(1) Area (2) Street (3) Description of temporary stopping up etc.
In the Borough of Cheshire West and Chester Private roads being Grinsome Road, Perimeter Road and Elton Lane, Ash Road and unnamed road off Ash Road Temporary full width closure to all traffic between the points marked 1-AA on sheet 1a and the points marked 1-A and 1-B and 1-C, 1-CC and 1-D on sheet 1 of the access rights of way plans
In the Borough of Cheshire West and Chester Ince Lane Temporary closure of the verge and reduction in carriageway width with traffic management measures between the points marked 2-G and 2-H on sheet 2 of the access rights of way plans
In the Borough of Cheshire West and Chester A5117 Temporary closure of the verge and reduction in carriageway width with traffic management measures between points marked 2-I and 2-J on sheet 2 of the access and rights of way plans
In the Borough of Cheshire West and Chester Private roads being unnamed road off Pool Lane Temporary full width closure to all traffic between points marked 3-D and 3-E on sheet 3 of the access and rights of way plans
In the Borough of Cheshire West and Chester A5117 Temporary partial width closure to all traffic with traffic management measures between points marked 3-G and 3-H on sheet 3 of the access and rights of way plans
In the Borough of Cheshire West and Chester B5132 (Cryers Lane) Partial width closure to all traffic with traffic management measures between points marked 4-A and 4-B on sheet 4 of the access and rights of way plans
In the Borough of Cheshire West and Chester B5132 (Cryers Lane) Temporary full width closure to all traffic between points marked 4-E and 4-F on sheet 4 of the access and rights of way plans
In the Borough of Cheshire West and Chester Thornton Green Lane Temporary full width closure to all traffic between points marked 5-B and 5-C on sheet 5 of the access and rights of way plans
In the Borough of Cheshire West and Chester Unnamed private track off Halls Green Lane Temporary full width closure to all traffic between points marked 5-I and 5-J on sheet 5 of the access and rights of way plans
In the Borough of Cheshire West and Chester Unnamed private track off Ince Lane Temporary full width closure to all traffic between points marked 5-K and 5-L on sheet 5 of the access and rights of way plans
In the Borough of Cheshire West and Chester Picton Lane Temporary full width closure to all traffic between points marked 6-F and 6-G on sheet 4 of the access and rights of way plans
In the Borough of Cheshire West and Chester Wervin Road Temporary partial width closure to all traffic with traffic management measures between points marked 7-D and 7-E on sheet 7 of the access and rights of way plans
In the Borough of Cheshire West and Chester Picton Lane Temporary full width closure to all traffic between points marked 7-F and 7-G on sheet 7 of the access and rights of way plans
In the Borough of Cheshire West and Chester Caughall Road and Croughton Road Temporary full width closure to all traffic between points marked 8-B and 8-C on sheet 8 of the access and rights of way plans
In the Borough of Cheshire West and Chester Chorlton Lane Temporary full width closure to all traffic between points marked 8-G and 8-H on sheet 8 of the access and rights of way plans
In the Borough of Cheshire West and Chester Unnamed farm track off Stanney Lane Temporary full width closure to all traffic between points marked 8-L and 8-M on sheet 8 of the access and rights of way plans
In the Borough of Cheshire West and Chester Chorlton Road Temporary full width closure to all traffic between points marked 8-N and 8-O on sheet 8 of the access and rights of way plans
In the Borough of Cheshire West and Chester A41 Temporary partial width closure to all traffic with traffic management measures between points marked 9-AA and 9-BB on sheet 9 of the access and rights of way plans
In the Borough of Cheshire West and Chester Station Road Temporary partial width closure to all traffic with traffic management measures between points marked 10-AA and 10-BB on sheet 10 of the access and rights of way plans
In the Borough of Cheshire West and Chester Grove Road Temporary full width closure to all traffic between points marked 10-C and 10-D on sheet 10 of the access and rights of way plans
