is guilty of an offence and liable on summary conviction to a fine not exceeding level 3 on the standard scale.

Traffic signs

38
  • (1) The promoter may, for the purposes of, or in connection with the construction or operation of, the authorised works, place or maintain traffic signs of a type prescribed by regulations made under section 64(1)(a) (general provisions as to traffic signs) of the 1984 Act or of a character authorised by the Secretary of State on any street specified in column (1) of Schedule 4 (streets subject to alteration of layout) or which gives access to such a street, or on any street in connection with any instrument made under article 39 (traffic regulation) or any other street as reasonably required for conveying information to traffic.
  • (2) The promoter—
  • (a) must consult with the traffic authority as to the placing of signs; and
  • (b) unless the traffic authority is unwilling to do so and subject to any directions given under section 65 (powers and duties of highway authorities as to placing of traffic signs) of the 1984 Act, must enter into arrangements with the traffic authority for the signs to be placed and maintained by the traffic authority.
  • (3) Any power conferred by section 65 of the 1984 Act to give directions to a traffic authority or local traffic authority as to traffic signs includes a power to give directions to the promoter as to traffic signs under this article; and the powers conferred by paragraph (1) are exercisable subject to and in conformity with any directions given under that section.
  • (4) A traffic authority or other authority having power under or by virtue of the 1984 Act to place and maintain, or cause to be placed and maintained, traffic signs on any street referred to in paragraph (1) must consult with the promoter as to the placing of any traffic signs which may affect the authorised works.
  • (5) Expressions used in this article and in the 1984 Act have the same meaning in this article as in that Act.

Traffic regulation

39
  • (1) Subject to the provisions of this article, and the consent of the traffic authority in whose area the street concerned is situated, which consent must not be unreasonably withheld, the promoter may, for the purposes of the authorised works—
  • (a) permit, prohibit or restrict the stopping, waiting, loading or unloading of vehicles in the manner specified in Parts 1 and 2 of Schedule 11 (traffic regulation) on those streets specified in column (2) and along the lengths and between the points specified in column (3) of that Part of that Schedule;
  • (b) make provision as to the movement of vehicular traffic in the manner specified in Part 3 of Schedule 11 on the street specified in column (2) as respects direction to the extent specified in column (3) of that Part of that Schedule; and
  • (c) permit or prohibit driving in the manner specified in Part 4 of Schedule 11 to that street specified in column (2) and along the lengths, between the points to the extent specified in column (3) of that Part of that Schedule.
  • (2) Without limitation on the scope of the specific powers conferred by paragraph (1) but subject to the provisions of this article and the consent of the traffic authority in whose area the street concerned is situated, which consent must not be unreasonably withheld, the promoter may, in so far as may be necessary or expedient for the purposes of, in connection with, or in consequence of the construction, maintenance or operation of the authorised works—
  • (a) revoke, amend or suspend the whole or in part any Order made, or having effect as if made, under the 1984 Act;
  • (b) permit, prohibit or restrict the stopping, waiting, loading or unloading of vehicles on any street;
  • (c) authorise the use as a parking place of any street;
  • (d) restrict the speed of vehicles along a street;
  • (e) make provision as to the direction or priority of vehicular traffic on any street; and
  • (f) permit or prohibit vehicular access to any street,

either at all times or at times, on days or during such periods as may be specified by the promoter.

  • (3) The powers conferred by paragraphs (1) and (2) may be exercised at any time prior to the expiry of 12 months from the opening of the authorised works for public use but subject to paragraph (7) any prohibition, restriction or other provision made under paragraph (1) or (2) may have effect both before and after the expiry of that period.
  • (4) The promoter must consult the chief officer of police and the traffic authority in whose area the street is situated before complying with the provisions of paragraph (5).
  • (5) The promoter must not exercise the powers conferred by paragraph (1) or (2) unless it has—
  • (a) given not less than—
  • (i) 12 weeks’ notice in writing of its intention so to do in the case of a prohibition, restriction or other provision intended to have effect permanently; or
  • (ii) 4 weeks’ notice in writing of its intention so to do in the case of a prohibition, restriction or other provision intended to have effect temporarily,

to the chief officer of police and to the traffic authority in whose area the street is situated; and

  • (b) advertised its intention in such manner as the traffic authority may specify in writing within 28 days of its receipt of notice of the promoter’s intention in the case of sub-paragraph (a)(i), or within 7 days of its receipt of notice of the promoter’s intention in the case of sub-paragraph (a)(ii).
  • (6) Any prohibition, restriction or other provision made by the promoter under paragraph (1) or (2)—
  • (a) has effect as if duly made by, as the case may be—

the traffic authority in whose area the street is situated, as a traffic regulation order under the 1984 Act; or

the local authority in whose area the street is situated, as an order under section 32 of the 1984 Act,

and the instrument by which it is effected may specify savings and exemptions (in addition to those mentioned in Schedule 11) to which the prohibition, restriction or other provision is subject; and

  • (b) be deemed to be a traffic order for the purposes of Schedule 7 to the Traffic Management Act 200423 (road traffic contraventions subject to civil enforcement).
  • (7) Any prohibition, restriction or other provision made under this article may be suspended, varied or revoked by the promoter from time to time by subsequent exercise of the powers conferred by paragraph (2) within a period of 24 months from the opening of the authorised works for public use.
  • (8) Expressions used in this article and in the 1984 Act have the same meaning in this article as in that Act.

Defence to proceedings in respect of statutory nuisance

40
  • (1) Where proceedings are brought under section 82(1) of the Environmental Protection Act 199024 (summary proceedings by person aggrieved by statutory nuisances) in relation to a nuisance falling within paragraph (g) of section 79(1) of that Act (noise emitted from premises so as to be prejudicial to health or a nuisance) no order is to be made, and no fine may be imposed, under section 82(2) of that Act if the defendant shows—
  • (a) that the nuisance relates to premises used by the promoter for the purposes of or in connection with the exercise of the powers conferred by this Order with respect to authorised works; and
  • (b) that the nuisance is attributable to the carrying out of authorised works which are being carried out in accordance with a notice served under section 60, or a consent given under section 61 or 65, of the Control of Pollution Act 1974 25; or
  • (c) that the nuisance is a consequence of the operation of the authorised works and that it cannot reasonably be avoided.
  • (2) The following provisions of the Control of Pollution Act 1974, namely—
  • (a) section 61(9) (consent for work on construction site to include statement that it does not of itself constitute a defence to proceedings under section 82 of the Environmental Protection Act 1990); and
  • (b) section 65(8) (corresponding provision in relation to consent for registered noise level to be exceeded),

do not apply where the consent relates to the use of premises by the promoter for the purposes of or in connection with the exercise of the powers conferred by this Order with respect to works.

