The Portishead Branch Line (MetroWest Phase 1) Order 2022
- (6) Nothing in sub-paragraph (5) authorises the undertaker to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 600 millimetres of the apparatus.
- (7) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to WPD facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and WPD or in default of agreement settled in accordance with paragraph 86.
- (8) In settling those terms and conditions in respect of alternative apparatus to be constructed in the land of the undertaker, the expert must—
- (a) give effect to all reasonable requirements of the undertaker for ensuring the safety and efficient operation of the authorised development and for securing any subsequent alterations or adaptations of the alternative apparatus which may be required to prevent interference with any proposed works of the undertaker; and
- (b) so far as it may be reasonable and practicable to do so in the circumstances of the particular case, give effect to the terms and conditions, if any, applicable to the apparatus constructed in the land for which the alternative apparatus is to be substituted.
- (9) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the expert less favourable on the whole to WPD than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the expert must make such provision for the payment of compensation by the undertaker to WPD as appears to the expert to be reasonable having regard to all the circumstances of the particular case.
- (10) If in accordance with the provisions of this Part of this Schedule WPD require that alternative apparatus of better type, of greater capacity or of greater dimensions, or at a greater depth is necessary in substitution for existing apparatus which for WPD’s network requirements is over and above what is necessary as a consequence of and for the purpose of the authorised development WPD must deduct the cost of such additional requirements from the amount payable by the undertaker pursuant to paragraph 85(1).
- (11) For the purposes of sub–paragraph (10)—
- (a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
- (b) where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.
84
- (1) Not less than 28 days before the undertaker intends to start the execution of any specified work, the undertaker must submit to WPD a plan, section and description of the works to be executed. Any submission must note the time limits imposed on WPD under sub-paragraph (3).
- (2) Subject to sub-paragraph (3) the undertaker must not commence any works to which sub-paragraph (1) applies until WPD has given written approval of the plan so submitted, and identified any reasonable requirements it has in relation to the carrying out of the works such approval not to be unreasonably withheld or delayed.
- (3) If by the expiry of 21 days beginning with the date on which a plan, section and description under sub-paragraph (1) are submitted WPD has not advised the undertaker in writing of its approval or disapproval of the plans and any reasonable requirements for the alteration or otherwise for the protection of the apparatus, or for securing access to it, it shall be deemed to have approved the plans, sections or descriptions as submitted.
- (4) The works referred to in sub-paragraph (1) must be executed only in accordance with the plan, section and description submitted under sub-paragraph (1) and in accordance with any reasonable requirements as may be notified in accordance with sub-paragraph (2) by WPD and WPD is entitled to watch and inspect the execution of those works.
- (5) At all times when carrying out any works authorised under the Order the undertaker must comply with WPD’s Avoidance of Danger from Electricity Overhead Lines and Underground Cables (2014), the Energy Network Association’s A Guide to the Safe Use of Mechanical Plant in the Vicinity of Electricity Overhead Lines (undated), the Health and Safety Executive’s GS6 Avoiding Danger from Overhead Power Lines and the Health and Safety Executive’s HSG47 Avoiding Danger from Underground Services (Third Edition) (2014) as the same may be replaced from time to time.
- (6) If WPD, in accordance with sub–paragraph (2) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement subject to sub-paragraph (3), paragraphs 83(1) to (6) apply as if the removal of the apparatus had been required by the undertaker under sub-paragraph 83(2).
- (7) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan, section and description instead of the plan, section and description previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan, section and description.
- (8) The undertaker is not required to comply with sub–paragraph (1) in a case of emergency but in that case it must give to WPD notice as soon as is reasonably practicable and a plan, section and description of those works as soon as reasonably practicable subsequently and must comply with sub–paragraph (2) in so far as is reasonably practicable in the circumstances.
Expenses and costs
85
- (1) Subject to the following provisions of this paragraph, the undertaker must pay to WPD the proper and reasonable expenses reasonably incurred by WPD in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any alternative apparatus arising as a result of the powers conferred upon the undertaker pursuant to this Order.
- (2) Subject to sub-paragraphs (3) and (4), if by reason or in consequence of the construction of any specified work, any damage is caused to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of WPD the undertaker is to—
- (a) bear and pay the cost reasonably incurred by WPD in making good such damage or restoring the supply; and
- (b) reimburse WPD for any other expenses, loss, damages, penalty or costs reasonably and properly incurred by WPD of such damage, by reason or in consequence of any such damage or interruption.
- (3) Nothing in sub-paragraph (2) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of WPD, its officers, servants, contractors or agents.
- (4) WPD must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of the undertaker which, if it withholds such consent, is to have the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
- (5) WPD shall not be liable to the undertaker for any losses or costs incurred by the undertaker resulting from delays to the authorised development as a result of its failure to undertake works to deliver any alternative apparatus.
Expert determination
86
- (1) Article 56 (arbitration) applies to any difference as to the legal interpretation of this Part of this Schedule and as provided for in sub–paragraph (7).
- (2) Save as provided for in sub–paragraph (1) or sub–paragraph (7) any difference under this Part of this Schedule must be referred to and settled by a single independent and suitable person who holds appropriate professional qualifications and is a member of a professional body relevant to the matter in dispute acting as an expert, such person to be agreed by the differing parties or, in the absence of agreement, identified by the President of the Institution of Civil Engineers.
- (3) All parties involved in settling any difference must use reasonable endeavours to do so within 14 days from the date of a dispute first being notified in writing by one party to the other and in the absence of the difference being settled within that period the expert must be appointed within 21 days of the notification of the dispute.
- (4) The fees of the expert are payable by the parties in such proportions as the expert may determine or, in the absence of such determination, equally.
- (5) The expert must—
- (a) invite the parties to make submission to the expert in writing and copied to the other party to be received by the expert within 21 days of the expert’s appointment;
- (b) permit a party to comment on the submissions made by the other party within 14 days of receipt of the submission;
- (c) issue a decision within 28 days of receipt of the submissions under sub-paragraph (5)(a); and
- (d) give reasons for the decision.
- (6) The expert must consider where relevant—
- (a) the development outcome sought by the undertaker;
- (b) the ability of the undertaker to achieve its outcome in a timely and cost-effective manner;
- (c) the nature of the power sought to be exercised by the undertaker;
- (d) the effectiveness, cost and reasonableness of proposals for mitigation arising from any party; and
- (e) any other important and relevant consideration.
- (7) Any determination by the expert is final and binding, except in the case of manifest error in which case the difference that has been subject to expert determination may be referred to and settled by arbitration under article 56.
87
Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker or Network Rail and WPD in respect of any apparatus laid or erected in land belonging to the undertaker or Network Rail on the date on which this Order is made.
88
The provisions of Part 2 of this Schedule do not apply in relation to WPD or any apparatus of WPD.
PART 8 — For the protection of National Grid as electricity undertaker
Application
89
For the protection of National Grid the following provisions of this Part of this Schedule have effect, unless otherwise agreed in writing between the undertaker and National Grid.
