1
- (1) For the protection of any operator, the following provisions shall, unless otherwise agreed in writing between the undertakers and the operator, have effect.
- (2) In this part of this Schedule—
- “conduit system” has the same meaning as in the electronic communications code and references to providing a conduit system shall be construed in accordance with paragraph 1(3A) of that code;
- “electronic communications apparatus” has the same meaning as in the electronic communications code;
- “the electronic communications code” has the same meaning as in Chapter 1 of Part 2 of the 2003 Act[^f00028];
- “electronic communications code network” means— so much of an electronic communications network or conduit system provided by an electronic communications code operator as is not excluded from the application of the electronic communications code by a direction under section 106 of the 2003 Act; and an electronic communications network which the Secretary of State is providing or proposing to provide;
- “electronic communications code operator” means a person in whose case the electronic communications code is applied by a direction under section 106 of the 2003 Act; and
- “operator” means the operator of an electronic communications code network.
2
The exercise of the powers of article 25 (statutory undertakers) are subject to paragraph 23 of Schedule 2 to the Telecommunications Act 1984[^f00029].
3
- (1) Subject to sub-paragraphs (2) to (4), if as the result of the authorised development or their construction, or of any subsidence resulting from any of those works—
- (a) any damage is caused to any electronic communications apparatus belonging to an operator (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works, or other property of an operator); or
- (b) there is any interruption in the supply of the service provided by an operator, the undertakers shall bear and pay the cost reasonably incurred by the operator in making good such damage or restoring the supply and shall—
- (i) make reasonable compensation to an operator for loss sustained by it; and
- (ii) indemnify an operator against claims, demands, proceedings, costs, damages and expenses which may be made or taken against, or recovered from, or incurred by, an operator by reason, or in consequence of, any such damage or interruption.
- (2) Nothing in sub-paragraph (1) shall impose any liability on the undertakers with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of an operator, its officers, servants, contractors or agents.
- (3) The operator shall give the undertakers reasonable notice of any such claim or demand and no settlement or compromise of the claim or demand shall be made without the consent of the undertakers which, if it withholds such consent, shall have the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
- (4) Any difference arising between the undertakers and the operator under this paragraph shall be referred to and settled by arbitration under article 33 (arbitration).
4
This part of this Schedule does not apply to—
- (a) any apparatus in respect of which the relations between the undertakers and an operator are regulated by the provisions of Part 3 of the 1991 Act; or
- (b) any damage, or any interruption, caused by electro-magnetic interference arising from the construction or use of the authorised development.
5
Nothing in this part of this Schedule shall affect the provisions of any enactment or agreement regulating the relations between the undertakers and an operator in respect of any apparatus laid or erected in land belonging to the undertakers on the date on which this Order is made.
PART 3 — Protection of Network Rail Infrastructure Limited
1
The following provisions of this Schedule have effect unless otherwise agreed in writing between the undertakers and Network Rail and, in the case of paragraph 15, any other person on whom rights or obligations are conferred by that paragraph.
2
In this part of this Schedule—
- “construction” includes execution, placing, alteration and reconstruction and “construct” and “constructed” have corresponding meanings;
- “the engineer” means an engineer appointed by Network Rail for the purposes of this Order;
- “network licence” means the network licence, as amended from time to time, granted to Network Rail by the Secretary of State in exercise of powers under section 8 of the Railways Act 1993[^f00030];
- “Network Rail” means Network Rail Infrastructure Limited (Company registration number 02904587) whose registered office is at Kings Place, 90 York Way, London, N1 9AG and any associated company of Network Rail which holds property for railway purposes, and for the purpose of this definition “associated company” means any company which is (within the meaning of section 1159 of the Companies Act 2006[^f00031]) the holding company of Network Rail Infrastructure Limited, a subsidiary of Network Rail Infrastructure Limited or another subsidiary of the holding company of Network Rail Infrastructure Limited;
- “plans” includes sections, designs, design data, software, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction), staging proposals, programmes and details of the extent, timing and duration of any proposed occupation of railway property;
- “railway operational procedures” means procedures specified under any access agreement (as defined in the Railways Act 1993) or station lease;
- “railway property” means any railway belonging to Network Rail and— any station, land, works, apparatus and equipment belonging to Network Rail or connected with any such railway; and any easement or other property interest held or used by Network Rail for the purposes of such railway or works, apparatus or equipment; and
- “specified work” means so much of any of the authorised development as is situated upon, across, under, over or within 15 metres of, or may in any way adversely affect, railway property.
3
- (1) Where under this part of this Schedule Network Rail is required to give its consent, agreement or approval in respect of any matter, that consent, agreement or approval is subject to the condition that Network Rail complies with any relevant railway operational procedures and any obligations under its network licence or under statute.
- (2) In so far as any specified work or the acquisition or use of railway property is or may be subject to railway operational procedures, Network Rail must—
- (a) co-operate with the undertakers with a view to avoiding undue delay and securing conformity as between any plans approved by the engineer and requirements emanating from those procedures; and
- (b) use its reasonable endeavours to avoid any conflict arising between the application of those procedures and the proper implementation of the authorised development under this Order.
4
- (1) The undertakers must not exercise the powers conferred by article 14 (authority to survey and investigate the land) or the powers conferred by section 11(3) of the 1965 Act (powers of entry) in respect of any railway property unless the exercise of such powers is with the consent of Network Rail.
- (2) The undertakers must not in the exercise of the powers conferred by this Order prevent pedestrian or vehicular access to any railway property, unless preventing such access is with the consent of Network Rail.
- (3) The undertakers shall not exercise the powers conferred by sections 271 or 272 of the 1990 Act (extinguishment of rights of statutory undertakers and electronic code communications operators: preliminary notices), or article 25 (statutory undertakers), in relation to any right of access of Network Rail to railway property, but such right of access may be diverted with the consent of Network Rail.
- (4) The undertakers must not under the powers conferred by this Order acquire or use or acquire new rights over, or seek to impose any restrictive covenants over, any railway property, or extinguish any existing rights of Network Rail in respect of any third party property except with the consent of Network Rail.
- (5) Where Network Rail is asked to give its consent or agreement pursuant to this paragraph, such consent or agreement must not be unreasonably withheld but may be given subject to reasonable conditions.
5
- (1) The undertakers must before commencing construction of any specified work supply to Network Rail proper and sufficient plans of that work for the reasonable approval of the engineer and the specified work shall not be commenced except in accordance with such plans as have been approved in writing by the engineer or settled by arbitration under article 33 (arbitration).
- (2) The approval of the engineer under sub-paragraph (1) shall not be unreasonably withheld, and if by the end of the period of 28 days beginning with the date on which such plans have been supplied to Network Rail the engineer has not intimated disapproval of those plans and the grounds of disapproval the undertakers may serve upon the engineer written notice requiring the engineer to intimate approval or disapproval within a further period of 28 days beginning with the date upon which the engineer receives written notice from the undertakers. If by the expiry of the further 28 days the engineer has not intimated approval or disapproval, the engineer is deemed to have approved the plans as submitted.
- (3) If by the end of the period of 28 days beginning with the date on which written notice was served upon the engineer under sub-paragraph (2), Network Rail gives notice to the undertakers that Network Rail desires itself to construct any part of a specified work which in the opinion of the engineer will or may affect the stability of railway property or the safe operation of traffic on the railways of Network Rail then, if the undertakers desires such part of the specified work to be constructed, Network Rail must construct it with all reasonable dispatch on behalf of and to the reasonable satisfaction of the undertakers in accordance with the plans approved or deemed to be approved or settled under this paragraph, and under the supervision (where appropriate and if given) of the undertakers.
- (4) When signifying approval of the plans the engineer may specify any protective works (whether temporary or permanent) which in the engineer’s opinion should be carried out before the commencement of the construction of a specified work to ensure the safety or stability of railway property or the continuation of safe and efficient operation of the railways of Network Rail or the services of operators using the same (including any relocation de-commissioning and removal of works, apparatus and equipment necessitated by a specified work and the comfort and safety of passengers who may be affected by the specified works), and such protective works as may be reasonably necessary for those purposes are to be constructed by Network Rail or by the undertakers, if Network Rail so desires, and such protective works shall be carried out at the expense of the undertakers in either case with all reasonable dispatch and the undertakers shall not commence the construction of the specified works until the engineer has notified the undertakers that the protective works have been completed to the engineer’s reasonable satisfaction.
