The North Wales Wind Farms Connection Order 2016

Type Statutory-Instrument
Publication 2016-07-28
Last updated 2017-03-31
State In force
Department King's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API

Procedure in relation to certain approvals etc.

39
  • (1) Where an application is made to or request is made of the relevant planning authority, a relevant highway authority, a traffic authority, a street authority, or the owner of a watercourse, sewer or drain for any consent, agreement or approval required or contemplated by any of the provisions of the Order (not including the Requirements), such consent, agreement or approval to be validly given, must be given in writing and must not be unreasonably withheld or delayed.
  • (2) Schedule 10 (procedure for discharge of Requirements) has effect in relation to all consents, agreements or approvals granted, refused or withheld in relation to the Requirements and any other consent, agreement or approval required under this Order.

Arbitration

40

Subject to article 38 (procedure in relation to certain approvals etc.) and except where otherwise provided for in this Order any difference under any provision of this Order, is to be referred to and settled by a single arbitrator to be agreed between the parties or, failing agreement, to be appointed on the application of either party (after giving notice in writing to the other) by the Secretary of State.

SCHEDULE 1 — AUTHORISED DEVELOPMENT

A nationally significant infrastructure project, as defined in sections 14(b) and 16 of the 2008 Act comprising the construction and installation of a 132kV electric line above ground, approximately 17.4 km in length, including up to 225 double wood pole supports consisting of 3 phased conductors, overhead and underground earthwire and protection and control cable comprising—

in the County of Denbighshire—

Work No. 1A—

  • (a) the construction and installation of a double wood pole 132kV above ground electric line, approximately 9.6 km in length, including up to 4 permanent supporting stays for each double wood pole support extending up to 19 m from the central point of the support together with foundations and all modifications required to any support to facilitate a change in angle of the electric line, commencing in the vicinity of the gantries at the new collector substation to be built at Clocaenog Forest, breaking for each section of Work No. 1B and terminating at a terminal structure south of Glascoed Road, B5381, and more particularly shown on sheet 1 to sheet 8 and sheet 12 to sheet 13 on the works plans; and
  • (b) the construction and installation of a terminal structure with up to 6 permanent supporting stays south of Glascoed Road, B5381.

Work No. 2A—

  • (a) site preparation works and site clearance (including fencing, felling and vegetation removal);
  • (b) earthworks (including soil stripping and storage and site levelling);
  • (c) works to alter the position of existing services;
  • (d) establishment of temporary laydown and storage area, temporary vehicle parking and construction fencing;
  • (e) establishment of winching points and the installation of scaffolding;
  • (f) tree and hedgerow planting;
  • (g) landscaping and ecological measures to replace trees, hedgerows and other vegetation that has been removed during construction;
  • (h) temporary and permanent means of access and trackways;
  • (i) drainage works and temporary culverts; and
  • (j) works to streets and any alteration, removal or installation of road furniture required to facilitate the construction of temporary accesses.

Work No. 3A development comprising landscaping to mitigate any adverse effects of the maintenance or use of the authorised development together with means of access.

Work No. 4 development comprising establishment of a temporary site construction compound including means of access, soil stripping and storage, creation of hard standing, vehicle parking, perimeter enclosure, security fencing, storage areas, construction related buildings, welfare facilities, construction lighting, drainage, bunding for fuel storage tanks and internal tracks.

in the County Borough of Conwy—

Work No. 1B development comprising the construction and installation of a double wood pole 132kV electric line above ground, approximately 7.8 km in length, including up to 4 permanent supporting stays for each double wood pole support extending up to 19 m from the central point of the support together with foundations and all modifications required to any support to facilitate a change in angle of the electric line, commencing at Pandy Wood (sheet 5 of the works plans), breaking for each section of Work No. 1A and terminating at the River Elwy (sheet 12 of the works plans) and more particularly shown on sheet 5 to sheet 6 and sheet 8 to sheet 12 on the works plans.

Work No. 2B—

  • (a) site preparation works and site clearance (including fencing, felling and vegetation removal;
  • (b) earthworks (including soil stripping and storage and site levelling);
  • (c) works to alter the position of existing services;
  • (d) establishment of temporary laydown and storage area, temporary vehicle parking and construction fencing;
  • (e) establishment of winching points and the installation of scaffolding;
  • (f) tree and hedgerow planting;
  • (g) landscaping and ecological measures to replace trees, hedgerows and other vegetation that has been removed during construction;
  • (h) temporary and permanent means of access and trackways;
  • (i) drainage works and temporary culverts; and
  • (j) works to streets and any alteration, removal or installation of road furniture required to facilitate the construction of temporary accesses.

Work No. 3B development comprising landscaping to mitigate any adverse effects of the maintenance or use of the authorised development together with means of access.

