The North Wales Wind Farms Connection Order 2016
| (1) Area | (2) Street or public right of way | (3) Extent of temporary prohibition or restriction of use of streets or public right of way |
|---|---|---|
| Denbighshire | Hafodty Ddu Road | Prohibition/restriction From the points marked A to B on the access and rights of way plans (sheet 1), being approximately 120 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Hafodty Ddu Road | Prohibition/restriction From the points marked C1 to C3 on the access and rights of way plans (sheet 1), being approximately 37 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Footpath 51 in the Parish of Llanrhaeadr-yng-Nghinmeirch | Prohibition/restriction Management of access to public right of way from the points marked F to G as shown on the access and rights of way plans (sheet 1), being approximately 35 metres. Purpose of the prohibition/restriction Management of all or part of the footpath and restriction of the use of the footpath in order to facilitate the construction and installation of the authorised development. |
| Denbighshire | Footpath 52 in the Parish of Llanrhaeadr-yng-Nghinmeirch | Prohibition/restriction Temporary closure from the points marked H to I as shown on the access and rights of way plans (sheet 1), being approximately 38 metres. Purpose of the prohibition/restriction Temporary closure of all or part of the footpath and restriction of the use of the footpath in order to facilitate the construction and installation of the authorised development. |
| Denbighshire | Hafodty Ddu Road | Prohibition/restriction From the points marked J to K on the access and rights of way plans (sheet 1), being approximately 150 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Hafodty Ddu Road | Prohibition/restriction From the points marked L1 to L2 on the access and rights of way plans (sheet 2), being approximately 36 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Footpath 53 in the Parish of Llanrhaeadr-yng-Nghinmeirch | Prohibition/restriction Management of access to public right of way from the points marked N to O as shown on the access and rights of way plans (sheet 2), being approximately 34 metres. Purpose of the prohibition/restriction Management of all or part of the footpath and restriction of the use of the footpath in order to facilitate the construction and installation of the authorised development. |
| Denbighshire | Nantglyn to Saron Road (B5435) | Prohibition/restriction From the points marked P to Q on the access and rights of way plans (sheet 2), being approximately 98 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Footpath 23 in the Parish of Llanrhaeadr-yng-Nghinmeirch | Prohibition/restriction Temporary closure from the points marked R to S as shown on the access and rights of way plans (sheet 3), being approximately 195 metres. Purpose of the prohibition/restriction Temporary closure of all or part of the footpath and restriction of the use of the footpath in order to facilitate the construction and installation of the authorised development. |
| Denbighshire | Bwlch Road | Prohibition/restriction From the points marked T1 to T2 on the access and rights of way plans (sheet 3), being approximately 104 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Bwlch Road | Prohibition/restriction From the points marked T2 to U1 on the access and rights of way plans (sheet 3), being approximately 76 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Bwlch Road | Prohibition/restriction From the points marked U1 to U2 on the access and rights of way plans (sheet 3), being approximately 10 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Footpath 22 in the Parish of Llanrhaeadr-yng-Nghinmeirch | Prohibition/restriction Temporary closure from the points marked V to W as shown on the access and rights of way plans (sheet 3), being approximately 58 metres. Purpose of the prohibition/restriction Temporary closure of all or part of the footpath and restriction of the use of the footpath in order to facilitate the construction and installation of the authorised development. |
| Denbighshire | Prion Road | Prohibition/restriction From the points marked X1 to X2 on the access and rights of way plans (sheet 3), being approximately 35 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Footpath 21 in the Parish of Llanrhaeadr-yng-Nghinmeirch | Prohibition/restriction Management of access to public right of way from the points marked Z to AA as shown on the access and rights of way plans (sheet 4), being approximately 79 metres. Purpose of the prohibition/restriction Management of all or part of the footpath and restriction of the use of the footpath in order to facilitate the construction and installation of the authorised development. |
| Denbighshire | Denbigh to Cerrigydrudion Road (B4501) | Prohibition/restriction From the points marked AB1 to AB2 on the access and rights of way plans (sheet 4), being approximately 82 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Denbigh to Cerrigydrudion Road (B4501) | Prohibition/restriction From the points marked AB2 to AC on the access and rights of way plans (sheet 4), being approximately 18 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Denbigh to Cerrigydrudion Road (B4501) | Prohibition/restriction From the points marked AD1 to AD2 on the access and rights of way plans (sheet 4), being approximately 35 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Footpath 26 in the Parish of Llanrhaeadr-yng-Nghinmeirch | Prohibition/restriction Management of access to public right of way from the points marked AF to AG as shown on the access and rights of way plans (sheet 4), being approximately 118 metres. Purpose of the prohibition/restriction Management of all or part of the footpath and restriction of the use of the footpath in order to facilitate the construction and installation of the authorised development. |
| Denbighshire | Denbigh to Nantglyn Road | Prohibition/restriction From the points marked AH1 to AH2 on the access and rights of way plans (sheet 5), being approximately 25 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Denbigh to Nantglyn Road | Prohibition/restriction From the points marked AJ to AK on the access and rights of way plans (sheet 5), being approximately 97 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Footpath 54 in the Parish of Denbigh | Prohibition/restriction Temporary closure from the points marked AN to AM as shown on the access and rights of way plans (sheet 5), being approximately 45 metres. Purpose of the prohibition/restriction Temporary closure of all or part of the footpath and restriction of the use of the footpath in order to facilitate the construction and installation of the authorised development. |
| Conwy | Llansannan Footpath 80 | Prohibition/restriction Temporary closure from the points marked AL to AN as shown on the access and rights of way plans (sheet 5), being approximately 43 metres. Purpose of the prohibition/restriction Temporary closure of all or part of the footpath and restriction of the use of the footpath in order to facilitate the construction and installation of the authorised development. |
| Conwy | Ffordd Gwaenynog (Bodeiliog Road) | Prohibition/restriction From the points marked AO to AP on the access and rights of way plans (sheet 6), being approximately 102 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Llansannan Footpath 79 | Prohibition/restriction Management of access to public right of way from the points marked AS to AT as shown on the access and rights of way plans (sheet 6), being approximately 37 metres. Purpose of the prohibition/restriction Management of all or part of the footpath and restriction of the use of the footpath in order to facilitate the construction and installation of the authorised development. |
