Channel Tunnel Rail Link Act 1996
Diversion of Henhurst Road, including a bridge over the railways (Works Nos. 12, 12A and 12B), commencing in that road at a point 40 metres south of its junction with the exit slip road from the westbound carriageway of the A2 and terminating in Henhurst Road at a point 60 metres north of the access from that road to Henhurst Cottage;
Work No
Diversion of Scotland Lane (Byway NS 195), including a bridge over the railway (Work No. 12), commencing in Scotland Lane at a point 210 metres south of its existing junction with Watling Street (B395), passing north-eastwards then eastwards to a junction with the existing access to The Mount, then passing northwards over the railway and terminating by a junction with the new road (Work No. 12F) at a point 15 metres from the commencement of that work;
Work No
A road, forming a diversion of Watling Street (B395), including a bridge over the railway (Work No. 12), commencing in that road at a point 130 metres south-east of the southern abutment of the bridge carrying that road over the A2, passing eastwards on the northern side of that road, then southwards over the railway and terminating by a junction with Halfpence Lane (C492) (Work No. 32C) at a point 80 metres north of its existing junction with Brewers Road;
Work No
Diversion of Brewers Road, including bridges over the railway (Work No. 12) and the A2, commencing in Brewers Road at its junction with Halfpence Lane (C492) passing eastwards, then north-eastwards over that railway and terminating in Brewers Road at a point 160 metres north-east of its junction with the slip roads to and from the eastbound carriageway of the A2;
Work No
An access road commencing by a junction with Brewers Road (Work No. 12H) at a point 55 metres south-west of the termination of that work, passing south-eastwards, then eastwards along the northern side of the A2 and terminating within the curtilage of Park Pale;
Work No
An access road to the Rochester and Cobham Park Golf Course, including a bridge over the A2, commencing by a junction with the access road (Work No. 12J) on the northern side of the A2 at a point 250 metres west of Park Pale, passing northwards and eastwards then southwards over that road and the A2 (including Works Nos. 31A, 31B, 34A and 35A), then westwards and southwards under the railway (Work No. 12), and terminating in the golf course south of the railway;
Work No
Diversion of an access road to Knights Place, including a bridge over the railway (Work No. 12), commencing in the existing access road from the A2 at a point 170 metres south of that road, passing southwards over the railway and terminating in the existing access road at a point 110 metres north of the access from that road to Knights Cottage;
Work No
A railway (14,100 metres in length) commencing by a junction with the railway (Work No. 12) at its termination, passing south-eastwards, on the western side of the M2, over new roads (Works Nos. 36C, 36D and 36E) forming part of Junction 2 of the motorway, under the A228 (Rochester Road) (Work No. 36F), over the London and Chatham Railway, then on viaduct over the Strood and Maidstone Railway, the River Medway and Wouldham Road, then continuing south-eastwards on the western side of the M2 to a point at Nashenden Bottom, 120 metres north-west of the northern end of the go-kart racing track at Buckmore Park, south of Rochester Airport, then passing in tunnel (the North Downs Tunnel) for a distance of 3,190 metres beneath Blue Bell Hill and the North Downs, then passing south-eastwards under the Pilgrims Way (Work No. 13F), over Boarley Lane (Work No. 13G), then in tunnel for a distance of 330 metres beneath Boxley Road (Work No. 13H), continuing south-eastwards, under the A249 (Sittingbourne Road) (Work No. 13J), and Hockers Lane (Work No. 13K) and terminating at a point 270 metres east of the northern abutment of the bridge carrying Hockers Lane over the M20, including bridges over Works Nos. 36C, 36D and 36E, the London and Chatham Railway, the said viaduct, and a bridge over Work No. 13G;
Work No
Slip roads forming part of Junction 2 of the M2 pending widening of that motorway, being roads to be stopped up on the construction of the slip roads (Works Nos. 36A to 36D), comprising—
Work No
A road, forming an exit slip road from the existing eastbound carriageway of the M2, commencing in that carriageway at a point 75 metres south-east of the southern end of the subway by which the footpath RS 203 passes under the motorway, passing south-eastwards and terminating by a junction with the A228 (Rochester Road) (Work No. 13A(4)) at a point 70 metres east of the eastern abutment of the existing bridge carrying that road over the M2;
Work No
A road, forming an entry slip road to the existing westbound carriageway of the M2, commencing in that carriageway at a point 345 metres south-east of the southern end of the subway by which the footpath NS 183 passes under the M2, passing south-eastwards and terminating by a junction with Work No. 36C at a point 100 metres west of the southern end of the said subway for the footpath RS 203;
Work No
A road forming an exit slip road from the existing westbound carriageway of the M2, commencing in that carriageway at a point 25 metres south-east of the southern abutment of the bridge carrying the M2 over the London and Chatham Railway, passing north-westwards under the railway (Work No. 13) and terminating by a junction with the western junction roundabout (part of Work No. 36E);
Work No
A road, forming a diversion of the A228 (Rochester Road), commencing by a junction with the road (Work No. 36F) at a point 395 metres north-east of the commencement of that work, passing north-eastwards and eastwards and terminating by a junction with the A228 at a point 140 metres north-east of the junction with that road of the existing slip roads to the eastbound carriageway of the M2;
Work No
Diversion of Burham Road (D422) commencing by a junction with Wouldham Road at a point 30 metres south-west of the existing junction of those roads, passing south-eastwards and terminating by a junction with Burham Road 325 metres south of that road junction;
Work No
Diversion of bridleway MR11 (Stony Lane), including a bridge over the railway (Work No. 13), commencing in that bridleway at the northern end of the subway by which it passes under the M2, passing south-westwards under the M2, then north-westwards and south-westwards over the railway, then southwards and south-eastwards and terminating by a junction with Stony Lane at the north-eastern corner of Upper Nashenden Farm;
Work No
An access, for construction purposes, commencing by a junction with the existing westbound carriageway of the M2 at a point 160 metres north-west of the southern end of the existing subway by which Stony Lane passes under the motorway, passing north-westwards and westwards to the southern side of the railway (Work No. 13), passing south-eastwards on that side of the railway between chainages 4,000 and 4,190 metres, then passing eastwards, northwards and north-westwards and terminating by a junction with that carriageway of the motorway at a point 180 metres south-east of the bridge carrying Borstal Farm access over the M2;
Work No
Diversion of byway MR401, commencing by a junction with the byway at a point 160 metres south of its junction with Lower Warren Road, passing southwards over the railway (Work No. 13) in tunnel, then south-westwards and south-eastwards and terminating by a junction with byway MR401 at a point 225 metres south of that commencement;
Work No
Realignment of Pilgrims Way, including a bridge carrying that byway over the railway (Work No. 13), commencing in that byway at a point 85 metres east of the northern end of the subway by which the Pilgrims Way passes under the A229 (Chatham Road), passing eastwards then north-eastwards over the railway and terminating in that byway at a point 130 metres east of that commencement;
Work No
Diversion of Boarley Lane (D898) commencing in that road at a point 100 metres south of Boarley Cottage, passing southwards and south-eastwards under the railway (Work No. 13) and terminating in Boarley Lane at a point 50 metres north-east of the access to Boarley Oast;
Work No
Diversion of Boxley Road (C97) commencing in that road at its junction with Sandy Lane, passing north-westwards then north-eastwards over the railway (Work No. 13) in tunnel and terminating in that road at a point 50 metres north-east of the access to Street Farm, Boxley;
Work No
Realignment of the A249 (Sittingbourne Road), including a bridge over the railway (Work No. 13), commencing in that road at a point 80 metres north-east of the junction with that road of the side road to Detling and terminating in Sittingbourne Road at a point 110 metres north of the northern abutment of the eastern bridge of the roundabout through which that road passes over the M20;
Work No
Realignment of Hockers Lane, including a bridge over the railway (Work No. 13), commencing in that road at a point 230 metres north of the northern abutment of the bridge carrying that road over the M20 and terminating in Hockers Lane at a point on that bridge 260 metres south of that commencement;
Work No
A railway (13,904 metres in length) commencing by a junction with the railway (Work No. 13) at its termination, passing south-eastwards over Thurnham Lane (Work No. 14A), Water Lane (Work No. 14B) and Crismill Lane (Work No. 14C), then over the Maidstone and Ashford Railway at a point 85 metres east of the bridge carrying the M20 over that railway, continuing south-eastwards in tunnel for a distance of 240 metres beneath the B2163 (Eyhorne Street) (Work No. 14D), then passing over Snagbrook Stream, under Hospital Road (Work No. 14E), over the A20 (Ashford Road) (Work No. 14F) and under Fairbourne Lane (Work No. 14H), over Bell Farm access (Work No. 14J), then under Runham Lane (Work No. 14K), Sandway Road (Work No. 14L), Old Ham Lane (Work No. 14M), in tunnel for a distance of 170 metres beneath Headcorn Road (Work No. 14N), then continuing under Boughton Road (Work No. 14P), Lenham Heath Road (Work No. 14Q) and Bowley Lane (Work No. 14S), over the Great Stour River at a point 40 metres north of the bridge carrying the M20 over that river, under the access road west of Hook Street (Work No. 14U) and terminating at a point 85 metres south of the junction of Bull Hill with Lenham Heath Road, including bridges over Works Nos. 14A, 14B and 14C, the Maidstone and Ashford Railway, Snagbrook Stream, Works Nos. 14F and 14J and the Great Stour River;
