Water Industry Act 1991
[^key-f7092ab6590c6e2a84d5a5494eb88553]: S. 117P(1) excluded (1.4.2017) by The Sewerage Services (Exception from Sewerage System Prohibition) (England) Regulations 2017 (S.I. 2017/244), regs. 1, 2(1)
[^key-f7d3e95f73403cb4679d7980ff808db1]: Words in s. 17H(7)(a) repealed (1.1.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 17(5)(b); S.I. 2015/1938, art. 3(f)(vii)
[^key-f7f54073530866fafed0829f33eb7abc]: Words in s. 91(1) substituted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 176(3)(b)(i), 186(6); S.I. 2022/1003, reg. 3(b)
[^key-f83d4cfc8c35afb8f27fdfbe49460d7d]: Words in s. 52(4A)(a) inserted (3.10.2016) by The Water and Sewerage Undertakers (Exit from Non-household Retail Market) Regulations 2016 (S.I. 2016/744), reg. 1(2), Sch. 2 para. 4
[^key-f847b99fc95bcb72075f4aa98cb30b65]: S. 27H(1)(d) inserted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 43(2)(c); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(k) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
[^key-f8504cfa3717ae6f3ce0d1fd7962e5b8]: S. 96G(6)(a) applied (26.12.2023) by S.I. 2015/810, reg. 9A(7) (as inserted by Levelling-up and Regeneration Act 2023 (c. 55), ss. 170(2), 255(6) (with s. 247))
[^key-f8b830f94e42f59598b8680b21c68c25]: Words in s. 3(4) inserted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 224(4) (with Sch. 7)
[^key-f8d53445e39b04ae37fb81ccad5d2e66]: Word in s. 203(6) substituted (14.7.2014) by Water Act 2014 (c. 21), ss. 36(3), 94(2)(j)
[^key-f8e46e9bdfcac5fdaff65f102e7c5657]: Words in Sch. 4ZA para. 3(3)-(6) substituted (1.4.2014) by The Enterprise and Regulatory Reform Act 2013 (Competition) (Consequential, Transitional and Saving Provisions) Order 2014 (S.I. 2014/892), art. 1(1), Sch. 1 para. 93(4)(b)(ii) (with art. 3)
[^key-f90dc35e8b58ec45a6931a2447d77806]: Word in Pt. 4 Ch. 1 heading inserted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 84; S.I. 2016/465, art. 2(m), Sch. 1 para. 1(o) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
[^key-f9d66a241b9210f99dcff4b5e5690eba]: S. 106 applied (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), arts. 1, 14(2) (with art. 44, Sch. 12)
[^key-fa49b115f852aa39a9206c18ed034e2b]: S. 106 applied (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 16(2)
[^key-fa53b36e97a7cc978f228f6f070b7008]: S. 106(8) excluded (23.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 70(1), Sch. 21 para. 7
[^key-fa7fff00d693a2635003aab15b7b454a]: Word in s. 15(1A) substituted (1.4.2014) by Enterprise and Regulatory Reform Act 2013 (c. 24), s. 103(3), Sch. 6 para. 56(3)(b); S.I. 2014/416, art. 2(1)(d) (with Sch.)
