The A428 Black Cat to Caxton Gibbet Development Consent Order 2022
| (1) Location | (2) Plot Reference Number shown on land plans | (3) Purpose for which temporary possession may be taken | (4) Relevant part of the authorised development |
|---|---|---|---|
| Land Plans – Sheet 1 | Land Plans – Sheet 1 | Land Plans – Sheet 1 | Land Plans – Sheet 1 |
| Roxton | 1/1l | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned A1 carriageway. | Work No. 21 |
| Roxton | 1/2a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Bedford Road. | Work No. 4 |
| Roxton | 1/2b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Bedford Road. | Work No. 4 |
| Roxton | 1/2c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Bedford Road. | Work No. 4 |
| Roxton | 1/7f | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and realigned A1 carriageway. | Work Nos. 7, 21 |
| Wyboston, Chawston and Colesden | 1/8a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Roxton Road access track. | Work No. 3 |
| Wyboston, Chawston and Colesden | 1/8f | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned dual carriageway west of the Black Cat junction. | Work No. 1 |
| Roxton | 1/8g | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned dual carriageway west of the Black Cat junction and westbound on slip road from the junction. | Work No. 1 |
| Roxton | 1/8h | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Bedford Road. | Work No. 4 |
| Wyboston, Chawston and Colesden | 1/8m | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Roxton Road access track. | Work No. 3 |
| Roxton | 1/8o | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Bedford Road. | Work No. 4 |
| Roxton | 1/8q | Required to provide a temporary construction area. Required to provide temporary storage, laydown areas, access and working space for this construction area, the construction of the realigned Greenacres access track, the construction of the flood compensation area south east of the new Black Cat junction circulatory, and the quarry restoration works. | Work Nos. 16, 17 |
| Roxton | 1/9e | Required to provide a temporary construction area. Required to provide temporary storage, laydown areas, access and working space for this construction area, the construction of the realigned Greenacres access track. | Work Nos. 15, 17 |
| Wyboston, Chawston and Colesden | 1/10c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Roxton Road access track. | Work No. 3 |
| Roxton | 1/10g | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and A1 northbound offslip road to the new Black Cat junction circulatory. | Work Nos. 7, 21 |
| Roxton | 1/10i | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and bridleway, as well as the flood compensation area to the west of the track. | Works No. 7,11 |
| Roxton | 1/10l | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and bridleway. | Work No. 7 |
| Roxton | 1/16e | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of a turn around area along School Lane. | - |
| Roxton | 1/16h | Required to provide a temporary construction compound, including temporary storage, laydown areas, access and working space. | - |
| Wyboston, Chawston and Colesden | 1/19a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Roxton Road. | Work No. 3 |
| Wyboston, Chawston and Colesden | 1/20a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Roxton Road. | Work No. 3 |
| Roxton | 1/20b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Bedford Road. | Work No. 4 |
| Roxton | 1/20c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Bedford Road. | Work No. 4 |
| Roxton | 1/21a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Roxton Road and required to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road Link (south). | Work Nos. 3, 18 |
| Roxton | 1/21c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and bridleway, as well as the flood compensation area to the west of the track. | Work Nos. 7, 11 |
| Wyboston, Chawston and Colesden | 1/23b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road Link (south). | Work No. 18 |
| Roxton | 1/23g | Required to provide temporary soil storage, as well as temporary storage, laydown areas, access and working space to facilitate the construction of the attenuation basin and realigned Bedford Road, Black Cat junction including slip roads. | Work Nos. 4, 5 |
| Roxton | 1/23i | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and the flood compensation area to the west of the track. | Work Nos. 7, 11 |
| Roxton | 1/23m | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned A1 carriageway, the realigned access track over Rockham Ditch at Greenacres, and flood compensation area south east of the new Black Cat junction circulatory. | Work Nos. 15, 21, 24 |
| Wyboston, Chawston and Colesden | 1/32c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road Link (south). | Work No. 18 |
| Wyboston, Chawston and Colesden | 1/33a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road Link (south). | Work No. 18 |
| Wyboston, Chawston and Colesden | 1/36b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the A1 Services link road and a construction area north east of the new Black Cat junction circulatory. | Work Nos. 22, 23 |
| Wyboston, Chawston and Colesden | 1/37b | Required to provide a temporary construction area, including temporary storage, laydown areas, access and working space. | Work No. 23 |
| Roxton | 1/40a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and realigned Bedford Road. | Work Nos. 4, 7a |
| Roxton | 1/42c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Greenacres access track and A1 southbound on slip road from the new Black Cat junction circulatory. | Work Nos. 15, 21 |
| Roxton | 1/43d | Required to provide a temporary construction area, including temporary storage, laydown areas, access and working space for this construction area, the construction of the realigned Greenacres access track, the construction of the realigned access track over Rockham Ditch, and the construction of the flood compensation area south east of the new Black Cat junction circulatory. | Work Nos. 15, 17, 24 |
| Roxton | 1/46b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and bridleway. | Work No. 7 |
| Roxton | 1/47a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and bridleway. | Work No. 7 |
| Roxton | 1/49a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned A1 carriageway. | Work No. 21 |
| Roxton | 1/49c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the combined Kelpie Marina access track and realigned A1 carriageway. | Work Nos. 7, 21 |
| Tempsford | 1/51a | Required to provide temporary storage, laydown areas, access and working space to facilitate improvements to the A1. | Work No. 21 |
| Land Plans – Sheet 2 | |||
| Wyboston, Chawston and Colesden | 2/1a | Required to facilitate improvements to the A1 and to provide temporary access and working space. | Work No. 21 |
| Wyboston, Chawston and Colesden | 2/1b | Required to facilitate improvements to the A1 and to provide temporary access and working space. | Work No. 21 |
| Wyboston, Chawston and Colesden | 2/1c | Required to provide temporary storage, laydown areas, access and working space to facilitate improvements to the A1 and the construction of the access road to The Lane. | Work Nos. 21, 36 |
| Wyboston, Chawston and Colesden | 2/1d | Required to provide temporary storage, laydown areas, access and working space to facilitate improvements to the A1, the construction of the access road to The Lane, and the diversion of underground utilities. | Work Nos. 20, 21, 28, 36 |
| Wyboston, Chawston and Colesden | 2/1e | Required to provide temporary storage, laydown areas, access and working space to facilitate improvements to the A1, the construction of the access road to The Lane, and the diversion of underground utilities. | Work Nos. 20, 21, 28, 36 |
| Wyboston, Chawston and Colesden | 2/1f | Required to facilitate improvements to the A1 and to provide temporary access and working space. | Work No. 21 |