Work No
Diversion of Thurnham Lane commencing in that road at a point 10 metres north of the access from that road to Gorewood Farm, passing south-westwards and southwards under the railway (Work No. 14) and terminating in Thurnham Lane at a point 10 metres north of the southern side of the bridge carrying the M20 over that road;
Work No
Diversion of Water Lane commencing in that road at a point 185 metres north of the northern side of the bridge carrying the M20 over that road, passing south-westwards and southwards under the railway (Work No. 14) and terminating in Water Lane at a point 5 metres north of the southern side of that bridge;
Work No
Diversion of bridleway KH134 (Crismill Lane) commencing in that bridleway at a point 30 metres south of the entrance to the Poer Meadow Shaw Pumping Station of the Mid-Kent Water Company, passing south-westwards, then south-eastwards and south-westwards under the railway (Work No. 14) and terminating in Crismill Lane at a point 5 metres north of the northern end of the subway by which that bridleway passes under the M20;
Work No
Realignment of the B2163 (Eyhorne Street) commencing at a point in that road 140 metres north-east of the northern abutment of the bridge carrying that road over the M20, passing south-westwards over the railway (Work No. 14) in tunnel and terminating at a point 75 metres south-west of that commencement;
Work No
Diversion of Hospital Road (D971), including a bridge over the railway (Work No. 14), commencing in that road at a point 180 metres north-east of the northern end of the subway by which that road passes under the M20, passing south-westwards, north-westwards, then south-westwards over the railway and south-eastwards and south-westwards and terminating in Hospital Road at a point 10 metres north-east of the southern end of that subway;
Work No
Diversion of the A20 (Ashford Road) commencing in that road at a point 20 metres east of the southern side of the bridge carrying the M20 over that road west of Holm Mill, passing eastwards under the railway (Work No. 14), then south-eastwards on the northern side of Work No. 14 and terminating in the A20 at a point 25 metres south-east of its junction with Holm Mill Lane;
Work No
Diversion of Greenway Court Road (D946) at its junction with the A20 (Ashford Road), commencing in Greenway Court Road at a point 110 metres north-east of its junction with Greenway Lane, passing south-westwards, then southwards on the eastern side of the existing road and terminating by a junction with the A20 (Work No. 14F) at a point 105 metres east of the intended bridge carrying the railway (Work No. 14) over that road;
Work No
Realignment of Fairbourne Lane, including a bridge over the railway (Work No. 14), commencing in that road at a point 50 metres south of its junction with the A20 (Ashford Road), passing southwards over the railway and terminating at a point 45 metres south of the northern end of the bridge carrying that road over the M20;
Work No
Diversion of the Bell Farm access from Sandway Road, Harrietsham, commencing by a junction with Sandway Road at a point 130 metres south-east of its junction with East Street, passing south-eastwards, then south-westwards and southwards under the railway (Work No. 14) and terminating in that access road at a point 35 metres south of the northern end of the subway by which it passes under the M20;
Work No
Realignment of Runham Lane, including a bridge over the railway (Work No. 14), commencing in that road at a point 60 metres south-west of its junction with Sandway Road, passing south-westwards over the railway and terminating in Runham Lane at a point 10 metres south-west of the north-eastern end of the bridge carrying that road over the M20;
Work No
Diversion of Sandway Road (C92), including a bridge over the railway (Work No. 14), commencing in that road at a point 180 metres south-east of its junction with Runham Lane, passing south-eastwards on the eastern side of Sandway Road, then southwards over the railway and terminating in that road at a point 190 metres north-west of its junction with Old Ham Lane;
Work No
Diversion of Old Ham Lane (D986), including a bridge over the railway (Work No. 14), commencing in that road at a point 360 metres north of its junction with Sandway Road and Lenham Heath Road, passing southwards over the railway and terminating in Old Ham Lane at that road junction;
Work No
Realignment of Headcorn Road commencing in that road at a point 220 metres north-east of its junction with Lenham Heath Road, passing south-westwards over the railway (Work No. 14) in tunnel and terminating in Headcorn Road at a point 130 metres north-east of that road junction;
Work No
Realignment of Boughton Road, including a bridge over the railway (Work No. 14) commencing in that road at a point 140 metres north of its junction with Lenham Heath Road, passing southwards over the railway and terminating in Boughton Road at a point 70 metres north of that road junction;
Work No
Diversion of Lenham Heath Road (C92) at Sandway, including a bridge over the railway (Work No. 14), commencing in that road at a point 225 metres south-east of its junction with Boughton Road, passing south-eastwards then north-eastwards over the railway, then south-eastwards and eastwards and terminating in Lenham Heath Road at a point 590 metres north-west of its existing junction with Bowley Lane;
Work No
Diversion of Lenham Heath Road (C92) at Chapel Mill commencing in that road at a point 260 metres north-west of its existing junction with Bowley Lane, passing south-eastwards over the Great Stour River and terminating in Lenham Heath Road at a point 310 metres south-east of that existing road junction, including a bridge over the Great Stour River;
Work No
Diversion of Bowley Lane at its junction with Lenham Heath Road, including bridges over the railway (Work No. 14) and the M20, commencing by a junction with Lenham Heath Road (Work No. 14R) at a point 225 metres south-east of the commencement of that work, passing southwards and south-westwards, over the railway and the motorway, and terminating in Bowley Lane at a point 165 metres south of the southern end of the existing bridge carrying that road over the M20;
Work No
An access road, for construction purposes, commencing by a junction with the eastbound carriageway of the M20 at a point 75 metres north-west of the western side of the existing bridge carrying Bowley Lane over the motorway, passing south-eastwards and eastwards to a point on the southern side of the railway (Work No. 14) 220 metres south-east of the intended bridge carrying that road over the railway, then passing southwards and south-eastwards and terminating by a junction with that carriageway of the M20 at a point 210 metres north-west of the western side of the bridge carrying Hubbard’s Farm access road over the motorway;
Work No
An access road on the line of Hubbard’s Farm access road west of Hook Street, including a bridge over the railway (Work No. 14), commencing by a junction with Lenham Heath Road at a point 75 metres west of its junction with Bull Hill, passing southwards over the railway and terminating in the existing access road at the southern end of the bridge carrying it over the M20;
Work No
An access road on the southern side of the railway (Work No. 14) commencing in the curtilage of Old Cottage, passing south-eastwards to a junction with the new road (Work No. 14U) at a point 120 metres south of its commencement, then continuing south-eastwards and terminating in the curtilage of Yew Tree Cottage off Hook Street (to be stopped up);
Work No
A railway (11,342 metres in length) commencing by a junction with the railway (Work No. 14) at its termination, passing south-eastwards under Egerton Road (Work No. 15C), Newlands Road (Work No. 15F) and Pluckley Road (Work No. 15G), passing eastwards in tunnel for a distance of 115 metres beneath Leacon Lane (Work No. 15J), and under the A20 (Maidstone Road) (Work No. 15K) then continuing south-eastwards over the M20 at a point 50 metres west of the bridge carrying the Maidstone and Ashford Railway over the motorway at Tutt Hill, passing under Westwell Lane (Work No. 15M) and over Station Road (Work No. 15N), under the A20 (Work No. 15P) and over Godinton Lane (Work No. 15Q) and terminating at a point in Rowcroft Barracks 530 metres north-west of the existing junction of Godinton Road with Chart Road, including bridges over the M20, Station Road and Godinton Lane;
Work No
A railway (2,576 metres in length) on the northern side of the railway (Work No. 15) commencing by a junction with that railway at a point 360 metres east of its commencement, passing eastwards under Egerton Road (Work No. 15C) and terminating by a junction with Work No. 15 at a point 125 metres north-west of the intended bridge carrying Newlands Road (Work No. 15F) over that railway;
Work No
A railway (2,576 metres in length) on the southern side of the railway (Work No. 15) commencing by a junction with that railway at the said point 360 metres east of its commencement, passing eastwards under Egerton Road (Work No. 15C) and terminating by a junction with Work No. 15 at the said point 125 metres north-west of the intended bridge carrying Newlands Road (Work No. 15F) over that railway;
Work No
Realignment of Egerton Road, including a bridge over the railways (Works Nos. 15, 15A and 15B), commencing in that road at a point 5 metres south-west of the southern end of the bridge carrying it over the M20, passing north-eastwards over those railways and terminating in Egerton Road at a point 130 metres north-east of its junction with Vicarage Lane;
Work No
Realignment of Vicarage Lane commencing in that road at a point 65 metres north of its junction with Egerton Road and terminating at that road junction;