6
- (1) Any specified work and any protective works to be constructed by virtue of paragraph 5(4) shall, when commenced, be constructed—
- (a) with all reasonable dispatch in accordance with the plans approved or deemed to have been approved or settled under paragraph 5;
- (b) under the supervision (where appropriate and if given) and to the reasonable satisfaction of the engineer;
- (c) in such manner as to cause as little damage as is possible to railway property; and
- (d) so far as is reasonably practicable, so as not to interfere with or obstruct the free, uninterrupted and safe use of any railway of Network Rail or the traffic thereon and the use by passengers of railway property.
- (2) If any damage to railway property or any such interference or obstruction is caused by the carrying out of, or in consequence of the construction of, a specified work, the undertakers must, regardless of any approval described in paragraph 6(1)(a), make good such damage and shall pay to Network Rail all reasonable expenses to which Network Rail may be put and compensation for any loss which it may sustain by reason of any such damage, interference or obstruction.
- (3) Nothing in this Schedule imposes any liability on the undertakers with respect to any damage, costs, expenses or loss attributable to the negligence of Network Rail or its servants, contractors or agents or any liability on Network Rail with respect of any damage, costs, expenses or loss attributable to the negligence of the undertakers or its servants, contractors or agents.
7
The undertakers must—
- (a) at all times afford reasonable facilities to the engineer for access to a specified work during its construction; and
- (b) supply the engineer with all such information as the engineer may reasonably require with regard to a specified work or the method of constructing it.
8
Network Rail must at all times afford reasonable facilities to the undertakers and its agents for access to any works carried out by Network Rail under this part of this Schedule during their construction and must supply the undertakers with such information as it may reasonably require with regard to such works or the method of constructing them.
9
- (1) If any permanent or temporary alterations or additions to railway property, or to any protective works under paragraph 5(4), are reasonably necessary in consequence of the construction of a specified work, or during a period of 24 months after the completion of that work in order to ensure the safety of railway property or the continued safe operation of the railway of Network Rail or the services of operators using the same, such alterations and additions may be carried out by Network Rail and if Network Rail gives to the undertakers reasonable notice of its intention to carry out such alterations or additions (which must be specified in the notice), the undertakers must pay to Network Rail the reasonable cost of those alterations or additions including, in respect of any such alterations and additions as are to be permanent, a capitalised sum representing the increase of the costs which may be expected to be reasonably incurred by Network Rail in maintaining, working and, when necessary, renewing any such alterations or additions.
- (2) If during the construction of a specified work by the undertakers, Network Rail gives notice to the undertakers that Network Rail desires itself to construct that part of the specified work which in the opinion of the engineer is endangering the stability of railway property or the safe operation of traffic on the railways of Network Rail then, if the undertakers decides that part of the specified work is to be constructed, Network Rail must assume construction of that part of the specified work and the undertakers must, notwithstanding any such approval of a specified work under paragraph 5(3), pay to Network Rail all reasonable expenses to which Network Rail may be put and compensation for any loss which it may suffer by reason of the execution by Network Rail of that specified work.
- (3) The engineer must, in respect of the capitalised sums referred to in this paragraph and paragraph 10(a) provide such details of the formula by which those sums have been calculated as the undertakers may reasonably require.
- (4) If the cost of maintaining, working or renewing railway property is reduced in consequence of any such alterations or additions a capitalised sum representing such saving must be set off against any sum payable by the undertakers to Network Rail under this paragraph.
10
The undertakers must repay to Network Rail all reasonable fees, costs, charges and expenses reasonably incurred by Network Rail—
- (a) in constructing any part of a specified work on behalf of the undertakers as provided by paragraph 5(3) or in constructing any protective works under the provisions of paragraph 5(4) including, in respect of any permanent protective works, a capitalised sum representing the cost of maintaining and renewing those works;
- (b) in respect of the approval by the engineer of plans submitted by the undertakers and the supervision by the engineer of the construction of a specified work;
- (c) in respect of the employment or procurement of the services of any inspectors, signalmen, watchmen and other persons whom it shall be reasonably necessary to appoint for inspecting, signalling, watching and lighting railway property and for preventing, so far as may be reasonably practicable, interference, obstruction, danger or accident arising from the construction or failure of a specified work;
- (d) in respect of any special traffic working resulting from any speed restrictions which may in the opinion of the engineer, require to be imposed by reason or in consequence of the construction or failure of a specified work or from the substitution or diversion of services which may be reasonably necessary for the same reason; and
- (e) in respect of any additional temporary lighting of railway property in the vicinity of the specified works, being lighting made reasonably necessary by reason or in consequence of the construction or failure of a specified work.
11
- (1) In this paragraph—
- “EMI” means, subject to sub-paragraph (2), electromagnetic interference with Network Rail’s apparatus generated by the operation of the authorised development where such interference is of a level which adversely affects the safe operation of Network Rail’s apparatus; and
- “Network Rail’s apparatus” means any lines, circuits, wires, apparatus or equipment (whether or not modified or installed as part of the authorised development) which are owned or used by Network Rail for the purpose of transmitting or receiving electrical energy or of radio, telegraphic, telephonic, electric, electronic or other like means of signalling or other communications.
- (2) This paragraph applies to EMI only to the extent that such EMI is not attributable to any change to Network Rail’s apparatus carried out after approval of plans under paragraph 5(1) for the relevant part of the authorised development giving rise to EMI (unless the undertakers has been given notice in writing before the approval of those plans of the intention to make such change).
- (3) Subject to sub-paragraph (5), the undertakers must in the design and construction of the authorised development take all measures necessary to prevent EMI and must establish with Network Rail (both parties acting reasonably) appropriate arrangements to verify their effectiveness.
- (4) In order to facilitate the undertakers’s compliance with sub-paragraph (3)—
- (a) the undertakers must consult with Network Rail as early as reasonably practicable to identify all Network Rail’s apparatus which may be at risk of EMI, and thereafter must continue to consult with Network Rail (both before and after formal submission of plans under paragraph 5(1)) in order to identify all potential causes of EMI and the measures required to eliminate them;
- (b) Network Rail must make available to the undertakers all information in the possession of Network Rail reasonably requested by the undertakers in respect of Network Rail’s apparatus identified pursuant to paragraph (a); and
- (c) Network Rail must allow the undertakers reasonable facilities for the inspection of Network Rail’s apparatus identified pursuant to paragraph (a).
- (5) In any case where it is established that EMI can only reasonably be prevented by modifications to Network Rail’s apparatus, Network Rail must not withhold its consent unreasonably to modifications of Network Rail’s apparatus, but the means of prevention and the method of their execution must be selected in the reasonable discretion of Network Rail, and in relation to such modifications paragraph 5(1) shall have effect subject to this sub-paragraph.
- (6) If at any time prior to the commencement of commercial operation of the authorised development and regardless of any measures adopted under to sub-paragraph (3), the testing or commissioning of the authorised development causes EMI then the undertakers shall immediately upon receipt of notification by Network Rail of such EMI either in writing or communicated orally (such oral communication to be confirmed in writing as soon as reasonably practicable after it has been issued) forthwith cease to use (or procure the cessation of use of) the undertakers’s apparatus causing such EMI until all measures necessary have been taken to remedy such EMI by way of modification to the source of such EMI or (in the circumstances, and subject to the consent, specified in sub-paragraph (5)) to Network Rail’s apparatus.
- (7) In the event of EMI having occurred—
- (a) the undertakers must afford reasonable facilities to Network Rail for access to the undertakers’s apparatus in the investigation of such EMI;
- (b) Network Rail must afford reasonable facilities to the undertakers for access to Network Rail’s apparatus in the investigation of such EMI; and
- (c) Network Rail must make available to the undertakers any additional material information in its possession reasonably requested by the undertakers in respect of Network Rail’s apparatus or such EMI.
- (8) Where Network Rail approves modifications to Network Rail’s apparatus pursuant to sub-paragraphs (5) or (6)—
- (a) Network Rail must allow the undertakers reasonable facilities for the inspection of the relevant part of Network Rail’s apparatus;
- (b) any modifications to Network Rail’s apparatus approved pursuant to those sub-paragraphs must be carried out and completed by the undertakers in accordance with paragraph 6.
- (9) To the extent that it would not otherwise do so, the indemnity in paragraph 15(1) applies to the costs and expenses reasonably incurred or losses suffered by Network Rail through the implementation of the provisions of this paragraph (including costs incurred in connection with the consideration of proposals, approval of plans, supervision and inspection of works and facilitating access to Network Rail’s apparatus) or in consequence of any EMI to which sub-paragraph (6) applies.