[^key-faab46f67e06c2e2e6c49d714f4ae861]: S. 106 applied (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 16(2) (with Sch. 8 Pt. 6 para. 19)
[^key-fac7c38d1cd5d29032f75edd1d78967e]: Word in s. 159(2)(a) omitted (E.) (31.10.2021) by virtue of The Water and Sewerage Undertakers (Exit from Non-household Retail Market) (Consequential Provision) Regulations 2021 (S.I. 2021/1208), regs. 1(2), 2(9)(a)
[^key-fb222c35c88a2962664cce36f268c15c]: Words in s. 91(6) inserted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 176(3)(e)(i), 186(6); S.I. 2022/1003, reg. 3(b)
[^key-fb57c0f38726e7019d03659f4c40d29a]: Word in s. 22A(2)(a)(ii) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 31(3)(a); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(j) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
[^key-fb67b482220fd1332c11c6fefc0429cf]: Sch. 11 applied (with modifications) (1.7.2015) by The National Park Authorities (England) Order 2015 (S.I. 2015/770), art. 1, Sch. 3 para. 5(1)
[^key-fb8c65e8cd856ebe3c73dcbbcc2a64ec]: Sch. 3 para. 8(a) and word omitted (26.5.2015) by virtue of Deregulation Act 2015 (c. 20), s. 115(3)(r), Sch. 23 para. 28(4)(e)(vi)
[^key-fc3631058b9b74666b9c335655d09b0f]: S. 169(2)(a) and word omitted (13.7.2016) by virtue of Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 14 para. 22(2); S.I. 2016/733, reg. 3(h) (with reg. 6)
[^key-fc6a99aac4ce42f601e969ea7bc2a053]: Sch. 1A para. 9(3)(ca) inserted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 261 (with Sch. 7)
[^key-fc743fe14c6bda0d8e65f4001363d868]: Words in s. 61(2) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 60(4)(b); S.I. 2017/462, art. 3(k)(vii)
[^key-fd222f23aa5ea815f7abc20e0afd7acd]: S. 13 cross-heading substituted (24.1.2022) by Environment Act 2021 (c. 30), ss. 86(3), 147(3) (with s. 144); S.I. 2022/48, reg. 2(m)
[^key-fd704f84559603c9df2370146a06e091]: Words in s. 71(6) substituted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 236(3) (with Sch. 7)
[^key-fd829d2c50a8f169388dfa5e79f213b7]: S. 106 applied (27.9.2024) by The Cottam Solar Project Order 2024 (S.I. 2024/943), arts. 1, 16(2) (with art. 48, Sch. 15)
[^key-fda32094686bc94921f5569222db5e08]: Words in s. 42(6)(b) inserted (1.4.2018) by Water Act 2014 (c. 21), ss. 18(2)(d), 94(3); S.I. 2017/462, art. 5(a) (with art. 14)
[^key-fdc0cb15c156b0f172a467ae7c62c12a]: S. 17P title substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 24(2); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(j) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
[^key-fe30eb0b15890e90268a7c07669300c5]: Words in s. 23(6) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 35(8)(a); S.I. 2017/462, art. 3(k)(ee)(v)
[^key-fe33584e5b5174ad9b06874ee7c74eb1]: Words in s. 2(2D) substituted (1.4.2017) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 3(5); S.I. 2017/462, art. 3(k)(ii)
[^key-fe343bfbc4a3de31533b8eb60ad0d6be]: S. 106 applied (9.4.2013) by The Hinkley Point C (Nuclear Generating Station) Order 2013 (S.I. 2013/648), arts. 1, 21(2) (with arts. 48, 68, 79)
[^key-fe38cd416b7978e63953c8898a47cd11]: Words in s. 38A(b) inserted (1.11.2016) by Water Act 2014 (c. 21), ss. 29(3)(c), 94(3); S.I. 2016/1007, art. 2(d)
