The Net Zero Teesside Order 2024

Type Statutory-Instrument
Publication 2024-02-16
Last updated 2025-10-29
State In force
Department King's Printer of Acts of Parliament
PDF Download
articles 1
Reform history JSON API
  • (10) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 56 days before commencing the execution of the authorised development, a new plan, instead of the plan previously submitted, and having done so the provisions of this paragraph shall apply to and in respect of the new plan.
  • (11) The undertaker will not be required to comply with sub-paragraph (1) where it needs to carry out “emergency works” as defined in Part 3 of the 1991 Act but in that case it must give to National Grid notice as soon as is reasonably practicable and a plan of those works and must comply with sub-paragraphs (6), (7) and (8) insofar as is reasonably practicable in the circumstances and comply with sub-paragraph (12) at all times.
  • (12) At all times when carrying out any works authorised under the Order, the undertaker must comply with National Grid’s policies for development near overhead lines EN43-8 and HSE’s guidance note 6 “Avoidance of Danger from Overhead Lines”.

Expenses

25
  • (1) Save where otherwise agreed in writing between National Grid and the undertaker and subject to the following provisions of this paragraph, the undertaker must pay to National Grid on demand all charges, costs and expenses reasonably and properly incurred by National Grid in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of any apparatus or the construction of any new or alternative apparatus which may be required in consequence of the execution of any authorised development including without limitation—
  • (a) any costs reasonably incurred by or compensation properly paid by National Grid in connection with the acquisition of rights or the exercise of statutory powers for such apparatus including without limitation all costs incurred by National Grid as a consequence of National Grid—
  • (i) using its own compulsory purchase powers to acquire any necessary rights under paragraph 22(3); or
  • (ii) exercising any compulsory purchase powers in the Order transferred to or benefitting National Grid;
  • (b) in connection with the cost of the carrying out of any diversion work or the provision of any alternative apparatus, where no written diversion agreement is otherwise in place;
  • (c) the cutting off of any apparatus from any other apparatus or the making safe of redundant apparatus;
  • (d) the approval of plans;
  • (e) the carrying out of protective works, plus a capitalised sum to cover the cost of maintaining and renewing permanent protective works; and
  • (f) the survey of any land, apparatus or works, the inspection and monitoring of works or the installation or removal of any temporary works reasonably necessary in consequence of the execution of any such works referred to in this Part of this Schedule.
  • (2) There will be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule and which is not re-used as part of the alternative apparatus, that value being calculated after removal.
  • (3) If in accordance with the provisions of this Part of this Schedule—
  • (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
  • (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with paragraph 30 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to National Grid by virtue of sub-paragraph (1) will be reduced by the amount of that excess save to the extent that it is not possible in the circumstances to obtain the existing type of apparatus at the same capacity and dimensions or place at the existing depth in which case full costs will be borne by the undertaker.

  • (4) For the purposes of sub-paragraph (3)—
  • (a) an extension of apparatus to a length greater than the length of existing apparatus will not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
  • (b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole will be treated as if it also had been agreed or had been so determined.
  • (5) Any amount which apart from this sub-paragraph would be payable to National Grid in respect of works by virtue of sub-paragraph (1) will, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on National Grid any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.

Indemnity

26
  • (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any works authorised by this Part of this Schedule or in consequence of the construction, use, maintenance or failure of any of the authorised development by or on behalf of the undertaker or in consequence of any act or default of the undertaker (or any person employed or authorised by it) in the course of carrying out such works, including without limitation works carried out by the undertaker under this Part of this Schedule or any subsidence resulting from any of these works, any damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of the authorised development) or property of National Grid, or there is any interruption in any service provided, or in the supply of any goods, by National Grid, or National Grid becomes liable to pay any amount to any third party, the undertaker will—
  • (a) bear and pay on demand the cost reasonably and properly incurred by National Grid in making good such damage or restoring the supply; and
  • (b) indemnify National Grid for any other expenses, loss, demands, proceedings, damages, claims, penalty or costs incurred by or recovered from National Grid, by reason or in consequence of any such damage or interruption or National Grid becoming liable to any third party as aforesaid other than arising from any default of National Grid.
  • (2) The fact that any act or thing may have been done by National Grid on behalf of the undertaker or in accordance with a plan approved by National Grid or in accordance with any requirement of National Grid as a consequence of the authorised development or under its supervision will not (unless sub-paragraph (3) applies), excuse the undertaker from liability under the provisions of sub-paragraph (2) unless National Grid fails to carry out and execute the works properly with due care and attention and in a skilful and workman like manner or in a manner that does not accord with the approved plan.
  • (3) Nothing in sub-paragraph (1) imposes any liability on the undertaker in respect of—
  • (a) any damage or interruption to the extent that it is attributable to the neglect or default of National Grid, its officers, employees, servants, contractors or agents; and
  • (b) any part of the authorised development and/or any other works authorised by this Part of this Schedule carried out by National Grid as an assignee, transferee or lessee of the undertaker with the benefit of this Order pursuant to section 156 of the Planning Act 2008 or article 8 (consent to transfer benefit of the Order) subject to the proviso that once such works become apparatus (“new apparatus”), any authorised development yet to be executed and not falling within this sub-section 3(b) will be subject to the full terms of this Part of this Schedule including this paragraph 26.
  • (4) National Grid must give the undertaker reasonable notice of any third party claim or demand and no settlement, admission of liability, or compromise or demand is to be made without the consent of the undertaker which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
  • (5) National Grid must use its reasonable endeavours to mitigate in whole or in part and to minimise any costs, expenses, loss, demands and penalties to which the indemnity under this paragraph 26 applies where it is within National Grid’s reasonable ability and control to do so and which expressly excludes any obligation to mitigate liability arising from third parties which is outside of National Grid’s control. If requested to do so by the undertaker, National Grid must provide an explanation of how the claim has been minimised or details to substantiate any cost or compensation claimed pursuant to sub-paragraph (1).
  • (6) National Grid must, in respect of any matter covered by the indemnity given by the undertaker in this paragraph, at all times act reasonably and in the same manner as it would as if settling third party claims on its own behalf from its own funds.