SCHEDULE 2 — REQUIREMENTS

Interpretation

1

In this Schedule—

  • “Broadleys compound” means the construction compound located on plot 53B and shown on sheet 7 of the land plans;
  • “core working hours” means Monday to Friday between 0700 and 1900 hours during the months of March to October and 0730 to 1730 or during daylight hours, whichever is the shorter, during the months of January to February and November to December and 0700 and 1300 hours on Saturday with no works to take place on Sundays and bank or public holidays;
  • “daylight hours” means the hours during which construction activities can be undertaken without the use of artificial lighting;
  • “decommissioning and site restoration scheme” means a plan that sets out details of the decommissioning and removal of numbered works 1A and 1B, the restoration of the land and the timeframe for completion of those works;
  • “ecological management plan” means the ecological management plan to be submitted to the relevant planning authority pursuant to Requirement 13;
  • “felling” means any felling or lopping undertaken pursuant to article 31 (felling or lopping of trees and removal of hedgerows) of this Order;
  • “HGVs” means goods vehicles weighing greater than 3.5 tonnes (gross);
  • “landscape planting” means new trees, shrubs and other soft landscaping to be located on the land shown coloured dark green and the land shown cross-hatched green on the land plans;
  • “new tree” means a tree that is not a replacement tree for a tree that has been removed as a result of the construction of the authorised development on the land shown coloured yellow and land shown coloured blue on the land plans (but excluding any such land shown cross-hatched green on the land plans);
  • “outline construction environmental management plan” means the document with reference 6.18 v.4 and certified by the Secretary of State and includes—the outline ecological management plan (document reference 6.18D v3);the outline hedgerow management plan (document reference 6.18C v4);the outline traffic management plan (document reference 6.18E v2);
  • “outline landscape management plan” means the plan annexed at appendix 7.6 of the environmental statement (document reference 6.20.6 v2);
  • “planning consent” means any of the following—planning permission granted under Part 3 of the 1990 Act;development consent granted under the 2008 Act;consent granted under the Electricity Act 1989; orplanning permission granted under the Town and Country Planning (General Permitted Development) Order 1995;
  • “reinstatement planting” means the reinstatement of the vegetation that has been removed to enable the construction of the authorised development on the land shown coloured yellow and the land shown coloured blue on the land plans (but excluding any such land shown cross-hatched green on the land plans);
  • “relevant design principles” means the design principles in section 2.2 of the design and construction report (document reference 7.1);
  • “stage” means a defined section or part of the authorised development, the extent of which is shown in a scheme submitted to and approved by the relevant planning authority pursuant to Requirement 4 (stages of authorised development); and
  • “wind farms” means the wind farms known as—Nant Bach approved under planning permission DC/0/35170 or such other planning consent replacing it or amending it;Derwydd Bach approved under planning permission 04/2007/0964/WF or such other planning consent replacing it or amending it;Clocaenog Forest approved under The Clocaenog Forest Wind Farm Order 201423 or such other planning consent replacing it or amending it; andBrenig approved under planning permission 25/2007/0565/WF or such other planning consent replacing it or amending it.

Time limits

2

The authorised development must be commenced within 5 years of the date that this Order is made.

Detailed Design

3
  • (1) The authorised development must be carried out in accordance with the approved plans, inclusive of any limits of deviation, bearing the references listed below and any other plans, drawings, documents, details, schemes, statements or strategies which are approved by the relevant planning authority pursuant to any Requirement—
Works plans Submission document reference number 2.3.0-2.3.13 Option B (revision 0)
Access and rights of way plans Submission document reference number 2.4.0-2.4.13 Option B (revision 0)
Section drawings Submission document reference number 2.7.0-2.7.29 Option B (revision P7)
Compound layout drawing Submission document reference number 2.7.30 (revision 1)
  • (2) Subject to article 4 (limits of deviation), the authorised development must be carried out in accordance with the parameters specified below—
Building or Structure Maximum height Above Existing Ground Level (metres) Minimum height Above Existing Ground Level (metres)
Double wood pole (each pole) 16.4 10.8
Terminal structure (cable connection) 15.8 11.8
Terminal structure (gantry) 14.7 12.7
  • (3) Any part of the authorised development must be designed substantially in accordance with the relevant design principles.

Stages of authorised development

4
  • (1) No authorised development is to commence until a written scheme setting out all the stages of the authorised development has been submitted to and approved by the relevant planning authority, such scheme to include the following details—
  • (a) confirmation whether the authorised development is to be carried out in a single stage or multiple stages;
  • (b) if multiple stages, the chronological order of such stages; and
  • (c) the date of commencement of each stage.
  • (2) The authorised development must be carried out in accordance with the approved scheme.

