  • (6) If at any time prior to the commencement of regular revenue-earning operations on the authorised railway comprised in the authorised development and notwithstanding any measures adopted pursuant to sub-paragraph (3), the testing or commissioning of the authorised development causes EMI then the undertaker must immediately upon receipt of notification by Network Rail of such EMI either in writing or communicated orally (such oral communication to be confirmed in writing as soon as reasonably practicable after it has been issued) forthwith cease to use (or procure the cessation of use of) the undertaker’s apparatus causing such EMI until all measures necessary have been taken to remedy such EMI by way of modification to the source of such EMI or (in the circumstances, and subject to the consent, specified in sub-paragraph (5)) to Network Rail’s apparatus.
  • (7) In the event of EMI having occurred—
  • (a) the undertaker must afford reasonable facilities to Network Rail for access to the undertaker’s apparatus in the investigation of such EMI;
  • (b) Network Rail must afford reasonable facilities to the undertaker for access to Network Rail’s apparatus in the investigation of such EMI; and
  • (c) Network Rail must make available to the undertaker any additional material information in its possession reasonably requested by the undertaker in respect of Network Rail’s apparatus or such EMI.
  • (8) Where Network Rail approves modifications to Network Rail’s apparatus pursuant to sub-paragraphs (5) or (6)—
  • (a) Network Rail must allow the undertaker reasonable facilities for the inspection of the relevant part of Network Rail’s apparatus; and
  • (b) any modifications to Network Rail’s apparatus approved pursuant to those sub-paragraphs must be carried out and completed by the undertaker in accordance with paragraph 6.
  • (9) To the extent that it would not otherwise do so, the indemnity in paragraph 15(1) applies to the costs and expenses reasonably incurred or losses suffered by Network Rail through the implementation of the provisions of this paragraph (including costs incurred in connection with the consideration of proposals, approval of plans, supervision and inspection of works and facilitating access to Network Rail’s apparatus) or in consequence of any EMI to which sub-paragraph (6) applies.
  • (10) For the purpose of paragraph 10(a) any modifications to Network Rail’s apparatus under this paragraph are deemed to be protective works referred to in that paragraph.
  • (11) In relation to any dispute arising under this paragraph the reference in article 56 (arbitration) to the Institution of Civil Engineers shall be read as a reference to the Institution of Electrical Engineers.

12

If at any time after the completion of a specified work, not being a work vested in Network Rail, Network Rail gives notice to the undertaker informing it that the state of maintenance of any part of the specified work appears to be such as adversely affects the operation of railway property, the undertaker must, on receipt of such notice, take such steps as may be reasonably necessary to put that specified work in such state of maintenance as not adversely to affect railway property.

13

The undertaker must not provide any illumination or illuminated sign or signal on or in connection with a specified work in the vicinity of any railway belonging to Network Rail unless it has first consulted Network Rail and it must comply with Network Rail’s reasonable requirements for preventing confusion between such illumination or illuminated sign or signal and any railway signal or other light used for controlling, directing or securing the safety of traffic on the railway.

14

Any additional expenses which Network Rail may reasonably incur in altering, reconstructing or maintaining railway property under any powers existing at the making of this Order by reason of the existence of a specified work must, provided that 56 days’ previous notice of the commencement of such alteration, reconstruction or maintenance has been given to the undertaker, be repaid by the undertaker to Network Rail.

15

  • (1) The undertaker must pay to Network Rail all reasonable costs, charges, damages and expenses not otherwise provided for in this Part of this Schedule which may be occasioned to or reasonably incurred by Network Rail by reason of—
  • (a) the construction or maintenance of a specified work or the failure thereof; or
  • (b) any act or omission of the undertaker or of any person in its employ or of its contractors or others whilst engaged upon a specified work,

and the undertaker must indemnify and keep indemnified Network Rail from and against all claims and demands arising out of or in connection with a specified work or any such failure, act or omission: and the fact that any act or thing may have been done by Network Rail on behalf of the undertaker or in accordance with plans approved by the engineer or in accordance with any requirement of the engineer or under the engineer’s supervision does not (if it was done without negligence on the part of Network Rail or of any person in its employ or of its contractors or agents) excuse the undertaker from any liability under the provisions of this sub-paragraph.

  • (2) Network Rail must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise of such a claim or demand is to be made without the prior consent of the undertaker.
  • (3) The sums payable by the undertaker under sub-paragraph (1) are to include a sum equivalent to the relevant costs.
  • (4) Subject to the terms of any agreement between Network Rail and a train operator regarding the timing or method of payment of the relevant costs in respect of that train operator, Network Rail must promptly pay to each train operator the amount of any sums which Network Rail receives under sub-paragraph (3) which relates to the relevant costs of that train operator.
  • (5) The obligation under sub-paragraph (3) to pay Network Rail the relevant costs is, in the event of default, enforceable directly by any train operator concerned to the extent that such sums would be payable to that operator pursuant to sub‑paragraph (4).
  • (6) In this paragraph—
  • the relevant costs” means the costs, direct losses and expenses (including loss of revenue) reasonably incurred by each train operator as a consequence of any restriction of the use of Network Rail’s railway network as a result of the construction, maintenance or failure of a specified work or any such act or omission as mentioned in subparagraph (1); and
  • train operator” means any person who is authorised to act as the operator of a train by a licence under section 8 (licences) of the Railways Act 1993.

16

Network Rail must, on receipt of a request from the undertaker, from time to time provide the undertaker free of charge with written estimates of the costs, charges, expenses and other liabilities for which the undertaker is or will become liable under this Part of this Schedule (including the amount of the relevant costs mentioned in paragraph 15) and with such information as may reasonably enable the undertaker to assess the reasonableness of any such estimate or claim made or to be made pursuant to this Part of this Schedule (including any claim relating to those relevant costs).

17

In the assessment of any sums payable to Network Rail under this Part of this Schedule there must not be taken into account any increase in the sums claimed that is attributable to any action taken by or any agreement entered into by Network Rail if that action or agreement was not reasonably necessary and was taken or entered into with a view to obtaining the payment of those sums by the undertaker under this Part of this Schedule or increasing the sums so payable.

18

The undertaker and Network Rail may, subject in the case of Network Rail to compliance with the terms of its network licence, enter into, and carry into effect, agreements for the transfer to the undertaker of—

  • (a) any railway property shown on the lands plans and described in the book of reference;
  • (b) any lands, works or other property held in connection with any such railway property; and
  • (c) any rights and obligations (whether or not statutory) of Network Rail relating to any railway property or any lands, works or other property referred to in this paragraph.

19

Nothing in this Order, or in any enactment incorporated with or applied by this Order, prejudices or affects the operation of Part 1 of the Railways Act 1993.

20

The undertaker must give written notice to Network Rail if any application is proposed to be made by the undertaker for the Secretary of State’s consent, under article 10 (consent to transfer benefit of order) of this Order and any such notice must be given no later than 28 days before any such application is made and must describe or give (as appropriate)—

  • (a) the nature of the application to be made;
  • (b) the extent of the geographical area to which the application relates; and
  • (c) the name and address of the person acting for the Secretary of State to whom the application is to be made.

21

The undertaker must no later than 28 days from the date that the plans and documents submitted to and certified by the Secretary of State in accordance with article 55 (documents to be certified) are certified by the Secretary of State, provide a set of those plans and documents to Network Rail in the form of a computer disc with read only memory.

PART 2 — Protection for Electricity, Gas, Water, Petroleum and Sewerage Undertakers.

22

The following provisions of this Part of this Schedule have effect, unless otherwise agreed in writing between the undertaker and the utility undertaker concerned.