Enactments and agreements

27

Save to the extent provided for to the contrary elsewhere in this Part of this Schedule or by agreement in writing between National Grid and the undertaker, nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and National Grid in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.

Co-operation

28
  • (1) Where in consequence of the proposed construction of any part of the authorised development, the undertaker or National Grid requires the removal of apparatus under paragraph 22(2) or National Grid makes requirements for the protection or alteration of apparatus under paragraph 24, the undertaker must use its best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of National Grid’s undertaking and National Grid must use its best endeavours to co-operate with the undertaker for that purpose.
  • (2) For the avoidance of doubt whenever National Grid’s consent, agreement or approval is required in relation to plans, documents or other information submitted by the undertaker or the taking of action by the undertaker, it must not be unreasonably withheld or delayed.

Access

29

If in consequence of the powers granted under this Order the access to any apparatus is materially obstructed, the undertaker must provide such alternative means of access to such apparatus as will enable National Grid to maintain or use the apparatus no less effectively than was possible before such obstruction.

Arbitration

30

Save for differences or disputes arising under paragraphs 22(2), 22(4), 23(1) and 24 any difference or dispute arising between the undertaker and National Grid under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and National Grid, be determined by arbitration in accordance with article 47 (arbitration).

Notices

31

Notwithstanding article 46 (service of notices), any plans submitted to National Grid by the undertaker pursuant to paragraph 24 must be submitted using the LSBUD system or such other address as National Grid may from time to time appoint instead for that purpose and notify to the undertaker in writing.

PART 4 — FOR THE PROTECTION OF NATIONAL GAS TRANSMISSION PLC AS GAS UNDERTAKER

Application

32

For the protection of National Gas as referred to in this Part of this Schedule the following provisions have effect, unless otherwise agreed in writing between the undertaker and National Gas.

Interpretation

33

In this Part of this Schedule—

  • alternative apparatus” means appropriate alternative apparatus to the satisfaction of National Gas to enable National Gas to fulfil its statutory functions in a manner no less efficient than previously;
  • apparatus” means any mains, pipes or other apparatus belonging to or maintained by National Gas for the purposes of gas supply, together with any replacement apparatus and such other apparatus constructed pursuant to the Order that becomes operational apparatus of National Gas for the purposes of transmission, distribution and/or supply and includes any structure in which apparatus is or will be lodged or which gives or will give access to apparatus;
  • authorised development” has the same meaning as in article 2 (interpretation) of this Order and includes any associated development authorised by the Order and (unless otherwise specified) for the purposes of this Part of this Schedule includes the use and maintenance of the authorised development and construction of any works authorised by this Schedule;
  • “commence” and “commencement” has the same meaning as in article 2 (interpretation) of this Order and commencement is construed to have the same meaning save that for the purposes of this Part of this Schedule only the term commence and commencement includes any below ground surveys, monitoring, ground work operations or the receipt and erection of construction plant and equipment within 15 metres of any apparatus;
  • functions” includes powers and duties;
  • ground mitigation scheme” means a scheme approved by National Gas (such approval not to be unreasonably withheld or delayed) setting out the necessary mitigation measures (if any) for a ground subsidence event;
  • ground monitoring scheme” means a scheme for monitoring ground subsidence which sets out the apparatus which is to be subject to such monitoring, the extent of land to be monitored, the manner in which ground levels are to be monitored, the timescales of any monitoring activities and the extent of ground subsidence which, if exceeded, will require the undertaker to submit for National Gas’s approval a ground mitigation scheme;
  • ground subsidence event” means any ground subsidence identified by the monitoring activities set out in the ground monitoring scheme that has exceeded the level described in the ground monitoring scheme as requiring a ground mitigation scheme;
  • “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over, across, along or upon such land;
  • “maintain” and “maintenance” shall include the ability and right to do any of the following in relation to any apparatus or alternative apparatus of National Gas including construct, use, repair, alter, inspect, renew or remove the apparatus;
  • National Gas” means National Gas Transmission plc (Company Number 02006000) whose registered office is at National Grid House, Warwick Technology Park, Gallows Hill, Warwick, CV34 6DA or any successor as a gas transporter within the meaning of Part 1 of the 1986 Act;
  • “plan” or “plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe and assess the works to be executed; and
  • specified works” means any of the authorised development or activities undertaken in association with the authorised development which—will or may be situated over, or within 15 metres measured in any direction of any apparatus the removal of which has not been required by the undertaker under paragraph 37(2) or otherwise;may in any way adversely affect any apparatus the removal of which has not been required by the undertaker under paragraph 37(2) or otherwise; and/orincludes any of the activities that are referred to in section 8 of T/SP/SSW/22 (National Gas’s policies for safe working in proximity to gas apparatus “Specification for safe working in the vicinity of National Gas, High pressure Gas pipelines and associated installation requirements for third parties”).

On Street Apparatus

34

Except for paragraphs 35 (apparatus of National Gas in streets subject to temporary stopping up), 39 (retained apparatus), 40 (expenses) and 41 (indemnity) of this Schedule which will apply in respect of the exercise of all or any powers under this Order affecting the rights and apparatus of National Gas, the other provisions of this Schedule do not apply to apparatus in respect of which the relations between the undertaker and National Gas are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act.

Apparatus of National Gas in streets subject to temporary stopping up

35

Notwithstanding the temporary stopping up or diversion of any street under the powers of article 13 (temporary stopping up of streets, public rights of way and access land), National Gas will be at liberty at all times to take all necessary access across any such stopped up street and/or to execute and do all such works and things in, upon or under any such street as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the stopping up or diversion was in that street.

Protective works to buildings

36

The undertaker, in the case of the powers conferred by article 19 (protective works to buildings), must exercise those powers so as not to obstruct or render less convenient the access to any apparatus without the written consent of National Gas.

