The Net Zero Teesside Order 2024
- (5) In Schedule 2A (counter-notice requiring purchase of land not in notice to treat)—
- (a) for paragraphs 1(2) and 14(2) substitute—
(2) But see article >28(3) (acquisition of subsoil or airspace only) of the Net Zero Teesside Order 2024, which excludes the acquisition of subsoil or airspace only from this Schedule.
; and
- (b) after paragraph 29, insert—
(30) In this Schedule, references to entering on and taking possession of land do not include doing so under article 31 (temporary use of land for carrying out the authorised development) or article 32 (temporary use of land for maintaining the authorised development) of the Net Zero Teesside Order 2024.
Rights under or over streets
30
- (1) Subject to article 21A (supplemental land), the undertaker may enter upon and appropriate so much of the subsoil of, or airspace over, any street within the Order land as may be required for the purposes of the authorised development and may use the subsoil or airspace for those purposes or any other purpose ancillary to the authorised development.
- (2) Subject to paragraph (3), the undertaker may exercise any power conferred by paragraph (1) in relation to a street without being required to acquire any part of the street or any easement or right in the street.
- (3) Paragraph (2) does not apply in relation to—
- (a) any subway or underground building; or
- (b) any cellar, vault, arch or other construction in, on or under a street which forms part of a building fronting onto the street.
- (4) Subject to paragraph (5) any person who is an owner or occupier of land in respect of which the power of appropriation conferred by paragraph (1) is exercised without the undertaker acquiring any part of that person’s interest in the land, and who suffers loss by the exercise of that power, is entitled to compensation to be determined, in case of dispute, under Part 1 (determination of questions of disputed compensation) of the 1961 Act.
- (5) Compensation is not payable under paragraph (4) to any person who is an undertaker to whom section 85 (sharing cost of necessary measures) of the 1991 Act applies in respect of measures of which the allowable costs are to be borne in accordance with that section.
Temporary use of land for carrying out the authorised development
31
- (1) Subject to article 21A (supplemental land), the undertaker may, in connection with the carrying out of the authorised development—
- (a) enter on and take possession of—
- (i) so much of the land specified in column (1) of Table 8 in Schedule 9 (land of which temporary possession may be taken) for the purpose specified in relation to that land in column (2) of that Table 8;
- (ii) any other part of the Order land in respect of which no notice of entry has been served under section 11 (powers of entry) of the 1965 Act and no declaration has been made under section 4 (execution of declaration) of the 1981 Act;
- (b) remove any buildings, structures, fences, debris and vegetation from that land;
- (c) construct temporary works (including the provision of means of access) and buildings on that land;
- (d) construct any works specified in relation to that land in column (2) of Table 8 in Schedule9 (land of which temporary possession may be taken); and
- (e) carry out or construct any mitigation works.
- (2) Before taking temporary possession of land for a period of time by virtue of paragraph (1) the undertaker must give a notice of intended entry to each of the owners and occupiers of the land, so far as known to the undertaker after making diligent inquiry.
- (3) The notice in paragraph (2) must specify—
- (a) the period after the end of which the undertaker may take temporary possession of the land provided that such period must not end earlier than the end of the period of 28 days beginning with the day on which the notice is given; and
- (b) subject to paragraph (4) the period for which the undertaker is to take temporary possession of the land, provided that such periods may be varied from time to time by agreement between the undertaker and the owner or occupier.
- (4) The undertaker may not, without the agreement of the owners of the land, remain in possession of any land under this article—
- (a) in the case of land specified in paragraph (1)(a)(i), after the earlier of—
- (i) where Schedule 9 (land of which temporary possession may be taken) specifies a purpose for which possession may be taken relating to particular Work Nos., the end of the period of one year beginning with the date of final commissioning of those Work Nos.; or
- (ii) the end of the period of one year beginning with the date of final commissioning of the authorised development; or
- (b) in the case of land referred to in paragraph (1)(a)(ii), after the end of the period of one year beginning with the date of final commissioning of the authorised development unless the undertaker has, before the end of that period, served notice of entry under section 11 of the 1965 Act, made a declaration under section 4 of the 1981 Act or has otherwise acquired or leased the land.
- (5) Unless the undertaker has served notice of entry under section 11 of the 1965 Act or made a declaration under section 4 of the 1981 Act or has otherwise acquired the land subject to temporary possession, the undertaker must, before giving up possession of land of which temporary possession has been taken under this article, remove all temporary works and restore the land to the reasonable satisfaction of the owners of the land; but the undertaker is not to be required to replace a building or any debris removed under this article.
- (6) The undertaker must pay compensation to the owners and occupiers of land of which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the provisions of this article.
- (7) Any dispute as to a person’s entitlement to compensation under paragraph (6), or as to the amount of the compensation, is to be determined under Part 1 (determination of questions of disputed compensation) of the 1961 Act.
- (8) Nothing in this article affects any liability to pay compensation under section 152 of the 2008 Act (compensation in case where no right to claim in nuisance) or under any other enactment in respect of loss or damage arising from the carrying out of the authorised development, other than loss or damage for which compensation is payable under paragraph (6).
- (9) The undertaker must not compulsorily acquire under this Order the land referred to in paragraph (1)(a)(i).
- (10) Nothing in this article precludes the undertaker from—
- (a) creating and acquiring new rights or imposing restrictions over any part of the Order land identified in Schedule 7 (land in which new rights etc. may be acquired); or
- (b) acquiring any part of the subsoil of or airspace over (or rights in the subsoil of or airspace over) that land under article 28 (acquisition of subsoil or airspace only) or article 30 (rights under or over streets).
- (11) Where the undertaker takes possession of land under this article, the undertaker is not required to acquire the land or any interest in it.
- (12) Section 13 (refusal to give possession to acquiring authority) of the 1965 Act applies to the temporary use of land pursuant to this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 (application of compulsory acquisition provisions) of the 2008 Act.
- (13) Nothing in this article prevents the taking of temporary possession more than once in relation to any land specified in Schedule 9 (land of which temporary possession may be taken).
- (14) The provisions of the Neighbourhood Planning Act 201740 do not apply insofar as they relate to temporary possession of land under this article in connection with the carrying out of the authorised development and other development.
- (15) Subject to Article 43, so much of the special category land as is required for the purposes of exercising the powers pursuant to this article is temporarily discharged from all rights, trusts and incidents to which it was previously subject, so far as their continuance would be inconsistent with the exercise of those powers, and only for such time as any special category land is being used under this article.