[^key-fe5b88dcb02b5ef75f07cd01877b4647]: S. 159 applied (with modifications) (28.6.2013) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (S.I. 2013/1582), reg. 1(1)(b), Sch. 1 para. 12(2) (with reg. 1(1)(c))
[^key-fe5e3319ba8a23ca748332acc417cf51]: S. 66CA inserted (1.4.2017 for specified purposes) by Water Act 2014 (c. 21), s. 94(3), Sch. 2 para. 2; S.I. 2017/462, art. 3(i)(ii)
[^key-fe7c6379121ac2ea4e87aac7a111a5c7]: Words in s. 206(3)(k) substituted (1.1.2024) by The Retained EU Law (Revocation and Reform) Act 2023 (Consequential Amendment) Regulations 2023 (S.I. 2023/1424), reg. 1(2), Sch. para. 30(3)
[^key-fe7c6993f02114bd0ddf50829804624d]: S. 101A(11) inserted (1.4.2013) by The Natural Resources Body for Wales (Functions) Order 2013 (S.I. 2013/755), art. 1(2), Sch. 2 para. 237(4) (with Sch. 7)
[^key-fe8edf04dc2d38fe6e4a96509602fafe]: S. 33D inserted (18.12.2015) by Water Act 2014 (c. 21), ss. 14(3), 94(3); S.I. 2015/1938, art. 2(d)
[^key-feaf69d23d4a16597796adc0c615245e]: Sch. 2 para. 2(7ZA) inserted (23.2.2024) by The Water Industry Act 1991 (Amendment) Order 2024 (S.I. 2024/204), arts. 1(2), 4
[^key-feccb45e151feec825a8a916d170d273]: Sch. 2 para. 5 applied (with modifications) (28.6.2013) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (S.I. 2013/1582), reg. 1(1)(b), Sch. 1 para. 3(3)(f) (with reg. 1(1)(c))
[^key-fef8e8faa10598aa283e51a1904f3761]: Words in s. 22A(8)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 31(7); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(j) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
[^key-fefe68b9c823e3775c44a2127623105b]: Pt. 2 Ch. 1A applied (with modifications) (28.6.2013) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (S.I. 2013/1582), reg. 1(1)(b), Sch. 1 para. 5(1) (with reg. 1(1)(c))
[^key-ff8eb1584defe0618a356dc0addf5be2]: Words in s. 205(4)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 115(b); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(y) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
[^key-ff944838e3c2e5b57ad4a8dbe4aae30d]: Ss. 205A-205C and cross-heading inserted (23.6.2025 for E., 1.9.2025 for W.) by Water (Special Measures) Act 2025 (c. 5), ss. 3, 17(3)(a)(4)(a); S.I. 2025/726, reg. 2(a); S.I. 2025/936, reg. 2(a)
[^key-ff9db25d6181eca43efe62983cc35223]: S. 195A applied (with modifications) (3.10.2016) by The Water and Sewerage Undertakers (Exit from Non-household Retail Market) Regulations 2016 (S.I. 2016/744), regs. 1(2), 11(6)
[^M_C_056248c9-a86a-46d0-e166-53e1d73f0a70]: S. 143D applied (with modifications) by S.I. 2013/1582, Sch. 11(2C) (as inserted (31.3.2017) by The Water Act 2014 (Consequential Amendments etc.) Order 2017 (S.I. 2017/506), arts. 1(1), 30(12)(d))
[^M_C_0a7b6b0a-b9d0-4cc8-bc9e-4cbbbcdcebd4]: S. 106 applied (23.7.2026) by The Peartree Hill Solar Farm Order 2026 (S.I. 2026/869), arts. 1, 18(2) (with art. 37, Sch. 11)
[^M_C_0e97269c-8b41-4eff-93a6-9fbe77bd9e68]: S. 195(2)(bc) modified (1.12.2005) by The Water Supply Licence (New Customer Exception) Regulations 2005 (S.I. 2005/3076), reg. 5(2) (as amended (3.10.2016) by The Water and Sewerage Undertakers (Exit from Non-household Retail Market) Regulations 2016 (S.I. 2016/744), reg. 1(2), Sch. 2 para. 9)