  • (3) The provisions of this article do not affect the application to the authorised works of section 122 of the 1993 Act26 (statutory authority as a defence to actions in nuisance, etc.) or any rule of common law having similar effect.

Trespass

41
  • (1) Any person who trespasses on any part of the land occupied by the promoter for the purposes of constructing the scheduled works is guilty of an offence and liable on summary conviction to a fine not exceeding level 3 on the standard scale.
  • (2) No person is to be convicted of an offence under this article unless it is shown that a notice warning the public not to trespass on such land was clearly exhibited and maintained in close proximity to all such land occupied by the promoter.

Disclosure of confidential information

42

A person who—

  • (a) enters a factory, workshop or workplace in pursuance of the provisions of article 14 (protective works to buildings, roads or apparatus of a statutory undertaker) or article 15 (power to survey and investigate land); and
  • (b) discloses to any person any information obtained pursuant to sub-paragraph (a) and relating to any manufacturing process or trade secret,

is guilty of an offence and liable on summary conviction to a fine not exceeding level 3 on the standard scale unless the disclosure is made in the course of that person’s performance of a duty in connection with the purposes for which the person was authorised to enter the land.

Statutory undertakers etc.

43

The provisions of Schedule 12 (provisions relating to statutory undertaker etc.) have effect.

For the protection of specified undertakers

44

The provisions of Schedule 13 (for the protection of specified undertakers) have effect.

For the protection of operators of electronic communications code networks

45

The provisions of Schedule 14 (for the protection of operators of electronic communications code networks) have effect.

For the protection of the Trust

46

The provisions of Schedule 15 (for the protection of the Trust) have effect.

For the protection of the Environment Agency

47

The provisions of Schedule 16 (for the protection of the Environment Agency) have effect.

Certification of plans etc.

48

The promoter must, as soon as practicable after the making of this Order, submit copies of the book of reference, the deposited plans and the deposited sections to the Secretary of State for certification that they are, respectively, true copies of the book of reference, the deposited plans and the deposited sections referred to in this Order; and a document so certified is admissible in any proceedings as evidence of the contents of the document of which it is a copy.

Service of notices

49
  • (1) A notice or other document required or authorised to be served for the purposes of this Order may be served—
  • (a) by post; or
  • (b) with the consent of the recipient and subject to paragraphs (6) to (8) by electronic transmission.
  • (2) Where the person on whom a notice or other document to be served for the purposes of this Order is a body corporate, the notice or document is duly served if it is served on the secretary or clerk of that body.
  • (3) For the purposes of section 7 of the Interpretation Act 197827 as it applies for the purposes of this article, the proper address of any person in relation to the service on that person of a notice or document under paragraph (1) is, if that person has given an address for service, that address, and otherwise—
  • (a) in the case of the secretary or clerk of a body corporate, the registered or principal office of that body; and
  • (b) in any other case, the last known address of that person at the time of service.
  • (4) Where for the purposes of this Order a notice or other document is required or authorised to be served on a person as having any interest in, or as the occupier of, land and the name or address of that person cannot be ascertained after reasonable enquiry, the notice may be served by—
  • (a) addressing it to that person by name or by the description of “owner”, or as the case may be “occupier”, of the land (describing it); and
  • (b) either leaving it in the hands of a person who is or appears to be resident or employed on the land or leaving it conspicuously affixed to some building or object on or near the land.
  • (5) Where a notice or other document required to be served or sent for the purposes of this Order is served or sent by electronic transmission the requirement is taken to be fulfilled where the recipient of the notice or other document to be transmitted has given consent to the use of electronic transmission either in writing or by electronic transmission.
  • (6) Where the recipient of a notice or other document served or sent by electronic transmission notifies the sender within 7 days of receipt that the recipient requires a paper copy of all or any part of that notice or other document the sender must provide such a copy as soon as reasonably practicable.
  • (7) Any consent to the use of electronic communication given by a person may be revoked by that person in accordance with paragraph (8).
  • (8) Where a person is no longer willing to accept the use of electronic transmission for any of the purposes of this Order—
  • (a) that person must give notice in writing or by electronic transmission revoking any consent given by that person for that purpose; and
  • (b) such revocation is final and takes effect on a date specified by the person in the notice but that date must not be less than 7 days after the date on which the notice is given.
  • (9) This article does not exclude the employment of any method of service not expressly provided for by it.

No double recovery

50

Compensation is not payable in respect of the same matter both under this Order and under any other enactment, any contract or any rule of law.

Arbitration

51

Any difference under any provision of this Order, unless otherwise provided for, must be referred to and settled by a single arbitrator to be agreed between the parties or, failing agreement, to be appointed on the application of either party (after giving notice in writing to the other) by the President of the Institution of Civil Engineers.

SCHEDULE 1 — SCHEDULED WORKS

In the City of Leeds—

  • Work No. 1 - A new station entrance building to the south side of Leeds Railway Station incorporating a pedestrian access bridge across the Aire and Calder Navigation and supported on reinforced concrete piles located in the bed of the Aire and Calder Navigation and including escalators and lifts commencing on the west side of the Aire and Calder Navigation at reference point 429872 (easting) and 833155 (northing) and extending in a north westerly direction and terminating on the east side of the Aire and Calder Navigation at reference point 429828 (easting), 433142 (northing).
  • Work No. 1A - A ramped pedestrian footbridge linking Work No. 1 with, and forming a pedestrian access along Dark Neville Street including the removal of the existing pedestrian footbridge commencing at reference point 429866 (easting) and 433168 (northing) and terminating at reference point 429822 (easting) and 433141 (northing).