Temporary use of land for maintaining the authorised development
32
- (1) Subject to paragraph (2), and article 21A (supplemental land), at any time during the maintenance period relating to any part of the authorised development, the undertaker may—
- (a) enter on and take temporary possession of any of the Order land if such possession is reasonably required for the purpose of maintaining the authorised development;
- (b) enter on any of the Order land for the purpose of gaining such access as is reasonably required for the purpose of maintaining the authorised development; and
- (c) construct such temporary works (including the provision of means of access) and buildings on the land as may be reasonably necessary for that purpose.
- (2) Paragraph (1) does not authorise the undertaker to take temporary possession of—
- (a) any house or garden belonging to a house; or
- (b) any building (other than a house) if it is for the time being occupied.
- (3) Not less than 28 days before entering on and taking temporary possession of land under this article the undertaker must serve notice of the intended entry on the owners and occupiers of the land.
- (4) The notice in paragraph (3) must specify—
- (a) the period after the end of which the undertaker may take temporary possession of the land provided that such period must not end earlier than the end of the period of 28 days beginning with the day on which the notice is given; and
- (b) subject to paragraph (5) the period for which the undertaker is to take temporary possession of the land, provided that such periods may be varied from time to time by agreement between the undertaker and the owner or occupier.
- (5) The undertaker may only remain in possession of land under this article for so long as may be reasonably necessary to carry out the maintenance of the part of the authorised development for which possession of the land was taken.
- (6) Before giving up possession of land of which temporary possession has been taken under this article, the undertaker must remove all temporary works and restore the land to the reasonable satisfaction of the owners of the land.
- (7) The undertaker must pay compensation to the owners and occupiers of land of which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the provisions of this article.
- (8) Any dispute as to a person’s entitlement to compensation under paragraph (7), or as to the amount of the compensation, is to be determined under Part 1 (determination of questions of disputed compensation) of the 1961 Act.
- (9) Nothing in this article affects any liability to pay compensation under section 152 (further provisions as to compensation for injurious affection) of the 2008 Act or under any other enactment in respect of loss or damage arising from the maintenance of the authorised development, other than loss or damage for which compensation is payable under paragraph (7).
- (10) Where the undertaker takes possession of land under this article, the undertaker is not required to acquire the land or any interest in it.
- (11) Section 13 (refusal to give possession to acquiring authority) of the 1965 Act applies to the temporary use of land pursuant to this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 (application of compulsory acquisition provisions) of the 2008 Act.
- (12) In this article “the maintenance period” means the period of one year beginning with the date of final commissioning.
- (13) The provisions of the Neighbourhood Planning Act 2017 do not apply insofar as they relate to temporary possession of land under this article in connection with the maintenance of the authorised development and other development necessary for the authorised development within the Order land.
- (14) Subject to Article 43, so much of the special category land as is required for the purposes of exercising the powers pursuant to this article is temporarily discharged from all rights, trusts and incidents to which it was previously subject, so far as their continuance would be inconsistent with the exercise of those powers, and only for such time as any special category land is being used under this article.
Statutory undertakers
33
Subject to the provisions of Schedule 12 (protective provisions) and article 21A (supplementary land), the undertaker may—
- (a) acquire compulsorily the land belonging to statutory undertakers within the Order land;
- (b) extinguish or suspend the rights of or restrictions for the benefit of, and remove or reposition the apparatus belonging to, statutory undertakers on, under, over or within the Order land; and
- (c) create and acquire compulsorily rights or impose restrictions over any Order land belonging to statutory undertakers.
Apparatus and rights of statutory undertakers in streets
34
Where a street is altered or diverted or its use is temporarily prohibited or restricted under article 10 (power to alter layout etc. of streets), article 11 (street works) or article 13 (temporary stopping up of streets, public rights of way and access land) any statutory undertaker whose apparatus is under, in, on, along or across the street is to have the same powers and rights in respect of that apparatus, subject to Schedule 12 (protective provisions), as if this Order had not been made.
Recovery of costs of new connections
35
- (1) Where any apparatus of a public utility undertaker or of a public communications provider is removed under article 33 (statutory undertakers) any person who is the owner or occupier of premises to which a supply was given from that apparatus is entitled to recover from the undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of effecting a connection between the premises and any other apparatus from which a supply is given.
- (2) Paragraph (1) does not apply in the case of the removal of a public sewer but where such a sewer is removed under article 33 (statutory undertakers) any person who is—
- (a) the owner or occupier of premises the drains of which communicated with the sewer; or
- (b) the owner of a private sewer which communicated with that sewer,
is entitled to recover from the undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of making the drain or sewer belonging to that person communicate with any other public sewer or with a private sewerage disposal plant.
- (3) This article does not have effect in relation to apparatus to which article 34 (apparatus and rights of statutory undertakers in streets) or Part 3 (street works in England and Wales) of the 1991 Act applies.
- (4) In this article—
- “public communications provider” has the same meaning as in section 151(1) (interpretation of Chapter 1) of the Communications Act 200341; and
- “public utility undertaker” has the same meaning as in the 1980 Act.
Compulsory acquisition of land – incorporation of the mineral code
36
Parts 2 and 3 of Schedule 2 (minerals) to the Acquisition of Land Act 198142 are incorporated in this Order subject to the following modifications—
- (a) for “the acquiring authority” substitute “the undertaker”;
- (b) for the “undertaking” substitute “authorised development”; and
- (c) paragraph 8(3) is not incorporated.
PART 6 — MISCELLANEOUS AND GENERAL
Deemed marine licence
37
The marine licences set out in Schedules 10 and 11 are deemed to have been issued under Part 4 of the 2009 Act (marine licensing) for the licensed activities set out in Part 1, and subject to the conditions set out in Part 2, of each licence.
Application of landlord and tenant law
38
- (1) This article applies to—
- (a) any agreement for leasing to any person the whole or any part of the authorised development or the right to operate the same;
- (b) any agreement entered into by the undertaker with any person for the construction, maintenance, use or operation of the authorised development, or any part of it; and
- (c) so far as any such agreement relates to the terms on which any land which is the subject of a lease granted by or under that agreement is to be provided for that person’s use.
- (2) No enactment or rule of law regulating the rights and obligations of landlords and tenants prejudices the operation of any agreement to which this article applies.