| Wyboston, Chawston and Colesden | 2/1g | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned A1 carriageway. | Work No. 21 |
| Wyboston, Chawston and Colesden | 2/1k | Required to facilitate the construction of a highway gantry in the A1 southbound verge and to provide temporary access and working space. | - |
| Wyboston, Chawston and Colesden | 2/2a | Required to provide temporary access and working space to facilitate the construction of the realigned A1 carriageway and the diversion of an underground water utility. | Work Nos. 21, 31 |
| Wyboston, Chawston and Colesden | 2/3a | Required to facilitate improvements to the A1 and to provide temporary access and working space. | Work No. 21 |
| Wyboston, Chawston and Colesden | 2/3b | Required to facilitate improvements to the A1 and to provide temporary access and working space. | Work No. 21 |
| Wyboston, Chawston and Colesden | 2/3d | Required to facilitate improvements to the A1 and the construction of the realigned A1 carriageway and to provide temporary access and working space. | Work No. 21 |
| Wyboston, Chawston and Colesden | 2/3e | Required to facilitate improvements to the A1 and the construction of the realigned A1 carriageway and to provide temporary access and working space for these works, as well as to provide temporary access and working space to facilitate the construction of the A1 Services link road and the access road to The Lane. | Work Nos. 21, 22, 36 |
| Wyboston, Chawston and Colesden | 2/4a | Required to facilitate improvements to the A1 and to provide temporary access and working space. | Work No. 21 |
| Wyboston, Chawston and Colesden | 2/4b | Required to facilitate the construction of the realigned sections of The Lane, and to provide temporary access and working space for these works, as well as to provide temporary access and working space to facilitate the construction of Roxton Road link (north). | Work Nos. 29, 36 |
| Wyboston, Chawston and Colesden | 2/4c | Required to provide temporary access and working space to facilitate the construction of the realigned A1 carriageway and the Nagshead Lane link. | Work Nos. 29, 31, 32 |
| Wyboston, Chawston and Colesden | 2/4d | Required to provide temporary access and working space to facilitate the construction of Roxton Road link (north and south). | Work Nos. 18, 19, 20, 28, 29 |
| Wyboston, Chawston and Colesden | 2/5a | Required to facilitate improvements to the A1 and to provide temporary access and working space. | Work No. 21 |
| Wyboston, Chawston and Colesden | 2/6a | Required to facilitate improvements to the A1 and to provide temporary access and working space. | Work No. 21 |
| Wyboston, Chawston and Colesden | 2/7a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (north) and the flood compensation area east of the link. | Work No. 29, 34 |
| Wyboston, Chawston and Colesden | 2/8b | Required to facilitate the decommissioning and removal of diverted utilities. | Work No. 32 |
| Wyboston, Chawston and Colesden | 2/8c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (north). | Work Nos. 29, 32 |
| Wyboston, Chawston and Colesden | 2/8f | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (north). | Work Nos. 29, 35 |
| Wyboston, Chawston and Colesden | 2/9a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (north) and the flood compensation area east of the link. | Work Nos. 29, 34 |
| Wyboston, Chawston and Colesden | 2/10a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the flood compensation area east of Roxton Road link (north). | Work No. 29, 34 |
| Wyboston, Chawston and Colesden | 2/11a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (north), the flood compensation area east of the link, and the attenuation basin east of both Roxton Road link (north) and the Nagshead Lane link. | Work Nos. 29, 33, 34 |
| Wyboston, Chawston and Colesden | 2/11b | Required to facilitate the decommissioning and removal of diverted utilities. | Work No. 32 |
| Wyboston, Chawston and Colesden | 2/13a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the access road to The Lane. | Work No. 36 |
| Wyboston, Chawston and Colesden | 2/14a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the access road to The Lane. | Work No. 36 |
| Wyboston, Chawston and Colesden | 2/15b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the access road to The Lane. | Work No. 36 |
| Wyboston, Chawston and Colesden | 2/16a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the access road to The Lane. | Work No. 36 |
| Wyboston, Chawston and Colesden | 2/18c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (north). | Work No. 29 |
| Wyboston, Chawston and Colesden | 2/19a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (north), the Nagshead Lane link and the attenuation basin east of these links. | Work Nos. 29, 33 |
| Wyboston, Chawston and Colesden | 2/19c | Required to facilitate the decommissioning and removal of diverted utilities. | Work No. 32 |
| Wyboston, Chawston and Colesden | 2/19d | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned A1 carriageway and the Nagshead Lane link. | Work Nos. 21, 29 |
| Wyboston, Chawston and Colesden | 2/21a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (north). | Work No. 29 |
| Wyboston, Chawston and Colesden | 2/22a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (north). | Work No. 29 |
| Wyboston, Chawston and Colesden | 2/23a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned A1 carriageway. | Work No. 21 |
| Wyboston, Chawston and Colesden | 2/24b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (south). | Work No. 18 |
| Wyboston, Chawston and Colesden | 2/24c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the flood compensation area west of Roxton Road link (south). | Work No. 26 |
| Wyboston, Chawston and Colesden | 2/25a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (south). | Work No. 18 |
| Wyboston, Chawston and Colesden | 2/26a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of Roxton Road link (south) and the associated culvert across South Brook. | Work No. 18, 25 |
| Land Plans – Sheet 3 | Land Plans – Sheet 3 | Land Plans – Sheet 3 | Land Plans – Sheet 3 |
| Wyboston, Chawston and Colesden | 3/1a | Required to provide a temporary construction area, including temporary storage, laydown areas, access and working space. | Work No. 23 |
| Wyboston, Chawston and Colesden | 3/1c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the River Great Ouse viaduct and the access track extending from the A1 Services link road. | Work Nos. 22, 39 |
| Wyboston, Chawston and Colesden | 3/2a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the River Great Ouse viaduct and the access track extending from the A1 Services link road. | Work Nos. 22, 39 |
| Roxton | 3/3c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the flood compensation area south east of the new Black Cat junction circulatory. | Work No. 24 |
| Roxton | 3/7a | Required to provide temporary access and working space to facilitate the construction of the River Great Ouse viaduct. | Work No. 39 |
| Tempsford | 3/8a | Required to provide temporary access and working space to facilitate the construction of the River Great Ouse viaduct. | Work No. 39 |
| Wyboston, Chawston and Colesden | 3/9a | Required to provide temporary access and working space to facilitate the construction of the River Great Ouse viaduct. | Work No. 39 |
| Tempsford | 3/10a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Barford Road. | Work No. 43 |
| Tempsford | 3/10b | Required to provide temporary access and working space to facilitate the construction of the realigned Barford Road. | Work No. 43 |
| Tempsford | 3/10f | Required to provide temporary access and working space to facilitate the construction of the River Great Ouse viaduct. | Work No. 39 |
| Tempsford | 3/10g | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Barford Road. | Work No. 43 |
