The Leeds Railway Station (Southern Entrance) Order 2013
- (2) The approval of the engineer under sub-paragraph (1) must not be unreasonably withheld or delayed, and if within 56 days after such plans (including any other particulars reasonably required under sub-paragraph (1)) have been supplied to the Trust the engineer has not intimated disapproval of those plans and the grounds of disapproval the engineer is deemed to have approved the plans as submitted.
- (3) When signifying his approval of the plans the engineer may specify—
- (a) any protective work (whether temporary or permanent); and
- (b) such other requirements as may be reasonably necessary to prevent detriment,
and such protective work must be constructed by the Trust or (if the Trust so desires) by the promoter with all reasonable dispatch and the promoter must not commence the construction of any specified work until the engineer has notified the promoter that the protective work has been completed to the engineer’s reasonable satisfaction.
9
Without affecting its obligations under the provisions of this Schedule the promoter must consult the Trust on―
- (a) the design and appearance of the specified works, including the materials to be used for their construction; and
- (b) the environmental effects of the specified works;
and must have regard to such views as may be expressed by the Trust, to the extent that these accord with the requirements of the local planning authority in response to such consultation pursuant, in particular, to the requirements imposed on the Trust by section 22 (general environmental and recreational duties) of the British Waterways Act 199534 and to the interest of the Trust in preserving and enhancing the environment of the relevant part of the waterway.
10
The promoter must give to the engineer 56 days’ notice of its intention to commence the construction of any of the specified works or protective works, or, in the case of repair carried out in an emergency, such notice as may be reasonably practicable so that, in particular, the Trust may where appropriate arrange for the publication of notices bringing those works to the attention of users of the relevant part of the waterway.
11
The promoter must provide and maintain at its own expense in the vicinity of any specified works or protective work such temporary lighting and such signal lights for the control of navigation as the engineer may reasonably require during the construction or failure of the specified work or protective work.
12
- (1) Any specified works must, when commenced, be constructed―
- (a) without unnecessary delay in accordance with the plans approved or deemed to have been approved or settled in accordance with this Schedule and with any requirements made under paragraph 8(3)(b);
- (b) under the supervision (if given) and, in the case of any specified work which directly and physically affects the relevant part of the waterway, to the reasonable satisfaction of the engineer;
- (c) in such manner as to cause as little detriment as is reasonably practicable; and
- (d) in such manner as to cause as little inconvenience as is reasonably practicable to the Trust, its officers and agents and all other persons lawfully using the relevant part of the waterway.
13
- (1) Any pile, stump or other obstruction which becomes exposed in consequence of the construction of a specified work must be removed by the promoter or, if it is not reasonably practicable to remove it, must be cut off at such level below the bed of the relevant part of the waterway as the Trust may direct.
- (2) If the promoter fails to remove any such pile, stump or other obstruction within 28 days after receipt of written notice from the Trust requiring the removal, the Trust may carry out the removal and recover its costs from the promoter.
14
The promoter must not in the course of constructing any specified work or protective work or otherwise in connection with the works do or permit anything which may result in the pollution of the relevant part of the waterway or the deposit of materials in it and must take such steps as the engineer may reasonably require to avoid or make good any breach of its obligations under this paragraph; but this provision does not prevent the promoter from carrying out works within the relevant part of the waterway.
15
- (1) The promoter must at all times on being given reasonable notice allow reasonable facilities to the engineer for access to any specified work during its construction; but such facilities for access are subject to the promoter’s reasonable requirements for ensuring the safety of the railway and of the engineer and other persons working on the railway.
- (2) The promoter must supply the engineer with all such information as the engineer may reasonably require with regard to any specified work or the method of constructing it.
16
- (1) If during the construction of a specified work or during a period of 24 months after the completion of a specified work any alterations or additions, either permanent or temporary, to the relevant part of the waterway are reasonably necessary in consequence of the construction of the specified work in order to avoid detriment, and the Trust gives to the promoter reasonable notice of its intention to carry out such alterations or additions (which must be specified in the notice), the promoter must pay to the Trust the reasonable cost of those alterations or additions including, in respect of any such alterations and additions as are to be permanent, a capitalised sum representing the increase of the costs which may be expected to be reasonably incurred by the Trust in maintaining, working and, when necessary, renewing any such alterations or additions.