- (3) No enactment or rule of law to which paragraph (2) applies is to apply in relation to the rights and obligations of the parties to any lease granted by or under any such agreement so as to—
- (a) exclude or in any respect modify any of the rights and obligations of those parties under the terms of the lease, whether with respect to the termination of the tenancy or any other matter;
- (b) confer or impose on any such party any right or obligation arising out of or connected with anything done or omitted on or in relation to land which is the subject of the lease, in addition to any such right or obligation provided for by the terms of the lease; or
- (c) restrict the enforcement (whether by action for damages or otherwise) by any party to the lease of any obligation of any other party under the lease.
Operational land for purposes of the 1990 Act
39
Development consent granted by this Order is to be treated as specific planning permission for the purposes of section 264(3)(a) (cases in which land is to be treated as not being operational land) of the 1990 Act.
Defence to proceedings in respect of statutory nuisance
40
- (1) Where proceedings are brought under section 82(1) (summary proceedings by persons aggrieved by statutory nuisances) of the Environmental Protection Act 199043 in relation to a nuisance falling within section 79(1) (statutory nuisances and inspections therefor.) of that Act no order is to be made, and no fine may be imposed, under section 82(2) (summary proceedings by persons aggrieved by statutory nuisances) of that Act if the defendant shows that the nuisance—
- (a) relates to premises used by the undertaker for the purposes of or in connection with the construction or maintenance of the authorised development and that the nuisance is attributable to the carrying out of the authorised development in accordance with a notice served under section 60 (control of noise on construction sites), or a consent given under section 61 (prior consent for work on construction sites) of the Control of Pollution Act 197444; or
- (b) is a consequence of the construction or maintenance of the authorised development and that it cannot reasonably be avoided; or
- (c) is a consequence of the use of the authorised development and that it cannot reasonably be avoided.
- (2) Section 61(9) of the Control of Pollution Act 1974 does not apply where the consent relates to the use of premises by the undertaker for the purposes of or in connection with the construction or maintenance of the authorised development.
Protection of interests
41
Schedule 12 (protective provisions) has effect.
Saving for Trinity House
42
Nothing in this Order prejudices or derogates from any of the rights, duties or privileges of Trinity House.
Crown Rights
43
- (1) Nothing in this Order affects prejudicially any estate, right, power, privilege, authority or exemption of the Crown and in particular, nothing in this Order authorises the undertaker or any lessee or licensee to take, use, enter upon or in any manner interfere with any land or rights of any description (including any portion of the shore or bed of the sea or any river, channel, creek, bay or estuary)—
- (a) belonging to His Majesty in right of the Crown and forming part of The Crown Estate without the consent in writing of the Crown Estate Commissioners;
- (b) belonging to His Majesty in right of the Crown and not forming part of The Crown Estate without the consent in writing of the government department having the management of that land; or
- (c) belonging to a government department or held in trust for His Majesty for the purposes of a government department without the consent in writing of that government department.
- (2) Paragraph (1) does not apply to the exercise of any right under this Order for the compulsory acquisition of an interest in any Crown land (as defined in the 2008 Act) which is for the time being held otherwise than by or on behalf of the Crown.
- (3) A consent under paragraph (1) may be given unconditionally or subject to terms and conditions and is deemed to have been given in writing where it is sent electronically.
Procedure in relation to certain approvals
44
- (1) Where an application is made to, or a request is made of, a consenting authority for any consent, agreement or approval required or contemplated by any of the provisions of the Order (not including the Requirements), such consent, agreement or approval to be validly given, must be given in writing.
- (2) Where paragraph (1) applies to any consent, agreement or approval, such consent, agreement or approval must not be unreasonably withheld or delayed.
- (3) Schedule 13 (procedure for discharge of Requirements) has effect in relation to all consents, agreements or approvals required, granted, refused or withheld in relation to the Requirements.
- (4) Save for applications made pursuant to Schedule 13 (procedure for discharge of Requirements) or where stated to the contrary if, within six weeks (or such longer period as may be agreed between the undertaker and the relevant consenting authority in writing) after the application or request has been submitted to a consenting authority it has not notified the undertaker of its disapproval and the grounds of disapproval, it is deemed to have approved the application or request.
- (5) Where any application is made as described in paragraph (1), the undertaker must include a statement in such application that refers to the timeframe for consideration of the application and the consequences of failure to meet that timeframe as prescribed by paragraph (4).
Certification of plans etc.
45
- (1) The undertaker, as soon as practicable after the making of this Order, must submit to the Secretary of State copies of all documents and plans listed in Table 13 in Schedule 14 (documents and plans to be certified) to this Order for certification that they are true copies of the documents referred to in this Order.
- (2) Where the amendment of any plan or document referred to in paragraph (1) is required to reflect the terms of the Secretary of State’s decision to make this Order, that plan or document, in the form amended to the Secretary of State’s satisfaction, is the version of the plan or document to be certified under paragraph (1).
- (3) A plan or document so certified is admissible in any proceedings as evidence of the contents of the document of which it is a copy.
Service of notices
46
- (1) A notice or other document required or authorised to be served for the purposes of this Order may be served—
- (a) by post;
- (b) by delivering it to the person on whom it is to be served or to whom it is to be given or supplied; or
- (c) subject to article 3 by electronic transmission.
- (2) If an electronic communication is received outside the recipient’s business hours, it is to be taken to have been received on the next working day.
- (3) Where the person on whom a notice or other document to be served for the purposes of this Order is a body corporate, the notice or document is duly served if it is served on the secretary or clerk of that body.
- (4) For the purposes of section 7 (references to service by post) of the Interpretation Act 197845 as it applies for the purposes of this article, the proper address of any person in relation to the service on that person of a notice or document under paragraph (1) is, if that person has given an address for service, that address, and otherwise—
- (a) in the case of the secretary or clerk of a body corporate, the registered or principal office of that body; and
- (b) in any other case, the last known address of that person at the time of service.
- (5) Where for the purposes of this Order a notice or other document is required or authorised to be served on a person as having any interest in, or as the occupier of, land and the name or address of that person cannot be ascertained after reasonable enquiry, the notice may be served by—
- (a) addressing it to that person by name or by the description of “owner”, or as the case may be “occupier”, of that land (describing it); and
- (b) either leaving it in the hands of a person who is or appears to be resident or employed on the land or leaving it conspicuously affixed to some building or object on or near the land.
- (6) This article does not exclude the employment of any method of service not expressly provided for by it.
Arbitration
47
- (1) Subject to article 42 (saving for Trinity House), any difference under any provision of this Order, unless otherwise provided for, must be referred to and settled by a single arbitrator to be agreed between the parties or, failing agreement, to be appointed on the application of either party (after giving notice in writing to the other) by the Secretary of State.