| Conwy | Lon Llewelyn (A543) | Prohibition/restriction From the points marked AU1 to AU2 on the access and rights of way plans (sheet 6), being approximately 32 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Lon Llewelyn (A543) | Prohibition/restriction From the points marked AU2 to AV on the access and rights of way plans (sheet 6), being approximately 78 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Lon Llewelyn (A543) | Prohibition/restriction From the points marked AV to AW on the access and rights of way plans (sheet 6), being approximately 74 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Lon Llewelyn (A543) | Prohibition/restriction From the points marked AX1 to AX2 on the access and rights of way plans (sheet 6), being approximately 33 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Lon Llewelyn (A543) | Prohibition/restriction From the points marked AZ1 to AZ2 on the access and rights of way plans (sheet 6), being approximately 17 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Lon Llywelyn | Prohibition/restriction From the points marked AQ1 to AQ2 on the access and rights of way plans (sheet 7), being approximately 28 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Footpath 65 in the Parish of Denbigh | Prohibition/restriction Management of access to public right of way from the points marked BF to BG as shown on the access and rights of way plans (sheet 8), being approximately 63 metres. Purpose of the prohibition/restriction Management of all or part of the footpath and restriction of the use of the footpath in order to facilitate the construction and installation of the authorised development. |
| Conwy | Henllan to Groes Road (B5428) | Prohibition/restriction From the points marked BH to BI2 on the access and rights of way plans (sheet 8), being approximately 69 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Henllan to Groes Road (B5428) | Prohibition/restriction From the points marked BI2 to BI1 on the access and rights of way plans (sheet 8), being approximately 25 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Eriviat Bach Road | Prohibition/restriction From the points marked BJ to BK2 on the access and rights of way plans (sheet 8), being approximately 41 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Eriviat Bach Road | Prohibition/restriction From the points marked BK2 to BK1 on the access and rights of way plans (sheet 8), being approximately 86 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Llansannan Footpath 30 | Prohibition/restriction Management of access to public right of way from the points marked BL to BM as shown on the access and rights of way plans (sheet 8), being approximately 86 metres. Purpose of the prohibition/restriction Management of all or part of the footpath and restriction of the use of the footpath in order to facilitate the construction and installation of the authorised development. |
| Conwy | Henllan to Llansannan Road (B5382) | Prohibition/restriction From the points marked BN1 to BN2 on the access and rights of way plans (sheet 9), being approximately 23 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Henllan to Llansannan Road (B5382) | Prohibition/restriction From the points marked BN2 to BO on the access and rights of way plans (sheet 9), being approximately 87 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Llansannan Footpath 49 | Prohibition/restriction Temporary closure from the points marked BP to BQ as shown on the access and rights of way plans (sheet 9), being approximately 68 metres. Purpose of the prohibition/restriction Temporary closure of all or part of the footpath and restriction of the use of the footpath in order to facilitate the construction and installation of the authorised development. |
| Conwy | Henllan to Cefn Berain Road | Prohibition/restriction From the points marked BR1 to BR2 on the access and rights of way plans (sheet 10), being approximately 39 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Henllan to Cefn Berain Road | Prohibition/restriction From the points marked BT2 to BU on the access and rights of way plans (sheet 10), being approximately 83 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Henllan to Cefn Berain Road | Prohibition/restriction From the points marked BT1 to BT2 on the access and rights of way plans (sheet 10), being approximately 35 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Cefn Berain to Bontnewydd Road | Prohibition/restriction From the points marked BV to BW2 on the access and rights of way plans (sheet 10), being approximately 95 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Cefn Berain to Bontnewydd Road | Prohibition/restriction From the points marked BW2 to BW1 on the access and rights of way plans (sheet 10), being approximately 25 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Henllan to Llannefydd Road | Prohibition/restriction From the points marked BY1 to BY2 on the access and rights of way plans (sheet 10), being approximately 35 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Henllan to Llannefydd Road | Prohibition/restriction From the points marked CD1 to CD2 on the access and rights of way plans (sheet 10), being approximately 103 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Henllan to Llannefydd Road | Prohibition/restriction From the points marked CB2 to CE1 on the access and rights of way plans (sheet 11), being approximately 61 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Henllan to Llannefydd Road | Prohibition/restriction From the points marked CB1 to CA1 on the access and rights of way plans (sheet 11), being approximately 73 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Henllan to Llannefydd Road | Prohibition/restriction From the points marked CA1 to CA2 on the access and rights of way plans (sheet 11), being approximately 85 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Henllan to Llannefydd Road | Prohibition/restriction From the points marked CB1 to CC on the access and rights of way plans (sheet 11), being approximately 17 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Llansannan Footpath 34 | Prohibition/restriction Management of access to public right of way from the points marked CB1 to CE2 as shown on the access and rights of way plans (sheet 11), being approximately 95 metres. Purpose of the prohibition/restriction Management of all or part of the footpath and restriction of the use of the footpath in order to facilitate the construction and installation of the authorised development. |
| Conwy | Bontnewydd Road | Prohibition/restriction From the points marked CF to CG on the access and rights of way plans (sheet 11), being approximately 58 metres. Purpose of the prohibition/restrictionTemporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Bontnewydd Road | Prohibition/restriction From the points marked CH to CI2 on the access and rights of way plans (sheet 11), being approximately 38 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Bontnewydd Road | Prohibition/restriction From the points marked CI2 to CI1 on the access and rights of way plans (sheet 11), being approximately 35 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Bontnewydd Road | Prohibition/restriction From the points marked CJ1 to CJ2 on the access and rights of way plans (sheet 11), being approximately 33 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Llansannan Footpath 22 | Prohibition/restriction Management of access to public right of way from the points marked CL to CM as shown on the access and rights of way plans (sheet 11), being approximately 100 metres. Purpose of the prohibition/restriction Management of all or part of the footpath and restriction of the use of the footpath in order to facilitate the construction and installation of the authorised development. |