Removal of apparatus

37
  • (1) If, in the exercise of powers conferred by this Order, the undertaker acquires any interest in or possesses temporarily any land in which any apparatus is placed, that apparatus must not be removed under this Part of this Schedule and any right of National Gas to maintain that apparatus in that land must not be extinguished until alternative apparatus has been constructed, and is in operation to the reasonable satisfaction of National Gas in accordance with sub-paragraphs (2) to (5).
  • (2) If, for the purpose of executing any works comprised in the authorised development in, on, under or over any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it must give to National Gas advance written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order National Gas reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), secure any necessary consents for the alternative apparatus and afford to National Gas to its satisfaction (taking into account paragraph 38(1) below) the necessary facilities and rights—
  • (a) for the construction of alternative apparatus in other land of or land secured by the undertaker; and
  • (b) subsequently for the maintenance of that apparatus.
  • (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of or land secured by the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2) in the land in which the alternative apparatus or part of such apparatus is to be constructed, National Gas must, on receipt of a written notice to that effect from the undertaker, take such steps as are reasonable in the circumstances in an endeavour to assist the undertaker to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed save that this obligation must not extend to the requirement for National Gas to use its compulsory purchase powers to this end unless it elects to so do.
  • (4) Any alternative apparatus to be constructed in land of or land secured by the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between National Gas and the undertaker.
  • (5) National Gas must, after the alternative apparatus to be provided or constructed has been agreed, and subject to a written diversion agreement having been entered into between the parties and the grant to National Gas of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.

Facilities and rights for alternative apparatus

38
  • (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to or secures for National Gas facilities and rights in land for the construction, use, maintenance and protection of alternative apparatus in substitution for apparatus to be removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and National Gas and must be no less favourable on the whole to National Gas than the facilities and rights enjoyed by it in respect of the apparatus to be removed unless otherwise agreed by National Gas.
  • (2) If the facilities and rights to be afforded by the undertaker and agreed with National Gas under sub-paragraph (1) above in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are less favourable on the whole to National Gas than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject the matter will be referred to arbitration in accordance with paragraph 45 (arbitration) of this Part of this Schedule and the arbitrator may make such provision for the payment of compensation by the undertaker to National Gas as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.

Retained apparatus

39
  • (1) Not less than 56 days before the commencement of any specified works the undertaker must submit to National Gas a plan and, if reasonably required by National Gas, a ground monitoring scheme in respect of those works.
  • (2) The plan to be submitted to National Gas under sub-paragraph (1) must include a method statement and describe—
  • (a) the exact position of the works;
  • (b) the level at which these are proposed to be constructed or renewed;
  • (c) the manner of their construction or renewal including details of excavation, positioning of plant etc;
  • (d) the position of all apparatus;
  • (e) by way of detailed drawings, every alteration proposed to be made to or close to any such apparatus; and
  • (f) any intended maintenance regimes.
  • (3) The undertaker must not commence any works to which sub-paragraphs (1) and (2) apply until National Gas has given written approval of the plan so submitted.
  • (4) Any approval of National Gas required under sub-paragraph (3)—
  • (a) may be given subject to reasonable conditions for any purpose mentioned in sub-paragraph (5) or (7); and
  • (b) must not be unreasonably withheld.
  • (5) In relation to any work to which sub-paragraphs (1) and/or (2) apply, National Gas may require such modifications to be made to the plans as may be reasonably necessary for the purpose of securing its apparatus against interference or risk of damage for the provision of protective works or for the purpose of providing or securing proper and convenient means of access to any apparatus.
  • (6) Works executed under sub-paragraphs (1) and (2) must be executed in accordance with the plan, submitted under sub-paragraph (2) or as relevant sub-paragraph (5), as approved or as amended from time to time by agreement between the undertaker and National Gas and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (5) or (7) by National Gas for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and National Gas will be entitled to watch and inspect the execution of those works.
  • (7) Where National Gas requires any protective works to be carried out by itself or by the undertaker (whether of a temporary or permanent nature) such protective works, inclusive of any measures or schemes required and approved as part of the plan approved pursuant to this paragraph, must be carried out to National Gas’s satisfaction prior to the commencement of any specified works for which protective works are required and National Gas must give notice of its requirement for such works within 42 days of the date of submission of a plan pursuant to this paragraph (except in an emergency).
  • (8) If National Gas in accordance with sub-paragraph (4) or (6) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 32 to 34, 37 and 38 apply as if the removal of the apparatus had been required by the undertaker under paragraph 37(2).
  • (9) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 56 days before commencing the execution of the specified works, a new plan, instead of the plan previously submitted, and having done so the provisions of this paragraph will apply to and in respect of the new plan.
  • (10) The undertaker will not be required to comply with sub-paragraph (1) where it needs to carry out emergency works as defined in Part 3 of the 1991 Act but in that case it must give to National Gas notice as soon as is reasonably practicable and a plan of those works and must comply with sub-paragraphs (5), (6) and (7) insofar as is reasonably practicable in the circumstances and comply with sub-paragraph (10) at all times;
  • (11) At all times when carrying out any works authorised under the Order National Gas must comply with National Gas’s policies for safe working in proximity to gas apparatus “Specification for safe working in the vicinity of National Gas, High pressure Gas pipelines and associated installation requirements for third parties T/SP/SSW22” and HSE’s “HS(~G)47 Avoiding Danger from underground services”.
  • (12) As soon as reasonably practicable after any ground subsidence event attributable to the authorised development the undertaker shall implement an appropriate ground mitigation scheme save that National Gas retains the right to carry out any further necessary protective works for the safeguarding of its apparatus and can recover any such costs in line with paragraph 40.

Expenses

40
  • (1) Save where otherwise agreed in writing between National Gas and the undertaker and subject to the following provisions of this paragraph, the undertaker must pay to National Gas on demand all charges, costs and expenses reasonably and properly incurred by National Gas in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of any apparatus or the construction of any new or alternative apparatus which may be required in consequence of the execution of any authorised development including without limitation—
  • (a) any costs reasonably incurred by or compensation properly paid by National Gas in connection with the acquisition of rights or the exercise of statutory powers for such apparatus including without limitation all costs incurred by National Gas as a consequence of National Gas—
  • (i) using its own compulsory purchase powers to acquire any necessary rights under paragraph 37(3); or
  • (ii) exercising any compulsory purchase powers in the Order transferred to or benefitting National Gas;
  • (b) in connection with the cost of the carrying out of any diversion work or the provision of any alternative apparatus, where no written diversion agreement is otherwise in place;
  • (c) the cutting off of any apparatus from any other apparatus or the making safe of redundant apparatus;
  • (d) the approval of plans;
  • (e) the carrying out of protective works, plus a capitalised sum to cover the cost of maintaining and renewing permanent protective works;
  • (f) the survey of any land, apparatus or works, the inspection and monitoring of works or the installation or removal of any temporary works reasonably necessary in consequence of the execution of any such works referred to in this Part of this Schedule.
  • (2) There will be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule and which is not re-used as part of the alternative apparatus, that value being calculated after removal.
  • (3) If in accordance with the provisions of this Part of this Schedule—
  • (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
  • (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with paragraph 45 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to National Gas by virtue of sub-paragraph (1) will be reduced by the amount of that excess save to the extent that it is not possible in the circumstances to obtain the existing type of apparatus at the same capacity and dimensions or place at the existing depth in which case full costs will be borne by the undertaker.