Landscaping

5
  • (1) No stage of the authorised development is to commence until a written landscaping scheme for that stage, in respect of landscape planting, which is substantially in accordance with the outline landscape management plan and the planting principles contained in the ecological management plan, has been submitted to and approved by the relevant planning authority. The landscaping scheme must include details of the landscape planting, including—
  • (a) location, number, species, size and planting density of any landscape planting;
  • (b) cultivation, importing of materials and other operations to ensure plant establishment;
  • (c) vehicular and pedestrian access, parking and circulation areas;
  • (d) implementation timetable for the landscape planting; and
  • (e) details of a maintenance regime for the landscape planting.
  • (2) The written landscaping scheme must not be submitted to the relevant planning authority pursuant to sub-paragraph (1) until consultation on the written landscaping scheme has been carried out with the owners of the land on which the landscape planting is proposed to be located and the undertaker must have regard to the consultation responses received.
  • (3) With respect to the landscaping scheme(s) approved under sub-paragraph (1), the undertaker may submit to the relevant planning authority for approval any amendments to such approved scheme(s) provided always that the approved landscaping scheme(s) (as may be amended under this sub-paragraph) remains substantially in accordance with the outline landscape management plan and the planting principles contained in the ecological management plan and includes the details listed in sub-paragraph (1).
  • (4) The landscape planting must be planted and maintained in accordance with the landscaping scheme(s) as approved under this Requirement.

Dying, diseased, damaged planting

6

Notwithstanding the maintenance regime to be approved pursuant to Requirement 5 and Requirement 7, where any tree or shrub planted as part of the landscaping scheme under Requirement 5 or the reinstatement planting plan under Requirement 7 (including new trees), is removed, dies or becomes seriously damaged or diseased, within a period of 5 years from the date of completion of the stage of landscape planting or reinstatement planting within which it is planted, it must be replaced by the undertaker in the first available planting season with a specimen of the same species and size as that originally planted.

Reinstatement planting

7
  • (1) The reinstatement planting must not include any new trees except by agreement with the owner of the land on which the reinstatement planting is to be carried out.
  • (2) No reinstatement planting which is to contain a new tree pursuant to the terms of Requirement 7(1) is to be carried out until a reinstatement planting plan has been submitted to and approved by the relevant planning authority. The reinstatement planting plan must include details of the new trees being introduced including—
  • (a) location, number, species, size and planting density of the new trees;
  • (b) cultivation, importing of materials and other operations to ensure tree establishment;
  • (c) details of the maintenance regime; and
  • (d) implementation timetable for reinstatement planting.
  • (3) With respect to the reinstatement planting plan approved under sub-paragraph (2), the undertaker may submit to the relevant planning authority for approval any amendments to such approved plan provided always that the approved plan (as may be amended under this sub-paragraph) includes the details listed in sub-paragraph (2).
  • (4) The new trees planted pursuant to this Requirement must be planted and maintained in accordance with the reinstatement planting plan as approved under this Requirement.

Felling

8
  • (1) All felling must be undertaken in accordance with the relevant guidance specified in paragraph (2) and NRW best practice (as amended from time to time).
  • (2) The relevant guidance is—
  • (a) The UK Forestry Standard (“UKFS”);
  • (b) UKFS Guidelines – Forests and Water (2011);
  • (c) UKFS Guidelines – Forests and Soil (2011);
  • (d) UKFS Guidelines – Forests and Biodiversity (2011); and
  • (e) UKFS Guidelines – Forests and Historic Environment (2011).

Highway works

9
  • (1) No work to construct or alter any permanent or temporary means of access to a highway to be used by vehicular traffic must commence until, following consultation with the relevant highway authority, written details of the design and layout of that means of access has been submitted to and approved by the relevant highway authority.
  • (2) The highway accesses must be constructed in accordance with the details approved under sub-paragraph (1).

Construction Hours

10
  • (1) Subject to sub-paragraphs (2) and (3), construction work must not take place other than during the core working hours.
  • (2) The following operations must only take place between 0900 and 1700 hours Monday to Friday and excluding bank or public holidays—
  • (a) piling;
  • (b) excavator and hydraulic jack hammer operations; and
  • (c) HGV deliveries to and from Broadleys compound.
  • (3) The following operations may take place outside the core working hours referred to in sub-paragraph (1)—
  • (a) the installation and removal of protective netting across highways or watercourses;
  • (b) only at Broadleys compound, the completion of operations commenced during the core working hours which cannot safely be stopped; and
  • (c) only at Broadleys compound, start up and close down activities up to one hour either side of core working hours.
  • (4) No artificial lighting is to be used in carrying out the construction of the authorised development other than at Broadleys compound.