Interpretation
90
In this Part of this Schedule—
- “1991 Act” means the New Roads and Street Works Act 1991;
- “2016 Order” means the National Grid (Hinkley Point C Connection Project) Order 2016 as amended;
- “alternative apparatus” means appropriate alternative apparatus to the satisfaction of National Grid to enable it to fulfil its statutory functions in a manner no less efficient than previously;
- “apparatus” means electric lines or electrical plant as defined in the Electricity Act 1989, belonging to or maintained by National Grid, together with any replacement apparatus and such other apparatus constructed that becomes operational apparatus of National Grid for the purposes of transmission, distribution and/or supply and includes any structure in which apparatus is or will be lodged or which gives or will give access to apparatus;
- “authorised works” has the same meaning as is given to the term “authorised development” in article 2 of this Order and includes any associated development authorised by the Order and for the purposes of this Part of this Schedule includes the use and maintenance of the authorised works and construction of any works authorised by this Schedule;
- “commence” has the same meaning as in article 2 of this Order and commencement shall be construed to have the same meaning;
- “deed of consent” means a deed of consent, crossing agreement, deed of variation or new deed of grant agreed between the parties acting reasonably in order to vary and/or replace existing easements, agreements, enactments and other such interests so as to secure land rights and interests as are necessary to carry out, maintain, operate and use the apparatus in a manner consistent with the terms of this Part of this Schedule;
- “functions” includes powers and duties;
- “ground mitigation scheme” means a scheme approved by the undertaker (such approval not to be unreasonably withheld or delayed) setting out the necessary measures (if any) for a ground subsidence event;
- “ground monitoring scheme” means a scheme for monitoring ground subsidence which sets out the apparatus which is to be subject to such monitoring, the extent of land to be monitored, the manner in which ground levels are to be monitored, the timescales of any monitoring activities and the extent of ground subsidence which, if exceeded, shall require the undertaker to submit for National Grid’s approval a ground mitigation scheme;
- “ground subsidence event” means any ground subsidence identified by the monitoring activities set out in the ground monitoring scheme that has exceeded the level described in the ground monitoring scheme as requiring a ground mitigation scheme;
- “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over, across, along or upon such land;
- “maintain” and “maintenance” shall include the ability and right to do any of the following in relation to any apparatus or alternative apparatus of National Grid including construct, use, repair, alter, inspect, renew or remove the apparatus;
- “National Grid” means National Grid Electricity Transmission plc (registered company number 02366977);
- “plan” or “plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe and assess the works to be executed;
- “specified works” means any of the authorised works or activities undertaken in association with the authorised works which—will or may be situated over, or within 15 metres measured in any direction of any apparatus the removal of which has not been required by the undertaker under paragraph 93(2) or otherwise; and/ormay in any way adversely affect any existing apparatus the removal of which has not been required by the undertaker under paragraph 95(3) or otherwise;
- “undertaker” means the undertaker as defined in article 2 of this Order.
91
Except for paragraphs 94 (apparatus of National Grid in stopped up streets), 98 (retained apparatus), 99 (expenses) and 100 (indemnity) of this Part of this Schedule which will apply in respect of the exercise of all or any powers under the Order affecting the rights and apparatus of National Grid, the other provisions of this Part of this Schedule do not apply to apparatus in respect of which the relations between the undertaker and National Grid are regulated by the provisions of Part 3 of the 1991 Act.
92
The provisions of Part 2 of this Schedule do not apply in relation to National Grid or any apparatus of National Grid.
93
- (1) The undertaker and National Grid will co-operate and work together to secure that the works proposed to be carried out by National Grid under the powers of the 2016 Order and the authorised works to be carried out by the undertaker under this Order will so far as reasonably possible be programmed, and arrangements for the carrying out, use and maintenance of those works will be made, so as, so far as reasonably possible, to avoid undue delay or any conflict arising between the carrying out, use and maintenance of those proposed works and carrying out, use and maintenance of the authorised development.
- (2) Any consent, agreement or approval by National Grid or the undertaker under this Part of this Schedule must not be unreasonably withheld or delayed.
Apparatus of National Grid in stopped up streets
94
- (1) Without prejudice to the generality of any other protection afforded to National Grid elsewhere in the Order, where any street is stopped up under article 14 (permanent stopping up of streets), if National Grid has any apparatus in the street or accessed via that street National Grid will be entitled to the same rights in respect of such apparatus as it enjoyed immediately before the stopping up and the undertaker will grant to National Grid, or will procure the granting to National Grid of, legal easements reasonably satisfactory to it in respect of such apparatus and access to it prior to the stopping up of any such street or highway.
- (2) Notwithstanding the temporary stopping up or diversion of any highway under the powers of article 15 (temporary stopping up of streets and public rights of way), National Grid will be at liberty at all times to take all necessary access across any such stopped up highway and/or to execute and do all such works and things in, upon or under any such highway as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the stopping up or diversion was in that highway.
Acquisition of land
95
- (1) Regardless of any provision in this Order or anything shown on the land plans or contained in the book of reference to the Order, the undertaker may not acquire or extinguish any land interest or apparatus or override any easement and/or other interest of National Grid, including any rights contained in the 2016 Order, otherwise than by agreement.
- (2) As a condition of agreement between the parties in sub-paragraph (1), prior to the carrying out of any part of the authorised works (or in such other timeframe as may be agreed between National Grid and the undertaker) that are subject to the requirements of this Part of this Schedule that will cause any conflict with or breach the terms of any easement and/or other legal or land interest of National Grid and/or affects the provisions of any enactment or agreement regulating the relations between National Grid and the undertaker in respect of any apparatus laid or erected in land belonging to or secured by the undertaker, the undertaker must as National Grid reasonably requires enter into such deeds of consent upon such terms and conditions as may be agreed between National Grid and the undertaker acting reasonably and which must be no less favourable on the whole to National Grid unless otherwise agreed by National Grid, and it will be the responsibility of the undertaker to procure and/or secure the consent and entering into of such deeds and variations by all other third parties with an interest in the land at that time who are affected by such authorised works.
- (3) The undertaker and National Grid agree that where there is any inconsistency or duplication between the provisions set out in this Part of this Schedule relating to the relocation and/or removal of apparatus (including but not limited to the payment of costs and expenses relating to such relocation and/or removal of apparatus) and the provisions of any existing easement, rights, agreements and licences granted, used, enjoyed or exercised by National Grid and/or other enactments relied upon by National Grid as of right or other use in relation to the apparatus, then the provisions in this Part of this Schedule shall prevail.
- (4) Any agreement or consent granted by National Grid under paragraph 98 or any other paragraph of this Part of this Schedule, shall not be taken to constitute agreement under paragraph 95(1).
Removal of existing apparatus
96
- (1) If, in the exercise of the agreement reached in accordance with paragraph 95 or in any other authorised manner, the undertaker acquires any interest in any land in which any apparatus is placed or requires that National Grid’s apparatus is relocated or diverted, that apparatus must not be removed under this Part of this Schedule and any right of National Grid to maintain that apparatus in that land must not be extinguished, until alternative apparatus has been constructed, and is in operation to the reasonable satisfaction of National Grid in accordance with sub-paragraphs (2) to (5) inclusive.
- (2) If, for the purpose of executing any works in, on, under or over any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it must give to National Grid 56 days’ advance written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order National Grid reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to National Grid to its satisfaction (taking into account paragraph 97(1)) the necessary facilities and rights for the construction of alternative apparatus in other land of or land secured by the undertaker and subsequently for the maintenance of that apparatus.
- (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of or land secured by the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2), in the land in which the alternative apparatus or part of such apparatus is to be constructed, National Grid must, as soon as is reasonably possible and on receipt of a written notice to that effect from the undertaker, take such steps as are reasonable in the circumstances in an endeavour to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed save that this obligation shall not extend to the requirement for National Grid to use its compulsory purchase powers to this end unless it elects to so do.
- (4) Any alternative apparatus to be constructed in land of or land secured by the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between National Grid and the undertaker or in default of agreement settled by arbitration in accordance with article 56 (arbitration).