  • (4) For the purposes of sub-paragraph (3)—
  • (a) an extension of apparatus to a length greater than the length of existing apparatus will not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
  • (b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole will be treated as if it also had been agreed or had been so determined.
  • (5) Any amount which apart from this sub-paragraph would be payable to National Gas in respect of works by virtue of sub-paragraph (1) will, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on National Gas any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.

Indemnity

41
  • (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any works authorised by this Part of this Schedule or in consequence of the construction, use, maintenance or failure of any of the authorised development by or on behalf of the undertaker or in consequence of any act or default of the undertaker (or any person employed or authorised by it) in the course of carrying out such works, including without limitation works carried out by the undertaker under this Part of this Schedule or any subsidence resulting from any of these works, any damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of the authorised development) or property of National Gas, or there is any interruption in any service provided, or in the supply of any goods, by National Gas, or National Gas becomes liable to pay any amount to any third party, the undertaker will—
  • (a) bear and pay on demand the cost reasonably and properly incurred by National Gas in making good such damage or restoring the supply; and
  • (b) indemnify National Gas for any other expenses, loss, demands, proceedings, damages, claims, penalty or costs incurred by or recovered from National Gas, by reason or in consequence of any such damage or interruption or National Gas becoming liable to any third party other than arising from any default of National Gas.
  • (2) The fact that any act or thing may have been done by National Gas on behalf of the undertaker or in accordance with a plan approved by National Gas or in accordance with any requirement of National Gas as a consequence of the authorised development or under its supervision will not (unless sub-paragraph (3) applies), excuse the undertaker from liability under the provisions of this sub-paragraph (2) unless National Gas fails to carry out and execute the works properly with due care and attention and in a skilful and workman like manner or in a manner that does not accord with the approved plan.
  • (3) Nothing in sub-paragraph (1) imposes any liability on the undertaker in respect of—
  • (a) any damage or interruption to the extent that it is attributable to the neglect or default of National Gas, its officers, employees, servants, contractors or agents; and
  • (b) any part of the authorised development and/or any other works authorised by this Part of this Schedule carried out by National Gas as an assignee, transferee or lessee of the undertaker with the benefit of this Order pursuant to section 156 of the Planning Act 2008 or article 8 (consent to transfer benefit of the Order) subject to the proviso that once such works become apparatus (“new apparatus”), any authorised development yet to be executed and not falling within this sub-section 3(b) will be subject to the full terms of this Part of this Schedule including this paragraph 41.
  • (4) National Gas must give the undertaker reasonable notice of any such third party claim or demand and no settlement, admission of liability, compromise or demand is to be made without the consent of the undertaker which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
  • (5) National Gas must use its reasonable endeavours to mitigate in whole or in part and to minimise any costs, expenses, loss, demands and penalties to which the indemnity under this paragraph 41 applies where it is within National Gas’s reasonable ability and control to do so and which expressly excludes any obligation to mitigate liability arising from third parties which is outside of National Gas’s control. If requested to do so by the undertaker, National Gas must provide an explanation of how the claim has been minimised or details to substantiate any cost or compensation claimed pursuant to sub-paragraph (1).
  • (6) National Gas must, in respect of any matter covered by the indemnity given by the undertaker in this paragraph, at all times act reasonably and in the same manner as it would as if settling third party claims on its own behalf from its own funds.

Enactments and agreements

42

Save to the extent provided for to the contrary elsewhere in this Part of this Schedule or by agreement in writing between National Gas and the undertaker, nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and National Gas in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.

Co-operation

43
  • (1) Where in consequence of the proposed construction of any part of the authorised development, the undertaker or National Gas requires the removal of apparatus under paragraph 37(2) or National Gas makes requirements for the protection or alteration of apparatus under paragraph 39, the undertaker must use its best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of National Gas’s undertaking and National Gas must use its best endeavours to co-operate with the undertaker for that purpose.
  • (2) For the avoidance of doubt whenever National Gas’s consent, agreement or approval is required in relation to plans, documents or other information submitted by the undertaker or the taking of action by the undertaker, it must not be unreasonably withheld or delayed.

Access

44

If in consequence of the powers granted under this Order the access to any apparatus is materially obstructed, the undertaker must provide such alternative means of access to such apparatus as will enable National Gas to maintain or use the apparatus no less effectively than was possible before such obstruction.

Arbitration

45

Save for differences or disputes arising under paragraphs 37(2), 37(4), 38(1) and 39 any difference or dispute arising between the undertaker and National Gas under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and National Gas, be determined by arbitration in accordance with article 47 (arbitration).

Notices

46

Notwithstanding article 46 (service of notices), any plans submitted to National Gas by the undertaker pursuant to paragraph 39 must be submitted using the LSBUD system or such other address as National Gas may from time to time appoint instead for that purpose and notify to the undertaker in writing.

PART 5 — FOR THE PROTECTION OF AIR PRODUCTS PLC

47

For the protection of Air Products the following provisions have effect, unless otherwise agreed in writing between the undertaker and Air Products.

48

In this Part—

  • Air Products” means Air Products Public Limited Company (company number 00103881) whose registered address is Hersham Place Technology Park, Molesey Road, Walton On Thames, Surrey KT12 4RZ;
  • alternative apparatus” means alternative apparatus adequate to enable Air Products to fulfil its contractual obligations in a manner not less efficient than previously;
  • apparatus” means any mains, pipes or other apparatus belonging to or maintained by Air Products for the purposes of gas supply; and
  • “in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land.