Contaminated land and groundwater

11
  • (1) In the event that contamination is found at any time when carrying out the authorised development, it must be reported in writing immediately to the relevant planning authority and the carrying out of that part of the authorised development affected by such contamination must cease immediately. An investigation and risk assessment must be completed in accordance with a scheme to assess the nature and extent of any contamination within the Order limits and whether or not it originates within the Order limits, such scheme to be submitted to and approved by the relevant planning authority, after consulting with NRW. The investigation and risk assessment must be undertaken by competent persons and a written report of the findings must be produced and submitted to and approved by the relevant planning authority, after consulting with NRW.
  • (2) Where remediation is required pursuant to the approved investigation and risk assessment, a detailed remediation scheme to bring the relevant land to a condition suitable for the intended use must be prepared, and submitted for the written approval of the relevant planning authority.
  • (3) The approved remediation scheme must be carried out in accordance with its terms.
  • (4) Following completion of measures identified in the approved remediation scheme, a verification report that demonstrates the effectiveness of the remediation carried out must be produced, and approved in writing by the relevant planning authority.
  • (5) Where the carrying out of any part of the authorised development has ceased pursuant to sub-paragraph (1) the undertaker may only recommence the carrying out of that part of the authorised development following—
  • (a) where remediation is required pursuant to the approved investigation and risk assessment for contamination affecting that part, the completion of measures pursuant to sub-paragraph (4); or
  • (b) in all other cases the approval of the investigation and risk assessment pursuant to sub-paragraph (2).

Archaeology

12
  • (1) No stage of the authorised development is to commence until, following consultation with the Clwyd-Powys Archaeological Trust and the relevant planning authority, for that stage, a written scheme setting out the methodology for a watching brief over areas of archaeological interest has been submitted to and approved by the relevant planning authority.
  • (2) The scheme must identify areas where a watching brief is required, and the measures to be taken to protect, record or preserve any significant archaeological remains that may be found.
  • (3) Any watching brief carried out under the scheme must be by a suitably qualified person or body approved by the relevant planning authority.
  • (4) Any watching brief must be carried out in accordance with the approved scheme.

Construction Environmental Management Plan

13
  • (1) No stage of the authorised development is to commence until, following consultation with NRW, the highways authority and the relevant planning authority, a construction environmental management plan for that stage, which is substantially in accordance with the outline construction environmental management plan, has been submitted to and approved by the relevant planning authority, after consulting with NRW. The construction environmental management plan must include measures to minimise impacts of construction works and must include but not be limited to the following plans—
  • (a) an ecological management plan including but not limited to method statements for sensitive habitats and species;
  • (b) hedgerow management plan including but not limited to principles to be followed for hedgerow removal and reinstatement;
  • (c) a traffic management plan including but not limited to the following—
  • (i) details of haulage routes for HGVs to use to deliver materials to the authorised development;
  • (ii) communication of the routes to drivers of HGVs;
  • (iii) details of timing for deliveries;
  • (iv) proposals for assessing the existing condition of affected highways; and
  • (v) details for making good any incidental damage to highways by construction traffic associated with the authorised development.
  • (2) The authorised development must be carried out in accordance with the construction environmental management plan as approved under this Requirement.

Piling

14
  • (1) No stage of the authorised development which requires piling activities must commence until a piling method statement for that stage of the authorised development has been submitted to and approved by the relevant planning authority.
  • (2) Piling must be carried out in accordance with the approved piling method statement.

Restoration of land used temporarily for construction

15
  • (1) No land within the Order limits that is to be used temporarily for construction is to be used until a photographic condition survey has been carried out and submitted to and approved by the relevant planning authority.
  • (2) Any land within the Order limits which is used temporarily for construction must be reinstated to its former condition as identified on the photographic condition survey, or such condition as the relevant planning authority may approve, within six months of the date of final commissioning of the authorised development (or such other period as may be agreed with the owner of the land) and the relevant planning authority shall be notified in writing upon reinstatement.

Requirement for written approval

16

Where under any of the above Requirements, the approval or agreement of the relevant planning authority or another person is required, that approval or agreement must be given in writing.

Decommissioning

17
  • (1) Not less than 12 months before the date set out in Requirement 19 (expiry of development consent), a decommissioning and site restoration scheme must be submitted to the relevant planning authority for its approval.
  • (2) The decommissioning and site restoration scheme must include provision for—
  • (a) a timetable for the implementation and completion of the decommissioning and site restoration scheme;
  • (b) removal of works 1A and 1B;
  • (c) the restoration of the Order land;
  • (d) a methodology for the ecological management of sensitive habitats during the decommissioning and restoration works;
  • (e) a methodology for the management of traffic during the decommissioning and restoration works; and
  • (f) a decommissioning environmental management plan, which is, where relevant to the proposed works, substantially in accordance with the construction environmental management plan approved in accordance with Requirement 13.
  • (3) Decommissioning and restoration must be completed in accordance with the approved decommissioning and site restoration scheme within the period set out in the approved scheme.