In the Borough of Cheshire West and Chester Overwood Lane Temporary partial width closure to all traffic with traffic management measures between points marked 10-K and 10-L on sheet 10 of the access and rights of way plans
In the Borough of Cheshire West and Chester Kingswood Lane (Byway Open to all Traffic 263/BY11/1) Temporary full width closure to all traffic between points marked 11-E and 11-F on sheet 11 of the access and rights of way plans
In the County of Flintshire Sealand Road Temporary partial width closure to all traffic with traffic management measures between points marked 12-E and 12-F on sheet 12 of the access and rights of way plans
In the County of Flintshire Deeside Lane Temporary partial width closure to all traffic with traffic management measures between points marked 12-DD on sheet 12 and 13-AA on sheet 13 of the access and rights of way plans
In the County of Flintshire Deeside Lane Temporary full width closure to all traffic between points marked 13-A and 13-AA on sheet 13 of the access and rights of way plans
In the County of Flintshire Sealand Road Temporary partial width closure to all traffic with traffic management measures between points marked 13-E and 13-F on sheet 13 of the access and rights of way plans
In the County of Flintshire Flint Road Temporary closure of the verge and reduction in carriageway width with traffic management measures between points marked 14-A and 14-B on sheet 14 of the access rights of way plans
In the County of Flintshire Unnamed private tracks off Flint Road Temporary full width closure to all traffic between points marked 14-F, 14-G and 14-H on sheet 14 of the access and rights of way plans
In the County of Flintshire Private road off B5129 (Flint Road) Temporary full width closure to all traffic between points marked 14-I and 14-J on sheet 14 of the access and rights of way plans
In the County of Flintshire Unnamed private tracks off Chester Road Temporary full width closure to all traffic between points marked 14-HH on sheet 14 and 15-CC on sheet 15 of the access and rights of way plans
In the County of Flintshire Unnamed private tracks off Chester Road Temporary full width closure to all traffic between points marked 15-A, 15-B and 15-C and 15-D on sheet 15 of the access and rights of way plans
In the County of Flintshire Moor Lane Temporary full width closure to all traffic between points marked 15-I and 15-J on sheet 15 of the access and rights of way plans
In the County of Flintshire Unnamed private road off Chester Road Temporary full width closure to all traffic between points marked 15-K and 15-L on sheet 15 of the access rights of way plans
In the County of Flintshire Chester Road Temporary partial width closure to all traffic with traffic management measures between points marked 16-AA and 16-BB on sheet 16 of the access rights of way plans
In the County of Flintshire Chester Road Temporary partial width closure to all traffic with traffic management measures between points marked 16-BB and 16-CC on sheet 16 of the access rights of way plans
In the County of Flintshire Chester Road Temporary partial width closure to all traffic with traffic management measures between points marked 16-CC and 16-DD on sheet 16 of the access rights of way plans
In the County of Flintshire Unnamed private track off Colliery Lane Temporary full width closure to all traffic between points marked 16-H and 16-I on sheet 16 of the access rights of way plans
In the County of Flintshire Colliery Lane Temporary full width closure to all traffic between points marked 16-J and 16-K on sheet 16 of the access rights of way plans
In the County of Flintshire Private road off Gladstone Way Temporary full width closure to all traffic between points marked 16-M and 16-N on sheet 16 of the access and rights of way plans
In the County of Flintshire Lower Aston Hall Lane Temporary full width closure to all traffic between points marked 17-C and 17-D on sheet 17 of the access rights of way plans
In the County of Flintshire Lower Aston Hall Lane Temporary closure of the verge and reduction in carriageway width with traffic management measures between points marked 17-EE and 17-FF on sheet 17 of the access rights of way plans