Work No
Diversion of Hurst Lane (D1198) at its junction with Newlands Road commencing in Hurst Lane at a point 260 metres north-west of that existing road junction, passing eastwards and terminating by a junction with Newlands Road (Work No. 15F) at a point 75 metres north of the said existing road junction;
Work No
Realignment of Newlands Road (D1199), including a bridge over the railway (Work No. 15), commencing in that road at a point 15 metres north of the northern abutment of the bridge carrying that road over the M20, passing northwards over the railway, then north-eastwards and terminating in Newlands Road at a point 135 metres north-east of its junction with Hurst Lane;
Work No
Realignment of Pluckley Road (C493), including a bridge over the railway (Work No. 15), commencing in that road at a point 25 metres south-west of the southern end of the bridge carrying it over the M20, passing north-eastwards and northwards over the motorway and the railway and terminating in Pluckley Road at a point 65 metres north of its existing junction with Leacon Lane;
Work No
Diversion of Leacon Lane between Pluckley Road and Leacon Alders commencing by a junction with Pluckley Road at its existing junction with Leacon Lane, passing eastwards then south-eastwards under the railway (Work No. 15) and terminating in Leacon Lane at a point 195 metres west of the bridge carrying that road over the stream at Leacon Alders, including access to Oakover Nursery and Raywood Cottages and to the emergency access to the M20;
Work No
Realignment of Leacon Lane east of Leacon Alders commencing in that road at a point 240 metres east of its junction with Hurstford Lane, passing north-eastwards over the railway (Work No. 15) in tunnel, and terminating in Leacon Lane at a point 200 metres south-west of its junction with the A20 (Maidstone Road);
Work No
Diversion of the A20 (Maidstone Road), including a bridge over the railway (Work No. 15), commencing in that road at a point 25 metres north of its junction with Leacon Lane, passing south-eastwards over the railway on the western side of the existing road and terminating in the A20 at the north-western end of the bridge carrying that road over the M20, including access to Leda Cottages at a point 35 metres north-west of that termination;
Work No
A road for access to premises on the eastern side of the existing A20 commencing by a junction with the A20 (Work No. 15K) at a point on its eastern side 205 metres south-east of its commencement, passing eastwards, then south-eastwards and terminating by a junction with the remaining part of the existing road at a point 285 metres south-east of the commencement of Work No. 15K;
Work No
Diversion of Westwell Lane (D1227) commencing in that road at the southern end of the bridge carrying it over the M20, passing southwards on the eastern side of the existing road, then south-westwards over the Maidstone and Ashford Railway and the railway (Work No. 15), then passing south-eastwards and southwards and terminating in that road at a point 180 metres south of the southern abutment of the existing bridge carrying that road over the Maidstone and Ashford Railway, including a bridge over that railway and Work No. 15;
Work No
Realignment of Station Road, Westwell, commencing in that road at a point 15 metres south-west of the bridge carrying the Maidstone and Ashford Railway over that road, passing south-westwards under the railway (Work No. 15) and terminating in Station Road at a point 220 metres south-west of that commencement;
Work No
Diversion of the A20 (Maidstone Road), including a bridge over the railway (Work No. 15), commencing in that road at a point 405 metres north-west of the entrance to Yonsea Farm, passing eastwards on the northern side of the existing road, over the railway, then south-eastwards and terminating in that road at a point at Potters Corner 25 metres south-east of the junction with that road of Godinton Lane;
Work No
Diversion of Godinton Lane commencing in that road at a point 225 metres south-west of its junction with the A20, passing south-westwards on the western side of the existing road, under the railway (Work No. 15) and terminating in Godinton Lane at a point 10 metres north-east of the access to North Lodge;
Work No
A railway (4,535 metres in length) commencing by a junction with the railway (Work No. 15) at its termination, passing south-eastwards to a point 130 metres north-west of the existing junction of Godinton Road with Chart Road, then in tunnel for a distance of 565 metres beneath Chart Road (Work No. 16F) and Godinton Road (Works Nos. 16G and 16H), the railway (Work No. 16A) and the Maidstone and Ashford Railway (Work No. 16C), then under Beaver Road (Work No. 16N), over the Great Stour and the East Stour Rivers, the Ashford and Canterbury Railway and the railways (Works Nos. 16C and 16D), then over the railways (Works Nos. 16A and 16E), under Boys Hall Road (Work No. 16Q), and terminating at a point 225 metres west of the western side of the existing bridge carrying Bad Munstereifel Road over the Ashford and Folkestone Railway at Sevington, including bridges over Works Nos. 16A, 16C, 16D and 16E, the Great Stour and the East Stour Rivers, the Ashford and Canterbury Railway, and the Aylesford Stream (Work No. 16S);
Work No
A railway (4,555 metres in length) commencing by a junction with the railway (Work No. 16) at a point 5 metres south-east of the commencement of that work, passing south-eastwards on the northern side of that railway, in tunnel for a distance of 405 metres beneath Chart Road (Work No. 16F), then passing southwards over the railway (Work No. 16) in tunnel, then south-eastwards and eastwards under Beaver Road (Work No. 16N), on existing bridges over the Great Stour and the East Stour Rivers, under Work No. 16, and Boys Hall Road (Work No. 16Q) and terminating by a junction with Work No. 16 at its termination, including bridges over Work No. 16K and the Aylesford Stream (Work No. 16S);
Work No
A railway (4,550 metres in length) commencing by a junction with the railway (Work No. 16) at a point 5 metres south-east of the commencement of that work, passing south-eastwards on the southern side of that railway, in tunnel for a distance of 475 metres beneath Chart Road (Work No. 16F) and Godinton Road (Works Nos. 16G and 16H), passing south-eastwards and eastwards under Beaver Road (Work No. 16N), on existing bridges over the Great Stour and East Stour Rivers, under Boys Hall Road (Work No. 16Q) and terminating by a junction with Work No. 16 at its termination, including bridges over Work No. 16K and the Aylesford Stream (Work No. 16S);
Work No
A railway (2,228 metres in length) commencing by a junction with the Maidstone and Ashford Railway at a point 200 metres north-west of the bridge carrying the Godinton Road over that railway, passing south-eastwards over the railway (Work No. 16) in tunnel, under Beaver Road (Work No. 16N), on existing bridges over the Great Stour and East Stour Rivers and terminating by a junction with the Ashford and Canterbury Railway at a point 70 metres east of the intended bridge carrying Work No. 16 over that railway, including a bridge over Work No. 16K;
Work No
A railway (954 metres in length), forming sidings on the Ashford and Canterbury and Ashford and Folkestone Railways, commencing at a point 45 metres south-east of the eastern abutment of the bridge carrying that railway over the East Stour River, passing south-eastwards on the southern side of the railway (Work No. 16C) to a junction with the Ashford and Canterbury Railway, then passing eastwards under the railway (Work No. 16) then south-eastwards and terminating at a point 125 metres north-west of the junction of Bentley Road with Hunter Avenue and Aylesford Place, including railway sidings;
Work No
A railway (748 metres in length) commencing by a junction with the railway (Work No. 16A) at a point 140 metres north-west of the intended bridge carrying the railway (Work No. 16) over that railway, passing south-eastwards under Work No. 16, on the northern side of Work No. 16A and terminating at a point 92 metres south-east of the eastern side of the existing Aylesford Place level crossing (to be stopped up), including railway sidings;
Work No
Realignment of the A28 (Chart Road) commencing in that road at a point 45 metres east of the junction of Hilton Road with that road, passing eastwards over the railways (Works Nos. 16, 16A and 16B) in tunnel and terminating in that road at a point 3 metres west of the western side of the bridge carrying the Maidstone and Ashford Railway over that road;
Work No
Realignment of Godinton Road (B2074) and Carlton Road (E1467) commencing by a junction with Chart Road (Work No. 16F) at the existing junction of that road with Godinton Road, passing south-eastwards on the line of that road over the railway (Work No. 16B) in tunnel, then passing south-westwards on the line of Carlton Road and terminating in that road at a point 63 metres south-west of its junction with Godinton Road;
Work No
A road commencing by a junction with Godinton Road (Work No. 16G) at a point 80 metres south-east of its existing junction with Chart Road, passing north-eastwards over the railways (Works Nos 16, 16A and 16B) in tunnel, then south-eastwards over the Maidstone and Ashford Railway (Work No. 16C) and terminating in Godinton Road at a point 45 metres north-west of its junction with James Street, including a bridge over the Maidstone and Ashford Railway (Work No. 16C);
Work No
Realignment of Bridge Road commencing in that road at a point 45 metres south-west of its existing junction with Godinton Road, passing north-eastwards, and terminating by a junction with Work No. 16G at that road junction;
Work No
An access road and cycle track commencing in Gasworks Lane at a point 30 metres south of its junction with the A292 (Elwick Road), passing south-westwards for a distance of 108 metres, on the western side of Gasworks Lane (to be stopped up), over the railway (Work No. 16), then continuing as a cycle track south-westwards, then eastwards and westwards, under the railways (Works Nos. 16A, 16B and 16C) and the Tonbridge and Ashford Railway, and terminating in Gasworks Lane at a point 10 metres south of the southern end of the existing bridge carrying that last mentioned railway over that road, including a bridge over Work No. 16;
