Compulsory Purchase (Vesting Declarations) Act 1981
Compulsory Purchase (Vesting Declarations) Act 1981
Act applied (with modifications) (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 28 (with arts. 40, 46(2), Sch. 19 para. 61)
Act applied (with modifications) (13.11.2012) by The Chiltern Railways (Bicester to Oxford Improvements) Order 2012 (S.I. 2012/2679), arts. 24, 36 (with art. 42(2))
Sch. A1 excluded (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 27(4)(b) (with arts. 51, 57)
Words in s. 5A renumbered as s. 5A(1) (31.1.2024) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 185(3)(a)(i), 255(7) (with s. 247); S.I. 2024/92, reg. 2(l) (with reg. 6(1))
Act applied (with modifications) (15.4.2025) by The A122 (Lower Thames Crossing) Development Consent Order 2025 (S.I. 2025/462), arts. 1, 31 (with arts. 5, 27(1)(b), 43, 53(7), Sch. 14) (as amended (12.9.2025) by The A122 (Lower Thames Crossing) Development Consent (Correction) Order 2025 (S.I. 2025/1014), art. 1, Sch.)
Act applied (with modifications) (24.8.2017) by The National Grid (Richborough Connection Project) Development Consent Order 2017 (S.I. 2017/817), art. 25 (with art. 22)
Words in s. 9(2) substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), ss. 191, 216(3); S.I. 2017/75, reg. 3(f) (with reg. 5)
S. 4 excluded (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), arts. 1, 19(1)(b) (with art. 30)
Words in s. 11(4) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 147 (with Sch. 5)
Sch. A1 excluded (9.5.2024) by The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024 (S.I. 2024/564), arts. 1, 22(4) (with arts. 22(5), 35, 36, Sch. 14)
Act applied (with modifications) (11.1.2023) by The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022 (S.I. 2022/1406), arts. 1, 21 (with arts. 23, 30, 34(2), Sch. 12 paras. 5, 47, 79)
Act applied (with modifications) (24.7.2014) by The Daventry International Rail Freight Interchange Alteration Order 2014 (S.I. 2014/1796), art. 21 (with art. 24(2), Sch. 6 para. 3)
Act applied (with modifications) (31.5.2025) by The East Yorkshire Solar Farm Order 2025 (S.I. 2025/585), arts. 1, 24 (with arts. 21(1), 49, Sch. 14)
Act applied (with modifications) (21.4.2011) by The Network Rail (Hitchin (Cambridge Junction)) Order 2011 (S.I. 2011/1072), arts. 19, 31
Act applied (with modifications) (6.11.2013) by The Transport for Greater Manchester (Light Rapid Transit System) (Second City Crossing) Order 2013 (S.I. 2013/2587), art. 28 (with arts. 38(1), 42, 43)
S. 8A inserted (31.1.2024) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 186(4), 255(7) (with s. 247); S.I. 2024/92, reg. 2(m) (with reg. 6(2))
Words in s. 6(1)(b) substituted (3.2.2017 for specified purposes, 6.4.2017 in so far as not already in force) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 15 para. 7; S.I. 2017/75, reg. 3(j) (with reg. 5); S.I. 2017/281, reg. 4(j) (with reg. 8(2))
Act applied (with modifications) (15.9.2016) by The River Humber Gas Pipeline Replacement Order 2016 (S.I. 2016/853), art. 26 (with art. 43)
Act applied (with modifications) (7.5.2014) by The National Grid (North London Reinforcement Project) Order 2014 (S.I. 2014/1052), art. 27
Act applied (with modifications) (12.5.2022) by The M54 to M6 Link Road Development Consent Order 2022 (S.I. 2022/475), arts. 1, 26
Act applied (with modifications) (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), art. 26 (with arts. 5, 22, 44)
Act applied (with modifications) (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 29 (with art. 24, Sch. 11)
Act applied (with modifications) (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 34
Act applied (with modifications) (7.1.2015) by The Willington C Gas Pipeline Order 2014 (S.I. 2014/3328), art. 21
Sch. A1 para. 16(4) inserted (19.7.2017) by Neighbourhood Planning Act 2017 (c. 20), ss. 41, 46(1); S.I. 2017/767, reg. 2(j)
Sch. A1 inserted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 18 para. 6; S.I. 2017/75, reg. 3(k) (with reg. 5)
Sch. A1 excluded (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), arts. 1, 28(3) (with arts. 28(4), 42, 43, Sch. 12)
Act applied (with modifications) (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), art. 23 (with Sch. 9 para. 144)
Sch. A1 excluded (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 26(3) (with art. 26(4), Sch. 11)