Decommissioning Environmental Management Plan

18
  • (1) No stage of the authorised development is to be decommissioned until, following consultation with NRW, the highways authority and the relevant planning authority, a decommissioning environmental management plan for that stage has been submitted to and approved by the relevant planning authority, after consultating with NRW. The decommissioning environmental management plan must include measures to minimise impacts of decommissining works and must include but not be limited to the following plans—
  • (a) an ecological management plan including but not limited to method statements for sensitive habitats and species;
  • (b) hedgerow management plan including but not limited to principles to be followed for hedgerow reinstatement;
  • (c) a traffic management plan including but not limited to the following—
  • (i) details of haulage routes for HGVs to use to deliver materials to or remove materials from the authorised development;
  • (ii) communication of the routes to drivers of HGVs;
  • (iii) details of timing for deliveries or removals;
  • (iv) proposals for assessing the existing condition of affected highways; and
  • (v) details for making good any incidental damage to highways by construction traffic associated with decommissioning the authorised development.
  • (2) The decommissioning of the authorised development must be carried out in accordance with the decommissioning environmental management plan as approved under this Requirement.
19

The development consent granted by this Order expires 30 years after the date of this Order.

Requirements for written approval, etc.

20
  • (1) Where under any of the above Requirements the approval or agreement of the relevant planning authority or any other party is required, that approval or agreement must be provided in writing.
  • (2) Where under any of the above Requirements a written scheme is required it shall be accompanied by such illustrations as are necessary and appropriate in the circumstances.

Approved plans and amendments to approved plans.

21
  • (1) Where a Requirement requires the authorised development to be carried out in accordance with a plan, scheme, statement, strategy or details (the “plan”) approved by the relevant planning authority, the approved plan must be taken to include any amendments that may be approved subsequently by the relevant planning authority (after consulting every person required to be consulted before approval of the original plan).
  • (2) The relevant planning authority must not approve the plan or an amendment to the plan unless it is satisfied that the plan or the amendment is unlikely to give rise to any new or materially different environmental effects from those assessed in the environmental statement.

SCHEDULE 3 — STREETS SUBJECT TO PERMANENT AND TEMPORARY ALTERATION OF LAYOUT

PART 1 — PERMANENT ALTERATION OF LAYOUT

(1) Area (2) Street subject to alteration of layout (3) Description of alteration
Denbighshire Access track from Leger Bach Modify the existing tarmacked track comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 6) between points AZ1/AZ2 and BA to provide temporary access to numbered work 1A during construction.
Conwy Access track from Leger Bach Modify the existing tarmacked track comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 6) between points BA to BB to provide temporary access to numbered work 1B during construction.
Denbighshire Lon Llewelyn (A453) Extend existing access comprising part of numbered work 4 and shown on the access and rights of way plans (sheet 7) between points AQ1 and AQ2 to provide temporary access to numbered work 4 during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Access track from A543 to Broadleys Farm Modify the existing track comprising part of numbered works 4 and shown on the access and rights of way plans (sheet 7) between points AQ1/2 and AR to provide temporary access to numbered work 4 during construction.
Conwy Henllan to Llannefydd Road Upgrade existing access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 10) between points BY1 and BY2 to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Access track from Henllan to Llannefydd Road Modify the existing stoned track comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 10) between points BY1/2 and BZ to provide temporary access to numbered work 1B during construction.
Conwy Bontnewydd Road Extend existing access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 11) between points CJ1 and CJ2 to provide temporary access to numbered work 1B during construction and for maintenance. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Access track from Bontnewydd Road Modify the existing stoned track comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 11) between points CJ1/2 and CK to provide temporary access to numbered work 1B during construction.
Conwy Henllan to Llannefydd Road Upgrade existing access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 12) between points CN1 and CN2 to provide temporary access to numbered work 1B during construction and for maintenance. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Access track from Henllan to Llannefydd Road Modify the existing stoned track comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 12) between points CN1/2 and CQ to provide temporary access to numbered work 1B during construction.