In the County of Flintshire Church Lane Temporary suspension of parking between the points marked 17-N and 17-NN, on sheet 17 of the access rights of way plans
In the County of Flintshire Church Lane and unnamed private track off Old Aston Hill Temporary full width closure to all traffic between points marked 17-S on sheet 17 and 18-A on sheet 18 of the access rights of way plans
In the County of Flintshire Shotton Lane Temporary full width closure to all traffic between points marked 18-B and 18-C on sheet 18 of the access rights of way plans
In the County of Flintshire B5125 (Holywell Road) Temporary partial width closure to all traffic with traffic management measures between points marked 18-G and 18-H on sheet 18 of the access and rights of way plans
In the County of Flintshire Holywell Road Temporary partial width closure to all traffic with traffic management measures between points marked 18-KK and 18-JJ on sheet 18 of the access and rights of way plans
In the County of Flintshire Green Lane Temporary full width closure to all traffic between points marked 18-R and 18-Q on sheet 18 of the access and rights of way plans
In the County of Flintshire Pinfold Lane Temporary full width closure to all traffic between points marked 19-A and 19-B on sheet 19 of the access and rights of way plans
In the County of Flintshire Brookside Junction to B5125 Mini Roundabout Temporary full width closure to all traffic between points marked 19-FF and 19-GG on sheet 19 of the access and rights of way plans
In the County of Flintshire Brookside Junction to B5125 Mini Roundabout Temporary full width closure to all traffic between points marked 19-H and 19-I on sheet 19 of the access and rights of way plans
In the County of Flintshire Brookside and Brookside Terrace Temporary full width closure to all traffic between points marked 20-B, and 20-C and 20-CC on sheet 20 of the access and rights of way plans
In the County of Flintshire B5125 (Village Road) Temporary full width closure to all traffic between points marked 20-DD and 20-EE on sheet 20 of the access and rights of way plans
In the County of Flintshire B5125 (Village Road) Temporary full width closure to all traffic] between points marked 20-I and 20-J on sheet 20 of the access and rights of way plans
In the County of Flintshire B5125 (Village Road) Temporary partial width closure to all traffic with traffic management measures between points marked 20-N and 20-O on sheet 20 of the access and rights of way plans
In the County of Flintshire B5125 (Village Road) Temporary full width closure to all traffic between points marked 20-R and 20-S on sheet 20 of the access and rights of way plans
In the County of Flintshire Starkey Lane Temporary full width closure to all traffic between points marked 21-D and 21-E on sheet 21 of the access and rights of way plans
In the County of Flintshire Alt-Goch Lane Temporary partial width closure to all traffic with traffic management measures between points marked 22-K and 22-L on sheet 22 of the access and rights of way plans
In the County of Flintshire Cornist Lane Temporary partial width closure to all traffic with traffic management measures between points marked 25-E and 25-F on sheet 25 of the access rights of way plans
In the County of Flintshire B5121 Temporary partial width closure to all traffic with traffic management measures between points marked 28-C and 28-D on sheet 28 of the access rights of way plans
In the County of Flintshire Racecourse Lane Temporary full width closure to all traffic between points marked 29-C and 29-D on sheet 29 of the access rights of way plans

SCHEDULE 6 — Public rights of way to be temporarily restricted and stopped up

PART 1 — Public rights of way to be temporarily restricted

(1) Area (2) Public right of way (3) Extent of restriction (being closure to all use)
In the Borough of Cheshire West and Chester 123/FP3/1 Between the points marked 2-E and 2-F on sheet 2 of the access and rights of way plans shown with a dashed orange line
In the Borough of Cheshire West and Chester 294/FP2/1 and 123/FPS/1 Between the points marked 4-H and 4-I, and 4-K and 4-J on sheet 4 of the access and rights of way plans shown with a dashed orange line