- (10) For the purpose of paragraph 10(a) any modifications to Network Rail’s apparatus under this paragraph is deemed to be protective works referred to in that paragraph.
- (11) In relation to any dispute arising under this paragraph the reference in article 33 (arbitration) to an arbitrator to be agreed shall be read as a reference to an arbitrator being a member of the Institution of Electrical Engineers.
12
If at any time after the completion of a specified work, not being a work vested in Network Rail, Network Rail gives notice to the undertakers informing it that the state of maintenance of any part of the specified work appears to be such as adversely affects the operation of railway property, the undertakers must, on receipt of such notice, take such steps as may be reasonably necessary to put that specified work in such state of maintenance as not adversely to affect railway property.
13
The undertakers must not provide any illumination or illuminated sign or signal on or in connection with a specified work in the vicinity of any railway belonging to Network Rail unless it has first consulted Network Rail and it must comply with Network Rail’s reasonable requirements for preventing confusion between such illumination or illuminated sign or signal and any railway signal or other light used for controlling, directing or securing the safety of traffic on the railway.
14
Any additional expenses which Network Rail may reasonably incur in altering, reconstructing or maintaining railway property under any powers existing at the making of this Order by reason of the existence of a specified work, provided that 56 days’ previous notice of the commencement of such alteration, reconstruction or maintenance has been given to the undertakers, are to be repaid by the undertakers to Network Rail.
15
- (1) The undertakers must pay to Network Rail all reasonable costs, charges, damages and expenses not otherwise provided for in this Schedule which may be occasioned to or reasonably incurred by Network Rail—
- (a) by reason of the construction or maintenance of a specified work or the failure thereof; or
- (b) by reason of any act or omission of the undertakers or of any person in its employ or of its contractors or others whilst engaged upon a specified work,
and the undertakers must indemnify and keep indemnified Network Rail from and against all claims and demands arising out of or in connection with a specified work or any such failure, act or omission: and the fact that any act or thing may have been done by Network Rail on behalf of the undertakers or in accordance with plans approved by the engineer or in accordance with any requirement of the engineer or under his supervision will not (if it was done without negligence on the part of Network Rail or of any person in its employ or of its contractors or agents) excuse the undertakers from any liability under the provisions of this sub-paragraph.
- (2) Network Rail must give the undertakers reasonable notice of any such claim or demand and no settlement or compromise of such a claim or demand is to be made without the prior consent of the undertakers, such consent not to be unreasonably withheld.
- (3) The sums payable by the undertakers under sub-paragraph (1) will include a sum equivalent to the relevant costs.
- (4) Subject to the terms of any agreement between Network Rail and a train operator regarding the timing or method of payment of the relevant costs in respect of that train operator, Network Rail must promptly pay to each train operator the amount of any sums which Network Rail receives under sub-paragraph (3) which relates to the relevant costs of that train operator.
- (5) The obligation under sub-paragraph (3) to pay Network Rail the relevant costs will, in the event of default, be enforceable directly by any train operator concerned to the extent that such sums would be payable to that operator pursuant to sub-paragraph (4).
- (6) In this paragraph—
- “the relevant costs” means the costs, direct losses and expenses (including loss of revenue) reasonably incurred by each train operator as a consequence of any restriction of the use of Network Rail’s railway network as a result of the construction, maintenance or failure of a specified work or any such act or omission as mentioned in sub-paragraph (1); and
- “train operator” means any person who is authorised to act as the operator of a train by a licence under section 8 of the Railways Act 1993.
16
Network Rail must, on receipt of a request from the undertakers, from time to time provide the undertakers free of charge with written estimates of the costs, charges, expenses and other liabilities for which the undertakers is or will become liable under this Schedule (including the amount of the relevant costs mentioned in paragraph 15) and with such information as may reasonably enable the undertakers to assess the reasonableness of any such estimate or claim made or to be made pursuant to this Schedule (including any claim relating to those relevant costs).
17
In the assessment of any sums payable to Network Rail under this Schedule there must not be taken into account any increase in the sums claimed that is attributable to any action taken by or any agreement entered into by Network Rail if that action or agreement was not reasonably necessary and was taken or entered into with a view to obtaining the payment of those sums by the undertakers under this Schedule or increasing the sums so payable.
18
The undertakers and Network Rail may, subject in the case of Network Rail to compliance with the terms of its network licence, enter into, and carry into effect, agreements for the transfer to the undertakers of—
- (a) any railway property shown on the works and land plans and described in the book of reference;
- (b) any lands, works or other property held in connection with any such railway property; and
- (c) any rights and obligations (whether or not statutory) of Network Rail relating to any railway property or any lands, works or other property referred to in this paragraph.
19
Nothing in this Order, or in any enactment incorporated with or applied by this Order, shall prejudice or affect the operation of Part I of the Railways Act 1993.
20
The undertakers must give written notice to Network Rail where any application is proposed to be made by the undertakers for the Secretary of State’s consent under article 5 (benefit of the Order) of this Order and any such notice must be given no later than 28 days before any such application is made and must describe or give (as appropriate)—
- (a) the nature of the application to be made;
- (b) the extent of the geographical area to which the application relates; and
- (c) the name and address of the person acting for the Secretary of State to whom the application is to be made.
21
The undertakers must no later than 28 days from the date that the plans submitted to and certified by the Secretary of State in accordance with article 32 (certification of plans etc.), provide a set of those plans to Network Rail in the form of a computer disc with read only memory.
PART 4 — For the protection of Anglian Water Services Limited
1
For the protection of Anglian Water, the following provisions of this Schedule shall, unless otherwise agreed in writing between the undertakers and Anglian Water, have effect.
2
In this part of this Schedule—
- “alternative apparatus” means alternative apparatus adequate to enable Anglian Water to fulfil its statutory functions in not less efficient a manner than previously;
- “Anglian Water” means Anglian Water Services Limited;
- “Apparatus” means any works, mains, pipes or other apparatus belonging to or maintained by Anglian Water for the purposes of water supply and sewerage; and— any drain or works vested in Anglian Water under the Water Industry Act 1991, any sewer which is so vested or is the subject of a notice of intention to adopt given under section 102 (4) of the Water Industry Act 1991 or an agreement to adopt made under section 104 of that Act, and includes a sludge main, disposal main or sewer outfall and any manholes, ventilating shafts, pumps or other accessories forming part of any sewer, drain, or works (within the meaning of section 219 of that Act) and any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;
- “functions” includes powers and duties;
- “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over or upon land; and
- “plan” includes sections, drawings, specifications and method statements.
3
The undertakers shall not interfere with, build over or near to any Apparatus within the Order land or execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within the standard protection strips which are the strips of land falling, the following distances to either side of the medial line of any Apparatus—
- 2.25 metres where the diameter of the pipe is less than 150 millimetres
- 3 metres where the diameter of the pipe is between 150 and 450 millimetres
- 4.5 metres where the diameter of the pipe is between 450 and 750 millimetres
- 6 metres where the diameter of the pipe exceeds 750 millimetres;
unless otherwise agreed in writing with Anglian Water, such agreement not to be unreasonably withheld or delayed, and such provision being brought to the attention of any agent or contractor responsible for carrying out any work on behalf of the undertakers.
4
The alteration, extension, removal or re-location of any Apparatus shall not be implemented until—
- (a) any requirement for any permits under the Environmental Permitting (England and Wales) Regulations 2010 or other legislations and any other associated consents are obtained, and any approval or agreement required from Anglian Water on alternative outfall locations as a result of such re-location are approved, such approvals or agreement from Anglian Water not to be unreasonably withheld or delayed; and
- (b) the undertakers has made the appropriate application required under the Water Industry Act 1991 together with a plan and description of the works proposed and Anglian Water has agreed all of the contractual documentation required under the Water Industry Act 1991, such agreement not to be unreasonably withheld or delayed; and such works to be executed only in accordance with the plan and description submitted and in accordance with such reasonable requirements as may be made by Anglian Water without delay for the alteration or otherwise for the protection of the Apparatus, or for securing access to it.
5
In the situation, where in exercise of the powers conferred by the Order, the undertakers acquires any interest in any land in which Apparatus is placed and such Apparatus is to be relocated, extended, removed or altered in any way, no alteration or extension shall take place until Anglian Water has established to its reasonable satisfaction, contingency arrangements in order to conduct its functions for the duration of the works to relocate, extend, remove or alter the Apparatus. Anglian Water shall use reasonable endeavours to establish contingency arrangements in a timely manner.
