Channel Tunnel Rail Link Act 1996
- (2) Any specified work shall not be constructed except in accordance with such plans as may be approved in writing by Canal & River Trust or determined under paragraph 11 below.
- (3) Any approval of Canal & River Trust required under this paragraph shall not be unreasonably withheld and—
- (a) shall be deemed to have been given if it is neither given nor refused within 28 days of the submission of the plans for approval; and
- (b) may be given subject to such reasonable requirements as Canal & River Trust may make for the purpose of ensuring the safety or stability of the canal, including requirements as to the construction of protective works.
4
- (1) Any specified work, and any protective works required by Canal & River Trust under paragraph 3(3)(b) above, shall be constructed with all reasonable despatch to the reasonable satisfaction of Canal & River Trust, and in such manner as to cause as little damage to the canal as may be reasonably practicable and as little interference as may be reasonably practicable with the passage of vessels using the canal, and Canal & River Trust shall be entitled by its officer at all reasonable times, on giving such notice as may be reasonable in the circumstances, to inspect the construction of such work or works.
- (2) The nominated undertaker shall give to Canal & River Trust not less than 28 days’ notice in writing of its intention to commence construction of any specified work or any protective works and also, except in emergency (when the nominated undertaker shall give such notice as may be reasonably practicable), of its intention to carry out any works for the repair or maintenance of any specified work insofar as such works of repair or maintenance affect or interfere with the canal.
5
In constructing the bridge, or bridges, forming parts of Works Nos. 1AA, 1BB, 1CC, 1DD, 1EE, 3B and 3C over the canal, the nominated undertaker shall ensure that the soffit of any bridge at its lowest point is at a level of not less than 26.28 metres above Ordnance Datum Newlyn.
6
- (1) The nominated undertaker shall not deposit any polluting material on, in or over the canal and shall not without the consent of Canal & River Trust—
- (a) deposit any other materials on, in or over the canal; or
- (b) notwithstanding anything in paragraph 9 of Schedule 2 to this Act (which authorises the discharge of water in connection with the construction or maintenance of works authorised under Part I of this Act), discharge any water directly or indirectly into the canal.
- (2) Any consent of Canal & River Trust required under this paragraph shall not be unreasonably withheld and—
- (a) shall be deemed to have been given if it is neither given nor refused within 28 days of the submission of the request therefor; and
- (b) may be given subject to such reasonable requirements as Canal & River Trust may make—
- (i) in the case of a deposit, so as to ensure that the use of the canal is not obstructed or rendered less safe, and
- (ii) in the case of a discharge, concerning the reimbursement by the nominated undertaker of expenses incurred by Canal & River Trust in disposing of the water so discharged, being expenses which Canal & River Trust would not have incurred but for the discharge.
7
In its application to the discharge of water into the canal, paragraph 9(5) of Schedule 2 to this Act shall have effect subject to the terms of any conditions attached to the consent under paragraph 6(2) above and, where such discharge includes a deposit to which consent has been given under paragraph 6(1) above, to any conditions attached to that consent.
8
- (1) If as a result of the construction of any specified work any part of the towing path beside the canal, or any public right of way giving access thereto, is temporarily closed to pedestrians or cyclists and there is no way which provides a reasonable alternative, the nominated undertaker shall, so far as reasonably practicable and to the extent that it is consistent with safety, provide a substitute path or paths for such time as the closure continues.
- (2) This paragraph is without prejudice to the requirements of paragraph 6(2) of Schedule 3 to this Act and of paragraph 3(1) of Part I of this Schedule.
9
- (1) The nominated undertaker shall indemnify Canal & River Trust from all claims, demands, proceedings or damages, which may be made or given against, or recovered from Canal & River Trust by reason of any damage to the canal which is caused by, or results from, the construction of any specified work or protective work or any act or omission of the nominated undertaker, its contractors, agents or employees whilst engaged upon the work and from any costs reasonably incurred in making good such damage.
- (2) Canal & River Trust shall give to the nominated undertaker reasonable notice of any such claim or demand and no settlement or compromise thereof shall be made without the consent of the nominated undertaker which, if it notifies Canal & River Trust that it desires to do so, shall have the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
10
Nothing in paragraph 9 above shall impose any liability on the nominated undertaker with respect to any damage to the extent that it is attributable to the act, neglect or default of Canal & River Trust, its officers, servants, contractors or agents but the fact that any work or thing has been executed or done in accordance with a plan approved or deemed to be approved by Canal & River Trust, or to its satisfaction, or in accordance with any directions or award of an arbitrator, shall not (in the absence of negligence on the part of Canal & River Trust, its officers, servants, contractors or agents) relieve the nominated undertaker from any liability under the provisions of this Part of this Schedule.
11
- (1) Any dispute arising between the nominated undertaker and Canal & River Trust under this Part of this Schedule shall, if the parties agree, be determined by arbitration, but shall otherwise be determined by the appropriate Minister.
- (2) In sub-paragraph (1) above, the reference to the appropriate Minister—
- (a) in the case of a dispute concerning land drainage or flood defence, is to the Secretary of State and the Minister of Agriculture, Fisheries and Food acting jointly, and
- (b) in the case of any other dispute, is to the Secretary of State.
Part VII — Protection of Port of London Authority
1
- (1) The provisions of this Part of this Schedule shall, unless otherwise agreed in writing between the nominated undertaker and the Port Authority, have effect for the protection of the Port Authority and the users of the river.
- (2) In this Part of this Schedule—
- “construction” includes execution, placing, altering, replacing, relaying and removal and, in its application to works which include or comprise any operation, means the carrying out of that operation;
- “operations” includes temporary works, dredging and mooring of vessels authorised by paragraph 11 of Schedule 2 to this Act;
- “plans” includes sections, drawings, specifications and method statements;
- “the Port Authority” means the Port of London Authority;
- “the river” means the waters within the limits of the port of London as described in Schedule 1 to the Port of London Act 1968;
- “specified work” means so much of any permanent or temporary work authorised by Part I of this Act (which includes, for the avoidance of doubt, any removal of gravel or other material, any dredging or similar work and any geotechnical investigations that may be undertaken) as is on, in, under or over—the surface of land below the level of mean high water springs forming part of the river; orany land owned, occupied or used by the Port Authority for operational purposes.
2
- (1) Before beginning any operations for the construction of any specified work, the nominated undertaker shall submit to the Port Authority plans of the work and such further particulars available to it as the Port Authority may within 14 days of the submission of the plans reasonably require.
- (2) A specified work shall not be constructed except in accordance with such plans as may be approved by the Port Authority or determined under paragraph 10 below.
- (3) Any approval of the Port Authority required under this paragraph shall not be unreasonably withheld and—
- (a) shall be deemed to be given if it is neither given nor refused (with an indication of the grounds for refusal) within 28 days of the submission of the plans; and
- (b) may be given subject to such reasonable requirements as the Port Authority may make for the protection of—
- (i) traffic in, or the flow or regime of, the river; or
- (ii) the use of its operational land for the purposes of performing its statutory functions.
- (4) The requirement for approval under this paragraph does not constitute any specified work a work subject to any of the controls in Part V of the Port of London Act 1968.
3
The nominated undertaker shall carry out all operations for the construction of any specified work with all reasonable despatch to the reasonable satisfaction of the Port Authority so that river traffic and the exercise of the Port Authority’s statutory functions shall not suffer more interference than is reasonably practicable and the Port Authority shall be entitled by its officer at all reasonable times, on giving such notice as may be reasonable in the circumstances, to inspect such operations other than any operation relating to Work No. 10.
4
- (1) The nominated undertaker shall not, without the consent of the Port Authority, deposit in, or allow to fall or be washed into, the river any gravel, soil or other material.
- (2) Any consent of the Port Authority under this paragraph shall not be unreasonably withheld and—
- (a) shall be deemed to have been given if it is neither given nor refused within 28 days of the submission of the request therefor; and
- (b) may be given subject to such reasonable requirements as the Port Authority may make for the protection of navigation in, or the flow or regime of, the river.
- (3) In its application to the discharge of water into the river, paragraph 9(5) of Schedule 2 to this Act shall have effect subject to the terms of any conditions attached to a consent given under this paragraph.
- (4) Nothing in this paragraph authorises the doing of anything prohibited by section 85(1), (2) or (3) of the Water Resources Act 1991 (offences of polluting controlled waters).
- (5) The requirement for consent under this paragraph does not constitute any specified work or any operation a work or operation subject to any of the controls in Part V of the Port of London Act 1968.
5
If any pile, stump or other obstruction to navigation becomes exposed in the course of constructing any specified work (other than a pile, stump or other obstruction on the site of any permanent work), the nominated undertaker shall, as soon as reasonably practicable after the receipt of notice in writing from the Port Authority requiring such action, remove it from the river or, if it is not reasonably practicable to remove it, cut it off at such level below the bed of the river (not being more than two metres below the bed of the river) as the Port Authority may reasonably direct.
6
If—
- (a) by reason of the construction of any specified work it is reasonably necessary for the Port Authority to incur costs in altering, removing, resiting or reinstating existing moorings owned by the Port Authority, or laying down and removing substituted moorings, or carrying out dredging operations for any such purpose, not being costs which it would have incurred for any other reason; and
- (b) the Port Authority gives to the nominated undertaker not less than 28 days’ notice of its intention to incur such costs, and take into account any representations which the nominated undertaker may make in response to the notice within 14 days of the receipt of the notice;
the nominated undertaker shall pay the costs reasonably so incurred by the Port Authority.
7
The nominated undertaker shall, at or near every specified work, and any other work of which the nominated undertaker is in possession in exercise of any of the powers of Part I of this Act, being in either case a work which is below the level of mean high water springs, exhibit such lights, lay down such buoys and take such other steps for preventing danger to navigation as the Port Authority may from time to time reasonably require.