23

In this Part of this Schedule—

  • alternative apparatus” means alternative apparatus adequate to enable the utility undertaker in question to fulfil its statutory functions in a manner not less efficient than previously;
  • apparatus” means—in the case of an electricity undertaker, electric lines or electrical plant (as defined in the Electricity Act 1989[^f00080]), belonging to or maintained by that undertaker for the purposes of electricity supply;in the case of a gas undertaker, any mains, pipes or other apparatus belonging to or maintained by a gas transporter within the meaning of Part 1 of the Gas Act 1986[^f00081] for the purposes of gas supply;in the case of a water undertaker, mains, pipes or other apparatus belonging to or maintained by that undertaker for the purposes of water supply; andin the case of a sewerage undertaker—any drain or works vested in the undertaker under the Water Industry Act 1991[^f00082]; andany sewer which is so vested or is the subject of a notice of intention to adopt given under section 102(4)[^f00083] (adoption of sewers and disposal works) of that Act or an agreement to adopt made under section 104[^f00084] (agreements to adopt sewer, drain or sewage disposal works, at future date) of that Act,and includes a sludge main, disposal main (within the meaning of section 219 (general interpretation) of that Act) or sewer outfall and any manholes, ventilating shafts, pumps or other accessories forming part of any such sewer, drain or works,

and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;

  • functions” includes powers and duties;
  • “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over or upon land; and
  • utility undertaker” means—any licence holder within the meaning of Part 1 of the Electricity Act 1989[^f00085];a gas transporter within the meaning of Part 1 of the Gas Act 1986;a water undertaker within the meaning of the Water Industry Act 1991; anda sewerage undertaker within the meaning of Part 1 of the Water Industry Act 1991,

for the area of the authorised development, and in relation to any apparatus, means the utility undertaker to whom it belongs or by whom it is maintained.

On street apparatus

24

This Part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and the utility undertaker are regulated by the provisions of Part 3 of the 1991 Act.

Acquisition of land

25

Regardless of any provision in this Order or anything shown on the land plans, the undertaker must not acquire any apparatus otherwise than by agreement.

Removal of apparatus

26

  • (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed, that apparatus must not be removed under this Part of this Schedule, and any right of a utility undertaker to maintain that apparatus in that land must not be extinguished, until alternative apparatus has been constructed and is in operation to the reasonable satisfaction of the utility undertaker in question.
  • (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it must give to the utility undertaker in question written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order a utility undertaker reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to the utility undertaker the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus.
  • (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2) in the land in which the alternative apparatus or part of such apparatus is to be constructed, the utility undertaker in question must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably possible use its best endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.
  • (4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule is to be constructed in such manner and in such line or situation as may be agreed between the utility undertaker in question and the undertaker or in default of agreement settled by arbitration in accordance with article 56 (arbitration).
  • (5) The utility undertaker in question must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 56, and after the grant to the utility undertaker of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.
  • (6) Regardless of anything in sub-paragraph (5), if the undertaker gives notice in writing to the utility undertaker in question that the undertaker desires itself to execute any work, or part of any work in connection with the construction or removal of apparatus in any land of the undertaker, that work, instead of being executed by the utility undertaker, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of the utility undertaker.
  • (7) Nothing in sub-paragraph (6) authorises the undertaker to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 300 millimetres of the apparatus.

Facilities and rights for alternative apparatus

27

  • (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to a utility undertaker facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights are to be granted upon such terms and conditions as may be agreed between the undertaker and the utility undertaker in question or in default of agreement settled by arbitration in accordance with article 56 (arbitration).
  • (2) In settling those terms and conditions in respect of alternative apparatus to be constructed in or along any railway, the arbitrator must—
  • (a) give effect to all reasonable requirements of Network Rail for ensuring the safety and efficient operation of the railway which forms or is to form part of Network Rail’s network and for securing any subsequent alterations or adaptations of the alternative apparatus which may be required to prevent interference with any proposed works of Network Rail or the undertaker or the traffic on the railway; and
  • (b) so far as it may be reasonable and practicable to do so in the circumstances of the particular case, give effect to the terms and conditions, if any, applicable to the apparatus constructed in or along the railway for which the alternative apparatus is to be substituted.
  • (3) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to the utility undertaker in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to that utility undertaker as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.

Retained apparatus

28

  • (1) Not less than 28 days before starting the execution of any works of the type referred to in paragraph 26(2) that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 26(2), the undertaker must submit to the utility undertaker in question a plan, section and description of the works to be executed.
  • (2) Those works are to be executed only in accordance with the plan, section and description submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by the utility undertaker for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker is entitled to watch and inspect the execution of those works.
  • (3) Any requirements made by a utility undertaker under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which a plan, section and description under sub–paragraph (1) are submitted to it.
  • (4) If a utility undertaker in accordance with sub-paragraph (3) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 23 to 27 apply as if the removal of the apparatus had been required by the undertaker under paragraph 26(2).
  • (5) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan, section and description instead of the plan, section and description previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan, section and description.
  • (6) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency but in that case it must give to the utility undertaker in question notice as soon as is reasonably practicable and a plan, section and description of those works as soon as reasonably practicable subsequently and must comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances.

Expenses and costs

29

  • (1) Subject to the following provisions of this paragraph, the undertaker must repay to a utility undertaker the reasonable expenses incurred by that utility undertaker in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus (including costs or compensation payable in connection with the acquisition of land for that purpose) which may be required in consequence of the execution of any such works as are referred to in paragraph 26(2).
  • (2) The value of any apparatus removed under the provisions of this Part of this Schedule is to be deducted from any sum payable under sub-paragraph (1), that value being calculated after removal.
  • (3) If in accordance with the provisions of this Part of this Schedule—
  • (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
  • (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 56 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the utility undertaker in question by virtue of sub-paragraph (1) is to be reduced by the amount of that excess.

  • (4) For the purposes of sub-paragraph (3)—
  • (a) an extension of apparatus to a length greater than the length of existing apparatus must not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
  • (b) where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole must be treated as if it also had been agreed or had been so determined.
  • (5) An amount which apart from this sub-paragraph would be payable to a utility undertaker in respect of works by virtue of sub-paragraph (1) must, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the utility undertaker any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.

Indemnity

30

  • (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any such works referred to in paragraph 26(2), any damage is caused to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of a utility undertaker, or there is any interruption in any service provided, or in the supply of any goods, by any utility undertaker, the undertaker must—
  • (a) bear and pay the cost reasonably incurred by that utility undertaker in making good such damage or restoring the supply; and
  • (b) make reasonable compensation to that utility undertaker for any other expenses, loss, damages, penalty or costs incurred by the utility undertaker,

by reason or in consequence of any such damage or interruption.

  • (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of a utility undertaker, its officers, servants, contractors or agents.
  • (3) A utility undertaker must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of the undertaker which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.

31

Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker or Network Rail and a utility undertaker in respect of any apparatus laid or erected in land belonging to the undertaker or Network Rail on the date on which this Order is made.

PART 3 — Protection for Operators of Electronic Communications Code Networks

32

  • (1) The provisions of this Part of this Schedule have effect unless otherwise agreed in writing between the undertaker and the operator.
  • (2) In this Part of this Schedule—
  • electronic communications apparatus” has the same meaning as in the electronic communications code[^f00086];
  • the electronic communications code” has the same meaning as in section 106(1) (application of the electronic communications code) of the 2003 Act[^f00087];
  • electronic communications code network” means—so much of an electronic communications network or infrastructure system provided by an electronic communications code operator as is not excluded from the application of the electronic communications code by a direction under section 106 of the 2003 Act; andan electronic communications network which the undertaker is providing or proposing to provide;
  • electronic communications code operator” means a person in whose case the electronic communications code is applied by a direction under section 106 of the 2003 Act;
  • infrastructure system” has the same meaning as in the electronic communications code and references to providing an infrastructure system are to be construed in accordance with paragraph 7(2) of that code; and
  • operator” means the operator of an electronic communications code network.

33

The exercise of the powers conferred by article 37 (statutory undertakers and electronic communications code network operators) is subject to Part 10 of the electronic communications code.