- (5) National Grid must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 56, and subject to the grant to National Grid of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.
Facilities and rights for alternative apparatus
97
- (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to or secures for National Grid facilities and rights in land for the construction, use, maintenance and protection of alternative apparatus in substitution for apparatus to be removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and National Grid and must be no less favourable on the whole to National Grid than the facilities and rights enjoyed by it in respect of the apparatus to be removed unless otherwise agreed by National Grid.
- (2) If the facilities and rights to be afforded by the undertaker and agreed with National Grid under sub-paragraph (1) in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are less favourable on the whole to National Grid than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the matter will be referred to arbitration in accordance with paragraph 104 (arbitration) and the arbitrator shall make such provision for the payment of compensation by the undertaker to National Grid as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.
Retained apparatus
98
- (1) Not less than 56 days before the commencement of any specified works that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 96(2) or otherwise, the undertaker must submit to National Grid a plan of the works to be executed and seek from National Grid details of the underground extent of their electricity tower foundations.
- (2) In relation to specified works which will or may be situated on, over, under or within 15 metres measured in any direction of any apparatus, or involve embankment works within 15 metres of any apparatus, the plan to be submitted to National Grid under sub-paragraph (1) must include a method statement and describe—
- (a) the exact position of the works;
- (b) the level at which these are proposed to be constructed or renewed;
- (c) the manner of their construction or renewal including details of excavation, positioning of plant;
- (d) the position of all apparatus;
- (e) by way of detailed drawings, every alteration proposed to be made to or close to any such apparatus;
- (f) any intended maintenance regimes; and
- (g) an assessment of risks of rise of earth issues.
- (3) In relation to any works which will or may be situated on, over, under or within 10 metres of any part of the foundations of an electricity tower or between any two or more electricity towers, the plan to be submitted under sub-paragraph (1) must, in addition to the matters set out in sub- paragraph (2), include a method statement describing—
- (a) details of any cable trench design including route, dimensions, clearance to pylon foundations;
- (b) demonstration that pylon foundations will not be affected prior to, during and post construction;
- (c) details of load bearing capacities of trenches;
- (d) details of cable installation methodology including access arrangements, jointing bays and backfill methodology;
- (e) a written management plan for high voltage hazard during construction and ongoing maintenance of the cable route;
- (f) written details of the operations and maintenance regime for the cable, including frequency and method of access;
- (g) assessment of earth rise potential if reasonably required by National Grid’s engineers; and
- (h) evidence that trench bearing capacity is to be designed to 26 tonnes to take the weight of overhead line construction traffic.
- (4) The undertaker must not commence any works to which sub-paragraphs (2) or (3) apply until National Grid has given written approval of the plan so submitted.
- (5) Any approval of National Grid required under sub-paragraphs (2) or (3)—
- (a) may be given subject to reasonable conditions for any purpose mentioned in sub-paragraphs (6) or (8); and
- (b) must not be unreasonably withheld.
- (6) In relation to any work to which sub-paragraphs (2) or (3) apply, National Grid may require such modifications to be made to the plans as may be reasonably necessary for the purpose of securing its apparatus against interference or risk of damage or for the purpose of providing or securing proper and convenient means of access to any apparatus .
- (7) Works to which this paragraph applies must only be executed in accordance with the plan, submitted under sub-paragraph (1) or as relevant sub-paragraph (5), as approved or as amended from time to time by agreement between the undertaker and National Grid and in accordance with such reasonable requirements as may be made in accordance with sub-paragraphs (6) or (8) by National Grid for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and National Grid will be entitled to watch and inspect the execution of those works.
- (8) Where National Grid requires any protective works to be carried out by itself or by the undertaker (whether of a temporary or permanent nature) such protective works, inclusive of any measures or schemes required and approved as part of the plan approved pursuant to this paragraph, must be carried out to National Grid’s satisfaction prior to the commencement of any authorised works (or any relevant part thereof) for which protective works are required and National Grid shall give 56 days’ notice of such works from the date of submission of a plan pursuant to this paragraph (except in an emergency).
- (9) If National Grid in accordance with sub-paragraphs (6) or (8) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 89 to 91 and 95 to 97 apply as if the removal of the apparatus had been required by the undertaker under paragraph 96(2).
- (10) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 56 days before commencing the execution of the authorised works, a new plan, instead of the plan previously submitted, and having done so the provisions of this paragraph shall apply to and in respect of the new plan.
- (11) The undertaker will not be required to comply with sub-paragraph (1) where it needs to carry out emergency works as defined in the 1991 Act but in that case it must give to National Grid notice as soon as is reasonably practicable and a plan of those works and must—
- (a) comply with sub-paragraphs (6), (7) and (8) insofar as is reasonably practicable in the circumstances; and
- (b) comply with sub-paragraph (12) at all times.
- (12) At all times when carrying out any works authorised under the Order, the undertaker must comply with National Grid’s policies for development near overhead lines EN43-8 and HSE’s guidance note 6 “Avoidance of Danger from Overhead Lines”.
Expenses
99
- (1) Subject to the following provisions of this paragraph, the undertaker must pay to National Grid on demand all charges, costs and expenses reasonably anticipated or incurred by National Grid in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of any apparatus or the construction of any new or alternative apparatus which may be required in consequence of the execution of any authorised works as are referred to in this Part of this Schedule including without limitation—
- (a) any costs reasonably incurred by or compensation properly paid by National Grid in connection with the acquisition of rights or the exercise of statutory powers for such apparatus including without limitation all costs incurred by National Grid as a consequence of National Grid—
- (i) using its own compulsory purchase powers to acquire any necessary rights under paragraph 96(3); or
- (ii) exercising any compulsory purchase powers in the Order transferred to or benefitting National Grid;
- (b) in connection with the cost of the carrying out of any diversion work or the provision of any alternative apparatus;
- (c) the cutting off of any apparatus from any other apparatus or the making safe of redundant apparatus;
- (d) the approval of plans;
- (e) the carrying out of protective works, plus a capitalised sum to cover the cost of maintaining and renewing permanent protective works; and
- (f) the survey of any land, apparatus or works, the inspection and monitoring of works or the installation or removal of any temporary works reasonably necessary in consequence of the execution of any such works referred to in this Part of this Schedule.
- (2) There will be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule and which is not re-used as part of the alternative apparatus, that value being calculated after removal.
- (3) If in accordance with the provisions of this Part of this Schedule—
- (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
- (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,
and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 56 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to National Grid by virtue of sub-paragraph (1) will be reduced by the amount of that excess save where it is not possible in the circumstances to obtain the existing type of apparatus at the same capacity and dimensions or place at the existing depth in which case full costs will be borne by the undertaker.
- (4) For the purposes of sub-paragraph (3)—
- (a) an extension of apparatus to a length greater than the length of existing apparatus will not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
- (b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole will be treated as if it also had been agreed or had been so determined.
- (5) Any amount which apart from this sub-paragraph would be payable to National Grid in respect of works by virtue of sub-paragraph (1) will, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on National Grid any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.
Indemnity
100
- (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any such works authorised by this Part of this Schedule or in consequence of the construction, use, maintenance or failure of any of the authorised works by or on behalf of the undertaker or in consequence of any act or default of the undertaker (or any person employed or authorised by him) in the course of carrying out such works, including without limitation works carried out by the undertaker under this Part of this Schedule or any subsidence resulting from any of these works, any damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of the authorised works) or property of National Grid, or there is any interruption in any service provided, or in the supply of any goods, by National Grid, or National Grid becomes liable to pay any amount to any third party, the undertaker will—
- (a) bear and pay on demand the cost reasonably incurred by National Grid in making good such damage or restoring the supply; and
- (b) indemnify National Grid for any other expenses, loss, demands, proceedings, damages, claims, penalty or costs incurred by or recovered from National Grid, by reason or in consequence of any such damage or interruption or National Grid becoming liable to any third party as aforesaid other than arising from any default of National Grid.