In the Borough of Cheshire West and Chester 318/FP1/1 Between the points marked 5-G and 5-H on sheet 5 of the access and rights of way plans shown with a dashed orange line
In the Borough of Cheshire West and Chester 309/FP1/2 Between the points marked 6-A and 6-B on sheet 6 of the access and rights of way plans shown with a dashed orange line
In the Borough of Cheshire West and Chester 309/FP3/1 and 241/FP6/2 Between the points marked 6-C and 6-D on sheet 6 of the access and rights of way plans shown with a dashed orange line
In the Borough of Cheshire West and Chester 211/FP4/1 Between the points marked 10-F and 10-G on sheet 10 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Footpath 308/1 and Footpath 307/3 Between the points marked 15-E and 15-F on sheet 15 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Footpath 308/1/10 Between the points marked 15-E and 15-G on sheet 15 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Footpath 308/4 and Footpath 303/44 Between the points marked 15-O and 15-P on sheet 15 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Chester Road Between the points marked 16-AA and 16-DD on sheet 16 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Footpath 303/32 Between the points marked 16-F and 16-G on sheet 16 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Footpath 303/30 Between the points marked 17-AA and 17-BB on sheet 17 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Footpath 303/34 Between the points marked 17-G and 17-H on sheet 17 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Footpath 303/26 Between the points marked 17-J and 17-K on sheet 17 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Footpath 303/25 Between the points marked 17-M and 17-MM on sheet 17 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Footpath 303/22 and Footpath 303/24 Between the points marked 17-P and 17-Q on sheet 17 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Footpath 303/20 Between the points marked 18-I and 18-II on sheet 18 of the access and rights of way plans shown
In the County of Flintshire Footpath 303/143 and Footpath 303/21 Between the points marked 18-J and 18-T, 18-K and 18-L on sheet 18 of the access and rights of way plans shown
In the County of Flintshire Footpath 303/141 Between the points marked 18-M and 18-N on sheet 18 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Footpath 414/39 Between the points marked 19-DD and 19-E on sheet 19 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Footpath 414/4 Between the points marked 20-F and 20-FF on sheet 20 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Footpath 414/2 Between the points marked 20-P on sheet 20 and 21-AA on sheet 21 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Footpath 414/1 Between the points marked 21-A and 21-B on sheet 21 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Footpath 404/70 Between the points marked 22-A and 22-B on sheet 22 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Footpath 404/68 Between the points marked 22-B and 22-C on sheet 22 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Footpath 404/66 Between the points marked 22-I and 22-J on sheet 22 of the access and rights of way plans shown with a dashed orange line
In the County of Flintshire Footpath 404/39 Between the points marked 25-I and 25-J on sheet 25 of the access and rights of way plans shown with a dashed orange

PART 2 — Public rights of way to be stopped up

Area (2) Public right of way (3) Extent of Stopping up (4) Alternative route
In the County of Flintshire Footpath 414/39A Between the points marked 19-D and 19-DD on sheet 19 of the access and rights of way plans shown with a dashed purple line Between the points marked 19-D and 19-DD on sheet 19 of the access and rights of way plans

SCHEDULE 7 — Land of which only temporary possession may be taken

PART 1 — Land of which only temporary possession may be taken

(1) Area (2) Number of plot shown on land plans (3) Purpose for which temporary possession may be taken (4) Relevant part of authorised development