| Tempsford | 3/10h | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Barford Road. | Work Nos. 43, 44 |
| Tempsford | 3/10i | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Barford Road. | Work Nos. 43, 44, 45 |
| Tempsford | 3/10l | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Barford Road, the attenuation basin and flood compensation areas east of this (north of the dual carriageway), and the dual carriageway. | Work Nos. 40, 43, 46, 48 |
| Tempsford | 3/10m | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Barford Road, the flood compensation area east of this (south of the dual carriageway), and the dual carriageway. | Work Nos. 40, 43, 48 |
| Tempsford | 3/10n | Required to provide temporary storage of soil and other materials, laydown areas, access and working space to facilitate the construction of the dual carriageway. | Work No. 40 |
| Tempsford | 3/11b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Barford Road. | Work No. 43 |
| Little Barford | 3/12a | Required to provide temporary access and working space to facilitate the construction of the realigned Barford Road. | Work No. 43 |
| Tempsford | 3/13a | Required to provide temporary access and working space to facilitate the construction of the realigned Barford Road. | Work No. 43 |
| Tempsford | 3/13b | Required to provide temporary access and working space to facilitate the construction of the realigned Barford Road. | Work Nos. 43, 44 |
| Tempsford | 3/17a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Barford Road, and the attenuation basin east of this. | Work Nos. 43, 44, 46 |
| Land Plans – Sheet 4 | Land Plans – Sheet 4 | Land Plans – Sheet 4 | Land Plans – Sheet 4 |
| Tempsford | 4/1a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway. | Work No. 40 |
| Tempsford | 4/1c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the East Coast Main Line bridge. | Work Nos. 40, 50 |
| Tempsford | 4/1f | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway. | Work No. 40 |
| Tempsford | 4/1l | Required to provide temporary storage of soil and other materials, laydown areas, access and working space to facilitate the construction of the dual carriageway. | Work No. 40 |
| Tempsford | 4/1o | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the attenuation basin east of the East Coast Main Line bridge, as well as the access tracks from the dual carriageway. | Work Nos. 40, 50, 53 |
| Tempsford | 4/1p | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the attenuation basin east of the East Coast Main Line bridge, as well as the access tracks from the dual carriageway. | Work Nos. 40, 50, 53 |
| Tempsford | 4/1q | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the attenuation basin east of the East Coast Main Line bridge, as well as the access tracks from the dual carriageway. | Work Nos. 40, 50, 53 |
| Tempsford | 4/1r | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway, the attenuation basin east of the East Coast Main Line bridge, as well as the access tracks from the dual carriageway. | Work Nos. 40, 50, 53, 54 |
| Tempsford | 4/1s | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the access track from the dual carriageway. | Work No. 50 |
| Tempsford | 4/2a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the East Coast Main Line bridge. | Work No. 50 |
| Tempsford | 4/2b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the East Coast Main Line bridge. | Work No. 50 |
| Tempsford | 4/2d | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the East Coast Main Line bridge. | Work No. 50 |
| Tempsford | 4/2e | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the East Coast Main Line bridge. | Work No. 50 |
| Tempsford | 4/2f | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the East Coast Main Line bridge. | Work No. 50 |
| Tempsford | 4/2h | Required to provide temporary access and working space to facilitate the construction of the East Coast Main Line bridge. | Work No. 50 |
| Tempsford | 4/2i | Required to provide temporary access and working space to facilitate the construction of the East Coast Main Line bridge. | Work No. 50 |
| Little Barford | 4/3a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway. | Work Nos. 40, 54 |
| Little Barford | 4/3c | Required to provide earthworks temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and Top Farm access track. | Work Nos. 54, 55 |
| Land Plans – Sheet 5 | Land Plans – Sheet 5 | Land Plans – Sheet 5 | Land Plans – Sheet 5 |
| Little Barford | 5/1b | Required to provide a temporary construction area, including temporary storage, laydown areas, access and working space to facilitate the construction of the Top Farm accommodate bridge and access tracks, as well as the dual carriageway. | Work Nos. 54, 55 |
| Little Barford | 5/1d | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Top Farm accommodate bridge and access tracks, as well as the dual carriageway. | Work Nos. 54, 55, 56 |
| Little Barford | 5/1e | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Top Farm accommodate bridge and access tracks, as well as the dual carriageway. | Work Nos. 54, 55, 56 |
| Little Barford | 5/1g | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway. | Work Nos. 54, 57 |
| Abbotsley; Little Barford | 5/2a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway, the flood compensation area between this and Potton Road, and a field access track from Potton Road. | Work Nos. 54, 57, 59 |
| Abbotsley | 5/2c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the realigned Potton Road, as well as the flood compensation area between the dual carriageway and Potton Road. | Work Nos. 57, 59, 64 |
| Abbotsley; Little Barford | 5/2d | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway. | Work No. 57 |
| Abbotsley | 5/2h | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway. | Work No. 57 |
| Abbotsley | 5/2j | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Potton Road. | Work No. 64 |
| Abbotsley | 5/3a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of a field access track from Potton Road. | - |
| Abbotsley | 5/3b | Required to facilitate the diversion of an underground water utility and to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Potton Road. | Work Nos. 60, 64 |
| Abbotsley | 5/3c | Required to facilitate the diversion of underground power and electronic communications utilities, as well as the construction of the realigned Potton Road. | Work Nos. 63, 64, 65, 66 |
| Abbotsley | 5/5a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Potton Road and the diversion of underground utilities. | Work Nos. 60, 61, 64 |
| Abbotsley | 5/6a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Potton Road and the diversion of underground utilities. | Work Nos. 60, 61, 64 |
| Abbotsley | 5/8b | Required to facilitate the diversion of an underground power utility, as well as the construction of the realigned Potton Road. | Work Nos. 63, 64 |
| Abbotsley | 5/8c | Required to facilitate the diversion of underground power and electronic communications utilities, as well as the construction of the realigned Potton Road. | Work Nos. 63, 64, 65 |
| Land Plans – Sheet 6 | Land Plans – Sheet 6 | Land Plans – Sheet 6 | Land Plans – Sheet 6 |
| Abbotsley; St Neots | 6/1a | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Abbotsley | 6/2a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046. | Work No. 68 |
| Abbotsley | 6/2c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046. | Work No. 68 |
| Abbotsley | 6/2e | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046 including the tie-in to the existing Potton Road being stopped up and retained as a private access. | Work Nos. 64, 68 |
| Part of the agricultural field and shrubbery; north of Potton Road and east of Rectory Farm Cottages, Eynesbury Hardwicke, St Neots. | 6/2g | Required to provide temporary storage of soil and other materials, laydown areas, access and working space to facilitate the construction of the dual carriageway and the realigned B1046. | Work Nos. 57, 68 |