6
Regardless of any provision in this Order or anything shown on any plan, the undertakers must not acquire any Apparatus otherwise than by agreement, and before extinguishing any existing rights for Anglian Water to use, keep, inspect, renew and maintain its Apparatus in the Order land, the undertakers shall, with the agreement of Anglian Water, create a new right to use, keep, inspect, renew and maintain the Apparatus that is reasonably convenient for Anglian Water such agreement not to be unreasonably withheld or delayed, and to be subject to arbitration under article 33 (arbitration).
7
If in consequence of the exercise of the powers conferred by the Order the access to any Apparatus is materially obstructed the undertakers shall provide such alternative means of access to such Apparatus as will enable Anglian Water to maintain or use the apparatus no less effectively than was possible before such obstruction.
8
If in consequence of the exercise of the powers conferred by the Order, previously unmapped sewers, lateral drains or other Apparatus are identified by the undertakers, notification of the location of such assets will immediately be given to Anglian Water and afforded the same protection as other Anglian Water assets.
9
If for any reason or in consequence of the construction of any of the works referred to in paragraphs 4 to 6 and 8 any damage is caused to any Apparatus (other than Apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of Anglian Water, or there is any interruption in any service provided, or in the supply of any goods, by Anglian Water, the undertakers shall—
- (a) bear and pay the cost reasonably incurred by Anglian Water in making good any damage or restoring the supply; and
- (b) make reasonable compensation to Anglian Water for any other expenses, loss, damages, penalty or costs properly and reasonably incurred by Anglian Water,
by reason or in consequence of any such damage or interruption.
10
Nothing in paragraph 9 shall impose any liability on the undertakers with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of Anglian Water, its officer, servants, contractors or agents.
11
Any difference or dispute arising between the undertakers and Anglian Water under this Schedule shall, unless otherwise agreed in writing between the undertakers and Anglian Water, be determined by arbitration in accordance with article 33 (arbitration).
PART 5 — For the protection of National Grid Gas plc and National Grid Electricity Transmission plc
Application
1
For the protection of the statutory undertakers referred to in this part of this Schedule the following provisions shall, unless otherwise agreed in writing between the undertakers and the statutory undertakers concerned, have effect.
Interpretation
2
In this Part of this Schedule—
- “1991 Act” means the New Roads and Street Works Act 1991;
- “alternative apparatus” means appropriate alternative apparatus to the reasonable satisfaction of the statutory undertakers to enable the statutory undertakers in question to fulfil its statutory functions in a manner no less efficient than previously;
- “apparatus” means— in the case of an electricity undertakers, electric lines or electrical plant as defined in the Electricity Act 1989, belonging to or maintained by that undertakers; in the case of a gas undertakers, any mains, pipes or other apparatus belonging to or maintained by a gas transporter for the purposes of gas supply;
- “commence” has the same meaning as article 2 of this Order;
- “functions” includes powers and duties;
- “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over, across, along or upon such land;
- “maintain” and “maintenance” shall include the ability and right to do any of the following in relation to any apparatus or alternative apparatus of the statutory undertakers including construct, use, repair, alter, inspect, renew or remove the apparatus;
- “plan” or “plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe the works to be executed;
- “statutory undertakers” means— any licence holder within the meaning of Part 1 of the Electricity Act 1989; and a gas transporter within the meaning of Part 1 of the Gas Act 1986; for the area of the authorised development, and in relation to any apparatus, means the statutory undertakers to whom it belongs or by whom it is maintained;
- “undertakers” means the undertakers as defined in article 2 of this Order.
Apparatus of undertakers in stopped up streets
3
Notwithstanding the temporary stopping up or diversion of any highway under the powers of article 10 (temporary stopping up of streets), a statutory undertakers shall be at liberty at all times to take all necessary access across any such stopped up highway and/or to execute and do all such works and things in, upon or under any such highway as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the stopping up or diversion was in that highway subject always to the undertaking of works by the undertakers authorised by this Order.
Acquisition of land
4
Regardless of any provision in this Order or anything shown on the land plans or contained in the book of reference to the Order, the undertakers shall not acquire any interest in land or any apparatus or override any easement or other interest of the statutory undertakers otherwise than by agreement, such agreement not to be unreasonably withheld or delayed.
Removal of apparatus
5
- (1) If, in the exercise of the agreement reached in accordance with paragraph 4 or in any other authorised manner, the undertakers acquires any interest in any land in which any apparatus is placed, that apparatus shall not be removed under this part of this Schedule and any right of a statutory undertakers to maintain that apparatus in that land shall not be extinguished until alternative apparatus has been constructed, and is in operation to the reasonable satisfaction of the statutory undertakers in question in accordance with sub-paragraphs (2) to (5) inclusive.
- (2) If, for the purpose of executing any works in, on, under or over any land purchased, held, appropriated or used under this Order, the undertakers requires the removal of any apparatus placed in that land, it shall give to the statutory undertakers in question 56 days’ advance written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order a statutory undertakers reasonably needs to remove any of its apparatus) the undertakers shall, subject to sub-paragraph (3), afford to the statutory undertakers to their reasonable satisfaction (taking into account paragraph 6(1)) the necessary facilities and rights for—
- (a) the construction of alternative apparatus in other land of the undertakers; and
- (b) subsequently for the maintenance of that apparatus.
- (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertakers, or the undertakers is unable to afford such facilities and rights as are mentioned in sub-paragraph (2), in the land in which the alternative apparatus or part of such apparatus is to be constructed, the statutory undertakers in question shall, on receipt of a written notice to that effect from the undertakers, as soon as reasonably possible take such steps as are reasonable in the circumstances in an endeavour to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed except that this obligation shall not extend to the requirement for the statutory undertakers to use its compulsory purchase powers to this end unless it elects to so do.
- (4) Any alternative apparatus to be constructed in land of the undertakers under this part of this Schedule shall be constructed in such manner and in such line or situation as may be agreed between the statutory undertakers in question and the undertakers.
- (5) The statutory undertakers in question shall, after the alternative apparatus to be provided or constructed has been agreed, and subject to the grant to the statutory undertakers of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertakers to be removed under the provisions of this part of this Schedule.
Facilities and rights for alternative apparatus
6
- (1) Where, in accordance with the provisions of this part of this Schedule, the undertakers affords to a statutory undertakers facilities and rights for the construction and maintenance in land of the undertakers of alternative apparatus in substitution for apparatus to be removed, those facilities and rights shall be granted upon such terms and conditions as may be agreed between the undertakers and the statutory undertakers in question and shall be no less favourable on the whole to the statutory undertakers in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed unless agreed by the statutory undertakers.
- (2) If the facilities and rights to be afforded by the undertakers and agreed with the statutory undertakers under paragraph 7(1) in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to the statutory undertakers in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator shall make such provision for the payment of compensation by the undertakers to that statutory undertakers as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.
Retained apparatus: protection: gas undertakers
7
- (1) Not less than 56 days before commencing the execution of any works authorised by this Order that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertakers under paragraph 5(2) or otherwise, the undertakers shall submit to the statutory undertakers in question a plan.
- (2) In relation to works which will or may be situated on, over, under or within 15 metres measured in any direction of any apparatus, or (wherever situated) impose any load directly upon any apparatus or involve embankment works within 15 metres of any apparatus, the plan to be submitted to the statutory undertakers under sub-paragraph (1) shall be detailed including a material statement and describing—
- (a) the exact position of the works;
- (b) the level at which these are proposed to be constructed or renewed;
- (c) the manner of their construction or renewal including details of excavation, positioning of plant etc.;
- (d) the position of all apparatus; and
- (e) by way of detailed drawings, every alteration proposed to be made to or close to any such apparatus.
- (3) The undertakers shall not commence the construction or renewal of any works to which sub-paragraph (1) or (2) applies until the statutory undertakers has given written approval of the plan so submitted.
- (4) Any approval of the statutory undertakers required under sub-paragraph (3)—
- (a) may be given subject to reasonable conditions for any purpose mentioned in sub-paragraph (5) or (7);
- (b) shall not be unreasonably withheld or delayed.