34

  • (1) Subject to sub-paragraphs (2) to (4), if as the result of the authorised development or its construction, or of any subsidence resulting from any of the works comprised in the authorised development—
  • (a) any damage is caused to any electronic communications apparatus belonging to an operator (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or other property of an operator; or
  • (b) there is any interruption in the supply of the service provided by an operator,

the undertaker must bear and pay the cost reasonably incurred by the operator in making good such damage or restoring the supply and must—

  • (a) make reasonable compensation to an operator for loss sustained by it; and
  • (b) indemnify an operator against claims, demands, proceedings, costs, damages and expenses which may be made or taken against, or recovered from, or incurred by, an operator by reason, or in consequence of, any such damage or interruption.
  • (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of an operator, its officers, servants, contractors or agents.
  • (3) The operator must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise of the claim or demand may be made without the consent of the undertaker which, if it withholds such consent, has the sole conduct of any settlement or compromise of any proceedings necessary to resist the claim or demand.
  • (4) Any difference arising between the undertaker and the operator under this Part of this Schedule must be referred to and settled by arbitration under article 56 (arbitration).

35

This Part of this Schedule does not apply to—

  • (a) any apparatus in respect of which the relations between the undertaker and an operator are regulated by the provisions of Part 3 of the 1991 Act; or
  • (b) any damage, or any interruption, caused by electro-magnetic interference arising from the construction or use of the authorised development.

36

Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker or Network Rail and an operator in respect of any apparatus laid or erected in land belonging to the undertaker or Network Rail on the date on which this Order is made.

PART 4 — Protection for the Environment Agency

37

  • (1) The following provisions apply for the protection of the Agency unless otherwise agreed in writing between the undertaker and the Agency.
  • (2) In this Part of this Schedule—
  • the Agency” means the Environment Agency;
  • emergency” means a situation which—is unexpected, in that there is little or no warning, or aspects of the event could not have reasonably been predicted in advance;is a serious event presenting a risk of harm or damage to people, property or the environment; andrequires a need for urgent action, in that immediate action is required to address the risk of harm, repair or prevent a worsening of the situation; and
  • relevant watercourse” has the same meaning as in article (powers in relation to relevant watercourses).

38

  • (1) Where in the exercise of the powers conferred by this Order, the undertaker proposes to interfere with or obstruct access by the Agency to a relevant watercourse, it must give the Agency 56 days’ written notice of that requirement.
  • (2) Except in cases of emergency where the undertaker interferes with or obstructs access by the Agency to a relevant watercourse and it is not possible for the undertaker to give the Agency the notice required under sub-paragraph (1), a suitable alternative access must be provided prior to and for the duration of any such interference.

39

If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest of the Agency in any land or proposes to interfere with, or remove, any of the Agency’s apparatus it must give the Agency 56 days’ written notice before any such interest is acquired or any apparatus is interfered with or removed.

40

The undertaker must indemnify the Agency in respect of all costs, charges and expenses which it may reasonably incur or which it may sustain in the examination of plans or other matters under this Part of this Schedule.

41

Any dispute arising between the undertaker and the Agency under this Part of this Schedule is to be determined by arbitration in accordance with article 56 (arbitration).

PART 5 — Protection for First Corporate Shipping Limited

42

The provisions of this Part have effect unless otherwise agreed in writing between the undertaker and BPC.

43

In this Part—

  • access works” means works—on, over or under or otherwise affecting a private street or any public right of way on BPC’s property, including the kerbs, splitter islands, footways, verges and carriageway of such street and any road markings, signing, signals, and other street furniture;to alter, modify, improve, create or provide any means of access (whether temporary or otherwise) on or across BPC’s property or to or from any private street or any other part of BPC’s property or to or from any dock public road;to alter the layout of any private street or any public right of way on BPC’s property; andto position or install plant or equipment on or over any private street or any public right of way on BPC’s property,

and includes, without limitation on the scope of the foregoing, any works under article 13 (street works and power to alter layout etc., of streets) or article 17 (access to works) in respect of or affecting any private street or any public right of way on BPC’s property;

  • ancillary works” means embankments, earthworks, retaining structures or works, planting, landscaping or other mitigation, fencing and all other works falling within the descriptions of the further associated development set out in paragraphs (a) to (x) (inclusive) of Schedule 1;
  • BPC” means First Corporate Shipping Limited (registered company number 02542406), trading as The Bristol Port Company, being the statutory harbour authority and competent harbour authority for the Port;
  • BPC’s apparatus” means all and any gas, oil and water pipes, water tanks, cisterns, drains and drainage works, sewers, pumps, electric and communication wires, cables and plant, ducts, conduits, governors, transformers, meters and any other service media, surface water interceptors (and whether in all cases for drainage, gas, oil water, electricity, telephone, television, data and information transmission or any other service) on BPC’s property;
  • BPC’s property” means the whole and each of every part of all the leasehold and freehold land and rights and the benefit of all covenants, owned by or vested in BPC at Avonmouth, Chittening and Portbury—upon, across, under, over or in respect of or affecting which any powers conferred by this Order may be exercised; orupon, across, under or over which there is situated anything over or in respect of which any such powers may be exercised,

and includes, without limitation on the scope of the foregoing, the Port’s railway and any private street but does not include the Court House Farm terminable access;

  • BPC’s representative” means the person appointed by BPC from time to time to be its representative for the purposes of this Order;
  • certified documents” means any and all of the plans and documents certified by the Secretary of State for the purpose of this Order;
  • construction” includes execution, placing, alteration and reconstruction and “construct” and “constructed” have corresponding meanings;
  • construction access rights” means any and all powers conferred on the undertaker by this Order to exercise temporary powers of access over any land with or without vehicles, plant and equipment including, without limitation on the scope of the foregoing, any ancillary powers to remove buildings and vegetation from that land and to construct works for the purpose of providing a means of access;
  • Court House Farm easement” means a Deed of Grant of Easement dated 4 September 2017 made between Network Rail and First Corporate Shipping Limited t/a The Bristol Port Company;
  • Court House Farm terminable access” means the existing crossing at grade over the disused Portishead Branch Line which is described in the Court House Farm easement;
  • dock public road” means each of the streets known as Marsh Lane, Royal Portbury Dock Road (including the roundabout at its junction with Portbury Way and Gordano Way), Redland Avenue, Gordano Way, Garonor Way and Portbury Way to the extent that it is maintainable highway;
  • drainage works” means works—to create, alter or remove any culvert or other crossing over, under or affecting any watercourse or drainage ditch on, over or under BPC’s property or which drains water to or from BPC’s property; andto make any opening or connection into any watercourse belonging to BPC or to lay down, take up or alter any pipes for that purpose;
  • environmental protection works” means measures reasonably required to be carried out on or in respect of Work No. 18 to protect the scrub environment and water bodies established and managed by BPC;
  • highway access land” means any and all of parcels 5/30, 5/61, 5/62, 5/65 and 5/70;
  • maintainable highway” has the same meaning as in section 86(1) (highway authorities, highways and related matters) of the 1991 Act;
  • Marsh Lane track” means the private street referred to in Schedule 3 (streets subject to street works) and therein described as Access Road to the M5 Avonmouth Bridge east of Marsh Lane, Easton-in-Gordano;
  • Marsh Lane track land” means any and all of parcels 5/25, 5/95, 5/100, 5/105, 5/106, 5/112 and 5/113 and that part of parcel 5/28 which lies to the east of an imaginary line projected in a northerly direction across the disused railway line at 126 miles 78 chains and includes the Marsh Lane track;
  • plans” includes sections, elevations, designs and design data, drawings, calculations, specifications, programmes, method statements, assessments of risk relating to the construction, carrying out, maintenance and, where appropriate, removal of any work;
  • Port” means the port and harbour of Bristol;
  • Port’s railway” means the railway owned by BPC leading from Portbury Junction, Pill to the Royal Portbury Dock;
  • powers of temporary possession” means the powers conferred by article 33 (temporary use of land for carrying out the authorised development);
  • preparatory activities” means ecological mitigation works, archaeological investigations, boreholes, intrusive surveys, environmental surveys and monitoring, other investigations for the purpose of assessing ground conditions or the receipt and erection of construction plant and equipment, utility diversions or ground clearance works but excluding any such activities carried out under article 23 (authority to survey and investigate land) or the powers conferred by section 11(3) (powers of entry) of the 1965 Act as applied by this Order in respect of any of BPC’s property;
  • private street” means any street on BPC’s property which is not a maintainable highway;
  • public path land” means any and all of parcels 5/27, 5/101, 5/102, 5/130, 5/131, 5/135 and 5/136;
  • rail link land” means any and all of parcels 5/104, 5/107, 5/108, 5/165, 5/171, 6/25 and 6/55;
  • railway rights land” means any and all of parcels 5/95, 5/100, 5/105, 5/122, 5/137, 5/140, 5/141, 6/10, 6/15, 6/20 6/55, 6/60 and 6/80;
  • relevant works” means that part of Work 1C that is on the Port’s railway and Work Nos. 14, 14A, 14B, 15, 16, 16A, 16C, 18, 19 and 20;
  • specified work” means—that part of Work No. 1C that is on the Port’s railway;the whole of Work Nos. 14, 14A, 15, 16, 16A, 16C, 18, 19 and 20;all access works and drainage works; andso much of all other parts of the authorised development and of any works to be carried out under the powers conferred by article 33 as is situated upon, across, under, over or within 5 metres of BPC’s property, including all environmental mitigation and restoration measures;
  • (2) In this Part of this Schedule—
  • (a) references to the undertaker include references to any person to or in which any or all of the benefit of the provisions of this Order and any related statutory powers are transferred or are vested pursuant to any provision of this Order and any person which may by virtue of any agreement made pursuant to article 11 (agreements with Network Rail) whether alone or jointly with another exercise any or all of the powers contained in this Order;
  • (b) references to numbered parcels are to the parcels of land so numbered in the book of reference;
  • (c) references to a requirement to consult include that consultation must take place in good faith and in a timely manner with the provision of all reasonably necessary information and so that the party concerned must act reasonably in taking into account the reasonable comments made by the other party in response; and
  • (d) references to BPC’s consent, agreement or approval are to BPC’s prior consent, agreement or approval given in writing.