8
- (1) If any specified work or any other work of which the nominated undertaker is in possession in exercise of any of the powers of Part I of this Act, being in either case a work which is below the level of mean high water springs is abandoned, the Port Authority may by notice in writing require the nominated undertaker to take such reasonable steps as may be specified in the notice to remove the work and (to such extent as the Port Authority reasonably requires) to restore the site to its former condition.
- (2) If any specified work which is below the level of mean high water springs is in such condition that it is, or is likely to become, a danger to or to interfere with navigation in the river, the Port Authority may by notice in writing require the nominated undertaker to take such reasonable steps as may be specified in the notice—
- (a) to repair and restore the work or part of it, or
- (b) if the nominated undertaker so elects, to remove the work and (to such extent as the Port Authority reasonably requires) to restore the site to its former condition.
- (3) If—
- (a) a specified work which consists of a tidal work and a non-tidal work is abandoned or falls into decay; and
- (b) the non-tidal work is in such a condition as to interfere with the right of navigation in the river;
the Port Authority may include the non-tidal work, or any part of it, in any notice under this paragraph.
- (4) In sub-paragraph (3) above “tidal work” means so much of any specified work as is below the level of mean high water springs and “non-tidal work” means so much of any such work as is above that level.
- (5) If after such reasonable period as may be specified in a notice under this paragraph the nominated undertaker has failed to begin taking steps to comply with the requirements of the notice or after beginning has failed to make reasonably expeditious progress towards their implementation, the Port Authority may carry out the works specified in the notice and any expenditure reasonably incurred by it in so doing shall be recoverable from the nominated undertaker.
9
Paragraph 9(4) of Schedule 2 to this Act shall apply to any discharge of water under paragraph 9(1) of that Schedule in connection with the construction or maintenance of a specified work notwithstanding that the part of the river affected by the discharge is not a main river.
10
Any dispute arising between the nominated undertaker and the Port Authority under this Part of this Schedule shall, if the parties agree, be determined by arbitration but shall otherwise be determined by the Secretary of State.
Construction and maintenance of scheduled works.
Planning: general.
Fees for planning applications.
Other legislation.
Expenditure in connection with securing construction of works.
Disapplication and modification of miscellaneous controls.
Arbitration.
42A
- (1) The Strategic Rail Authority may do anything which it arranges with the Secretary of State to do on his behalf in connection with any agreement or other arrangement made by him for the purpose of securing the design, construction, financing, maintenance or operation of the rail link or any of the other works authorised by this Part of this Act.
- (2) Subsection (1) above—
- (a) does not authorise the Strategic Rail Authority to exercise any function conferred or imposed by or by virtue of any enactment, and
- (b) is subject to the terms of the agreement or other arrangement.
- (3) Sections 207 and 208 of the Transport Act 2000 do not apply to the power conferred by this section.
Blight: compensation for pre-enactment acquisition.
Work No
Railways between St. Pancras and Highbury Corner and related works comprising the following railways, including a station terminus at St Pancras for international and domestic services and the provision of facilities in connection therewith—
Work No
A railway (741 metres in length) commencing in the intended St. Pancras Station, passing north-westwards over the new road (Work No. 5D), then northwards over the realigned Camley Street (Work No. 5A) and terminating at a point 33 metres south of the southern abutment of the existing bridge over the Regent’s Canal, including bridges over Works Nos. 5A and 5D;
Work No
A railway (2,189 metres in length) commencing by a junction with the railway (Work No. 1A) at its termination, passing northwards over the Regent’s Canal and the railway (Work No. 2) in tunnel, then passing north-eastwards over the diverted York Way (Work No. 5Q), the railways (Works Nos. 2AA and 2BB) in tunnel and the East Coast Main Line to a tunnel portal 65 metres to the east of that railway, then passing in tunnel over the Piccadilly Line then beneath Caledonian Road, Westbourne Road and Liverpool Road and terminating at Highbury Corner beneath the junction of that road with Highbury Place, including bridges over the Regent’s Canal, Work No. 5Q and the East Coast Main Line;
Work No
A railway (737 metres in length) commencing in the intended St. Pancras Station, passing north-westwards over the new road (Work No. 5D), then northwards over the realigned Camley Street (Work No. 5A) and terminating at a point 30 metres south of the southern abutment of the existing bridge over the Regent’s Canal, including bridges over Works Nos. 5A and 5D;
Work No
A railway (2,182 metres in length) commencing by a junction with the railway (Work No. 1B) at its termination, passing northwards over the Regent’s Canal and the railway (Work No. 2) in tunnel, then passing north-eastwards in tunnel beneath the railway (Work No. 1CC) for a distance of 150 metres, then over the diverted York Way (Work No. 5Q), the railways (Works Nos. 2AA and 2BB) in tunnel and the East Coast Main Line to a tunnel portal 65 metres to the east of that railway, then passing in tunnel over the Piccadilly Line then beneath Caledonian Road, Westbourne Road and Liverpool Road and terminating at Highbury Corner beneath the junction of that road with Highbury Place, including bridges over the Regent’s Canal, Work No. 5Q and the East Coast Main Line;
Work No
A railway (533 metres in length) commencing in the intended St. Pancras Station at a point 15 metres north-west of the existing junction of Clarence Passage with Pancras Road, passing north-westwards on the eastern side of the existing Midland Main Line, over the new road (Work No. 5D) and the realigned Camley Street (Work No. 5A), and terminating at a point 25 metres south of the southern abutment of the existing bridge over the Regent’s Canal, including bridges over Works Nos. 5A and 5D;
Work No
A railway (650 metres in length) commencing by a junction with the railway (Work No. 1C) at its termination, passing northwards over the Regent’s Canal, then passing north-eastwards over the railways (Works Nos. 1BB and 1DD) in tunnel, then over the diverted York Way (Work No. 5Q) and terminating by a junction with the railway (Work No. 1AA) at a point 100 metres north-east of the existing York Way bridge, including bridges over the Regent’s Canal and Work No. 5Q;
Work No
A railway (534 metres in length) commencing in the intended St. Pancras Station at a point 15 metres north-west of the existing junction of Clarence Passage with Pancras Road, passing north-westwards on the eastern side of the existing Midland Main Line, over the new road (Work No. 5D) and the realigned Camley Street (Work No. 5A), and terminating at a point 30 metres south of the southern abutment of the existing bridge over the Regent’s Canal, including bridges over Works Nos. 5A and 5D;
Work No
A railway (680 metres in length) commencing by a junction with the railway (Work No. 1D) at its termination, passing northwards over the railway (Work No. 2) in tunnel and the Regent’s Canal, then passing north-eastwards in tunnel beneath the railway (Work No. 1CC) for a distance of 150 metres, then over the diverted York Way (Work No. 5Q) and the railways (Works Nos. 2AA and 2BB) in tunnel, and terminating by a junction with the railway (Work No. 1BB) at a point 125 metres north-east of the existing York Way bridge, including bridges over the Regent’s Canal and Work No. 5Q;
Work No
A railway (767 metres in length) commencing by a junction with the railway (Work No. 1AA) at a point on the existing bridge over the Regent’s Canal, passing northwards over the Midland City Line (Thameslink) in tunnel, then north-westwards and westwards, then on viaduct over the Midland City Line (Thameslink), the diverted Midland Main Line (Work No. 3B) and the railways (Works Nos. 1HH and 3C) and terminating by a junction with the North London Line at a point 15 metres east of the bridge carrying that railway over St Pancras Way, including the said viaduct;
Work No
A railway (394 metres in length) commencing by a junction with the railway (Work No. 1EE) at a point 95 metres north of the northern abutment of the existing bridge over the Regent’s Canal, passing northwards and north-eastwards under the railway (Work No. 1GG) and terminating by a junction with the realigned North London Incline Railway (Work No. 1JJ) at a point 30 metres west of the bridge carrying York Way over that railway;
Work No
A railway (696 metres in length) commencing by a junction with the railway (Work No. 1EE) at a point 40 metres east of the bridge carrying the North London Line over St. Pancras Way, passing eastwards on viaduct over the diverted Midland Main Line (Work No. 3B), the railways (Works Nos. 1HH and 3C) and the Midland City Line (Thameslink), then continuing on viaduct, passing south-eastwards over the new road (Work No. 5EE) and the railway (Work No. 1FF) and terminating by a junction with the railway (Work No. 1AA) at a point 40 metres west of the bridge carrying York Way over the North London Incline Railway, including the said viaduct;
Work No
A railway (610 metres in length) commencing by a junction with the railway (Work No. 1EE) at a point 55 metres north of the northern abutment of the existing bridge over the Regent’s Canal, passing northwards over the Midland City Line (Thameslink) in tunnel, then under the railways (Works Nos. 1EE, 1GG and 1JJ) and the existing bridge carrying the North London Line over the Midland Main Line and terminating by a junction with that railway at a point beneath the southern parapet of the bridge carrying Agar Grove over that railway;
Work No
A railway (955 metres in length), forming a realignment of the North London Incline Railway, commencing by a junction with the North London Line at a point 130 metres east of the bridge carrying that railway over St. Pancras Way, passing eastwards then south-eastwards, then on viaduct over the diverted Midland Main Line (Work No. 3B), the railways (Works Nos. 1HH and 3C), the Midland City Line (Thameslink) and the new road (Work No. 5EE), then over the diverted York Way (Work No. 5Q), then passing northwards under the North London Line on viaduct and terminating by a junction with the Great Northern Suburban Line at the southern portal of the western bore of the Copenhagen Tunnel, including the said viaduct and a bridge over Work No. 5Q;
Work No
A railway (103 metres in length), forming a cross-over between the diverted Midland Main Line (Work No. 3B) and the railway (Work No. 1A), commencing by a junction with Work No. 3B at its commencement and terminating by a junction with Work No. 1A at its termination;
Work No