- (2) If the cost of maintaining, working or renewing the relevant part of the waterway is reduced in consequence of any such alterations or additions a capitalised sum representing such saving must be set off against any sum payable by the promoter to the Trust under this paragraph.
17
- (1) The promoter must, upon completion of any part of any permanent specified work, remove as soon as practicable any temporary works constructed and materials for temporary works placed in, on, over or under the relevant part of the waterway in connection with that part of the specified work.
- (2) All temporary works must be removed to the reasonable satisfaction of the engineer, and in the construction, maintenance and removal of such works the promoter must not cause unavoidable detriment.
18
If at any time after the completion of a specified work, not being a work vested in the Trust, the Trust gives notice to the promoter informing it that the state of maintenance of the work appears to be such that the work is causing, or is likely to cause, detriment, the promoter must, on receipt of such notice, take such steps as may be reasonably necessary to put the work in such state of maintenance as not to cause such detriment.
19
Any additional expenses which the Trust may reasonably incur in maintaining the relevant part of the waterway under any powers existing at the making of this Order by reason of the existence of a specified work must, provided that 56 days’ previous notice of the commencement of such maintenance has been given to the promoter, be repaid by the promoter to the Trust.
20
The promoter must repay to the Trust all fees, costs, charges and expenses reasonably incurred by the Trust―
- (a) in constructing any protective works under the provisions of paragraph 8(3)(a) including, in respect of any permanent protective works, a capitalised sum representing the cost of maintaining and renewing those works;
- (b) in respect of the approval by the engineer of plans submitted by the promoter and the supervision by the engineer of the construction or repair of any specified work and any protective work;
- (c) in respect of the employment during the period of the initial construction of any specified work or protective work of any inspectors, watchkeepers and other persons whom it is reasonably necessary to appoint for inspecting, watching and lighting any part of the relevant part of the waterway and for preventing, so far as may be reasonably practicable, interference, obstruction, danger or accident arising from the construction or failure of the specified work or any protective work; and
- (d) in bringing the specified work or any protective work to the notice of users of the relevant part of the waterway.
21
- (1) If any detriment is caused by the construction or failure of any specified work or protective work, the promoter (if so required by the Trust) must make good such detriment and must pay to the Trust all reasonable expenses to which the Trust may be put, and compensation for any loss which the Trust may sustain, in making good or otherwise by reason of the detriment.
- (2) The promoter is responsible for and must make good to the Trust all costs, charges, damages, expenses and losses not otherwise provided for in this Schedule which may be occasioned to or reasonably incurred by the Trust―
- (a) by reason of the construction of any specified work or a protective work or the failure of such a work; or
- (b) by reason of any act or omission of the promoter or of any person in its employ or of its contractors or others whilst engaged upon the construction of any specified work or of a protective work,
and subject to sub-paragraph (4) the promoter must effectively indemnify and hold harmless the Trust from and against all claims and demands arising out of any of the matters referred to in paragraphs (a) and (b).
- (3) The fact that any act or thing may have been done by the Trust on behalf of the promoter or in accordance with plans approved by the engineer or in accordance with any requirement of the engineer or under the engineer’s supervision or in accordance with any directions or awards of an arbitrator does not (if it was done without negligence on the part of the Trust or of any person in its employ or of its contractors or agents) excuse the promoter from any liability under the provisions of this paragraph.
- (4) The Trust must give the promoter reasonable notice of any such claim or demand and no settlement or compromise of such a claim or demand is to be made without the prior consent of the promoter.
22
Where under any provision of this Schedule the Trust or the promoter (as the case may be) is entitled to a capitalised sum, it must provide such details of the formula by which the sum is calculated as may reasonably be requested by the party required to pay the sum.
23
Except as provided by this Order, nothing in this Order is to prejudice or derogate from the estates, rights, interests, privileges, liberties or franchises of the Trust or alter or diminish any power, authority or jurisdiction vested in the Trust at the making of this Order.
24
Any difference arising between the promoter and the Trust under this Schedule (other than a difference as to the meaning or construction of this Schedule) is to be referred to and settled by arbitration in accordance with article 51 (arbitration).
SCHEDULE 16 — FOR THE PROTECTION OF THE ENVIRONMENT AGENCY
1
- (1) The following provisions of this Schedule, unless otherwise agreed in writing between the promoter and the Agency, have effect.