Sch. A1 excluded (4.4.2025) by The North Lincolnshire Green Energy Park Order 2025 (S.I. 2025/362), arts. 1, 30(3) (with art. 30(4), Sch. 14)
Act applied (with modifications) (7.2.2024) by The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024 (S.I. 2024/70), arts. 1, 21 (with arts. 18(1)(b), 43, Sch. 12 paras. 5, 24)
Act applied (with modifications) (7.7.2014) by The East Anglia ONE Offshore Wind Farm Order 2014 (S.I. 2014/1599), art. 19 (with arts. 37, 38, Sch. 9 para. 19)
S. 4 excluded (14.8.2015) by The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570), arts. 1, 20(1)(b)
Act applied (with modifications) (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), art. 28 (with arts. 58, 59)
Act applied (with modifications) (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), art. 19
Sch. A1 excluded (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), arts. 1, 23(3) (with arts. 23(4), 40, 41, Sch. 9 Pt. 5 para. 18)
Act applied (with modifications) (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), arts. 1, 24 (with art. 20(1), Sch. 15)
S. 4 excluded (7.8.2015) by The Preesall Underground Gas Storage Facility Order 2015 (S.I. 2015/1561), arts. 1, 31(1)(b) (with art. 44)
Act applied (with modifications) (5.4.2017) by The Keuper Underground Gas Storage Facility Order 2017 (S.I. 2017/433), art. 26
Act applied (with modifications) (24.11.2016) by The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order 2016 (S.I. 2016/1035), art. 29 (with arts. 43, 44)
Act applied (with modifications) (2.8.2022) by The Network Rail (Oxford Station Phase 2 Improvements (Land Only)) Order 2022 (S.I. 2022/871), arts. 1, 5
Act applied (with modifications) (11.1.2006) by The Cambridgeshire Guided Busway Order 2005 (S.I. 2005/3523), arts. 24, 33 (with art. 52)
S. 7(1) substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 18 para. 3; S.I. 2017/75, reg. 3(k) (with reg. 5)
Act applied (with modifications) (18.2.2026) by Planning and Infrastructure Act 2025 (c. 34), s. 118(3), Sch. 4 paras. 15, 16 (with s. 116); S.I. 2025/1370, reg. 4(1)(l)
Sch. A1 excluded (24.4.2025) by The London Luton Airport Expansion Development Consent Order 2025 (S.I. 2025/463), arts. 1, 31(3)(b)(4) (with Sch. 8 paras. 36(3), 87)
Act applied (with modifications) (2.10.2014) by The North Killingholme (Generating Station) Order 2014 (S.I. 2014/2434), arts. 19(1)(b), 21 (with arts. 6, 13, 16(4), Sch. 8 Pt. 1 para. 6, Sch. 8 Pt. 3 paras. 4(3), 6, 17, Sch. 8 Pt. 5 para. 9)
Act applied (with modifications) (23.6.2015) by The Norfolk County Council (Norwich Northern Distributor Road (A1067 to A47(T))) Order 2015 (S.I. 2015/1347), art. 25
Sch. A1 excluded (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), arts. 1, 34(3) (with art. 6, Sch. 10)
Act applied (with modifications) (26.8.2015) by The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015 (S.I. 2015/1592), art. 27 (with arts. 40, 41)
Act applied (with modifications) (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), arts. 1, 30 (with art. 51)
Sch. A1 excluded (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 32(3)(b) (with arts. 5, 32(4), 53, Sch. 8 paras. 6, 64)
Act applied (with modifications) (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), arts. 1, 31 (with arts. 4, 26, 52, Sch. 9 para. 82)
Act applied (with modifications) (1.2.2011) by The River Mersey (Mersey Gateway Bridge) Order 2011 (S.I. 2011/41), arts. 23, 34 (with art. 51, Sch. 10 paras. 68, 85)
Sch. 1 excluded (22.7.2008) by Crossrail Act 2008 (c. 18), Sch. 6 para. 11(3)(b)
S. 5A inserted (13.7.2016) by Housing and Planning Act 2016 (c. 22), ss. 182(2), 216(3); S.I. 2016/733, reg. 3(i) (with reg. 7)
Act applied (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), ss. 4(4), 64(1) (with s. 9(1)(b))
Sch. A1 excluded (5.4.2024) by The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024 (S.I. 2024/393), arts. 1, 34(3) (with art. 44, Sch. 15)
Words in s. 8(1) substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 18 para. 4; S.I. 2017/75, reg. 3(k) (with reg. 5)
S. 4 excluded (21.4.2015) by The Crossrail (Plumstead Sidings) Order 2015 (S.I. 2015/781), arts. 1, 16(b)
Act applied (with modifications) (19.1.2021) by The Network Rail (Suffolk Level Crossing Reduction) Order 2020 (S.I. 2020/1663), arts. 1, 20
Act applied (with modifications) (4.4.2025) by The North Lincolnshire Green Energy Park Order 2025 (S.I. 2025/362), arts. 1, 28 (with art. 25(1)(b), Sch. 14)