PART 2 — TEMPORARY ALTERATION OF LAYOUT

(1) Area (2) Street subject to alteration of layout (3) Description of alteration
Denbighshire Hafodty Ddu Road Creation of new southern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 1) between points A and B to provide temporary access to numbered work 1A during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Hafodty Ddu Road Creation of new northern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 1) between points A and B to provide temporary access to numbered work 1A during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Hafodty Ddu Road Extend existing western access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 1) between points C1 and C2 to provide temporary access to numbered work 1A during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Hafodty Ddu Road Extend existing eastern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 1) between points C2 and C3 to provide temporary access to numbered work 1A during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Access track from Hafodty Ddu Road Creation of temporary stoned track comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 1) between points C1/C2 and D to provide temporary access to numbered work 1A during construction.
Denbighshire Access track from Hafodty Ddu Road Creation of temporary stoned track comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 1) between points C2/C3 and E to provide temporary access to numbered work 1A during construction.
Denbighshire Hafodty Ddu Road Creation of new western access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 1) between points J and K to provide temporary access to numbered work 1A during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Hafodty Ddu Road Creation of new eastern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 1) between points J and K to provide temporary access to numbered work 1A during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Hafodty Ddu Road Creation of new access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 2) between points L1 and L2 to provide temporary access to numbered work 1A during construction and for maintenance. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Access track from Hafodty Ddu Road Creation of temporary stoned track comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 2) between points L1/L2 and M to provide temporary access to numbered work 1A during construction.
Denbighshire Nantglyn to Saron Road (B5435) Creation of new southern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 2) between points P and Q to provide temporary access to numbered work 1A during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Nantglyn to Saron Road (B5435) Creation of new northern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 2) between points P and Q to provide temporary access to numbered work 1A during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Bwlch Road Extend existing southern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 3) between points T2 and U1 to provide temporary access to numbered work 1A during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Bwlch Road Upgrade existing northern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 3) between points T2 and U1 to provide temporary access to numbered work 1A during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Prion Road Extend existing access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 3) between points X1 and X2 to provide temporary access to numbered work 1A during construction and for maintenance. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Access track off Prion Road Creation of temporary stoned track comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 3) between pointsX1/X2 and Y to provide temporary access to numbered work 1A during construction.
Denbighshire Denbigh to Cerrigydrudion Road (B4501) Extend existing southern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 4) between points AB1 and AB2 to provide temporary access to numbered work 1A during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Denbigh to Cerrigydrudion Road (B4501) Extend existing northern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 4) between points AD1 and AD2 to provide temporary access to numbered work 1A during construction and for maintenance. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Access track off Denbigh to Cerrigydrudion Road (B4501) Creation of temporary stoned track comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 4) between pointsAD1/AD2 and AE to provide temporary access to numbered work 1A during construction.
Denbighshire Denbigh to Nantglyn Road Creation of new access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 5) between points AH1 and AH2 to provide temporary access to numbered work 1A during construction and for maintenance. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Access track off Denbigh to Nantglyn Road Creation of temporary stoned track comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 5) between points AH1/AH2 and AI to provide temporary access to numbered work 1A during construction.
Denbighshire Denbigh to Nantglyn Road Creation of new access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 5) between points AJ and AK to provide temporary access to numbered work 1A during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Ffordd Gwaenynog (Bodeiliog Road) Extend existing eastern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 6) between points AO and AP to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Ffordd Gwaenynog (Bodeiliog Road) Upgrade existing western access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 6) between points AO and AP to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Lon Llewelyn (A543) Extend existing southern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 6) between points AU2 and AV to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Lon Llewelyn (A543) Extend existing southern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 6) between points AV and AW to provide temporary access to numbered work 1A during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Lon Llewelyn (A543) Creation of new northern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 6) between points AU2 and AV to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Lon Llewelyn (A543) Creation of new northern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 6) between points AV and AW to provide temporary access to numbered work 1A during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Access track from Lon Llewelyn (A543) Creation of temporary stoned track comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 6) between points AX1/AX2 and AY to provide temporary access to numbered work 1A during construction.
Denbighshire Access track from Leger Bach Creation of temporary stoned track comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 6) between points BC and BB to provide temporary access to numbered work 1A during construction.
Conwy Access track from Leger Bach Creation of temporary stoned track comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 6) between points BB and BD to provide temporary access to numbered work 1B during construction.
Denbighshire Access track from Leger Bach Creation of temporary stoned track comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 6) between points BD and BE to provide temporary access to numbered work 1A during construction.
Conwy Henllan to Groes Road (B5428) Creation of new southern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 8) between points BH and BI2 to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Henllan to Groes Road (B5428) Creation of new northern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 8) between points BH and BI2 to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Eriviat Bach Road Creation of new southern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 8) between points BJ and BK2 to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Eriviat Bach Road Creation of new northern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 8) between points BJ and BK2 to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Henllan to Llansannan Road (B5382) Creation of new southern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 9) between points BN2 and BO to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Henllan to Llansannan Road (B5382) Extend existing northern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 9) between points BN2 and BO to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Henllan to Cefn Berain Road Extend existing access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 10) between points BR1 and BR2 to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Access track from Henllan to Cefn Berain Road Creation of temporary stoned track comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 10) between points BR1/BR2 and BS to provide temporary access to numbered work 1B during construction.
Conwy Henllan to Cefn Berain Road Extend existing southern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 10) between points BT2 and BU to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Henllan to Cefn Berain Road Extend existing northern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 10) between points BT2 and BU to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Cefn Berain to Bontnewydd Road Extend existing southern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 10) between points BV and BW2 to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Cefn Berain to Bontnewydd Road Creation of new northern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 10) between points BV and BW2 to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Henllan to Llannefydd Road Creation of new northern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 10) between points CD1 and CD2 to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Henllan to Llannefydd Road Upgrade existing eastern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 11) between points CB2 and CE1 to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Henllan to Llannefydd Road Extend existing access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 11) between points CB1 and CA1 to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Bontnewydd Road Upgrade existing southern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 11) between points CF and CG to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Bontnewydd Road Upgrade existing northern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 11) between points CF and CG to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Conwy Bontnewydd Road Extend existing northern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 11) between points CH and CI2 to provide temporary access to numbered work 1B during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Groesffordd Marli to Cefn Meiriadog Road Creation of new southern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 13) between points CR and CS to provide temporary access to numbered work 1A during construction.
Denbighshire Groesffordd Marli to Cefn Meiriadog Road Extend existing northern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 13) between points CR and CS to provide temporary access to numbered work 1A during construction. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Groesffordd Marli to Glascoed Road Extend existing access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 13) between points CT1 and CT2 to provide temporary access to numbered work 1A during construction and for maintenance. Comprising, where required, of the installation of new or improved street surface, white lining, removal of vegetation including hedgerows and replacement of vegetation including hedgerows.
Denbighshire Access track from Groesffordd Marli to Glascoed Road Creation of temporary stoned track comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 13) between points CT1/CT2 and CU to provide temporary access to numbered work 1A during construction.

