| (1) Plot reference number shown on land plans | (2) Purpose for which rights over land may be acquired | (3) Works for which rights over land may be acquired |
|---|---|---|
| 1/3f | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 2, 3 |
| 1/4b | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 2, 3 |
| 1/5a | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 2, 3 |
| 1/6b | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 2, 3 |
| 1/7b | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 2, 3 |
| 1/8b | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 2, 3 |
| 1/10d | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 5 |
| 3/1h | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 16, 18 |
| 3/1m | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 16 |
| 3/1n | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 16 |
| 3/2j | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult | 27 |
| 3/2l | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 26 |
| 3/3h | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 26 |
| 3/4d | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 16 |
| 3/4f | Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables and 11kv electricity cable together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 8, 16, 26, 27 |
| 3/4j | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 16 |
| 3/4k | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 16, 18 |
| 3/6b | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 16, 18 |
| 3/7b | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 16, 17, 18 |
| 3/7c | Divert, install, underground, alter, create new connections to, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 17 |
| 3/7d | Divert, install, underground, alter, create new connections to, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 17 |
| 3/8b | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, create new connections to, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 27 |
| 4/3e | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 29 |
| 4/6c | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, create new connections to, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 29, 31, 33, 36 |
| 4/7b | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights, bat hotel and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 33, 34, 36 |
| 4/9e | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 33, 36, 37, 38 |
| 4/10a | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 36 |
| 5/2c | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 36 |
| 5/4b | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 55, 56 |
| 5/4c | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables and 11kV electricity cable together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 57 |
| 5/4e | Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables and 11kv electricity cable together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 55, 57 |
| 5/4f | Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 55, 56 |
| 5/6d | Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 56 |
| 5/6j | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 58 |
| 5/7b | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 56 |
| 5/7d | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 58 |
| 6/4f | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 49 |
| 6/5c | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 49 |
| 7/3d | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 48 |
| 7/4c | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 49 |
| 7/4e | Place, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers. Divert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines, conduits and associated infrastructure. Right to pass and repass with or without plant and vehicles and including access to highways. To include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult. | 48, 52 |
SCHEDULE 6 — MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS
Compensation enactments
1
The enactments for the time being in force with respect to compensation for the compulsory purchase of land apply, with the necessary modifications as respects compensation, in the case of a compulsory acquisition under this Order of a right by the creation of a new right or imposition of a restrictive covenant as they apply in respect of compensation on the compulsory purchase of land and interests in land.
2
- (1) Without limitation on the scope of paragraph 1, the 1961 Act has effect subject to the modification set out in sub-paragraph (2).
- (2) For section 5A(5A)95 (relevant valuation date) of the 1961 Act substitute—
(5A) If— (a) the acquiring authority enters on land for the purposes of exercising a right in pursuance of a notice of entry under section 11(1) of the 1965 Act (as modified by paragraph 5(5) of Schedule 6 to the A47 Wansford to Sutton Development Consent Order 2023 (“the A47 Wansford to Sutton Order”)); (b) the acquiring authority is subsequently required by a determination under paragraph 12 of Schedule 2A to the 1965 Act (as substituted by paragraph 5(8) of Schedule 6 to the A47 Wansford to Sutton Order) to acquire an interest in the land; and (c) the acquiring authority enter on and take possession of that land, the authority is deemed for the purposes of subsection (3)(a) to have entered on that land when it entered on that land for the purpose of exercising that right.
3
- (1) Without limitation on the scope of paragraph 1, the Land Compensation Act 197396 has effect subject to the modifications set out in sub-paragraph (2).
- (2) In section 44(1) (compensation for injurious affection), as it applies to compensation for injurious affection under section 7 (measure of compensation in case of severance) of the 1965 Act as substituted by paragraph 5(3)—
- (a) for “land is acquired or taken from” substitute “a right or restrictive covenant over land is purchased from or imposed on”; and
- (b) for “acquired or taken from him” substitute “over which the right is exercisable or the restrictive covenant enforceable”.
