act 1981
Act applied (with modifications) (25.4.2024) by The Network Rail (Church Fenton Level Crossing Reduction) Order 2024 (S.I. 2024/526), arts. 1, 20 (with art. 27(1))
Sch. A1 excluded (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 35(3)(b)
Sch. A1 excluded (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 1, 21(4)(b) (with arts. 24(8), 33(2))
Act applied (with modifications) (30.9.2015) by The Network Rail (Blackthorn and Piddington) (Land Acquisition) Order 2015 (S.I. 2015/1684), art. 5(2)
Sch. A1 excluded (11.10.2023) by The Awel y Môr Offshore Wind Farm Order 2023 (S.I. 2023/1033), arts. 1, 24
Act applied (with modifications) (9.1.2014) by The National Grid (King’s Lynn B Power Station Connection) Order 2013 (S.I. 2013/3200), art. 21 (with art. 20(1))
Act applied (with modifications) (22.7.2020) by The Norfolk Vanguard Offshore Wind Farm Order 2020 (S.I. 2020/706), arts. 1, 22 (with arts. 41, 42, Sch. 16 para. 66)
Act applied (with modifications) (29.7.2014) by The Felixstowe Branch Line (Land Acquisition) Order 2014 (S.I. 2014/1821), arts. 5, 14
Sch. A1 excluded (27.9.2024) by The Cottam Solar Project Order 2024 (S.I. 2024/943), arts. 1, 25(3) (with arts. 25(4), 48, Sch. 15)
Words in Sch. A1 para. 2 inserted (19.12.2025 for specified purposes, 18.2.2026 for E. in so far as not already in force) by Planning and Infrastructure Act 2025 (c. 34), ss. 109(6), 118(5)(d) (with s. 116); S.I. 2025/1370, regs. 3(1)(c), 4(1)(j)
Sch. 1 Pt. I omitted (3.2.2017) by virtue of Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 18 para. 7; S.I. 2017/75, reg. 3(k) (with reg. 5)
Words in Sch. A1 para. 5 renumbered as Sch. A1 para. 5(1) (31.1.2024) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 186(6)(a), 255(7) (with s. 247); S.I. 2024/92, reg. 2(m) (with reg. 6(2))
Act applied (with modifications) (2.8.2023) by The Rother Valley Railway (Bodiam to Robertsbridge Junction) Order 2023 (S.I. 2023/815), arts. 1, 20 (with art. 42)
Act applied (with modifications) (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), art. 22 (with art. 7)
Sch. A1 excluded (4.10.2024) by The National Grid (Bramford to Twinstead Reinforcement) Order 2024 (S.I. 2024/958), arts. 1, 24(3) (with art. 40, Sch. 14)
Act applied (with modifications) (14.10.2008) by The Felixstowe Branch Line and Ipswich Yard Improvement Order 2008 (S.I. 2008/2512), arts. 24, 33(1) (with art. 36(3))
Sch. A1 excluded (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), arts. 1(2), 24(3)(b) (with arts. 24(4), 40, 41)
Sch. A1 excluded (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 25(b) (with Sch. 8 Pt. 6 para. 19)
Words in s. 10(3) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 146 (with Sch. 5)
Act applied (with modifications) (8.1.2026) by The Five Estuaries Offshore Wind Farm Order 2025 (S.I. 2025/1376), arts. 1, 26 (with arts. 22(1)(b), 39, 40, Sch. 9)
Sch. A1 excluded (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), arts. 1, 31(3)(b) (with arts. 31(4), 51)
Sch. A1 excluded (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 27(3)(b) (with arts. 5, 27(4))
Act applied with modificatiions (22.4.2022) by The East Anglia ONE North Offshore Wind Farm Order 2022 (S.I. 2022/432), arts. 1(2), 22 (with arts. 40, 41)
Act applied (with modifications) (17.2.2025) by The Heckington Fen Solar Park Order 2025 (S.I. 2025/85), arts. 1, 21 (with arts. 18(1)(b), 43, Sch. 13)