| Conwy | Henllan to Llannefydd Road | Prohibition/restriction From the points marked CN1 to CN2 on the access and rights of way plans (sheet 12), being approximately 34 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Conwy | Llansannan Footpath 22 | Prohibition/restriction Management of access to public right of way from the points marked CP to CO as shown on the access and rights of way plans (sheet 12), being approximately 9 metres. Purpose of the prohibition/restriction Management of all or part of the footpath and restriction of the use of the footpath in order to facilitate the construction and installation of the authorised development. |
| Denbighshire | Groesffordd Marli to Cefn Meiriadog Road | Prohibition/restriction From the points marked CR to CS on the access and rights of way plans (sheet 13), being approximately 100 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
| Denbighshire | Groesffordd Marli to Glascoed Road | Prohibition/restriction From the points marked CT1 to CT2 on the access and rights of way plans (sheet 13), being approximately 28 metres. Purpose of the prohibition/restriction Temporary closure of part of the street and the ability to permit, prohibit, or restrict the stopping, parking, waiting, loading or unloading of vehicles and the provision of the direction of or priority of vehicular traffic to facilitate the construction and installation of the authorised development. |
SCHEDULE 7 — MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS
Compensation enactments
1
The enactments in force with respect to compensation for the compulsory purchase of land apply, with the necessary modifications as respects compensation set out in this Schedule, in the case of a compulsory acquisition under this Order of a right by the creation of a new right or the imposition of a restriction as they apply as respects compensation on the compulsory purchase of land and interests in land.
2
- (1) The Land Compensation Act 1973[^f00026] has effect subject to the modifications set out in sub-paragraphs (2) and (3).
- (2) In section 44(1) (compensation for injurious affection), as it applies to compensation for injurious affection under section 7 of the 1965 Act as substituted by paragraph 4—
- (a) for the words “land is acquired or taken” there are substituted the words “a right or restrictive covenant over land is purchased from or imposed on”; and
- (b) for the words “acquired or taken from him” there are substituted the words “over which the right is exercisable or the restrictive covenant enforceable”.
- (3) In section 58(1) (determination of material detriment where part of house etc. proposed for compulsory acquisition), as it applies to determinations under section 8 of the 1965 Act as substituted by paragraph 5—
- (a) for the word “part” in paragraphs (a) and (b) there are substituted the words “a right over or restrictive covenant affecting land consisting”;
- (b) for the word “severance” there are substituted the words “right or restrictive covenant over or affecting the whole of the house, building or manufactory or of the house and the park or garden”;
- (c) for the words “part proposed” there are substituted the words “right or restrictive covenant proposed”; and
- (d) for the words “part is” there are substituted the words “right or restrictive covenant is”.
Application of the 1965 Act
3
- (1) The 1965 Act has effect for the compulsory acquisition under this Order of a right by the creation of a new right, or to the imposition under this Order of a restrictive covenant, as it applies to the compulsory acquisition of land, so that, in appropriate contexts, references in that Act to land are read (according to the requirements of the particular context) as referring to, or as including references to—
- (a) the right acquired or to be acquired;
- (b) the restrictive covenant imposed or to be imposed;
- (c) the land over which the right is or is to be exercisable; or
- (d) the land over which the restrictive covenant is or is to be applied.
- (2) Part 1 of the 1965 Act applies in relation to the compulsory acquisition under this Order of a right by the creation of a new right or the imposition of a restriction with the modifications specified in paragraphs 4 to 8.
4
For section 7 of the 1965 Act (measure of compensation) there is substituted the following section—
(7) In assessing the compensation to be paid by the acquiring authority under this Act, regard must be had not only to the extent (if any) to which the value of the land over which the right is to be acquired or the restrictive covenant is to be imposed is depreciated by the acquisition of the right or the imposition of the restrictive covenant but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act.
5
For section 8 of the 1965 Act (provisions as to divided land) there is substituted the following section—
(8) the North Wales Wind Farms Connection Order 2016 (“the Order”) ceases, in relation to that person, to authorise the purchase of the right and be deemed to authorise the purchase of that person’s interest in the whole of the relevant land including, where the land consists of such a park or garden, the house to which it belongs, and the notice is deemed to have been served in respect of that interest on such date as the tribunal directs. (1) Where in consequence of the service on a person under section 5 of this Act of a notice to treat in respect of a right over land consisting of a house, building or manufactory or of a park or garden belonging to a house (“the relevant land”)— (a) a question of disputed compensation in respect of the purchase of the right or the imposition of the restrictive covenant would apart from this section fall to be determined by the Upper Tribunal (“the tribunal”); and (b) before the tribunal has determined that question the tribunal is satisfied that the person has an interest in the whole of the relevant land and is able and willing to sell that land and— (i) where that land consists of a house, building or manufactory, that the right cannot be purchased or the restrictive covenant imposed without material detriment to that land; or (ii) where the land consists of such a park or garden, that the right cannot be purchased or the restrictive covenant imposed without seriously affecting the amenity or convenience of the house to which that land belongs, (2) Any question as to the extent of the land in which the Order is deemed to authorise the purchase of an interest by virtue of subsection (1) of this section must be determined by the tribunal. (3) Where in consequence of a determination of the tribunal that it is satisfied as mentioned in subsection (1) of this section the Order is deemed by virtue of that subsection to authorise the purchase of an interest in land, the acquiring authority may, at any time within the period of 6 weeks beginning with the date of the determination, withdraw the notice to treat in consequence of which the determination was made; but nothing in this subsection prejudices any other power of the authority to withdraw the notice.