- (2) In this Schedule—
- “the Agency” means the Environment Agency;
- “construction” includes execution, placing, altering, replacing, relaying and removal and “construct” and “constructed” are construed accordingly;
- “drainage work” means any watercourse and includes any land which provides or is expected to provide flood storage capacity for any watercourse and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage, flood defence or tidal monitoring;
- “the fishery” means the relevant part of the waterway containing fish and the spawn, habitat or food of such fish;
- “plans” includes sections, drawings, specifications and method statements; and
- “specified work” means so much of any work or operation authorised by this Order as is in, on, under, over or within 16 metres of a drainage work or is otherwise likely to— affect any drainage work or the volumetric rate of flow of water in or flowing to or from any drainage work; affect the flow, purity or quality of water in any watercourse or other surface waters or ground water; cause obstruction to the free passage of fish or damage to any fishery; or affect the conservation, distribution or use of water resources.
2
- (1) Before beginning to construct any specified work, the promoter must submit to the Agency plans of the specified work and such further particulars available to it as the Agency may within 28 days of the submission of the plans reasonably require.
- (2) Any such specified work must not be constructed except in accordance with such plans as may be approved in writing by the Agency, or determined under paragraph 13.
- (3) Any approval of the Agency required under this paragraph—
- (a) must not be unreasonably withheld;
- (b) is deemed to have been given if it is neither given nor refused within 2 months of the submission of the plans for approval and, in the case of a refusal, accompanied by a statement of the grounds of refusal; and
- (c) may be given subject to such reasonable requirements as the Agency may make for the protection of any drainage work or the fishery or for the protection of water resources, or for the prevention of flooding or pollution or in the discharge of its environmental duties.
- (4) The Agency must use its reasonable endeavours to respond to the submission of any plans before the expiration of the period mentioned in sub-paragraph (3)(b).
3
Without limitation on the scope of paragraph 2, the requirements which the Agency may make under that paragraph include conditions requiring the promoter at its own expense to construct such protective works, whether temporary or permanent, during the construction of the specified works (including the provision of flood banks, walls or embankments or other new works and the strengthening, repair or renewal of existing banks, walls or embankments) as are reasonably necessary—
- (a) to safeguard any drainage work against damage; or
- (b) to secure that its efficiency for flood defence purposes is not impaired and that the risk of flooding is not otherwise increased,
by reason of any specified work.
4
- (1) Subject to sub-paragraph (2), any specified work, and all protective works required by the Agency under paragraph 3, must be constructed—
- (a) without unreasonable delay in accordance with the plans approved or deemed to have been approved or settled under this Schedule; and
- (b) to the reasonable satisfaction of the Agency,
and an officer of the Agency is entitled to watch and inspect the construction of such works.
- (2) The promoter must give to the Agency not less than 14 days’ notice in writing of its intention to commence construction of any specified work and notice in writing of its completion not later than 7 days after the date on which it is brought into use.
- (3) If any part of a specified work or any protective work required by the Agency is constructed otherwise than in accordance with the requirements of this Schedule, the Agency may by notice in writing require the promoter at the promoter’s own expense to comply with the requirements of this Schedule or (if the promoter so elects and the Agency in writing consents, such consent not to be unreasonably withheld or delayed) to remove, alter or pull down the work and, where removal is required, to restore the site to its former condition to such extent and within such limits as the Agency reasonably requires.
- (4) Subject to sub-paragraph (5) and paragraph 8, if within a reasonable period, being not less than 28 days from the date when a notice under sub-paragraph (3) is served upon the promoter, it has failed to begin taking steps to comply with the requirements of the notice and subsequently to make reasonably expeditious progress towards their implementation, the Agency may execute the works specified in the notice and any expenditure incurred by it in so doing is recoverable from the promoter.
- (5) In the event of any dispute as to whether sub-paragraph (3) is properly applicable to any work in respect of which notice has been served under that sub-paragraph, or as to the reasonableness of any requirement of such a notice, the Agency must not except in emergency exercise the powers conferred by sub-paragraph (4) until the dispute has been finally determined.
5
- (1) Subject to the provisions of this Schedule and except to the extent that the Agency or another person is liable to maintain any such work and is not precluded by the exercise of the powers conferred by this Order from so doing, the promoter must from the commencement of the construction of the specified works maintain in good repair and condition and free from obstruction any drainage work which is situated within the limits of deviation or on land held by the promoter for the purposes of or in connection with the specified works, whether or not the drainage work is constructed under the powers conferred by this Order or is already in existence.