Precedence of the 1991 Act in respect of apparatus in streets

49

This Part does not apply to apparatus in respect of which the relations between the undertaker and Air Products are regulated by the provisions of Part 3 (Street works in England and Wales) of the 1991 Act.

50

Regardless of the temporary prohibition or restriction of use of streets under the powers conferred by article 13 (temporary stopping up of streets, public rights of way and access land), Air Products is at liberty at all times to take all necessary access across any such street and to execute and do all such works and things in, upon or under any such street as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the prohibition or restriction was in that street.

No acquisition etc. except by agreement

51

Regardless of any provision in this Order or anything shown on the land plans, the undertaker must not acquire any apparatus otherwise than by agreement.

Removal of apparatus

52
  • (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or over which access to any apparatus is enjoyed or requires that Air Products’ apparatus is relocated or diverted, that apparatus must not be removed under this Part, and any right of Air Products to maintain that apparatus in that land and to gain access to it must not be extinguished, until alternative apparatus has been constructed and is in operation, and access to it has been provided, to the reasonable satisfaction of Air Products in accordance with sub-paragraphs (2) to (7).
  • (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, the undertaker must give to Air Products written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order Air Products reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to Air Products the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus.
  • (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2), in the land in which the alternative apparatus or part of such apparatus is to be constructed, Air Products must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably possible use reasonable endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.
  • (4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between Air Products and the undertaker or in default of agreement settled by arbitration in accordance with article 47 (arbitration).
  • (5) Air Products must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 47 (arbitration), and after the grant to Air Products of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part.
  • (6) Regardless of anything in sub-paragraph (5), if the undertaker gives notice in writing to Air Products that it desires itself to execute any work, or part of any work, in connection with the construction or removal of apparatus in any land controlled by the undertaker, that work, instead of being executed by Air Products, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of Air Products.
  • (7) Nothing in sub-paragraph (6) authorises the undertaker to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 300 millimetres of the apparatus.

Facilities and rights for alternative apparatus

53
  • (1) Where, in accordance with the provisions of this Part, the undertaker affords to Air Products facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and Air Products or in default of agreement settled by arbitration in accordance with article 47 (arbitration).
  • (2) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to Air Products than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to Air Products as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.

Retained Apparatus

54
  • (1) Not less than 28 days before starting the execution of any works in, on or under any land purchased, held, appropriated or used under this Order that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 52(2), the undertaker must submit to Air Products a plan, section and description of the works to be executed.
  • (2) Those works must be executed only in accordance with the plan, section and description submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by Air Products for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and Air Products is entitled to watch and inspect the execution of those works.
  • (3) Any requirements made by Air Products under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which a plan, section and description under sub-paragraph (1) are submitted to it.
  • (4) If Air Products in accordance with sub-paragraph (1) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 47 to 53 apply as if the removal of the apparatus had been required by the undertaker under paragraph 52(2).
  • (5) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan, section and description instead of the plan, section and description previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan, section and description.
  • (6) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency but in that case it must give to Air Products notice as soon as is reasonably practicable and a plan, section and description of those works as soon as reasonably practicable subsequently and must comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances.

Expenses and costs

55
  • (1) Subject to the following provisions of this paragraph, the undertaker must repay to Air Products the reasonable expenses incurred by it in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in paragraph 52(2).
  • (2) There is to be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part, that value being calculated after removal.
  • (3) If in accordance with the provisions of this Part—
  • (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
  • (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was, and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 47 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to Air Products by virtue of sub-paragraph (1) is to be reduced by the amount of that excess.
  • (4) For the purposes of sub-paragraph (3)—
  • (a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus where such extension is required in consequence of the execution of any such works as are referred to in paragraph 52(2); and
  • (b) where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.
  • (5) An amount which apart from this sub-paragraph would be payable to Air Products in respect of works by virtue of sub-paragraph (1), if the works include the placing of apparatus provided in substitution for apparatus placed more than seven years and six months earlier so as to confer on Air Products any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, is to be reduced by the amount which represents that benefit.
56
  • (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any of the works referred to in paragraph 52(2), any damage is caused to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of Air Products, or there is any interruption in any service provided, or in the supply of any goods, by Air Products, the undertaker must—
  • (a) bear and pay the cost reasonably incurred by Air Products in making good such damage or restoring the supply; and
  • (b) make reasonable compensation to Air Products for any other expenses, loss, damages, penalty or costs incurred by Air Products, by reason or in consequence of any such damage or interruption.
  • (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of Air Products, its officers, employees, servants, contractors or agents.
  • (3) Air Products must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of the undertaker which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
  • (4) Air Products must use its reasonable endeavours to mitigate in whole or in part and to minimise any costs, expenses, loss, demands, and penalties to which the indemnity under this paragraph 56 applies. If requested to do so by the undertaker, Air Products must provide an explanation of how the claim has been minimised or details to substantiate any cost or compensation claimed pursuant to sub-paragraph (1). The undertaker shall only be liable under this paragraph 56 for claims reasonably incurred by Air Products.

Enactments and agreements

57

Nothing in this Part affects the provisions of any enactment or agreement regulating the relations between the undertaker and Air Products in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.

PART 6 — FOR THE PROTECTION OF CATS NORTH SEA LIMITED

58

For the protection of CATS, the following provisions have effect, unless otherwise agreed in writing between the undertaker and CATS.