6
The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say—
- (a) section 9(4) (failure by owners to convey);
- (b) paragraph 10(3) of Schedule 1 (owners under incapacity);
- (c) paragraph 2(3) of Schedule 2 (absent and untraced owners); and
- (d) paragraphs 2(3) and 7(2) of Schedule 4 (common land),
are modified as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily created and acquired or the restrictive covenant which is to be imposed is vested absolutely in the acquiring authority.
7
Section 11 of the 1965 Act (powers of entry) is modified as to secure that, as from the date on which the acquiring authority has served notice to treat in respect of any right or restrictive covenant it has power, exercisable in equivalent circumstances and subject to equivalent conditions, to enter for the purpose of exercising that right or enforcing that restrictive covenant (which is deemed for this purpose to have been created on that date of service of the notice); and sections 12 (penalty for unauthorised entry) and 13 (entry on warrant in the event of obstruction) of the 1965 Act are modified correspondingly.
8
Section 20 of the 1965 Act (protection for interests of tenants at will, etc.) applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right or the enforcement of the restrictive covenant in question.
9
Section 22 of the 1965 Act (protection of acquiring authority’s possession where by inadvertence an estate, right or interest has not been got in) is modified as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right created and acquired and to continue to be entitled to the benefit of the restrictive covenant imposed, subject to compliance with that section as respects compensation.
SCHEDULE 8 — LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
| (1) Location | (2) Number of land shown on land plans | (3) Purpose for which temporary possession may be taken | (4) Relevant part of the authorised development |
|---|---|---|---|
| Woodland and track, forming part of Clocaenog Forest situated to the south west of Hafodty Ddu | 1A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Woodland and track, forming part of Clocaenog Forest situated to the south west of Hafodty Ddu | 1B | Temporary use to fell or lop trees in order to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land and fencing situated to the west of Hafodty Ddu | 2A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Public adopted highway known as the Hafodty Ty Ddu Road (un-named) together with grass embankment, drain and fencing situated to the west of Hafodty Ddu | 3A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Public adopted highway known as the Hafodty Ty Ddu Road (un-named) together with fencing and grass verge situated to the west of Hafodty Ddu | 4A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerows, fencing, gate and track situated to the west of Hafodty Ddu | 5A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Fencing and hard standing situated to the west of Hafodty Ddu | 5B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerows, fencing, gate and track situated to the west of Hafodty Ddu | 6A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land and hedgerow situated to the north of Hafodty Ddu | 7A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerows, fencing and trees situated to the north of Hafodty Ddu | 8A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow, trees, gate and telecommunications lines over situated to the north of Hafodty Ddu | 8B | Temporary use to provide access to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerows, fencing, trees and part of Public Footpath 51 situated to the north of Hafodty Ddu | 9A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow, gate, fencing, trees, telecommunications lines over and pole situated to the north of Hafodty Ddu | 9B | Temporary use to provide access to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerows, fencing and part of Public Footpath 52 situated to the south west of Bryn Golau | 10A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Public adopted highway known as the Hafodty Ty Ddu Road (un-named) together with hedgerows, fencing, telecommunications lines over and poles situated to the south west of Bryn Golau | 11A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow, telecommunications lines over and poles situated to the south west of Bryn Golau | 12A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerows, trees, part of Public Footpath 53, Electricity distribution lines over and pole situated to the east of Bryn Golau | 13A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Public adopted highway known as the Nantglyn to Saron Road (B5435) together with hedgerows and grass verge situated to the west of Pentre Saron | 14A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerows, fencing, trees, electricity distribution lines over, Telecommunications lines over and pole situated to the north west of Pentre Saron | 15A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, fencing, hedgerows, trees and electricity distribution lines over situated to the north of Pentre Saron | 16A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land and hedgerow to the north of Pentre Saron | 16B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A and 3A |
| Agricultural land, hedgerow, fencing and trees situated to the south of Tan Yr Allt | 17A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land and hedgerow situated to the south of Tan Yr Allt | 17B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A and 3A |
| Agricultural land, hedgerow and fencing situated to the south of Tan Yr Allt | 18A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow, wooded area and fencing situated to the south east of Tan Yr Allt | 18B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A and 3A |
| Agricultural land, fencing, trees and part of Public Footpath 23, hedgerows and woodland situated to the south east of Tan Yr Allt | 19A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow, trees, gate and part of Public Footpath 23 situated to the south east of Tan Yr Allt | 19B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A and 3A |
| Agricultural land, hedgerows, trees and electricity distribution lines over situated to the south east of Tan Yr Allt | 20A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow, gate, trees, part of Public Footpath 23 and electricity distribution lines over situated to the north east of Tan Yr Allt | 20B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A and 3A |
| Public adopted highway known as the Bwlch Road (unnamed) together with hedgerows, embankment, electricity distribution lines over, gates and sign for public right of way situated to the east of Tan Yr Allt | 21A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow, trees and electricity distribution lines over situated to the north east of Tan Yr Allt | 22A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow, gates, woodland and electricity distribution lines over situated to the north east of Tan Yr Allt | 22B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A and 3A |
| Agricultural land, fencing, trees and part of Public Footpath 22 situated to the south west of Tan Y Garth | 23A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerows, fencing, trees, spring, drain and pond situated to the west of Tan Y Garth | 24A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow, trees, spring and drain situated to the west of Tan Y Garth | 24B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A and 3A |