44

Nothing in this Order affects—

  • (a) any right of BPC to use the Court House Farm terminable access; or
  • (b) the provisions of the Court House Farm easement or any other agreement relating to the Court House Farm terminable access,

and accordingly the following provisions of this Part of this Schedule do not apply as regards the Court House Farm terminable access.

45

The undertaker must give written notice to BPC if any application is proposed to be made by the undertaker for the Secretary of State’s consent under article 10 (consent to transfer of benefit of order) and any such notice must be given no later than 28 days before any such application is made and must describe or give (as appropriate)—

  • (a) the nature of the application to be made;
  • (b) the extent of the geographical area to which the application relates; and
  • (c) the name and address of the person acting for the Secretary of State to whom the application is to be made.

46

  • (1) No agreement made under article 11 (agreements with Network Rail) may authorise or permit the exercise by Network Rail, or by the undertaker, or by Network Rail and the undertaker jointly, of any powers and rights of Network Rail and the undertaker (as the case may be) under any BPC contract or affecting any of BPC’s property.
  • (2) In sub-paragraph (1), “BPC contract” means all and any contracts, licences, easements and other agreements, permissions and consents to which BPC is a party or of which it has the benefit.

Watercourses and drainage

47

  • (1) No part of any impounded dock at the Port is included within the definition of “watercourse” for any purpose of this Order.
  • (2) The undertaker must not without BPC’s consent (such consent not to be unreasonably withheld or delayed but which may be given subject to reasonable conditions) create any new discharges for water into any watercourse belonging to or used by BPC.
  • (3) Without limitation on the scope of sub-paragraph (2), any consent given by BPC under this paragraph—
  • (a) may be given subject to reasonable conditions as to the quantities of water permitted to be discharged and as to the duration of any use of the relevant watercourse by the undertaker; and
  • (b) does not obviate the need for the undertaker to obtain any further consents required in relation to the activity concerned.
  • (4) In the exercise of any power under article 22 (discharge of water), the undertaker must not damage or interfere with the bed or banks of any watercourse in, on, over or under BPC’s property.

Surveys

48

  • (1) The undertaker must not exercise the powers conferred by article 23 (authority to survey and investigate land) or the powers conferred by section 11(3) (powers of entry) of the 1965 Act as applied by this Order in respect of any of BPC’s property—
  • (a) outside the Order limits except to the extent that BPC agrees for the purpose of carrying out non-intrusive surveys, investigations and monitoring only;
  • (b) other than to the extent that the exercise of such powers is necessary in connection with carrying out the authorised development; and
  • (c) other than by prior agreement with BPC on each and every occasion, such agreement not to be unreasonably withheld or delayed but which may be given subject to reasonable conditions, and on at least 14 days’ notice.
  • (2) When requesting BPC’s agreement to access under sub-paragraph (1) the undertaker must provide to BPC full details of the property to which access is requested, the activities proposed (including risk assessments and method statements and intended duration of the activities), the identity of the persons who would undertake them and any apparatus that might be left on the affected property.
  • (3) BPC is, without limitation on the scope of sub-paragraph (1)(c)—
  • (a) entitled to refuse access as requested by the undertaker on any occasion for operational reasons, in which case BPC must act reasonably and without delay in seeking to offer alternative arrangements; and
  • (b) entitled as a condition of its agreement on any occasion to require the production of evidence of the existence of adequate insurance with insurers of repute, the proceeds of which will be available to cover all liability, costs, claims, expenses and demands which may arise as a result of that access.
  • (4) The undertaker must remove any equipment left on, over or under BPC’s property as soon as reasonably possible after completion of the relevant surveys and investigations.
  • (5) The undertaker must, at its own expense, deliver to BPC as soon as reasonably practicable after their production on a non-reliance basis copies in an electronic format of all survey and ground investigation reports carried out in respect of BPC’s property under the powers conferred by article 23 or the powers conferred by section 11(3) of the 1965 Act as applied by this Order, which reports BPC may use and provide to others (on a non-reliance basis) free of cost in connection with works and operations at the Port.