- (5) In relation to a work to which sub-paragraph (1) or (2) applies, the statutory undertakers may require such modifications to be made to the plans as may be reasonably necessary for the purpose of securing its system against interference or risk of damage or for the purpose of providing or securing proper and convenient means of access to any apparatus provided that such modifications are made within a period of 56 days beginning with the date on which the plan under sub-paragraph (1) is submitted to it. For the avoidance of doubt, provided that any further iterations of the plan submitted to the statutory undertakers for approval as a result of modifications required under this paragraph are not materially different to the modifications previously made by the statutory undertakers, any further required modifications will be made by the statutory undertakers as soon as reasonably practicable thereafter and in any event within 21 days of receipt of any further plans.
- (6) Works executed under this Order shall be executed only in accordance with the plan, submitted under sub-paragraph (1) or as relevant sub paragraph (2), as amended from time to time by agreement between the undertakers and the statutory undertakers and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (5) or (7) by the statutory undertakers for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and the statutory undertakers shall be entitled to watch and inspect the execution of those works.
- (7) Where statutory undertakers require any protective works to be carried out either themselves or by the undertakers (whether of a temporary or permanent nature) such protective works shall be carried out to the statutory undertakers’ satisfaction prior to the carrying out of any works authorised by the Order (or any relevant part thereof) and the statutory undertakers shall give 56 days’ notice of such works from the date of submission of a plan in line with sub-paragraph (1) or (2) (except in an emergency).
- (8) If a statutory undertakers in accordance with sub-paragraph (5) or (7) and in consequence of the works proposed by the undertakers, reasonably requires the removal of any apparatus and gives written notice to the undertakers of that requirement, paragraphs 1 to 3 and 6 to 8 shall apply as if the removal of the apparatus had been required by the undertakers under paragraph 5(2).
- (9) Nothing in this paragraph shall preclude the undertakers from submitting at any time or from time to time, but in no case less than 56 days before commencing the execution of any works, a new plan, instead of the plan previously submitted, and having done so the provisions of this paragraph shall apply to and in respect of the new plan.
- (10) The undertakers shall not be required to comply with sub-paragraph (1) where it needs to carry out emergency works as defined in the 1991 Act but in that case it shall give to the statutory undertakers in question notice as soon as is reasonably practicable and a plan of those works and shall—
- (a) comply with sub-paragraphs (5), (6) and (7) insofar as is reasonably practicable in the circumstances; and
- (b) comply with sub-paragraph (11) at all times.
- (11) At all times when carrying out any works authorised under the Order comply with National Grid’s policies for safe working in proximity to gas apparatus “Specification for safe working in the vicinity of National Grid, High pressure Gas pipelines and associated installation requirements for third parties T/SP/SSW27” and HSE’s “HS(~G)47 Avoiding Danger from underground services”.
Retained apparatus: protection: electricity undertakers
8
- (1) Not less than 56 days before commencing the execution of any works authorised by this Order that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertakers under paragraph 5(2) or otherwise, the undertakers shall submit to the statutory undertakers in question a plan.
- (2) In relation to works which will or may be situated on, over, under or within 8.1 metres measured in any direction of any apparatus, or involve embankment works within 8.1 metres of any apparatus, the plan to be submitted to the statutory undertakers under sub-paragraph (1) shall be detailed including a material statement and describing—
- (a) the exact position of the works;
- (b) the level at which these are proposed to be constructed or renewed;
- (c) the manner of their construction or renewal including details of excavation, positioning of plant;
- (d) the position of all apparatus; and
- (e) by way of detailed drawings, every alteration proposed to be made to or close to any such apparatus.
- (3) The undertakers shall not commence the construction or renewal of any works to which sub-paragraph (1) or (2) applies until the statutory undertakers has given written approval of the plan so submitted.
- (4) Any approval of the statutory undertakers required under sub-paragraph (3)—
- (a) may be given subject to reasonable conditions for any purpose mentioned in sub-paragraph (5) or (7);
- (b) shall not be unreasonably withheld.
- (5) In relation to a work to which sub-paragraph (1) or (2) applies, the statutory undertakers may require such modifications to be made to the plans as may be reasonably necessary for the purpose of securing its system against interference or risk of damage or for the purpose of providing or securing proper and convenient means of access to any apparatus provided that such modifications are made within a period of 56 days beginning with the date on which the plan under sub-paragraph (1) is submitted to it. For the avoidance of doubt, provided that any further iterations of the plan submitted to the statutory undertakers for approval as a result of modifications required under this paragraph are not materially different to the modifications previously made by the statutory undertakers, any further required modifications will be made by the statutory undertakers as soon as reasonably practicable thereafter and in any event within 21 days of receipt of any further plans.
- (6) Works executed under this Order shall be executed only in accordance with the plan, submitted under sub-paragraph (1) or as relevant sub paragraph (2), as amended from time to time by agreement between the undertakers and the statutory undertakers and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (5) or (7) by the statutory undertakers for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and the statutory undertakers shall be entitled to watch and inspect the execution of those works.
- (7) Where statutory undertakers require any protective works to be carried out either themselves or by the undertakers (whether of a temporary or permanent nature) such protective works shall be carried out to the statutory undertakers’ satisfaction prior to the carrying out of any works authorised by the Order (or any relevant part thereof) and the statutory undertakers shall give 56 days’ notice of such works from the date of submission of a plan in line with sub-paragraph (1) or (2) (except in an emergency).
- (8) If a statutory undertakers in accordance with sub-paragraph (5) or (7) and in consequence of the works proposed by the undertakers, reasonably requires the removal of any apparatus and gives written notice to the undertakers of that requirement, paragraphs 1 to 3 and 6 to 8 shall apply as if the removal of the apparatus had been required by the undertakers under paragraph 5(2).
- (9) Nothing in this paragraph shall preclude the undertakers from submitting at any time or from time to time, but in no case less than 56 days before commencing the execution of any works, a new plan, instead of the plan previously submitted, and having done so the provisions of this paragraph shall apply to and in respect of the new plan.
- (10) The undertakers shall not be required to comply with sub-paragraph (1) where it needs to carry out emergency works as defined in the 1991 Act but in that case it shall give to the statutory undertakers in question notice as soon as is reasonably practicable and a plan of those works and shall—
- (a) comply with sub-paragraphs (5), (6) and (7) insofar as is reasonably practicable in the circumstances; and
- (b) comply with sub-paragraph (11) at all times.
- (11) At all times when carrying out any works authorised under the Order comply with National Grid’s policies for development near over headlines EN43-8 and HSE’s guidance note 6 “Avoidance of Danger from Overhead Lines”.
Expenses
9
- (1) Subject to the following provisions of this paragraph, the undertakers shall repay to a statutory undertakers on demand all charges, costs and expenses reasonably and properly incurred by that statutory undertakers in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in this Schedule including without limitation—
- (a) any costs reasonably incurred or compensation properly paid in connection with the acquisition of rights or the exercise of statutory powers for such apparatus including without limitation in the event that the statutory undertakers elects to use powers of compulsory acquisition to acquire any necessary rights under 5(3) all costs incurred as a result of such action;
- (b) in connection with the cost of the carrying out of any diversion work or the provision of any alternative apparatus;
- (c) the cutting off of any apparatus from any other apparatus or the making safe of redundant apparatus;
- (d) the approval of plans;
- (e) the carrying out of protective works, plus a capitalised sum to cover the cost of maintaining and renewing permanent protective works;
- (f) the survey of any land, apparatus or works, the inspection and monitoring of works or the installation or removal of any temporary works reasonably necessary in consequence of the execution of any such works referred to in this Schedule.
- (2) There shall be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Schedule and which is not re-used as part of the alternative apparatus, that value being calculated after removal.
- (3) If in accordance with the provisions of this part of this Schedule—
- (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
- (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,
and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertakers or in default of agreement settled by arbitration in accordance with article 34 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the statutory undertakers in question by virtue of sub-paragraph (1) shall be reduced by the amount of that excess save where it is not possible in the circumstances to obtain the existing type of operations, capacity, dimensions or place at the existing depth in which case full costs shall be borne by the undertakers.
- (4) For the purposes of sub-paragraph (3)—
- (a) an extension of apparatus to a length greater than the length of existing apparatus shall not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
- (b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole shall be treated as if it also had been agreed or had been so determined.
- (5) An amount which apart from this sub-paragraph would be payable to a statutory undertakers in respect of works by virtue of sub-paragraph (1) shall, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the statutory undertakers any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.