- (2) The fact that any act or thing may have been done by National Grid on behalf of the undertaker or in accordance with a plan approved by National Grid or in accordance with any requirement of National Grid or under its supervision will not (unless sub-paragraph (3) applies), excuse the undertaker from liability under the provisions of sub-paragraph (1) unless National Grid fails to carry out and execute the works properly with due care and attention and in a skilful and workman like manner or in a manner that does not accord with the approved plan.
- (3) Nothing in sub-paragraph (1) shall impose any liability on the undertaker in respect of any damage or interruption to the extent that it is attributable to the neglect or default of National Grid, its officers, servants, contractors or agents.
- (4) National Grid must give the undertaker reasonable notice of any such third party claim or demand and no settlement or compromise must, unless payment is required in connection with a statutory compensation scheme, be made without first consulting the undertaker and considering their representations.
Enactments and agreements
101
Save to the extent provided for to the contrary elsewhere in this Part of this Schedule or by agreement in writing between National Grid and the undertaker, nothing in this Part of this Schedule shall affect the provisions of any enactment or agreement regulating the relations between the undertaker and National Grid in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.
Co-operation
102
Where in consequence of the proposed construction of any of the authorised works, the undertaker or National Grid requires the removal of apparatus under paragraph 96(2) or National Grid makes requirements for the protection or alteration of apparatus under paragraph 98, the undertaker shall use its best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of National Grid’s undertaking and National Grid shall use its best endeavours to co-operate with the undertaker for that purpose.
Access
103
If in consequence of the agreement reached in accordance with paragraph 95(1) or the powers granted under this Order the access to any apparatus is materially obstructed, the undertaker must provide such alternative means of access to such apparatus as will enable National Grid to maintain or use the apparatus no less effectively than was possible before such obstruction.
Arbitration
104
Any difference or dispute arising between the undertaker and National Grid under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and National Grid, be determined by arbitration in accordance with article 56 (arbitration).
Notices
105
The plans submitted to National Grid by the undertaker pursuant to paragraph 98 must be sent to National Grid Plant Protection at plantprotection@nationalgrid.com or such other address as National Grid may from time to time appoint instead for that purpose and notify to the undertaker in writing.
PART 9 — For the protection of Wales and West Utilities (“WWU”)
106
For the protection of WWU in this Part of this Schedule the following provisions, unless otherwise agreed in writing between the undertaker and WWU, have effect.
107
In this Part of this Schedule—
- “alternative apparatus” means alternative apparatus adequate to enable WWU to fulfil its statutory functions in a manner not less efficient than previously;
- “apparatus” means any mains, pipes or other apparatus belonging to or maintained by WWU for the purposes of gas supply and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;
- “functions” includes powers and duties;
- “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over or upon land; and
- “WWU” means Wales & West Utilities Limited (Company No. 05046791) whose registered office is at Wales & West House, Spooner Close Coedkernew, Newport, South Wales, NP10 8FZ, a gas transporter within the meaning of Part 1 of the Gas Act 1986[^f00089].
108
This Part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and WWU are regulated by the provisions of Part 3 of the 1991 Act.
109
Regardless of any provision in this Order or anything shown on the land plans, the undertaker must not acquire any apparatus otherwise than by agreement.
110
- (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed, that apparatus must not be removed under this Part of this Schedule and any right of WWU to maintain that apparatus in that land must not be extinguished until alternative apparatus has been constructed and is in operation to the reasonable satisfaction of WWU.
- (2) If, for the purpose of executing any works authorised by this Order in, on, over, or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it must give to WWU written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order WWU reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to WWU the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus.
- (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2), in the land in which the alternative apparatus or part of such apparatus is to be constructed, WWU must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably practicable use reasonable endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed, or agree with the undertaker an alternative route for the alternative apparatus over land in respect of which it is possible for the undertaker to obtain the relevant facilities and rights. For the avoidance of doubt, WWU shall not be obliged to exercise its compulsory purchase powers pursuant to the Gas Act 1986 in order to obtain any such facilities or rights and WWU shall retain an absolute discretion as to whether it shall choose to exercise those powers.
- (4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule is to be constructed in such manner and in such line or situation as may be agreed between WWU and the undertaker, or in default of agreement settled by arbitration in accordance with article 56 (arbitration).
- (5) WWU must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration as referred to in sub-paragraph (4) in accordance with article 56 (arbitration), and after the grant to WWU of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed as soon as reasonably practicable to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.
- (6) Regardless of anything in sub-paragraph (5), if the undertaker gives notice in writing to WWU that it desires itself to execute any work, or part of any work in connection with the construction or removal of apparatus in any land of the undertaker, that work, instead of being executed by WWU, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of WWU.
- (7) Nothing in sub-paragraph (6) authorises the undertaker to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 300 millimetres of the apparatus.
111
- (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to WWU facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights are to be granted upon such terms and conditions as may be agreed between the undertaker and WWU or in default of agreement settled by arbitration in accordance with article 56 (arbitration).
- (2) In settling those terms and conditions in respect of alternative apparatus to be constructed in or along any railway of the undertaker, the arbitrator must—
- (a) give effect to all reasonable requirements of Network Rail and the undertaker for ensuring the safety and efficient operation of the railway which forms or is to form part of Network Rail’s network and for securing any subsequent alterations or adaptations of the alternative apparatus which may be required to prevent interference with any proposed works of Network Rail or the undertaker or the traffic on the railway; and
- (b) so far as it may be reasonable and practicable to do so in the circumstances of the particular case, give effect to the terms and conditions, if any, applicable to the apparatus constructed in or along the railway for which the alternative apparatus is to be substituted.
- (3) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to WWU than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to WWU as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.
112
- (1) Not less than 28 days before starting the execution of any works of the type referred to in paragraph 110(2) that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 110(2), the undertaker must submit to WWU a plan, section and description of the works to be executed.
- (2) Those works are to be executed only in accordance with the plan, section and description submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by WWU for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and WWU is entitled to watch and inspect the execution of those works.
- (3) Any requirements made by WWU under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which a plan, section and description under sub-paragraph (1) are submitted to it.
- (4) If WWU in accordance with sub-paragraph (3) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 106 to 110 apply as if the removal of the apparatus had been required by the undertaker under paragraph 110(2).
- (5) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan, section and description instead of the plan, section and description previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan, section and description.
- (6) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency, but in that case it must give to WWU notice as soon as reasonably practicable and a plan, section and description of those works as soon as reasonably practicable if possible before carrying out those works, or if not, as soon as reasonably practicable afterwards and must comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances.
- (7) For the avoidance of doubt, whenever the undertaker carries out any works in the vicinity of any apparatus of WWU and whether or not WWU has made any requirements pursuant to sub-paragraph (2) above, the undertaker must comply with—
- (a) all applicable health and safety laws, including the Construction (Design and Management) Regulations 2015;
- (b) the Pipeline Safety Regulations 1996; and
- (c) the safety guidance published from time to time by WWU and the HSE.