Act applied (with modifications) (28.3.2013) by The Network Rail (Seaham Level Crossing) Order 2013 (S.I. 2013/533), arts. 7, 13
Act applied (with modifications) (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), art. 28 (with arts. 4, 23, 37)
Sch. A1 excluded (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 30(3)(b) (with arts. 5, 30(4), Sch. 27 para. 36)
Act applied (with modifications) (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), arts. 1, 26 (with arts. 6(2), 18, 21, Sch. 11 paras. 5, 30)
Sch. A1 excluded (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), arts. 1, 25(3) (with art. 25(4), Sch. 15)
Act applied (with modifications) (16.4.2013) by The Network Rail (Pont Briwet) (Land Acquisition) Order 2013 (S.I. 2013/767), art. 5 (with arts. 20, 21)
Act applied (with modifications) (19.8.2016) by The North Wales Wind Farms Connection Order 2016 (S.I. 2016/818), art. 24 (with art. 35)
S. 4 excluded (26.2.2015) by The Cornwall Council (A30 Temple to Higher Carblake Improvement) Order 2015 (S.I. 2015/147), arts. 1, 20(1)
S. 5 applied (with modifications) (28.2.2013) by The Rookery South (Resource Recovery Facility) Order 2011 2013 (S.I. 2013/680), art. 21(6)
Sch. A1 excluded (11.7.2025) by The Oaklands Farm Solar Park Order 2025 (S.I. 2025/739), arts. 1, 22(3) (with art. 22(4), Sch. 10)
Act applied (with modifications) (29.10.2014) by The Able Marine Energy Park Development Consent Order 2014 (S.I. 2014/2935), art. 36 (with arts. 30(4), 53)
Act applied (with modifications) (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 29 (with art. 5, Sch. 27 para. 36)
Act: power to amend conferred (26.12.2023) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 132, 255(3)(a) (with s. 247)
Act applied (with modifications) (1.6.2016) by The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016 (S.I. 2016/547), art. 26 (with arts. 4, 5(3))
Act applied (with modifications) (23.8.2007) by The Docklands Light Railway (Capacity Enhancement and 2012 Games Preparation) Order 2007 (S.I. 2007/2297), arts. 22, 31 (with arts. 3(6), 12(3))
Sch. A1 excluded (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 32(3) (with arts. 4, 32(4))
Sch. A1 excluded (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), arts. 1, 23(3) (with arts. 23(4), 45, Sch. 14)
Sch. 1 excluded (23.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), ss. 7(2), 8(2), 70(1) (with s. 8(3))
Act applied (with modifications) (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), art. 26 (with art. 5)
Act applied (with modifications) (27.9.2024) by The Cottam Solar Project Order 2024 (S.I. 2024/943), arts. 1, 24 (with arts. 21(1)(b), 48, Sch. 15)
Words in s. 4(1) omitted (19.12.2025 for specified purposes, 18.2.2026 for E. in so far as not already in force) by virtue of Planning and Infrastructure Act 2025 (c. 34), ss. 108(3)(a), 118(5)(d) (with s. 116); S.I. 2025/1370, regs. 3(1)(b), 4(1)(i) (with reg. 6(3))
Act applied (with modifications) (18.3.2017) by The North London Heat and Power Generating Station Order 2017 (S.I. 2017/215), art. 23
Act applied (with modifications) (4.3.2020) by The Midland Metro (Birmingham Eastside Extension) Order 2020 (S.I. 2020/141), art. 30 (with arts. 47, 48, Sch. 10 para. 19)
Sch. A1 excluded (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), arts. 1, 30(3)(b) (with arts. 30(4), 58, 59)
Act applied (with modifications) (21.8.2013) by The Croxley Rail Link Order 2013 (S.I. 2013/1967), art. 18