SCHEDULE 2 — ACQUISITION OF CERTAIN LANDS FOR ANCILLARY WORKS

(1) Area (2) Number of land shown on the deposited plans (3) Purpose for which land may be acquired or used
City of Leeds 103, 104, 105, 106, 109 and 110 Provision of construction and maintenance access, station access and working sites
111 Provision of construction and maintenance access, station access, a working site and oversailing of equipment
146, 147 and 148 Provision of construction and maintenance access, access to Leeds Railway Station, a working site, oversailing of equipment and landscaping

SCHEDULE 3 — STREETS SUBJECT TO STREET WORKS

(1) Area (2) Street subject to street works
City of Leeds Little Neville Street Water Lane Meadow Lane Private footways adjoining Waterman Place

SCHEDULE 4 — STREET SUBJECT TO ALTERATION OF LAYOUT

(1) Street subject to alteration of layout (2) Description of alteration
Little Neville Street Realignment of street and alteration of level of carriageway

SCHEDULE 5 — STREET TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED

(1) Area (2) Street to be stopped up (3) Extent of stopping up (4) New street to be substituted
City of Leeds Pedestrian footbridge spanning the Aire and Calder Navigation in Dark Neville Street Within limits of deviation for the scheduled works Work No. 1A

SCHEDULE 6 — STREETS TO BE TEMPORARILY STOPPED UP

(1) Area (2) Street to be temporarily stopped up (3) Extent of temporary stopping up
City of Leeds Little Neville Street Within Order limits
Dark Neville Street Within Order limits
Neville Street Within Order limits
Footbridge over Aire and Calder Navigation at Waterman’s Place Within Order limits
Meadow Lane Within Order limits
Water Lane Within Order limits
Granary Wharf Piazza Within Order limits
Private footways within Waterman’s Place Within Order limits
Footway adjacent to south bank of Aire and Calder Navigation Between points TS1 and TS2

SCHEDULE 7 — ACCESS TO WORKS

(1) Area (2) Description of access
City of Leeds Meadow Lane Water Lane Little Neville Street

SCHEDULE 8 — MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS OR IMPOSITION OF RESTRICTIVE COVENANTS

Compensation enactments

1

The enactments for the time being in force with respect to compensation for the compulsory purchase of land apply with the necessary modifications as respects compensation in the case of a compulsory acquisition under this Order of a right by the creation of a new right, and in the case of the imposition of a restrictive covenant, as they apply as respects compensation on the compulsory purchase of land and interests in land.

2
  • (1) Without limitation on the scope of paragraph 1, the Land Compensation Act 197328 has effect subject to the modifications set out in sub-paragraphs (2) and (3).
  • (2) In section 44(1) (compensation for injurious affection), as it applies to compensation for injurious affection under section 7 of the 1965 Act as substituted by paragraph 4—
  • (a) for the words “land is acquired or taken” there are substituted the words “a right or restrictive covenant over land is purchased from or imposed on”; and
  • (b) for the words “acquired or taken from him” there are substituted the words “over which the right is exercisable or the restrictive covenant enforceable”.
  • (3) In section 58(1) (determination of material detriment where part of house etc. proposed for compulsory acquisition), as it applies to determinations under section 8 of the 1965 Act as substituted by paragraph 5—
  • (a) for the word “part” in paragraphs (a) and (b) there are substituted the words “a right over or restrictive covenant affecting land consisting”;
  • (b) for the word “severance” there are substituted the words “right over or restrictive covenant affecting the whole of the house, building or manufactory or of the house and the park or garden”;
  • (c) for the words “part proposed” there are substituted the words “right or restrictive covenant proposed”; and
  • (d) for the words “part is” there are substituted the words “right or restrictive covenant is”.

Application of the 1965 Act

3
  • (1) The 1965 Act has effect with the modifications necessary to make it apply to the compulsory acquisition under this Order of a right by the creation of a new right, or to the imposition under this Order of a restrictive covenant, as it applies to the compulsory acquisition under this Order of land, so that, in appropriate contexts, references in that Act to land are to be read (according to the requirements of the particular context) as referring to, or as including references to—
  • (a) the right acquired or to be acquired or the restrictive covenant imposed or to be imposed; or
  • (b) the land over which the right is or is to be exercisable or the restrictive covenant is or is to be enforceable.
  • (2) Without limitation on the scope of sub-paragraph (1), Part 1 of the 1965 Act applies in relation to the compulsory acquisition under this Order of a right by the creation of a new right or in relation to the imposition of a restrictive covenant, with the modifications specified in the following provisions of this Schedule.
4

For section 7 of the 1965 Act (measure of compensation in case of severance) there is substituted the following section—

(7) In assessing the compensation to be paid by the acquiring authority under this Act regard must be had not only to the extent (if any) to which the value of the land over which the right is to be acquired or the restrictive covenant is to be imposed is depreciated by the acquisition of the right or the imposition of the restrictive covenant but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act.

5

For section 8 of the 1965 Act (other provisions as to divided land) there is substituted the following—

(8) (1) Where in consequence of the service on a person under section 5 of this Act of a notice to treat in respect of a right over, or a restrictive covenant affecting, land consisting of a house, building or manufactory or of a park or garden belonging to a house (“the relevant land”)— (a) a question of disputed compensation in respect of the purchase of the right or the imposition of the restrictive covenant would apart from this section fall to be determined by the Upper Tribunal (“the tribunal”); and (b) before the tribunal has determined that question, the tribunal is satisfied that the person has an interest in the whole of the relevant land and is able and willing to sell that interest, and— (i) where that land consists of a house, building or manufactory, that the right cannot be purchased or the restrictive covenant imposed without material detriment to that land; or (ii) where that land consists of such a park or garden, that the right cannot be purchased or the restrictive covenant imposed without seriously affecting the amenity or convenience of the house to which that land belongs, the Leeds Railway Station (Southern Entrance) Order 201329 (“the Order”), in relation to that person, ceases to authorise the purchase of the right and is deemed to authorise the purchase of that person’s interest in the whole of the relevant land including, where the land consists of such a park or garden, the house to which it belongs, and the notice is deemed to have been served in respect of that interest on such date as the tribunal directs. (2) Any question as to the extent of the land in which the Order is deemed to authorise the purchase of an interest by virtue of subsection (1) of this section is to be determined by the tribunal. (3) Where in consequence of a determination of the tribunal that it is satisfied as mentioned in subsection (1) of this section the Order is deemed by virtue of that subsection to authorise the purchase of an interest in land, the acquiring authority may, at any time within the period of 6 weeks beginning with the date of the determination, withdraw the notice to treat in consequence of which the determination was made; but nothing in this subsection prejudices any other power of the authority to withdraw the notice.