| Agricultural land situated to the west of Tan Y Garth | 25A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerows, fencing and trees situated to the west of Tan Y Garth | 26A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow, trees, stream and part of Public Footpath 21 situated to the south west of Hendy College | 27A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land and hedgerow situated to the south west of Hendy College | 28A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerows, electricity distribution lines over, telecommunications lines over and pole situated to the south of the B4501 and to the west of Hendy College | 29A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow, fencing, telecommunications lines over and pole situated to the south of the B4501 and to the west of Hendy College | 29B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A and 3A |
| Public adopted highway known as the Denbigh to Cerrigydrudion Road (B4501) together with hedgerows and telecommunications lines over situated to the west of Hendy College | 30A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerows, fencing, stream, trees, part of Public Footpath 26, telecommunications lines over and poles situated to the south of Plas Captain | 31A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerows, fencing, stream, trees and part of Public Footpath 26 situated to the south of Plas Captain | 31B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A and 3A |
| Agricultural land and hedgerow situated to the south of Plas Captain | 32A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Public adopted highway known as the Denbigh to Nantglyn Road (un-named) together with hedgerow situated to the south of Pandy Wood | 33A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Public adopted highway known as the Denbigh to Nantglyn Road (un-named) together with hedgerow situated to the south of Pandy Wood | 34A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, fence, hedgerow and woodland known as Pandy Wood situated to the east of River Ystrad | 35A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, fence and woodland known as Pandy Wood situated to the east of River Ystrad | 35B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A and 3A |
| Agricultural land, fencing, hedgerow and trees situated to the west of Pandy Wood | 37A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow, woodland and fencing situated to the west of Pandy Wood | 37B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A and 3A |
| Agricultural land, hedgerow, fencing, gate, woodland and part of Llansannan Public Footpath 80 situated to the west of Pandy Wood | 37C | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Agricultural land, fences, hedgerow, trees and part of Llansannan Public Footpath 54 situated to the north east of Pandy and to the north east of River Ystrad | 38A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, trees, fencing and hedgerows situated to the north west of Pandy and to the north of River Ystrad | 39A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, trees and fence situated to the north of Pandy and to the north of River Ystrad | 39B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Agricultural land, hedgerows, trees, gate and electricity distribution lines over situated to the south of Bach and to the east of Ffordd Gwaenynog (Bodeiliog Road) | 40A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Public adopted highway known as Ffordd Gwaenynog (Bodeiliog Road), hedgerows, gates, telecommunications lines over and pole situated to the south of Bach | 41A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, gate, telecommunications lines over and pole situated to the south west of Bach and to the west of Ffordd Gwaenynog (Bodeiliog Road) | 42A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, fencing, stream, trees and part of Llansannan Public Footpath 79 situated to the west of Bach | 43A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, fences, trees and electricity distribution lines over situated to the north west of Bach and to the south of the A543 | 44A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land and hedgerow situated to the north west of Bach and to the south of the A543 | 44B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerow and tree situated to the north west of Bach and to the south of the A543 | 44C | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Agricultural land, fencing, trees and hedgerows situated to the west of Goppa Farm and to the south of the A543 | 45A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow, fence and tree situated to the north west of Bach and to the south of the A543 | 45B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A and 3A |
| Public adopted highway known as Lon Llewelyn (A543) together with verge, track, hedgerows, gate and county sign | 46A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Public adopted highway known as Lon Llewelyn (A543) together with hedgerow and fence | 47A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Public adopted highway known as Lon Llewelyn (A543) together with hedgerow | 48A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow and gates situated to the north of the A543 | 49A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, gate and tree situated to the north of the A543 | 50A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow and fencing situated to the north west of the A543 and to the south west of Beacon Hill | 51A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow, fence and gate situated to the north of the A543 | 51B | Temporary use to provide access to facilitate construction of the authorised development | Part of numbered work 2A |
| Private track servicing Eriviat Park situated to the north of the A543 | 52A | Temporary use to provide access to facilitate construction of the authorised development | Part of numbered work 2A |
| Private track servicing Eriviat Park situated to the north of the A543 | 52B | Temporary use to provide access to facilitate construction of the authorised development | Part of numbered work 2A |
| Private track servicing Eriviat Park, gates, hedgerow and fencing situated to the north of the A543 | 52E | Temporary use to provide access to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, fencing and trees situated to the west of Beacon Hill | 53A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, private access, hedgerow, trees and, fencing and hard surface situated to the north west of Broadleys Farm | 53B | Temporary use to facilitate construction of the authorised development including but not limited to (1) use as a construction and maintenance compound, working area, lay down and parking areas for all plant, equipment, materials and vehicles; (2) installation, maintenance and removal of any unit, cabin or other structure and all related plant, equipment and machinery; and (3) construction and improvement of existing access track | Numbered work 4 |
| Agricultural land situated to the north west of Beacon Hill | 54A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land and tree situated to the north west of Beacon Hill | 55A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, stream, hedgerows and trees situated to the east of Eriviat Park | 56A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerow, fence and gate situated to the west of Beacon Hill | 56B | Temporary use to provide access to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerow, fence and gate situated to the west of Beacon Hill | 56C | Temporary use to provide access to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, stream, hedgerows, trees and part of Public Footpath 65 situated to the east of Eriviat Park | 57A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow, fencing and trees situated to the north east of Eriviat Park | 57B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A and 3A |