Act applied (with modifications) (14.9.2006) by The Borough of Poole (Poole Harbour Opening Bridges) Order 2006 (S.I. 2006/2310), art. 20 (with art. 40, Sch. 7 para. 12)
S. 4 restricted (30.6.2022) by The Network Rail (Essex and Others Level Crossing Reduction) Order 2022 (S.I. 2022/651), arts. 1, 27(1)(b) (with art. 27(2))
Sch. A1 excluded (7.2.2024) by The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024 (S.I. 2024/70), arts. 1, 22(3) (with arts. 22(4), 43, Sch. 12 paras. 5, 24)
S. 4 excluded (30.9.2015) by The Network Rail (Blackthorn and Piddington) (Land Acquisition) Order 2015 (S.I. 2015/1684), arts. 1, 12(1)(b)
Act applied (with modifications) (15.6.2013) by The Galloper Wind Farm Order 2013 (S.I. 2013/1203), art. 20 (with arts. 11, 12)
Sch. A1 excluded (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 21(3)(b) (with arts. 21(4), 37)
Act applied (with modifications) (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 20 (with art. 37)
Act applied (with modifications) (23.9.2016) by The M4 Motorway (Junctions 3 to 12) (Smart Motorway) Development Consent Order 2016 (S.I. 2016/863), art. 24
Act applied (with modifications) (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), arts. 1, 25 (with arts. 15, 50, Sch. 11 para. 29)
Act applied (with modifications) (20.7.2010) by The Network Rail (Nuneaton North Chord) Order 2010 (S.I. 2010/1721), arts. 18, 25
Act applied (with modifications) (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), art. 31 (with Sch. 13 Pt. 1 para. 19)
Act applied (with modifications) (9.4.2013) by The Hinkley Point C (Nuclear Generating Station) Order 2013 (S.I. 2013/648), art. 29 (with arts. 48, 68, 79)
Act applied (with modifications) (12.10.2018) by The Eggborough Gas Fired Generating Station Order 2018 (S.I. 2018/1020), art. 22(10) (with art. 6)
Act applied (with modifications) (28.6.2018) by The High Speed Rail (London West Midlands) (Greatmoor Railway Sidings Etc.) Order 2018 (S.I. 2018/693), arts. 9, 15
Act applied (with modifications) (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 31 (with arts. 55, 56)
Sch. A1 excluded (7.12.2022) by The A57 Link Roads Development Consent Order 2022 (S.I. 2022/1206), arts. 1, 29(3)(b) (with arts. 5, 29(4))
Sch. A1 excluded (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), arts. 1, 22(3) (with arts. 22(4), 44, Sch. 12)
Act applied (2.10.2014) by The Clocaenog Forest Wind Farm Order 2014 (S.I. 2014/2441), art. 25 (with art. 33)
Act applied (with modifications) (28.7.2025) by The Mona Offshore Wind Farm Order 2025 (S.I. 2025/870), arts. 1, 24 (with arts. 20(1)(b), 37, 38, Sch. 10)
Act applied (with modifications) (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), s. 64(1), Sch. 7 para. 3 (with s. 9(1)(b))
Sch. A1 excluded (27.11.2025) by The Cory Decarbonisation Project Order 2025 (S.I. 2025/1227), arts. 1, 31(3) (with art. 31(4), Sch. 12)
Act applied (with modifications) (22.7.2008) by Crossrail Act 2008 (c. 18), Sch. 6 paras. 4, 5
Act applied (with modifications) (18.9.2009) by The London Underground (Victoria Station Upgrade) Order 2009 (S.I. 2009/2364), arts. 19, 30
Act applied (with modifications) (11.2.2005) by The Merseytram (Liverpool City Centre to Kirkby) Order 2005 (S.I. 2005/120), arts. 31, 41 (with arts. 65, 66)
Sch. A1 excluded (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), arts. 1, 24(3)(b) (with arts. 24(4), 41, 42, Sch. 16)
Act applied (with modifications) (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 23
Act applied (with modifications) (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), art. 22 (with art. 30)
Sch. A1 excluded (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), arts. 1(2), 31(4) (with arts. 21, 41, Sch. 10)
Act applied (with modifcations) (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), art. 33 (with arts. 43(1), 55-57, Sch. 8 para. 13)
Act applied (with modifications) (18.12.2024) by The Network Rail (Leeds to Micklefield Enhancements) Order 2024 (S.I. 2024/1284), arts. 1, 24 (with art. 33(1), Sch. 15)
Act applied (with modifications) (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 30 (with art. 37)
Act applied (with modifications) (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 21, 26