[^M_C_19f7d93d-9ccc-4915-9aa4-0275eaddedbf]: S. 96ZA(2) modified (temp.) (1.7.2015) by The Water Act 2014 (Commencement No. 4 and Transitional Provisions) Order 2015 (S.I. 2015/1469), art. 5(2)(5)
[^M_C_20e2fa48-d314-438b-f59d-50811268ecdf]: S. 106 applied (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), arts. 1, 15(2) (with arts. 15(6), 41, 42, Sch. 16)
[^M_C_24a0df68-7f5d-450d-85e6-96eb5280673c]: S. 144ZF applied (with modifications) by S.I. 2013/1582, Sch. 11(3B) (as inserted (31.3.2017) by The Water Act 2014 (Consequential Amendments etc.) Order 2017 (S.I. 2017/506), arts. 1(1), 30(12)(f))
[^M_C_2fafebba-1a51-479b-ebba-79034190b045]: S. 91 excluded (1.4.2013 for E.) by virtue of Health and Social Care Act 2012 (c. 7), ss. 37(4), 306(2)(3); S.I. 2013/160, art. 2(2) (with arts. 7-9)
[^M_C_453233f6-5d62-4c85-d2ea-247c36f9ca1d]: S. 27 applied (with modifications) (28.6.2013) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (S.I. 2013/1582), reg. 1(1)(b), Sch. 1 para. 8 (with reg. 1(1)(c)) (as amended (10.1.2015) by S.I. 2015/22, regs. 1(1), 5)
[^M_C_4cbdeae5-e136-4598-9815-1e447d187870]: Pt. 2 Ch. 1A applied (with modifications) (28.6.2013) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (S.I. 2013/1582), reg. 1(1)(b), Sch. 1 para. 4 (with reg. 1(1)(c)) (as amended (10.1.2015) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) (Amendment) Regulations 2015 (S.I. 2015/22), regs. 1(1), 3)
[^M_C_4d8100a8-1110-4719-e9f4-0e96a98c7425]: S. 143C applied (with modifications) by S.I. 2013/1582, Sch. 11(2B) (as inserted (31.3.2017) by The Water Act 2014 (Consequential Amendments etc.) Order 2017 (S.I. 2017/506), arts. 1(1), 30(12)(d))
[^M_C_56dd1dae-0d78-4a20-ce57-55e8a3719520]: S. 106 applied (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 20(2) (with art. 53)
[^M_C_58ad290b-718f-486f-878e-b9a480db258d]: S. 143E applied (with modifications) by S.I. 2013/1582, Sch. 11(2D) (as inserted (31.3.2017) by The Water Act 2014 (Consequential Amendments etc.) Order 2017 (S.I. 2017/506), arts. 1(1), 30(12)(d))
[^M_C_69f6ffd4-9f4f-4788-be4d-64ecdec857ed]: Act: power to amend conferred (24.5.2024 for specified purposes) by Digital Markets, Competition and Consumers Act 2024 (c. 13), ss. 138(2)-(7), 339(2)(c)
[^M_C_791a1904-fa56-449a-bb63-0dba210cb4a3]: S. 39ZA(2)(a) modified (temp.) (1.7.2015) by The Water Act 2014 (Commencement No. 4 and Transitional Provisions) Order 2015 (S.I. 2015/1469), art. 5(1)(5)
[^M_C_7c9e46e5-fbe0-455e-86d6-1d59c035c376]: Act applied (Isles of Scilly) (with modifications) (1.11.2019) by The Isles of Scilly (Application of Water Legislation) Order 2019 (S.I. 2019/1259), arts. 2(1), 4 (as amended (27.3.2020) by The Isles of Scilly (Application of Water Legislation) Order 2020 (S.I. 2020/214), art. 6)
[^M_C_7dee1b8e-a36d-4320-a943-ac14717a922a]: S. 143 applied (with modifications) (28.6.2013) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (S.I. 2013/1582), reg. 1(1)(b), Sch. 1 para. 11(2) (with reg. 1(1)(c)) (as amended (31.3.2017) by The Water Act 2014 (Consequential Amendments etc.) Order 2017 (S.I. 2017/506), arts. 1(1), 30(12)(b))