| Agricultural land, hedgerows, fencing and trees situated to the north east of Eriviat Park | 58A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerows, fencing and trees situated to the north east of Eriviat Park | 58B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A and 3A |
| Agricultural land, hedgerow and trees situated to the north east of Eriviat Park | 59A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, fencingand trees situated to the north east of Eriviat Park | 59B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Public adopted highway known as the Henllan to Groes Road (B5428) together with hedgerows, fencing and trees | 60A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, fencing, trees and stream situated to the south of Eriviat Bach Isa | 61A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, fencing, culvert under the road and trees situated to the south of Eriviat Bach Isa | 61B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Public adopted highway known as Eriviat Bach Road (un-named) together with hedgerow, trees and culvert under the road situated to the south west of Eriviat Bach Isa | 62A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, trees, part of Llansannan Public Footpath 30 and electricity distribution lines over situated to the north west of Eriviat Bach Isa | 63A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, fencing and woodland situated to the west of Eriviat Bach Isa | 63B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Agricultural land, hedgerows and trees situated to the south of Caeau Mawr | 65A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows and woodland situated to the south of Caeau Mawr | 65B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Agricultural land, hedgerows and trees situated to the south of Gwenallt | 66A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows and trees situated to the south of Gwenallt | 67A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, stream, trees, electricity distribution lines over, telecommunications lines over and pole situated to the south and to the west of Gwenallt | 68A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land and hedgerow situated to the west of Gwenallt | 68B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Public adopted highway known as the Henllan to Llansannan Road (B5382), telecommunications lines over and poles situated to the south of Hafod Dingle | 69A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, fencing, gate, trees, electricity distribution lines over and pole situated to the east of Hafod | 70A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, trees, wooded area and fencing situated to the east of Hafod | 70B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Woodland and steep valley side, knownas Hafod Dingle situated to the south west of Llechryd | 71A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Woodland and steep valley side, known as Hafod Dingle situated to the east of Hafod | 73A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Agricultural land, hedgerow, trees, fencing and part of Llannefydd Public Footpath 49 situated to the north of Hafod Dingle | 74A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Agricultural land, hedgerows, fencing and part of Llannefydd Public Footpath 49 situated to the north of Hafod Dingle | 75A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Agricultural land and hedgerows situated to the north west of Hafod Dingle | 76A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Agricultural land, gate, hedgerow, trees and electricity distribution lines over situated to the west of Llechryd Bach | 77A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, trees, hedgerows and fencing situated to the north west of Hafod Dingle | 77B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Agricultural land and fence situated to the north west of Llechryd Bach | 78A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows and fence situated to the north west of Llechryd Bach | 78B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Public adopted highway known as the Henllan to Cefn Berain Road (un-named) together with hedgerows, telecommunications lines over and poles situated to the north west of Llechryd Bach | 79A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, fencing, gate, electricity distribution lines over, telecommunications lines over and pole situated to the east of Ty-celyn and to the south west of Berain Farm | 80A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, fencing and gate situated to the east of Ty-celyn and to the south west of Berain Farm | 80B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Public adopted highway known as the Cefn Berain to Bontnewydd Road (un-named) together with hedgerows, trees and embankment situated to the west of Berain Farm | 81A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, stream, trees, tracks and electricity distribution lines over, Telecommunications lines over and pole situated to the west of Berain Farm | 82A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, stream, tracks, trees, telecommunications lines over and pole situated to the west of Berain Farm | 82B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Agricultural land, gate and hedgerow situated to the north of Berain Farm | 82D | Temporary use to provide access to facilitate construction of the authorised development | Part of numbered work 2B |
| Public adopted highway known as the Henllan to Llannefydd Road (un-named) and hedgerows situated to the east of Tyddyn Bartley | 83A | Temporary use to provide access to facilitate construction of the authorised development | Part of numbered work 2B |
| Public adopted highway known as the Tyddyn Bartley Road (un-named) situated to the north of Tyddyn Bartley | 83B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land and hedgerows situated to the east of Tyddyn Bartley | 84A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land and hedgerows situated to the east of Tyddyn Bartley | 85A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land and hedgerow situated to the east of Tyddyn Bartley | 85B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Agricultural land situated to the south of Croen Llwm Mawr | 86A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerow and fence situated to the south of Croen Llwm Mawr | 86B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Agricultural land, hedgerow and fence situated to the south of Croen Llwm Mawr | 87A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerow and fence situated to the south of Croen Llwm Mawr | 87B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Private road, culvert under the road and part of Llannefydd Public Footpath 34 situated to the south of Croen Llwm Mawr | 88A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Private road and part of Llannefydd Public Footpath 34 situated to the south of Croen Llwm Mawr | 88B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Hedgerow, woodland and stream situated to the south of Croen Llwm Mawr | 90A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Agricultural land, wooded