| Part of the agricultural field, trees, shrubbery and ditches; east of Rectory Farm Cottage and south of Potton Road, Eynesbury Hardwicke, St Neots. | 6/2i | Required to provide temporary storage of soil and other materials, laydown areas, access and working space to facilitate the construction of the dual carriageway and the realigned Potton Road. | Work Nos. 57, 64 |
| Part of the agricultural field; north of Parkers Farmhouse and east of Potton Road, St Neots. | 6/2m | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Potton Road. | Work Nos. 64, 66 |
| Part of the agricultural field; north-east of Eynesbury Warehousing and south of St Neots Road, B1046, Eynesbury Hardwicke, St Neots. | 6/2o | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046. | Work No. 68 |
| Abbotsley | 6/3a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046. | Work No. 68 |
| Abbotsley | 6/8a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046. | Work No. 68 |
| Abbotsley | 6/8c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the realigned B1046, as well as the underpass and culvert at Hen Brook, including the stopping up of a section of Footpath 1/20 between the existing A428 and the new dual carriageway. | Work Nos. 57, 68, 72 |
| Abbotsley | 6/8f | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway, the realigned B1046, an attenuation basin and the flood compensation area north of the B1046, and the access track between the B1046 and the attenuation basins. | Work Nos. 57, 68, 70, 71 |
| Abbotsley | 6/8g | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway, the realigned B1046, the flood compensation area and an attenuation basin north of the B1046, and the access track between the B1046 and the attenuation basins, as well as the underpass and culvert at Hen Brook. | Work Nos. 57, 68, 71, 72, 73 |
| Abbotsley | 6/9a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the access track between the B1046 and attenuation basins. | Work Nos. 57, 68 |
| Land Plans – Sheet 7 | Land Plans – Sheet 7 | Land Plans – Sheet 7 | Land Plans – Sheet 7 |
| Little Barford; St Neots; Wyboston, Chawston and Colesden | 7/1a | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Little Barford; St Neots | 7/1b | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Abbotsley; St Neots | 7/1c | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Abbotsley; St Neots | 7/1d | Required to provide temporary storage, laydown areas, access and working space to facilitate the introduction of the construction area north-west of the existing A428, between the B1046 and Hen Brook, as well as to facilitate the de-trunking of the existing A428 carriageway. | Work No. 74 |
| St Neots | 7/2a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046. | Work No. 68 |
| St Neots | 7/2b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046. | Work No. 68 |
| Abbotsley; St Neots | 7/2c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046. | Work No. 68 |
| Abbotsley | 7/2d | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046. | Work No. 68 |
| Little Barford | 7/3a | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Wyboston, Chawston and Colesden | 7/4a | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Abbotsley; Little Barford; St Neots | 7/4b | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Wyboston, Chawston and Colesden | 7/4c | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Wyboston, Chawston and Colesden | 7/4d | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| St Neots | 7/5a | Required to provide temporary storage, laydown areas, access and working space to facilitate the introduction of the construction area north-west of the existing A428, between the B1046 and Hen Brook. | Work Nos. 68, 74 |
| Abbotsley | 7/5b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned B1046. | Work No. 68 |
| St Neots | 7/6a | Required to facilitate the introduction of the temporary construction area north-west of the existing A428, between the B1046 and Hen Brook. | Work No. 74 |
| Land Plans – Sheet 8 | Land Plans – Sheet 8 | Land Plans – Sheet 8 | Land Plans – Sheet 8 |
| Abbotsley; St Neots | 8/1a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction and the de-trunking of the existing A428 carriageway. | Work No. 80a |
| St Neots | 8/2a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction and the de-trunking of the existing A428 carriageway. | Work No. 80a |
| Abbotsley | 8/3a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction and the de-trunking of the existing A428 carriageway. | Work No. 80a |
| Abbotsley | 8/4a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway. | Work No. 57 |
| Abbotsley | 8/5a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway, footbridge and realigned footpath. | Work Nos. 57, 77 |
| Abbotsley | 8/5c | Required to facilitate the construction of the dual carriageway, Cambridge Road Junction, footbridge and realigned footpath, including the regrading of earthworks as well as temporary storage, laydown areas, access and working space. | Work Nos. 57, 77, 80a |
| Abbotsley | 8/5e | Required to facilitate the construction of the dual carriageway, footbridge and realigned footpath, including the regrading of earthworks as well as temporary storage, laydown areas, access and working space. | Work Nos. 57, 77 |
| St Neots | 8/6a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction. | Work No. 80a |
| St Neots | 8/6b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction and the de-trunking of the existing A428 carriageway. | Work No. 80a |
| St Neots | 8/7a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction and the de-trunking of the existing A428 carriageway. | Work No. 80a |
| Abbotsley | 8/8a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction and the de-trunking of the existing A428 carriageway. | Work No. 80a |
| Land Plans – Sheet 9 | Land Plans – Sheet 9 | Land Plans – Sheet 9 | Land Plans – Sheet 9 |
| St Neots | 9/1b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction. | Work No. 80a |
| Abbotsley | 9/2b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction, accommodation bridge and realigned access track, as well as the de-trunking of the existing A428 carriageway. | Work Nos. 80c, 85 |
| St Neots | 9/3a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction. | Work No. 80a |
| St Neots | 9/4a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction. | Work No. 80a |
| St Neots | 9/5a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction. | Work No. 80a |
| Abbotsley | 9/6a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction. | Work No. 80a |
| Abbotsley | 9/6d | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and Cambridge Road Junction. | Work Nos. 57, 80b |
| Abbotsley | 9/6g | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the accommodation bridge and realigned access track. | Work No. 85 |
| Abbotsley | 9/7a | Required to provide a temporary construction area, including temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction and the attenuation basin west of the junction. | Work Nos. 79, 80a |
| Abbotsley | 9/7c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and Cambridge Road Junction. | Work Nos. 57, 80b, 80c |
| Abbotsley | 9/7d | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and Cambridge Road Junction. | Work Nos. 57, 80c |
| Abbotsley | 9/7h | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway. | Work No. 57 |
| Abbotsley | 9/7i | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Cambridge Road Junction. | Work No. 80c |
| Abbotsley | 9/7k | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway, attenuation basin east of the Cambridge Road Junction, and the access track to this basin from the realigned existing A428. | Work Nos. 57, 80c, 84 |
| Abbotsley | 9/7l | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway, accommodation bridge and realigned access track. | Work Nos. 57, 85 |