Compensation
10
- (1) Subject to sub-paragraphs (2), (3) and (4), if by reason or in consequence of the construction of any such works authorised by this Schedule or in consequence of the construction, use, maintenance or failure of any of the authorised development by or on behalf of the undertakers or in consequence of any act or default of the undertakers (or any person employed or authorised by him) in the course of carrying out such works, including without limitation works carried out by the undertakers under this Schedule or any subsidence resulting from any of these works), any damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of a statutory undertakers, or there is any interruption in any service provided, or in the supply of any goods, by any statutory undertakers, or the statutory undertakers becomes liable to pay any amount to any third party, the undertakers shall—
- (a) bear and pay on demand the cost reasonably incurred by that statutory undertakers in making good such damage or restoring the supply; and
- (b) compensate that statutory undertakers for any other expenses, loss, demands, proceedings, damages, claims, penalty or costs incurred by or recovered from the statutory undertakers, by reason or in consequence of any such damage or interruption or the statutory undertakers becoming liable to any third party as aforesaid.
- (2) The fact that any act or thing may have been done by a statutory undertakers on behalf of the undertakers or in accordance with a plan approved by a statutory undertakers or in accordance with any requirement of a statutory undertakers or under its supervision shall not (subject to sub-paragraph (3), excuse the undertakers from liability under the provisions of this sub-paragraph (1)).
- (3) Nothing in sub-paragraph (1) shall impose any liability on the undertakers with respect to any damage or interruption to the extent that it is attributable to the neglect or default of a statutory undertakers, its officers, servants, contractors or agents.
- (4) A statutory undertakers shall give the undertakers reasonable notice of any such claim or demand and no settlement or compromise shall be made without first consulting the undertakers and considering their representations (such representations not to be unreasonably withheld or delayed).
Ground subsidence monitoring scheme in respect of statutory undertakers’s apparatus
11
- (1) No works within 15 metres of any apparatus or alternative apparatus shall commence until a scheme for monitoring ground subsidence (“referred to in this paragraph as the monitoring scheme”) which is capable of interfering with or risking damage to statutory undertakers’s apparatus has been submitted to and approved by the relevant statutory undertakers, such approval not to be unreasonably withheld or delayed.
- (2) The ground subsidence monitoring scheme described in sub-paragraph (1) shall set out—
- (a) the apparatus which is to be subject to such monitoring;
- (b) the extent of land to be monitored;
- (c) the manner in which ground levels are to be monitored;
- (d) the timescales of any monitoring activities; and
- (e) the extent of ground subsidence which, if exceeded, shall require the undertakers to submit for statutory undertakers’s approval a ground subsidence mitigation scheme in respect of such subsidence in accordance with sub-paragraph (3).
- (3) The monitoring scheme required by sub-paragraphs (1) and (2) must be submitted within 56 days prior to the commencement of any works authorised by this Order or comprised within the authorised development. Any requirements of the statutory undertakers will be notified within 28 days of receipt of the monitoring scheme. Thereafter the monitoring scheme must be implemented as approved, unless otherwise agreed in writing with the statutory undertakers.
- (4) As soon as reasonably practicable after any ground subsidence identified by the monitoring activities set out in the monitoring scheme has exceeded the level described in sub-paragraph (2)(e), a scheme setting out necessary mitigation measures (if any) for such ground subsidence (referred to in this paragraph as a “mitigation scheme”) shall be submitted to the statutory undertakers for approval, such approval not to be unreasonably withheld or delayed; and any mitigation scheme must be implemented as approved, unless otherwise agreed in writing with the statutory undertakers except that the statutory undertakers retains the right to carry out any further necessary protective works for the safeguarding of their apparatus and can recover any such costs in line with paragraph 10.
Enactments and agreements
12
Nothing in this part of this Schedule shall affect the provisions of any enactment or agreement regulating the relations between the undertakers and a statutory undertakers in respect of any apparatus laid or erected in land belonging to the undertakers on the date on which this Order is made.
Co-operation
13
Where in consequence of the proposed construction of any of the authorised development, the undertakers or a statutory undertakers requires the removal of apparatus under paragraph 5(2) or a statutory undertakers makes requirements for the protection or alteration of apparatus under paragraph 7 or 8 the undertakers shall use its best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of the statutory undertakers’s undertaking and each statutory undertakers shall use its best endeavours to co-operate with the undertakers for that purpose.
Access
14
If in consequence of the agreement reached in accordance with paragraph 4 or the powers granted under this Order the access to any apparatus is materially obstructed, the undertakers shall provide such alternative means of access to such apparatus as will enable the statutory undertakers to maintain or use the apparatus no less effectively than was possible before such obstruction.
Arbitration
15
Save for differences or disputes arising under paragraphs 5(2) and (4), 6(1), 7 and 8 any difference or dispute arising between the undertakers and a statutory undertakers under this Schedule shall, unless otherwise agreed in writing between the undertakers and that statutory undertakers, be determined by arbitration in accordance with article 34 (arbitration).
SCHEDULE 10 — Deemed licence under the Marine and Coastal Access Act 2009 – generation assets
PART 1 — Licensed marine activities
1
- (1) In this licence—
- “the 2008 Act” means the Planning Act 2008[^f00032];
- “the 2009 Act” means the Marine and Coastal Access Act 2009[^f00033];
- “Annex 1 Habitat” means such habitat as defined under the EU Council Directive 92/43/EEC[^f00034] on the Conservation of Natural Habitats and of Wild Fauna and Flora;
- “authorised deposits” means the substances and articles specified in paragraph 2(4) of Part 1 of this Schedule;
- “authorised scheme” means Work No. 1 described in paragraph 2 of Part 1 of this Schedule;
- “Cefas” means the Centre for Environment, Fisheries and Aquaculture Science;
- “commence” means the first carrying out of any part of the licensed activities save for pre-construction surveys and monitoring and “commencement” shall be construed accordingly;
- “condition” means a condition in Part 2 and references in this licence to numbered conditions are to conditions with those numbers in Part 2;
- “draft written scheme of investigation: archaeology and cultural heritage (offshore)” means the document certified as the draft written scheme of investigation: archaeology and cultural heritage (offshore) by the Secretary of State for the purposes of this Order;
- “enforcement officer” means a person authorised to carry out enforcement duties under Chapter 3 of the Marine and Coastal Access Act 2009;
- “environmental statement” means the document certified as the environmental statement by the Secretary of State for the purposes of this Order and submitted with the application;
- “gravity base foundation” means a structure principally of steel, concrete, or steel and concrete which rests on the seabed either due to its own weight with or without added ballast or additional skirts and associated equipment including scour protection, J-tubes, corrosion protection systems and access platforms and equipment;
- “HVAC offshore collector station” means a platform with one or more decks, whether open or fully clad, accommodating electrical power transformers, low, medium and/or high voltage switch gear, instrumentation, protection and control systems, neutral earthing resistors, reactive compensation, standby electrical generation equipment, fuelling facilities, auxiliary and uninterruptible power supply systems and transformers, accommodation and/or emergency shelter, craneage, metering stations, meteorological equipment, helicopter landing facilities, messing facilities, potable water storage, black water separation equipment, control hub, drainage facilities, access equipment, J-tubes, marking and lighting and other associated equipment and facilities to enable the transmission of electronic communications and for electricity to be collected at, and exported from, the platform;
- “jacket foundation” means a steel jacket/lattice-type structure constructed of steel which is fixed to the seabed at two or more points with steel pin piles or steel suction buckets and associated equipment including scour protection, J-tubes, corrosion protection systems and access platform(s) and equipment, and “discrete jacket foundation types” shall include pre-piled or post-piled jackets, three-legged or four legged jackets, or straight or battered leg jackets;
- “JNCC” means the Joint Nature Conservation Committee;
- “Kingfisher Fortnightly Bulletin” means the bulletin published by the Humber Seafood Institute or such other alternative publication approved in writing by the MMO for the purposes of this licence;
- “LAT” means lowest astronomical tide;
- “licensed activities” means the activities specified in Part 1 of this licence;