- (2) Any matter for which the consent or approval of the Secretary of State or the MMO is required under any provision of this Order is not subject to arbitration under this article.
Funding for compulsory acquisition compensation
48
- (1) The undertaker must not exercise the powers conferred by the provisions referred to in paragraph (2) in relation to any Order land unless it has first put in place, following approval by the Secretary of State, either—
- (a) a guarantee (and the amount of that guarantee) in respect of the liabilities of the undertaker to pay compensation pursuant to the provisions referred to in paragraph (2) in respect of the exercise of the relevant power in relation to that land; or
- (b) an alternative form of security (and the amount of that security) in respect of the liabilities of the undertaker to pay compensation pursuant to the provisions referred to in paragraph (2).
- (2) The provisions are—
- (a) article 22 (compulsory acquisition of land);
- (b) article 25 (compulsory acquisition of rights etc.);
- (c) article 26 (private rights);
- (d) article 28 (acquisition of subsoil or airspace only);
- (e) article 30 (rights under or over streets);
- (f) article 31 (temporary use of land for carrying out the authorised development);
- (g) article 32 (temporary use of land for maintaining the authorised development); and
- (h) article 33 (statutory undertakers).
- (3) A guarantee or alternative form of security given in respect of the liabilities of the undertaker to pay compensation pursuant to the provisions referred to in paragraph (2) is to be treated as enforceable against the guarantor or person providing the alternative form of security by any person to whom such compensation is payable and must be in such a form as to be capable of enforcement by such a person.
- (4) Nothing in this article requires a guarantee or alternative form of security to be in place for more than 15 years after the date on which the relevant power is exercised.
SCHEDULE 1 — AUTHORISED DEVELOPMENT
In the Borough of Redcar and Cleveland and the Borough of Stockton on Tees a nationally significant infrastructure project as defined in sections 14(1)(a) and 15 of the 2008 Act, and development which is to be treated as development for which development consent is required by direction under sections 35(1) and 35ZA of that Act, and associated development under section 115(1)(b) of that Act, comprising—
Work No. 1 – an electricity generating station fuelled by natural gas and with a gross output capacity of up to 860 megawatts (MWe) comprising—
- (a) Work No. 1A – a combined cycle gas turbine plant, comprising—
- (i) a gas turbine;
- (ii) a steam turbine;
- (iii) a heat recovery steam generator (HRSG);
- (iv) gas and steam turbine buildings;
- (v) gas turbine air intake filters;
- (vi) selective catalytic reduction equipment;
- (vii) HRSG stack;
- (viii) a transformer;
- (ix) deaerator and feed water pump buildings;
- (x) chemical sampling / dosing plant;
- (xi) demineralised water treatment plant, including storage tanks;
- (xii) electrical substation, including electrical equipment, buildings and enclosures;
- (xiii) gas reception facility, including gas supply pipeline connection works, gas receiving area, gas pipeline internal gauge receiver for pipe inspection, emergency shutdown valves, gas vents and gas metering, and pressure reduction equipment;
- (xiv) auxiliary boiler and emissions stack; and
- (xv) continuous emissions monitoring system;
- (b) Work No. 1B – CCGT and CCP cooling and utilities infrastructure, comprising—
- (i) mechanical draft cooling towers;
- (ii) cooling water pumps, plant and buildings;
- (iii) cooling water dosing and sampling plant and buildings;
- (iv) standby diesel generator and emissions stack;
- (v) diesel fuel storage tanks and unloading area;
- (vi) fire and raw water storage tanks;
- (vii) chemical storage facilities;
- (viii) wastewater treatment plant and building; and
- (ix) effluent, stormwater and firewater retention ponds;
- (c) Work No. 1C – CCP, comprising—
- (i) flue gas pre-treatment plant and blower;
- (ii) carbon dioxide absorption column and associated stack;
- (iii) carbon dioxide stripper and solvent regenerator;
- (iv) carbon dioxide conditioning and compression equipment; and
- (v) ancillary equipment, including pumps, chemical storage, water washing equipment, acid washing equipment and pipework;
- (d) Work No. 1D – administration, control room and stores, comprising—
- (i) administration and control buildings; and
- (ii) workshop and stores buildings; and
- (e) Work No. 1E – ancillary works in connection with Work Nos. 1A, 1B, 1C and 1D—
- (i) ancillary plant, buildings, enclosures and structures;
- (ii) pipework, pipe runs and pipe racks;
- (iii) firefighting equipment, buildings and distribution pipework;
- (iv) lubrication oils storage facilities;
- (v) permanent plant laydown area for operation and maintenance activities; and
- (vi) mechanical, electrical, gas, telecommunications and water networks, pipework, cables, racks, infrastructure, instrumentation and utilities, including connections between Work Nos. 1A, 1B, 1C and 1D and parts of Work Nos. 2A, 3, 4, 5, 6, 7 and 8.
Work No. 2 – a gas connection, being works for the transport of natural gas to Work No. 1A, comprising—
- (a) Work No. 2A – underground high pressure gas pipeline, comprising—
- (i) an underground high-pressure gas supply pipeline of up to 600 millimetres nominal bore diameter;
- (ii) cathodic protection posts;
- (iii) marker posts; and
- (iv) underground electrical supply cables, transformers and control systems cables; and
- (b) Work No. 2B – above ground installations connecting Work No. 2A to the National Transmission System, comprising—
- (i) a compound for National Gas Transmission plc’s apparatus, comprising—
- (aa) an offtake connection from the National Transmission System;
- (bb) above and below ground valves, flanges and pipework;
- (cc) remotely operated valve and valve bypass;
- (dd) an above or below ground pressurisation bridle;
- (ee) instrumentation and electrical kiosks; and
- (ff) telemetry and communications equipment;
- (ii) compounds for the undertaker’s apparatus, comprising—
- (aa) above and below ground valves, flanges and pipework;
- (bb) isolation valves;
- (cc) pipeline inline gauge launching facility;
- (dd) instrumentation and electrical kiosks; and
- (ee) telemetry and communications equipment; and
- (iii) in connection with Work No. 2B, access works, vehicle parking, electrical and telecommunications connections, surface water drainage, security fencing and gates, closed circuit television cameras and columns.