6

The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say—

  • (a) section 9(4) (failure by owners to convey);
  • (b) paragraph 10(3) of Schedule 1 (owners under incapacity);
  • (c) paragraph 2(3) of Schedule 2 (absent and untraced owners); and
  • (d) paragraphs 2(3) and 7(2) of Schedule 4 (common land),

are modified so as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily acquired or the restrictive covenant which is to be imposed is vested absolutely in the acquiring authority.

7

Section 11 of the 1965 Act (powers of entry) is modified so as to secure that, as from the date on which the acquiring authority has served notice to treat in respect of any right or restrictive covenant, it has power, exercisable in the equivalent circumstances and subject to the equivalent conditions, to enter for the purpose of exercising that right or enforcing that restrictive covenant (which is deemed for this purpose to have been created on the date of service of the notice); and sections 12 (penalty for unauthorised entry) and 13 (entry on warrant in the event of obstruction) of the 1965 Act are modified correspondingly.

8

Section 20 of the 1965 Act (protection for interests of tenants at will etc.) applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right or the enforcement of the restrictive covenant in question.

9

Section 22 of the 1965 Act (interests omitted from purchase) is modified so as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired or to enforce the restrictive covenant imposed, subject to compliance with that section as respects compensation.

SCHEDULE 9 — ACQUISITION OF NEW RIGHTS ONLY

(1) Location (2) Number of land shown on the deposited plans
In the City of Leeds 103, 104, 105, 106, 109, 110, 111

SCHEDULE 10 — LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

(1) Area (2) Number of land shown on the deposited plans (3) Purpose for which temporary possession may be taken (4) Authorised work
City of Leeds 101, 102, 107, 108 Working site and construction access The scheduled works
112 Working site, construction access and oversailing of equipment The scheduled works
113, 114, 119, 130, 138, 152, 156, 158 Oversailing of equipment The scheduled works
115, 118, 120, 121, 123, 124, 125, 126, 127, 128, 131, 137, 142, 143, 144, 145, 153 and 154 Working site, construction access and oversailing of equipment The scheduled works
149, 150 and 151 Working site, construction access, landscaping and oversailing of equipment The scheduled works
155 and 157 Temporary traffic management and oversailing of equipment The scheduled works
122 Construction access, temporary construction moorings and oversailing of equipment The scheduled works
201 Temporary construction moorings The development and use of a construction working site at Water Lane and Meadow Lane
202, 203, 204, 205, 206, 207, 208, 209, 210, 211, 212, 213 and 214 Working site and construction access The development and use of a construction working site at Water Lane and Meadow Lane

SCHEDULE 11 — TRAFFIC REGULATION

Interpretation

In column (1) of each of the tables below, the number before the full stop refers to the relevant sheet number of the traffic regulation and rights of way plans, and the number after the full stop refers to the relevant traffic regulation reference number shown on that sheet. In the event of there being any discrepancy between a provision in this Schedule and the illustration of that provision shown on the traffic regulation and rights of way plans, this Schedule prevails.

PART 1 — NO WAITING AT ANY TIME

(1) No. (2) Road (3) Extent (4) Notes
1.1 Wharf Approach West side from its junction with the Granary Wharf car park in a northerly direction for a distance of 32 metres To maintain vehicular flow
1.2 Wharf Approach South-west side from its junction with the Granary Wharf car park to its junction with Water Lane, a distance of 109 metres To maintain vehicular flow
1.3 Wharf Approach North-east side from its junction with Water Lane in a north-westerly direction for 20 metres To maintain vehicular flow
1.4 Wharf Approach North-east side from a point 26 metres northwest of its junction with Water Lane in a north-westerly direction for a distance of 65 metres To maintain vehicular flow
1.5 Wharf Approach East side from its junction with Canal Wharf in a northerly direction for 11 metres To maintain vehicular flow
1.6 Canal Wharf North side from its junction with Wharf Approach in an easterly direction for a distance of 93 metres To maintain vehicular flow
1.7 Canal Wharf South side from its junction with Wharf Approach in an easterly direction for a distance of 110 metres To maintain vehicular flow
1.8 Canal Wharf North side from a point 92 metres east of its junction with Wharf Approach in a north-easterly direction for 3 metres To maintain vehicular flow
1.9 Canal Wharf North side from a point 98 metres east of its junction with Wharf Approach in a north-westerly direction for 3 metres To maintain vehicular flow
1.10 Canal Wharf South side from a point 108 metres southeast of its junction with Wharf Approach in a south-easterly direction for 6 metres To maintain vehicular flow
1.11 Canal Wharf South side from a point 115 metres east of its junction with Wharf Approach in a south-westerly direction for 6 metres To maintain vehicular flow
1.12 Canal Wharf North side from a point 98 metres east of its junction with Wharf Approach in a south-easterly direction for 70 metres To maintain vehicular flow
1.13 Canal Wharf South side from a point 115 metres east of its junction with Wharf Approach in a south-easterly direction to its junction with Water Lane, a distance of 77 metres To maintain vehicular flow
1.14 Canal Wharf North-east side from a point 163 metres east of its junction with Wharf Approach in a south-easterly direction for 6 metres To maintain vehicular flow
1.15 Canal Wharf North-east side from its junction with Water Lane in a north-westerly direction for 28 metres To maintain vehicular flow
1.16 Wharf Approach East side from its junction with Canal Wharf in a southerly direction for 48 metres To maintain vehicular flow