Work No
A road commencing by a junction with Leacon Road at its junction with Norfolk Drive, passing eastwards and terminating by a junction with Gasworks Lane at a point 120 metres south of the southern end of the bridge carrying the Tonbridge and Ashford Railway over that road;
Work No
A cycle track commencing by a junction with the footpath AU 37 at a point 32 metres south of its junction with the A292 (Elwick Road), passing south-westwards over the railways (Works Nos. 16, 16A, 16B and 16C), the Maidstone and Ashford and the Tonbridge and Ashford Railways, then passing westwards, then eastwards and terminating by a junction with the footpath at a point 5 metres south-west of the southern end of the footbridge carrying that footpath over the Tonbridge and Ashford Railway;
Work No
Diversion of the A2070 (Beaver Road) commencing in that road at its junction with the A292 (Elwick Road and Station Road), passing southwards over the railways (Works Nos. 16, 16A, 16B and 16C) and terminating in the A2070 at its junction with the Romney Marsh Road, including a bridge over the said railways and a junction roundabout at that termination;
Work No
A cycle track commencing at the southern end of Alsops Road, passing eastwards, then westwards and eastwards, then southwards over the railways (Works Nos. 16, 16A and 16B) and the Ashford and Folkestone Railway, then continuing westwards and eastwards and terminating by a junction with Crowbridge Road at a point 60 metres west of the junction of that road with Gladstone Road;
Work No
Diversion of Boys Hall Road and Canterbury Road (E1466), including a bridge over the Ashford and Folkestone Railway in place of the existing bridge over that railway and over the railways (Works Nos. 16, 16A and 16B) and the new road (Work No. 16RR), commencing in Boys Hall Road at a point 215 metres north-east of the existing junction of Crowbridge Road with that road, passing south-westwards over Works Nos. 16, 16A and 16B, the Ashford and Folkestone Railway and Work No. 16RR on the eastern side of the existing road and terminating in Canterbury Road at a point 150 metres south-west of that existing road junction;
Work No
A road, forming in part a realignment of Crowbridge Road (D4488), commencing in that road at a point 230 metres north-west of its existing junction with Canterbury Road, passing south-eastwards under Work No. 16QQ then passing southwards, south-westwards and south-eastwards and terminating at a roundabout in the northern corner of Orbital Park, Ashford, at a point 520 metres north-west of the junction of Bad Munstereifel Road (Work No. 17A) with the access road to Orbital Park, Ashford;
Work No
A road commencing by a junction with the new road (Work No. 16QQ) at a point 40 metres north-east of the junction of Mead Road with Canterbury Road, passing south-eastwards and terminating by a junction with Work No. 16RR at a point 120 metres south-east of that road junction;
Work No
A cut, forming a diversion of the Aylesford Stream, commencing in that stream at a point 185 metres upstream from the northern side of the bridge carrying the Ashford and Folkestone Railway over that stream, passing westwards under the railways (Works Nos. 16, 16A and 16B) and terminating in that stream at a point 5 metres north of the southern side of the said bridge;
Work No
A railway (1,201 metres in length), forming sidings, commencing by a junction with the Ashford to Canterbury Railway at a point 4 metres south of the southern side of the bridge carrying Hythe Road over that railway, passing southwards, westwards then north-westwards and terminating in the Ashford Goods Yard at a point 200 metres east of the south-western side of the bridge carrying the Ashford to Folkestone Railway over the East Stour river;
Work No
A railway (100 metres in length), forming a cross-over, commencing by a junction with the railway (Work No. 16E) at a point 60 metres west of the junction of Bentley Road with Hunter Avenue and Aylesford Place, passing south-eastwards and terminating by a junction with the railway (Work No. 16A) at a point 85 metres south of that road junction;
Work No
A railway (12,300 metres in length) commencing by a junction with the railway (Work No. 16) at its termination, passing south-eastwards on the northern side of the Ashford and Folkestone Railway, under Bad Munstereifel Road (Work No. 17A) and Highfield Lane (Work No. 17C), over Blind Lane (Work No. 17D), then in tunnel beneath Church Road, Mersham for a distance of 160 metres, then passing eastwards, under Station Road, Smeeth (Work No. 17H), over Church Lane, Sellindge, (Work No. 17K), then on the southern side of the Sellindge Converter Station, under Harringe Lane (Work No. 17L), over the A20 (Ashford Road) at Sellindge (Work No. 17M) and the East Stour River west of Stone Street, Westenhanger, under the B2068 Link Road (Work No. 17P) and the A20 (Ashford Road) (Work No. 17Q) to a point alongside the western portal of the tunnel on the Ashford and Folkestone Railway beneath the access to Sandling Park, then in tunnel for a distance of 90 metres beneath that access and terminating at a point 427 metres east of the eastern portal of that tunnel at the access to Sandling Park, including bridges over Works Nos. 17D, 17K and 17M;
Work No
Realignment of Bad Munstereifel Road, including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge over that railway, commencing in that road at a point 330 metres north-east of the north-eastern abutment of the said existing bridge passing south-westwards over the two railways and terminating in that road at a point 420 metres south-west of the south-western abutment of that existing bridge;
Work No
Diversion of Highfield Lane and Church Road north of the bridge carrying Highfield Lane over the Ashford and Folkestone Railway, commencing in Church Road at a point 260 metres south of its junction with Bad Munstereifel Road, passing southwards, then eastwards on the line of Church Road to its junction with Highfield Lane, then passing north-eastwards on the line of that road to a point 120 metres north-east of that road junction, then passing eastwards and terminating by a junction with Highfield Lane (Work No. 17C) at a point 120 metres south-west of the commencement of that work;
Work No
A new road, forming a diversion of Highfield Lane and Church Road, including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge carrying Highfield Lane over that railway, commencing by a junction with Highfield Lane at a point 260 metres north-east of its existing junction with Church Road, passing westwards, then south-westwards and southwards on the eastern side of the existing road, over the two railways, and terminating by a junction with Highfield Lane at a point 40 metres south of the access from that road to The Dean;
Work No
A road for access to premises on the eastern side of Highfield Lane south of the Ashford and Folkestone Railway, commencing by a junction with the new road (Work No. 17C) at a point 100 metres north of the termination of that work, passing eastwards and terminating by a junction with the remaining part of Highfield Lane at a point 80 metres north of the access to The Dean;
Work No
Realignment of Blind Lane commencing in that road at a point 180 metres north-east of the existing bridge carrying the Ashford and Tonbridge Railway over that road, passing under that railway and the railway (Work No. 17) and terminating in Blind Lane at a point 90 metres south-west of the said existing bridge;
Work No
A tunnel over the Ashford and Folkestone Railway coterminous with the tunnel forming part of the railway (Work No. 17), beneath Church Road, Mersham (Work No. 17F);
Work No
A road, forming a diversion of Church Road, Mersham, commencing in that road at a point 240 metres south-west of its junction with Bower Road, passing south-westwards and southwards on the eastern side of the existing road, over the railway (Work No. 17) in tunnel and the Ashford and Folkestone Railway in tunnel (Work No. 17E), and terminating in Church Road at a point 190 metres north of its junction with Jemmett Lane;
Work No
A road for access to premises on the western side of Church Road, Mersham, north of the Ashford and Folkestone Railway, commencing in the remaining part of Church Road at a point opposite Bridge Cottage and terminating by a junction with Church Road (Work No. 17F) at a point 180 metres south-west of its commencement;
Work No
Diversion of the B2069 (Station Road, Smeeth), including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge carrying that road over that railway, commencing in Station Road at a point 260 metres south-west of the access to Park Wood Cottage, passing northwards on the western side of the existing road over the two railways, and terminating in Station Road at a point 130 metres north of the northern abutment of that existing bridge;
Work No
A cut, forming a diversion of a tributary of the East Stour River west of Church Lane, Sellindge, commencing in that stream at a point 130 metres east of the northern end of the culvert by which it passes under the Ashford and Folkestone Railway, passing westwards, then southwards and terminating in that stream at a point 10 metres north of the northern end of that culvert;
Work No
A cut, forming a diversion of the East Stour River, commencing in that river at a point 60 metres south-west of the southern end of the culvert by which that river passes under the Ashford and Folkestone Railway 290 metres east of Grove Bridge, passing eastwards then southwards and terminating in that river at a point 80 metres south of the southern end of the culvert by which that river passes under that railway 750 metres east of Grove Bridge;
Work No
A cut, forming a diversion of the East Stour River at Westenhanger, commencing in that river at the northern end of the culvert by which that river passes under the Ashford and Folkestone Railway west of Stone Street, passing eastwards on the northern side of the railway (Work No. 17), and terminating in that river at a point 170 metres north-east of that commencement;