A railway (876 metres in length), including a station tunnel on the Midland City Line (Thameslink) beneath St. Pancras Station, commencing by a junction with that railway in tunnel at a point beneath Midland Road 145 metres north-east of the existing junction of that road with Euston Road, passing in tunnel north-westwards and northwards beneath the Regent’s Canal and terminating by a junction with that railway in tunnel at a point beneath the existing Midland Main Line 55 metres north of the northern abutment of the bridge carrying that last-mentioned railway over that canal;
Work No
A railway (325 metres in length) commencing by a junction with the railway (Work No. 2) in tunnel at a point beneath the existing Midland Main Line 250 metres south of the southern abutment of the bridge carrying that railway over Camley Street, passing in tunnel northwards on the western side of Work No. 2 beneath the railways (Works Nos. 1A and 1B) and the realigned Camley Street (Work No. 5A) and terminating in tunnel at a point beneath the railway (Work No. 1D) 90 metres south of the southern abutment of the existing bridge over the Regent’s Canal;
Work No
A railway (883 metres in length) commencing by a junction with the railway (Work No. 2A) at its termination, passing in tunnel north-eastwards beneath the railways (Works Nos. 1C and 2), St. Pancras Basin, the Regent’s Canal and the diverted York Way (Work No. 5Q), then passing north-eastwards and northwards under the railways (Works Nos. 1AA, 1BB and 1DD) to a tunnel portal at a point 40 metres south of the southern side of the viaduct carrying the North London Line over the East Coast Main Line, then continuing under the North London Line on viaduct and terminating by a junction with the Great Northern Suburban Line at the southern portal of the western bore of the Copenhagen Tunnel on that railway;
Work No
A railway (255 metres in length) commencing by a junction with the railway (Work No. 2) in tunnel at the said point beneath the existing Midland Main Line 250 metres south of the southern abutment of the bridge carrying that railway over Camley Street, passing in tunnel northwards on the eastern side of Work No. 2 beneath the railways (Works Nos. 1A, 1B, 1C and 1D) and terminating in tunnel at a point beneath the realigned Camley Street (Work No. 5A) 150 metres south-east of the southern abutment of the existing bridge over the Regent’s Canal;
Work No
A railway (928 metres in length) commencing by a junction with the railway (Work No. 2B) at its termination, passing in tunnel north-eastwards beneath St. Pancras Basin, the Regent’s Canal and the diverted York Way (Work No. 5Q), then passing north-eastwards and northwards under the railways (Works Nos. 1AA, 1BB and 1DD) to a tunnel portal at a point 35 metres south of the southern side of the viaduct carrying the North London Line over the East Coast Main Line, then continuing under the North London Line on viaduct and terminating by a junction with the Great Northern Suburban Line at the said southern portal of the western bore of the Copenhagen Tunnel on that railway;
Work No
A railway (80 metres in length), forming a cross-over between the northbound and southbound rails of the Great Northern Suburban Line in tunnel within the western bore of the Copenhagen Tunnel, commencing and terminating by junctions with that railway at points respectively 50 metres and 130 metres north of the southern portal of that tunnel;
Work No
A railway (240 metres in length), forming cross-overs between the northbound and southbound rails of the City Widened Lines (Thameslink) partly within the Clerkenwell No. 3 Tunnel, commencing by a junction with that railway in tunnel beneath the junction of Frederick Street with the Kings Cross Road, passing north-westwards beneath Acton Street, Swinton Street, Wicklow Street and Britannia Street and terminating by a junction with that railway at a point 10 metres south-east of the bridge carrying Leeke Street over that railway;
Work No
A railway (349 metres in length), forming a cross-over between the Midland City Line (Thameslink) and the Midland Main Line at Kentish Town, commencing by a junction with that first named railway at a point 20 metres south-east of the south-eastern side of the bridge carrying Islip Street over that railway, passing south-eastwards and terminating by a junction with that last named railway at a point 85 metres north-west of the north-western portal of the Camden Road Tunnel;
Work No
A railway (645 metres in length), forming a diversion of the Midland Main Line at St. Pancras Station, commencing at its terminus in that station, passing north-westwards on the western side of the existing railway, including a western extension of the station over Midland Road and Pancras Road, then northwards over the new road (Work No. 5D) and the realigned Camley Street (Work No. 5A) and terminating at a point on the northern side of Work No. 5A 140 metres south of the existing bridge over the Regent’s Canal, including bridges over Works Nos. 5A and 5D;
Work No
A railway (846 metres in length), forming a continuation of the diversion of the Midland Main Line at St. Pancras Station, commencing by a junction with the railway (Work No. 3) at its termination, passing northwards over the Regent’s Canal, under the railways (Works Nos. 1EE, 1GG and 1JJ) on viaduct and the existing bridge carrying the North London Line over the Midland Main Line and terminating by a junction with that railway beneath a point 30 metres north of the southern parapet of the bridge carrying Agar Grove over that railway, including a bridge over the Regent’s Canal;
Work No
A railway (876 metres in length), forming a siding on the western side of the diverted Midland Main Line (Works Nos. 3 and 3B) north of St. Pancras Station, commencing at a point 60 metres south of the bridge carrying that railway over the realigned Camley Street (Work No. 5A), passing northwards over Work No. 5A and the Regent’s Canal, under the railways (Works Nos. 1EE, 1GG and 1JJ) on viaduct and the existing bridge carrying the North London Line over the Midland Main Line and terminating by a junction with that railway beneath a point 15 metres south of the said southern parapet of the bridge carrying Agar Grove over that railway, including bridges over Work No. 5A and the Regent’s Canal;
Work No
A railway (71 metres in length), forming a cross-over between the northbound and southbound rails of the Midland Main Line, commencing by a junction with that railway at the northern portal of the Camden Road Tunnel on that railway, passing northwards and terminating by a junction with that railway at a point 70 metres north of its commencement;
Work No
A railway (829 metres in length), for construction purposes, commencing by a junction with the railway (Work No. 1HH) at a point 110 metres south-east of the southern side of the bridge carrying the North London Line over the Midland Main Line, passing south-eastwards, then eastwards and north-eastwards under the diverted York Way (Work No. 5Q), then passing northwards and terminating by a junction with the Great Northern Suburban Line at a point 65 metres south of the southern side of the viaduct carrying the North London Line over that railway;
Work No
Ticket halls and subways, including alteration of existing ticket halls and subways, of the London Underground Railways comprising—
Work No
A passenger subway commencing on the eastern side of the intended St. Pancras Station beneath a point 22 metres north of the existing junction of Clarence Passage with Pancras Road, passing south-eastwards to a ticket hall beneath the northern side of the forecourt of the Great Northern Hotel and terminating by a junction with the passenger subways (Works Nos. 4AA and 4F) beneath a point 26 metres north of the north-eastern corner of the Great Northern Hotel, including the said ticket hall;
Work No
A passenger subway commencing by a junction with the passenger subway (Work No. 4A) at its termination and the passenger subway (Work No. 4F) at its commencement, passing eastwards to junctions with the passenger subway (Work No. 4MM) then continuing south-eastwards to a junction with the passenger subway (Work No. 4D), continuing eastwards and terminating by a junction with the existing passenger subway beneath a point 14 metres west of the junction of Caledonian Road with Pentonville Road;
Work No
A ticket hall in the German Gym off Pancras Road and a passenger subway commencing on the south-western side of that building at a point 40 metres west of the existing junction of Wellers Court with Cheney Road, passing south-eastwards, then south-westwards and terminating by a junction with the subway (Work No. 4A) beneath a point 23 metres east of the junction of Wellers Court with Pancras Road;
Work No
A passenger subway, forming a cross-passage between northbound and southbound station tunnels of the Victoria Line, commencing beneath a point 29 metres north-west of the junction of Caledonian Road with Pentonville Road; and terminating beneath a point 45 metres north-west of that road junction;
Work No
A passenger subway, including a lift shaft, commencing by a junction with the cross-passage (Work No. 4C) beneath a point 35 metres north-west of the junction of Caledonian Road with Pentonville Road, passing south-westwards to a junction with the passenger subway (Work No. 4A) at its termination and terminating by a junction with the cross-passage (Work No. 4E) beneath a point 55 metres west of that road junction;
Work No
A passenger subway, forming a cross-passage between northbound and southbound station tunnels of the Victoria Line, commencing and terminating beneath points 95 metres and 80 metres respectively south-east of the junction of Caledonia Street with York Way;
Work No
A passenger subway commencing by a junction with the passenger subway (Work No. 4A) at its termination and the passenger subway (Work No. 4AA) at its commencement beneath a point 26 metres north of the north-eastern corner of the Great Northern Hotel, passing south-westwards and terminating by a junction with the passenger subway (Work No. 4G) beneath a point in Pancras Road 40 metres south-west of the south-western corner of that building;
Work No
A passenger subway, including a lift shaft, commencing by a junction with the cross-passage (Work No. 4Q), passing eastwards to junctions with the cross-passage (Work No. 4R) and with the passenger subway (Work No. 4F) at its termination, and terminating by a junction with the existing cross-passage between northbound and southbound station tunnels of the Northern Line beneath a point 60 metres north-east of the existing junction of Pancras Road with Euston Road;
Work No
A passenger subway commencing in the ticket hall (part of Work No. 4A) beneath a point 48 metres north of the north-eastern corner of the Great Northern Hotel, passing south-eastwards and terminating by a junction with the existing passenger subway beneath a point 40 metres south-east of that corner of that building;
Work No
A passenger subway commencing in the existing ticket hall beneath the station concourse of King’s Cross Station beneath a point 40 metres north of the junction of Pancras Road with Euston Road and terminating in St. Pancras Station beneath a point 60 metres north-west of that road junction;
Work No