PART 2 — NO LOADING AT ANY TIME

(1) No. (2) Road (3) Extent (4) Notes
2.1 Wharf Approach West side from its junction with the Granary Wharf car park in a northerly direction for a distance of 32 metres To maintain vehicular flow
2.2 Wharf Approach South-west side from its junction with the Granary Wharf car park to its junction with Water Lane, a distance of 109 metres To maintain vehicular flow
2.3 Wharf Approach North-east side from its junction with Water Lane in a north-westerly direction for 20 metres To maintain vehicular flow
2.4 Wharf Approach North-east side from a point 26 metres northwest of its junction with Water Lane in a north-westerly direction for a distance of 65 metres To maintain vehicular flow
2.5 Wharf Approach East side from its junction with Canal Wharf in a northerly direction for 8 metres To maintain vehicular flow
2.6 Intentionally left blank
2.7 Intentionally left blank
2.8 Canal Wharf North-east side from a point 92 metres southeast of its junction with Wharf Approach in a north-easterly direction for 3 metres. To maintain vehicular flow
2.9 Canal Wharf North side from a point 98 metres south-east of its junction with Wharf Approach in a north-westerly direction for 4 metres. To maintain vehicular flow.
2.10 Canal Wharf South side from a point 108 metres south-east of its junction with Wharf Approach in a south-easterly direction for 6 metres. To maintain vehicular flow.
2.11 Canal Wharf South side from a point 115 metres south-east of its junction with Wharf Approach in a south-westerly direction for 8 metres To maintain vehicular flow.
2.12 Intentionally left blank.
2.13 Intentionally left blank.
2.14 Canal Wharf North-east side from a point 167 metres east of its junction with Wharf Approach in a south-easterly direction for 6 metres To maintain vehicular flow
2.15 Canal Wharf North-east side from its junction with Water Lane in a north-westerly direction for 28 metres To maintain vehicular flow
2.16 Wharf Approach East side from its junction with Canal Wharf in a southerly direction for 48 metres To maintain vehicular flow

PART 3 — PRESCRIBED MOVEMENT OF TRAFFIC

(1) No. (2) Road (3) Extent (4) Notes
3.1 Little Neville Street Compulsory ahead only movement onto Sovereign Street

PART 4 — PROHIBITION OF DRIVING WITH SPECIFIED EXEMPTIONS

(1) No. (2) Road (3) Extent (4) Notes
4.1 Little Neville Street Prohibition of driving between 7am and 10pm except for access to off-street premises, for loading/unloading by goods vehicles between 10am and 4pm, and 7pm and 7am from a point 12 metres south of its junction with Dark Neville Street and to its junction with Neville Street To prevent private vehicles, taxis and private hire vehicles from picking-up or dropping-off passengers to the Leeds Station Southern Entrance

SCHEDULE 12 — PROVISIONS RELATING TO STATUTORY UNDERTAKERS ETC.

Apparatus of statutory undertaker etc. on land acquired

1
  • (1) Sections 271 to 274 of the 1990 Act (power to extinguish rights of statutory undertaker etc. and power of statutory undertaker etc. to remove or re-site apparatus) apply in relation to any land acquired or appropriated by the promoter under this Order subject to the following provisions of this paragraph; and all such other provisions of that Act as apply for the purposes of those provisions (including sections 275 to 278, which contain provisions consequential on the extinguishment of any rights under sections 271 and 272, and sections 279(2) to (4), 280 and 282, which provide for the payment of compensation) have effect accordingly.
  • (2) In the provisions of the 1990 Act, as applied by sub-paragraph (1), references to the appropriate Minister are references to the Secretary of State.
  • (3) Where any apparatus of a public utility undertaker or of a public communications provider is removed in pursuance of a notice or order given or made under section 271, 272 or 273 of the 1990 Act, as applied by sub-paragraph (1), any person who is the owner or occupier of premises to which a supply was given from that apparatus is entitled to recover from the promoter compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of effecting a connection between the premises and any other apparatus from which a supply is given.
  • (4) Sub-paragraph (3) does not apply in the case of the removal of a public sewer but where such a sewer is removed in pursuance of such a notice or order as is mentioned in that paragraph, any person who is—
  • (a) the owner or occupier of premises the drains of which communicated with that sewer; or
  • (b) the owner of a private sewer which communicated with that sewer,

is entitled to recover from the promoter compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of making the drain or sewer belonging to that person communicate with any other public sewer or with a private sewerage disposal plant.

  • (5) The provisions of the 1990 Act mentioned in sub-paragraph (1), as applied by that sub-paragraph, do not have effect in relation to apparatus as respects which paragraph 2, or Part 3 of the 1991 Act, applies.
  • (6) In this paragraph “public communications provider” has the same meaning as in section 151(1) of the 2003 Act.

Apparatus of statutory undertakers etc. in stopped up streets

2
  • (1) Where a street is stopped up under this Order any statutory utility whose apparatus is under, in, upon, along or across the street has the same powers and rights in respect of that apparatus, subject to the provisions of this paragraph, as if this Order had not been made.
  • (2) Where a street is stopped up under this Order any statutory utility whose apparatus is under, in, upon, over, along or across the street may, and if reasonably requested to do so by the promoter must—
  • (a) remove the apparatus and place it or other apparatus provided in substitution for it in such other position as the utility may reasonably determine and has power to place it; or
  • (b) provide other apparatus in substitution for the existing apparatus and place it in that other position.
  • (3) Subject to the following provisions of this paragraph, the promoter must pay to any statutory utility an amount equal to the cost reasonably incurred by the utility in or in connection with—
  • (a) the execution of the relocation works required in consequence of the stopping up of the street; and
  • (b) the doing of any other work or thing rendered necessary by the execution of the relocation works.
  • (4) If in the course of the execution of relocation works under sub-paragraph (2)—
  • (a) apparatus of a better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus; or
  • (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the promoter, or, in default of agreement, is not determined by arbitration to be necessary, then, if it involves cost in the execution of the relocation works exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the statutory utility by virtue of sub-paragraph (3) is to be reduced by the amount of that excess.

  • (5) For the purposes of sub-paragraph (4)—
  • (a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
  • (b) where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.
  • (6) An amount which apart from this sub-paragraph would be payable to a statutory utility in respect of works by virtue of sub-paragraph (3) (and having regard, where relevant, to sub-paragraph (4)) must, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the utility any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.
  • (7) Sub-paragraphs (3) to (6) do not apply where the authorised works constitute major transport works for the purposes of Part 3 of the 1991 Act, but instead—
  • (a) the allowable costs of the relocation works are to be determined in accordance with section 85 of that Act (sharing of cost of necessary measures) and any regulations for the time being having effect under that section; and
  • (b) the allowable costs are to be borne by the promoter and the statutory utility in such proportions as may be prescribed by any such regulations.
  • (8) In this paragraph—
  • “apparatus” has the same meaning as in Part 3 of the 1991 Act;
  • “relocation works” means work executed, or apparatus provided, under sub-paragraph (2); and
  • “statutory utility” means a statutory undertaker for the purposes of the 1980 Act or a public communications provider as defined in paragraph 1(6).