59

In this Part of this Schedule—

  • CATS” means CATS North Sea Limited (Company number 09250798) whose registered address is Suite 1, 7th Floor, 50 Broadway, London, United Kingdom, SW1H 0BL and any successor in title or function to the CATS pipelines;
  • CATS pipeline(s)” means the following pipelines, owned by CATS and operated by Wood UK Ltd—The 36″ CATS pipeline (PL-774) transporting high pressure natural gas 411.84km (404km subsea, 7.84km onshore) from the CATS Riser Platform, located in the Central Graben Development of the North Sea, to processing facilities at the CATS Terminal in Teesside;Onshore 6″ Condensate export pipeline (PL-937) transporting natural gas condensate 2.87km from the CATS Terminal to Sabic, North Tees plant;Onshore 6″ Condensate export pipeline (PL-938) transporting natural gas condensate 2.45km from the CATS Terminal to the Navigator Terminals storage site;Onshore 6″ Propane pipeline (CAT-Pipeline-04) transporting Propane 1.09km from the CATS Terminal to ConocoPhillips storage site; and CAT-Pipeline-05 6″ Butane pipeline transporting butane 1.09km from the CATS Terminal to Conoco Phillips storage site;
  • CATS requirements” means the requirements applicable for works undertaken within 50 metres of the CATS pipelines as set out in the—CATS Wayleaves Guidance for Landowners and Third Parties, Doc Number: CAT-PPI-PRC-019;CATS Conditions and Restrictions for Work Activities in Close Proximity to CATS Pipelines, Doc Number: CAT-PPI-PRC-020; andCATS Procedures for the Excavation and Backfill of CATS Pipelines, Doc Number: CAT-PPI-PRC-021,or any updates or amendments thereto as notified to the undertaker in writing; and
  • works details” means—plans and sections;details of the proposed method of working and timing of execution of works;details of vehicle access routes for construction and operational traffic; andany further particulars provided in response to a request under paragraph 60.
60

Before commencing any part of the authorised development within 50 metres of the CATS pipelines, the undertaker must submit to CATS the works details for the proposed works and such further particulars as CATS may, within 28 days from the day on which the works details are submitted under this paragraph, reasonably require in line with the CATS requirements.

61

No works comprising any part of the authorised development within 50 metres of the CATS pipelines are to be commenced until the works details in respect of those works submitted under paragraph 60 have been approved by CATS.

62
  • (1) Any approval of CATS required under paragraph 61 must not be unreasonably withheld or delayed but may be given subject to such reasonable requirements as CATS may require to be made having regard to the CATS requirements.
  • (2) Where CATS consider that the authorised development will adversely affect the safe operation of the CATS pipelines it is entitled to withhold its authorisation until the undertaker can demonstrate to the reasonable satisfaction of CATS that the authorised development will not adversely affect the safe operation of the CATS pipeline.
  • (3) The authorised development must be carried out in accordance with the works details approved under paragraph 61 and any requirements imposed on the approval under sub-paragraph (1).
  • (4) Where there has been a reference to an arbitrator in accordance with paragraph 70 and the arbitrator gives approval for the works details, the authorised development must be carried out in accordance with the approval and conditions contained in the decision of the arbitrator under paragraph 70.
63

Where formal consent is required under the CATS requirements for works within the wayleave of the CATS pipelines (between 3.5 metres to 7.5 metres either side of the pipeline, depending on location), approval given by CATS under paragraph 61 constitutes formal consent for the purposes of the CATS requirements.

Compliance with the CATS requirements

64

In undertaking any works or exercising any rights within 50 metres of the CATS pipelines, the undertaker must comply with such conditions, requirements or regulations as are set out in the CATS requirements.

65

No explosives for blasting are to be used within 400 metres of any part of the CATS pipeline(s) or associated installations, until the details in respect of those works have been submitted to and approved by CATS, such approval not to be unreasonably withheld or delayed and shall be deemed to have been given if no response is received from CATS within 60 days of a request having been made by the undertaker.

Monitoring for damage to pipelines

66
  • (1) When undertaking any works or exercising any rights within 50 metres of the CATS pipelines, the undertaker must monitor the CATS pipelines to establish whether damage has occurred.
  • (2) Where any damage occurs to the CATS pipelines as a result of the works, the undertaker must immediately cease all work in the vicinity of the damage and must notify CATS to enable repairs to be carried out to the reasonable satisfaction of CATS.
  • (3) If damage has occurred to the CATS pipelines as a result of the works the undertaker will, at the request and election of CATS—
  • (a) afford CATS all reasonable facilities to enable it to fully and properly repair and test the CATS pipelines and pay to CATS its costs incurred in doing so including the costs of testing the effectiveness of the repairs and cathodic protection and any further works or testing shown by that testing to be reasonably necessary; or
  • (b) fully and properly repair the affected pipeline as soon as reasonably practicable, in which case the repairs must be properly tested by the undertaker and be shown to the reasonable satisfaction of CATS to have effectively repaired the affected pipeline before any backfilling takes place.
  • (4) Where testing has taken place under sub-paragraph (3)(b), the undertaker must (except where CATS agrees otherwise in writing) provide CATS with a copy of the results of such testing prior to any backfilling.
  • (5) Following the completion of any works within 50 metres of the CATS pipelines if damage is found to have occurred to any of the CATS pipelines as a result of the relevant works, sub-paragraphs (2) to (4) of this paragraph apply to that damage.
  • (6) In the event that the undertaker does not carry out necessary remedial work in a timely manner then CATS is entitled, but not obliged, to undertake the necessary remedial work and recover the cost of doing so from the undertaker.
67
  • (1) If any damage occurs to a CATS pipeline causing a leakage or escape from a pipeline, all work in the vicinity must cease and CATS must be notified immediately.
  • (2) Where there is leakage or escape, the undertaker must immediately—
  • (a) evacuate all personnel from the immediate vicinity of the leak;
  • (b) inform CATS;
  • (c) prevent any approach by the public;
  • (d) shut down any machinery and other sources of ignition within at least 350 metres from the leakage; and
  • (e) assist emergency services as may be requested.

Indemnity

68
  • (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any of the works referred to in paragraph 60, any damage is caused to the CATS Pipelines, or there is any interruption in any service provided, or in the supply of any goods, by CATS, the undertaker must—
  • (a) bear and pay the cost reasonably incurred by CATS in making good such damage or restoring the supply; and
  • (b) make reasonable compensation to CATS for any other expenses, loss, damages, penalty or costs incurred by CATS, by reason or in consequence of any such damage or interruption.
  • (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of CATS, its officers, employees, servants, contractors or agents.
  • (3) CATS must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of the undertaker which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
  • (4) CATS must use its reasonable endeavours to mitigate in whole or in part and to minimise any costs, expenses, loss, demands, and penalties to which the indemnity under this paragraph 68 applies. If requested to do so by the undertaker, CATS must provide an explanation of how the claim has been minimised or details to substantiate any cost or compensation claimed pursuant to sub-paragraph (1). The undertaker shall only be liable under this paragraph 68 for claims reasonably incurred by CATS.