A ticket hall beneath the forecourt of St. Pancras Station off Euston Road and a passenger subway commencing in that ticket hall beneath a point 100 metres west of the junction of Pancras Road with Euston Road, passing south-eastwards then north-eastwards and terminating by a junction with the Circle and Metropolitan Line Station concourse beneath a point 95 metres south-west of that road junction;
Work No
A passenger subway commencing in St. Pancras Station at a point 75 metres west of the junction of Pancras Road with Euston Road, passing south-eastwards beneath Euston Road and terminating in the footway on the southern side of Euston Road at a point 75 metres south-west of that road junction, including a junction with the new ticket hall (part of Work No. 4K) and a permanent opening in Euston Road at that termination;
Work No
A passenger subway, including a lift shaft, commencing by a junction with the existing Piccadilly Line Station concourse beneath a point 56 metres north-west of the junction of York Way with Euston Road, passing northwards to junctions with the passenger subway (Work No. 4AA) and the cross passage (Work No. 4N) then continuing south-eastwards and terminating by a junction with the passenger subway (Work No. 4AA) beneath a point 45 metres north-east of that road junction;
Work No
A passenger subway, forming a cross-passage between westbound and eastbound station tunnels of the Piccadilly Line, commencing beneath a point 35 metres west of the junction of Caledonia Street with York Way and terminating beneath a point 46 metres west of that road junction;
Work No
A passenger subway, including a lift shaft, commencing in the ticket hall (part of Work No. 4A) beneath a point 17 metres east of the north-eastern corner of the Great Northern Hotel, passing south-eastwards, then south-westwards and south-eastwards and terminating beneath that building at a point 11 metres north-west of the south-eastern corner of that hotel;
Work No
A passenger subway, forming a cross-passage between southbound and northbound station tunnels of the Northern Line, commencing beneath a point 70 metres south of the existing junction of Cheney Road with Pancras Road and terminating beneath a point 82 metres south of that road junction;
Work No
A passenger subway, forming a cross-passage between southbound and northbound station tunnels of the Northern Line, commencing beneath a point 72 metres south of the existing junction of Cheney Road with Pancras Road and terminating beneath a point 84 metres south of that road junction;
Work No
A passenger subway, including a lift shaft, commencing in the existing passenger subway beneath a point 33 metres north of the junction of Belgrove Street with Euston Road and terminating at the Circle and Metropolitan Line Station concourse beneath a point 20 metres north of that road junction;
Work No
Roadworks and sewer diversions associated with Works Nos. 1 to 4 comprising—
Work No
Realignment of Camley Street commencing at a point in that road 50 metres south of its junction with Granary Street, passing south-eastwards then eastwards under the railways (Works Nos. 1A to 1D and 3), then south-eastwards and terminating by a junction with Camley Street (Work No. 5C) at a point on the western side of that road 44 metres north-west of its existing junction with Goods Way;
Work No
A road commencing in Pancras Road at a point 20 metres south-east of the entrance from that road to St. Pancras Old Church, passing south-eastwards then southwards to a junction with Brill Place and terminating in Midland Road at its existing junction with Euston Road, including access to a service area in St. Pancras Station;
Work No
A road commencing by a junction with Camley Street (Work No. 5A) at a point 45 metres north-west of its existing junction with Goods Way, passing south-eastwards to a point 5 metres east of the existing junction of Wellers Court with Cheney Road, then south-westwards to a point 55 metres south of the existing junction of Wellers Court with Pancras Road, then passing south-eastwards along the line of that road and terminating in that road at its existing junction with Euston Road, including access to a service area in St. Pancras Station and a parcels depot;
Work No
A road commencing by a junction with Work No. 5B at a point 175 metres south-east of its commencement, passing north-eastwards beneath the intended St. Pancras Station (Works Nos. 1A to 1D and 3), across Work No. 5C at a point 7 metres south of its commencement and terminating by a junction with Goods Way at a point 155 metres from the junction of that road with York Way;
Work No
A road, for construction purposes, commencing at a point 43 metres north-west of Battle Bridge Road at its termination west of Kings Cross Station, passing northwards, then north-westwards over Goods Way (Work No. 5D) at the termination of that work and over the Regent’s Canal, then south-westwards and terminating by a junction with Wharf Road at a point 45 metres west of the existing bridge between Wharf Road and Goods Way, including bridges over Goods Way and the Regent’s Canal;
Work No
Widening of Wharf Road on its northern side between a point 50 metres west of the western side of the existing bridge over the Regent’s Canal between Wharf Road and Goods Way and a point 15 metres east of the eastern side of that bridge;
Work No
A road commencing by a junction with the diverted York Way (Work No. 5Q) at a point 70 metres south of the bridge carrying the North London Line over that road, passing westwards then south-westwards and southwards under the realigned North London Incline Railway (Work No. 1JJ) and the railway (Work No. 1GG) and terminating at a point 150 metres south-east of the existing bridge carrying the North London Line over the Midland Main Line;
Work No
A road commencing by a junction with Pancras Road (Work No. 5C) at a point 75 metres from its termination, passing north-eastwards, then northwards and north-westwards and terminating by a junction with Work No. 5C at the south-eastern corner of the German Gym in Cheney Road as existing, including access to a parcels depot;
Work No
A road commencing by a junction with Work No. 5F at a point 65 metres from the commencement of that work, passing westwards and north-westwards along the frontage of the Great Northern Hotel, then continuing northwards and north-eastwards and terminating by a junction with Work No. 5F at a point 75 metres from the termination of that work;
Work No
Widening of Euston Road on its southern side between its junctions with Crestfield Street and Birkenhead Street;
Work No
Widening of Euston Road on its northern side between its junction with Euston Square and a point 45 metres north-east of that road junction;
Work No
A road, forming a diversion of York Way, commencing at a point in that road 80 metres north of the junction of Copenhagen Street with York Way, passing northwards then north-westwards over the railway (Work No. 3E) and the railways (Works Nos. 2AA and 2BB) in tunnel, then northwards under the railways (Works Nos. 1AA, 1BB, 1CC, 1DD and 1JJ) to a junction with the new road (Work No. 5EE), then continuing northwards under the North London Line and terminating at a point in York Way 10 metres north-west of the junction of Vale Royal with York Way;
Work No
A road, forming a diversion of Randell’s Road, commencing by a junction with the diverted York Way (Work No. 5Q) at a point 20 metres west of the existing junction of Randell’s Road with York Way, passing eastwards and terminating at a point in Randell’s Road 55 metres east of that existing road junction;
Work No
A sewer, forming a diversion of part of the Fleet Sewer, commencing by a junction with that sewer beneath a point in Pancras Road 35 metres south-east of the junction of Chenies Place with that street, passing along the line of Work No. 5B to its junction with Brill Place, then passing eastwards beneath the intended St. Pancras Station, then southwards on the eastern side of that station and terminating beneath a point in Pancras Road 5 metres north of the existing junction of Wellers Court with that road, including a weir chamber at its junction with the Fleet Storm Relief Sewer;
Work No
A sewer, forming a diversion of the Midland Road sewer, commencing by a junction with that sewer beneath a point in Midland Road 140 metres north of its existing junction with Euston Road, passing north-westwards then northwards beneath land adjoining Midland Road and terminating by a junction with Work No. 5J beneath a point on the north-western side of Brill Place at its existing junction with Midland Road;
Work No
A sewer, forming a diversion of part of the Camden Sewer, commencing by a junction with that sewer beneath a point 10 metres north of the bridge carrying the North London Line over the diverted York Way (Work No. 5Q), passing southwards, south-eastwards, then southwards and south-westwards and terminating by a junction with that sewer beneath a point 110 metres west of the Maiden Lane Bridge carrying York Way over the Regent’s Canal;
Work No
A sewer, forming a diversion of the Camley Street Sewer, commencing by a junction with that sewer beneath a point in that street (Work No. 5A) 93 metres from the termination of that work, passing southwards along the line of that work and Work No. 5C to a point 15 metres south of Battle Bridge Road, then passing south-eastwards and terminating by a junction with the sewer (Work No. 5J) at a point on the northern side of Stanley Passage 35 metres north-east of its existing junction with Pancras Road;
Work No
A sewer, forming a diversion of the Goods Way Sewer, commencing by a junction with the sewer (Work No. 5N) at a point 105 metres south of the commencement of that work, passing eastwards on the line of the new road (Work No. 5D) and terminating by a junction with the Goods Way sewer beneath a point in Goods Way 180 metres west of its junction with York Way;
Work No
A sewer, forming a diversion of part of the St. Pancras Sewer, commencing by a junction with that sewer beneath a point 38 metres north-west of the junction of Pancras Road with Euston Road, passing northwards, then westwards, north-westwards, then north-eastwards and terminating by a junction with the Fleet Sewer beneath a point 10 metres south-west of the south-eastern gable of the Great Northern Hotel;
Work No
A railway (7,229 metres in length) commencing by a junction with the railways (Works Nos. 1AA and 1BB) at their termination, passing eastwards in tunnel beneath the North London Line, or land adjoining on the northern or southern side thereof, beneath Highbury Corner, Highbury Grove, Wallace Road, Mildmay Park, King Henry’s Walk, Kingsland High Street, Dalston Lane, the Liverpool Street and Cambridge Railway, Mare Street, Barnabas Road, Kenworthy Road, the East Cross Route on the northern side of the North London Line, Eastway, the River Lea Navigation, Waterden Road and the River Lea, including ventilation shafts on lands off Corsica Street and Graham Road, then in retained cutting from chainage 6,147 metres for a distance of 1,067 metres, partly in tunnel beneath the railways (Works Nos. 6B and 6C) and the access roads (Works Nos. 6H and 6J), in land west of the High Meads Loop Railway, in the International Freight Terminal and the site of the former Chobham Farm Container Depot at Stratford, and terminating beneath a point on the western side of Angel Lane 60 metres north of the northern abutment of the bridge carrying that road over the Great Eastern Railway, including facilities for a railway crossover and junction at the International Freight Terminal and Depot at Stratford;