Railway and navigation undertakings

3
  • (1) Subject to the following provisions of this paragraph, the powers under article 6 (power to execute street works)to break up or open a street are not exercisable where the street, not being a highway maintainable at public expense (within the meaning of the 1980 Act)—
  • (a) is under the control or management of, or is maintainable by a railway or tramway undertaker or a navigation authority; or
  • (b) forms part of a level crossing belonging to any such undertakers or to such an authority or to any other person,

except with the consent of the undertakers or authority or, as the case may be, of the person to whom the level crossing belongs.

  • (2) Sub-paragraph (1) does not apply to the carrying out under this Order of emergency works, within the meaning of Part 3 of the 1991 Act.
  • (3) A consent given for the purpose of sub-paragraph (1) may be made subject to such reasonable conditions as may be specified by the person giving it but must not be unreasonably withheld.
  • (4) In this paragraph “navigation authority” means any person who has a duty or power under any enactment to work, maintain, conserve, improve or control any canal or other inland navigation, navigable river, estuary, harbour or dock.

SCHEDULE 13 — FOR THE PROTECTION OF SPECIFIED UNDERTAKERS

1
  • (1) The following provisions , unless otherwise agreed in writing between the promoter and the undertakers concerned, have effect.
  • (2) The provisions of Schedule 12 (provisions relating to statutory undertakers etc.), in so far as they relate to the removal of apparatus, do not apply in relation to apparatus to which this Schedule applies.
2
  • (1) In this Schedule—
  • “alternative apparatus” means alternative apparatus adequate to enable the undertaker in question to fulfil its statutory functions in a manner not less efficient than previously;
  • “apparatus” means— in the case of an electricity undertaker, electric lines or electrical plant (as defined in the Electricity Act 198930) belonging to or maintained by that undertaker; in the case of a gas undertaker, any mains, pipes or other apparatus belonging to or maintained by a gas transporter for the purposes of gas supply; in the case of a water undertaker, any mains, pipes or other apparatus belonging to or maintained by that undertaker for the purposes of water supply; and in the case of a sewerage undertaker— any drain or works vested in the undertaker under the Water Industry Act 199131; and any sewer which is so vested or is the subject of a notice of intention to adopt given under section 102(4) of that Act or an agreement to adopt made under section 104 of that Act, and includes a sludge main, disposal main (within the meaning of section 219 of that Act) or sewer outfall and any manholes, ventilating shafts, pumps or other accessories forming part of any such sewer, drain or works, and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;
  • “functions” includes powers and duties;
  • “in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land; and
  • “undertaker” means— any licence holder within the meaning of Part 1 of the Electricity Act 1989; a gas transporter within the meaning of Part 1 of the Gas Act 198632; a water undertaker within the meaning of the Water Industry Act 1991; and a sewerage undertaker within the meaning of Part 1 of the Water Industry Act 1991, for the area of the authorised works, and in relation to any apparatus, means the undertaker to whom it belongs or by whom it is maintained.
3

This Schedule does not apply to apparatus in respect of which the relations between the promoter and the undertaker are regulated by the provisions of Part 3 of the 1991 Act.

4
  • (1) Where any street is stopped up under article 8 (stopping up of streets), any undertaker whose apparatus is in the street has the same powers and rights in respect of that apparatus as it enjoyed immediately before the stopping up, but nothing in this paragraph affects any right of the promoter or of the undertaker to require the removal of that apparatus under paragraph 6(2) or the power of the promoter to carry out works under paragraph 8.
  • (2) The promoter must give not less than 28 days’ notice in writing of its intention to stop up any street under article 8 to any undertaker whose apparatus is in that street.
5

Regardless of any provision in this Order or anything shown on the deposited plans the promoter must not acquire any apparatus other than by agreement.

6
  • (1) If, in the exercise of the powers conferred by this Order, the promoter acquires any interest in any land in which any apparatus is placed, that apparatus must not be removed under this Schedule and any right of an undertaker to maintain that apparatus in that land must not be extinguished until alternative apparatus has been constructed and is in operation to the reasonable satisfaction of the undertaker in question.
  • (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the promoter requires the removal of any apparatus placed in that land, it must give to the undertaker in question written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order an undertaker reasonably needs to remove any of its apparatus) the promoter must, subject to sub-paragraph (3), afford to the undertaker the necessary facilities and rights for the construction of alternative apparatus in other land of the promoter and for the subsequent maintenance of that apparatus.
  • (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the promoter, or the promoter is unable to afford such facilities and rights as are mentioned in sub-paragraph (2), in the land in which the alternative apparatus or part of such apparatus is to be constructed, the undertaker in question must, on receipt of a written notice to that effect from the promoter, as soon as reasonably possible use its best endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.
  • (4) Any alternative apparatus to be constructed in land of the promoter under this Schedule is to be constructed in such manner and in such line or situation as may be agreed between the undertaker in question and the promoter or in default of agreement settled by arbitration in accordance with article 51 (arbitration).
  • (5) The undertaker in question must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 51, and after the grant to the undertaker of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the promoter to be removed under the provisions of this Schedule.
  • (6) Regardless of anything in sub-paragraph (5), if the promoter gives notice in writing to the undertaker in question that it desires itself to execute any work to which this sub-paragraph applies, that work, instead of being executed by the undertaker, must be executed by the promoter without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of the undertaker.
  • (7) Sub-paragraph (6) applies to any part of any work necessary in connection with construction of alternative apparatus, or the removal of apparatus required to be removed, as will take place in any land of the promoter.
  • (8) Nothing in sub-paragraph (6) authorises the promoter to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 300 millimetres of the apparatus.
7
  • (1) Where, in accordance with the provisions of this Schedule, the promoter affords to an undertaker facilities and rights for the construction and maintenance in land of the promoter of alternative apparatus in substitution for apparatus to be removed, those facilities and rights are to be granted upon such terms and conditions as may be agreed between the promoter and the undertaker in question or in default of agreement settled by arbitration in accordance with article 51 (arbitration).
  • (2) In settling those terms and conditions in respect of the alternative apparatus to be constructed in or along any railway, the arbitrator must—
  • (a) give effect to all reasonable requirements of the promoter for ensuring the safety and efficient operation of the railway and for securing any subsequent alterations or adaptations of the alternative apparatus which may be required to prevent interference with any proposed works of the promoter or the traffic on the railway; and
  • (b) so far as it may be reasonable and practicable to do so in the circumstances of the particular case, give effect to the terms and conditions, if any, applicable to the apparatus constructed in or along the railway for which the alternative apparatus is to be substituted.
  • (3) If the facilities and rights to be afforded by the promoter in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to the undertaker in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the promoter to that undertaker as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.
8
  • (1) Not less than 28 days before starting the execution of any works of the type referred to in paragraph 6(2) that are near to, or will or may affect, any apparatus the removal of which has not been required by the promoter under paragraph 6(2), the promoter must submit to the undertaker in question a plan, section and description of the works to be executed.
  • (2) Those works are to be executed only in accordance with the plan, section and description submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by the undertaker for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and an officer of the undertaker is entitled to watch and inspect the execution of those works.
  • (3) Any requirements made by the undertaker under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which a plan, section and description under sub-paragraph (1) are submitted to it.
  • (4) If an undertaker in accordance with sub-paragraph (3) and in consequence of the works proposed by the promoter, reasonably requires the removal of any apparatus and gives written notice to the promoter of that requirement, paragraphs 6 and 7 apply as if the removal of the apparatus had been required by the promoter under paragraph 6(2).
  • (5) Nothing in this paragraph precludes the promoter from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan, section and description instead of the plan, section and description previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan, section and description.
  • (6) The promoter is not required to comply with sub-paragraph (1) in a case of emergency but in that case it must give to the undertaker in question notice as soon as is reasonably practicable and a plan, section and description of those works as soon as reasonably practicable subsequently and must comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances.
9
  • (1) Subject to the following provisions of this paragraph, the promoter must repay to an undertaker the reasonable expenses incurred by that undertaker in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in paragraph 6(2).
  • (2) The value of any apparatus removed under the provisions of this Schedule is to be deducted from any sum payable under sub-paragraph (1), that value being calculated after removal.
  • (3) If in accordance with the provisions of this Schedule—
  • (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
  • (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was,