Work No
A diversion of Church Lane, Sellindge, commencing in that road at a point 20 metres north of the northern side of the existing bridge carrying the Ashford and Folkestone Railway over that road, passing south-eastwards under the railway (Work No. 17) and the Ashford and Folkestone Railway and terminating in Church Lane at a point 280 metres south of the southern side of that existing bridge;
Work No
A realignment of Harringe Lane, including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge carrying that road over that railway, commencing in that road at a point 50 metres north of the northern end of the bridge carrying that road over the M20, passing southwards over the motorway and over the two railways and terminating in Harringe Lane at a point 50 metres north of the bridge carrying that road over the East Stour River;
Work No
Realignment of the A20 (Ashford Road) at Sellindge commencing in that road at the southern side of the bridge carrying the M20 over that road, passing southwards on the line of the A20, under the railway (Work No. 17) and the Ashford and Folkestone Railway, and terminating in that road at a point 50 metres south of the southern side of the bridge carrying that last-mentioned railway over that road;
Work No
A road commencing by a junction with Stone Street at a point 80 metres west of the southern end of the bridge carrying the emergency services access road over the M20 at Stanford, passing south-eastwards then eastwards on the northern side of the railway (Work No. 17), then northwards, and terminating by a junction with the roundabout at Junction 11 of the M20 at a point 70 metres west of the junction with that roundabout of the westbound slip road of the B2068 Link Road;
Work No
Realignment of the B2068 Link Road, including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge carrying that road over that railway, commencing in that road at the existing junction of that road with the roundabout at Junction 11 of the M20, passing southwards over those two railways and terminating in that road at the existing roundabout at its junction with the A20 (Ashford Road);
Work No
Diversion of the A20 (Ashford Road) at Sandling, including a bridge over the railway (Work No. 17) and the Ashford and Folkestone Railway in place of the existing bridge carrying that road over that railway, commencing in that road at the existing roundabout at its junction with the B2068 Link Road, passing north-eastwards over those two railways and terminating in that road at a point 220 metres north-east of the northern abutment of that existing bridge;
Work No
A railway (3,476 metres in length) commencing by a junction with the railway (Work No. 17) at its termination, passing eastwards under Sandling Road (Work No. 18H) on the northern side of the Ashford and Folkestone Railway and the northern side of the Dollands Moor Freight Yard, then under the roundabout (part of Work No. 18J) and terminating at a point on the western side of the M20 at Newington 215 metres south-west of the junction of Newington Road with the A20;
Work No
A railway (1,700 metres in length) commencing by a junction with the railway (Work No. 18A) at its termination, passing eastwards over the M20 and the A20 and an access road within the Channel Tunnel Terminal and terminating by a junction with the Eurotunnel Railway at a point 1,430 metres east of the western end of the bridge carrying that railway over the A20, including bridges over the M20, the A20 and the said access road;
Work No
A railway (4,400 metres in length) commencing by a junction with the railway (Work No. 17) at its termination, passing eastwards on the northern side of the Ashford and Folkestone Railway, under Sandling Road (Work No. 18H), then over the Saltwood Tunnel on that railway, continuing on the southern side of that railway and the Dollands Moor Freight Yard, over the railway (Work No. 18E), under the B2065 (Hythe Road) (Work No. 18J), on existing bridges over the M20 and the A20 and terminating by a junction with the Eurotunnel Railway at a point 570 metres east of the eastern end of the bridge carrying that railway over the A20, including a bridge over Work No. 18E;
Work No
A railway (1,591 metres in length) commencing by a junction with the railway (Work No. 18B) at chainage 369 metres, passing eastwards on the southern side of the railway (Work No. 18A), then south-eastwards and terminating by a junction with the northern sidings of the Dollands Moor Freight Yard at a point 370 metres east of the eastern portal of the Saltwood Tunnel;
Work No
A railway (352 metres in length) commencing by a junction with the railway (Work No. 18A) at chainage 588 metres, passing eastwards and terminating by a junction with the railway (Work No. 18C) at chainage 571 metres;
Work No
A deviation railway (2,136 metres in length), forming a diversion of the Ashford and Folkestone Railway, commencing by a junction with that railway at the eastern portal of the Saltwood Tunnel, passing eastwards under the railway (Work No. 18B) and the B2065 (Hythe Road) (Work No. 18J) and terminating by a junction with the Ashford and Folkestone Railway at a point 470 metres west of the bridge carrying Cheriton High Street over that railway;
Work No
A railway (1,423 metres in length) commencing by a junction with the railway (Work No. 18E) at chainage 150 metres, passing eastwards under the B2065 (Hythe Road) (Work No. 18J), and terminating by a junction with the Eurotunnel Railway at a point 365 metres east of the existing bridge carrying that road over the Dollands Moor Freight Yard;
Work No
A railway (1,272 metres in length) commencing by a junction with the railway (Work No. 18E) at chainage 750 metres, passing eastwards under the B2065 (Hythe Road) (Work No. 18J) and terminating by a junction with the railway (Work No. 18B) at a point 90 metres east of the western end of the bridge carrying that railway over the M20;
Work No
Realignment of Sandling Road, including a bridge over the railways (Works Nos. 18A and 18B), commencing in that road at the bridge carrying that road over the Ashford and Folkestone Railway, passing north-westwards over those railways and terminating in Sandling Road at a point 140 metres south-east of the junction of that road with the A20 (Ashford Road), including a bridge over Works Nos. 18A and 18B;
Work No
Realignment of the B2065 (Hythe Road), including a roundabout at the junction of that road with the exit slip road from the Channel Tunnel Terminal (Work No. 18K) and bridges carrying that roundabout over the railway (Work No. 18A), commencing in the B2065 at a point 183 metres south of the centre of the roundabout at the Beechborough Cross Roads, passing southwards over Work No. 18A, then on viaduct over Dollands Moor Freight Yard and over the railways (Works Nos. 18B, 18E, 18F and 18G) and terminating in the B2065 at a point 215 metres north of its junction with the bridleway HE 260, including the said roundabout bridges and viaduct;
Work No
A road commencing by a junction with the north-eastern side of the roundabout (part of Work No. 18J), passing north-eastwards and eastwards and terminating by a junction with the exit slip road from the Channel Tunnel Terminal at a point 250 metres from the western end of the bridge carrying that road over the M20;
Work No
A railway (1,050 metres in length), forming a diversion of the northbound track of the West London Line between North Pole Junction and Kensington Olympia, commencing by a junction with that railway at a point 25 metres south-east of the bridge over that railway beneath Westway west of the junction of that road with West Cross Route, passing south-eastwards on the western side of that railway under the bridge carrying the Hammersmith and City Line of the London Underground over that railway and terminating by a junction with the West London Line at a point 170 metres north of the northern portal of the tunnel in which that railway passes beneath the junction of West Cross Route with Holland Park Avenue, Shepherds Bush Green and the Uxbridge Road;
Work No
A railway (715 metres in length), forming a siding of the West London Line, commencing by a junction with the railway (Work No. 19) at its commencement, passing south-eastwards on the eastern side of that railway, under the bridge carrying the Hammersmith and City Line of the London Underground over that railway and terminating at a point 258 metres south of the southern side of the said railway bridge;
Work No
A railway (1,111 metres in length), forming sidings of the Gravesend and Higham Railway at Hoo Junction, commencing by a junction with that railway on the eastern side of the Queens Farm Road level crossing on that railway, passing eastwards on the northern side of that railway, then north-eastwards on the southern side of the Grain Branch of that railway and terminating at a point 120 metres south of the south-western abutment of the bridge carrying that railway over the former Thames and Medway Canal;
Work No
A railway (827 metres in length), forming sidings of the Gravesend and Higham Railway at Hoo Junction, commencing by a junction with that railway on the eastern side of the Queens Farm Road level crossing on that railway, passing eastwards then south-eastwards on the southern side of that railway and terminating at the eastern end of the existing siding of that railway, including railway sidings;
Work No
A railway (1,139 metres in length), forming sidings at the Richborough Power Station at Stonelees, commencing by a junction with the Margate and Dover Railway at a point 530 metres north-west of the north-western abutment of the bridge carrying that railway over the River Stour, passing south-eastwards and terminating at a point 470 metres west of the north-western end of the culvert carrying the A256 (Ramsgate Road) over Minster Stream, including railway sidings.
The Table — Buildings Authorised to be Demolished
The Table — Buildings Authorised to be Extended and Altered
Ancient monuments etc.