Cheshire and Chester West 1-05 Temporary use as a construction working area and for access (as part of Work No.3) Work Nos 1, 2, 3, 3A, 3B 4 and 5
Cheshire and Chester West 1-06d Temporary use as a construction access (Work No.3A) Work Nos 1, 2, 3, 3A, 3B, 4 and 5
Cheshire and Chester West 1-08 Temporary use as a construction compound and working area (as part of Work No.1A) Work Nos 1, 2, 3, 4 and 5
Cheshire and Chester West 1-16, 1-17 Temporary use as construction access (as part of Work No.3) Work Nos 1, 2, 3, 4 and 5
Cheshire and Chester West 2-02 Temporary use as a construction working area and for access to facilitate construction (as part of Work No.5C) Work Nos 2, 3, 4 and 5
Cheshire and Chester West 2-04 Temporary use as a construction access (as part of Work No.5C) Work Nos 2, 3, 4, 5 and 6
Cheshire and Chester West 2-07 Temporary use as a construction access (as part of Work No.5A) Work Nos 2, 3, 4, 5 and 6
Cheshire and Chester West 2-11, 2-12 Temporary use a construction access (as part of Work No.5B) Work Nos 2, 3, 4, 5 and 6
Cheshire and Chester West 3-01 Temporary use as a construction access (Work No. 6C) Work Nos 4, 5, 6, 7 and 11
Cheshire and Chester West 3-02 Temporary use as a construction compound and working area (as part of Work No. 6B) Work Nos 4, 5, 6, 7, 11, 57A and 57B
Cheshire and Chester West 4-01, 4-02 Temporary use as a construction compound and working area (as part of Work No. 6B) Work Nos 4, 5, 6, 7, 11, 57A and 57B
Cheshire and Chester West 4-03, 4-04 Temporary use for a construction access including visibility splay (as part of Work No. 6D) Work Nos 4, 5, 6, 7, 11, 57A and 57B
Cheshire and Chester West 4-11 Temporary use as a construction access (Work No. 6E) Work Nos 4, 5, 6, 7, 11, 57A and 57B
Cheshire and Chester West 5-03, 5-04 Temporary use as a construction access (as part of Work No 12) Work Nos 11, 12, 13, 14, 57C and 57D
Cheshire and Chester West 5-19, 5-21, 5-24, 5-25, 5-26, 6-11, 6-13 Temporary use for access and peat storage Work Nos 13, 13A, 14, 57E and 57F
Cheshire and Chester West 6-20 Temporary use as a construction compound and working area (as part of Work No. 15A) Work Nos 14, 15 and 16
Cheshire and Chester West 6-21 Temporary use as a construction access (Work No.15B) Work Nos 14, 15 and 16
Cheshire and Chester West 7-02, 7-02a, 7-03b Temporary use as a construction access (Work No.16B) Work No. 16A
Cheshire and Chester West 7-10 Temporary use as a working area (as part of Work No. 17) Work No. 17
Cheshire and Chester West 8-02 Temporary use as a construction working are and access (Work No. 18A) Work Nos. 17, 18, 19, 19A, 20 and 21
Cheshire and Chester West 8-06, 8-08 Temporary use as a construction working area (Work No. 18) Work Nos. 18, 19, 19A, 20 and 21
Cheshire and Chester West 8-09 Temporary use as a construction access, compound and working area (Work Nos.19A and 19B) Work Nos. 17, 18, 19, 19A, 20 and 21
Cheshire and Chester West 8-14 Temporary use as a construction access (Work No. 19C) Work Nos. 20 and 21
Cheshire and Chester West 9-02, 9-05, 9-06, 9-08, 9-11, 9-13 Temporary use as a construction access and working area (as part of Work No. 22) Work Nos. 19, 22, 23, 24 and 57G
Cheshire and Chester West 9-18 Temporary use as a construction access (Work No. 23A) Work Nos. 19, 22, 23 and 24
Cheshire and Chester West 9-20 Temporary use as a construction access and working area (as part of Work No. 23B) Work Nos. 22, 23 and 24
Cheshire and Chester West 9-23 Temporary use as a construction access (as part of Work No.24A) Work Nos. 24 and 25
Cheshire and Chester West 10-04a Temporary possession for traffic management Work No. 25
Cheshire and Chester West 10-14 10-15 Temporary use as a construction access (as part of Work No.25) Work Nos. 25, 26, 27, 28
Cheshire and Chester West 10-17 Temporary use as a construction access (Work No.28A) Work Nos. 25, 26, 26A, 27, 28, 28A, 28B
Cheshire and Chester West 10-19 Temporary use as a construction access and working area (as part of Work Nos.25, 26, 26A and 27 Work Nos. 25, 26, 26A, 27 and 28
Cheshire and Chester West 11-01, 11-02 Temporary use as a construction access (Work No.28A) Work Nos. 25, 26, 26A, 27, 28, 28A, 28B