and the placing of apparatus of that type or capacity or those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the promoter or, in default of agreement, is not determined by arbitration in accordance with article 51 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the undertaker in question by virtue of sub-paragraph (1), is to be reduced by the amount of that excess.

  • (4) For the purposes of sub-paragraph (3)—
  • (a) an extension of apparatus to a length greater than the length of existing apparatus must not be treated as placing of apparatus of greater dimensions than those of the existing apparatus; and
  • (b) where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole must be treated as if it also had been agreed or had been so determined.
  • (5) An amount which apart from this sub-paragraph would be payable to an undertaker in respect of works by virtue of sub-paragraph (1) must, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the undertaker any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.
10
  • (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any of the works referred to in paragraph 6(2), any damage is caused to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of an undertaker, or there is any interruption in any service provided, or in the supply of any goods, by any undertaker, the promoter must—
  • (a) bear and pay the cost reasonably incurred by that undertaker in making good such damage or restoring the supply; and
  • (b) make reasonable compensation to that undertaker for any other expenses, loss, damages, penalty or costs incurred by the undertaker,

SCHEDULE 14 — FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS

1
  • (1) The provisions of this Schedule, unless otherwise agreed in writing between the promoter and the operator, have effect.
  • (2) In this Schedule—
  • ...
  • “electronic communications apparatus” has the same meaning as in the electronic communication code;
  • “the electronic communications code” has the same meaning as in Chapter 1 of Part 2 of the 2003 Act33;
  • “electronic communications code network” means—so much of an electronic communications network or infrastructure system provided by an electronic communications code operator as is not excluded from the application of the electronic communications code by a direction under section 106 of the 2003 Act; andan electronic communications network which the Secretary of State is providing or proposing to provide;
  • “electronic communications code operator” means a person in whose case the electronic communications code is applied by a direction under section 106 of the 2003 Act;
  • “infrastructure system” has the same meaning as in the electronic communications code and references to providing an infrastructure system are to be construed in accordance with paragraph 7 of that code; and
  • “operator” means the operator of an electronic communications code network.
2

The temporary stopping up or diversion of any street under article 9 (temporary stopping up of streets) does not affect any right of the operator under Part 8 of the electronic communications code to maintain any apparatus which, at the time of the stopping up or diversion, is in that street.

3
  • (1) Subject to sub-paragraphs (2) to (4), if as the result of the authorised works or their construction, or of any subsidence resulting from any of those works—
  • (a) any damage is caused to any electronic communications apparatus belonging to an operator (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works), or other property of an operator; or
  • (b) there is any interruption in the supply of the service provided by an operator, the promoter must bear and pay the cost reasonably incurred by the operator in making good such damage or restoring the supply and must—
  • (i) make reasonable compensation to an operator for loss sustained by it; and
  • (ii) indemnify an operator against claims, demands, proceedings, costs, damages and expenses which may be made or taken against, or recovered from, or incurred by, an operator by reason, or in consequence of, any such damage or interruption.
  • (2) Sub-paragraph (1) does not apply to—
  • (a) any apparatus in respect of which the relations between the promoter and an operator are regulated by the provisions of Part 3 of the 1991 Act; or
  • (b) any damage, or any interruption, caused by electro-magnetic interference arising from the construction or use of the authorised works.
  • (3) Nothing in sub-paragraph (1) imposes any liability on the promoter with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of an operator, its officers, servants, contractors or agents.
  • (4) The operator must give the promoter reasonable notice of any such claim or demand and no settlement or compromise of the claim or demand may be made without the consent of the promoter which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
  • (5) Any difference arising between the promoter and the operator under this Schedule is to be referred to and settled by arbitration under article 51 (arbitration).