113
- (1) Subject to the following provisions of this paragraph, the undertaker must repay to WWU the reasonable expenses incurred by WWU in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus (including: costs or compensation payable in connection with the acquisition of land for that purpose; and any reasonable legal or other professional costs properly incurred relating to any such works to apparatus, or to the provision of alternative apparatus) which may be required in consequence of the execution of any such works as are referred to in paragraph 110(2).
- (2) If in accordance with the provisions of this Part of this Schedule WWU require that alternative apparatus of better type, of greater capacity or of greater dimensions, or at a greater depth is necessary in substitution for existing apparatus which for WWU’s requirements is over and above what is necessary as a consequence of and for the purpose of the authorised development WWU must deduct the cost of such additional requirements from the amount payable by the undertaker pursuant to sub-paragraph (1).
- (3) For the purposes of sub–paragraph (2) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus.
- (4) For the avoidance of doubt and subject to paragraph 108, the provisions of sub-paragraph (1) require the undertaker to repay the full costs of any works carried out to WWU’s apparatus, or in order to protect that apparatus, or in consequence of any works carried out in the vicinity of that apparatus by the undertaker.
114
- (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any such works referred to in paragraph 110(2), any damage is caused to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of WWU, or there is any interruption in any service provided, or in the supply of any goods, by WWU, the undertaker must—
- (a) bear and pay the cost reasonably incurred by WWU in making good such damage or restoring the supply; and
- (b) make reasonable compensation to WWU for any other expenses, loss, damages, penalty or costs incurred by WWU,
by reason or in consequence of any such damage or interruption.
- (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of WWU, its officers, servants, contractors or agents.
- (3) WWU must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of the undertaker which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
115
Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker or Network Rail and WWU in respect of any apparatus laid or erected in land belonging to the undertaker or Network Rail on the date on which this Order is made.
116
The provisions of Part 2 of this Schedule do not apply in relation to WWU or any apparatus of WWU.
PART 10 — For the protection of the National Trust
117
- (1) The provisions of this Part of this Schedule have effect for the protection of the Trust unless otherwise agreed in writing between the undertaker and the Trust.
- (2) In this Part of this Schedule—
- “activities” means vegetation clearance, removal of loose rocks, rock scaling, insertion of rock bolts and erecting catch fences and associated stays, cables and anchors;
- “construction” includes execution, placing, erecting and insertion, and “construct” and “constructed” have corresponding meanings;
- “emergency” means a situation which—is unexpected, in that there is little or no warning, or aspects of the event could not have reasonably been predicted in advance;is a serious event presenting a risk of harm or damage to people, property or the environment; andrequires a need for urgent action, in that immediate action is required to address the risk of harm, repair or prevent a worsening of the situation;
- “plans” includes sections, designs, design data, software, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction), staging proposals, programmes and assessments of risk relating to the construction, carrying out, maintenance and, where appropriate, removal of any work and details of the extent, timing and duration of any proposed occupation of property belonging to the Trust for the purpose of engaging in the activities;
- “Quarry Bridge 2 works” means the reconstruction of the accommodation bridge under the railway at 122 miles 74 chains providing access to the property of the Trust;
- “the Trust” means The National Trust for Places of Historic Interest or Natural Beauty (Registered Charity 205846); and
- “Trust property” means any property belonging to the Trust.
Powers of compulsory acquisition
118
The powers of article 27 (compulsory acquisition of rights or imposition of covenants) and article 31 (acquisition of subsoil or airspace only) may only be exercised in relation to Trust property with the consent of the Trust.
Works provisions
119
- (1) The undertaker must before commencing activities on Trust property or the Quarry Bridge 2 works under the powers of this Order supply to the Trust proper and sufficient plans and method statements for the proposed activities for the reasonable approval of the Trust and the activities must not be commenced except in accordance with such plans and method statements as have been approved in writing by the Trust or settled in accordance with paragraph 126.
- (2) The approval of the Trust under sub-paragraph (1) must not be unreasonably withheld, and if by the end of the period of 28 days beginning with the date on which such plans have been supplied to the Trust the Trust has not indicated its disapproval of those plans and the grounds of disapproval the undertaker may serve upon the Trust written notice requiring the Trust to intimate its approval or disapproval within a further period of 14 days beginning with the date upon which the Trust receives written notice from the undertaker. If by the expiry of the further 14 days the Trust has not intimated its approval or disapproval, the Trust will be deemed to have approved the plans as submitted.
120
- (1) Any activities to be carried out by virtue of paragraph 119 must, when commenced, be carried out—
- (a) with all reasonable dispatch in accordance with the plans approved or deemed to have been approved or settled under paragraph 119;
- (b) under the supervision (where appropriate and if given) and to the reasonable satisfaction of the Trust;
- (c) in such manner as to cause as little damage as is possible to the Trust’s property; and
- (d) so far as is reasonably practicable, so as not to interfere with or obstruct the free, uninterrupted and safe access to Trust property.
- (2) If any damage to Trust property or any such interference or obstruction is caused by the carrying out of, or in consequence of the entry on to Trust property, the undertaker must, notwithstanding any such approval, make good such damage and must pay to the Trust all reasonable expenses to which the Trust may be put by reason of any such damage, interference or obstruction.
- (3) Nothing in this Part of this Schedule imposes—
- (a) any liability on the undertaker with respect to any damage, costs, expenses or loss attributable to the negligence of the Trust or its servants, contractors or agents; or
- (b) any liability on the Trust with respect to any damage, costs, expenses or loss attributable to the negligence of the undertaker or its servants, contractors or agents.
121
The undertaker must—
- (a) at all times afford reasonable facilities to the Trust for access to inspect the activities of the undertaker on Trust property; and
- (b) supply the Trust with all such information as the Trust may reasonably require with regard to activities of the undertaker on Trust property.
122
- (1) Subject to sub-paragraph (2) the undertaker must not in the exercise of the powers conferred by this Order prevent pedestrian or vehicular access to any Trust property, unless preventing such access is with the consent of the Trust or is in the case of an emergency.
- (2) Sub-paragraph (1) does not apply to the Quarry Bridge 2 works while they are under construction, save that access to any Trust property must not be prevented in the case of an emergency.
123
- (1) Subject to sub-paragraph (2) where in the exercise of the powers conferred by this Order, the undertaker proposes to interfere with or obstruct access by the Trust to Trust property, it must give the Trust 56 days’ written notice of that requirement.
- (2) Sub-paragraph (1) does not apply in the case of an emergency.
124
Where under this Part of this Schedule the Trust is required to give its consent or approval in respect of any matter, that consent or approval must not be unreasonably withheld or delayed but may be subject to reasonable conditions.
125
The undertaker must repay to the Trust all costs, charges and expenses which it may reasonably incur or which it may sustain—
- (a) in the examination of plans under this Part of this Schedule;
- (b) in respect of the approval of plans submitted by the undertaker and the supervision by the Trust of the carrying out or construction of any activities or the Quarry Bridge 2 works and otherwise in connection with the implementation of the provisions of this Part of this Schedule; and
- (c) in respect of the employment or procurement of the services of any persons whom it is reasonably necessary to appoint for inspecting and watching the activities of the undertaker on Trust property.
Expert determination
126
- (1) Article 56 (arbitration) applies to any difference as to the legal interpretation of this Part of this Schedule and as provided for in sub–paragraph (7).
- (2) Save as provided for in sub–paragraph (1) or sub–paragraph (7) any difference under this Part of this Schedule must be referred to and settled by a single independent and suitable person who holds appropriate professional qualifications and is a member of a professional body relevant to the matter in dispute acting as an expert, such person to be agreed by the differing parties or, in the absence of agreement, identified by the President of the Institution of Civil Engineers.