Act applied (with modifications) (11.3.2014) by The Crossrail (Paddington Station Bakerloo Line Connection) Order 2014 (S.I. 2014/310), arts. 10, 17
Act applied (with modifications) (9.1.2014) by The Ashton Vale to Temple Meads and Bristol City Centre Rapid Transit Order 2013 (S.I. 2013/3244), arts. 25, 35 (with arts. 57, 58, Sch. 11 para. 19)
S. 5(1) omitted (3.2.2017 for specified purposes, 6.4.2017 in so far as not already in force) by virtue of Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 15 para. 6; S.I. 2017/75, reg. 3(j) (with reg. 5); S.I. 2017/281, reg. 4(j) (with reg. 8(2))
Sch. A1 excluded (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 33(4)(b) (with art. 33(5))
Sch. A1 excluded (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 24(3)(b) (with art. 24(4), Sch. 9 para. 144)
Act applied (with modifications) (5.11.2025) by The Tillbridge Solar Order 2025 (S.I. 2025/1105), arts. 1, 25 (with arts. 22(2), 49, Sch. 15)
Act applied (with modifications) (27.2.2025) by The Associated British Ports (Immingham Green Energy Terminal) Order 2025 (S.I. 2025/165), arts. 1, 29 (with arts. 23(1)(b), 48, 59, Sch. 14)
Act applied (with modifications) (2.8.2022) by The Network Rail (Oxford Station Phase 2 Improvements (Land Only)) (No. 2) Order 2022 (S.I. 2022/872), arts. 1(1), 5
Act applied (with modifications) (12.1.2016) by The London Underground (Bank Station Capacity Upgrade) Order 2015 (S.I. 2015/2044), art. 22
Word in s. 8(1) inserted (19.12.2025 for specified purposes, 18.2.2026 for E. in so far as not already in force) by Planning and Infrastructure Act 2025 (c. 34), ss. 109(4), 118(5)(d) (with s. 116); S.I. 2025/1370, regs. 3(1)(c), 4(1)(j)
Act applied (with modifications) (13.12.2006) by The Luton Dunstable Translink Order 2006 (S.I. 2006/3118), arts. 21, 28
Act applied (with modifications) (7.9.2016) by The Hornsea Two Offshore Wind Farm Order 2016 (S.I. 2016/844), art. 22 (with arts. 37, 38)
Act applied (with modifications) (4.6.2018) by The Network Rail (Kings Mill No. 1 Level Crossing) (Land Acquisition and Closure) Order 2018 (S.I. 2018/571), arts. 7, 14
Act applied (with modifications) (1.7.2011) by The Saundersfoot Harbour Empowerment Order 2011 (S.I. 2011/1565), art. 18
Act applied (with modifications) (31.12.2014) by The Hornsea One Offshore Wind Farm Order 2014 (S.I. 2014/3331), art. 19 (with arts. 37, 38)
S. 4 excluded (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 26(b) (with art. 37)
Sch. A1 excluded (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 27(4)(b) (with art. 27(5))
Act applied (with modifications) (21.10.2014) by The Central Bedfordshire Council (Woodside Link Houghton Regis) Development Consent Order 2014 (S.I. 2014/2637), art. 23
Act applied (with modifications) (14.6.2016) by The Midland Metro (Birmingham City Centre Extension, etc.) (Land Acquisition and Variation) Order 2016 (S.I. 2016/545), art. 22 (with art. 39)
Act applied (with modifications) (27.9.2016) by The Triton Knoll Electrical System Order 2016 (S.I. 2016/880), art. 20 (with arts. 39, 40, Sch. 8 para. 19)
Act applied (with modifications) (11.3.2015) by The Dogger Bank Creyke Beck Offshore Wind Farm Order 2015 (S.I. 2015/318), art. 26 (with arts. 40, 41, Sch. 12 Pt. 1 paras. 4, 9(2), 10, Sch. 12 Pt. 2 paras. 4(2)(3), 19, Sch. 12 Pt. 4 paras. 3, 4, 16)