[^M_C_867bb1a5-fbfa-475a-d18e-1ffc2ae4cd98]: S. 144ZE applied (with modifications) by S.I. 2013/1582, Sch. 11(3A) (as inserted (31.3.2017) by The Water Act 2014 (Consequential Amendments etc.) Order 2017 (S.I. 2017/506), arts. 1(1), 30(12)(f))
[^M_C_870fabf2-c769-4d4b-bb7c-e3168bcd42fd]: S. 106 applied (4.4.2025) by The North Lincolnshire Green Energy Park Order 2025 (S.I. 2025/362), arts. 1, 37(2) (with Sch. 14)
[^M_C_94a839f2-d32e-4667-8ac2-d48808727475]: S. 144 applied (with modifications) (28.6.2013) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (S.I. 2013/1582), reg. 1(1)(b), Sch. 1 para. 11(3) (with reg. 1(1)(c)) (as amended (31.3.2017) by The Water Act 2014 (Consequential Amendments etc.) Order 2017 (S.I. 2017/506), arts. 1(1), 30(12)(e))
[^M_C_bcc36461-b794-41b5-d90c-baea01553d01]: S. 17K applied (with modifications) (28.6.2013) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (S.I. 2013/1582), reg. 1(1)(b), Sch. 1 para. 5(2) (with reg. 1(1)(c)) (as amended (10.1.2015) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) (Amendment) Regulations 2015 (S.I. 2015/22), regs. 1(1), 4(a))
[^M_C_bf9d4648-22f6-4d50-cef6-f493be8e6e2f]: S. 17P applied (with modifications) (28.6.2013) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (S.I. 2013/1582), reg. 1(1)(b), Sch. 1 para. 5(6) (with reg. 1(1)(c)) (as amended (10.1.2015) by The Water Industry (Specified Infrastructure Projects) (English Undertakers) (Amendment) Regulations 2015 (S.I. 2015/22), regs. 1(1), 4(b))
[^M_C_d47012e5-6ae7-42e0-a268-ac9d17c7cd7b]: Act: references to the Director General of Water Services (“the Director”, “him”, “he”) have effect as references to the Water Services Regulation Authority (“the Authority”, ”it”) (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
[^M_C_d8677e48-dcdd-4878-cccb-746074bf4ba2]: S. 106 applied (4.3.2026) by The Outer Dowsing Offshore Wind Farm Order 2026 (S.I. 2026/138), arts. 1(2), 16(2) (with arts. 42, 43, Sch. 18)
[^M_C_fd285f9e-1381-4b18-960e-a1a58683e277]: S. 143B applied (with modifications) by S.I. 2013/1582, Sch. 11(2A) (as inserted (31.3.2017) by The Water Act 2014 (Consequential Amendments etc.) Order 2017 (S.I. 2017/506), arts. 1(1), 30(12)(d))
[^M_F_33983520-5b86-4ab2-e8cb-e745a037a88f]: Words in s. 127 sidenote substituted (1.4.1996) by 1995 c. 25, ss. 120(1), Sch. 22 para. 107 (with ss. 7(6), 115, 117); S.I. 1996/186, art. 3
[^M_F_39d24c4e-5a52-4c0a-8ec0-d9ae264b261d]: Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
[^M_F_3a80c390-910a-40ed-ed19-777619cafc63]: Words in s. 132(8) substituted (1.4.1996) by 1995 c. 25, s. 120(1), Sch. 22 para. 110(1)(2) (with ss. 7(6), 115, 117); S.I. 1996/186, art. 3
[^M_F_3b185de6-c239-40a1-fb20-e082dc64356c]: Words in s. 195(2)(bc) expressed to be inserted (3.10.2016) after the words "the Water Supply Licence (New Customer Exception) Regulations 2005" by The Water and Sewerage Undertakers (Exit from Non-household Retail Market) Regulations 2016 (S.I. 2016/744), reg. 1(2), Sch. 2 para. 9