Work No. 3 – works for the export of electricity from Work No. 1A to the National Grid Electricity Transmission system, comprising—
- (a) Work No. 3A – an electrical connection from Work No. 1A to Work No. 3B, comprising 275 kilovolt underground and overground electrical cables and control systems cables, and the connection between Work No. 3B and the National Grid Tod Point substation; and
- (b) Work No. 3B – a new electrical substation at Tod Point, including electrical equipment, buildings, enclosures and extension works at the National Grid substation.
Work No. 4 – water supply connection works to provide cooling and make-up water to Work No.1, comprising up to two water pipelines of up to 1100 millimetres nominal bore diameter from the existing raw water main.
Work No. 5 – wastewater disposal works in connection with Work No. 1, comprising—
- (a) Work No. 5B – a new water discharge pipeline to the Tees Bay; and
- (b) Work No. 5C – up to two new wastewater pipelines between Bran Sands Wastewater Treatment Plant and Work No. 1.
Work No. 6 – a carbon dioxide gathering network, comprising underground and overground pipelines of up to 550 millimetres nominal bore diameter for the transport of carbon dioxide to Work No. 7.
Work No. 6A– above ground installations required to facilitate Work No. 6, comprising—
- (a) above and below ground piping;
- (b) a PIG launcher;
- (c) remotely operated valves and valve bypass; and
- (d) instrumentation and electrical kiosk.
Work No. 7 – a high pressure carbon dioxide compression station, comprising—
- (a) inlet metering;
- (b) compression facilities;
- (c) electrical connection and substation;
- (d) hydrogen storage; and
- (e) mechanical, electrical, gas, telecommunications, pipework, cables, racks, infrastructure, instrumentation and utilities, including connections between Work No. 7 and Work Nos. 1A, 1B, 1C, 1D, 6 and 8.
Work No. 8 – high pressure carbon dioxide export pipeline corridor, comprising an overground and underground pipeline of up to 800 millimetres nominal bore diameter and associated power and fibre-optic cables.
Work No. 9 – temporary construction and laydown areas, comprising hardstanding, laydown and open storage areas, contractor compounds and construction staff welfare facilities, gatehouse and weighbridge, vehicle parking and cycle storage facilities, internal roads and pedestrian and cycle routes, security fencing and gates, external lighting including lighting columns, and, closed circuit television cameras and columns, comprising—
- (a) Work No. 9A – Teesworks laydown;
- (b) Work No. 9B – Navigator Terminal and Seal Sands laydown;
- (c) Work No. 9C – INEOS laydown;
- (d) Work No. 9D – Saltholme laydown;
- (e) Work No. 9E – Saltholme laydown; ...
- (f) Work No. 9F – Haverton Hill laydown ; and
- (g) Work No. 9G – temporary construction laydown area.
Work No. 10 – access and highway improvements, comprising works to create, improve, repair or maintain access roads, haul roads and access points.
SCHEDULE 2 — REQUIREMENTS
Commencement of the authorised development
1
- (1) The authorised development may not be commenced after the expiration of five years from the date this Order comes into force.
- (2) The authorised development may not commence unless the undertaker has given the relevant planning authority fourteen days’ notice of its intention to commence the authorised development.
Notice of start and completion of commissioning
2
- (1) Notice of the intended start of commissioning of the authorised development must be given to the relevant planning authority no later than fourteen days prior to the date that commissioning is started.
- (2) Notice of the intended date of final commissioning of each of Work Nos.1 and 6 must be given to the relevant planning authority no later than fourteen days prior to the date of final commissioning.
Detailed design
3
- (1) No part of the authorised development comprised in Work No. 1 may commence, save for the permitted preliminary works, until details of the following for that part have been submitted to and approved by the relevant planning authority (following consultation with STDC)—
- (a) the siting, layout, scale and external appearance, including the colour, materials and surface finishes of all new permanent buildings and structures;
- (b) finished floor levels;
- (c) the height of the stacks which must be at a level at which the environmental effects will be no worse than those identified in Chapter 8 of the environmental statement;
- (d) hard standings; and
- (e) the internal vehicular access and circulation roads, loading and unloading, vehicle parking and turning facilities, cycle parking and routes, and pedestrian routes.
- (2) No part of the authorised development comprised in Work No. 2A may commence, save for the permitted preliminary works, until details of the following, to the extent that they are above mean low water springs, for that part have been submitted to and approved by the relevant planning authority (following consultation with Sembcorp, STDC and the TG entities)—
- (a) the route and method of installation of the high-pressure gas supply pipeline and any electrical supply, telemetry and other apparatus;
- (b) the number and location of cathodic protection posts and marker posts;
- (c) surface water drainage; and
- (d) works involving trenchless technologies including their location.
- (3) No part of the authorised development comprised in Work No. 2B may commence, save for the permitted preliminary works, until details of the following for that part have been submitted to and approved by the relevant planning authority (following consultation with Sembcorp, STDC and the TG entities)—
- (a) the siting, layout, scale and external appearance, including the colour, materials and surface finishes of all new permanent buildings, structures and above ground apparatus;
- (b) hard standings;
- (c) the internal vehicular access and circulation roads, loading and unloading, vehicle parking and turning facilities; and
- (d) works involving trenchless technologies including their location.
- (4) No part of the authorised development comprised in Work No. 3 may commence, save for the permitted preliminary works, until details of the following for that part have been submitted to and approved by the relevant planning authority (following consultation with Sembcorp and STDC)—
- (a) the route and method of installation of the 275 kilovolt electrical cables and control system cables running from Work No. 1 to the existing substation at Tod Point;
- (b) the connections within the existing substation at Tod Point, including electrical cables, connections to the existing busbars and new, upgraded or replacement equipment; ...
- (c) works involving trenchless technologies including their location ; and
- (d) the siting and external appearance of cable support structures.
- (5) No part of the authorised development comprised in Work No. 4 may commence, save for the permitted preliminary works, until details of the following for that part have been submitted to and approved by the relevant planning authority (following consultation with STDC)—
- (a) route and method of construction of the water supply pipelines; and
- (b) works involving trenchless technologies including their location.
- (6) No part of the authorised development comprised in Work No. 5 may commence, save for permitted preliminary works, until details of the following for that part have been submitted to and approved by the relevant planning authority (following consultation with Sembcorp and STDC)—
- (a) the route and method of construction of any new wastewater water pipelines above mean low water springs; and
- (b) works involving trenchless technologies including their location.
- (7) No part of the authorised development comprised in Work No. 6 may commence, save for the permitted preliminary works, until details of the following, to the extent that they are above mean low water springs, for that part have been submitted to and approved by the relevant planning authority (following consultation with Sembcorp and STDC)—
- (a) the route and method of installation of the carbon dioxide gathering network pipelines and any electrical supply, telemetry and other apparatus;
- (b) the number and location of cathodic protection posts and marker posts; and
- (c) works involving trenchless technologies including their location.