Work No
Improvement of the A2 between its junction with Halfpence Lane (C492) and its junction with the M2 at Junction 1, comprising—
Work No
Improvement and realignment of the eastbound carriageway of the A2 commencing at a point 115 metres east of the bridge carrying Brewers Road over that road, passing eastwards and terminating at a point 100 metres west of the bridge carrying the westbound slip road of the A2 over the M2 at Junction 1;
Work No
Improvement and realignment of the westbound carriageway of the A2 commencing at a point 340 metres west of the said bridge carrying Brewers Road over that road, passing eastwards and terminating at a point 220 metres west of the bridge carrying the said westbound slip road over that road;
Work No
Improvement of the junction of Halfpence Lane (C492) and Brewers Road with the A2 at Cobham Junction, comprising—
Work No
A road, forming an entry slip road to the eastbound carriageway of the A2 (Work No. 31A), commencing by a junction with Brewers Road at a point 150 metres north-east of the north-eastern abutment of the bridge carrying that road over the A2, passing southwards and terminating by a junction with that carriageway at a point 410 metres east of that bridge;
Work No
A road, forming an exit slip road from the westbound carriageway of the A2 (Work No. 31B), commencing by a junction with the C492 at a point 150 metres south-west of the existing junction of Brewers Road with that road, passing northwards, then north-eastwards over the railway (Work No. 12) in tunnel, and terminating by a junction with that carriageway at a point 20 metres west of the said bridge over the A2, including a roundabout at the junction of the slip road with Brewers Road (Work No. 32C);
Work No
A road, forming an entry slip road to the westbound carriageway of the A2 from the C492 commencing at a point 30 metres south-east of that carriageway, passing southwards over the railway (Work No. 12), passing eastwards through the roundabout (part of Work No. 32B) along Brewers Road and terminating at a point 160 metres west of the said roundabout, including a bridge over Work No. 12;
Work No
Improvement of the M2 between Junction 1 and Junction 2, comprising—
Work No
Improvement and realignment of the M2 to form the eastbound carriageway of the motorway, commencing by a junction with Work No. 31A at its termination, passing south-eastwards under the A2 (Work No. 35A) at Junction 1 of the M2, over the existing subway by which footpath NS 183 passes under the M2, then over the road (Work No. 36E) and under Rochester Road (Work No. 36F) and the cycle track (Work No. 36G), over the London and Chatham Railway and terminating on the existing bridge carrying the M2 over that railway at a point 20 metres south-east of that railway, including a bridge over Work No. 36E;
Work No
A road, forming the westbound carriageway of the M2, commencing by a junction with Work No. 31B at its termination, passing south-eastwards under the A2 (Work No. 35A) at Junction 1 of the M2, over footpath NS 183, then over Work No. 36E and under Work No. 36F and Work No. 36G, over the London and Chatham railway and terminating at a point 180 metres south-east of that railway, including bridges over Work No. 36E and the said railway and extension of the subway for the footpath NS 183;
Work No
Improvement of Junction 1 of the M2 comprising—
Work No
A road, forming the exit slip road from the eastbound carriageway of the A2, commencing by a junction with that carriageway (Work No. 31A) at a point 210 metres west of the existing bridge carrying the footpath between Park Pale and the Rochester and Cobham Park Golf Course, passing eastwards and terminating in the A2 at a point 20 metres east of the junction of Crutches Lane with that road;
Work No
A road, forming the entry slip road to the eastbound carriageway of the M2, commencing at a point on the northern side of Old Watling Street 270 metres east of its junction with Bowesden Lane and terminating in the M2 (Work No. 33A) at a point 30 metres north-west of the bridge carrying the A2 (Work No. 35A) over the M2;
Work No
A road, forming the exit slip road from the westbound carriageway of the M2, commencing in the intended eastbound entry slip road to the Wainscott Northern Bypass at a point 435 metres east of the bridge carrying the said footpath between Park Pale and the Rochester and Cobham Park Golf Course over the M2 and terminating in the M2 (Work No.33B) at a point 190 metres from that commencement;
Work No
Roads between the junction of the A2 and Halfpence Lane (C492) and Junction 1 of the M2, comprising—
Work No
Diversion of the A2 at Junction 1 commencing in the westbound carriageway of the A2 (Work No. 31B) at a point 660 metres east of the existing bridge carrying Brewers Road over the A2, passing eastwards on the southern side of the A2, then north-eastwards over the M2 (Works Nos. 33A and 33B) on the northern side of the existing bridge carrying the westbound slip road from the A2 over the M2, continuing eastwards and terminating in the westbound carriageway of the A2 at a point 20 metres east of the junction of Crutches Lane with that road, including bridges over Works Nos. 33A and 33B;
Work No
A road, forming a diversion of the access road to the Colewood Reservoirs of Southern Water Services Limited, commencing by a junction with the new road (Work No. 35A) at a point 230 metres west of the junction of the existing access road with the A2, passing southwards then eastwards and terminating by a junction with the existing access on the northern side of those reservoirs;
Work No
Improvement of Junction 2 of the M2, comprising—
Work No
A road, forming the exit slip road from the eastbound carriageway of the M2 (Work No. 33A) at Junction 2, commencing by a junction with that carriageway at a point 550 metres north-west of the existing subway by which the footpath RS 203 passes under the M2, passing south-eastwards and terminating at the eastern junction roundabout (part of Work No. 36E);
Work No
A road, forming the entry slip road to the eastbound carriageway of the M2 (Work No. 33A) at Junction 2, commencing at the said eastern junction roundabout (part of Work No. 36E), passing southwards under Rochester Road (Work No. 36F) and the cycle track (Work No. 36G), over the London and Chatham Railway and terminating by a junction with Work No. 33A at its termination;
Work No
A road, forming the entry slip road on to the westbound carriageway of the M2 (Work No. 33B) at Junction 2, commencing by a junction with that carriageway at a point 590 metres north-west of the southern end of the said existing subway, passing south-eastwards under the railway (Work No. 13) and terminating at the western junction roundabout (part of Work No. 36E);
Work No
A road, forming the exit slip road from the westbound carriageway of the M2 (Work No. 33B) at Junction 2, commencing at the western junction roundabout (part of Work No. 36E), passing south-eastwards under the railway (Work No. 13), under Rochester Road (Work No. 36F) and the cycle track (Work No. 36G) and over the London and Chatham Railway and terminating by a junction with the westbound carriageway (Work No. 37B) at a point 160 metres south-east of that railway, including a bridge over the London and Chatham Railway;
Work No
A road, forming dual carriageways, commencing by junctions with Work No. 36A at its termination and Work No. 36B at its commencement at the eastern junction roundabout, the centre of which is at a point 180 metres south of the junction of Bootham Close with Rushdean Road, passing south-westwards under the M2 (Works Nos. 33A and 33B) and the railway (Work No. 13) to junctions with Work No. 36C at its termination and Work No. 36D at its commencement at the western junction roundabout, the centre of which is at a point 355 metres south-west of the junction of Bootham Close with Rushdean Road, then passing southwards and terminating by a junction with the A228 (Rochester Road) (Work No.38F) at a roundabout, the centre of which is at a point 190 metres north-east of the northern end of the existing bridge carrying the A228 over the London and Chatham Railway, including those roundabouts;
Work No
A road, being a diversion of the A228, commencing in that road at the northern end of the said bridge carrying that road over the London and Chatham Railway, passing north-eastwards over the cycle track (Work No. 36H) to the roundabout (part of Work No. 36E), then north-eastwards over the railway (Work No. 13) and the M2 (Works Nos. 36B, 33A, 33B and 36D), over the cycle track (Work No. 36J) and terminating in the A228 at a point 30 metres south-west of the junction of Roman Way with that road, including bridges over Works Nos. 13, 33A, 33B, 36B, 36D 36H and 36J;
Work No
A cycle track on the southern side of the A228 (Work No. 36F) commencing by a junction with that work at a point 45 metres north-east of its commencement, passing north-eastwards on the eastern side of Work No. 36F to a junction with the cycle track (Work No. 36H), then over Work No. 13, the M2 and Work No. 36J and terminating by a junction with the A228 at a point 370 metres south-west of the termination of Work No. 36F;
Work No
A cycle track commencing by a junction with the A228 (Work No. 36F) at a point 60 metres north-east of its commencement, passing northwards then eastwards and south-eastwards under the A228 and terminating by a junction with Work No. 36G at a point 90 metres north-east of the commencement of that work;
Work No
A cycle track commencing by a junction with the A228 (Work No. 36F) at a point 370 metres south-west of its termination, passing westwards then southwards under the A228 and terminating by a junction with the cycle track (Work No. 36K) at a point 180 metres north-east of the termination of that work;
Work No
Realignment and improvement of the cycle track between the A228 and the bridge carrying the M2 over the River Medway, commencing by a junction with the cycle track (Work No. 36G) at a point 45 metres south-west of its termination, passing southwards to a junction with the cycle track (Work No. 36J), then south-westwards and south-eastwards and terminating by a junction with the existing cycle track at a point 5 metres south-east of the western abutment of the bridge carrying the M2 over the London and Chatham Railway;