- (2) If any such drainage work which the promoter is liable to maintain is not maintained to the reasonable satisfaction of the Agency, the Agency may by notice in writing require the promoter to repair and restore the work, or any part of such work, or (if the promoter so elects and the Agency in writing consents, such consent not to be unreasonably withheld or delayed), to remove the work and restore the site to its former condition, to such extent and within such limits as the Agency reasonably requires.
- (3) Subject to paragraph 8, if, within a reasonable period being not less than 28 days beginning with the date on which a notice in respect of any drainage work is served under sub-paragraph (2) on the promoter, the promoter has failed to begin taking steps to comply with the reasonable requirements of the notice and has not subsequently made reasonably expeditious progress towards their implementation, the Agency may do what is necessary for such compliance and may recover any expenditure reasonably incurred by it in so doing from the promoter.
- (4) In the event of any dispute as to the reasonableness of any requirement of a notice served under sub-paragraph (2) , the Agency must not except in a case of emergency exercise the powers conferred by sub-paragraph (3) until the dispute has been finally determined.
6
Subject to paragraph 8, if by reason of the construction of any specified work or of the failure of any such work the efficiency of any drainage work for flood defence purposes is impaired, or that drainage work is otherwise damaged, such impairment or damage must be made good by the promoter to the reasonable satisfaction of the Agency and if the promoter fails to do so, the Agency may make good the impairment or damage and recover from the promoter the expense reasonably incurred by it in doing so.
7
- (1) The promoter must take all such measures as may be reasonably practicable to prevent any interruption of the free passage of fish in the fishery during the construction of any specified work.
- (2) If by reason of—
- (a) the construction of any specified work; or
- (b) the failure of any such work,
damage to the fishery is caused, or the Agency has reason to expect that such damage may be caused, the Agency may serve notice on the promoter requiring it to take such steps as may be reasonably practicable to make good the damage, or, as the case may be, to protect the fishery against such damage.
- (3) Subject to paragraph 8, if within such time as may be reasonably practicable for that purpose after the receipt of written notice from the Agency of any damage or expected damage to a fishery, the promoter fails to take such steps as are described in sub-paragraph (2), the Agency may take those steps and may recover from the promoter the expense reasonably incurred by it in doing so.
- (4) Subject to paragraph 8, in any case where immediate action by the Agency is reasonably required in order to secure that the risk of damage to the fishery is avoided or reduced, the Agency may take such steps as are reasonable for the purpose, and may recover from the promoter the reasonable cost of so doing provided that notice specifying those steps is served on the promoter as soon as reasonably practicable after the Agency has taken, or commenced to take, the steps specified in the notice.
8
Nothing in paragraphs 4(4), 5(3), 6, 7(3) and (4) authorises the Agency to execute works on or affecting the authorised works.
9
The promoter must indemnify the Agency in respect of all costs, charges and expenses which the Agency may reasonably incur or have to pay or which it may sustain—
- (a) in the examination or approval of plans under this Schedule; and
- (b) in the inspection of the construction of the specified works or any protective works required by the Agency under this Schedule.
10
- (1) Without affecting the other provisions of this Schedule, the promoter must indemnify the Agency in respect of all claims, demands, proceedings, costs, damages, expenses or loss, which may be made or taken against, recovered from, or incurred by, the Agency by reason of—
- (a) any damage to any drainage work so as to impair its efficiency for the purposes of flood defence;
- (b) any damage to the fishery;
- (c) any raising or lowering of the water table in land adjoining the authorised works or any sewers, drains and watercourses;
- (d) any flooding or increased flooding of any such lands; or
- (e) inadequate water quality in any watercourse or other surface waters or in any groundwater,
which is caused by the construction of any of the specified works or any act or omission of the promoter, its contractors, agents or employees whilst engaged upon the work.
- (2) The Agency must give to the promoter reasonable notice of any such claim or demand and no settlement or compromise may be made without the agreement of the promoter which agreement must not be unreasonably withheld or delayed.
11
The fact that any work or thing has been executed or done by the promoter in accordance with a plan approved or deemed to be approved by the Agency, or to its satisfaction, or in accordance with any directions or award of an arbitrator, does not relieve the promoter from any liability under the provisions of this Schedule.