SCHEDULE 15 — FOR THE PROTECTION OF THE TRUST

1
  • (1) The following provisions of this Schedule, unless otherwise agreed in writing between the promoter and the Trust, have effect.
  • (2) In this Schedule—
  • “construction”, in relation to any specified work or protective work, includes— the execution and placing of that work; and any replacing, relaying, removal, alteration, renewal, maintenance, repair or reconstruction of that work as may be carried out during the period of 12 months from the completion of the work; and “construct” and “constructed” have corresponding meanings;
  • “detriment” means any damage to the relevant part of the waterway or any other property of the Trust and, without limitation on the scope of that meaning, includes— the erosion of the bed or banks of the relevant part of the waterway, or the impairment of the stability of any works, lands or premises forming part of the relevant part of the waterway; the silting of the relevant part of the waterway or the deposit of materials in it so as to permanently damage the relevant part of the waterway; the pollution of the relevant part of the waterway; any permanent alteration in the water level of the relevant part of the waterway, or permanent interference with the supply of water to it, or drainage of water from it; and any permanent harm to the ecology of the relevant part of the waterway (including any permanent adverse impact on any site of special scientific interest comprised in the relevant part of the waterway).
  • “the engineer” means an engineer appointed by the Trust for the purpose in question;
  • “plans” includes sections, designs, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction) and programmes;
  • “protective work” means a work which is reasonably necessary to be carried out before the commencement of construction of any specified work to prevent detriment;
  • “specified work” means so much of any of the authorised works as is situated upon, across under, over or within 15 metres of, or may directly and physically affect, the relevant part of the waterway.
2

The promoter must not under the powers conferred by this Order acquire compulsorily any land of the Trust or any easement or other right over such land, other than such land or easements or other rights over such land, as is reasonably necessary for, or in connection with, the construction, maintenance or operation of the authorised works.

3
  • (1) The promoter must not in the exercise of the powers conferred by this Order permanently obstruct or interfere with pedestrian or vehicular access to the relevant part of the waterway unless such permanent obstruction or interference with such access is with the consent of the Trust.
  • (2) Nothing in article 13 (discharge of water) authorises the promoter—
  • (a) to discharge any water directly or indirectly into the relevant part of the waterway; or
  • (b) to carry out any works to, or make any opening in, or otherwise interfere with, the relevant part of the waterway (including the banks and bed thereof),

except with the consent of the Trust and in accordance with plans approved by, and under the supervision (if given) of, the engineer.

  • (3) The promoter must not exercise the powers conferred by article 14 (protective works to buildings, roads and apparatus of a statutory undertaker) in relation to any building forming part of the relevant part of the waterway, or situated on land or property of the Trust forming part of the relevant part of the waterway, except with the consent of the Trust.
  • (4) The promoter must not exercise the powers conferred by article 15 (power to survey and investigate land) or the powers conferred by section 11(3) of the 1965 Act in relation to the relevant part of the waterway except with the consent of the Trust.
  • (5) The promoter must not exercise the powers conferred by section 271 or 272 of the 1990 Act, as applied by Schedule 12 to this Order, so as to permanently divert any right of access to the relevant part of the waterway, but any such right of access may be permanently diverted with the consent of the Trust.
  • (6) The consent of the Trust under any of sub-paragraphs (1), (3), (4) and (5) and the approval of plans under sub-paragraph (2) must not be unreasonably withheld or delayed but may be given subject to reasonable conditions which in the case of article 13 (discharge of water) may include conditions—
  • (a) specifying the maximum volume of water which may be discharged in any period; and
  • (b) authorising the Trust on giving reasonable notice (except in an emergency, when the Trust may require immediate suspension) to the promoter to require the promoter to suspend the discharge of water or reduce the flow of water where this is necessary by reason of any operational requirement of the Trust and where a reasonable alternative is available to enable the promoter to discharge the water in question during the period of the suspension.
4

The promoter must not use any land or property of the Trust forming part of the relevant part of the waterway for the passage or siting of vehicles, plant or machinery employed in the construction of the specified work other than—

  • (a) with the consent in writing of the engineer whose consent must not be unreasonably withheld; and
  • (b) subject to compliance with such reasonable requirements as the engineer may from time to time specify—
  • (i) for the prevention of detriment; or
  • (ii) in order to avoid or reduce any inconvenience to the Trust, its officers and agents and all other persons lawfully on such land or property.
5

If in consequence of or in connection with the exercise of the powers conferred by this Order any part of a way over land forming part of the relevant part of the waterway or any public right of way giving access to the relevant part of the waterway (“the closed section”) is temporarily closed to persons on foot or on cycles and there is no way which provides a reasonable alternative, the promoter must to the reasonable satisfaction of the Trust, provide in substitution as sufficient and convenient a way as is reasonably practicable between the points of commencement and termination of the closed section for such time as the closure continues.

6

Where so required by the engineer the promoter must, to the reasonable satisfaction of the engineer, fence off any specified work or protective work or take such other steps as the engineer may require to be taken for the purpose of separating a specified work or a protective work from the relevant part of the waterway, whether on a temporary or permanent basis or both.

7
  • (1) Before the commencement of the initial construction of any part of the specified works and again following completion of the specified works the promoter must bear the reasonable costs of the carrying out, by a qualified surveyor or engineer (“the surveyor”) to be approved by the Trust and the promoter, of surveys (“the surveys”) of so much of the relevant part of the waterway and of any land and existing works of the promoter which may provide support for the relevant part of the waterway as will or may be affected by the specified works.
  • (2) For the purposes of the surveys the promoter must—
  • (a) on being given reasonable notice (save in case of emergency, when immediate access must be afforded) afford reasonable facilities to the surveyor for access to the site of the specified works and to any land and existing works of the promoter which may provide support for the relevant part of the waterway as will or may be affected by the specified works; and
  • (b) supply the surveyor as soon as reasonably practicable with all such information as he may reasonably require with regard to such land and existing works of the promoter and to the specified works or the method of their construction.
  • (3) The reasonable costs of the surveys must include the costs of any dewatering or reduction of the water level of any part of the relevant part of the waterway (where reasonably required) which may be effected to facilitate the carrying out of the surveys and the provisions of this Schedule apply with all necessary modifications to any such dewatering or reduction in the water level as though the same were specified works.
  • (4) Copies of the reports of the surveys must be provided to both the Trust and the promoter.
8
  • (1) The promoter must, before commencing construction of any specified work, including any temporary works, supply to the Trust proper and sufficient plans of that work and such further particulars available to it as the Trust may within 14 days of the submission of the plans reasonably require for the approval of the engineer and must not commence such construction of any specified work until plans of that work have been approved in writing by the engineer or settled by arbitration.

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.