Work No
A railway (1,368 metres in length) commencing by a junction with the railway (Work No. 6) at the commencement of the retained cutting forming part of that work, passing eastwards between the eastbound and westbound lines of that railway to a point 210 metres west of the eastern face of the tunnel beneath the railway (Work No. 6C), then passing north-eastwards over the eastbound line of Work No. 6 and northwards in tunnel beneath the Old Yard Sidings (Work No. 6C) and the Lea Valley Line, then continuing north-westwards on the eastern side of that railway and terminating at a point under the bridge carrying Temple Mill Lane over that railway;
Work No
A railway (426 metres in length), for construction purposes, commencing by a junction with the North London Line at a point 10 metres north-west of the junction of that railway with the Channelsea Curve at Stratford Station, passing northwards, on the eastern side of the High Meads Curve, then north-eastwards over the railways (Works Nos. 6 and 6A) in tunnel and terminating by a junction with the High Meads Sidings at a point 30 metres north-east of the termination of the said tunnel over Works Nos. 6 and 6A;
Work No
A railway (836 metres in length) for construction purposes, commencing by a junction with the Lea Valley Line at a point 120 metres north-east of the junction of that railway with the Great Eastern Railway at Stratford Station, passing northwards and north-eastwards through the Old Yard Sidings and terminating by a junction with the Lea Valley Line at a point 130 metres south of the bridge carrying Temple Mill Lane over that railway;
Work No
A railway (1,032 metres in length) commencing in the existing Traction Maintenance Depot at a point 25 metres south-west of the south-western corner of the diesel repair shed in that depot, passing north-eastwards and northwards, then north-westwards on the western side of the Lea Valley Line to a junction with that railway 60 metres south of the bridge carrying Temple Mill Lane over that railway, passing under that bridge, then continuing on the eastern side of the Lea Valley Line and terminating by a junction with the railway (Work No. 6E) at a point 390 metres north of that bridge;
Work No
A railway (2,720 metres in length) commencing by a junction with the railway (Work No. 6A) at its termination, passing north-westwards and westwards through the former Temple Mills Marshalling Yard under Ruckholt Road and terminating at a point on the northern side of the Lea Valley Line 15 metres south-east of the eastern side of the bridge carrying Lea Bridge Road over that railway;
Work No
A railway (410 metres in length), for construction purposes, commencing by a junction with the Lea Valley Line at a point 345 metres south-east of the bridge carrying Lea Bridge Road over that railway, passing eastwards and terminating by a junction with the railway (Work No. 6E) at chainage 1,922 metres;
Work No
A railway (509 metres in length) commencing by a junction with the railway (Work No. 6E) at a point 30 metres south-east of the bridge carrying Ruckholt Road over the Lea Valley Line, passing westwards under that bridge then south-westwards and terminating by a junction with that railway at a point 459 metres north-west of that bridge;
Work No
A cut, forming a diversion of the Channelsea River at its confluence with the River Lea, commencing in the Channelsea River at a point 26 metres south of the former sluice on that river at Bully Fen, passing south-westwards and terminating at the confluence of those rivers;
Work No
An access road commencing by a junction with the access road to the International Freight Terminal on the eastern side of the Container Terminal, passing south-westwards, over Works Nos. 6 and 6A in tunnel, and southwards through the International Freight Terminal, then south-eastwards, eastwards and north-eastwards on the northern side of the North London Line, then continuing northwards, then eastwards and terminating by a junction with the access road to the Channelsea site, north of Stratford Station;
Work No
An access road commencing at a point in the existing Traction Maintenance Depot on the western side of the diesel repair shed in that depot, passing south-westwards, then westwards on the northern side of the retained cutting forming part of Work No. 6, then south-westwards over that railway and Work No. 6A in tunnel, then southwards and south-westwards and terminating by a junction with Work No. 6H in the International Freight Terminal;
Work No
A railway (4,560 metres in length) commencing by a junction with the railway (Work No. 6) at its termination, passing eastwards in tunnel beneath Angel Lane, The Grove, Atherton Road, Woodgrange Road, Romford Road, Woodgrange Park Cemetery and Browning Road, including a ventilation shaft on land off Woodgrange Road and terminating beneath a point 60 metres east of the junction of Reesland Close with Barrington Road;
Work No
A railway (6,700 metres in length) commencing by a junction with the railway (Work No. 7) at its termination, passing eastwards in tunnel beneath the North Circular Road and the River Roding, then south-eastwards beneath Barking Station, Station Parade, Ripple Road and Alfred’s Way, then eastwards beneath Renwick Road and the Ripple Lane Freightliner Terminal to a portal at a point 462 metres south-east of the junction of Morrison Road with Julia Gardens, then continuing eastwards under the railway (Work No. 22A) and the new road (Work No. 22H(1)), across Chequers Lane (to be stopped up) and under Kent Avenue and terminating at a point 85 metres east of the bridge carrying Kent Avenue over the Tilbury Loop Railway, including ventilation shafts on lands off Barrington Road and Alfred’s Way and a footbridge over the railway at Chequers Lane;
Work No
A railway (2,201 metres in length), forming a diversion of the Tilbury Loop Railway westbound line, commencing by a junction with that railway at a point 253 metres east of the junction of Stebbing Way with Wivenhoe Road, passing eastwards under Renwick Road, then south-eastwards and eastwards over the railway in tunnel (Work No. 22), under the new road (Work No. 22H(1)) and terminating by a junction with the Tilbury Loop Railway westbound line at a point 2 metres west of the western end of Dagenham Dock Station platforms;
Work No
A railway (2,252 metres in length), forming holding sidings, commencing by a junction with the railway (Work No. 22A) at a point 15 metres west of the bridge carrying Renwick Road over the Tilbury Loop Railway, passing south-eastwards and eastwards, under the new road (Work No. 22H(1)) and across Chequers Lane and terminating at a point 120 metres south-east of the eastern end of Dagenham Dock Station platforms, including a footbridge over the railway at Chequers Lane;
Work No
A railway (1,523 metres in length), for construction purposes, commencing by a junction with the Tilbury Loop Railway at a point 166 metres south-east of the bridge carrying Renwick Road over that railway, passing south-eastwards and eastwards, and terminating at a point 38 metres south-west of the point where the new road (Work No. 22H(1)) passes over the railway (Work No. 22B), including railway sidings;
Work No
A railway (280 metres in length) forming a connection between the Tilbury Loop Railway goods line and the railway (Work No. 22A), commencing by a junction with the said goods line at a point 468 metres south-east of the bridge carrying Renwick Road over that goods line, passing south-eastwards and terminating by a junction with Work No. 22A at a point 742 metres south-east of the said bridge;
Work No
A railway (1,095 metres in length) forming a connecting line between the railway (Work No. 22A) and the railway (Work No. 8E), commencing by a junction with Work No. 22A at a point 342 metres south of the junction of Morrison Road with Julia Gardens, passing eastwards under the new road (Work No. 22H(1)) and across Chequers Lane and terminating by a junction with Work No. 8E at a point 180 metres south-east of the eastern end of Dagenham Dock Station platforms, including a footbridge over the railway at Chequers Lane;
Work No
A railway (648 metres in length) forming a connecting line between the railway (Work No. 22A) and the railway (Work No. 22), commencing by a junction with Work No. 22A at a point 378 metres south-east of the junction of Morrison Road with Julia Gardens, passing eastwards under the new road (Work No. 22H(1)) and terminating by a junction with Work No. 22 at a point 150 metres west of the eastern end of Dagenham Dock Station platforms;
Work No
A railway (715 metres in length), for construction purposes, commencing by a junction with the railway (Work No. 22B) at a point 27 metres west of the point where the new road (Work No. 22H(1)) passes over Work No. 22B, passing eastwards then southwards, and terminating at a point 270 metres south-east of the eastern end of Dagenham Dock Station platforms, including railway sidings;
Work No
A jetty commencing on the northern bank of the River Thames at a point 190 metres north-west of The Gores outfall sluice, extending in a south-westerly direction into the said river for a distance of 230 metres and there terminating, including a jetty head with mooring dolphins and berthing facilities;
Work No
A railway (5,200 metres in length) commencing by a junction with the railway (Work No. 22) at its termination, passing eastwards under Thames Avenue (Work No. 8R), over the Beam River, and under the intended A13 link road (under construction), then continuing south-eastwards on viaduct over the new road (Work No. 8S) and Rainham Creek, and terminating beneath the intended A13 (under construction) at a point 20 metres south-west of the Tilbury Loop Railway;
Work No
A railway (906 metres in length), forming a connection between the railway (Work No. 22E) and the westbound line of the railway (Work No. 8), commencing by a junction with Work No. 22E at its termination, passing south-eastwards under Kent Avenue (Work No. 8Q) and terminating by a junction with the railway (Work No. 8) at a point 30 metres west of the intended Thames Avenue bridge (Work No. 8R);
Work No
A railway (1,330 metres in length), forming a connection between the Tilbury Loop Railway and the eastbound line of the railway (Work No. 8), commencing by a junction with the Tilbury Loop Railway 10 metres east of the eastern end of Dagenham Dock Station, passing eastwards on the southern side of that line under Kent Avenue (Work No. 8Q) and Thames Avenue (Work No. 8R), over the Beam River and terminating by a junction with Work No. 8 at a point 215 metres east of the intended Thames Avenue bridge (Work No. 8R), including a bridge over the Beam River;
Work No
A railway (279 metres in length), connecting the goods line (Work No. 22B) with a private siding west of Kent Avenue, commencing by a junction with Work No. 22B at its termination, passing south-eastwards and southwards, under the intended A13 and terminating by a junction with the said siding at a point 55 metres south of the footpath crossing that siding east of Breach Lane;
Work No