- (8) No part of the authorised development comprised in Work No. 7 may commence, save for the permitted preliminary works, until details of the following for that part have been submitted to and approved by the relevant planning authority (following consultation with STDC)—
- (a) the siting, layout, scale and external appearance, including the colour, materials and surface finishes of all new permanent buildings and structures;
- (b) finished floor levels;
- (c) hard standings; and
- (d) the internal vehicular access and circulation roads, loading and unloading, vehicle parking and turning facilities, and pedestrian routes.
- (9) No part of the authorised development comprised in Work No. 8 may commence, save for the permitted preliminary works, until details of the following for that part have been submitted to and approved by the relevant planning authority (following consultation with STDC)—
- (a) the route and method of installation of the carbon dioxide export pipeline and any electrical supply, telemetry and other apparatus;
- (b) the number and location of cathodic protection posts and marker posts; and
- (c) works involving trenchless technologies including their location.
- (10) No part of the authorised development comprised in Work No. 9 may commence until details of the following for that part have been submitted to and approved by the relevant planning authority (following consultation with Sembcorp and STDC)—
- (a) layout and heights of contractor compounds and construction staff welfare facilities; and
- (b) vehicle access, parking and cycle storage facilities.
- (11) Work Nos. 1, 3 and 7 must be carried out in accordance with the design parameters in Schedule 15.
- (12) Subject to other terms of this Order, Work Nos. 1, 2, 3, 4, 5, 6, 7, 8 and 9 must be carried out in accordance with the details approved in accordance with sub-paragraphs (1) to (10) above, unless otherwise agreed with the relevant planning authority.
- (13) The details to be submitted to and approved by the relevant planning authority under sub-paragraphs (1) and (8) must be in accordance with the principles in section 7 and 8 of the design and access statement.
Landscape and biodiversity protection management and enhancement
4
- (1) No part of the authorised development may commence until a landscape and biodiversity protection plan for that part has been submitted to and approved by the relevant planning authority (following consultation with Sembcorp and STDC).
- (2) The plan submitted and approved pursuant to sub-paragraph (1) must include details of—
- (a) measures to protect existing shrub and tree planting that is to be retained;
- (b) details of any trees and hedgerows to be removed; and
- (c) biodiversity and habitat mitigation and impact avoidance.
- (3) The plan submitted and approved pursuant to sub-paragraph (1) must be implemented as approved throughout the construction of the authorised development unless otherwise agreed with the relevant planning authority.
- (4) No part of Work Nos. 1 or 7 may be commissioned until a landscape and biodiversity management and enhancement plan for that part has been submitted to and approved by the relevant planning authority (following consultation with Sembcorp and STDC).
- (5) The plan submitted and approved pursuant to sub-paragraph (4) must include details of—
- (a) implementation and management of all new shrub and tree planting;
- (b) measures to enhance and maintain existing shrub and tree planting that is to be retained;
- (c) measures to enhance biodiversity and habitats;
- (d) an implementation timetable;
- (e) annual landscape and biodiversity management and maintenance; and
- (f) monitoring measures in accordance with the measures and timeframes set out in sections 6 and 7 of the indicative landscape and biodiversity strategy and including a process for submission to and approval by the relevant planning authority of an annual monitoring report and provision of the annual monitoring report to STDC.
- (6) Any shrub or tree planted as part of the approved plan that, within a period of five years after planting, is removed, dies or becomes, in the opinion of the relevant planning authority, seriously damaged or diseased, must be replaced in the first available planting season with a specimen of the same species and size as that originally planted unless otherwise agreed with the relevant planning authority.
- (7) The plans submitted and approved pursuant to sub-paragraphs (1) and (4) must be—
- (a) in accordance with the principles of the indicative landscape and biodiversity strategy; and
- (b) implemented and maintained as approved during the operation of the relevant part of the authorised development unless otherwise agreed with the relevant planning authority.
Public rights of way and access land management
5
- (1) No public rights of way may be temporarily diverted or stopped up and access to any access land must not be temporarily prevented until a management plan for the relevant section of public rights of way or access land has been submitted to and approved by the relevant planning authority.
- (2) The plan must include details of—
- (a) measures to minimise the length of any sections of public rights of way and the area of any access land to be temporarily closed; and
- (b) advance publicity and signage in respect of any sections of public rights of way to be temporarily closed or diverted and access land to be temporarily closed.
- (3) The plan must be implemented as approved unless otherwise agreed with the relevant planning authority.
External lighting
6
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until a scheme for all external lighting to be installed during construction for that part (with the exception of the aviation warning lighting required by virtue of requirement 27) has been submitted to and approved by the relevant planning authority.
- (2) No part of the authorised development may be commissioned until a scheme for all permanent external lighting to be installed (with the exception of the aviation warning lighting required by virtue of requirement 27) in that part has been submitted to and approved by the relevant planning authority.
- (3) The schemes submitted and approved pursuant to sub-paragraphs (1) and (2) of this requirement must be in accordance with the indicative lighting strategy and include measures to minimise and otherwise mitigate any artificial light emissions.
- (4) The schemes must be implemented as approved unless otherwise agreed with the relevant planning authority.
Highway accesses
7
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until details of the siting, design and layout (including visibility splays and construction specification) of any new or modified temporary means of access between any part of the Order limits and the public highway to be used by vehicular traffic during construction, and the means of and a programme for reinstating any such means of access after construction has, for that part, been submitted to and, after consultation with the highway authority, Sembcorp and STDC, approved by the relevant planning authority.
- (2) The highway accesses approved pursuant to sub-paragraph (1) must be constructed in accordance with the approved details and, unless approved pursuant to sub-paragraph (3) to be retained permanently, reinstated in accordance with the approved programme, unless otherwise agreed with the relevant planning authority.
- (3) Prior to the date of final commissioning of each relevant Work No. details of the siting, design and layout (including visibility splays and construction specification) of any new or modified permanent means of access to a highway to be used by vehicular traffic, must, for each part of the authorised development, be submitted to and, after consultation with the highway authority, Sembcorp and STDC, approved by the relevant planning authority.
- (4) The highway accesses approved pursuant to sub-paragraph (3) must be constructed in accordance with the details approved unless otherwise agreed with the relevant planning authority.