12
For the purposes of Chapter 2 of Part 2 of the Water Resources Act 199135 (abstraction and impounding of water), section 109 of that Act (as to structures in, over or under watercourses) and Part 4 of the Eels (England and Wales) Regulations 200936 (passage of eels) as applying to the construction of any specified work, any consent or approval given or deemed to be given by the Agency under this Schedule with respect to such construction is deemed also to constitute a licence under that Chapter to obstruct or impede the flow of inland waters at that point by means of impounding works, to constitute a consent or approval under section 109 and to discharge any liability on the promoter to carry out anything under regulation 14 of the Eels (England and Wales) Regulations 2009, as the case may be.
13
Any dispute arising between the promoter and the Agency under this Schedule, if the parties agree, is to be determined by arbitration under article 51 (arbitration), but otherwise is to be determined by the Secretary of State for Environment, Food and Rural Affairs and the Secretary of State for Transport acting jointly on a reference to them by the promoter or the Agency, after notice in writing by one to the other.
Signed
Signed by authority of the Secretary of State
Martin Woods — Head of the Transport and Works Act Orders Unit — Department for Transport — 1st August 2013
Explanatory note
(This note is not part of the Order)
EXPLANATORY NOTE
This Order authorises West Yorkshire Passenger Transport Executive (Metro) and Network Rail Infrastructure Limited together (referred to in this Order as the promoter) to construct and operate an extension of Leeds Railway Station consisting of a new station entrance constructed over the Aire and Calder Navigation to the south of Leeds Railway Station. For these purposes the Order confers powers, compulsorily or by agreement, to acquire land and rights in land to use land. The Order also contains a number of protective provisions for the benefit of the protected undertakers.
The Order also makes provision for miscellaneous ancillary matters including the power to execute street works, extinguish rights of navigation in part of the Aire and Calder Navigation, the temporary stopping up of part of the Aire and Calder Navigation, the carrying out of alterations to the highway and the introduction of measures to regulate the traffic on streets in the vicinity of the proposed works.
A copy of the works and land plans, the book of reference, and the traffic regulation and rights of way plan mentioned in this Order and certified in accordance with article 48 (certification of plans, etc.) of this Order, may be inspected free of charge during working hours of the offices of Metro at 40 - 50 Wellington Street, Leeds LS1 2DE and at the offices of Network Rail Infrastructure Limited Kings Place, 90 York Way London N1 9AG.
Footnotes
1992 c. 42. Relevant amending instruments are S.I. 1995/1541, S.I. 1998/2226, S.I. 2000/3199 and S.I. 2006/958.
1993 c. 43 as amended by the Transport Act 2000 (c. 38) and the Railways Act 2005 (c. 14).
type=start slip=2015-01-01 time=1422025710524S.I. 2013/1933.type=end slip=2015-01-01 time=1422025710524
1986 c. 44. A new section 7 was substituted by section 5 of the Gas Act 1995 (c. 45), and was further amended by section 76 of the Utilities Act 2000 (c. 27).
See section 106.