A railway (1,452 metres in length), connecting the goods line (Work No. 22B) with private sidings east of Kent Avenue, commencing by a junction with Work No. 22B at its termination, passing eastwards under Kent Avenue (Work No. 8Q) and Thames Avenue (Work No. 8R), over the Beam River and terminating at a point 33 metres west of the bridge carrying the intended A13 link road (under construction) over the Tilbury Loop Railway and the railway (Work No. 8), including a bridge over the Beam River and railway sidings;
Work No
A railway (496 metres in length) commencing by a junction with a private siding on the eastern side of Kent Avenue at a point 10 metres south of the southern end of the viaduct carrying that road and railway across Dagenham Breach, passing northwards on that existing viaduct, under the intended A13, then eastwards and terminating by a junction with the railway (Work No. 8J) at a point 300 metres east of the intended Kent Avenue bridge (Work No. 8Q);
Work No
A railway (301 metres in length) commencing by a junction with the railway (Work No. 8J) at a point 245 metres west of the intended Thames Avenue bridge (Work No. 8R), passing eastwards then southwards and terminating by a junction with a private siding at a point 30 metres north of Lake Road on the western side of Thames Avenue;
Work No
A road commencing by a junction with Ripple Road at a point on its southern side 23 metres east of the junction of Pooles Lane with that road, passing southwards on the eastern side of Pooles Lane, then south-eastwards and southwards on the line of Choats Manor Way, over a private siding, the diverted Tilbury Loop Railway (Work No. 22A) and the railways (Works Nos. 22, 22B, 22E, 22F and 22G), and terminating at a point 100 metres south-west of the junction of Choats Road with Hindmans Way, including a bridge over the said railways;
Work No
A road commencing at a point 25 metres west of Pooles Lane at the southern end of that road, passing eastwards and north-eastwards and terminating by a junction with the new road ( Work No. 22H(1)) at a point 240 metres from its commencement;
Work No
A road commencing by a junction with Choats Road at a point 240 metres west of its junction with Hindmans Way, passing eastwards along the line of Choats Road and Hindmans Way to a point 80 metres west of the junction of Hindmans Way with Chequers Lane, then turning southwards and terminating by a junction with Chequers Lane at a point 120 metres south of that last-mentioned road junction;
Work No
A road commencing by a junction with the new road (Work No. 8P(3)) at a point 100 metres from its termination, passing north-eastwards and terminating by a junction with Chequers Lane at a point 60 metres north of its junction with Hindmans Way;
Work No
Realignment of Kent Avenue, including a bridge over a private siding, the Tilbury Loop Railway and the railways (Works Nos. 8, 8E, 8G and 8J), commencing in that road at a point 205 metres south of its junction with New Road, Hornchurch, passing southwards over the said railways and terminating in Kent Avenue at a point 10 metres north of the northern end of the viaduct carrying that road over Dagenham Breach;
Work No
Realignment of Thames Avenue, including a bridge over the Tilbury Loop Railway, the railways (Works Nos. 8, 8G and 8J) and private sidings, commencing in that road at a point 25 metres south of its junction with New Road, Hornchurch, passing southwards over those railways and terminating in Thames Avenue at the junction of Lake Road with that road;
Work No
A road commencing by a junction with Bridge Road at the roundabout on that road 200 metres south of its junction with New Road, Hornchurch, passing westwards over Rainham Creek, then south-westwards under the Tilbury Loop Railway and the railway (Work No. 8), then passing southwards over Rainham Creek at a point 140 metres downstream from the bridge carrying the Tilbury Loop Railway over that river, then south-eastwards and terminating by a junction with Ferry Lane at the southernmost junction of Lamson Road with that road;
Work No
A road, forming an access to the Riverside Sewage Treatment works at Rainham off the new road (Work No. 8S), commencing in the said Treatment Works at Creekside Cottages, passing south-eastwards and eastwards and terminating by a junction with Work No. 8S at a point 70 metres south-west of the intended viaduct carrying the railway (Work No. 8) over that new road;
Work No
A cut, forming a diversion of the Ship and Shovel Relief Channel, commencing by a junction with that watercourse at a point 148 metres from its confluence with The Gores, passing eastwards, then south-eastwards and terminating in The Gores at that confluence;
Work No
A cut, forming a diversion of The Gores, commencing at the confluence of the Ship and Shovel Relief Channel (Work No. 8U(4)) with that stream, passing eastwards then northwards under the railways (Works Nos. 22, 22A, 22B, 22E, 22F and 22G), and terminating by a junction with The Gores at a point 70 metres east of the northern end of its existing culvert under the Tilbury Loop Railway;
Work No
A cut, forming a diversion of Pooles Sewer, commencing by a junction with that watercourse 85 metres south of the southern side of the existing Manor Way level crossing on the Tilbury Loop Railway, passing eastwards and south-eastwards, then northwards under the railway (Work No. 8) and terminating by a junction with that watercourse at the southern end of its culvert under the Tilbury Loop Railway;
Work No
A cut, forming a diversion of the Ferry Lane Sewer, commencing by a junction with that watercourse at the northern end of its culvert under the Tilbury Loop Railway west of Rainham Station, passing southwards under that railway and the railway (Work No. 8), then eastwards and southwards and terminating in that watercourse on the western side of Ferry Lane at a point 48 metres south of the existing Ferry Lane level crossing on the Tilbury Loop Railway;
Work No
A cut, forming a diversion of the Rainham Cross Sewer, commencing at a point on the southern side of the Tilbury Loop Railway 375 metres east of the eastern end of Rainham Station, passing eastwards for a distance of 95 metres and there terminating by a junction with that watercourse;
Work No
A cut, forming an improvement of the Rainham Main Sewer, commencing in that watercourse at a point 15 metres north of the northern end of its existing culvert under the Tilbury Loop Railway, passing under that railway and the railway (Work No. 8) and terminating in that watercourse at a point 52 metres south of the southern end of that existing culvert;
Work No
A cut, forming a diversion of the Wennington Main Sewer, commencing by a junction with the cut (Work No. 8U(9)) at a point 10 metres north of its termination, passing south-eastwards on the southern side of the existing watercourse and terminating by a junction with that watercourse at a point 100 metres south of the southern end of a branch of that watercourse south of Manstead Gardens;
Work No
A cut, forming an improvement of the Common Watercourse (Southall Sewers), commencing in that watercourse at a point 10 metres north-east of the northern end of its existing culvert under the Tilbury Loop Railway, passing south-westwards under that railway and the railway (Work No. 8) and terminating in that watercourse at a point 47 metres south-west of the southern end of that existing culvert;
Work No
A cut, forming a diversion of Wennington Branch Sewer, commencing in that watercourse at a point 10 metres north-east of the northern end of its existing culvert under the Tilbury Loop Railway, passing under that railway and the railway (Work No. 8) and terminating in that watercourse at a point 40 metres south-west of the southern end of that existing culvert;
Work No
A railway (3,835 metres in length) commencing by a junction with the railway (Work No. 8) at its termination, passing south-eastwards on the southern side of the realigned Tilbury Loop Railway (Work No. 23A) then on viaduct over that railway, then over the diverted Aveley Sewer (Work No. 23D) and under the new road (Work No. 23B(1)), then continuing over Mar Dyke and under the new road (Work No. 23C(2)), passing on the southern side of the Purfleet Bypass and terminating at a point 250 metres east of the junction of London Road, Purfleet with the Purfleet Bypass, including the said viaduct and a bridge over Mar Dyke;
Work No
A railway (1,185 metres in length), being a realignment of the Tilbury Loop Railway, commencing by a junction with that railway at a point 230 metres south-east of the Wennington Branch Sewer where that sewer passes in culvert under that railway, passing south-eastwards in tunnel under the railway (Work No. 23) and terminating by a junction with the Tilbury Loop Railway at a point 240 metres south-west of the point where Tank Hill Road is crossed on the level by the Tilbury Loop Railway;
Work No
A road, forming a diversion of Tank Hill Road (A1090), commencing by a junction with Arterial Road, Purfleet (A13) at a point 165 metres north of its junction with Tank Hill Road, passing south-westwards then southwards over the diverted Aveley Sewer (Work No. 23D), the railway (Work No. 23), the Tilbury Loop Railway and Mar Dyke and terminating in that road at a point 15 metres north of the junction of Marlow Avenue with Tank Hill Road, including bridges over Works Nos. 23 and 23D, the Tilbury Loop Railway and Mar Dyke;
Work No
A road, forming an access road into the Purfleet Industrial Estate, commencing by a junction with the new road (Work No. 23B(1)) at a point 130 metres west of the junction of Tank Hill Road with Arterial Road, Purfleet (A13), passing westwards then northwards and terminating at a point in the said estate 155 metres north-west of its commencement;
Work No
A road, forming an access road, commencing by a junction with the new road (Work No. 23B(1)) at a point 110 metres south-west of the point where Tank Hill Road is crossed on the level by the Tilbury Loop Railway, passing eastwards and terminating at a point 105 metres south of that level crossing;
Work No
Diversion of Arterial Road, Purfleet, and Purfleet Bypass and diversion of Tank Lane and Botany Way, comprising—
Work No
Diversion of the A13 (Arterial Road, Purfleet) commencing in that road at a point 360 metres west of its existing junction with Purfleet Bypass, passing eastwards by way of the northern junction roundabout forming part of Work No. 23C(2), and terminating in the A13 at a point 235 metres east of the said existing road junction;
Work No
A road, including junction roundabouts at its commencement and termination, commencing by a junction with the diverted Arterial Road, Purfleet (Work No. 23C(1)) at a point 48 metres north-east of the existing junction of Arterial Road with Purfleet Bypass, passing south-westwards over the railway (Work No. 23) and terminating by a junction with the diverted Tank Lane (Works Nos. 23C(4) and 23C(5)) at a point 150 metres west of the existing junction of Tank Lane with Botany Way, including a bridge over Work No. 23;
Work No
Diversion of Purfleet Bypass at its junction with the A13 commencing by a junction with that road at the northern junction roundabout forming part of Work No. 23C(2), passing southwards and south-eastwards and terminating in Purfleet Bypass at a point 160 metres north-west of its junction with North Road;