| Abbotsley | 9/8b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the accommodation bridge and realigned access track. | Work No. 85 |
| Abbotsley | 9/9c | Required to provide temporary storage, laydown areas, access and working space to facilitate works to existing Bridleway 1/18. | Work No. 85 |
| Abbotsley | 9/10a | Required to provide temporary storage, laydown areas, access and working space to facilitate works to existing Bridleway 1/18. | Work No. 85 |
| Abbotsley | 9/11b | Required to provide temporary storage, laydown areas, access and working space to facilitate works to existing Bridleway 1/18, as well as the de-trunking of the existing A428 carriageway. | Work No. 85 |
| Land Plans – Sheet 10 | Land Plans – Sheet 10 | Land Plans – Sheet 10 | Land Plans – Sheet 10 |
| Abbotlsey; Croxton | 10/1a | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Abbotsley | 10/2a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the accommodation bridge and realigned access track. | Work No. 85 |
| Abbotsley | 10/4a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the accommodation bridge and realigned access track. | Work No. 85 |
| Abbotsley | 10/4b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway, the accommodation bridge and realigned access track, the culverts at Fox Brook and Gallow Brook, and the attenuation basin west of Toseland Road, as well as the de-trunking of the existing A428. | Work Nos. 57, 85, 86, 87, 88 |
| Abbotsley; Toseland | 10/4c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway, the accommodation bridge and realigned access track, the culverts at Fox Brook and Gallow Brook, and the realigned Toseland Road. | Work Nos. 57, 85, 86, 87, 89 |
| Abbotsley | 10/5b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the accommodation bridge and realigned access track. | Work No. 85 |
| Abbotsley | 10/5d | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the accommodation bridge and realigned access track. | Work No. 85 |
| Abbotsley | 10/5e | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the accommodation bridge and realigned access track. | Work No. 85 |
| Land Plans – Sheet 11 | Land Plans – Sheet 11 | Land Plans – Sheet 11 | Land Plans – Sheet 11 |
| Croxton | 11/1a | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Croxton | 11/1b | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Croxton | 11/1c | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Croxton | 11/1d | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Croxton | 11/3a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Toseland Road and the de-trunking of the existing A428 carriageway. | Work No. 89 |
| Toseland | 11/4a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the realigned Toseland Road. | Work Nos. 57, 89 |
| Croxton | 11/4c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the realigned Toseland Road and the attenuation basin west of Toseland Road. | Work Nos. 88, 89 |
| Croxton; Yelling | 11/4f | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the realigned Toseland Road. | Work Nos. 57, 89 |
| Yelling | 11/4g | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway. | Work No. 57 |
| Land Plans – Sheet 12 | Land Plans – Sheet 12 | Land Plans – Sheet 12 | Land Plans – Sheet 12 |
| Croxton | 12/1a | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Croxton | 12/1b | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Croxton | 12/1c | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Eltisley | 12/1d | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Eltisley | 12/1e | Required to provide temporary storage, laydown areas, access and working space to facilitate the diversion of underground utilities and the de-trunking of the existing A428 carriageway. | Work No. 95 |
| Croxton | 12/2a | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Croxton | 12/2b | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Eltisley | 12/2c | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Yelling | 12/3a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway. | Work No. 57 |
| Yelling | 12/3c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway. | Work No. 57 |
| Yelling | 12/4b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway. | Work No. 57 |
| Yelling | 12/5a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway. | Work No. 57 |
| Yelling; Eltisley | 12/6b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the access track west of Eltisley link. | Work Nos. 57, 91, 98a |
| Yelling; Eltisley | 12/6c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the Combined bridleway and watercourse underpass to the north of Eltisley. | Work Nos. 57, 91, 92 |
| Eltisley | 12/6g | Required to facilitate the construction of the Combined bridleway and watercourse underpass to the north of Eltisley, also providing temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the Eltisley link. | Work Nos. 91, 92, 98a, 98b |
| Eltisley | 12/6i | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Eltisley link. | Work No. 98a |
| Land Plans – Sheet 13 | Land Plans – Sheet 13 | Land Plans – Sheet 13 | Land Plans – Sheet 13 |
| Eltisley | 13/2e | Required to provide temporary storage, laydown areas, access and working space to facilitate the de-trunking of the existing A428 carriageway. | - |
| Eltisley | 13/4f | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway. | Work No. 91 |
| Eltisley | 13/4g | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Eltisley link. | Work No. 98c |
| Eltisley | 13/5b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Eltisley link and the diversion of an underground utility. | Work Nos. 98c, 99 |
| Eltisley | 13/6a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Eltisley link and the diversion of an underground utility. | Work Nos. 98c, 99 |
| Eltisley | 13/7a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Eltisley link. | Work No. 98c |
| Eltisley | 13/10f | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Caxton Gibbet junction. | Work No. 109a |
| Eltisley | 13/11a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the Eltisley link. | Work Nos. 91, 98e |
| Eltisley | 13/12b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Eltisley link. | Work No. 98e |
| Eltisley | 13/14a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Eltisley link. | Work Nos. 98b, 98d, 98e |
| Eltisley | 13/14e | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the Eltisley link. | Work Nos. 91, 98e |
| Eltisley | 13/14i | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the access track from the Eltisley South roundabout. | Work Nos. 91, 98b |
| Land Plans – Sheet 14 | Land Plans – Sheet 14 | Land Plans – Sheet 14 | Land Plans – Sheet 14 |
| Caxton | 14/2b | Required to provide temporary access and working space to facilitate the construction of the Caxton Gibbet junction and the diversion of underground utilities. | Work Nos. 103, 104, 109b |
| Cambourne; Caxton | 14/4c | Required to provide temporary access and working space to facilitate the construction of the Caxton Gibbet junction and the diversion of underground utilities. | Work Nos. 103, 104, 109b |
| Eltisley; Papworth Everard | 14/6a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Caxton Gibbet junction. | Work No. 109a |
| Eltisley; Papworth Everard | 14/6c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Caxton Gibbet junction. | Work No. 109a |
| Caxton | 14/8a | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the westbound onslip road from the Caxton Gibbet junction. | Work Nos. 91, 103 |
| Caxton | 14/8b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the westbound onslip road from the Caxton Gibbet junction. | Work No. 91 |
| Caxton | 14/8f | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the westbound onslip road from the Caxton Gibbet junction, and the Caxton Gibbet junction. | Work Nos. 91, 109b, 109d |