Work No
Improvement of the M2 between Junctions 2 and 3, comprising—
Work No
Improvement and realignment of the M2 to form the eastbound carriageway of the motorway, commencing by a junction with Work No. 33A at its termination, passing south-eastwards on the existing viaduct over the Strood and Maidstone Railway and the River Medway, then over Wouldham Road (Work No. 38B) and under Work No. 38F, then continuing south-eastwards to Junction 3 (Work No. 39), under the A229 (Work No. 40A) east of Buckmore Park, the new roundabout (Work No. 39E) and Robin Hood Lane (Work No. 41C) and over footpath MR 440 and terminating at a point 145 metres south-west of the junction of Woodbury Road with Walderslade Woods, including a bridge over Work No. 38B;
Work No
A road, forming the westbound carriageway of the M2, commencing by a junction with Work No. 33B at its termination, passing south-eastwards on viaduct over the Strood and Maidstone Railway and the River Medway, then over Work No. 38B and under Work No. 38F, then continuing south-eastwards to Junction 3 (Work No. 39), under Works Nos. 40A, 39E and 41C and over footpath MR 440 and terminating at a point 205 metres south of the junction of Woodbury Road with Walderslade Woods, including the said viaduct and a bridge over Work No. 38B and extension of the underpass for the said footpath;
Work No
Roads between Junctions 2 and 3 of the M2, comprising—
Work No
A road, for construction purposes, commencing at a point 300 metres north-west of the western abutment of the bridge carrying the M2 over Wouldham Road (Work No. 38B), passing south-eastwards on the northern side of Work No. 37A and terminating by a junction with Work No. 38B at a point 30 metres north-west of the M2 eastbound carriageway;
Work No
Realignment of Wouldham Road commencing in that road at a point 20 metres north-east of the northern side of the existing bridge carrying the M2 over that road, passing south-westwards under Works Nos. 37A and 37B and terminating in Wouldham Road at a point 35 metres north-east of the junction of Burham Road with that road;
Work No
A road, forming a diversion of Nashenden Farm Lane and the access to Waterworks Cottages, commencing by a junction with Wouldham Road (Work No. 38B) at a point 110 metres south-west of its commencement, passing south-eastwards on the southern side of the M2 to a junction with Nashenden Farm Lane at a point 65 metres north-east of the access to Nashenden Farm Cottages, continuing southwards and terminating at a point 20 metres south-east of the entrance to Waterworks Cottages;
Work No
A road, for construction purposes, forming a diversion of the access to Nashenden Farm and Borstal Court Farm, commencing in Burham Road (Work No. 13B) at a point 100 metres south-east of the commencement of that work, passing eastwards, then south-eastwards on the southern side of Work No. 38C and terminating by a junction with the new road (Work No. 38C) at a point 225 metres from the commencement of that work;
Work No
A road, forming a diversion of the access track from the Roman Burial grounds to Stony Lane, commencing at a point 30 metres north of the existing bridge carrying that track over the M2, passing south-eastwards and terminating by a junction with Stony Lane (Work No. 38F) at a point 325 metres from its commencement;
Work No
A road, forming a diversion of bridleway MR11 (Stony Lane) commencing in Maidstone Road at its junction with Stony Lane, passing south-westwards and north-westwards, then south-westwards over the M2 (Works Nos. 37A and 37B), then southwards and terminating by a junction with the new access road (Work No. 13C) at a point 340 metres north-west of the western end of the subway by which Stony Lane passes under the M2, including a bridge over Works Nos. 37A and 37B;
Work No
Improvements of the M2 at Junction 3, comprising—
Work No
Realignment of the exit slip road from the eastbound carriageway of the M2 (Work No. 37A), commencing by a junction with Work No. 37A at a point 185 metres south of the access from Rochester Road to the caravan site on the south side of Rochester Airport, passing south-eastwards under the A229 (Work No. 40A) and terminating at the north-eastern end of the roundabout (Work No. 39E);
Work No
Realignment of the entry slip road to the eastbound carriageway of the M2 (Work No. 37A), commencing at the north-eastern end of the roundabout (Work No. 39E), passing southwards under Robin Hood Lane (Work No. 41C), over footpath MR 440 and terminating by a junction with Work No.37A at a point 145 metres south-west of the junction of Woodbury Road with Walderslade Woods;
Work No
A road, forming the entry slip road to the westbound carriageway of the M2 (Work No. 37B), commencing by a junction with Work No. 37B at a point 230 metres south of the access from Rochester Road to the said caravan site, passing south-eastwards under the A229 (Work No. 40A) and terminating at the south-western end of the roundabout (Work No. 39E);
Work No
A road, forming the exit slip road from the westbound carriageway of the M2 (Work No. 37B), commencing at the south-western end of the roundabout (Work No. 39E), passing south-eastwards under Robin Hood Lane (Work No. 41C), over footpath MR 440 and terminating by a junction with Work No. 37B at a point 205 metres west of the junction of Woodbury Road with Walderslade Woods;
Work No
Improvement of the Taddington Wood Loop Junction, forming a new roundabout over the M2 (Works Nos. 37A and 37B) including two bridges over those works;
Work No
A road commencing at the north-eastern end of the roundabout (Work No. 39E), passing eastwards and terminating by a junction with Walderslade Woods (Work No. 39G) at the Walderslade Woods Roundabout, the centre of which is 160 metres south of the junction of Hurst Hill with Taddington Wood Lane, including the said Walderslade Woods Roundabout;
Work No
Realignment of Walderslade Woods, forming dual carriageways, commencing at a point 140 metres south-east of the junction of that road with Taddington Wood Lane, passing south-eastwards to the roundabout (part of Work No. 39F) then continuing south-eastwards and terminating in Walderslade Woods at a point 310 metres from that commencement;
Work No
A road, forming dual carriageways, commencing at the south-western end of the roundabout (Work No. 39E), passing westwards and north-westwards and terminating by a junction with the A229 at the roundabout (Work No. 40N);
Work No
Realignment of Maidstone Road to form a junction with the new road (Work No. 39H) at Blue Bell Hill, commencing in that road at a point 40 metres north-west of its existing junction with Victoria Close, passing south-eastwards, then southwards to the junction with Work No. 39H, then continuing southwards and south-westwards and terminating in Maidstone Road at a point 120 metres north of its junction with Robin Hood Lane;
Work No
Improvements of the A229 at Junction 3 of the M2, comprising—
Work No
Improvement and realignment of the A229 (Maidstone Road), forming dual carriageways, commencing at a point 345 metres north of the existing Bridgewood Roundabout at the junction of that road with Walderslade Woods and Rochester Road, passing southwards over the new roundabout at that road junction (Work No. 40F), the M2 (Works Nos. 37A, 37B, 39A and 39C), then under the roundabout (Work No. 40N) and terminating at a point 10 metres north of the bridge carrying Common Road over the A229, including bridges over Works Nos. 40F, 37A, 37B, 39A and 39C;
Work No
A road, forming the southbound exit slip road from the A229 (Work No. 40A), commencing by a junction with that road at a point 280 metres north of the existing Bridgewood Roundabout, passing southwards and terminating at the eastern end of the roundabout (Work No. 40F);
Work No
A road, forming the southbound entry slip road to the A229 (Work No. 40A), commencing at the eastern end of the roundabout (Work No. 40F), passing southwards and terminating by a junction with Work No. 40A at a point 145 metres south of the existing Bridgewood Roundabout;
Work No
A road, forming the northbound entry slip road to the A229 (Work No. 40A), commencing by a junction with that road at a point 280 metres north of the said existing Bridgewood Roundabout, passing southwards and terminating at the western end of the roundabout (Work No. 40F);
Work No
A road, forming the northbound exit slip road from the A229 (Work No. 40A), commencing at the western end of the roundabout (Work No. 40F), passing southwards and terminating by a junction with Work No. 40A at a point 145 metres south of the existing Bridgewood Roundabout;
Work No
A roundabout (the Bridgewood Roundabout) at the junction of Walderslade Woods, Rochester Road and the A229;
Work No
Realignment of Rochester Road commencing in that road at a point 160 metres north-west of its junction with the A229 at the existing Bridgewood Roundabout, passing south-eastwards and terminating at the western end of the roundabout (Work No. 40F);
Work No
Improvement and realignment of Walderslade Woods forming dual carriageways, commencing at the eastern end of the roundabout (Work No. 40F), passing eastwards and terminating in Walderslade Woods at a point 100 metres east of that commencement;
Work No
A road, forming the southbound exit slip road from the A229 (Work No. 40A), commencing by a junction with that road at a point 270 metres north of the intended Lord Lees Roundabout (Work No. 40N), passing southwards and terminating at the eastern end of that roundabout;
Work No
A road, forming the southbound entry slip road to the A229 (Work No. 40A), commencing at the eastern end of the intended Lord Lees Roundabout (Work No. 40N), passing southwards and terminating by a junction with Work No. 40A at a point 80 metres north-west of the bridge carrying Common Road over the A229;
Work No
A road, forming the northbound entry slip road to the A229 (Work No. 40A), commencing by a junction with that road at a point 300 metres north of the intended Lord Lees Roundabout (Work No. 40N), passing southwards and terminating at the western end of that roundabout;
Work No