SCHEDULE 4 — STREETS SUBJECT TO STREET WORKS

(1) Area (2) Street subject to street works
Denbighshire Hafodty Ddu Road
Denbighshire Access tracks off Hafodty Ddu Road
Denbighshire Nantglyn to Saron Road (B5435)
Denbighshire Bwlch Road
Denbighshire Prion Road
Denbighshire Access track off Prion Road
Denbighshire Denbigh to Cerrigydrudion Road (B4501)
Denbighshire Access track off Denbigh to Cerrigydrudion Road (B4501)
Denbighshire Denbigh to Nantglyn Road
Denbighshire Access track off Denbigh to Nantglyn Road
Conwy Ffordd Gwaenynog (Bodeiliog Road)
Conwy Lon Llewelyn (A543)
Denbighshire Lon Llewelyn (A543)
Conwy Access tracks off Lon Llewelyn (A543)
Denbighshire Access tracks off Lon Llewelyn (A543)
Denbighshire Access track off Lon Llewelyn (A543) to Broadleys Farm
Conwy Henllan to Groes Road (B5428)
Conwy Eriviat Bach Road
Conwy Henllan to Llansannan Road (B5382)
Conwy Henllan to Cefn Berain Road
Conwy Access track off Henllan to Cefn Berain Road
Conwy Cefn Berain to Bontnewydd Road
Conwy Henllan to Llannefydd Road
Conwy Access track off Henllan to Cefn Berain Road
Conwy Bontnewydd Road
Conwy Access track off Henllan to Llannefydd Road
Denbighshire Groesffordd Marli to Cefn Meiriadog Road
Denbighshire Groesffordd Marli to Glascoed Road
Denbighshire Access track off Groesffordd Marli to Glascoed Road