Streets, access and public rights of way

49

  • (1) The undertaker must not in carrying out any works or exercising the powers conferred by this Order cause pedestrian or vehicular access to or across any of BPC’s property (including access for cargo operations but excluding access over the Court House Farm terminable access) to be interfered with or obstructed, other than with the consent of BPC, not to be unreasonably withheld or delayed, or, if the carrying out of works or exercising the powers relate to a dock public road, unless the undertaker has first consulted with BPC.
  • (2) Without limitation on the scope of sub-paragraph (1), the undertaker must not exercise any powers under—
  • (a) article 13(1) (street works and power to alter layout etc., of streets) in respect of or so as to affect the Marsh Lane track other than by prior agreement with BPC such agreement not to be unreasonably withheld or delayed but which may be given subject to reasonable conditions;
  • (b) article 13(1) in respect of or so as to affect any dock public road unless it has first consulted with BPC; or
  • (c) article 13(2) in respect of or so as to affect any private street on any part of BPC’s property.
  • (3) With the exception of the locations specified in columns (1) and (2) of Schedule 7 (access to works) and shown on sheet 5 of the compounds, haul roads and access to works plan as AW5.1 (access from the highway known as Marsh Lane, Easton in Gordano, north of the disused Portishead Branch railway line) and AW5.3 (access from the highway known as Marsh Lane, Easton in Gordano, south of the disused Portishead Branch railway line) the undertaker must not pursuant to any powers in this Order carry out any works to create or improve any means of access affecting any private street or any public right of way on BPC’s property or any other part of BPC’s property or any dock public road.
  • (4) In carrying out any access works, the undertaker must not so far as reasonably practicable interfere with or obstruct the free, uninterrupted and safe use by other traffic of any street or interfere with street furniture, signage and lighting masts.
  • (5) Without limitation on the scope of sub-paragraph (1), the undertaker must not exercise any powers under article 15(1) (temporary stopping up of streets and public rights of way) in respect of—
  • (a) the Marsh Lane track (except to the extent permitted by article 15(5)) or any other private street; or
  • (b) Royal Portbury Dock Road without BPC’s consent, such consent not to be unreasonably withheld or delayed but which may be given subject to reasonable conditions.
  • (6) Despite any provision in this Order, the undertaker must not, except with the agreement of BPC, exercise any power under article 15 or article 46 (traffic regulation) to use or to authorise the use of any private street or any dock public road or any public right of way on BPC’s property as a temporary working site or as a parking place.
  • (7) The undertaker must exercise the power granted to it under paragraph (5) of article 15 to stop up public rights of way LA8/67/10 and LA/8/68/10 to the extent specified in column (3) of Part 2 of Schedule 5 (bridleways and footpaths to be temporarily suspended for which no substitute is to be provided during suspension), throughout the period of operation or use of the Lodway Farm construction compound to be constructed as Work No. 17 and the temporary construction compound located under the M5 Avonmouth Bridge.
  • (8) The undertaker must, before submitting any survey, proposed measures or strategy relating to the Marsh Lane track to the relevant planning authority for approval in accordance with requirement 35 (requirement for written approval) of Schedule 2 (requirements), consult with BPC in relation to the content of all such surveys, measures and strategies.
  • (9) Despite paragraphs (1) and (2) of article 19 (construction and maintenance of new or altered streets)—
  • (a) any street constructed under this Order on BPC’s property; and
  • (b) the altered or diverted part of any street altered or diverted under this Order on BPC’s property

must be maintained by and at the expense of the relevant highway authority at all times from its completion.

  • (10) If the undertaker acquires, whether compulsorily or by agreement, any of BPC’s property within the Order limits, or any right or interest in or over such property, which property is subject to a public right of way, from the date of the acquisition of the relevant land, right or interest or from the date of entry onto the land by the undertaker under section 11(1) (power of entry) of the 1965 Act, whichever is the earlier, any liability or responsibility of BPC to the relevant highway authority for or in respect of the maintenance of that public right of way is extinguished and that public right of way shall after that date instead be maintained by and at the expense of the relevant highway authority.
  • (11) Without limitation on the scope of any other provision in this Part if any damage to any public right of way on BPC’s property is caused in the exercise of any powers under this Order or by the carrying out of, or in consequence of the construction of, any works under this Order, the undertaker must make good such damage and pay to BPC all reasonable expenses to which BPC may be put by reason of any such damage.
  • (12) The undertaker must not exercise any powers under article 13, article 15 or article 46 over or in respect of any part of BPC’s property or any dock public road after completion of construction of the authorised development.
  • (13) Despite any other provision of this Order, no part of Work No. 16 or Work No. 18 (including the right of way to be constructed by the undertaker pursuant to article 16(3) and described in Part 2 of Schedule 6 (bridleways, cycle tracks and footpaths) as a bridleway between points B1 and B2 shown on Sheet 5 of the new highways plan) is or will become open for use by any person or a public right of way or other highway except with the agreement of BPC.

Acquisition and use of land

50

  • (1) The undertaker must not exercise the powers conferred by section 271 (extinguishment of rights of statutory undertakers: preliminary notices) of the 1990 Act in relation to any rights of BPC over or in respect of the railway rights land or the highway access land; or any of BPC’s apparatus.
  • (2) Despite any other provisions of this Order, if the undertaker acquires any interest in the railway rights land or the highway access land, whether compulsorily or by agreement, no rights of BPC over or in respect of the railway rights land or the highway access land so acquired must be extinguished.
  • (3) The undertaker must not exercise the powers conferred by—
  • (a) article 24 (compulsory acquisition of land) or article 31 (acquisition of subsoil or airspace only) over or in respect of the public path land or any part of parcel 5/50 which is not part of the embankment supporting Marsh Lane;
  • (b) article 27(1) (compulsory acquisition of rights or imposition of covenants) over or in respect of the rail link land or any parcels 5/75, 5/103 and 5/112;
  • (c) article 27(2) over or in respect of any of BPC’s property;
  • (d) article 32 (rights under or over streets) over or in respect of any private street; or
  • (e) article 34 (temporary use of land for maintaining the authorised development) over or in respect of any of BPC’s property,

unless the exercise of such powers is with the consent of BPC.

  • (4) Except to the extent BPC may agree, article 28(3) (private rights over land subject to compulsory acquisition or temporary possession), article 29 (power to override easements and other rights) and article 37 (statutory undertakers and electronic communications code network operators) is not to apply in relation to any interest, right or restriction, the benefit of which is vested in or enjoyed by BPC affecting the rail link land or the Marsh Lane track land.

Use of land and execution, maintenance and use of the authorised development

51

  • (1) Despite any provision in this Order or anything shown on the land plan, the undertaker must not except with the agreement of BPC—
  • (a) exercise any powers of temporary possession over or in respect of parcel 5/75 or (if and to the extent they form part of BPC’s property) parcel 5/85 or parcel 5/86 unless BPC fails, within 14 days of a request by the undertaker, to make available for exercise by the undertaker in substitution for the exercise of the relevant powers temporary rights of access over other land which are sufficient (whether alone or in conjunction with the exercise by the undertaker of other powers under this Order) to enable the undertaker to gain access in connection with the construction of the authorised development, with such vehicles, plant and equipment as may be necessary, from access point AW5.3 shown on the compounds, haul roads and access to works plan to the accommodation bridge (and associated walls, embankments and structures) on land adjacent to parcel 05/86 and to the culvert, watercourse and head wall situated on land adjacent to parcel 05/85;
  • (b) other than any construction access rights which may be authorised by or pursuant to the terms of this Order over the Marsh Lane track, the rail link land or parcel 05/75, or over bridleways and footpaths that are open to the public, exercise any construction access rights over BPC’s property or otherwise use any part of BPC’s property for the purpose of gaining access to any part of the authorised development or to any other land or in connection with the construction or maintenance of the authorised development; or
  • (c) exercise any powers of temporary possession over or in respect of the Marsh Lane track land or the rail link land or parcels 5/103 and 5/170.
  • (2) Any exercise of powers of temporary possession by the undertaker in respect of the rail link land or the Marsh Lane track land which may be permitted pursuant to the terms of this Order is subject to, and in common with, the use of the rail link land and the Marsh Lane track land by BPC and by any other person acting with BPC’s authority or which may have rights to use the rail link land and the Marsh Lane track land.

52

  • (1) If required to do so by BPC (acting reasonably), the undertaker must at its cost and expense procure that surveys are carried out to a specification approved by BPC (acting reasonably) to show the condition of any land of which temporary possession is taken under article 33 (together with all associated structures) before the undertaker’s use of it begins and after that use ends.
  • (2) The undertaker must promptly after receipt of reasonable demand by BPC and at the undertaker’s cost and expense make good any and all damage and wear and tear caused to any part of BPC’s property which is used by the undertaker in connection with the construction or maintenance of the authorised development where in BPC’s reasonable opinion the rectification of such damage, wear or tear is necessary in the interests of safety or security.
  • (3) If required to do so by BPC (acting reasonably), the undertaker must permit BPC to inspect the execution of all works of rectification being carried out under this paragraph in order to ensure compliance by the undertaker with the requirements of this paragraph.