- “maintain” includes inspect, maintain, repair, adjust and alter, and further includes remove, reconstruct and replace any of the ancillary works in Part 2 of Schedule 1 (authorised project) and any component part of any wind turbine generator, offshore substation or meteorological mast described in Part 1 of Schedule 1 (authorised project) (but not including the alteration, removal or replacement of foundations) to the extent assessed in the environmental statement; and “maintenance” shall be construed accordingly;
- “major storm event” means a greater than 1 in 10 year wave event within the Order limits seaward of MHWS in terms of a wave height measured from the West Gabbard Waverider buoy (WESTGAB) or any other definition as agreed with the MMO;
- “Marine Management Organisation” or “MMO” means the body created under the Marine and Coastal Access Act 2009 which is responsible for the monitoring and enforcement of this licence;
- “MCA” means the Maritime and Coastguard Agency;
- “mean high water springs level” or “MHWS” means the highest level which spring tides reach on average over a period of time;
- “meteorological mast” means a mast housing equipment to measure wind speed and other wind characteristics, including a topside housing electrical, communication and associated equipment and marking and lighting;
- “monopile foundation” means a steel pile, typically cylindrical, driven and/or drilled into the seabed and associated equipment including scour protection, J-tubes, corrosion protection systems and access platform(s) and equipment;
- “notice to mariners” includes any notice to mariners which may be issued by the Admiralty, Trinity House, Queen’s harbourmasters, government departments and harbour and pilotage authorities;
- “offshore Order limits” means the limits shown on the works plan within which the authorised scheme may be carried out;
- “offshore substation” means a HVAC collector station;
- “the Order” means the East Anglia ONE Offshore Wind Farm Order 2014;
- “Order limits boundary coordinates plan” means the document certified as the Order limits boundary coordinates plan by the Secretary of State for the purposes of this Order;
- “outline navigation monitoring strategy” means the document certified as the outline navigation monitoring strategy by the Secretary of State for the purposes of this Order;
- “outline offshore operations and maintenance and monitoring plan” means the document certified as the outline offshore operations and maintenance and monitoring plan by the Secretary of State for the purposes of this Order;
- “suction buckets” means large diameter steel cylindrical shells which penetrate the seabed assisted by hydrostatic pressure differential for fixity of steel jacket foundations;
- “suction caisson foundation” means a tubular steel structure which penetrates the seabed assisted by a hydrostatic pressure differential and associated equipment, including scour protection, J-tubes, corrosion protection systems and access platform(s) and equipment;
- “Trinity House” means the Corporation of Trinity House of Deptford Strond;
- “UK Hydrographic Office” means the UK Hydrographic Office of Admiralty Way, Taunton, Somerset, TA1 2DN;
- “undertakers” means East Anglia ONE Limited;
- “vessel” means every description of vessel, however propelled or moved, and includes a non-displacement craft, a personal watercraft, a seaplane on the surface of the water, a hydrofoil vessel, a hovercraft or any other amphibious vehicle and any other thing constructed or adapted for movement through, in, on or over water and which is at the time in, on or over water;
- “wind turbine generator” or “WTG” means a structure comprising a tower, rotor with three blades connected at the hub, nacelle and ancillary electrical and other equipment which may include J-tube(s), transition piece, access and rest platforms, access ladders, boat access systems, corrosion protection systems, fenders and maintenance equipment, helicopter landing facilities and other associated equipment, fixed to a foundation;
- “Work No. 2” means up to two HVDC offshore converter stations;
- “Work No. 3A” means up to four HVDC export cables from Work No. 2 to MHWS; and
- “works plan” means the plan certified as the works plan by the Secretary of State for the purposes of the Order.
- (2) A reference to any statute, order, regulation or similar instrument shall be construed as a reference to a statute, order, regulation or instrument as amended by any subsequent statute, order, regulation or instrument or as contained in any subsequent re-enactment.
- (3) Unless otherwise indicated—
- (a) all times shall be taken to be Greenwich Mean Time (GMT);
- (b) all co-ordinates shall be taken to be latitude and longitude degrees and minutes to two decimal places.
- (4) Except where otherwise notified in writing by the relevant organisation, the primary point of contact with the organisations listed below and the address for returns and correspondence shall be—
- (a) Marine Management Organisation
Offshore Marine Licensing
Lancaster House
Hampshire Court
Newcastle upon Tyne
NE4 7YH
Tel: 0300 123 1032
- (b) Marine Management Organisation (local office)
Marine Environment Team
Pakefield Road
Lowestoft
Suffolk
NR33 0HT
- (c) Trinity House
Tower Hill
London
EC3N 4DH
Tel: 020 7481 6900
- (d) The United Kingdom Hydrographic Office
Admiralty Way
Taunton
Somerset
TA1 2DN
Tel: 01823 337 900
- (e) Maritime and Coastguard Agency
Navigation Safety Branch
Bay 2/04, Spring Place
105 Commercial Road
Southampton
SO15 1EG
Tel: 023 8032 9191
- (f) Centre for Environment, Fisheries and Aquaculture Science
Pakefield Road
Lowestoft
Suffolk
NR33 0HT
Tel: 01502 562 244
- (g) Natural England
Foundry House
3 Millsands
Riverside Exchange
Sheffield
S3 8NH
Tel: 0300 060 4911
- (h) English Heritage
Eastgate Court
195-205 High Street
Guildford
GU1 3EH
Tel: 01483 252 057
- (i) JNCC
Inverdee House
Baxter Street
Aberdeen
AB11 9QA
Tel: 01224 266 550.
Details of licensed marine activities
2
- (1) Subject to the licence conditions, this licence authorises the undertakers (and any agent or contractor acting on their behalf) to carry out the following licensable marine activities under section 66(1) of the 2009 Act—
- (a) the deposit at sea of the substances and articles specified in sub-paragraph (4);
- (b) the construction of works in or over the sea and/or on or under the sea bed; and
- (c) the removal of sediment samples for the purposes of informing environmental monitoring under this licence during pre-construction, construction and operation.
- (2) Such activities are authorised in relation to the construction, maintenance and operation of—
Work No. 1—
- (a) an offshore wind turbine generating station with a gross electrical output capacity of up to 1,200 MW comprising up to 240 wind turbine generators each fixed to the seabed by one of three foundation types (namely, jacket foundation, gravity base foundation or suction caisson foundation), fitted with rotating blades and situated within the area shown on the works plan and further comprising paragraphs (b) to (d);
- (b) up to three HVAC offshore collector stations fixed to the seabed within the area shown on the works plan by one of two foundation types (namely jacket foundation or gravity base foundation);
- (c) up to one meteorological mast fixed to the seabed within the area shown on the works plan by one of four foundation types (namely jacket foundation, gravity base foundation, suction caisson foundation or monopile foundation);
- (d) a network of subsea cables within the area shown on the works plan between the WTGs and the HVAC offshore collector stations, up to two interconnection cables between the HVAC offshore collector stations, up to ten export cables between the HVAC offshore collector stations and Work No. 2, and up to one interconnection cable between the HVDC offshore converter stations comprising Work No. 2 for the transmission of electricity and electronic communications between these different structures including one or more cable crossings.
- (3) And in connection with such Work No. 1, ancillary works within the Order limits which have been subject to an environmental impact assessment recorded in the environmental statement comprising—
- (a) temporary landing places, moorings or other means of accommodating vessels in the construction and/or maintenance of the authorised scheme;
- (b) buoys, beacons, fenders and other navigational warning or ship impact protection works;
- (c) temporary works for the benefit or protection of land or structures affected by the authorised scheme; and
- (d) the disposal of up to 5,603,500 metres³ of inert material of natural origin within the offshore Order limits produced during construction drilling and seabed preparation for foundation works and cable sandwave preparation works at disposal site reference TH23 East Anglia ONE.
- (4) The substances or articles authorised for deposit at sea are—
- (a) iron/steel;
- (b) stone and rock;
- (c) concrete;
- (d) sand and gravel;
- (e) plastic/synthetic;
- (f) material extracted from within the offshore Order limits during construction drilling and seabed preparation for foundation works and cable sandwave preparation works; and
- (g) marine coatings, other chemicals and timber.
3
The grid coordinates for the authorised scheme are specified below and more particularly shown on the Order limits boundary coordinates plan—
| Point | Latitude (DMS) | Longitude (DMS) |
|---|---|---|
| A | 52° 17′ 50.395″ | 2° 21′ 1.372″ |
| B | 52° 19′ 10.175″ | 2° 27′ 36.407″ |
| C | 52° 23′ 22.654″ | 2° 31′ 40.044″ |
| D | 52° 21′ 53.636″ | 2° 34′ 13.872″ |
| E | 52° 18′ 15.833″ | 2° 34′ 13.645″ |
| F | 52° 7′ 14.982″ | 2° 32′ 58.021″ |
| G | 52° 4′ 46.512″ | 2° 31′ 2.669″ |
| H | 52° 4′ 45.732″ | 2° 28′ 1.913″ |
4
This licence shall remain in force until the authorised scheme has been decommissioned in accordance with a programme approved by the Secretary of State under section 106 of the 2004 Act, including any modification to the programme under section 108, and the completion of such programme has been confirmed by the Secretary of State in writing.