Application of Part 1 of the 1965 Act
4
Part 1 (compulsory purchase under Acquisition of Land Act 1946) of the 1965 Act, as applied by section 125 (application of compulsory acquisition provisions) of the 2008 Act (and modified by article 30 (modification of Part 1 of the 1965 Act)) to the acquisition of land under article 24 (compulsory acquisition of land), applies to the compulsory acquisition of a right by the creation of a new right, or to the imposition of a restrictive covenant under article 27(1) (compulsory acquisition of rights and imposition of restrictive covenants)—
- (a) with the modifications specified in paragraph 5; and
- (b) with such other modifications as may be necessary.
5
- (1) The modifications referred to in paragraph 4(a) are as follows.
- (2) References in the 1965 Act to land are, in the appropriate contexts, to be read (according to the requirements of the particular context) as referring to, or as including references to—
- (a) the right acquired or to be acquired, or the restrictive covenant imposed or to be imposed; or
- (b) the land over which the right is or is to be exercisable, or the restriction is or is to be enforceable.
- (3) For Section 7 (measure of compensation in case of severance) of the 1965 Act substitute—
(7) In assessing the compensation to be paid by the acquiring authority under this Act, regard must be had not only to the extent (if any) to which the value of the land over which the right is to be acquired or the restrictive covenant is to be imposed is depreciated by the acquisition of the right or the imposition of the restrictive covenant but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the posers conferred by this or the special Act.
- (4) The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say—
- (a) section 9(4) (failure by owners to convey);
- (b) paragraph 10(3) of Schedule 1 (owners under incapacity);
- (c) paragraph 2(3) of Schedule 2 (absent and untraced owners); and
- (d) paragraphs 2(3) and 7(2) of Schedule 4 (common land),
are modified so as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily acquired or the restrictive covenant which is to be imposed is vested absolutely in the acquiring authority.
- (5) Section 1197 (powers of entry) of the 1965 Act is modified so as to secure that, where the acquiring authority has served notice to treat in respect of any right or restrictive covenant, as well as the notice of entry required by subsection (1) of that section (as it applies to a compulsory acquisition under article 24), it has power, exercisable in equivalent circumstances and subject to equivalent conditions, to enter for the purpose of exercising that right or enforcing that restrictive covenant; and sections—
- (a) 11A98 (powers of entry: further notices of entry);
- (b) 11B99 (counter-notice requiring possession to be taken on specified dated);
- (c) 12100 (unauthorised entry); and
- (d) 13101 (refusal to give possession to acquiring authority),
of the 1965 Act are modified correspondingly.
- (6) Section 20102 (tenants at will, etc.) of the 1965 Act applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right or the enforcement of the restrictive covenant in question.
- (7) Section 22 (interests omitted from purchase) of the 1965 Act as modified by article 30(4) (modification of Part 1 of the 1965 Act) is also modified so as to enable the acquiring authority in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired, subject to compliance with that section as respects compensation.
- (8) For Schedule 2A of the 1965 Act substitute—
SCHEDULE2A (1) (1) This Schedule applies where an undertaker serves a notice to treat in respect of a right over, or a restrictive covenant affecting, the whole or part of a house, building or factory and has not executed a general vesting declaration under section 4 of the Compulsory Purchase (Vesting Declarations) Act 1981 as applied by article 31 (application of the 1981 Act) of the A47 Wansford to Sutton Development Consent Order 2023 in respect of the land to which the notice to treat relates. (2) But see article 32(3) (acquisition of subsoil or airspace only) of the A47 Wansford to Sutton Development Consent Order 2023 which excludes the acquisition of subsoil or airspace only from this Schedule. (2) In this Schedule, “house” includes any park or garden belonging to a house. (3) A person who is able to sell the house, building or factory (“the owner”) may serve a counter-notice requiring the acquiring authority to purchase the owner’s interest in the house, building or factory. (4) A counter-notice under paragraph 3 must be served within the period of 28 days beginning with the day on which the notice to treat was served. (5) On receiving