Editorial notes
Art. 1 in force at 22.8.2013, see art. 1
Art. 2 in force at 22.8.2013, see art. 1
Art. 3 in force at 22.8.2013, see art. 1
Art. 4 in force at 22.8.2013, see art. 1
Art. 5 in force at 22.8.2013, see art. 1
Art. 6 in force at 22.8.2013, see art. 1
Art. 7 in force at 22.8.2013, see art. 1
Art. 8 in force at 22.8.2013, see art. 1
Art. 9 in force at 22.8.2013, see art. 1
Art. 10 in force at 22.8.2013, see art. 1
Art. 11 in force at 22.8.2013, see art. 1
Art. 12 in force at 22.8.2013, see art. 1
Art. 13 in force at 22.8.2013, see art. 1
Art. 14 in force at 22.8.2013, see art. 1
Art. 15 in force at 22.8.2013, see art. 1
Art. 16 in force at 22.8.2013, see art. 1
Art. 17 in force at 22.8.2013, see art. 1
Art. 18 in force at 22.8.2013, see art. 1
Art. 19 in force at 22.8.2013, see art. 1
Art. 20 in force at 22.8.2013, see art. 1
Art. 21 in force at 22.8.2013, see art. 1
Art. 22 in force at 22.8.2013, see art. 1
Art. 23 in force at 22.8.2013, see art. 1
Art. 24 in force at 22.8.2013, see art. 1
Art. 25 in force at 22.8.2013, see art. 1
Art. 26 in force at 22.8.2013, see art. 1
Art. 27 in force at 22.8.2013, see art. 1
Art. 28 in force at 22.8.2013, see art. 1
Art. 29 in force at 22.8.2013, see art. 1
Art. 30 in force at 22.8.2013, see art. 1
Art. 31 in force at 22.8.2013, see art. 1
Art. 32 in force at 22.8.2013, see art. 1
Art. 33 in force at 22.8.2013, see art. 1
Art. 34 in force at 22.8.2013, see art. 1
Art. 35 in force at 22.8.2013, see art. 1
Art. 36 in force at 22.8.2013, see art. 1
Art. 37 in force at 22.8.2013, see art. 1
Art. 38 in force at 22.8.2013, see art. 1
Art. 39 in force at 22.8.2013, see art. 1
Art. 40 in force at 22.8.2013, see art. 1
Art. 41 in force at 22.8.2013, see art. 1
Art. 42 in force at 22.8.2013, see art. 1
Art. 43 in force at 22.8.2013, see art. 1
Art. 44 in force at 22.8.2013, see art. 1
Art. 45 in force at 22.8.2013, see art. 1
Art. 46 in force at 22.8.2013, see art. 1
Art. 47 in force at 22.8.2013, see art. 1
Art. 48 in force at 22.8.2013, see art. 1
Art. 49 in force at 22.8.2013, see art. 1
Art. 50 in force at 22.8.2013, see art. 1
Art. 51 in force at 22.8.2013, see art. 1
Sch. 8 para. 1 in force at 22.8.2013, see art. 1
Sch. 8 para. 2 in force at 22.8.2013, see art. 1
Sch. 8 para. 3 in force at 22.8.2013, see art. 1
Sch. 8 para. 4 in force at 22.8.2013, see art. 1
Sch. 8 para. 5 in force at 22.8.2013, see art. 1
Sch. 8 para. 6 in force at 22.8.2013, see art. 1
Sch. 8 para. 7 in force at 22.8.2013, see art. 1
Sch. 8 para. 8 in force at 22.8.2013, see art. 1
Sch. 8 para. 9 in force at 22.8.2013, see art. 1
Sch. 12 para. 1 in force at 22.8.2013, see art. 1
Sch. 12 para. 2 in force at 22.8.2013, see art. 1
Sch. 12 para. 3 in force at 22.8.2013, see art. 1
Sch. 13 para. 1 in force at 22.8.2013, see art. 1
Sch. 13 para. 2 in force at 22.8.2013, see art. 1
Sch. 13 para. 3 in force at 22.8.2013, see art. 1
Sch. 13 para. 4 in force at 22.8.2013, see art. 1
Sch. 13 para. 5 in force at 22.8.2013, see art. 1
Sch. 13 para. 6 in force at 22.8.2013, see art. 1
Sch. 13 para. 7 in force at 22.8.2013, see art. 1
Sch. 13 para. 8 in force at 22.8.2013, see art. 1
Sch. 13 para. 9 in force at 22.8.2013, see art. 1
Sch. 13 para. 10 in force at 22.8.2013, see art. 1
Sch. 14 para. 1 in force at 22.8.2013, see art. 1
Sch. 14 para. 2 in force at 22.8.2013, see art. 1
Sch. 14 para. 3 in force at 22.8.2013, see art. 1
Sch. 15 para. 1 in force at 22.8.2013, see art. 1
Sch. 15 para. 2 in force at 22.8.2013, see art. 1