Sch. A1 excluded (9.10.2024) by The M3 Junction 9 Development Consent Order 2024 (S.I. 2024/752), arts. 1, 32(3) (with arts. 4, 32(4), Sch. 10) (as amended by S.I. 2024/1020, Sch.) Sch. A1 excluded (18.12.2024) by The Network Rail (Leeds to Micklefield Enhancements) Order 2024 (S.I. 2024/1284), arts. 1, 26(3) (with art. 26(4), Sch. 15)
Act applied (with modifications) (8.12.2017) by The Network Rail (Closure of Abbots Ripton Level Crossing) Order 2017 (S.I. 2017/1074), Sch. 1 paras. 4, 5
Act applied (with modifications) (23.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 4(4), Sch. 6 para. 3, Sch. 9 paras. 3, 4 (as amended (24.2.2017) by 2017 (c. 7), s. 70(2), Sch. 14 paras. 6, 7, 9; S.I. 2017/209, reg. 2)
Act applied (with modifications) (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1(1), 30 (with art. 3(1))
S. 4 excluded (2.10.2014) by The Clocaenog Forest Wind Farm Order 2014 (S.I. 2014/2441), arts. 1, 21(b) (with art. 33)
Sch. A1 excluded (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 31(3) (with arts. 4, 31(4), 45, Sch. 9 paras. 6, 46, 54(1))
Act applied (with modifications) (7.8.2012) by The Ipswich Barrier Order 2012 (S.I. 2012/1867), arts. 23, 33 (with arts. 46-48, Sch. 8 para. 18)
S. 4 excluded (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 20(1)(b)
Words in s. 2(1) inserted (19.12.2025 for specified purposes, 18.2.2026 for E. in so far as not already in force) by Planning and Infrastructure Act 2025 (c. 34), ss. 108(2), 118(5)(d) (with s. 116); S.I. 2025/1370, regs. 3(1)(b), 4(1)(i) (with reg. 6(3))
Act applied (with modifications) (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), arts. 1(2), 22 (with arts. 40, 41)
Sch. A1 excluded (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 25(3)(b) (with art. 25(4))
Act applied (with modifications) (29.12.2022) by The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 (S.I. 2022/1396), arts. 1, 23(1)-(10) (with art. 32, Sch. 10 paras. 26(2), 68)
S. 4 excluded (30.12.2015) by The Port Talbot Steelworks Generating Station Order 2015 (S.I. 2015/1984), arts. 1, 15(b) (with art. 26)
S. 3 omitted (3.2.2017 for specified purposes, 6.4.2017 in so far as not already in force) by virtue of Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 15 para. 5; S.I. 2017/75, reg. 3(j) (with reg. 5); S.I. 2017/281, reg. 4(j) (with reg. 8(2))
Sch. 2 para. 4 substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 18 para. 8; S.I. 2017/75, reg. 3(k) (with reg. 5)
Act applied (with modifications) (2.2.2016) by The East Midlands Gateway Rail Freight Interchange and Highway Order 2016 (S.I. 2016/17), art. 29
Act applied (with modifications) (9.2.2016) by The National Grid (Hinkley Point C Connection Project) Order 2016 (S.I. 2016/49), art. 25 (with arts. 21(1), 32)
Act applied (with modifications) (18.2.2016) by The A19/A1058 Coast Road (Junction Improvement) Development Consent Order 2016 (S.I. 2016/73), art. 23 (with art. 37)
Sch. A1 excluded (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 25(3)(b) (with art. 25(4))
Act applied (with modifications) (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), arts. 1, 22 (with arts. 40, 41, Sch. 9 Pt. 5 para. 18)
Act applied (with modifications) (6.8.2014) by The Rampion Offshore Wind Farm Order 2014 (S.I. 2014/1873), art. 27 (with arts. 12, 13, Sch. 12 Pt. 1 para. 19, Pt. 2 para. 6, Pt. 3 para. 5, Pt. 4 para. 4, Pt. 5 para. 4)
S. 4(1ZA) inserted (19.12.2025 for specified purposes, 18.2.2026 for E. in so far as not already in force) by Planning and Infrastructure Act 2025 (c. 34), ss. 108(3)(b), 118(5)(d) (with s. 116); S.I. 2025/1370, regs. 3(1)(b), 4(1)(i) (with reg. 6(3))