a counter-notice, the undertaker must decide whether to— (a) withdraw the notice to treat, (b) accept the counter-notice, or (c) refer the counter-notice to the Upper Tribunal. (6) The undertaker must serve notice of their decision on the owner within the period of 3 months beginning with the day on which the counter-notice is served (“the decision period”). (7) If the undertaker decides to refer the counter-notice to the Upper Tribunal it must do so within the decision period. (8) If the undertaker does not serve notice of a decision within the decision period it is to be treated as if it had served notice of a decision to withdraw the notice to treat at the end of that period. (9) If the undertaker serves notice of a decision to accept the counter-notice, the compulsory purchase order and the notice to treat are to have effect as if they are included the owner’s interest in the house, building or factory. (10) On a referral under paragraph 7, the Upper Tribunal must determine whether the acquisition of the right or the imposition of the restrictive covenant would— (a) in the case of a house, building or factory, cause material detriment to the house, building or factory, or (b) in the case of a park or garden, seriously affect the amenity or convenience of the house to which the park or garden belongs. (11) In making the determination, the Upper Tribunal must take into account— (a) the effect of the acquisition of the right or the imposition of the covenant, (b) the use to be made of the right or covenant proposed to be acquired or imposed, and (c) if the right or covenant is proposed to be acquired or imposed for works or other purposes extending to other land, the effect of the whole of the works and the use of the other land. (12) If the Upper Tribunal determines that the acquisition of the right or the imposition of the covenant would have either of the consequences described in paragraph 10, it must determine how much of the house, building or factory the acquiring authority ought to be required to take. (13) If the Upper Tribunal determines that the undertaker ought to be required to take some or all of the house, building or factory, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in that land. (14) (1) If the Upper Tribunal determines that the undertaker ought to be required to take some or all of the house, building or factory, the acquiring authority may at any time within the period of 6 weeks beginning with the day on which the Upper Tribunal makes it determination withdraw the notice to treat in relation to that land. (2) If the undertaker withdraws the notice to treat under this paragraph it must pay the person on whom the notice was served compensation for any loss or expense caused by the giving and withdrawing of the notice. (15) Any dispute as to the compensation is to be determined by the Upper Tribunal.
SCHEDULE 7 — LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
| (1) Location | (2) Plot Reference Number shown on land plans | (3) Purpose for which temporary possession may be taken | (4) Relevant part of the authorised development |
|---|---|---|---|
| Parish of Thornhaugh | 1/1a | Temporary storage and working area to support construction of the following in adjoining land parcels: a new private means of access to 4 properties, diversion, protection and removal of potable water pipes and the protection of the NGG gas pipeline including the crossing of Work No. 2. | 2, 3, 4 |
| Parish of Thornhaugh | 1/1c | Temporary storage and working area to support construction of the following in adjoining land parcels: a new private means of access to 4 properties, diversion, protection and removal of potable water pipes, electronic communication cables and apparatus, and overhead and underground electricity cables. | 2, 3 |
| Parish of Thornhaugh | 1/1e | Temporary storage and working area to support construction of the following in adjoining land parcels: diversion, protection and removal of potable water pipes, electronic communication cables and apparatus, overhead and underground electricity cables crossing Work No. 2 and protection of NGG gas pipeline. | 3, 4 |
| Parish of Thornhaugh | 1/3a | Temporary storage and working area to support construction of the following in adjoining land parcels: diversion, protection and removal of potable water pipes, electronic communication cables and apparatus, and overhead and underground electricity cables and adjacent utility works. | 3 |
| Parish of Thornhaugh | 1/3c | Temporary storage and working area to support construction of the following in adjoining land parcels: diversion, protection and removal of potable water pipes, electronic communication cables and apparatus, and overhead and underground electricity cables and adjacent utility works. | 3 |