Costs

69
  • (1) Subject to the following provisions of this paragraph, the undertaker must repay to CATS the reasonable expenses incurred by them in, or in connection with, the inspection, removal, alteration or protection of any CATS pipeline which may be required in consequence of the execution of any such works referred to or approved under this Part, including without limitation—
  • (a) authorisation of works details in accordance with paragraphs 60 to 63;
  • (b) the engagement of an engineer and their observation of the authorised works affecting the CATS pipelines and the provision of safety advice in accordance with the CATS requirements; and
  • (c) any reasonable costs incurred by CATS in engaging and retaining such external experts, consultants and contractors as may be reasonably necessary.
  • (2) Prior to incurring any fees, costs, charges or expenses associated with the activities outlined in sub-paragraph (1), CATS must give prior written notice to the undertaker of the activity or activities to be undertaken and an estimate of the fees, costs, charges or expenses to be incurred.
  • (3) Any fees, costs, charges and expenses reasonably incurred by the operating partner of the CATS pipeline (who for the time being is Wood Group UK Limited) shall not be notifiable costs in terms of sub-paragraph (2).

Arbitration

70

Any difference or dispute arising between the undertaker and CATS under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and CATS, be referred to and settled by arbitration in accordance with article 47 (arbitration).

PART 7 — FOR THE PROTECTION OF CF FERTILISERS UK LIMITED

71

For the protection of CF Fertilisers, the following provisions have effect, unless otherwise agreed in writing between the undertaker and CF Fertilisers.

72

In this Part of this Schedule—

  • alternative apparatus” means alternative apparatus adequate to enable CF Fertilisers to undertake its operations on the CF Fertilisers site in a manner not less efficient than previously;
  • apparatus” means any mains, pipes or other apparatus belonging to or maintained by CF Fertilisers;
  • CF Fertilisers” means CF Fertilisers UK Limited (company number 03455690) whose registered address is Head Office Building, Ince, Chester, Cheshire CH2 4LB and any successor in title to the CF Fertilisers site;
  • the CF Fertilisers site” means the land in between Haverton Hill Road and Belasis Avenue, adjacent to the Order limits and which is owned and operated by CF Fertilisers;
  • “in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land;
  • “the proposed CF pipeline” the proposed pipeline to service the CF Fertilisers site and which is to be owned or for the benefit of CF Fertilisers and to be used for the passage of multi-purpose hydrocarbon fuels and all ancillary apparatus including such works and apparatus properly appurtenant to the pipeline as are specified by section 65(2) of the Pipe-lines Act 1962 (meaning of “pipe-line”);
  • the respective authorised developments” means the authorised development and the proposed CF pipeline respectively; and
  • works details” means—plans and sections;details of the proposed method of working and timing of execution of works;details of vehicle access routes for construction and operational traffic; andany further particulars provided in response to a request under paragraph79.

Precedence of the 1991 Act in respect of apparatus in streets

73

This Part does not apply to apparatus in respect of which the relations between the undertaker and CF Fertilisers are regulated by the provisions of Part 3 (Street works in England and Wales) of the 1991 Act.

74

Regardless of the temporary prohibition or restriction of use of streets under the powers conferred by article 13 (temporary stopping up of streets, public rights of way and access land), CF Fertilisers is at liberty at all times to take all necessary access across any such street and to execute and do all such works and things in, upon or under any such street as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the prohibition or restriction was in that street.

Removal of apparatus/access

75
  • (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or over which access to any apparatus is enjoyed or requires that apparatus is relocated or diverted, that apparatus must not be removed under this Part, and any right of CF Fertilisers to maintain that apparatus in that land and to gain access to it must not be extinguished (or otherwise made less advantageous), until alternative apparatus (or alternative rights as the case may be) has been constructed (or granted) and is in operation, and access to it has been provided, to the reasonable satisfaction of CF Fertilisers in accordance with sub-paragraphs (2) to (7).
  • (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, the undertaker must give to CF Fertilisers written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order CF Fertilisers reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to CF Fertilisers the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus.
  • (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2), in the land in which the alternative apparatus or part of such apparatus is to be constructed, CF Fertilisers must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably possible use reasonable endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.
  • (4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between CF Fertilisers and the undertaker or in default of agreement settled by arbitration in accordance with article 47 (arbitration).
  • (5) CF Fertilisers must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 47 (arbitration), and after the grant to CF Fertilisers of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part.
  • (6) Regardless of anything in sub-paragraph (5), if the undertaker gives notice in writing to CF Fertilisers that it desires itself to execute any work, or part of any work, in connection with the construction or removal of apparatus in any land controlled by the undertaker, that work, instead of being executed by CF Fertilisers, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of CF Fertilisers.
  • (7) Nothing in sub-paragraph (6) authorises the undertaker to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 300 millimetres of the apparatus.

Facilities and rights for alternative apparatus

76
  • (1) Where, in accordance with the provisions of this Part, the undertaker affords to CF Fertilisers facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights must be granted—
  • (a) upon such terms and conditions as may be agreed between the undertaker and CF Fertilisers or in default of agreement settled by arbitration in accordance with article 47; and
  • (b) in compliance with all health and safety, environmental and regulatory requirements and relevant industry standards.
  • (2) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to CF Fertilisers than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to CF Fertilisers as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.

Retained Apparatus

77
  • (1) Not less than 28 days before starting the execution of any works comprised in the authorised development that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 76(2), the undertaker must submit to CF Fertilisers the works details for the proposed works and such further particulars as CF Fertilisers may, within 28 days from the day on which the works details are submitted under this paragraph, reasonably require.
  • (2) No works referred to in sub-paragraph (1) are to be commenced until the works details in respect of those works submitted under sub-paragraph (1) have been approved by CF Fertilisers.
  • (3) Any approval of CF Fertilisers required under sub-paragraph (1) must not be unreasonably withheld or delayed but may be given subject to such reasonable requirements as CF Fertilisers may require to be made for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and CF Fertilisers is entitled to watch and inspect the execution of those works.
  • (4) The works referred to in sub-paragraph (1) must be carried out in accordance with the works details approved under sub-paragraph (2) and any requirements imposed on the approval under sub-paragraph (3).
  • (5) Where there has been a reference to an arbitrator in accordance with paragraph 87 and the arbitrator gives approval for the works details, the works referred to in sub-paragraph (1) must be carried out in accordance with the approval and conditions contained in the decision of the arbitrator under paragraph 87.
  • (6) If CF Fertilisers in accordance with sub-paragraph (3) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 1 to 7 apply as if the removal of the apparatus had been required by the undertaker under paragraph 76(2).
  • (7) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan, section and description instead of the plan, section and description previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan, section and description.
  • (8) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency but in that case it must give to CF Fertilisers notice as soon as is reasonably practicable and a plan, section and description of those works as soon as reasonably practicable subsequently and must comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances.
78

Paragraphs 79 to 82 of this Part only apply where prior to the undertaker commencing any part of Work Numbers 2A or 6 CF Fertilisers has begun (but not completed) construction of the proposed CF pipeline anywhere within the Order limits.