- (3) All parties involved in settling any difference must use all reasonable endeavours to do so within 14 days from the date of a dispute first being notified in writing by one party to the other and in the absence of the difference being settled within that period the expert must be appointed within 21 days of the notification of the dispute.
- (4) The fees of the expert are payable by the parties in such proportions as the expert may determine or, in the absence of such determination, equally.
- (5) The expert must—
- (a) invite the parties to make submissions to the expert in writing and copied to the other party to be received by the expert within 21 days of the expert’s appointment;
- (b) permit a party to comment on the submissions made by the other party within 14 days of receipt of the submission;
- (c) issue a decision within 28 days of receipt of the submissions under sub-paragraph (5)(a); and
- (d) give reasons for the decision.
- (6) The expert must consider where relevant—
- (a) the development outcome sought by the undertaker;
- (b) the ability of the undertaker to achieve its outcome in a timely and cost-effective manner;
- (c) the nature of the power sought to be exercised by the undertaker;
- (d) the effectiveness, cost and reasonableness of proposals for mitigation arising from any party; and
- (e) any other important and relevant consideration.
- (7) Any determination by the expert is final and binding, except in the case of manifest error in which case the difference that has been subject to expert determination may be referred to and settled by arbitration under article 56 (arbitration).
SCHEDULE 17 — Documents to be Certified
Documents for certification that they are true copies of the documents referred to in this Order—
| (1) Document | (2) Drawing Number | (3) Revision |
|---|---|---|
| Ashton Vale Road and Winterstoke Road Highway Works Plan | 674946.BD.29.01-SK31 Rev L | 2 |
| The Avon Gorge Vegetation Management Plan | - | 2 |
| The book of reference | - | 5 |
| Bridleway Extension under Elevated M5 plan | 467470.BQ.04.20.520 Rev H | 4 |
| Cattle Creep Proposed General Arrangement drawing | W1097B-ARP-DRG-ECV-300003 and W1097B-ARP-DRG-ECV-300004 | 1 |
| The Code of Construction Practice | - | 2 |
| The compounds, haul roads and access to works plan | 674946.BQ.42.01-380 to 674946.BQ.42.01-403 Rev H | 5 |
| The crossings to be extinguished plans | 674946.BQ.42.01-410 to 674946.BQ.42.01-426 Rev G | 3 |
| CTMP - Construction Traffic Management Plan | - | 1 |
| The design drawings | See requirement 4 | See requirement 4 |
| Earthworks | W1097B-ARP-DRG-EGE 300001 Rev A02 to W1097B ARP-DRG-EGE-300008 Rev A02 | 1 |
| The environmental master plan | 674946-001-024-A ES-C | 3 |
| The environmental statement (including the Addendums to the Environmental Statement) | - | - |
| General arrangement plans | 674946.BQ.42.01-570 to 674946.BQ.42.01-593 Rev K | 5 |
| Habitat impacted by construction works within the Avon Gorge Woodlands SAC plan | 674946-004-004-A Rev ES A | 1 |
| The hedgerow location plan | 674946.BQ.42.01-600 A | 1 |
| The important hedgerow plan | 674946-006-020-A | 2 |
| The land plan | - | 4 |
| The Master CEMP | - | 3 |
| The permanent and temporary stopping up and diversion plan | 674946.BQ.42.01-480 to 674946.BQ.42.01-481 674946.BQ.42.01-484 to 674946.BQ.42.01-486 674946.BQ.42.01-496 | 2 |
| The permanent traffic regulation order plans | 467470.BQ.04.20-160 Rev H 467470.BQ.04.20-215 Rev F 467470.BQ.04.20-225 Rev D 467470.BQ.04.20.601 Rev O | 2 |
| Portbury Hundred location of additional tree planting plans | 467470.BQ.04.20-610 to 467470.BQ.04.20-613 | 1 |
| Railway landscape plans (disused line) | 674946.BJ.35.01-01 to 674946.BJ.35.01-08 Rev I | 3 |
| Section drawings (Longitudinal Profile of Railway Alignment and Cross Section Plans) | W1097B-ARP-DRG-ETR-001301 to W1097B-ARP-DRG-ETR-01309 | 2 |
| Section drawings (Longitudinal Profile of Railway Alignment and Cross Section Plans) | 467470.BQ.04.20-104 Rev B 467470.BQ.04.20-219 Rev B 467470.BQ.04.20-292 Rev B 467470.BQ.04.20-410 Rev B 467470.BQ.04.20-531 Rev B 467470.BQ.04.20-630 Rev B 467470.BQ.04.20-SK300-SK304 Rev K 674946.BD.29.01-SK33 Rev A | 3 |
| The works plans | 674946.BQ.42.01-300 to 674946.BQ.42.01-324 Rev Q | 7 |
| The National Cycle Network (NCN) temporary and permanent work plans | 467470.BQ.04.20-530 Rev H 467470.BQ.04.20-540 Rev I 467470.BQ.04.20-550 Rev E 467470.BQ.04.20-551 Rev E 467470.BQ.04.20-552 Rev F 467470.BQ.04.20-553 Rev E 467470.BQ.04.20-554 Rev B | 2 |
| The new highways plans | 674946.BQ.42.01-510 to 674946.BQ.42.01-511 Rev H 674946.BQ.42.01-515 Rev H 674946.BQ.42.01-525 to 674946.BQ.42.01-526 Rev H | 3 |
Signed
Signed by authority of the Secretary of State for Transport
Natasha Kopala — Head of the Transport and Works Act Orders Unit — Department for Transport — 14th November 2022
Explanatory note
(This note is not part of the Order)
EXPLANATORY NOTE
This Order authorises North Somerset District Council to construct a new railway on the formation of the disused Portishead Branch Line railway and to carry out works to upgrade the existing freight only Parson Street to Royal Portbury Dock railway to allow it to be used for passenger railway services.
The purpose of this Order is to allow passenger services to run between Portishead and Bristol and to connect into the wider national railway network. The railway will, once open to passenger services, be owned and maintained by Network Rail Infrastructure Limited.
The works also necessitate the diversion of an existing public footpath that crosses the railway at Barons Close, Ashton, Bristol.
The Order permits North Somerset District Council to acquire, compulsorily or by agreement, land and rights in land and to use land for this purpose.
The Order also makes provision in connection with the maintenance of the new section of railway.
A copy of the plans and book of reference referred to in this Order and certified in accordance with article 55 (documents to be certified) of this Order may be inspected free of charge during working hours at the offices of North Somerset District Council at Town Hall, Walliscote Grove Road, Weston–super–Mare BS23 1UJ.
Footnotes
[^f00001]: 2008 c. 29. Parts 1 to 7 were amended by Chapter 6 of Part 6 of the Localism Act 2011 (c. 20).
[^f00002]: S.I. 2009/2264, amended by S.I. 2010/439, S.I. 2010/602, S.I. 2012/635, S.I. 2012/2654, S.I. 2012/2732, S.I. 2013/522, S.I. 2013/755, S.I. 2014/469, S.I. 2014/2381, S.I. 2015/377, S.I. 2015/1682, S.I. 2017/524, S.I. 2017/572, S.I. 2018/378 and S.I. 2019/734.
[^f00003]: S.I. 2010/103, amended by S.I. 2012/635.
[^f00004]: 1961 c. 33.
[^f00005]: 1965 c. 56.
[^f00006]: 1980 c. 66.
[^f00007]: 1981 c. 66.
[^f00008]: 1984 c. 27.