| Parish of Thornhaugh | 1/9a | Protection, diversion and removal of existing water pipes, electricity and telecommunications cables and associated apparatus Temporary storage and working area to support construction of the following in adjoining land parcels: new private means of access to 4 properties and a service vehicle turning point including earthworks and associated drainage. Temporary storage and working area to support construction of the following in adjoining land parcels: diversion, protection and removal of potable water pipes, electronic communication cables and apparatus, and overhead and underground electricity cables and adjacent utility works. | 2, 3 |
| Parish of Thornhaugh | 1/10a | Temporary storage and working area to support construction of the following in adjoining land parcels: diversion, protection and removal of potable water pipes, electronic communication cables and apparatus, and overhead and underground electricity cables and adjacent utility works. | 3, 5 |
| Parish of Wansford | 2/1d | Temporary protection of electricity and telecommunications cables and associated apparatus. Temporary storage and working area to support construction of the following in adjoining land parcels: improvement to the eastbound carriageway of the existing A47 including the realignment of the central reserve and a new cycle crossing point at the Wansford western roundabout. | 12 |
| Parish of Thornhaugh | 2/3b | Temporary storage and working area to support construction of the following in adjoining land parcels: new carriageway to create a free flow link from A1 southbound to the dualled A47 eastbound including embankments and associated drainage. Temporary storage and working area to support diversion and removal of underground electronic communication cables and apparatus and adjacent utilities works. | 5, 6 |
| Parish of Wansford | 3/1c | Temporary protection of electricity and telecommunications cables and associated apparatus. Temporary storage and working area to support construction of the following in adjoining land parcels new carriageway to create a free flow link from A1 southbound to the dualled A47 eastbound including embankments and associated drainage. Temporary storage to facilitate construction of the following in adjoining land parcels: the dualling of the A47 mainline including earthworks and associated drainage. Temporary storage and working area to support diversion, protection and removal of potable water pipes, electronic communication cables and apparatus, and overhead and adjacent utilities works. | 1, 2, 6 |
| Parish of Wansford | 3/1j | Temporary protection of electronic communications cables and associated apparatus. Temporary access to facilitate construction of the following in adjoining land parcels: diversion and removal of electronic communication cables and apparatus and diversion of water pipes and construction of a site office and construction areas. | 16 |
| Parish of Wansford | 3/1l | Temporary protection of water pipes, sewers, electricity and telecommunications cables and associated apparatus. Temporary access to facilitate construction of the following in adjoining land parcels: diversion and removal of electronic communication cables and apparatus and diversion of water pipes and construction of a site office and construction areas. | 16 |
| Parish of Wansford | 3/1o | Temporary protection of electronic communications cables and associated apparatus. Temporary access to facilitate construction of the following in adjoining land parcels: diversion and removal of electronic communication cables and apparatus and diversion of water pipes and construction of a site office and construction areas. | 16 |
| Parish of Wansford | 3/2c | Temporary welfare and compound area including a haul route. | 24 |
| Parish of Wansford | 3/2e | Temporary storage to facilitate construction of the following in adjoining land parcels: the dualling of the A47 mainline from the existing Wansford eastern roundabout to the existing A47 including earthworks and associated drainage. Temporary storage and working area to facilitate construction of the following in adjoining land parcels: a new Sacrewell Farm access road connecting to Work No. 15 and running north passing through the Sacrewell Farm underbridge including earthworks and drainage. Temporary welfare and compound area including a haul route. | 1, 21, 24 |