53

  • (1) The undertaker must present to BPC not less than three months before the intended date of commencing construction the draft programme for the execution of each part of the authorised development on BPC’s property.
  • (2) The undertaker must consult with BPC in relation to the draft programme and must present its final programme for the execution of the authorised development on BPC’s property to BPC not less than four weeks before the intended date of commencing construction.
  • (3) The undertaker must not enter on or take temporary possession of any part of BPC’s property unless it has served at least 14 days’ written notice on BPC of its intended entry onto that part.
  • (4) In this paragraph “intended date of commencing construction” means the first date on which the undertaker wishes to commence construction of any part of the authorised development on, under or over any part of BPC’s property, including carrying out any preparatory activities.
  • (5) In the exercise of any powers of temporary possession in respect of any part of BPC’s property and in the commencement and execution of the authorised development on BPC’s property the undertaker must—
  • (a) proceed diligently with the works affecting each part of BPC’s property; and
  • (b) notify BPC in writing of the completion of the relevant part of the authorised development affecting each part of BPC’s property within fourteen days of its completion.
  • (6) In the exercise of any powers of temporary possession in respect of any part of BPC’s property the undertaker must not—
  • (a) except with the agreement of BPC, provide or authorise the provision of car parking or storage (for materials or other items) facilities on any part of BPC’s property other than within Work No. 16A;
  • (b) demolish or remove any buildings; or
  • (c) except as BPC agrees, construct or carry out on BPC’s property any works comprising fencing, any mitigation works, ground or rock stability, geotechnical or strengthening works other than works which are of a temporary nature.
  • (7) In addition to and without limitation on the scope of the undertaker’s other obligations under this Order (including those in article 33(4) and Schedule 2), before giving up possession of any part of BPC’s property in respect of which any powers of temporary possession have been exercised the undertaker must remove any works constructed in contravention of sub-paragraph (6) or paragraph 54.

Works

54

Despite any provision of this Order or anything shown on the certified documents except as BPC may agree—

  • (a) no part of Work No. 14 or any ancillary works associated with Work No. 14 must be constructed or maintained on parcel 04/55; and
  • (b) other than works of a temporary nature, no ancillary works associated with any relevant works or with Work No. 1A or Work No. 1B must be constructed or maintained upon, across, under or over BPC’s property of which only temporary possession is taken under this Order or over which the undertaker does not, under this Order, acquire rights authorising the retention of those ancillary works.

55

  • (1) The undertaker must before commencing construction of any specified work supply to BPC proper and sufficient plans of that work for BPC’s approval and the specified work must not be commenced or executed except in accordance with such plans as have been approved in writing by BPC.
  • (2) Subject to sub-paragraph (3), BPC’s approval under sub-paragraph (1) must not be unreasonably withheld or delayed, but may be given subject to reasonable conditions.
  • (3) BPC’s approval to plans must not be unreasonably withheld or delayed, but may be given subject to reasonable conditions—
  • (a) in respect of all or any of Work No. 1C on BPC’s property and Work No. 19, if and in so far as the proposed works comprise and, following design development, are broadly consistent with the works shown on drawings W1097B-ARP-DRG-ECV-000305, W1097B-ARP-DRG-ECV-000330 and W1097B-ARP-DRG-ECV-000331;
  • (b) in respect of Work No. 18 if and in so far as the proposed works comprise and, following design development, are broadly consistent with the Bridleway Extension Under the Elevated M5 Plan, and
  • (c) in respect of Work No. 16C, if and in so far as the proposed works comprise only work necessary to renew the level crossing in modern equivalent form.
  • (4) Where under sub-paragraph (2) or (3) BPC’s approval to plans submitted by the undertaker under sub-paragraph (1) cannot be unreasonably withheld or delayed if by the end of the period of 28 days beginning with the date on which such plans have been supplied to BPC, BPC has not intimated disapproval of those plans and the grounds of disapproval the undertaker may serve upon BPC written notice requiring BPC to intimate approval or disapproval within a further period of 28 days beginning with the date upon which BPC receives written notice from the undertaker. If by expiry of the further period of 28 days BPC has not intimated approval or disapproval, BPC is deemed to have approved the plans as submitted.
  • (5) When signifying approval of plans submitted under sub-paragraph (1), BPC may specify any protective works (whether temporary or permanent) which in BPC’s opinion should be carried out before the commencement of the construction of a specified work to ensure the safety or stability of BPC’s property or the continuation of safe and efficient operation of the Port (including the Port’s railway) and such protective works as may be reasonably necessary for those purposes are to be constructed by BPC but at the expense of the undertaker, or if BPC so desires such protective works must be carried out by the undertaker at its own expense with all reasonable dispatch, and the undertaker must not commence the construction of the specified work until BPC has notified the undertaker that the protective works have been completed to BPC’s reasonable satisfaction.
  • (6) When signifying approval of plans submitted under sub-paragraph (1) in relation to Work No. 18, BPC may specify any environmental protection works which in BPC’s reasonable opinion should be implemented before the commencement of, or during, the construction of Work No. 18 and such environmental protection works as may be reasonably necessary for those purposes are to be implemented by BPC but at the expense of the undertaker, or if BPC so desires such environmental protection works must be implemented by the undertaker at its own expense with all reasonable dispatch, and except to the extent BPC may agree the undertaker must not commence the construction of the specified work until BPC has notified the undertaker that any and all relevant environmental protection works have been implemented to BPC’s reasonable satisfaction.

56

  • (1) Any specified work and any protective works (and any environmental protection works connected with Work No. 18) to be constructed or implemented by virtue of paragraph 55(5) or 55(6) must, when commenced, be constructed and implemented with all reasonable dispatch in accordance with the plans approved or deemed to have been approved under paragraph 55—
  • (a) under BPC’s supervision (where appropriate and if given) and to BPC’s reasonable satisfaction;
  • (b) in such manner as to cause as little damage as is possible to BPC’s property; and
  • (c) so far as is reasonably practicable, so as not to interfere with or obstruct the free, uninterrupted and safe and efficient operation of the Port (including use of the Port’s railway or the traffic on it).
  • (2) If any damage to BPC’s property or any such interference or obstruction is caused by the carrying out of, or in consequence of the construction of, a specified work, the undertaker must, regardless of any approval described in paragraph 55(1), make good such damage and pay to BPC all reasonable expenses to which BPC may be put and compensation for any loss which it may sustain by reason of any such damage, interference or obstruction.
  • (3) Nothing in this Part of this Schedule imposes—
  • (a) any liability on the undertaker with respect to any damage, costs, expenses or loss attributable to the negligence of BPC or its servants, contractors or agents; or
  • (b) any liability on BPC with respect to any damage, costs, expenses or loss attributable to the negligence of the undertaker or its servants, contractors or agents.

57

The undertaker must—

  • (a) at all times afford reasonable facilities to BPC’s representative (or to a person nominated by BPC’s representative) for access to a specified work during its construction; and
  • (b) supply BPC with all such information as BPC’s representative may reasonably require with regard to a specified work or the method of constructing it.

58

BPC must at all times afford reasonable facilities to the undertaker and its agents for access to any works carried out by BPC under this Part during their construction and must supply the undertaker with such information as it may reasonably require with regard to such works or the method of constructing them.

59

  • (1) If any permanent or temporary alterations or additions to BPC’s property, or any protective works under paragraph 55(5), are reasonably necessary during the construction of a specified work, or during a period of 12 months after the opening for public use of any part of the authorised development that includes a specified work, in consequence of the construction of that specified work, such alterations and additions may be carried out by BPC and if BPC gives to the undertaker reasonable notice of its intention to carry out such alterations or additions, the undertaker must pay to BPC all costs reasonably and properly incurred in constructing those alterations or additions including, in respect of any such alterations and additions as are to be permanent, a capitalised sum representing the increase of the costs which may be expected to be reasonably incurred by BPC in maintaining, working and, when necessary, renewing any such alterations or additions.
  • (2) If the cost of maintaining, working or renewing BPC’s property is reduced in consequence of any such alterations or additions a capitalised sum representing such saving must be set off against any sum payable by the undertaker to BPC under this paragraph.