area and electricity distribution lines over situated to the west of Croen Llwm Mawr | 91A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, woodland, electricity distribution lines over and pole situated to the west of Croen Llwm Mawr | 91B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Woodland situated to the west of Croen Llwm Mawr | 93A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Woodland situated to the north west of Croen Llwm Mawr | 93C | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Agricultural land, hedgerows, gate and track situated to the north west of Croen Llwm Mawr | 94A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, fence and woodland situated to the north west of Croen Llwm Mawr | 94B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Woodland and stream situated to the south of Bontnewydd Road and to the east of Tal Y Bryn | 96A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Public adopted highway known as Bontnewydd Road together with hedgerows situated to the west of Bryniau Bychain | 97A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, wooded area and stream situated to the north of the Bontnewydd Road and to the west of Bryniau Bychain | 98A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land and hedgerow situated to the north of the Bontnewydd Road and to the west of Bryniau Bychain | 98B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Agricultural land, hedgerows, woodland and tracks situated to the south of the Graig Brook and to the south east of Bodysgaw Isa | 99A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, trees and tracks situated to the south of the Graig Brook and to the south east of Bodysgaw Isa | 99B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Gravel track forming part of Llannefydd Public Footpath 22 together with agricultural land, part of quarry, electricity distribution lines over and trees situated to the east of Bodysgaw Isa and to the south of the River Elwy | 101A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Agricultural land, hedgerows, fencing, part of quarry and woodland situated to the east of Bodysgaw Isa and to the south of the River Elwy | 101B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Woodland situated to the east of Bodysgaw Isa and to the south of the River Elwy | 102A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B |
| Woodland situated to the east of Bodysgaw Isa and to the south of the River Elwy | 102B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2B and 3B |
| Agricultural land, trees, hedgerows, electricity distribution lines over, telecommunications lines over and pole situated to the north of the River Elwy and to the west of Coed y Fadir | 105A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow, fencing and woodland situated to the north of the River Elwy and to the west of Coed y Fadir | 105B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A and 3A |
| Public adopted highway known as the Groesffordd Marli to Cefn Meiriadog Road (un-named) and hedgerows, telecommunications line over situated to the east of Plas Hafod | 106A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, fencing, tree and hedgerows situated to the east of Coed Plas-newydd | 107A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, fencing and hedgerows situated to the east of Coed Plas-newydd | 107B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A and 3A |
| Agricultural land, gate, fencing and hedgerows situated to the south of Groesffordd | 108A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, fencing and hedgerow situated to the south of Groesffordd | 108B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A and 3A |
| Agricultural land and hedgerow situated to the south of Trebanog | 111A | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A |
| Agricultural land, hedgerow, fencing and trees situated to the south of Groesffordd | 111B | Temporary use to facilitate construction of the authorised development | Part of numbered work 2A and 3A |
SCHEDULE 9 — PROTECTIVE PROVISIONS
PART 1 — FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
1
- (1) For the protection of any operator, the following provisions have effect, unless otherwise agreed in writing between the undertaker and the operator.
- (2) In this Part of this Schedule—
- “the 2003 Act” means the Communications Act 2003[^f00027];
- “conduit system” has the same meaning as in the electronic communications code and references to providing a conduit system are to be construed in accordance with paragraph 1(3A) of that code;
- “electronic communications apparatus” has the same meaning as in the electronic communications code;
- “the electronic communications code” has the same meaning as in section 106(1) of the 2003 Act[^f00028];
- “electronic communications code network” means— so much of an electronic communications network or conduit system provided by an electronic communications code operator as is not excluded from the application of the electronic communications code by a direction under section 106 of the 2003 Act; and an electronic communications network which the Secretary of State is providing or proposing to provide;
- “electronic communications code operator” means a person in whose case the electronic communications code is applied by a direction under section 106 of the 2003 Act; and
- “operator” means the operator of an electronic communications code network.
2
The exercise of the powers of article 29 (statutory undertakers) is subject to paragraph 23 of Schedule 2 to the Telecommunications Act 1984[^f00029] (undertaker’s works).
3
- (1) Subject to sub-paragraphs (2) to (4), if as the result of the authorised development or its construction, or of any subsidence resulting from any of those works—
- (a) any damage is caused to any electronic communications apparatus belonging to an operator (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works), or other property of an operator; or
- (b) there is any interruption in the supply of the service provided by an operator,
the undertaker must bear and pay the cost reasonably incurred by the operator in making good such damage or restoring the supply and make reasonable compensation to that operator for any other expenses, loss, damages, penalty or costs incurred by it, by reason, or in consequence of, any such damage or interruption.
- (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of an operator, its officers, servants, contractors or agents.
- (3) The operator must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise of the claim or demand is to be made without the consent of the undertaker which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
- (4) Any difference arising between the undertaker and the operator under this Part of this Schedule must be referred to and settled by arbitration under article 40 (arbitration).
4
This Part of this Schedule does not apply to—
- (a) any apparatus in respect of which the relations between the undertaker and an operator are regulated by the provisions of Part 3 of the 1991 Act; or
- (b) any damage, or any interruption, caused by electro-magnetic interference arising from the construction or use of the authorised development.
5
Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and an operator in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.
PART 2 — FOR THE PROTECTION OF DŴR CYMRU CYFYNGEDIG
6
For the protection of DCC referred to in this Part 2 of Schedule 9, the following provisions will, unless otherwise agreed in writing between the undertaker and DCC, have effect.