| Parish of Wansford | 3/2i | Temporary protection of water pipes and associated apparatus. Temporary storage to facilitate construction of the following in adjoining land parcels: the dualling of the A47 mainline from the existing Wansford eastern roundabout to the termination point to the east for tie into existing A47 including earthworks and associated drainage. Temporary storage and working area to facilitate construction of the following in adjoining land parcels: a new Sacrewell Farm access road connecting to Work No. 15 and running north passing through the Sacrewell Farm underbridge including earthworks and drainage. Temporary welfare and compound area including a haul route. | 1, 21, 24 |
| Parish of Wansford | 3/2k | Temporary storage to facilitate construction of the following in adjoining land parcels: the dualling of the A47 mainline from the existing Wansford eastern roundabout to the termination point to the east for tie into existing A47 including earthworks and associated drainage. Temporary welfare and compound area including a haul route. | 1, 24 |
| Parish of Wansford | 3/3d | Temporary storage and working area to support provision of a new Sacrewell Farm access road connecting to Work No. 15 and running north passing through the Sacrewell Farm underbridge including earthworks and drainage. | 23 |
| Parish of Wansford | 3/3g | Temporary storage and working area to support provision of a new Sacrewell Farm access road connecting to Work No. 15 and running north passing through the Sacrewell Farm underbridge including earthworks and drainage and access link to Sacrewell Farm. | 23 |
| Parish of Wansford | 3/4h | Temporary protection of electronic communications cables and associated apparatus. Temporary access to facilitate construction of the following in adjoining land parcels: diversion and removal of electronic communication cables and apparatus and diversion of water pipes, provision of a site office and construction area and a new Sacrewell Farm Underbridge under the dualled A47 (Work No. 1) including structural units, concrete foundations, drainage and waterproofing. | 16, 25 |
| Parish of Wansford | 3/4i | Temporary protection of electronic communications cables and associated apparatus. Temporary access to facilitate construction of the following in adjoining land parcels: diversion and removal of electronic communication cables and apparatus and diversion of water pipes, provision of a site office and construction area and protection, diversion and resilience works to large diameter water pipelines and associated apparatus and adjacent utility works. | 16, 27 |
| Parish of Wansford | 3/5a | Temporary storage and working area to facilitate construction of the following in adjoining land parcels: the removal of underground electricity cables crossing Work Nos. 1, 8, 10, 11, 13, 16, 17, 21 and 26, and improvements to the existing A1/A47 on and off ramps to the Wansford east roundabout including earthwork widening. | 9, 11, 27 |
| Parish of Wansford | 4/2b | Temporary storage to facilitate construction of the following in adjoining land parcels: the dualling of the A47 mainline from the existing Wansford eastern roundabout to the existing A47 including earthworks and associated drainage, the provision of support for a new balancing pond to the north of the dualled A47 (Work No. 1) including drainage inlets, an outlet to river Nene and an access track. Temporary storage and working area to support the diversion and removal of overhead electrical cables and adjacent utilities works. | 1, 28, 29 |
| Parish of Wansford and Parish of Sutton | 4/2f | Temporary storage to facilitate construction of the following in adjoining land parcels: the dualling of the A47 mainline from the existing Wansford eastern roundabout to the existing A47 including earthworks and associated drainage and adjacent utilities works. | 1, 16, 26 |
| Parish of Sutton | 4/2i | Temporary storage to facilitate construction of the following in adjoining land parcels: the dualling of the A47 mainline from the existing Wansford eastern roundabout to the termination point to the existing A47 including earthworks and associated drainage and adjacent utilities works and provision of a new balancing pond to the north of the dualled A47 (Work No. 1) including drainage inlets, an outlet to river Nene and an access track. | 1, 16, 26, 27, 28 |
| Parish of Wansford | 4/3d | Temporary storage to facilitate construction of the following in adjoining land parcels: the dualling of the A47 mainline from the existing Wansford eastern roundabout to the existing A47 including earthworks and associated drainage, a new length of carriageway to form a new link road from A47 Wansford eastern roundabout (Work No. 13) and a new A47 westbound off slip from the dualled A47 (Work No. 1) including earthworks, associated drainage and a cycle track, and adjacent utilities works. | 1, 15, 16, 29 |