| Papworth Everard | 14/10b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Caxton Gibbet junction and the diversion of underground utilities. | Work Nos. 103, 104, 109b, 109d |
| Papworth Everard | 14/11a | Required to provide temporary access and working space to facilitate a construction area north-west of the Caxton Gibbet junction, the construction of the Caxton Gibbet junction, and the diversion of underground utilities. | Work Nos. 104a, 106, 107, 109b |
| Cambourne; Caxton | 14/11b | Required to provide temporary access and working space to facilitate the construction of the Caxton Gibbet junction and the diversion of underground utilities. | Work Nos. 103, 104, 109b |
| Papworth Everard | 14/13a | Required to provide temporary access and working space to facilitate the construction of the Caxton Gibbet junction. | Work No. 109b |
| Elsworth; Papworth Everard | 14/15b | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Caxton Gibbet junction. | Work No. 109b |
| Elsworth | 14/16b | Required to provide temporary storage, laydown areas, access and working space to facilitate a construction area north-east of the Caxton Gibbet junction, the construction of the Caxton Gibbet junction, and the diversion of overhead utilities. | Work Nos. 109c, 110, 111 |
| Eltisley | 14/21c | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the dual carriageway and the westbound onslip road from the Caxton Gibbet junction. | Work Nos. 91, 103 |
| Eltisley; Papworth Everard | 14/21d | Required to provide temporary storage, laydown areas, access and working space to facilitate a construction area north-west of the Caxton Gibbet junction, and the construction of the Caxton Gibbet junction. | Work Nos. 106, 109a |
| Eltisley; Papworth Everard | 14/21f | Required to provide temporary storage, laydown areas, access and working space to facilitate the construction of the Caxton Gibbet junction. | Work No. 109a |
| Land Plans – Sheet 15 | Land Plans – Sheet 15 | Land Plans – Sheet 15 | Land Plans – Sheet 15 |
| Elsworth | 15/2a | Required to provide temporary access and working space to facilitate the construction of the shared access and bridleway from the Caxton Gibbet junction north roundabout, and the diversion of overhead utilities. | Work Nos. 109c, 110 |
| Elsworth | 15/4b | Required to provide temporary access and working space to facilitate a construction area north-east of the Caxton Gibbet junction, the construction of the shared access and bridleway from the Caxton Gibbet junction north roundabout, and the diversion of overhead utilities. | Work Nos. 109c, 110, 111 |
| Elsworth | 15/6b | Required to provide temporary storage, laydown areas, access and working space to facilitate a construction area north-east of the Caxton Gibbet junction, the construction of the Caxton Gibbet junction, and the diversion of overhead utilities. | Work Nos. 109c, 110, 111 |
| Land Plans – Sheet 16 | Land Plans – Sheet 16 | Land Plans – Sheet 16 | Land Plans – Sheet 16 |
| Great Barford | 16/1a | Required to provide access and working space to facilitate a temporary vehicle recovery area off the A421 eastbound carriageway. | - |
| Tempsford | 16/1b | Required to facilitate the construction of a highway gantry in the A1 northbound verge and to provide temporary access and working space. | - |
| Wyboston, Chawston and Colesden | 16/1c | Required to facilitate the construction of a highway gantry in the A421 eastbound verge and to provide temporary access and working space. | - |
| Hail Weston | 16/2a | Required to provide access and working space to facilitate a temporary vehicle recovery area off Kimbolton Road/B645. | - |
| Tempsford | 16/3a | Required to provide temporary access and working space to facilitate the construction of a highway gantry in the A1 northbound verge. | - |
| Tempsford | 16/3b | Required to provide temporary access and working space to facilitate the construction of a highway gantry in the A1 northbound verge. | - |
| Hail Weston | 16/5a | Required to provide a temporary vehicle recovery area off Kimbolton Road/B645. | - |
| Hail Weston | 16/6a | Required to provide access and working space to facilitate a temporary vehicle recovery area off Kimbolton Road/B645. | - |
| Great Barford | 16/7a | Required to provide a temporary vehicle recovery area off the A421 eastbound carriageway. | - |
| Tempsford | 16/8a | Required to provide access and working space to facilitate a temporary vehicle recovery area off Tempsford Road. | - |
| Tempsford | 16/9a | Required to provide a temporary vehicle recovery area off Tempsford Road. | - |
| Tempsford | 16/10a | Required to provide temporary access and working space to facilitate the construction of a highway gantry in the A1 northbound verge. | - |
SCHEDULE 8 — HEDGEROWS AND TREES
PART 1 — REMOVAL OF HEDGEROWS
| (1) Location of hedgerow | (2) Relevant part of the authorised development | (3) Important hedgerow |
|---|---|---|
| The hedgerow marked H1 on page 2 of the habitats plan | Work No. 2 | No |
| The hedgerow marked H2 on page 2 of the habitats plan | Work Nos. 2, 3 | No |
| The hedgerow marked H3 on page 2 of the habitats plan | Work Nos. 1, 3 | No |
| The hedgerow marked H4 on page 2 of the habitats plan | Work Nos. 1, 3 | No |
| The hedgerow marked H5 on page 2 of the habitats plan | Work Nos. 1, 3 | No |
| The hedgerow marked H6 on page 2 of the habitats plan | Work Nos. 3, 18 | No |
| The hedgerow marked H9 on page 2 of the habitats plan | Work Nos. 21, 22 | No |
| The hedgerow marked H10 on page 2 of the habitats plan | Work No. 15 | No |
| The hedgerow marked H11 on page 2 of the habitats plan | Work No. 24 | No |
| The hedgerow marked H12 on page 2 of the habitats plan | Work Nos. 1, 24 | No |
| The hedgerow marked H13 on page 2 of the habitats plan | Work No. 1 | No |
| The hedgerow marked H14 on page 3 of the habitats plan | Work Nos. 50, 52 | No |
| The hedgerow marked H15 on page 3 of the habitats plan | Work Nos. 40, 53a, 54 | No |
| The important hedgerow marked H16 on page 3 of the habitats plan | Work No. 54 | Yes |
| The hedgerow marked H17 on page 3 of the habitats plan | Work No. 54 | No |
| The hedgerow marked H18 on page 3 of the habitats plan | Work No. 54 | No |
| The hedgerow marked H19 on page 3 of the habitats plan | Work No. 54 | No |
| The hedgerow marked H20 on page 3 of the habitats plan | Work No. 55 | No |
| The hedgerow marked H21 on page 3 of the habitats plan | Work No. 54 | No |
| The important hedgerow marked H22 on page 3 of the habitats plan | Work No. 54 | Yes |
| The important hedgerow marked H23 on page 3 of the habitats plan | Work Nos. 54, 57 | Yes |
| The important hedgerow marked H24 on page 3 of the habitats plan | Work Nos. 54, 57 | Yes |
| The important hedgerow marked H25 on page 4 of the habitats plan | Work No. 72 | Yes |
| The important hedgerow marked H26 on page 4 of the habitats plan | Work No. 57 | Yes |
| The important hedgerow marked H27 on page 4 of the habitats plan | Work No. 57 | Yes |
| The hedgerow marked H28 on page 4 of the habitats plan | Work No. 57 | No |
| The hedgerow marked H29 on page 4 of the habitats plan | Work Nos. 57, 75 | No |
| The hedgerow marked H30 on page 4 of the habitats plan | Work No. 57 | No |
| The hedgerow marked H31 on page 4 of the habitats plan | Work Nos. 57, 80a, 80b, 80c, 81 | No |
| The hedgerow marked H32 on page 4 of the habitats plan | Work No. 57 | No |
| The hedgerow marked H33 on page 5 of the habitats plan | Work Nos. 85, 86 | No |
| The important hedgerow marked H34 on page 5 of the habitats plan | Work No. 87 | Yes |
| The important hedgerow marked H35 on page 6 of the habitats plan | Work Nos. 57, 89 | Yes |
| The hedgerow marked H36 on page 6 of the habitats plan | Work No. 57 | No |
| The hedgerow marked H37 on page 6 of the habitats plan | Work No. 57 | No |
| The hedgerow marked H38 on page 6 of the habitats plan | Work No. 57 | No |
| The hedgerow marked H39 on page 6 of the habitats plan | Work No. 57 | No |