Work No
Diversion of Tank Lane commencing at a point 165 metres north of the bridge carrying Tank Lane over the Tilbury Loop Railway, passing southwards then eastwards along the northern side of Tank Lane, then south-eastwards along the line of that road and terminating at the southern junction roundabout forming part of Work No. 23C(2), at a point 150 metres west of the existing junction of Tank Lane with Botany Way;
Work No
Diversion of Tank Lane and Botany Way, commencing at the southern junction roundabout forming part of Work No. 23C(2) at a point 150 metres north-west of its existing junction with Botany Way, passing eastwards then southwards on the line of Botany Way and terminating by a junction with that road at a point 115 metres south-west of its existing junction with Purfleet Bypass;
Work No
A cut, forming a diversion of the Aveley Sewer, commencing in that watercourse at a point 25 metres south-west of the southern end of its existing culvert under the Tilbury Loop Railway, passing in a north-easterly direction under the railways (Works Nos. 23 and 23A) and the new road (Work No. 23B(1)), then passing northwards and terminating at a point in a new balancing pond 95 metres north-west of the junction of Tank Hill Road with Arterial Road, Purfleet;
Work No
A railway (1,537 metres in length) commencing by a junction with the railway (Work No. 23) at its termination, passing south-eastwards on viaduct over the A1090 (London Road, Purfleet), the Tilbury Loop Railway and the northbound Dartford Tunnel Approach Road (Canterbury Way), under a span of the southbound approach to the Queen Elizabeth II Bridge, and over Oliver Close (North) (Work No. 9B) in the West Thurrock Industrial Estate to a point 90 metres west of the existing southernmost junction of Oliver Close with Oliver Road, then under Oliver Road (Work No. 9C) and terminating at a point 160 metres south-east of that existing road junction, including the said viaducts and a bridge over Work No. 9A(1);
Work No
Diversion of Oliver Close (North) commencing in that road at a point 25 metres south of the westernmost corner of that road, passing northwards for a distance of 60 metres from that commencement under the railway (Work No. 9), then turning eastwards and terminating by a junction with Oliver Close (North) at a point 160 metres west of its junction with Oliver Road;
Work No
Diversion of Oliver Road, including a bridge over the railway (Work No. 9), commencing in that road at the existing junction of that road with Oliver Close (North), passing southwards over Work No. 9 on the eastern side of the existing road, and terminating by a junction with Oliver Road at a point 130 metres south of its existing junction with Burnley Road;
Work No
Realignment of Burnley Road and Watson Close commencing by a junction with Oliver Road (Work No. 9C) at the existing road junction, passing eastwards along the line of, and then to the south of, Burnley Road, then turning northwards and terminating in Watson Close at a point 60 metres north of its existing junction with Burnley Road;
Work No
A railway (835 metres in length) commencing by a junction with the railway (Work No. 9F(2)) at a point 275 metres from its commencement, passing westwards, south-westwards, southwards and south-eastwards and terminating at a point on the western side of Watson Close (Work No. 9D) at a point 45 metres north of the existing junction of that road with Burnley Road;
Work No
A deviation railway (849 metres in length), commencing by a junction with the Tilbury Loop Railway at a point 325 metres east of the bridge carrying the southbound approach to the Queen Elizabeth II Bridge over that railway, passing eastwards on the southern side of that railway and terminating at the eastern end of the existing sidings;
Work No
A railway (9,161 metres in length) commencing by a junction with the railway (Work No. 9) at its termination, passing south-eastwards to a point 249 metres from that commencement, then passing in tunnel beneath Burnley Road and Watson Close (Work No. 9D), then beneath the River Thames and Bell Wharf, Swanscombe, with shafts at Burnley Road, West Thurrock Power Station, Bell Wharf and Swanscombe Marsh, continuing in tunnel south-eastwards to a point 120 metres north-west of the existing junction of Green Manor Way with Lower Road, then passing south-eastwards and southwards, under Galley Hill Road (Work No. 10K), then in tunnel for a distance of 58 metres beneath the North Kent Railway, continuing under the railway (Work No. 10C) and the new road (Work No. 10S(1)), then on viaduct over the River Ebbsfleet, then in tunnel for a distance of 310 metres beneath the course of the former Gravesend West Branch Railway and the A2 (Watling Street) at a point 50 metres west of the southern abutment of the bridge carrying the B262 (Hall Road) over that road, then passing in tunnel for distances of 35 metres and 25 metres respectively beneath the B262 and the slip road to that road and Station Road on the southern side of the A2, then continuing south-eastwards on the southern side of the A2, then in tunnel for a distance of 80 metres beneath the railway (Work No. 11A) and on viaduct over the A227 (Wrotham Road) and terminating at a point 180 metres east of that road 340 metres south of the southern side of the bridge carrying the A2 over that road, including the said viaducts over the River Ebbsfleet and Wrotham Road;
Work No
A railway (1,732 metres in length), partly for construction purposes, commencing at the seaward end of the existing Swanscombe Jetty, passing south-eastwards from that jetty and terminating by a junction with the railway (Work No. 10B) at a point 40 metres south-east of the intended bridge (Work No. 10K) carrying Galley Hill Road over that railway;
Work No
A railway (2,281 metres in length) commencing by a junction with the railway (Work No. 10) at a point 113 metres north-west of the intended bridge (Work No. 10K) carrying Galley Hill Road over that railway, passing south-eastwards on the eastern side of that railway under that road, and in tunnel for a distance of 71 metres beneath the North Kent Railway, then passing eastwards over a private road between the Northfleet Cement Works and Springhead Road, then in tunnel for a distance of 60 metres beneath the North Kent Railway at a point 30 metres south-east of the eastern abutment of the bridge carrying that railway over the mineral railway at the entrance to Church Path Pit, then south-eastwards on the northern side of the North Kent Railway, under Springhead Road (Work No. 10N) and terminating by a junction with that railway at a point 110 metres east of the intended bridge forming part of Work No. 10N, including a bridge over the said private road;
Work No
A railway (2,324 metres in length) commencing by a junction with the railway (Work No. 10) at a point 140 metres north-west of the intended bridge (Work No. 10K) carrying Galley Hill Road over that railway, passing south-eastwards on the western side of that railway under that road and in tunnel for a distance of 54 metres beneath the North Kent Railway, then eastwards, over the railways (Works Nos. 10, 10D and 10E) and over the said private road between the Northfleet Cement Works and Springhead Road, then south-eastwards on viaduct across the northern bay of the Blue Lake south of the North Kent Railway and under Springhead Road (Work No. 10N) and terminating by a junction with that railway at a point 95 metres east of the intended bridge forming part of Work No. 10N, including the said viaduct and bridges over Works Nos. 10, 10D and 10E and the said private road;
Work No
A railway (1,523 metres in length) commencing by a junction with the railway (Work No. 10B) at a point 45 metres north-west of the northern portal of the intended tunnel by which that railway passes beneath the North Kent Railway, passing south-eastwards on the western side of Work No. 10B beneath the North Kent Railway in that tunnel, then continuing southwards on the eastern side of the railway (Work No. 10), under the railway (Work No. 10C) and the new road (Work No. 10S(1)) and terminating by a junction with Work No. 10 at a point 10 metres south of the commencement of the intended viaduct carrying that railway over the River Ebbsfleet;
Work No
A railway (1,445 metres in length) commencing by a junction with the railway (Work No. 10C) 7 metres north-west of the southern portal of the intended tunnel by which that railway passes beneath the North Kent Railway, passing south-eastwards on the eastern side of Work No. 10C, then under that railway and continuing on the western side of the railway (Work No. 10), under the new road (Work No. 10S(1)) and terminating by a junction with Work No. 10 at a point 5 metres north of the commencement of the said intended viaduct carrying that railway over the River Ebbsfleet;
Work No
A railway (532 metres in length) commencing by a junction with the railway (Work No. 10B) at a point 140 metres west of the bridge carrying the North Kent Railway over the mineral railway at the entrance to the Church Path Pit, passing eastwards under that bridge and terminating in that pit at a point 378 metres east of that railway bridge;
Work No
A railway (200 metres in length) commencing by a junction with the North Kent Railway at a point 230 metres north-west of the western end of the westbound platform of Northfleet Station passing eastwards and terminating by a junction with the sidings of the mineral railway on the southern side of the North Kent Railway at the western end of those sidings;
Work No
Improvement of Manor Way (West) commencing at the junction of that road with the A226 (London Road), passing north-eastwards and eastwards along the line of Manor Way (West) and terminating at a point 20 metres east of the junction of that road with Pilgrims Road;
Work No
A road commencing by a junction with Manor Way (West) (Work No. 10G) at the termination of that work, passing eastwards, then south-eastwards and terminating at the existing roundabout at the west end of the central access road in the Northfleet Industrial Estate;
Work No
A road, forming a diversion of Lower Road and Green Manor Way, commencing by a junction with Manor Way (West) (Work No. 10G) at its termination, passing northwards on the line of the footpath DS2 to a point 280 metres north of its existing junction with Lower Road, then turning eastwards and south-eastwards on the eastern side of the railway (Work No. 10) to a point on the northern side of Lower Road 330 metres east of its existing junction with Green Manor Way, then passing north-eastwards and eastwards on the line of Lower Road and terminating by a junction with Lower Road at a point 60 metres north of its junction with Stonebridge Road and Galley Hill Road;
Work No
A road commencing by a junction with Green Manor Way at a point 310 metres north of its existing junction with Lower Road, passing southwards then south-westwards and terminating by a junction with the new road (Work No. 10J) at a point 85 metres from that commencement;
Work No
A road commencing by a junction with Manor Way (East) at a point 110 metres north of its existing junction with Lower Road, passing southwards and terminating by a junction with the new road (Work No. 10J) at a point 105 metres from that commencement;
Work No