| Parish of Wansford | 4/3f | Temporary storage and working area to support diversion and removal of overhead electrical cables crossings and utilities works in adjoining land parcels. | 29 |
| Parish of Sutton | 4/5b | Temporary storage and working area to support diversion and removal of electronic communication cables and apparatus and utilities works in adjoining land parcels. | 36 |
| Parish of Sutton | 4/6b | Temporary storage and working area to support diversion and removal of overhead electrical cables crossings and utilities works in adjoining land parcels. | 29, 32 |
| Parish of Sutton | 4/9a | Temporary access route from Work No. 37 turning to temporary welfare and compound area including a haul road to the north of the dualled A47 (Work No. 1) and a new temporary access track from Work No. 37. | 38 |
| Parish of Sutton | 5/3a | Temporary storage and working area to facilitate construction of the following in adjoining land parcels: new Sutton Heath House roundabout (Work No. 44) north to Sutton Heath Road including earthworks and drainage and access points. | 42 |
| Parish of Sutton | 5/3b | Temporary storage and working area to facilitate construction of the following in adjoining land parcels: new Sutton Heath House roundabout (Work No. 44) north to Sutton Heath Road including earthworks and drainage and access points. | 42 |
| Parish of Upton | 5/4d | Temporary storage and working area to support diversion of electronic overhead and underground communication cables and apparatus crossings in adjoining land parcels. | 56 |
| Parish of Upton | 5/5b | Temporary storage and working area to support improvements to the existing Upton Drift including passing places and other works in adjoining land parcels. | 55 |
| Parish of Upton | 5/6a | Temporary storage and working area to support construction of the following in adjoining land parcels: improvements to the existing Upton Drift including passing places, widening the metalled surface into highway verge, straightening of the S- bend and sight lines and widening of its existing junction with Langley Bush Road and the existing junction adjacent to Model Farm. | 55 |
| Parish of Upton | 5/6c | Temporary storage and working area to support improvements to the existing Upton Drift including passing places in adjoining land parcels. | 55 |
| Parish of Upton | 5/6e | Temporary storage and working area to support improvements to the existing Upton Drift including passing places and connected works in adjoining land parcels. | 55 |
| Parish of Upton | 5/6g | Temporary storage and working area to support diversion of electronic overhead and underground communication cables and apparatus crossings in adjoining land parcels. | 56 |
| Parish of Upton | 5/6h | Temporary storage and working area to support diversion of electronic overhead and underground communication cables and apparatus crossing in adjoining land parcels. | 56 |
| Parish of Upton | 5/6k | Temporary storage and working area to support diversion of the underground cables and protection of the foul sewer crossings in adjoining land parcels. | 58 |
| Parish of Upton | 5/6l | Temporary storage and working area to support improvements to the existing Upton Drift including passing places, widening the metalled surface into highway verge, straightening of the S- bend and sight lines and widening of its existing junction with Langley Bush Road and the existing junction adjacent to Model Farm including earthworks and drainage in adjoining land parcels. | 55 |
| Parish of Upton | 5/7a | Temporary storage and working area to support improvements to the existing Upton Drift including passing places, widening the metalled surface into highway verge, straightening of the S- bend and sight lines and widening of its existing junction with Langley Bush Road and the existing junction adjacent to Model Farm including earthworks and drainage in adjoining land parcels. | 55 |
| Parish of Upton | 5/7c | Temporary storage and working area to support improvements to the existing Upton Drift including passing places, widening the metalled surface into highway verge, straightening of the S- bend and sight lines and widening of its existing junction with Langley Bush Road and the existing junction adjacent to Model Farm including earthworks and drainage in adjoining land parcels. | 55 |
| Parish of Upton | 5/8a | Temporary storage and working area to support diversion of the underground cables and protection of the foul sewer crossings in adjoining land parcels. | 58 |
| Parish of Sutton | 6/1e | Temporary storage and working area to support with the creation of a new turning head to the existing Drift with gated access for service providers for 250 metres including earthworks, drainage, sub-base layers, pavement, signage, fence and gates in adjoining land parcels. | 47 |