| The hedgerow marked H40 on page 6 of the habitats plan | Work Nos. 95, 96, 97 | No |
| The hedgerow marked H41 on page 7 of the habitats plan | Work No. 91 | No |
| The hedgerow marked H42 on page 7 of the habitats plan | Work No. 104 | No |
| The hedgerow marked H43 on page 7 of the habitats plan | Work No. 91 | No |
| The hedgerow marked H44 on page 7 of the habitats plan | Work Nos. 91, 109d | No |
| The hedgerow marked H45 on page 7 of the habitats plan | Work Nos. 109d, 109b | No |
| The hedgerow marked H46 on page 7 of the habitats plan | Work Nos. 104, 104a, 104b, 107, 109b, 110 | No |
| The hedgerow marked H47 on page 7 of the habitats plan | Work Nos. 104, 107, 109b | No |
| The hedgerow marked H48 on page 4 of the habitats plan | Work No. 80a | No |
| The hedgerow marked H49 on page 4 of the habitats plan | Work No. 80a | No |
| The important hedgerow marked H50 on page 7 of the habitats plan | Work No. 109b | Yes |
| The hedgerow marked H52 on page 7 of the habitats plan | Work No. 91 | No |
| The hedgerow marked H53 on page 7 of the habitats plan | Work No. 111 | No |
| The hedgerow marked H54 on page 7 of the habitats plan | Work No. 111 | No |
| The hedgerow marked H55 on page 6 of the habitats plan | Work Nos. 96, 97 | No |
| The important hedgerow marked H56 on page 6 of the habitats plan | Work No. 95, 96, 97 | Yes |
| The hedgerow marked H58 on page 6 of the habitats plan | Work No. 57 | No |
| The hedgerow marked H59 on page 6 of the habitats plan | Work No. 57 | No |
| The hedgerow marked H61 on page 6 of the habitats plan | Work No. 91 | No |
| The hedgerow marked H62 on page 6 of the habitats plan | Work No. 92 | No |
| The hedgerow marked H63 on page 7 of the habitats plan | Work Nos. 103, 104 | No |
| The hedgerow marked H64 on page 7 of the habitats plan | Work Nos. 91, 109d | No |
| The hedgerow marked H65 on page 6 of the habitats plan | Work Nos. 96, 97 | No |
| The hedgerow marked H66 on page 6 of the habitats plan | Work Nos. 96, 97 | No |
| The hedgerow marked H68 on page 7 of the habitats plan | Work No. 104 | No |
| The hedgerow marked H69 on page 6 of the habitats plan | Work No. 98c | No |
| The hedgerow marked H70 on page 6 of the habitats plan | Work Nos. 96, 97 | No |
| The hedgerow marked H71 on page 2 of the habitats plan | Work No. 29 | No |
| The hedgerow marked H72 on page 2 of the habitats plan | Work No. 29 | No |
| The hedgerow marked H73 on page 2 of the habitats plan | Work Nos. 20, 28, 29 | No |
| The hedgerow marked H74 on page 2 of the habitats plan | Work No. 20, 28 | No |
| The hedgerow marked H75 on page 2 of the habitats plan | Work No. 32 | No |
| The hedgerow marked H76 on page 2 of the habitats plan | Work No. 36 | No |
| The hedgerow marked H77 on page 2 of the habitats plan | Work No. 1 | No |
| The important hedgerow marked H78 on page 2 of the habitats plan | Work No. 1 | Yes |
| The hedgerow marked H79 on page 2 of the habitats plan | Work No. 1 | No |
| The important hedgerow marked H80 on page 2 of the habitats plan | Work No. 1 | Yes |
| The hedgerow marked H81 on page 2 of the habitats plan | Work No. 21 | No |
| The hedgerow marked H82 on page 3 of the habitats plan | Work No. 50 | No |
| The hedgerow marked H83 on page 3 of the habitats plan | Work No. 50 | No |
| The hedgerow marked H84 on page 3 of the habitats plan | Work No. 50 | No |
| The hedgerow marked H85 on page 3 of the habitats plan | Work No. 50 | No |
| The hedgerow marked H86 on page 3 of the habitats plan | Work No. 50 | No |
| The hedgerow marked H87 on page 3 of the habitats plan | Work No. 50 | No |
| The hedgerow marked H88 on page 4 of the habitats plan | Work No. 80a | No |
| The hedgerow marked H89 on page 4 of the habitats plan | Work No. 80a | No |
| The hedgerow marked H91 on page 7 of the habitats plan | Work Nos. 103, 104, 109b | No |
| The hedgerow marked H92 on page 4 of the habitats plan | Work No. 80c | No |
| The hedgerow marked H93 on page 7 of the habitats plan | Work No. 107 | No |
PART 2 — TREES SUBJECT TO TREE PRESERVATION ORDERS
| (1) Name of Order / Type of tree | (2) Work to be carried out | (3) Relevant part of the authorised development |
|---|---|---|
| Land at Croxton Estate, Croxton Road, Toseland, Cambridgeshire (TPO No. 007/84 G1) (Oak) (not found at the time of survey) | Remove single tree | Work No. 89 |
| Land at Croxton Estate, Croxton Road, Toseland, Cambridgeshire (TPO No. 007/84 G1) (Oak) (not found at the time of survey) | Remove single tree | Work No. 89 |
| Land at Croxton Estate, Croxton Road, Toseland, Cambridgeshire (TPO No. 007/84 G1) (Oak) (not found at the time of survey) | Remove single tree | Work No. 89 |
| Land at Croxton Estate, Croxton Road, Toseland, Cambridgeshire (TPO No. 007/84 G1) (Oak) (as shown on Sheet 52 of the tree constraints plan) | Remove full group of trees | Work No. 89 |
| Land at Croxton Estate, Croxton Road, Toseland, Cambridgeshire (TPO No. 007/84 G1) (Plum, Dogwood) (not found at the time of survey) | Remove part of tree group | Work No. 89 |
| Land at Croxton Estate, Croxton Road, Toseland, Cambridgeshire (TPO No. 007/84 T6) (Oak) (not found at the time of survey) | Remove single tree | Work No. 89 |
| Land at Croxton Estate, Croxton Road, Toseland, Cambridgeshire (TPO No. 007/84 T7) (Oak) (not found at the time of survey) | Remove single tree | Work No. 89 |
| Land situated near to the north west corner of enclosure No. 5917 (Parish: Croxton CP) (TPO No. 5/84/SC G1) (Ash) (as shown on Sheet 48 of the tree constraints plan) | Remove single tree | Work No. 89 |
| Land situated near to the north west corner of enclosure No. 5917 (Parish: Croxton CP) (TPO No. 5/84/SC G1) (Ash / White Poplar / Field Maple) (as shown on Sheet 48 of the tree constraints plan) | Remove part of tree group | Work No. 89 |
| Land at Weald Corner, Cambridge Road, Eynesbury, Cambridgeshire (TPO No. 003/73 W1) (as shown on Sheet 45 of the tree constraints plan) | Remove part of tree group | Work No. 85 |
| Land situated within enclosure pt. 122 on Ordnance Sheet Beds XII-4 1926 (Parish: Roxton) (TPO No. Roxton and Great Barford Tree Preservation Order 1959 (7/190/2/031) assumed G7) (Oak, Horse Chestnut, Sycamore, Lime, Ash) (as shown on Sheet 13 of the tree constraints plan) | Remove single tree | Work Nos. 1, 3 |
| Land situated within enclosure pt. 122 on Ordnance Sheet Beds XII-4 1926 (Parish: Roxton) (TPO No. Roxton and Great Barford Tree Preservation Order 1959 (7/190/2/031) assumed G7) (Oak, Horse Chestnut, Sycamore, Lime, Ash) (as shown on Sheet 13 of the tree constraints plan) | Remove single tree | Work Nos. 1, 3 |
| Land situated within enclosure pt. 122 on Ordnance Sheet Beds XII-4 1926 (Parish: Roxton) (TPO No. Roxton and Great Barford Tree Preservation Order 1959 (7/190/2/031) assumed G7) (Oak, Horse Chestnut, Sycamore, Lime, Ash) (as shown on Sheet 13 of the tree constraints plan) | Remove part of tree group | Work Nos. 1, 3 |
| Land situated within enclosure pt. 122 on Ordnance Sheet Beds XII-4 1926 (Parish: Roxton) (TPO No. Roxton and Great Barford Tree Preservation Order 1959 (7/190/2/031) assumed G7) (Oak, Horse Chestnut, Sycamore, Lime, Ash) (as shown on Sheet 13 of the tree constraints plan) | Remove part of tree group | Work Nos. 1, 3 |
| Land situated within enclosure Nos. 9144 and 1743 and land (Parish: Eltisley CP) (TPO No. 5/84/SC) (Hawthorn / Elm) (as shown on Sheet 49 of the tree constraints plan) | Remove full tree group | Work Nos. 92, 93, 98b |
| Land situated within enclosure Nos 9144 and 1743 (Parish: Eltisley CP) (TPO No. 5/84/SC) (Ash / Hawthorn) (as shown on Sheet 49 of the tree constraints plan) | Remove part of tree group | Work Nos. 92, 93, 98b |
SCHEDULE 9 — PROTECTIVE PROVISIONS
PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWAGE UNDERTAKERS
1
For the protection of the utility undertakers referred to in this Part of this Schedule the following provisions have effect, unless otherwise agreed in writing between the undertaker and the utility undertaker concerned.