[^f00009]: 1990 c. 8.
[^f00010]: 1991 c. 22.
[^f00011]: 2003 c. 21.
[^f00012]: 2017 c. 20.
[^f00013]: The definition of “cycle track” was amended by section 1 of the Cycle Tracks Act 1984 (c. 38) and paragraph 21(2) of Schedule 3 to the Road Traffic (Consequential Provisions) Act 1988 (c. 54).
[^f00014]: Section 32(1) was amended by S.I. 2011/1210.
[^f00015]: 1981 c. 67. The definition of “owner” was amended by section 70 of, and paragraph 9 of Schedule 15 to, the Planning and Compensation Act 1991 (c. 34). There are other amendments to the 1981 Act which are not relevant to this Order.
[^f00016]: 26 & 27 Vict. c. cvii.
[^f00017]: 29 & 30 Vict. c. lxxxviii.
[^f00018]: Section 121A was inserted by section 168(1) of, and paragraph 70 of Schedule 8 to, the 1991 Act.
[^f00019]: 1845 c. 20. Section 46 was amended by section 109(1) and (3) of, and paragraph 22 of Schedule 8, and Schedule 10 to, the Courts Act 2003 (c. 39). Section 58 was amended by section 46 of, and Part 3 of Schedule 7 to, the Justices of the Peace Act 1949 (c. 101). Section 78 was amended by section 39(3) of, and Schedule 7 to, the Compulsory Purchase Act 1965 (c. 56) and S.I. 2009/1307. Section 105 was amended by section 46 of, and Part 3 of Schedule 7 to, the Justices of the Peace Act 1949, section 31(6) of the Criminal Law Act 1977 (c. 45) and sections 37 and 49 of the Criminal Justice Act 1982 (c. 48).
[^f00020]: 1923 c. 20. Section 15 was amended by section 10(1) of the Decimal Currency Act 1969 (c. 19).
[^f00021]: 1863 c. 92.
[^f00022]: S.I. 2010/948.
[^f00023]: S.I. 2015/596.
[^f00024]: Section 64 was amended by Schedule 17 to the Local Government Act 1985 (c. 51) and Schedule 9 to the 1991 Act.
[^f00025]: Section 56 was amended by sections 40 and 43 of the Traffic Management Act 2004 (c. 18).
[^f00026]: Section 56A was inserted by section 44 of the Traffic Management Act 2004.
[^f00027]: Sections 58 was amended by section 51 of the Traffic Management Act 2004.
[^f00028]: Section 58A was inserted by section 52(1) of the Traffic Management Act 2004.
[^f00029]: Schedule 3A was inserted by section 52 of, and Schedule 4 to, the Traffic Management Act 2004.
[^f00030]: Sections 54, 55, 57, 60, 68 and 69 were amended by section 40(1) and (2) of, and Schedule 1 to, the Traffic Management Act 2004.
[^f00031]: Section 54 was amended by section 49(1) of the Traffic Management Act 2004.
[^f00032]: Section 55 was amended by sections 49(2) and 51(9) of the Traffic Management Act 2004.
[^f00033]: Section 57 was amended by section 52(3) of the Traffic Management Act 2004.
[^f00034]: Section 59 was amended by section 42 of the Traffic Management Act 2004.
[^f00035]: 1991 c. 56. Section 106 was amended by section 35(1) and (8) and section 43(2) of, and Schedule 2 to, the Competition and Service (Utilities) Act 1992 (c. 43), sections 36(2) and 99 of the Water Act 2003 (c. 37) and paragraph 16(1) of Schedule 3 to the Flood and Water Management Act 2016 (c. 29).
[^f00036]: S.I. 2016/1154.
[^f00037]: 1991 c. 57.
[^f00038]: Section 125 was amended by Schedule 16 to the Housing and Planning Act 2016 (c. 22).
[^f00039]: Section 4A(1) was inserted by section 202(1) of the Housing and Planning Act 2016.
[^f00040]: Section 11A was inserted by section 186(3) of the Housing and Planning Act 2016.
[^f00041]: Schedule 2A was inserted by paragraphs 1 and 3 of Schedule 17 to the Housing and Planning Act 2016.
[^f00042]: Section 4 was amended by sections 184, 185 and 199(2) of, and paragraphs 1 and 2 of Part 1 of Schedule 13 to, the Housing and Planning Act 2016.
[^f00043]: Section 11(1) was amended by Schedule 4 to the Acquisition of Land Act 1981 (c. 67) and section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (2006 No. 1) and section 186(1) and (2 of the Housing and Planning Act 2016 (c. 22),
[^f00044]: Section 138 was amended by section 23(4) of the Growth and Infrastructure Act 2013 (c. 27) and S.I. 2017/1285.
[^f00045]: Section 10 was amended by S.I. 2009/1307.
[^f00046]: Section 152 was amended by S.I. 2009/1307.
[^f00047]: Section 5 was amended by section 183 of, and Schedule 15 to, the Housing and Planning Act 2016 (c. 22).
[^f00048]: Section 5A was inserted by section 182(2) of the Housing and Planning Act 2016.
[^f00049]: Section 5B was inserted by section 202(2) of the Housing and Planning Act 2016.
[^f00050]: Section 6 was amended by section 183 of, and paragraphs 4 and 7 of Schedule 15 to, the Housing and Planning Act 2016 and section 4 of, and paragraph 52(2) of Schedule 2 to, the Planning (Consequential Provisions) Act 1990 (c. 11).
[^f00051]: Section 7 was amended by section 199(2) of, and paragraphs 1 and 3 of Part 1 of Schedule 18 to, the Housing and Planning Act 2016.
[^f00052]: Schedule A1 was inserted by paragraph 6 of Part 1 of Schedule 18 to the Housing and Planning Act 2016.
[^f00053]: Section 153(4A) was inserted by section 200(2) of the Housing and Planning Act 2016 (c. 22).
[^f00054]: Section 11 was amended by Schedule 4 to the Acquisition of Land Act 1981 (c. 67), section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (2006 No. 1), section 186(1) and (2), section 187(1) and (2), section 188 and section 190 of, and paragraphs 2 and 3 of Schedule 16 to, the Housing and Planning Act 2016 and S.I. 2009/1307.
[^f00055]: Section 13 was amended by sections 62(3) and 139(4) to (9) and section 62(3) of, paragraphs 27 and 28(1) and (3) of Schedule 13 to, and Part 3 of Schedule 23 to, the Tribunals, Courts and Enforcement Act 2007 (c. 15).
[^f00056]: 1993 c. 43.
[^f00057]: 1990 c. 9.
[^f00058]: S.I. 1997/1160.
[^f00059]: 1990 c. 43. There are amendments to section 82(1) which are not relevant to this Order.
[^f00060]: Section 82(2) was amended by section 5(2) of the Noise and Statutory Nuisance Act 1993 (c. 40) and section 107 of and paragraph 6(b) of Schedule 17 to, the Environment Act 1995 (c. 43).
[^f00061]: 1974 c. 40. Section 61(2) was amended by section 133(2) of, and Schedule 7 to, the Building Act 1984 (c. 55). Section 61(9) was amended by Schedule 24 to the Environment Act 1995 (c. 25) and section 162 of, and paragraph 15 of Schedule 15 to, the Environmental Protection Act 1990 (c. 43). There are other amendments to section 61 which are not relevant to this Order.
[^f00062]: Section 32 was amended by section 102 of, and Schedule 17 to, the Local Government Act 1985 (c. 51) and section 168(1) of, and paragraph 39 of Schedule 8 to, the 1991 Act.