Flintshire 12-12a, 12-13 Temporary use as a construction compound and working area (as part of Work Nos. 29A and 30A) Work Nos. 28, 29. 29A, 30 and 30A
Flintshire 12-15, 12-16, 12-17 Temporary use as a construction access (Works No.30 and 30A) Work Nos. 28, 29, 29A, 30 and 30A
Flintshire 13-14, 13-16 Temporary use as a construction compound and working area (as part of Work No. 30D) Work Nos. 30 and 31
Flintshire 13-19 Temporary use as a construction access (as part of Work No.30E) Work Nos. 30 and 31
Flintshire 14-01 Temporary use as a construction compound and working area (as part of Work No. 30D) Work Nos. 30 and 31
Flintshire 14-14 Temporary use as a construction compound and working area (as part of Work Nos. 31A and 31B) Work Nos. 30, 31, 32 and 33
Flintshire 14-23, 14-24, 14-25, 14-26, 14-27 Temporary use as a construction access and working area (as part of Work No. 31B) Work Nos. 30, 31, 31A, 32 and 33
Flintshire 14-30a, 15-01a Temporary use as a construction access (as part of Work No.33) Work No. 33
Flintshire 15-02 Temporary use as a construction access and working area (as part of Work No.33) Work Nos.32, 33 and 33A
Flintshire 16-01, 16-06, 16-06a, 16-07, 16-08, 16-09, 16-11 Temporary use as a construction access and working area, and for diversion of public right of way and watercourse (as part of Work No. 34) Work Nos. 33 and 34
Flintshire 16-17 Temporary use as a working area (as part of Work No. 34) Work Nos. 34 and 35
Flintshire 16-28 Temporary use as a construction working area and access (Work No.35) Work Nos. 35, 36, 36A and 37
Flintshire 17-05 Temporary use as a construction access and working area (as part of Work Nos. 35 and 36A) Work Nos. 35, 36, 36A and 37
Flintshire 17-09, 17-10 Temporary use as a construction access (Work No.38A) Work Nos. 35, 36, 36A and 37
Flintshire 17-11 Temporary use as a working area (as part of Work No. 38) Work Nos. 37 and 38
Flintshire 17-16 Temporary use as a construction working area and access (as part of Work No.39B) Work Nos. 38, 39, 40 and 57H
Flintshire 17-31 Temporary use as a construction access (Work No.39A) Work Nos. 39, 40 and 57H
Flintshire 17-35, 17-37, 17-38 Temporary use as a construction access and working area (Work No. 40A) Work Nos. 39, 40 and 57H
Flintshire 18-01 Temporary use as a working area, access and public right of way diversion (as part of Work No. 40B) Work Nos.40, 41 and 57I
Flintshire 18-13 Temporary use as a construction compound, working area and access (as part of Work Nos. 41A and 41B) Work Nos. 40, 41, 42 and 57I
Flintshire 18-16, 18-17 Temporary use as a construction access and visibility splay (as part of Work No.41B) Work Nos. 40, 41, 42 and 57I
Flintshire 19-04c Temporary use as a working area (as part of Work No. 43D) Work Nos. 42, 43, 57J and 57K
Flintshire 20-07 Temporary use as a working area (as part of Work No. 44) Work Nos. 44 and 57L
Flintshire 20-10, 20-10a Temporary use as a construction access (as part of Work No.44B) Work Nos. 44, 44A, 45, 46, 57L and 57M
Flintshire 20-16, 20-17 Temporary use as a construction access (as part of Work No.46) Work Nos. 44, 44A, 45 and 46
Flintshire 20-19b Temporary use as a construction access (as part of Work No.45) Work Nos. 44, 45 and 45B
Flintshire 20-20 Temporary use as a construction compound and working area (as part of Work Nos. 44C and 45A) Work Nos. 44, 44A, 45, 46, 57L and 57M
Flintshire 21-03 Temporary use as a construction access (Work No.47A) Work No. 47
Flintshire 21-07 Temporary use as a construction access (Work No.47B) Work No. 47 and 48
Flintshire 22-02 Temporary use as a working area and access (as part of Work No. 47) Work Nos. 47 and 48
Flintshire 22-04 Temporary use for and to construct an access (Work No.49) Work No. 47, 48 and 49
Flintshire 25-03, 25-07, 25-08, 25-09 Temporary use as a working area (as part of Work Nos. 51a, 51B and 52) Work Nos. 51, 51A and 52
Flintshire 27-02, 28-01 Temporary use as a working area (as part of Work Nos. 53A and 53B) Work Nos. 53, 53A and 54
Flintshire 28-02 Temporary use for and to construct an access (Work No.54) Work Nos. 53, 53A and 54
Flintshire 29-01 Temporary use for and to construct an access (Work No.56) Work Nos. 55, 55A and 56
Flintshire 29-02 Temporary use as a working area (as part of Work No. 55B) Work Nos. 55, 55A and 56