A road, forming the northbound exit slip road from the A229 (Work No. 40A), commencing at the western end of the Roundabout (Work No. 40N), passing southwards and terminating by a junction with Work No. 40A at a point 70 metres north-east of the bridge carrying Common Road over the A229;
Work No
A roundabout (Lord Lees Roundabout) over the A229 (Work No. 40A) at Blue Bell Hill, including two bridges over Work No. 40A;
Work No
A road, forming an access road to the Buckmore Park Activity Centre and an access way for cycles and pedestrians at Shall Hook Wood, commencing in the existing access road at a point 250 metres north of the centre of the existing Lord Lees Roundabout, passing southwards and south-westwards on the western side of the slip road (Work No. 40L) and terminating at the western end of the roundabout (Work No. 40N);
Work No
A road, forming an access road to the premises known as Nil Desperandum, commencing by a junction with the access road (Work No. 40P) at a point 40 metres west of the termination of that work, passing north-eastwards and terminating in the curtilage of those premises;
Work No
An access way to land on the northern side of the Common Road Sports Ground, commencing by a junction with the access way (Work No. 40S) at a point 90 metres north of the termination of that work, passing southwards on the western side of that work and Work No. 40M and terminating in the existing access way at a point 30 metres north of the said land;
Work No
A road, forming an access way for cycles and pedestrians, commencing by a junction with the access road (Work No. 40P) at a point 30 metres from the termination of that work, passing southwards and south-eastwards and terminating by a junction with the slip road (Work No. 40M) at a point 250 metres from the termination of that work;
Work No
Associated works connected with improvements at Junction 3 of the M2, comprising—
Work No
A road, forming a southern extension of Hallsfield Road, commencing at a point 30 metres east of the western end of that road east of Maidstone Road, passing westwards, then southwards and terminating at a point 260 metres south of that commencement;
Work No
Realignment of Hallsfield Road commencing at a point 30 metres west of the junction of that road with Sadlers Close and terminating in Hallsfield Road at a point 95 metres north-west of that road junction;
Work No
Realignment of Robin Hood Lane commencing at a point 60 metres west of the existing junction of that road with the access road to the Medway Crematorium, passing eastwards over the M2 (Works Nos. 37A and 37B) and terminating at a point 180 metres east of that commencement, including a bridge over Works Nos. 37A, 37B, 39B and 39D;
Work No
Diversion of the said access road to the Medway Crematorium, commencing by a junction with Robin Hood Lane (Work No. 41C) at a point 15 metres west of its existing junction with that road and terminating in that access road at a point 80 metres south of that commencement;
Work No
Improvement of the M2 between Junctions 3 and 4, comprising —
Work No
Improvement and realignment of the M2, to form the eastbound carriageway of that motorway, commencing by a junction with Work No. 37A at its termination, passing under the footpath KH 32 (Work No. 45), over Harp Farm Road (Work No. 43A), and under Lidsing Road and Forge Lane (Works Nos. 43C and 43E) and under Maidstone Road, then passing to Junction 4 (Work No. 44) and terminating at a point 190 metres east of the easternmost bridge at that Junction carrying the A278 (Hoath Way) over the M2, including a bridge over Harp Farm Road;
Work No
A road forming the westbound carriageway of the M2, being in part a new road and in part improvement and realignment of the existing westbound carriageway, commencing by a junction with Work No. 37B at its termination, passing over Work No. 43A, under Works Nos. 43C, 43E and 45 and under Maidstone Road, then passing to Junction 4 (Work No. 44) and terminating at a point 190 metres east of the said bridge over the M2, including a bridge over Harp Farm Road;
Work No
Roads between Junctions 3 and 4, comprising—
Work No
Realignment of Harp Farm Road, commencing at a point 65 metres south of the centre of the roundabout at its junction with Walderslade Woods, passing southwards under the M2 (Works Nos. 42A and 42B) and terminating at a point 50 metres south-west of its existing junction with Yelsted Lane;
Work No
A road, forming a diversion of Yelsted Lane, commencing by a junction with Harp Farm Road (Work No. 43A) at a point 10 metres south of its existing junction with that road, passing eastwards on the southern side of the M2 (Work No. 42B) and terminating in Yelsted Lane at a point 345 metres east of that commencement;
Work No
Realignment of Lidsing Road commencing at a point 260 metres south of the southern end of the existing bridge carrying that road over the M2, passing northwards over the M2 (Works Nos. 42A and 42B) and terminating at a point 70 metres south of the junction of that road with Westfield Sole Road and Blind Lane, including a new bridge over Works Nos. 42A and 42B;
Work No
Realignment of an existing track between Blind Lane and Forge Lane on the northern side of the M2 (Work No. 42A), commencing at a point 370 metres north-east of the junction of that track with Blind Lane, passing north-eastwards on the northern side of the existing track then northwards and terminating by a junction with Forge Lane (Work No. 43E) at a point 260 metres south-east of its junction with Chapel Lane;
Work No
Realignment of Forge Lane commencing at its junction with Chapel Lane, passing south-eastwards over the M2 (Works Nos. 42A and 42B) and terminating at a point 40 metres south-east of the junction of Forge Lane with Blind Lane on the southern side of the motorway, including a bridge over the M2;
Work No
Improvement of Junction 4 of the M2, comprising —
Work No
Realignment of the exit slip road from the eastbound carriageway of the M2 (Work No. 42A), commencing by a junction with Work No. 42A at a point 390 metres north-east of the existing bridge carrying Forge Lane over the M2, passing under Maidstone Road and terminating at the northern end of the roundabout over the M2 at Junction 4;
Work No
Realignment of the entry slip road to the westbound carriageway of the M2 (Work No. 42B) commencing by a junction with Work No. 42B at a point 155 metres north-east of the said bridge carrying Forge Lane over the M2, passing under Maidstone Road and terminating at the southern end of the roundabout over the M2 at Junction 4.
Work No
Realignment of footpath KH 32, commencing at a point 12 metres south of the southern end of the footbridge carrying footpath KH 32A over Walderslade Wood, passing southwards over the M2 (Works Nos. 42A and 42B) on the eastern side of the existing bridge carrying that footpath over the M2 and terminating at a point 30 metres south of the southern end of that existing bridge, including a bridge over Works Nos. 42A and 42B;
Work No
A cycle track commencing by a junction with the existing cycle track on the western side of the A229 (Maidstone Road) at a point 190 metres north of the centre of the Bridgewood Roundabout, passing westwards and terminating at a point on the eastern side of Rochester Road 200 metres west of the centre of that roundabout.
Editorial notes
[^c1251921]: Act: transfer of functions (26.1.1998) by S.I. 1997/2971, art. 3(3)(b)(4)(5)
[^c1251922]: Act: transfer of rights and obligations (19.2.1999) by S.I. 1999/391, art. 4(2)(4)(6)
[^c1251923]: Act: S.I. 2001/1451 to be construed as one with this Act (22.3.2001) by virtue of art. 15(2) of that S.I.
[^c1251924]: Act wholly in force; Act mainly in force at Royal Assent but see ss. 40, 41, 46 for retrospective in-force dates
[^c1251925]: Power conferred by s. 1 to ceased to have effect (19.2.1999) by S.I. 1999/537, art. 16
[^c1251926]: 1981 c. 67.
[^c1251927]: 1965 c. 56.
[^c1251929]: 1961 c. 33.
[^c1251930]: 1990 c. 8.
[^c1251931]: S. 8 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8 S. 8 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a) S. 8 applied (with modifications) (12.8.2002) by S.I. 2002/1943, art. 15(1)(a)
[^c1251932]: S. 9(1) excluded (17.2.1999) by S.I. 1999/107, reg. 3
[^c1251933]: S.I. 1995/418.
[^c1251934]: 1990 c. 8.
[^c1251936]: Words in s. s. 11(1) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 26(a)
[^c1251937]: Words in s. 11(3)(a) substituted (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 26(b)
[^c1251938]: 1990 c. 8.
[^c1251939]: Definition in s. 11(6) repealed (26.1.1998) by S.I. 1997/2971, art. 6(1), Sch. paras. 25, 26(c)
[^c1251940]: S. 14 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)
[^c1251941]: 1993 c. 43.
[^c1251942]: S. 16 extended (22.3.2001) by S.I. 2001/1451, art. 7(2)
[^c1251943]: 1993 c. 43.
[^c1251944]: S. 17 extended (22.3.2001) by S.I. 2001/1451, art. 7(2)
[^c1251945]: 1993 c. 43.
[^c1251946]: S. 18 extended (22.3.2001) by S.I. 2001/1451, art. 7(2)
[^c1251949]: S. 19 extended (22.3.2001) by S.I. 2001/1451, art. 7(2)
[^c1251950]: Words in s. 19(2)(5)(6) substituted (1.2.2001 subject to transitional provision in Sch. 2 Pt. II of the commencing S.I.) by 2000 c. 38, s. 215, Sch. 16 para. 56; S.I. 2001/57, art. 3, Sch. 2 Pt. I
[^c1251955]: 1986 c. 45.
[^c1251956]: 1993 c. 43.
[^c1251958]: S. 21 extended (22.3.2001) by S.I. 2001/1451, art. 7(2)
[^c1251960]: Words in s. 21(6) and subsection (7) inserted (1.3.2000) by 1998 c. 41, ss. 54, 66(5), Sch. 10 Pt. IV para. 16(2) (with s. 73); S.I. 2000/344, art. 2
[^c1251968]: S. 22 extended (22.3.2001) by S.I. 2001/1451, art. 7(2)
[^c1251983]: S. 23 repealed (1.3.2000) by S.I. 2000/311, art. 31(2)
[^c1251992]: S. 25 repealed (1.3.2000) by S.I. 2000/311, art. 31(2)
[^c1252005]: S. 27 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8 S. 27 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)
[^c1252006]: S. 28 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8 S. 28 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 para. 1(a)
[^c1252007]: 1990 c. 8.
[^c1252017]: S. 29 applied (with modifications) (19.2.1999) by S.I. 1999/537, art. 13(1), Sch. 3 paras. 1-8 S. 29 applied (with modifications) (22.3.2001) by S.I. 2001/1451, art. 15(1), Sch. 3 paras. 1(a), 4(1)
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.