[^f00063]: 2004 c. 18.
[^f00064]: 1973 c. 26. Section 20 was amended by section 146(6) and (12) of, and Schedule 13 to, the 1984 Act. Subsection (10) of section 20(10) was repealed by section 343(3) of, and Schedule 25 to, the 1980 Act and subsection (11) was repealed by section 155 of, and Schedule 25 to, the Rent Act 1977 (c. 42). Section 20A was inserted by paragraph 5 of Schedule 15 to the Planning and Compensation Act 1991 (c. 34).
[^f00065]: 1978 c. 30.
[^f00066]: Section 115(2) was amended by section 160(3) of the Housing and Planning Act 2016 (c. 22).
[^f00067]: Such appointment may be made by the Planning Inspectorate on behalf of the Secretary of State.
[^f00068]: The costs of the appointed person are calculated based on the applicable day rate for a Single Inspector as if he or she were appointed under section 78 and section 79 of the 2008 Act.
[^f00069]: 1971 c. 80.
[^f00070]: Sub-section (5A) was inserted by paragraph 4(2) of Schedule 17 to the Housing and Planning Act 2016 (c. 22).
[^f00071]: 1973 c. 26.
[^f00072]: Section 11A was inserted by section 186(3) of the Housing and Planning Act 2016 (c. 22).
[^f00073]: Section 11B was inserted by section 187(3) of the Housing and Planning Act 2016.
[^f00074]: Section 12 was amended by section 56(2) of and Part 1 of Schedule 9 to, the Courts Act 1971 (c. 23) and paragraph 4 of Schedule 16 to the Housing and Planning Act 2016.
[^f00075]: Section 13 was amended by sections 62(3), 139(4) to (9) and 146 of, and paragraphs 27 and 28 of Schedule 13 and Part 3 of Schedule 23 to, the Tribunals, Courts and Enforcement Act 2007 (c. 15).
[^f00076]: Section 20 was amended by paragraph 4 of Schedule 15 to the Planning and Compensation Act 1991 (c. 34) and S.I. 2009/1307.
[^f00077]: 1993 c. 43. Section 8 was amended by sections 216 and 274 of, and paragraph 4 of Schedule 17 to, the Transport Act 2000 (c. 38), section 16(5) of, and Schedule 2 to, the Railways and Transport Safety Act 2003 (c. 20), sections 1(1) and 59(6) of, and paragraph 3 of Schedule 1 and Part 1 of Schedule 13 to, the Railways Act 2005 (c. 14) and S.I. 2015/1682.
[^f00078]: 2006 c. 46.
[^f00079]: Section 272 was amended by section 406(1) of, and paragraph 103 of Schedule 17 to, the Communications Act 2003 (c. 21).
[^f00080]: 1989 c. 29. The definition of “electrical plant” in section 64 of the Act was amended by paragraph 38 of Schedule 6 to the Utilities Act 2000 (c. 27).
[^f00081]: 1986 c. 44. A new section 7 was substituted by section 5 of the Gas Act 1995 (c. 45), and was further amended by section 76 of the Utilities Act 2000 (c. 27).
[^f00082]: 1991 c. 56.
[^f00083]: Section 102(4) was amended by sections 56 and 96(1)(c) to (e) of, and paragraphs 2 and 90 of Schedule 7 to, the Water Act 2014 (c. 21), and section 96(1) of the Water Act 2003 (c. 37).
[^f00084]: Section 104 was amended by sections 96(4) and 101(2) of, and Part 3 of Schedule 9 to, the Water Act 2003 and section 42(3) of the Flood and Water Management Act 2010 (c. 29)
[^f00085]: 1989 c. 29. A new section 6 was substituted by section 30 of the Utilities Act 2000 (c. 27) and was further amended by sections 136 and 145(5) to (7) of and Schedules 19 and 23(1) to the Energy Act 2004 (c. 20), S.I. 2012/2400 and S.I. 2011/2704. There are other amendments to section 6 but none are relevant to this Order.
[^f00086]: See paragraph 5 of Schedule 3A (the electronic communications code) to the Communications Act 2003 (c. 21). Schedule 3A was inserted by Schedule 1 to the Digital Economy Act 2017 (c. 30).
[^f00087]: Section 106 was amended by section 4 of the Digital Economy Act 2017.
[^f00088]: 1989 c. 29.
[^f00089]: 1986 c. 44. Section 7 was substituted by section 5 of the Gas Act 1995 (c. 45), and was further amended by section 76 of the Utilities Act 2000 (c. 27).
Editorial notes
[^key-7520faffac5e8f41ed73c5f4a466817d]: Art. 1 in force at 5.12.2022, see art. 1
[^key-e141b09a04ede8b232acc13a3f3a0eee]: Art. 2 in force at 5.12.2022, see art. 1
[^key-4d7794d271cea74bb1cc5dc07c3676a1]: Art. 3 in force at 5.12.2022, see art. 1
[^key-f2138d45f0c47654178a549b255d9a70]: Art. 4 in force at 5.12.2022, see art. 1
[^key-e3674ca5a19d5d14bbb7b026871025e8]: Art. 5 in force at 5.12.2022, see art. 1
[^key-9b4f91d42165b2c50d3c4094c28f6505]: Art. 6 in force at 5.12.2022, see art. 1
[^key-f5d91c32d03a11a171059d6ceb6777f1]: Art. 7 in force at 5.12.2022, see art. 1
[^key-ce9726d94eb9d26dba618eb3a14fe93a]: Art. 8 in force at 5.12.2022, see art. 1
[^key-19d56ea414c1dc3a75ecefa01eab8ef1]: Art. 9 in force at 5.12.2022, see art. 1
[^key-fc671420bbb0d05b5e4636259d2b86a9]: Art. 10 in force at 5.12.2022, see art. 1
[^key-27d7d8e33935ec5c69f4c49a5a14c381]: Art. 11 in force at 5.12.2022, see art. 1
[^key-a6b71720324f79b32f3df4731d225b55]: Art. 12 in force at 5.12.2022, see art. 1
[^key-6dd6fb8469b34cdca1adbeef203632cb]: Art. 13 in force at 5.12.2022, see art. 1
[^key-c03dfc019dc081b1820e621e4a36df62]: Art. 14 in force at 5.12.2022, see art. 1
[^key-a1f19fd49c6446d0bedc6e04b0cd2c25]: Art. 15 in force at 5.12.2022, see art. 1
[^key-15ce9189a75c6fd66b6d6cd00c833ba7]: Art. 16 in force at 5.12.2022, see art. 1
[^key-bbf7a7a77f4fa970dffd3c37f776f85c]: Art. 17 in force at 5.12.2022, see art. 1
[^key-1c7d5158cda53ea4892f5fede7e92b65]: Art. 18 in force at 5.12.2022, see art. 1
[^key-171ff04ae3677dc1fc910bba32334a60]: Art. 19 in force at 5.12.2022, see art. 1
[^key-75dbdc3837bd780d60d81951d7368d5c]: Art. 20 in force at 5.12.2022, see art. 1
[^key-1390ce1da288684a0e011e368811455b]: Art. 21 in force at 5.12.2022, see art. 1
[^key-bbce9ae78ca44ab83abe9d7b7b9d0835]: Art. 22 in force at 5.12.2022, see art. 1
[^key-7685a6655e1050b0b712253e4a9affc6]: Art. 23 in force at 5.12.2022, see art. 1
[^key-82e53b63af77772226a72e1b28f61b92]: Art. 24 in force at 5.12.2022, see art. 1
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.