SCHEDULE 5 — ACCESS

PART 1 — THOSE PARTS OF ACCESSES TO BE MAINTAINED AT THE EXPENSE OF THE UNDERTAKER

(1) Area (2) Street (3) Description of relevant part of access
Denbighshire Hafodty Ddu Road The new southern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 1) hatched green between points A and B.
Denbighshire Hafodty Ddu Road The new northern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 1) hatched green between points A and B.
Denbighshire Hafodty Ddu Road The extension of the existing western access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 1) hatched green between points C1 and C2.
Denbighshire Hafodty Ddu Road The extension of the existing eastern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 1) hatched green between points C2 and C3.
Denbighshire Hafodty Ddu Road The new western access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 1) hatched green between points J and K.
Denbighshire Hafodty Ddu Road The new eastern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 1) hatched green between points J and K.
Denbighshire Hafodty Ddu Road The new access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 2) hatched green between points L1 and L2.
Denbighshire Nantglyn to Saron Road (B5435) The new southern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 2) hatched green between points P and Q.
Denbighshire Nantglyn to Saron Road (B5435) The new northern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 2) hatched green between points P and Q.
Denbighshire Bwlch Road The extension of existing southern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 3) hatched green between points T2 and U1.
Denbighshire Bwlch Road The upgrade of existing northern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 3) hatched green between points T2 and U1.
Denbighshire Prion Road The extension of an existing access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 3) hatched green between points X1 and X2.
Denbighshire Denbigh to Cerrigydrudion Road (B4501) The extension of the existing southern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 4) hatched green between points AB1 and AB2.
Denbighshire Denbigh to Cerrigydrudion Road (B4501) The extension of the existing northern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 4) hatched green between points AD1 and AD2.
Denbighshire Denbigh to Nantglyn Road The new access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 5) hatched green between points AH1 and AH2.
Denbighshire Denbigh to Nantglyn Road The new access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 5) hatched green between points AJ and AK.
Conwy Ffordd Gwaenynog (Bodeiliog Road) The extension of the existing eastern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 6) hatched blue between points AO and AP.
Conwy Ffordd Gwaenynog (Bodeiliog Road) The upgrade of the existing western access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 6) hatched blue between points AO and AP.
Conwy Lon Llewelyn (A543) The extension of the existing southern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 6) hatched blue between points AU2 and AV.
Conwy Lon Llewelyn (A543) The new northern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 6) hatched blue between points AU2 and AV.
Denbighshire Lon Llewelyn (A543) The extension of the existing southern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 6) hatched green between points AV and AW.
Denbighshire Lon Llewelyn (A543) The new northern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 6) hatched green between points AV and AW.
Denbighshire Lon Llewelyn (A543) The extension of the existing access comprising part of numbered works 4 and shown on the access and rights of way plans (sheet 7) hatched green between points AQ1 and AQ2.
Conwy Henllan to Groes Road (B5428) The new southern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 8) hatched blue between points BH and BI2.
Conwy Henllan to Groes Road (B5428) The new northern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 8) hatched blue between points BH and BI2.
Conwy Eriviat Bach Road The new southern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 8) hatched blue between points BJ and BK2.
Conwy Eriviat Bach Road The new northern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 8) hatched blue between points BJ and BK2.
Conwy Henllan to Llansannan Road (B5382) The new southern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 9) hatched blue between points BN2 and BO.
Conwy Henllan to Llansannan Road (B5382) The extension of the existing northern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 9) hatched blue between points BN2 and BO.
Conwy Henllan to Cefn Berain Road The extension of the existing access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 10) hatched blue between points BR1 and BR2.
Conwy Henllan to Cefn Berain Road The extension of the existing southern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 10) hatched blue between points BT2 and BU.
Conwy Henllan to Cefn Berain Road The extension of the existing northern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 10) hatched blue between points BT2 and BU.
Conwy Cefn Berain to Bontnewydd Road The extension of the existing southern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 10) hatched blue between points BV and BW2.
Conwy Cefn Berain to Bontnewydd Road The new northern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 10) hatched blue between points BV and BW2.
Conwy Henllan to Llannefydd Road The upgrade to existing access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 10) hatched blue between points BY1 and BY2.
Conwy Henllan to Llannefydd Road The new access north comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 10) hatched blue between points CD1 and CD2.
Conwy Henllan to Llannefydd Road The upgrade to existing access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 11) hatched blue between points CB2 and CE1.
Conwy Henllan to Llannefydd Road The extension of the existing access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 11) hatched blue between points CB1 and CA1.
Conwy Bontnewydd Road The upgrade to existing southern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 11) hatched blue between points CF and CG.
Conwy Bontnewydd Road The upgrade to existing northern access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 11) hatched blue between points CF and CG.
Conwy Bontnewydd Road The extension of the existing access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 11) hatched blue between points CH and CI2.
Conwy Bontnewydd Road The extension of the existing access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 11) hatched blue between points CJ1 and CJ2.
Conwy Henllan to Llannefydd Road The upgrade to existing access comprising part of numbered works 2B and shown on the access and rights of way plans (sheet 12) hatched blue between points CN1 and CN2.
Denbighshire Groesffordd Marli to Cefn Meiriadog Road The new southern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 13) hatched green between points CR and CS.
Denbighshire Groesffordd Marli to Cefn Meiriadog Road The extension of the existing northern access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 13) hatched green between points CR and CS.
Denbighshire Groesffordd Marli to Glascoed Road The extension of the existing access comprising part of numbered works 2A and shown on the access and rights of way plans (sheet 13) hatched green between points CT1 and CT2.

PART 2 — THOSE WORKS TO RESTORE TEMPORARY ACCESSES WHICH WILL BE MAINTAINED AT THE PUBLIC EXPENSE

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.