Sch. A1 excluded (23.4.2025) by The Cambridge Waste Water Treatment Plant Relocation Order 2025 (S.I. 2025/452), arts. 1, 29(3)(b), 30(6)(b)
Act applied (with modifications) (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), arts. 1, 31
Act applied (with modifications) (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 28 (with art. 7)
Sch. A1 excluded (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1(1), 31(3)(b) (with arts. 3(1), 31(4))
Sch. A1 excluded (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), arts. 1, 25(3) (with arts. 25(4), 42, 43, Sch. 9 Pt. 1 para. 4, Sch. 9 Pt. 3 para. 6(1), Sch. 9 Pt. 4 para. 20, Sch. 9 Pt. 9 para. 4)
Words in s. 12 substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 18 para. 5; S.I. 2017/75, reg. 3(k) (with reg. 5)
Act applied (with modifications) (21.11.2013) by The Network Rail (Redditch Branch Enhancement) Order 2013 (S.I. 2013/2809), art. 19 (with arts. 16(1), 27(2), 39, Sch. 10 para. 4)
Act applied (with modifications) (25.3.2016) by The Thorpe Marsh Gas Pipeline Order 2016 (S.I. 2016/297), art. 25 (with art. 39)
Act applied (with modifications) (26.8.2005) by The River Tyne (Tunnels) Order 2005 (S.I. 2005/2222), art. 26 (with arts. 45(1), 48, Sch. 10 paras. 21, 29)
Act applied (with modifications) (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 30 (with arts. 5, 27, 53, Sch. 8 paras. 6, 64)
Sch. A1 excluded (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 30-32 (with art. 46(2), Sch. 19 para. 61)
S. 10(1A) substituted (19.12.2025 for specified purposes, 18.2.2026 for E. in so far as not already in force) by Planning and Infrastructure Act 2025 (c. 34), ss. 109(5), 118(5)(d) (with s. 116); S.I. 2025/1370, regs. 3(1)(c), 4(1)(j)
Act applied (with modifications) (16.4.2021) by The Network Rail (Chart Leacon) Order 2021 (S.I. 2021/419), arts. 1, 5 (with art. 12(1)(b))
Sch. A1 excluded (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), arts. 1, 22(3) (with arts. 22(4), 32(2))
Act applied (with modifications) (30.6.2015) by The Swansea Bay Tidal Generating Station Order 2015 (S.I. 2015/1386), art. 29 (with arts. 51, 53)
Sch. A1 excluded (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 1, 22(3)(b) (with arts. 22(4), 31(2))
Act applied (with modifications) (26.9.2018) by The Network Rail (Felixstowe Branch Line Improvements Level Crossings Closure) Order 2018 (S.I. 2018/937), arts. 12, 18(1)(b)
Act applied (with modifications) (5.9.2017) by The London Overground (Barking Riverside Extension) Order 2017 (S.I. 2017/830), art. 23 (with Sch. 8 para. 20)
Act applied (with modifications) (15.12.2014) by The London Underground (Northern Line Extension) Order 2014 (S.I. 2014/3102), art. 25 (with Sch. 8 para. 45)
Act applied (with modifications) (22.8.2013) by The Leeds Railway Station (Southern Entrance) Order 2013 (S.I. 2013/1933), arts. 23, 33
Sch. A1 excluded (25.3.2022) by The Bridgwater Tidal Barrier Order 2022 (S.I. 2022/299), arts. 1, 35 (with art. 55)
Act applied (with modifications) (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), arts. 1(2), 30 (with arts. 21, 25, 41, Sch. 10)
Sch. A1 excluded (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 35 (with arts. 35(4), 62, 76, 87)
Act applied (with modifications) (28.11.2014) by The Walney Extension Offshore Wind Farm Order 2014 (S.I. 2014/2950), art. 23 (with arts. 38, 39)
S. 5A(2) inserted (31.1.2024) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 185(3)(a)(iii), 255(7) (with s. 247); S.I. 2024/92, reg. 2(l) (with reg. 6(1))
Act applied (with modifications) (25.11.2005) by The Docklands Light Railway (Capacity Enhancement) Order 2005 (S.I. 2005/3105), arts. 26, 36 (with arts. 3(5), 15(3))
Act applied (with modifications) (10.8.2016) by The York Potash Harbour Facilities Order 2016 (S.I. 2016/772), art. 28 (with arts. 35, 36)
S. 4(3)(4) substituted for s. 4(3) (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 18 para. 2; S.I. 2017/75, reg. 3(k) (with reg. 5)
Sch. A1 excluded (15.2.2025) by The West Burton Solar Project Order 2025 (S.I. 2025/116), arts. 1, 25 (with art. 47, Sch. 15)
Act applied (with modifications) (19.3.2007) by The Ouseburn Barrage Order 2007 (S.I. 2007/608), arts. 25, 32 (with arts. 46-48, Sch. 6 para. 23)
Sch. A1 excluded (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 28(3)(b) (with arts. 28(4), 32, Sch. 9 para. 36)
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.