Means of enclosure
8
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until details of a programme for the removal of all temporary means of enclosure for any construction areas or sites associated with the authorised development have, for that part, been submitted to and approved by the relevant planning authority (following consultation with Sembcorp and STDC).
- (2) Any construction areas or sites associated with the authorised development must remain securely fenced at all times during construction and commissioning of the authorised development and the temporary means of enclosure must then be removed in accordance with the programme approved pursuant to sub-paragraph (1).
- (3) Prior to the date of final commissioning of each relevant Work No., details of any proposed permanent means of enclosure, must, for each part of the authorised development, be submitted to and approved by the relevant planning authority.
- (4) Prior to the date of final commissioning of each relevant Work No., any approved permanent means of enclosure must be completed.
- (5) The authorised development must be carried out in accordance with the approved details unless otherwise agreed with the relevant planning authority.
- (6) In this requirement, “means of enclosure” means fencing, walls or other means of boundary treatment and enclosure.
Site security
9
- (1) No part of Work Nos. 1 or 7 may be brought into use until a written scheme detailing security measures to minimise the risk of crime has, for that part, been submitted to and approved by the relevant planning authority.
- (2) The approved scheme must be maintained and operated throughout the operation of the relevant part of the authorised development.
Fire prevention
10
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until a fire prevention method statement providing details of fire detection measures, fire suppression measures and the location of accesses to all fire appliances in all of the major building structures and storage areas within the relevant part of the authorised development, including measures to contain and treat water used to suppress any fire has, for that part, been submitted to and, after consultation with the Health and Safety Executive and the Cleveland Fire Authority, approved by the relevant planning authority.
- (2) The authorised development must be implemented in accordance with the approved details and all relevant fire prevention, detection and suppression measures, accesses and fire appliances must be maintained to the reasonable satisfaction of the relevant planning authority at all times throughout the operation of the relevant part of the authorised development.
Surface and foul water drainage
11
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until details of the temporary surface and foul water drainage systems, including means of pollution control in accordance with the construction environmental management plan and a management and maintenance plan to ensure that the systems remain fully operational throughout the construction of the relevant part of the authorised development have, for that part, been submitted to, and after consultation with the Environment Agency, the lead local flood authority, the relevant internal drainage board, Sembcorp and STDC, approved by the relevant planning authority.
- (2) The scheme approved pursuant to sub-paragraph (1) must be implemented as approved and maintained throughout the construction of the authorised development unless otherwise agreed with the relevant planning authority.
- (3) Details of the permanent surface and foul water drainage systems, including a programme for their implementation, must be submitted to and, after consultation with the Environment Agency, relevant internal drainage board and Sembcorp, approved by the relevant planning authority prior to the start of construction of any part of those systems.
- (4) The details submitted and approved pursuant to sub-paragraphs (1) and (3) of this requirement must be in accordance with the principles set out in Chapter 9 of the environmental statement.
- (5) The scheme approved pursuant to sub-paragraph (3) must be implemented as approved and maintained throughout the operation of the relevant part of the authorised development unless otherwise agreed with the relevant planning authority.
- (6) When submitting schemes pursuant to sub-paragraphs (1) and (3) the undertaker may submit separate schemes for the foul and surface water drainage systems.
Flood risk mitigation
12
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until a scheme for the mitigation of flood risk during construction, has, for that part, been submitted to, and after consultation with the Environment Agency and STDC, approved by the relevant planning authority.
- (2) The scheme approved pursuant to sub-paragraph (1) must be implemented as approved and maintained throughout the construction of the authorised development unless otherwise agreed with the relevant planning authority.
- (3) No part of the authorised development may be commissioned until a scheme for the mitigation of flood risk during operation has, for that part, been submitted to and, after consultation with the Environment Agency and STDC, approved by the relevant planning authority.
- (4) The schemes submitted and approved pursuant to sub-paragraphs (1) and (3) of this requirement must be in accordance with the principles set out in Chapter 9 and appendix 9A of the environmental statement.
- (5) The scheme approved pursuant to sub-paragraph (3) must be implemented as approved and maintained throughout the operation of the relevant part of the authorised development unless otherwise agreed with the relevant planning authority.
- (6) The authorised development must not be commissioned until the flood risk mitigation has been implemented and a flood emergency response and contingency plan has been submitted to, and after consultation with the Environment Agency and STDC, approved by the relevant planning authority.
- (7) The plan approved pursuant to sub-paragraph (6) must be implemented throughout the commissioning and operation of the relevant part of the authorised development unless otherwise agreed with the relevant planning authority.
Contaminated land and groundwater
13
- (1) Subject to sub-paragraph (8), no part of the authorised development may commence, save for geotechnical surveys and other investigations for the purpose of assessing ground conditions, until a scheme to deal with the contamination of land, including groundwater, which is likely to cause significant harm to persons or pollution of controlled waters or the environment, has, for that part, been submitted to and, after consultation with the Environment Agency and STDC, approved by the relevant planning authority.
- (2) The scheme submitted and approved under sub-paragraph (1) must be consistent with the principles set out in Chapter 10 of the environmental statement and any construction environmental management plan submitted under requirement 16(1) and include—
- (a) a preliminary risk assessment (desk top study) and risk assessment that—
- (i) is supported by a site investigation scheme; and
- (ii) identifies the extent of any contamination;
- (b) an appraisal of remediation options and a proposal of the preferred option where the risk assessment indicates that remediation is required in order for the relevant area of land not to meet the definition of “contaminated land” under Part 2A (contaminated land) of the Environmental Protection Act 199046;
- (c) where the risk assessment carried out under sub-paragraph (a) identifies the need for remediation, a remediation strategy which must include—
- (i) the preferred option for remediation to ensure that the site will not meet the definition of “contaminated land” under Part 2A (contaminated land) of the Environmental Protection Act 1990; and
- (ii) a verification plan, providing details of the data to be collected in order to demonstrate that the works set out in the remediation scheme submitted for approval under this sub-paragraph are complete;
- (d) a materials management plan that is in accordance with the prevailing code of practice relevant to such plans, which sets out long-term measures with respect to any contaminants remaining on the site during and after the authorised development is carried out;
- (e) details of how any unexpected contamination will be dealt with;
- (f) an update to the hydrogeological impact assessment including hydrogeological conceptual model that is informed by any further ground investigation reports and groundwater monitoring in addition to the information in Chapter 10 of the environmental statement;
- (g) a long term monitoring and maintenance plan in respect of contamination, including details of (but not limited to) monitoring of groundwater and surface water, appropriate screening criteria, and a time-table of monitoring and submission of monitoring reports, and which must include any necessary contingency action or mitigation measures arising from the matters reported; and
- (h) a plan for managing or otherwise decommissioning any boreholes installed for the investigation of soils, groundwater or geotechnical purposes, including details of how redundant boreholes are to be decommissioned in order to prevent risk of groundwater pollution, how any boreholes that need to be retained for monitoring purposes will be secured, protected and inspected, and including a requirement for appropriate validation records within a report to be submitted to demonstrate that all boreholes which are no longer required have been decommissioned in accordance with best practice.