7
In this Part of this Schedule—
- “acceptable insurance” means a policy of public liability/third party liability insurance effected and maintained by the undertaker and available in the market on commercially reasonable terms having regard (inter alia) to premiums required and the policy terms obtainable, with a level of insurance cover to be agreed between the undertaker and DCC, during the construction of the works pursuant to this Order with a reputable insurer and with DCC named as an insured party under the policy;
- “accessories” has the same meaning as that set out in section 219 of the WIA 1991 but also includes any feature or aspect of a design that is intended to receive or facilitate the receipt of rainwater or surface water and which is part of a sustainable drainage system;
- “DCC apparatus” means all apparatus or accessories vested in or belonging to DCC for the purpose of carrying on its statutory undertaking including reservoirs, water treatment works and waste water treatment works;
- “clearance area” means the area of land—within 3 metres either side of the centre line of any public sewer or public water main that is less than 300mm in diameter;within 6 metres either side of a public sewer or public water main where the public sewer or public water main is between 300mm and 600mm in diameter; orwithin 9 metres either side of the centre line of a rising main;
- “DCC” means Dŵr Cymru Cyfyngedig, a limited company registered in Wales under Company No. 2366777 and having its registered office at Pentwyn Road, Nelson, Treharris, Mid Glamorgan CF46 6LY or its properly authorised agents or sub-contractors;
- “draft specification” means a detailed plan, cross-section and description of the works to be prepared by the undertaker (including, without limitation, a method statement and risk assessment setting out the intention in respect of the works, construction methods and programmes, position of the affected DCC apparatus and intended works and a statement that to the best of the undertaker’s knowledge, and having used all reasonable care and skill to plan the works, the works will not cause damage to the DCC apparatus);
- “functions” has the same meaning as in section 219 of the WIA 1991 and includes powers and duties;
- “in” in a context referring to DCC apparatus in land includes a reference to DCC apparatus under, over or upon land;
- “sustainable drainage system” means any structure designed to receive rainwater and other surface water which structure is to include any feature or aspect of design that is intended to receive or facilitate the receipt of rainwater except a public sewer or a natural watercourse;
- “WIA 1991” means the Water Industry Act 1991[^f00030] as amended; and
- “works” means any works forming part of the authorised development in, on, over or under any land purchased, held, or used under this Order that are near to, or will or may in any way affect any DCC apparatus together with all ancillary actions relating hereto.
8
- (1) Regardless of any provision in this Order or anything shown on the land plans or contained in the book of reference, the undertaker must not acquire any DCC apparatus or its accessories or override or extinguish any easement or other interest of DCC or acquire any land or other interest of DCC identified in the book of reference or create any new rights over the same otherwise than by agreement with DCC in accordance with the provisions of this Schedule.
- (2) Sub-paragraph (1) does not apply to the powers conferred on the undertaker by this Order to interfere temporarily with DCC’s rights to access DCC apparatus or accessories but subject always to each sub-paragraph of paragraphs 12 and 13 of this Part and to the undertaker giving DCC 28days’ notice of such interference.
Precedence of the WIA 1991
9
- (1) Regardless of any provision of this Order and this Schedule the undertaker must comply fully with all provisions of the WIA 1991 in relation to any use of, any connection with or any actions or omissions which in any way affect the DCC apparatus and nothing in this Order releases the undertaker from the requirement to comply with the provisions of the WIA 1991 in relation to any use of, any connection with or any actions or omissions which in any way affect the DCC apparatus, including without limitation—
- (a) sections 41 to 44 of the WIA 1991 in respect of water main requisitions;
- (b) section 45 of the WIA 1991 in respect of any connections to a water main;
- (c) sections 98 to 101 of the WIA 1991 in respect of sewer requisitions;
- (d) section 102 of the WIA 1991 in respect of the adoption of sewers and disposal works;
- (e) section 104 of the WIA 1991 in respect of the adoption of any sewers, drains or sewage disposal works as part of the development;
- (f) sections 106 to 109 of the WIA 1991 in respect of any connections to public sewers;
- (g) section 111 of the WIA 1991 in respect of the restrictions on use of public sewers;
- (h) sections 158 and 159 of the WIA 1991 in respect of statutory rights of access to DCC apparatus;
- (i) section 174 of the WIA 1991 in respect of offences of interference with works etc;
- (j) section 178 of the WIA 1991 in respect of obstruction of sewerage works etc; and
- (k) section 185 of the WIA 1991 in respect of the removal, diversion or alteration of DCC apparatus.
- (2) The arbitration provisions at article 40 or specified in this Schedule do not apply where DCC uses a warrant of entry in accordance with the provisions of the WIA 1991.
Protection of DCC apparatus
10
- (1) Not less than 28 days before starting the execution of any works that are within the clearance area or will, or could reasonably foreseeably affect, any DCC apparatus the removal or alteration of which has not been required by the undertaker under paragraph 9(1)(k), the undertaker must submit to DCC written notice together with a draft specification.
- (2) DCC must examine the draft specification submitted under sub-paragraph (1) and give its written consent or proposed amendments (each not to be unreasonably withheld or delayed) to the draft specification (including the proposed commencement date and anticipated completion date) within 28 days from the date of receipt (and in the event of amendments the process in this sub-paragraph (2) must be repeated where those amendments are not accepted). For the avoidance of doubt, DCC’s proposed amendments may include such reasonable requirements for the alteration (including but not limited to the extension of DCC apparatus) or otherwise for the protection of DCC apparatus, or for securing access to it.
- (3) Once approved under sub-paragraph (2), the draft specification is to be the specification and the works must be executed only in accordance with the specification and such reasonable requirements as may be made in accordance with sub paragraph (2) and DCC is entitled to watch and inspect the execution of those works.
- (4) Nothing in this paragraph 10 precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a draft specification instead of the draft specification previously submitted, and having done so the provisions of this paragraph 10 apply to and in respect of the new draft specification.
- (5) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency provided it has complied with sub-paragraph (8) below save that the undertaker must comply with sub-paragraphs (1) and (3) above in so far as is reasonably practicable in the circumstances.
- (6) DCC may opt to carry out any temporary and/or protective works specified under sub-paragraph (2) to DCC apparatus, and if DCC opts to do so it must—
- (a) agree the scope and timings of the works with the undertaker (and the undertaker must not unreasonably withhold or delay its agreement to the same);
- (b) provide an invoice together with supporting evidence of the estimated costs of the works on the basis of which it must agree with the undertaker the reasonable costs of the works to be met by the undertaker;
- (c) following agreement and payment of the costs, DCC must as soon as reasonably practicable carry out and complete the works; and
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.