Realignment of Galley Hill Road, including a bridge over the railways (Works Nos. 10, 10A, 10B and 10C), commencing in that road at a point 270 metres east of its junction with London Road, Swanscombe, and terminating in Galley Hill Road at a point 310 metres west of its junction with Stonebridge Road;
Work No
Realignment of Springhead Road, including a bridge over the railways (Works Nos. 10B and 10C) and the North Kent Railway, commencing in that road at a point 40 metres north of the northern abutment of the existing bridge carrying that road over the North Kent Railway and terminating in that road at a point 110 metres south of the southern abutment of that existing bridge;
Work No
Diversion of Downs Road commencing in that road at a point 310 metres south-east of its junction with the Hog Lane subway under the A2 (Watling Street), passing south-eastwards and eastwards then southwards over the railways (Works Nos. 10, 11A and 11B) and terminating in Downs Road at a point 330 metres south of the existing junction with that road of the road to Northfleet Green, including bridges over Works Nos. 10, 11A and 11B;
Work No
Diversion of the road from Downs Road to Northfleet Green commencing in that road at a point 20 metres east of the access from that road to Hazells, passing south-eastwards and terminating by a junction with Downs Road (Work No. 10P) at a point 210 metres north of the termination of that work;
Work No
A road, for construction purposes, including a bridge over the A2, commencing in the course of the former Gravesend West Branch Railway at a point 35 metres north-east of the northern side of that road, passing south-westwards over that road and terminating in the disused railway at a point 50 metres south-west of the southern side of that road;
Work No
A cut, forming a diversion of the Swanscombe Main Drain south of the sewage disposal works on Swanscombe Marshes, commencing in that drain at a point 60 metres north of the junction of Pilgrims Road with Manor Way (West), passing northwards, then in culvert north-westwards under the new road (Work No. 10J), then northwards and terminating in that drain at the south-western corner of the said sewage works;
Work No
A drainage pumping main commencing at a point 300 metres south-west of the western end of the platform of Northfleet Station, passing north-eastwards, under the railway (Work No. 10F(1)) and the North Kent Railway, then continuing north-eastwards and eastwards in Stonebridge Road and Grove Road between its junctions with Stonebridge Road and College Road, then eastwards in the Creek to a point 40 metres east of the junction of that road with College Road, then passing north-eastwards and terminating at a point at low water on the south bank of the River Thames 15 metres east of Robins Creek;
Work No
A road commencing by a junction with the access road between the Northfleet Cement Works and Springhead Road at a point 75 metres south of the southern end of the bridge carrying that road over the River Ebbsfleet, passing southwards over that river, over the railways (Works Nos. 10, 10D and 10E), then south-westwards and terminating by a junction with the new road (Work No. 10S(2)) at a point 140 metres north of the junction with the existing Southfleet Road of the access road to the Northfleet West Grid Substation, including roundabouts at that commencement and termination and bridges over the river and Works Nos. 10, 10D and 10E;
Work No
A road commencing at a point adjoining Southfleet Road 310 metres north of the existing junction with that road of the said road access to the Northfleet West Grid Substation, passing southwards to a point 120 metres south of that existing road junction then passing south-eastwards and terminating at a point 60 metres east of Southfleet Road, 220 metres north of the existing junction with the A2 of the road access from that road to the Northfleet West Grid Substation, including a roundabout at that termination;
Work No
A road commencing by a junction with the new road (Work No. 10S(2)) at its termination, passing eastwards, then south-eastwards to a junction with Work No. 10T(4) at its termination, then eastwards over the railway (Work No. 10) in tunnel and terminating in the existing eastbound exit slip road of the A2 at Pepper Hill at a point 80 metres north-west of the junction of that slip road with Hall Road;
Work No
A road commencing by a junction with the road (Work No. 10T(1)) at a point 85 metres north-west of the access to the Springhead Nursery from the existing access road on the northern side of the A2, passing south-eastwards on the southern side of Work No. 10T(1), over the railway (Work No. 10) in tunnel, and terminating in the eastbound carriageway of the A2 at a point 250 metres south-east of the bridge carrying Hall Road over the A2;
Work No
A road, forming an exit slip road from the eastbound carriageway of the A2, commencing in that carriageway at a point 325 metres east of the footbridge over the A2 between Blue House and Swanscombe Park, passing eastwards over the new roads (Works Nos. 10T(6) and 10T(8)) and terminating by a junction with the road (Work No. 10T(1)) at a point 260 metres from its commencement;
Work No
A road, forming an entry slip road to the westbound carriageway of the A2, commencing by a junction with the new road (Work No. 10S(2)) at its termination, passing southwards under the A2 then south-westwards, westwards and north-westwards to a point 300 metres west of the bridge carrying the A2 over the B259 (Park Corner Road) continuing westwards and terminating in the westbound carriageway of the A2 at a point 130 metres east of the said footbridge over the A2;
Work No
A road commencing by a junction with the slip road (Work No. 10T(6)) at a point 325 metres north of the junction of Park Corner Road with the road leading to North End Farm, passing southwards and terminating by a junction with Park Corner Road at a point 150 metres from that commencement;
Work No
A station access road, forming an exit slip road from the westbound carriageway of the A2, commencing by a junction with the new road (Work No. 10S(2)) at its termination, passing southwards under the A2 on the western side of the slip road (Work No. 10T(6)) to a point on the western side of the B259 (Park Corner Road) 160 metres south of the southern end of the bridge carrying the A2 over that road, then turning south-westwards, north-westwards, northwards and north-eastwards, passing over the road and the slip road (Work No. 10T(6)) on the southern side of the A2, continuing eastwards and terminating in the westbound carriageway of the A2 at a point 190 metres north-west of the bridge carrying Hall Road over the A2;
Work No
A railway (4,402 metres in length) commencing by a junction with the London and Chatham Railway at a point 130 metres east of the eastern abutment of the bridge carrying that railway over Pinden Road, passing eastwards, then north-eastwards on the course of the former Gravesend West Branch Railway, over the B260 (Main Road, Longfield), under Whitehill Road (Work No. 11C), the B255 (Hook Green Road) (Work No. 11D) and the B259 (Dale Road) (Work No. 11E), then eastwards under New Barn Road (Work No. 11F), and terminating at a point 60 metres east of the intended bridge forming part of that work, including a bridge over the B260;
Work No
A railway (1,366 metres in length) commencing by a junction with the railway (Work No. 11) at its termination, passing eastwards over the railway (Work No. 10) in tunnel, then south-eastwards on the northern side of that railway under Downs Road (Work No. 10P) and terminating by a junction with that railway at a point 290 metres south-east of the intended bridge forming part of that work;
Work No
A railway (1,354 metres in length) commencing by a junction with the railway (Work No. 11) at its termination, passing south-eastwards on the southern side of the railway (Work No. 10) under Downs Road (Work No. 10P) and terminating by a junction with the railway at a point 275 metres south-east of the intended bridge forming part of that work;
Work No
Realignment of Whitehill Road, including a bridge over the railway (Work No. 11), commencing in Whitehill Road at a point 375 metres south of the southern abutment of the existing bridge carrying that road over the disused railway and terminating in that road at its junction with Hook Green Road;
Work No
Realignment of the B255 (Hook Green Road), including a bridge over the railway (Work No. 11), commencing in that road at a point 50 metres south-east of its junction with Whitehill Road and terminating in the B255 at a point 190 metres east of the eastern abutment of the existing bridge over the disused railway;
Work No
Realignment of the B259 (Dale Road), including a bridge over the railway (Work No. 11), commencing in that road at a point 60 metres south of the southern abutment of the existing bridge over that disused railway and terminating in that road at a point 70 metres south of its junction with the B262 (Station Road);
Work No
Realignment of New Barn Road, including a bridge over the railway (Work No. 11), commencing in that road at a point 25 metres south of the centre of the roundabout at the junction of that road with the B262 (Station Road) and terminating in New Barn Road at a point 370 metres south-west of that commencement;
Work No
A railway (7,700 metres in length) commencing by a junction with the railway (Work No. 10) at its termination, passing eastwards on the southern side of the A2 (Watling Street), under Henhurst Road (Work No. 12D), Scotland Lane (Work No. 12E), Watling Street (B395) (Work No. 12F) and Halfpence Lane (C492) (Work No. 32C), then in tunnel for a distance of 75 metres beneath Work No. 32B and an adjoining area, under Brewers Road (Work No. 12H), over the access road (Work No. 12K) and under the access road (Work No. 12L), then passing south-eastwards on the western side of the M2, under a land bridge in Temple Wood, and terminating at a point 435 metres north-west of the southern end of the subway by which the footpath RS203 passes under the M2 as existing, including a bridge over Work No. 12K;
Work No
A railway (2,520 metres in length) on the northern side of the railway (Work No. 12) commencing by a junction with that railway at a point 50 metres east of its commencement, passing eastwards under Henhurst Road (Work No. 12D) and terminating by a junction with Work No. 12 at a point 515 metres east of the intended bridge carrying that road over that railway;
Work No
A railway (2,520 metres in length) on the southern side of the railway (Work No. 12) commencing by a junction with that railway at the said point 50 metres east of its commencement, passing eastwards under Henhurst Road (Work No. 12D) and terminating by a junction with Work No. 12 at the said point 515 metres east of the intended bridge carrying that road over that railway;
Work No
Diversion of Church Road commencing in that road at a point 170 metres north of the entrance from that road to St Margaret’s Church, Ifield Court, passing north-eastwards then south-eastwards and terminating by a junction with Henhurst Road (Work No. 12D) at a point 100 metres south of the southern abutment of the intended bridge carrying that road over the railways (Works Nos. 12, 12A and 12B);
Work No
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.