| Parish of Sutton | 6/2a | Temporary storage and working area to support a new access route from Work No. 37, temporary welfare and compound area including haul road to the north of the dualled A47 in adjoining land parcels. | 38 |
| Parish of Sutton | 6/3f | Temporary storage and working area to support creation of new turning head to the existing drift with gated access for service providers for 250 metres including earthworks, drainage, sub-base layers, pavement, signage, fence, and gates in adjoining land parcels. | 47 |
| Parish of Sutton | 6/3h | Temporary storage and working area to support diversion and removal of existing electronic communication cables and apparatus, underground electricity cables, and utility works in adjoining land parcels. | 48 |
| Parish of Sutton | 6/4a | To support access route from Work No. 37. Temporary welfare and compound area including haul road to the north of the dualled A47 (Work No. 1). To support diversion and removal of electronic communication cables and apparatus, electrical cables and potable water pipes and adjacent utility works in adjoining land parcels. | 36, 38 |
| Parish of Sutton | 6/4e | Temporary storage and working area to support a new access route from Work No. 37. Temporary welfare and compound area including haul road to the north of the dualled A47 (Work No. 1) and a new temporary access track from Work No. 37. | 38 |
| Parish of Sutton | 6/4g | Temporary storage and working area to support a new access route from Work No. 37. Temporary welfare and compound area including haul road to the north of the dualled A47 (Work No. 1) and a new temporary access track from Work No. 37. Temporary storage and working area to facilitate the protection, diversion and resilience works to potable water pipes and associated apparatus and adjacent utility works in adjoining land parcels. | 38, 49 |
| Parish of Sutton | 6/5b | Temporary storage and working area to support the following in adjoining land parcel: diversion, and removal of existing electronic communication cables and apparatus, underground electricity cables, and adjacent utility works, ecological works and provision of landscaping area to the south of the dualled A47. | 39, 48 |
| Parish of Sutton | 6/5e | Temporary storage and working area to support alterations to The Drift in adjoining land parcels. | 47 |
| Parish of Sutton | 7/3a | Temporary storage and working area to support alterations to The Drift and to facilitate the protection, diversion and resilience works to potable water pipes and associated apparatus and utility works in adjoining land parcels. | 47, 49 |
| Parish of Sutton | 7/4b | Temporary storage and working area to support alterations to The Drift and to support diversion and removal of existing electronic communication cables and apparatus, underground electricity cables, and potable water pipes and utility works in adjoining land parcels. | 47, 48 |
SCHEDULE 8 — REMOVAL OF HEDGEROWS AND TREES
PART 1 — REMOVAL OF HEDGEROWS
| (1) Location of hedgerow | (2) Work to be carried out | (3) Relevant part of the authorised development |
|---|---|---|
| Located at the A1 side road, next to the proposed access to the properties on the A1. H2 shown on sheet 1 of the Hedgerow Plans. | Partial removal | Work nos. 2, 3 and 4 |
| Located at A1 side road. H3 shown on sheet 2 of the Hedgerow Plans. | Full removal | Work nos. 5, 6 and 7 |
| Located at the pond maintenance track next to the new proposed free flow link road from the A1 to the A47. H4 and H6 shown on sheets 3 of the Hedgerow Plans. | Partial removal | Work nos. 9 and 10 |
| Located at the proposed Sacrewell Farm Access Road. H7 shown on sheet 3 of the Hedgerow Plans. | Partial removal | Work no. 21 |
| Located at the existing A47 near the proposed Sacrewell Farm Access Road. H9 shown on sheet 3 of the Hedgerow Plans. | Partial removal | Work nos. 1, 8, 9, 17 and 21 |
| Located at the existing A47 nearby the proposed Sacrewell Farm Access Road. H11 and H13 on sheet 3 of the Hedgerow Plans. | Partial removal | Work nos. 8, 17 and 21 |
| Located at the existing A47 near the existing Sacrewell Farm link road. H15 shown on sheets 3 and 4 of the Hedgerow Plans. | Partial removal | Work nos. 1, 15, 16, 27 and 28 |
| Located at the existing A47 near the existing Sacrewell Farm link road. H16 shown on sheet 3 of the Hedgerow Plans. | Full removal | Work nos. 8, 15, 16, 26 and 27 |
| Located at the existing A47 where it overlaps with the proposed A47. H17 shown on sheet 4 of the Hedgerow Plans. | Full removal | Work nos. 1, 15, 16, 28, 29, 30, 33, 36 and 40 |