- (3) The authorised development, including any remediation and monitoring, must be carried out in accordance with the approved scheme unless otherwise agreed with the relevant planning authority following consultation with the Environment Agency.
- (4) Following the implementation of the remediation strategy approved under sub-paragraph (3), a verification report, based on the data collected as part of the remediation strategy and demonstrating the completion of the remediation measures must be produced and supplied to the relevant planning authority and the Environment Agency.
- (5) Where the verification report produced under sub-paragraph (4) does not demonstrate the completion of the remediation measures, a statement as to how any outstanding remediation measures will be addressed must be supplied to the relevant planning authority and the Environment Agency at the same time as the verification report.
- (6) The outstanding remediation measures must be completed to the reasonable satisfaction of the relevant planning authority, after consultation with the Environment Agency and STDC, by the date agreed with that authority.
- (7) As an alternative to seeking an approval under sub-paragraph (1), the undertaker may instead submit for approval by the relevant planning authority, following consultation with the Environment Agency and STDC, a notification that the undertaker instead intends to rely on any scheme to deal with the contamination of land (including groundwater) which relates to any part of Work Nos. 1, 7, 9A or 10 that has been previously approved by the relevant planning authority pursuant to an application for planning permission or an application to approve details under a condition attached to a planning permission.
- (8) If a notification under sub-paragraph (7) is—
- (a) approved by the relevant planning authority following consultation with the Environment Agency then the undertaker must implement the previously approved scheme and an approval under sub-paragraph (1) is not required; or
- (b) not approved by the relevant planning authority following consultation with the Environment Agency then an approval under sub-paragraph (1) is required.
- (9) Sub-paragraphs (1) to (8) do not apply to any part of the Order land where the undertaker demonstrates to the relevant planning authority following consultation with the Environment Agency that the relevant part of the Order land is fit for the authorised development through the provision of a remedial validation report (which must include a risk assessment, details of any planning permission under which remediation works were carried out and any ongoing monitoring requirements) and the relevant planning authority notifies the undertaker that it is satisfied that the relevant part of the Order land is fit for the authorised development on the basis of that report.
- (10) The undertaker must comply with any ongoing monitoring requirements and any activities identified as necessary by the monitoring contained within the documents submitted to and approved by the relevant planning authority pursuant to sub-paragraph (9).
Archaeology
14
- (1) No part of the authorised development may commence until a written scheme of investigation for that part has been submitted to and, after consultation with the relevant archaeological body, approved by the relevant planning authority.
- (2) The scheme submitted and approved must be in accordance with Chapter 18 of the environmental statement.
- (3) The scheme must identify any areas where further archaeological investigations are required and the nature and extent of the investigation required in order to preserve by knowledge or in-situ any archaeological features that are identified.
- (4) The scheme must provide details of the measures to be taken to protect record or preserve any significant archaeological features that may be found and must set out a process for how unexpected finds will be dealt with.
- (5) Any archaeological investigations implemented and measures taken to protect record or preserve any identified significant archaeological features that may be found must be carried out—
- (a) in accordance with the approved scheme; and
- (b) by a suitably qualified person or organisation approved by the relevant planning authority in consultation with relevant archaeological body unless otherwise agreed with the relevant planning authority.
Protected species
15
- (1) No part of the authorised development may commence until further survey work for that part has been carried out to establish whether any protected species are present on any of the land affected, or likely to be affected, by that part of the authorised development.
- (2) Where a protected species is shown to be present, no authorised development of that part must commence until a scheme of protection and mitigation measures has been submitted to and, following consultation with Natural England, approved by the relevant planning authority.
- (3) The authorised development must be carried out in accordance with the approved scheme unless otherwise agreed with the relevant planning authority.
- (4) In this requirement, “protected species” has the same meaning as in regulations 42 and 46 of the Conservation of Habitats and Species Regulations 201747.
Construction environmental management plan
16
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until a construction environmental management plan for that part has been submitted to and, after consultation with the Environment Agency, Sembcorp and STDC, approved by the relevant planning authority.
- (2) The plan submitted and approved must be in accordance with the framework construction environmental management plan and the indicative landscape and biodiversity strategy and incorporate—
- (a) a code of construction practice, specifying measures designed to minimise the impacts of construction works;
- (b) a scheme for the control of any emissions to air;
- (c) a soil management plan;
- (d) a sediment control plan;
- (e) a scheme for environmental monitoring and reporting during the construction of the authorised development, including measures for undertaking any corrective actions;
- (f) a scheme for the notification of any significant construction impacts on local residents and businesses for handling any complaints received relating to such impacts during the construction of the authorised development;
- (g) surface and foul water drainage measures that are in accordance with the surface and foul water drainage scheme submitted under requirement 11(1);
- (h) the measures outlined in paragraphs 15.7.4, 15.8.12 to 15.8.16, 15.8.19 and 15.9.1 in Appendix B: Ornithology in the Environmental Statement Addendum – Volume I of the ES addendum or such other measures to achieve the same maximum noise levels as are set out in paragraphs 15.8.13 to 15.8.16 of Appendix B: Ornithology in the Environmental Statement Addendum – Volume I of the ES addendum;
- (i) a groundwater monitoring plan that comprises monitoring of groundwater levels and chemical contaminants of concern to inform the construction design process and which must take into account the updated hydrogeological impact assessment and any further ground investigation reports and groundwater monitoring required by requirement 13(2)(f);
- (j) a materials management plan in accordance with paragraph 5.3.76 of Chapter 5 of the environmental statement;
- (k) a hazardous materials management plan in accordance with paragraph 10.5.3 in Chapter 10 of the environmental statement; and
- (l) any other management or mitigation plans set out in the framework construction environmental management plan.
- (3) All construction works associated with the authorised development must be carried out in accordance with the relevant approved construction environmental management plan unless otherwise agreed with the relevant planning authority.
Protection of highway surfaces
17
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.