Sch. 15 para. 3 in force at 22.8.2013, see art. 1
Sch. 15 para. 4 in force at 22.8.2013, see art. 1
Sch. 15 para. 5 in force at 22.8.2013, see art. 1
Sch. 15 para. 6 in force at 22.8.2013, see art. 1
Sch. 15 para. 7 in force at 22.8.2013, see art. 1
Sch. 15 para. 8 in force at 22.8.2013, see art. 1
Sch. 15 para. 9 in force at 22.8.2013, see art. 1
Sch. 15 para. 10 in force at 22.8.2013, see art. 1
Sch. 15 para. 11 in force at 22.8.2013, see art. 1
Sch. 15 para. 12 in force at 22.8.2013, see art. 1
Sch. 15 para. 13 in force at 22.8.2013, see art. 1
Sch. 15 para. 14 in force at 22.8.2013, see art. 1
Sch. 15 para. 15 in force at 22.8.2013, see art. 1
Sch. 15 para. 16 in force at 22.8.2013, see art. 1
Sch. 15 para. 17 in force at 22.8.2013, see art. 1
Sch. 15 para. 18 in force at 22.8.2013, see art. 1
Sch. 15 para. 19 in force at 22.8.2013, see art. 1
Sch. 15 para. 20 in force at 22.8.2013, see art. 1
Sch. 15 para. 21 in force at 22.8.2013, see art. 1
Sch. 15 para. 22 in force at 22.8.2013, see art. 1
Sch. 15 para. 23 in force at 22.8.2013, see art. 1
Sch. 15 para. 24 in force at 22.8.2013, see art. 1
Sch. 16 para. 1 in force at 22.8.2013, see art. 1
Sch. 16 para. 2 in force at 22.8.2013, see art. 1
Sch. 16 para. 3 in force at 22.8.2013, see art. 1
Sch. 16 para. 4 in force at 22.8.2013, see art. 1
Sch. 16 para. 5 in force at 22.8.2013, see art. 1
Sch. 16 para. 6 in force at 22.8.2013, see art. 1
Sch. 16 para. 7 in force at 22.8.2013, see art. 1
Sch. 16 para. 8 in force at 22.8.2013, see art. 1
Sch. 16 para. 9 in force at 22.8.2013, see art. 1
Sch. 16 para. 10 in force at 22.8.2013, see art. 1
Sch. 16 para. 11 in force at 22.8.2013, see art. 1
Sch. 16 para. 12 in force at 22.8.2013, see art. 1
Sch. 16 para. 13 in force at 22.8.2013, see art. 1
Sch. 1 in force at 22.8.2013, see art. 1
Sch. 2 in force at 22.8.2013, see art. 1
Sch. 3 in force at 22.8.2013, see art. 1
Sch. 4 in force at 22.8.2013, see art. 1
Sch. 5 in force at 22.8.2013, see art. 1
Sch. 6 in force at 22.8.2013, see art. 1
Sch. 7 in force at 22.8.2013, see art. 1
Sch. 9 in force at 22.8.2013, see art. 1
Sch. 10 in force at 22.8.2013, see art. 1
Sch. 11 Pt. 1 in force at 22.8.2013, see art. 1
Sch. 11 Pt. 2 in force at 22.8.2013, see art. 1
Sch. 11 Pt. 3 in force at 22.8.2013, see art. 1
Sch. 11 Pt. 4 in force at 22.8.2013, see art. 1
Words in art. 13(7) substituted (1.1.2017) by The Environmental Permitting (England and Wales) Regulations 2016 (S.I. 2016/1154), reg. 1(1), Sch. 29 para. 51 (with regs. 1(3), 77-79, Sch. 4)
Words in Sch. 14 para. 1(2) omitted (28.12.2017) by virtue of The Communications Act 2003 and the Digital Economy Act 2017 (Consequential Amendments to Secondary Legislation) Regulations 2017 (S.I. 2017/1011), reg. 1(1), Sch. 1 para. 25(2)(a)(i)
Words in Sch. 14 para. 1(2) substituted (28.12.2017) by The Communications Act 2003 and the Digital Economy Act 2017 (Consequential Amendments to Secondary Legislation) Regulations 2017 (S.I. 2017/1011), reg. 1(1), Sch. 1 para. 25(2)(a)(ii)
Words in Sch. 14 para. 1(2) inserted (28.12.2017) by The Communications Act 2003 and the Digital Economy Act 2017 (Consequential Amendments to Secondary Legislation) Regulations 2017 (S.I. 2017/1011), reg. 1(1), Sch. 1 para. 25(2)(a)(iii)
Words in Sch. 14 para. 2 substituted (28.12.2017) by The Communications Act 2003 and the Digital Economy Act 2017 (Consequential Amendments to Secondary Legislation) Regulations 2017 (S.I. 2017/1011), reg. 1(1), Sch. 1 para. 25(2)(b)
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.