79

Before commencing any part of the authorised development which would have an effect on the operation or maintenance of the proposed CF pipeline or access to it, the undertaker must submit to CF Fertilisers the works details for the proposed works and such further particulars as CF Fertilisers may, within 28 days from the day on which the works details are submitted under this paragraph, reasonably require.

80

No works comprising any part of the authorised development which would have an effect on the operation or maintenance of the proposed CF pipeline or access to it are to be commenced until the works details in respect of those works submitted under paragraph ‎79 have been approved by CF Fertilisers.

81

Any approval of CF Fertilisers required under paragraph 80 must not be unreasonably withheld or delayed but may be given subject to such reasonable requirements as CF Fertilisers may require to be made for the routing, construction, safety, operational viability and maintenance of the proposed CF pipeline.

82
  • (1) The authorised development must be carried out in accordance with the works details approved under paragraph 80 and any requirements imposed on the approval under paragraph 81.
  • (2) Where there has been a reference to an arbitrator in accordance with paragraph 87 and the arbitrator gives approval for the works details, the authorised development must be carried out in accordance with the approval and conditions contained in the decision of the arbitrator under paragraph 87.
  • (3) Nothing in paragraphs 79 to 82 precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan, section and description instead of the plan, section and description previously submitted, and having done so the provisions of paragraphs 79 to 84 apply to and in respect of the new plan, section and description.

Notices

83

Any notices to be served on CF Fertilisers in accordance with this Part shall be served in writing on the registered company address and on the General Counsel at CF Fertilisers, Ince, Chester, Cheshire CH2 4LB.

Co-operation

84
  • (1) This paragraph applies insofar as—
  • (a) the construction of the authorised development would have the potential to have an effect on the exercise by CF Fertilisers of its rights in connection with the proposed CF pipeline within the Order limits;
  • (b) the construction of the respective authorised developments may be undertaken within the Order limits concurrently; or
  • (c) the construction of one of the respective authorised developments would have an effect on the operation or maintenance of the other respective authorised development or access to it.
  • (2) Where this paragraph applies the undertaker and CF Fertilisers must—
  • (a) co-operate with each other with a view to ensuring—
  • (i) the compatibility of the respective authorised developments;
  • (ii) the co-ordination of construction programming and the carrying out of the respective authorised developments;
  • (iii) that access for the purposes of constructing the respective authorised developments is maintained for the undertaker, CF Fertilisers and their respective employees, contractors and sub-contractors;
  • (iv) the undertaker and CF Fertilisers have the appropriate risk assessments, method statements (RAMS) and construction design management (CDM) in place and are able to comply with their obligations in this respect; and
  • (v) that operation, maintenance and access to the respective authorised developments is maintained for the undertaker and CF Fertilisers; and
  • (b) use reasonable endeavours to avoid any conflict arising from the carrying out of the respective authorised developments.

Expenses and costs

85
  • (1) Subject to the following provisions of this paragraph, the undertaker must repay to CF Fertilisers the reasonable expenses incurred by it in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in paragraph 76(2).
  • (2) There is to be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part, that value being calculated and agreed after removal.
  • (3) If in accordance with the provisions of this Part—
  • (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
  • (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was, and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 47 (arbitration) to be necessary,

then, if such placing involves cost in the construction of works under this Part exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to CF Fertilisers by virtue of sub-paragraph (1) is to be reduced by the amount of that excess. The provisions of this sub-paragraph (3) shall only apply where the alteration is at the election of CF Fertilisers and not where such change to the existing type, capacity, dimensions or depth is as a result of industry requirements, legislation or environmental or health and safety considerations.

  • (4) For the purposes of sub-paragraph (3)—
  • (a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus where such extension is required in consequence of the execution of any such works as are referred to in paragraph 76(2); and
  • (b) where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.
  • (5) An amount which apart from this sub-paragraph would be payable to CF Fertilisers in respect of works by virtue of sub-paragraph (1), if the works include the placing of apparatus provided in substitution for apparatus placed more than seven years and six months earlier so as to confer on CF Fertilisers any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, is to be reduced by the amount which represents that benefit.
86
  • (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any works authorised by this Part of this Schedule, any damage is caused to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of CF Fertilisers, or there is any interruption in any service provided, or in the supply of any goods, by CF Fertilisers, the undertaker must—
  • (a) bear and pay the cost reasonably incurred by CF Fertilisers in making good such damage or restoring the supply; and
  • (b) make reasonable compensation to CF Fertilisers for any other expenses, loss, damages, penalty or costs incurred by CF Fertilisers, by reason or in consequence of any such damage or interruption.
  • (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of CF Fertilisers, its officers, employees, servants, contractors or agents.
  • (3) CF Fertilisers must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of the undertaker which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand subject to its obligations in sub-paragraph (4).
  • (4) If the Undertaker becomes responsible for a claim or demand pursuant to sub-paragraph (3) it must—
  • (a) keep CF Fertilisers fully informed of the developments and material elements of the proceedings;
  • (b) take account of the views of CF Fertilisers before taking any action in relation to the claim;
  • (c) not bring the name of CF Fertilisers or any related company into disrepute and act in an appropriate and professional manner when disputing any claim; and
  • (d) not pay or settle such claims without the prior written consent of CF Fertilisers, such consent not to be unreasonably withheld or delayed.

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.