| Located at the existing A47 where it overlaps with the proposed A47. H19 shown on sheet 4 of the Hedgerow Plans. | Partial removal | Work nos. 1, 16 and 28 |
| Located at the new link to Sutton Heath Road and Langley Bush Road. H21 shown on sheet 5 of the Hedgerow Plans. | Partial removal | Work nos. 36, 42 and 43 |
| Located near the new A47 Sutton Roundabout. H29 shown on sheet 6 of the Hedgerow Plans. | Partial removal | Work nos. 1 and 38 |
| Located at the new link to Sutton Heath Road. H31 shown on sheet 6 of the Hedgerow Plans. | Partial removal | Work nos. 36 and 42 |
| Located at the new A47 Sutton roundabout. H33 shown on sheet 6 of the Hedgerow Plans. | Partial removal | Work nos. 1, 36 and 46 |
| Located at the proposed A47 dual carriageway. H35 shown on sheet 6 of the Hedgerow Plans. | Partial removal | Work nos. 1 and 49 |
| Located at the proposed A47 dual carriageway. H38 shown on sheet 7 of the Hedgerow Plans. | Partial removal | Work nos. 1 and 48 |
| Located at the existing A47 where it is used as cycle path/footway. H39 shown on sheet 6 of the Hedgerow Plans. | Partial removal | Work nos. 36 and 40 |
| Located at the new link with Peterborough Road. H42 shown on sheet 6 and 7 of the Hedgerow Plans. | Partial removal | Work nos. 45, 48 and 49 |
| Located at the new pond near Nene Way. H44 shown on sheet 7 of the Hedgerow Plans. | Partial removal | Work nos. 48 and 50 |
| Located at the new link with Peterborough Road. H46 shown on sheet 7 of the Hedgerow Plans. | Partial removal | Work nos. 45, 48 and 50 |
| Located at the new link with Peterborough Road H49 shown on sheet 7 of the Hedgerow Plans. | Partial removal | Work nos. 45, 48, 50 and 52 |
| Located at the proposed A47 dual carriageway. H51 shown on sheet 7 of the Hedgerow Plans. | Partial removal | Work nos. 1 and 48 |
| Located at Upton Road. H53 shown on sheet 7 of the Hedgerow Plans. | Partial removal | Work nos. 53 and 54 |
| Located at Upton Road. H54 shown on sheet 7 of the Hedgerow Plans. | Full removal | Work nos. 53 and 54 |
| Located at Upton Drift. H55 and H56 shown on sheet 5 (Inset 5B) of the Hedgerow Plans. | Full removal | Work nos. 55, 56, 57 and 58 |
PART 2 — REMOVAL OF IMPORTANT HEDGEROWS
| (1) Location of hedgerow | (2) Work to be carried out | (3) Relevant part of the authorised development |
|---|---|---|
| Located at the new link to Sutton Road. H23 shown on sheet 5 of the Hedgerow Plans. | Partial removal | Work nos. 36, 42 and 43 |
| Located at the new link to Sutton Road. H25 shown on sheet 5 of the Hedgerow Plans. | Partial removal | Work nos. 36 and 41 |
| Located at the Wansford NMU Underpass to Sutton Heath Road. H27 shown on sheet 4 of the Hedgerow Plans. | Partial removal | Work nos. 1, 33, 37 and 38 |
SCHEDULE 9 — PROTECTIVE PROVISIONS
PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWAGE UNDERTAKERS
1
For the protection of the utility undertakers referred to in this Part of this Schedule the following provisions have effect, unless otherwise identified in another Part of this Schedule or agreed in writing between the undertaker and the utility undertaker concerned.
2
In this Part of this Schedule—
- “alternative apparatus” means alternative apparatus adequate to enable the utility undertaker in question to fulfil its statutory functions in a manner no less efficient than previously;
- “apparatus” means—in the case of an electricity undertaker, electric lines or electrical plant (as defined in the Electricity Act 1989103), belonging to or maintained by that utility undertaker;in that case of a gas undertaker, any mains, pipes or other apparatus belonging to or maintained by a gas transporter within the meaning of Part 1 of the Gas Act 1986104 for the purposes of gas supply;in the case of water undertaker, mains, pipes or other apparatus belonging to or maintained by that utility undertaker for the purposes of water supply; andin the case of a sewerage undertaker—any drain or works vested in the utility undertaker under the Water Industry Act 1991105; andany sewer which is so vested or is the subject of a notice of intention to adopt given under section 102(4)106 (adoption of sewers and disposal works) of that Act or an agreement to adopt made under section 104 (agreement to adopt sewers, drains or sewage disposal works at future date) of that Act107,and includes a sludge main, disposal main (within the meaning of section 219 (general interpretation)108 of that Act) or sewer outfall and any manholes, ventilating shafts, pumps or other accessories forming part of any such sewer, drain or works,
and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;
- “functions” includes powers and duties;
- “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over or upon land;
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.