60

The undertaker must repay to BPC all fees, costs, charges and expenses reasonably and properly incurred by BPC—

  • (a) in constructing any protective works under the provisions of paragraph 55(5) and in the implementing of any environmental protection works under the provisions of paragraph 55(6) including, in respect of any permanent protective works or permanent environmental protection works, a capitalised sum representing the cost of maintaining and renewing those works;
  • (b) in respect of BPC’s representative’s approval of plans submitted by the undertaker and the supervision by BPC of the construction of a specified work and otherwise in connection with the implementation of the provisions of this Part;
  • (c) in respect of the employment or procurement of the services of any persons whom it is reasonably necessary to appoint for inspecting, watching and lighting BPC’s property (including the Port’s railway) and for preventing, so far as may be reasonably practicable, interference, obstruction, danger or accident arising from the construction or failure of a specified work; and
  • (d) in respect of any additional temporary lighting of BPC’s property in the vicinity of the specified works, being lighting made reasonably necessary by reason or consequence of the construction or failure of a specified work.

61

If at any time after the completion of a specified work BPC gives notice to the undertaker informing it that the state of maintenance of any part of the specified work appears to be such as adversely affects the operation or use of any of BPC’s property (including the Port’s railway) in connection with carrying on BPC’s statutory undertaking, the undertaker must, on receipt of such notice, take such steps as may be reasonably necessary to put that specified work in such state of maintenance as not to adversely affect the operation or use of such property in that connection.

62

Any additional expenses which BPC may reasonably incur in altering, reconstructing, working, or maintaining under any powers existing at the making of this Order any of BPC’s property in connection with carrying on BPC’s statutory undertaking by reason of the existence of a specified work, provided that 56 days’ previous notice of the commencement of such alteration, reconstruction, working or maintenance has been given to the undertaker, are to be repaid by the undertaker to BPC.

63

  • (1) The undertaker must pay to BPC all costs, charges, damages and expenses not otherwise provided for in this Part (but subject to article 41 (no double recovery)) which may be occasioned to or reasonably and properly incurred by BPC—
  • (a) by reason of the construction, working, maintenance of a specified work or the failure of such a work; or
  • (b) by reason of any act or omission of the undertaker or of any person in its employ or of its contractors or others whilst engaged upon a specified work,

and the undertaker must indemnify BPC from and against all costs, claims and demands arising out of or in connection with a specified work or any such failure, act or omission; and the fact that any act or thing may have been done by BPC on behalf of the undertaker or in accordance with plans approved by BPC or in accordance with any requirement of BPC’s representative or under BPC’s representative’s supervision will not (if it was done without negligence on the part of BPC or of any person in its employ or of its contractors or agents) excuse the undertaker from any liability under the provisions of this sub-paragraph.

  • (2) BPC must give the undertaker reasonable notice of any such claim or demand made by a third party as soon as reasonably practicable after BPC becomes aware of it and must make no settlement or compromise of such a claim or demand in excess of £10,000 without the prior consent of the undertaker (such consent not to be unreasonably withheld or delayed).

64

BPC must, on receipt of a request from the undertaker, from time to time provide free of charge with written estimates of the costs, charges, expenses and other liabilities for which the undertaker is or will become liable under this Part and with such information as may reasonably enable the undertaker to assess the reasonableness of any such estimate or claim made or to be made under this Part.

65

In the assessment of any sums payable to BPC under this Part there must not be taken into account any increase in the sums claimed that is attributable to any action taken by or any agreement entered into by BPC if that action or agreement was not reasonably necessary and was taken or entered into with a view to obtaining the payment of those sums by the undertaker under this Part or increasing the sums so payable.

BPC’s apparatus

66

Despite any provision of this Order or anything shown on the land plan—

  • (a) the undertaker must not acquire any of BPC’s apparatus other than by agreement;
  • (b) any right of BPC to maintain and use any of BPC’s apparatus in land must not be extinguished, suspended or interfered with other than with BPC’s agreement; and
  • (c) the undertaker must not alter, divert, remove, replace, reposition, relocate or repair any of BPC’s apparatus other than with BPC’s consent (not to be unreasonably withheld or delayed in respect of any specified work).

The Port’s railway

67

For the purpose of this Order—

  • (a) no part of the Port’s railway is, or will become by virtue of this Order or the execution of the authorised development, existing operational railway or operational railway; and
  • (b) no part of BPC’s property or of any other land over which the Port’s railway is located (whether or not that land is owned by BPC) is, or will become by virtue of this Order or the execution of the authorised development, operational railway land or currently operational railway land or form part of the railway authorised by this Order to which article 39 (operation and use of railways) applies.

Trees and other vegetation

68

Despite any provision in this Order and anything shown on the certified documents, in the exercise of any powers under this Order and in the construction, maintenance and operation of the authorised development the undertaker must not—

  • (a) plant new or replacement trees, hedges, hedgerows, shrubs or other vegetation on BPC’s property otherwise than with BPC’s consent, such consent not to be unreasonably withheld or delayed; or
  • (b) remove, cut back, fell or lop, prune or reduce in any way any other hedge, tree, shrub or other vegetation on BPC’s property otherwise than with BPC’s consent, such consent not to be unreasonably withheld or delayed.

General

69

The undertaker must in the exercise of any powers under this Order and in the construction, maintenance and operation of the authorised development secure compliance with and implementation of all and any applicable conditions attached to any relevant consent, agreement or approval given by BPC for the purpose of this Part.

70

Article 49 (procedure in relation to further approvals, etc) will not apply in relation to any consent, agreement or approval from BPC required under this Order.

PART 6 — Protection for Exolum Pipeline System Ltd

71

The provisions of this Part have effect for the protection of the Exolum undertaker referred to in this Part unless otherwise agreed in writing between the undertaker and the Exolum undertaker.

72

In this Part of this Schedule—

  • alternative apparatus” means alternative apparatus adequate to enable the Exolum undertaker to fulfil its statutory functions in a manner not less efficient than previously;
  • apparatus” means the pipeline, or any part of it, belonging to or maintained by the Exolum undertaker, which is within the Order limits, and includes any structure in which that apparatus is or is to be lodged or which gives or will give access to apparatus;
  • Exolum undertaker” means Exolum Pipeline System Ltd (registered company number 09497223) or any successor in title to the Exolum undertaker in respect of the apparatus;
  • functions” includes powers and duties; and
  • “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over or upon land.

73

Despite any provision of this Order or anything shown on the land plan, the undertaker must not acquire any apparatus otherwise than by agreement.

74

  • (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which the apparatus is placed, that apparatus must not be removed under this Part and any right of the Exolum undertaker to maintain that apparatus in that land must not be extinguished until alternative apparatus has been constructed and is in operation to the reasonable satisfaction of the Exolum undertaker.
  • (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it must give to the Exolum undertaker written notice of that requirement, together with a plan and section of the work proposed.
  • (3) If alternative apparatus or any part of such apparatus is to be constructed as a consequence of the removal of apparatus placed in the land referred to in sub-paragraph (2), the Exolum undertaker, must on receipt of a written notice to that effect from the undertaker, as soon as reasonably possible use its best endeavours to obtain the necessary facilities and rights in other land in which the alternative apparatus is to be constructed.
  • (4) The Exolum undertaker must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 56 (arbitration), and after the grant to the Exolum undertaker of any such facilities and rights as are referred to in sub-paragraph (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part.
  • (5) Regardless of anything in sub-paragraph (4), if the undertaker gives notice in writing to the Exolum undertaker that it desires itself to execute any work, or part of any work in connection with the construction or removal of apparatus, that work, instead of being executed by the Exolum undertaker, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of the Exolum undertaker.
  • (6) Nothing in sub-paragraph (5) authorises the undertaker to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 300 millimetres of the apparatus.