Act applied (with modifications) (6.11.2012) by The Network Rail (North Doncaster Chord) Order 2012 (S.I. 2012/2635), art. 26 (with art. 35(2))
Act applied (with modifications) (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), art. 32
Act applied (with modifications) (2.8.2016) by The Midland Metro (Wolverhampton City Centre Extension) Order 2016 (S.I. 2016/684), art. 29 (with arts. 39, 46, 47, Sch. 9 para. 4, Sch. 10 para. 12(2))
Sch. A1 excluded (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 23(3)(b) (with arts. 7, 23(4))
Act applied (with modifications) (9.10.2024) by The M3 Junction 9 Development Consent Order 2024 (S.I. 2024/752), arts. 1, 31 (with arts. 4, 26(1), Sch. 10) (as amended by S.I. 2024/1020, Sch.) Act applied (with modifications) (25.10.2024) by The Associated British Ports (Immingham Eastern Ro-Ro Terminal) Development Consent Order 2024 (S.I. 2024/1014), arts. 1, 15 (with arts. 11(b), 36, 40, Sch. 4)
Act applied (with modifications) (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 20(1), 28(1)(b) (with art. 31(2))
S. 8B inserted (19.12.2025 for specified purposes, 18.2.2026 for E. in so far as not already in force) by Planning and Infrastructure Act 2025 (c. 34), ss. 109(2), 118(5)(d) (with s. 116); S.I. 2025/1370, regs. 3(1)(c), 4(1)(j)
Act applied (with modifications) (7.8.2015) by The Preesall Underground Gas Storage Facility Order 2015 (S.I. 2015/1561), art. 22 (with art. 44)
Sch. A1 excluded (1.5.2025) by The Viking CCS Carbon Dioxide Pipeline Order 2025 (S.I. 2025/509), arts. 1(2), 29(4) (with art. 41, Sch. 9)
Sch. A1 excluded (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 25(3)(b) (with arts. 7, 25(4))
Act applied (with modifications) (1.5.2025) by The Viking CCS Carbon Dioxide Pipeline Order 2025 (S.I. 2025/509), arts. 1(2), 28 (with arts. 23(1)(b), 41, Sch. 9)
Words in Sch. A1 para. 5(1) inserted (31.1.2024) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 186(6)(b), 255(7) (with s. 247); S.I. 2024/92, reg. 2(m) (with reg. 6(2))
Sch. A1 para. 5(2) inserted (31.1.2024) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 186(6)(c), 255(7) (with s. 247); S.I. 2024/92, reg. 2(m) (with reg. 6(2))
Act applied (with modifications) (2.4.2004) by The Docklands Light Railway (Woolwich Arsenal Extension) Order 2004 (S.I. 2004/757), arts. 25, 37
Sch. A1 excluded (5.11.2025) by The Tillbridge Solar Order 2025 (S.I. 2025/1105), arts. 1, 26(3) (with arts. 26(4), 49, Sch. 15)
Sch. A1 excluded (22.4.2022) by The East Anglia ONE North Offshore Wind Farm Order 2022 (S.I. 2022/432), arts. 1(2), 24(3)(b) (with arts. 40, 41)
Act applied (with modifications) (13.6.2024) by The Network Rail (Cambridge Re-Signalling) Order 2024 (S.I. 2024/724), arts. 1, 6 (with arts. 12(1)(b), 13)
Act applied (with modifications) (9.5.2024) by The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024 (S.I. 2024/564), arts. 1, 21 (with arts. 18(1), 35, 36, Sch. 14)
Act applied (with modifications) (9.6.2015) by The White Moss Landfill Order 2015 (S.I. 2015/1317), art. 17 (with art. 5)
Act applied (with modifications) (21.4.2014) by The Network Rail (Norton Bridge Area Improvements) Order 2014 (S.I. 2014/909), art. 24 (with art. 34(2))
Act applied (with modifications) (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), arts. 1, 22 (with arts. 19(1)(b), 45, Sch. 14)
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.