[^M_F_3d92c9c2-7460-4ae2-9b87-d1574c7f6a23]: Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
[^M_F_3eb6e6e9-5348-49b5-9dd1-61260370db8c]: Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
[^M_F_4bdf1093-da28-4207-bf4e-d69a3f4765f3]: S. 87A(3A) omitted (1.11.2022 for E.) by virtue of Health and Care Act 2022 (c. 31), ss. 175(3), 186(6); S.I. 2022/1003, reg. 3(a)
[^M_F_682ee8a0-846d-4554-865b-e9ef3951d548]: S. 110L(3A) inserted (3.10.2016) by The Water and Sewerage Undertakers (Exit from Non-household Retail Market) Regulations 2016 (S.I. 2016/744), reg. 1(2), Sch. 2 para. 8
[^M_F_68c68343-c5a7-44f5-fd35-6edbac271c5b]: Words in s. 132(3) substituted (1.4.1996) by 1995 c. 25, s. 120(1), Sch. 22 para. 110(1)(2) (with ss. 7(6), 115, 117); S.I. 1996/186, art. 3
[^M_F_6b26fc3f-30bc-49f2-8f3e-1af4ce085906]: Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
[^M_F_6c1cf5a2-ec3c-4945-d112-6e4661b05fbd]: Words in s. 127(1) substituted (1.4.1996) by 1995 c. 25, ss. 120(1), Sch. 22 para. 107 (with ss. 7(6), 115, 117); S.I. 1996/186, art. 3
[^M_F_73d3f852-3cd5-48e9-e267-f8590ebc43fe]: Sch. 11 para. 1(3)(e) substituted (24.5.2007) by The Planning and Compulsory Purchase Act 2004 (Corresponding Amendments) Order 2007 (S.I. 2007/1519), art. 1(1), Sch. para. 8(a) (with art. 1(3))
[^M_F_93970788-c46c-4fcc-922c-cadc19384d04]: Words in s. 132(2)(a) substituted (1.4.1996) by 1995 c. 25, s. 120(1), Sch. 22 para. 110(1)(2) (with ss. 7(6), 115, 117); S.I. 1996/186, art. 3
[^M_F_941a0666-14b3-4384-e969-9d95b05ca6d7]: Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
[^M_F_a4f3a16a-afb8-44da-e113-f0bc7360b87a]: Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
[^M_F_abd7225a-953e-4d2a-fde0-1a54bb6d9b83]: Words Sch. 11 para. 10 omitted (24.5.2007) by virtue of The Planning and Compulsory Purchase Act 2004 (Corresponding Amendments) Order 2007 (S.I. 2007/1519), art. 1(1), Sch. para. 8(b) (with art. 1(3))
[^M_F_aeeb0512-cfa0-423b-d913-8c0516df37af]: s. 87(7G) inserted (1.11.2022 for E.) by Health and Care Act 2022 (c. 31), ss. 175(2)(f), 186(6); S.I. 2022/1003, reg. 3(a)
[^M_F_b1af8557-0123-45ae-bc23-f20f09214901]: Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
[^M_F_c146d252-0490-43e3-c28c-5f0178363f35]: Words in s. 132(4)(c) substituted (1.4.1996) by 1995 c. 25, s. 120(1), Sch. 22 para. 110(1)(2) (with ss. 7(6), 115, 117); S.I. 1996/186, art. 3
[^M_F_c7034c0a-43c2-48d1-9fc2-d7d027eb97af]: Words in s. 131 sidenote substituted (1.4.1996) by 1995 c. 25, s. 120(1), Sch. 22 para. 109 (with ss. 7(6), 115, 117); S.I. 1996/186, art. 3
[^M_F_c78ad010-3ae8-4460-824b-81cf9cf343cf]: Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
[^M_F_cc41a3e6-16e4-41f5-9013-f6c63d5fbc44]: Words in Act substituted (1.4.2006) by virtue of Water Act 2003 (c. 37), ss. 36(2), 105(3); S.I. 2005/2714, art. 4(c)
[^M_F_ef5f4959-2749-4f82-87bb-7c753e64893c]: Words in s. 68(1A)(b) substituted (1.4.2016) by Water Act 2014 (c. 21), s. 94(3), Sch. 7 para. 67(3)(c); S.I. 2016/465, art. 2(m), Sch. 1 para. 1(m) (with Sch. 2) (as amended (22.3.2017) by S.I. 2017/462, art. 16)
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.