75

  • (1) Not less than 28 days before starting the execution of any works of the type referred to in paragraph 74(2) that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under that sub-paragraph, the undertaker must submit to the Exolum undertaker a plan, section and description of the works to be executed.
  • (2) Those works must be executed only in accordance with the plan, section and description submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by the Exolum undertaker for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and the Exolum undertaker is entitled to watch and inspect the execution of those works.
  • (3) In relation to works which will or may be situated on, over, under or within 15 metres measured in any direction of the apparatus or (wherever situated) will impose any load directly upon the apparatus or involve embankment works within 15 metres of the apparatus, the information to be submitted to the Exolum undertaker under paragraph 75(1) shall be submitted not less than 35 days before the works are started and shall include a method statement describing—
  • (a) the exact position of the works;
  • (b) the level at which the works are to be constructed or renewed;
  • (c) the manner of their construction or renewal;
  • (d) the position of the apparatus; and
  • (e) by way of detailed drawings, every alteration proposed to be made to the apparatus,

to permit the Exolum undertaker to assess whether any protective works or monitoring of adjoining activities or works are necessary, acting reasonably.

  • (4) Any requirements made by the Exolum undertaker under sub-paragraph (2) must be made within a period of 28 days beginning with the date on which a plan, section and description under sub-paragraph (1) re-submitted to it.
  • (5) If the Exolum undertaker in accordance with sub-paragraph (4) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraph 74 applies as if the removal of the apparatus had been required by the undertaker under sub-paragraph (2) of that paragraph.
  • (6) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan, section and description instead of the plan, section and description previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan, section and description.
  • (7) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency but in that case it must give to the Exolum undertaker notice as soon as is reasonably practicable and a plan, section and description of the works referred to in sub-paragraph (1) as soon as reasonably practicable subsequently and must comply with sub-paragraph (2) and sub-paragraph (3) in so far as is reasonably practicable in the circumstances.
  • (8) Where, in the reasonable opinion of the Exolum undertaker or the undertaker, anything done in the exercise of the powers conferred by this Order might interfere with the cathodic protection forming part of apparatus or any apparatus might interfere with the proposed or existing cathodic protection forming part of the undertaker’s works, the Exolum undertaker and the undertaker must co-operate in carrying out any tests which they consider reasonably necessary for ascertaining the nature and extent of such interference, and measures reasonably necessary for providing or preserving such cathodic protection.

76

  • (1) Subject to the following provisions of this paragraph, the undertaker must repay to the Exolum undertaker the proper and reasonable expenses reasonably incurred by the Exolum undertaker in, or in connection with, the inspection, removal, alteration or protection of any apparatus including those expenses incurred through stopping and restoring supply to the apparatus.
  • (2) The value of any apparatus removed under the provisions of this Part of this Schedule is to be deducted from any sum payable under sub-paragraph (1), that value being calculated after removal.

77

  • (1) If in accordance with the provisions of this Part of this Schedule—
  • (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
  • (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was, and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 56 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the Exolum undertaker by virtue of paragraph 76(1) is to be reduced by the amount of that excess.
  • (2) For the purposes of sub-paragraph (1), the extension of the apparatus to a length greater than the length of the existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus.
  • (3) An amount which apart from this sub-paragraph would be payable to the Exolum undertaker in respect of works by virtue of paragraph 76(1) must, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the Exolum undertaker any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.

78

Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker or Network Rail and the Exolum undertaker in respect of any apparatus laid or erected in land belonging to the undertaker or Network Rail on the date on which this Order is made.

PART 7 — For the protection of Western Power Distribution Limited (South West) Plc

Application

79

For the protection of Western Power Distribution Limited (South West) plc as referred to in this Part of this Schedule the following provisions have effect, unless otherwise agreed in writing between the undertaker and Western Power Distribution Limited (South West) plc.

Interpretation

80

In this Part of this Schedule—

  • alternative apparatus” means alternative apparatus adequate to enable WPD to fulfil its statutory functions in a manner not less efficient than previously;
  • alternative rights” means all and any necessary legal easements, consents, or permissions required by WPD in order to permit or authorise a diversion;
  • apparatus” means electric lines or electrical plant as defined in the Electricity Act 1989[^f00088], belonging to or maintained by WPD;
  • diversion” means an alteration to the WPD network in order to enable or facilitate the authorised development;
  • functions” includes powers and duties;
  • “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over or upon land;
  • “plan” or “plans” includes all designs, drawings, specifications, method statements, programmes, calculations, risk assessments and other documents that are reasonably necessary to properly and sufficiently describe and assess the works to be executed;
  • specified work” means so much of any of the authorised development that is carried out within 6 metres of any apparatus;
  • WPD” means Western Power Distribution (South West) plc (company number 02366894) whose registered office is at Avonbank, Feeder Road, Bristol BS2 0TB;
  • WPD network” means WPD’s distribution network operated pursuant to its distribution licence issued pursuant to section 6 (licences authorising supply, etc.) of the Electricity Act 1989; and

for the avoidance of doubt, all other terms as defined in article 2 (interpretation) of this Order.

Precedence of 1991 Act in respect of apparatus in streets

81

This Part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and WPD are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act.

No acquisition or extinguishment except by agreement

82

Regardless of any provision in this Order or anything shown on the land plans, the undertaker must not acquire any apparatus otherwise than by agreement.

Removal of apparatus

83

  • (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or requires that WPD’s apparatus is relocated or diverted, that apparatus must not be removed under this Part of this Schedule and any right of WPD to maintain that apparatus in that land must not be extinguished until alternative apparatus has been constructed and is in operation and access to it has been provided if necessary to the reasonable satisfaction of WPD in accordance with sub-paragraphs (2) to (11).
  • (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it must give to WPD written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order WPD reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (2)(a), (b) and (c), afford to WPD the necessary facilities and rights for the construction of alternative apparatus in other land owned or controlled by the undertaker and subsequently for the maintenance of that apparatus—
  • (a) if, for the purpose of executing any works, the undertaker requires to remove or divert any apparatus placed within the Order land, and alternative apparatus or any part of such alternative apparatus is to be constructed in land other than the Order land as a consequence of the removal or diversion of apparatus, then the undertaker shall use its reasonable endeavours to obtain alternative rights in other land in which the alternative apparatus is to be constructed;
  • (b) should the undertaker not be able to obtain the alternative rights required under paragraph (a) then the undertaker and WPD shall use reasonable endeavours to agree a reasonably practicable and mutually agreeable alternative engineering solution which does not require alternative apparatus to be constructed in land other than Order land and does not require alternative rights;
  • (c) if alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker and the undertaker is unable to afford such facilities and rights as are mentioned in paragraph (a) and an alternative engineering solution cannot be agreed in accordance with paragraph (b), WPD must on receipt of written notice to that effect from the undertaker, take such steps as are reasonable in the circumstances to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed save that this obligation shall not extend to a requirement on WPD to use its compulsory purchase powers to this end unless WPD elects to do so.
  • (3) Any alternative apparatus required pursuant to sub-paragraph (2) must be constructed in such manner and in such line or situation as may be agreed between WPD and the undertaker or in default of agreement settled in accordance with paragraph 86.
  • (4) WPD must, after the alternative apparatus to be provided or constructed has been agreed or settled pursuant to paragraph 86, and after the grant to WPD of any such facilities and rights as are referred to in sub-paragraph (2), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.
  • (5) Regardless of anything in sub-paragraph (4), if the undertaker gives notice in writing to WPD that it desires itself to execute any work, or part of any work in connection with the construction or removal of apparatus in any land of the undertaker, that work, instead of being executed by WPD, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of WPD.

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.