2
In this Part of this Schedule—
- “alternative apparatus” means alternative apparatus adequate to enable the utility undertaker in question to fulfil its statutory functions in a manner no less efficient than previously;
- “apparatus” means—in the case of an electricity undertaker, electric lines or electrical plant (as defined in the Electricity Act 1989[^f00115], belonging to or maintained by that utility undertaker;in the case of a gas undertaker, any mains, pipes or other apparatus belonging to or maintained by a gas transporter within the meaning of Part 1 of the Gas Act 1986[^f00116] for the purposes of gas supply;in the case of a water undertaker, mains, pipes or other apparatus belonging to or maintained by that utility undertaker for the purposes of water supply; andin the case of a sewerage undertaker—any drain or works vested in the utility undertaker under the Water Industry Act 1991[^f00117]; andany sewer which is so vested or is the subject of a notice of intention to adopt given under section 102(4)[^f00118] (adoption of sewers and disposal works) of that Act or an agreement to adopt made under section 104 (agreement to adopt sewers, drains or sewage disposal works at a future date) of that Act[^f00119],and includes a sludge main, disposal main (within the meaning of section 219 (general interpretation) of that Act) or sewer outfall and any manholes, ventilating shafts, pumps or other accessories forming part of any such sewer, drain or works, and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;
- “functions” includes powers and duties;
- “in” in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land;
- “plan” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe the works to be executed; and
- “utility undertaker” means—any licence holder within the meaning of Part 1 of the Electricity Act 1989;a gas transporter within the meaning of Part 1 of the Gas Act 1986;a water undertaker within the meaning of the Water Industry Act 1991; anda sewerage undertaker within the meaning of Part 1 of the Water Industry Act 1991,for the area of the authorised development, and in relation to any apparatus, means the utility undertaker to whom it belongs or by whom it is maintained.
On street apparatus
3
This Part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and the utility undertaker are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act.
Apparatus in stopped up streets
4
- (1) Where any street is stopped up under article 18 (permanent stopping up and restriction of use of streets and private means of access), any utility undertaker whose apparatus is in the street has the same powers and rights in respect of that apparatus as it enjoyed immediately before the stopping up and the undertaker must grant to the utility undertaker legal easements reasonably satisfactory to the utility undertaker in respect of such apparatus and access to it, but nothing in this paragraph affects any right of the undertaker or of the utility undertaker to require the removal of that apparatus under paragraph 7 or the power of the undertaker to carry out works under paragraph 9.
- (2) Regardless of the temporary stopping up or diversion of any highway under the powers conferred by article 16 (temporary alteration, diversion, prohibition and restriction of use of streets), a utility undertaker is at liberty at all times to take all necessary access across any such stopped up highway and to execute and do all such works and things in, upon or under any such highway as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the stopping up or diversion was in that highway.
Protective works to buildings
5
The undertaker, in the case of the powers conferred by article 22 (protective work to buildings), must exercise those powers so as not to obstruct or render less convenient the access to any apparatus.
Acquisition of land
6
Regardless of any provision in this Order or anything shown on the land plans, the undertaker must not acquire any apparatus otherwise than by agreement.
Removal of apparatus
7
- (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or requires that the utility undertaker’s apparatus is relocated or diverted, that apparatus must not be removed under this Part of this Schedule, and any right of a utility undertaker to maintain that apparatus in that land must not be extinguished until alternative apparatus has been constructed and is in operation to the reasonable satisfaction of the utility undertaker in question in accordance with sub-paragraphs (2) to (7).
- (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, the undertaker must give to the utility undertaker in question 28 days’ written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order a utility undertaker reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to the utility undertaker the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus.
- (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2) in the land in which the alternative apparatus or part of such apparatus is to be constructed, the utility undertaker must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably possible use its best endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.
- (4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between the utility undertaker in question and the undertaker or in default of agreement settled by arbitration in accordance with article 50 (arbitration).
- (5) The utility undertaker in question must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 50 (arbitration), and after the grant to the utility undertaker of any such facilities and rights as are referred to in sub-paragraphs (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.
- (6) Regardless of anything in sub-paragraph (5), if the undertaker gives notice in writing to the utility undertaker in question that the undertaker desires itself to execute any work, or part of any work in connection with the construction or removal of apparatus in any land of the undertaker, that work, instead of being executed by the utility undertaker, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of the utility undertaker.
- (7) If the utility undertaker in question fails either reasonably to approve, or to provide reasons for its failure to approve along with an indication of what would be required to make acceptable, any proposed details relating to required removal works under sub-paragraph (2) within 28 days of receiving a notice of the required works from the undertaker, then such details are deemed to have been approved. For the avoidance of doubt, any such “deemed consent” does not extend to the actual undertaking of the removal works, which shall remain the sole responsibility of the utility undertaker or its contractors.
Facilities and rights for alternative apparatus
8
- (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to a utility undertaker facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights are to be granted upon such terms and conditions as may be agreed between the undertaker and the utility undertaker in question or in default of agreement settled by arbitration in accordance with article 50 (arbitration).
- (2) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to the utility undertaker in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to that utility undertaker as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.
Retained apparatus
9
- (1) Not less than 28 days before starting the execution of any works in, on or under any land purchased, held, appropriated or used under this Order that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 7(2), the undertaker must submit to the utility undertaker in question a plan of the works to be executed.
- (2) Those works must be executed only in accordance with the plan submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by the utility undertaker for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker is entitled to watch and inspect the execution of those works.
- (3) Any requirements made by a utility undertaker under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which a plan under sub-paragraph (1) is submitted to it.
- (4) If a utility undertaker, in accordance with sub-paragraph (3) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 1 to 3 and 6 to 8 apply as if the removal of the apparatus had been required by the undertaker under paragraph 7(2).
- (5) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan instead of the plan previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan.
- (6) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency but in that case must give to the utility undertaker in question notice as soon as is reasonably practicable and a plan of those works as soon as reasonably practicable subsequently and must comply with sub-paragraph (3) in so far as is reasonably practicable in the circumstances.
Expenses and costs
10
- (1) Subject to the following provisions of this paragraph, the undertaker must repay to a utility undertaker all expenses reasonably incurred by that utility undertaker in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in paragraph 7(2).
- (2) There must be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule that value being calculated after removal.
- (3) If in accordance with the provisions of this Part of this Schedule—
- (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.