5
The provisions of section 72 of the 2009 Act shall apply to this licence except that the provisions of section 72(7) relating to the transfer of the licence shall only apply to a transfer not falling within article 5 (benefit of the Order).
6
Where the words ‘unless otherwise agreed’ or ‘unless otherwise stated’ appear in the conditions in Part 2, any such agreement or statement may only be given in relation to immaterial changes where it has been demonstrated to the satisfaction of MMO that the subject matter of the approval or agreement sought is unlikely to give rise to any materially new or materially different environmental effects from those assessed in the environmental statement.
PART 2 — Conditions
Design parameters for wind turbines
1
- (1) No wind turbine generator forming part of the authorised scheme shall—
- (a) exceed a height of 200 metres when measured from LAT to the tip of the vertical blade;
- (b) exceed a height of 120 metres to the height of the centreline of the generator shaft forming part of the hub when measured from LAT;
- (c) exceed a rotor diameter of 170 metres;
- (d) be less than 675 metres from the nearest WTG in either direction perpendicular to the approximate prevailing wind direction (crosswind) or be less than 900 metres from the nearest WTG in either direction which is in line with the approximate prevailing wind direction (downwind);
- (e) have a distance of less than 22 metres between the lowest point of the rotating blade of the wind turbine and MHWS;
- (f) except with the consent of the Secretary of State, have an electrical output of less than 5MW.
- (2) In sub-paragraph (1), references to the location of a wind turbine generator are references to the centre point of that turbine.
2
No meteorological mast, wind turbine generator or HVAC offshore collector station forming part of the authorised scheme shall be erected within the areas hatched black on the works plan, whose coordinates are specified below and more particularly shown on the Order limits boundary coordinates plan—
| Point | Latitude (DMS) | Longitude (DMS) |
|---|---|---|
| i | 52° 17′ 29.501″ | 2° 21′ 18.183″ |
| ii | 52° 19′ 32.953″ | 2° 29′ 16.557″ |
| iii | 52° 19′ 47.657″ | 2° 34′ 8.460″ |
| iv | 52° 20′ 36.356″ | 2° 34′ 8.509″ |
| v | 52° 20′ 18.296″ | 2° 28′ 48.188″ |
| vi | 52° 23′ 17.520″ | 2° 31′ 41.224″ |
| vii | 52° 21′ 52.244″ | 2° 34′ 8.586″ |
| viii | 52° 18′ 15.948″ | 2° 34′ 8.368″ |
| ix | 52° 7′ 15.824″ | 2° 32′ 52.848″ |
| x | 52° 4′ 49.734″ | 2° 30′ 59.349″ |
| xi | 52° 4′ 48.985″ | 2° 28′ 5.706″ |
3
- (1) The total number of HVAC offshore collector stations forming part of the authorised scheme must not exceed three.
- (2) The dimensions of any HVAC offshore collector stations forming part of the authorised scheme (excluding towers, helipads, masts and cranes) must not exceed 60 metres in height when measured from LAT, 30 metres in length and 40 metres in width.
4
- (1) The total length of the cables comprising Work No. 1(d) must not exceed 680 kilometres.
- (2) The total amount of cable protection for the cables comprising Work No. 1(d) must not exceed 3,000 metres³.
5
- (1) In relation to a WTG, each gravity base foundation must not have—
- (a) diameter at the level of the seabed which is more than 50 metres;
- (b) a base height, where there is a flat base and a cylindrical shaft, which is more than 10 metres above the level of the seabed;
- (c) a column diameter, where there is a flat or conical base, of more than 7.5 metres at LAT.
- (2) In relation to a WTG, each suction caisson foundation must not have—
- (a) a diameter at the level of the seabed which is more than 25 metres;
- (b) a base height where there is a flat base, which is more than 5 metres above the level of the seabed;
- (c) a column diameter which is more than 7.5 metres at LAT.
- (3) In relation to a WTG, each jacket foundation must not have—
- (a) a width spacing between its legs at the level of the seabed which is more than 35 metres;
- (b) a pile diameter which is more than 2.5 metres in the case of pin piles or a suction bucket diameter of more than 5 metres;
- (c) more than one pile per leg or more than one suction bucket per leg;
- (d) more than four legs.
- (4) In relation to a meteorological mast, each monopile foundation must not have a diameter greater than 6.5 metres.
- (5) The total number of WTGs with gravity base foundations must not exceed 240.
- (6) The total amount of scour protection for the WTGs and HVDC offshore converter stations forming part of the authorised scheme must not exceed 3.5 kilometres².
Notifications and inspections
6
- (1) The undertakers must ensure that—
- (a) a copy of this licence (issued as part of the grant of the Order) and any subsequent amendments or revisions to it is provided to—
- (i) all agents and contractors notified to the MMO in accordance with condition 15; and
- (ii) the masters and transport managers responsible for the vessels notified to the MMO in accordance with condition 15;
- (b) within 28 days of receipt of a copy of this licence those persons referred to at paragraph (a) must provide a completed form to the MMO confirming their understanding of the terms of conditions of this licence.
- (2) Only those persons and vessels notified to the MMO in accordance with condition 15 are permitted to carry out the licensed activities.
- (3) Copies of this licence must also be available for inspection at the following locations—
- (a) the undertakers’s registered address;
- (b) any site office located at or adjacent to the construction site and used by the undertakers or its agents and contractors responsible for the loading, transportation or deposit of the authorised deposits; and
- (c) on board each vessel and at the office of any transport manager with responsibility for vessels from which authorised deposits or removals are to be made.
- (4) The document referred to in sub-paragraph (1)(a) must be available for inspection by an authorised enforcement officer at all times at the locations set out in sub-paragraph (3).
- (5) The undertakers must provide access, and if necessary appropriate transportation, to the offshore construction site or any other associated works or vessels to facilitate any inspection that the MMO considers necessary to inspect the works during construction and operation of the authorised scheme.
- (6) The undertakers must inform the local MMO office in writing at least ten working days prior to the commencement of the licensed activities or any part of them and within ten working days of completion of any works comprised in the licensed activities.
- (7) Prior to the commencement of the licensed activities the undertakers must publish in the Kingfisher Fortnightly Bulletin details of the vessel routes (if appropriate), timings and locations relating to the construction of the authorised scheme.
- (8) The undertakers must ensure that a notice to mariners is issued at least 10 working days prior to the commencement of the licensed activities or any part of them advising of the start date of Work No. 1 and the expected vessel routes from the local construction ports to the relevant location.
- (9) The undertakers must ensure that the notices to mariners are updated and reissued at regular intervals, and at least fortnightly, and supplemented with VHF radio broadcasts agreed with the MCA in accordance with the construction programme approved under condition 11(a). Copies of all notices must be provided to the MMO.
- (10) The undertakers must notify—
- (a) the Hydrographic Office of both the commencement (within two weeks), progress and completion (within two weeks) of the authorised scheme in order that all necessary amendments to nautical charts are made; and
- (b) the MMO, MCA and Trinity House once the authorised scheme is completed and any required lighting or marking has been established.
Offshore safety management
7
- (1) The authorised scheme shall not commence until the Secretary of State, in consultation with the MCA, has confirmed in writing that the undertakers has taken into account and adequately addressed all MCA recommendations contained within MGN 371 “Offshore Renewable Energy Installations (OREIs) – Guidance on UK Navigational Practice, Safety and Emergency Response Issues” and its annexes including full details of the Emergency Co-operation Plans (ERCoP) for the construction, operation and decommissioning as appropriate to the authorised scheme.
- (2) The undertakers will prepare and implement a project-specific Active Safety Management System, taking account of safety and mitigation measures as referred to in the navigation risk assessment in the environmental statement.
Aids to navigation
8
- (1) The undertakers must at or near the authorised scheme during the whole period of the construction, operation, alteration, replacement or decommissioning of the authorised scheme exhibit such lights, marks, sounds, signals and other aids to navigation and take such other steps for the prevention of danger to navigation as Trinity House may from time to time direct.
- (2) The undertakers must ensure that timely and efficient notices to mariners and other navigational warnings of the position and nature of the authorised scheme seaward of MHWS, are issued during and after the period of construction, alteration, replacement or decommissioning of the authorised scheme, such information to be promulgated to mariners in the shipping and fishing industry as well as to recreational mariners, in accordance with condition 6(8) and (9).
- (3) The undertakers must notify Trinity House as soon as reasonably practicable of both the progress and completion of the authorised scheme seaward of MHWS and any aids for navigation established from time to time.
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.