Flintshire 29-06 Temporary use as a working area (as part of Work Nos. 55A and 55B) Work Nos. 55, 55A and 56

PART 2 — Land of which only temporary possession for access may be taken

(1) Area (2) Number of plot shown on land plans (3) Purpose for which temporary possession may be taken (4) Relevant part of authorised development
Cheshire and Chester West 2-06 Temporary use for access (as part of Work No.5A) Work Nos 2, 3, 4, 5 and 6
Cheshire and Chester West 9-24, 9-25 Temporary use as a construction access (as part of Work No.24A) Work Nos. 24 and 25
Flintshire 13-13, 13-15, 13-17, 13-18, 14-02, 14-03 Temporary use as a construction access (as part of Work No.30E) Work Nos. 30, 30D 31, 31A, 32 and 33
Flintshire 17-34 Temporary use for access (as part of Work No.40) Work Nos. 39, 39A, 40, 40A, 41, 57H and 57I
Flintshire 19-06 Temporary use as a construction access (as Work No.43C) Work Nos. 42, 43, 44, 57J and 57K

SCHEDULE 8 — Land in which only new rights etc., may be acquired

(1) Number of plot shown on land plans (2) Purpose for which rights may be acquired
1-01 1-01a 1-02 1-03 1-04 1-06 1-06a 1-06b 1-06c 1a-01 1a-02 1a-03 1a-04 12-21 13-01 13-02 13-03 13-04 13-05 13-06 13-10 13-11 14-21 14-22 1. Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised development to— (a) pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of laying down, installing, adjusting, altering, constructing, using, maintaining, repairing, renewing, inspecting, removing and replacing the authorised development, the inspection, testing, maintenance, renewal, upgrading, replacement and removal of the pipeline and connection into any adjacent pipeline and associated works, to take plant and equipment on to adjoining land; (b) make such investigations in or on the Land which is ancillary for the purposes of exercise of the rights; (c) use, maintain and improve a means of access including visibility splays, and retain, maintain, repair, alter, upgrade and use existing access routes for the purposes of accessing the Land, adjoining land and highway; (d) install, alter, re-lay, maintain, protect, adjust, operate or remove pipes, cables or conduits or apparatus including but not limited to electricity poles, electricity pylons, electricity masts, overhead electricity lines, telecommunications cables and any ancillary equipment and apparatus, public and private drains, watercourses, sewers, ponds or culverts, service media (including the pipes, cables or conduits or apparatus of statutory undertakers and pipes, cables or conduits or apparatus to serve the authorised development); (e) construct, lay down, use and remove temporary access roads or road surfacing including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram, temporary bridging, culverting or diversion of water courses and drains during any period during which construction, maintenance, repair or renewal of any drainage work is being carried out; (f) install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation works for environmental or ecological mitigation or enhancement works, including temporary barriers for the protection of fauna; and (g) carry out such works (together with associated fencing) required by a planning permission and/or consent now or to be granted over the Land in accordance with any necessary licences relating to protected species and/or wildlife. 2. A restrictive covenant over the Land for the benefit of the remainder of the Order land to prevent anything being done which may interfere with free flow and passage of carbon dioxide along the pipeline or telecommunications through the cables ancillary to the pipeline, or support for the authorised development.
3-04 3-05 3-06 3-07 3-08 3-09 3-10 1. Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised development to— (h) pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of laying down, installing, adjusting, altering, constructing, using, maintaining, repairing, renewing, inspecting, removing and replacing the authorised development, the inspection, testing, maintenance, renewal, upgrading, replacement and removal of the pipeline and connection into any adjacent pipeline and associated works, to take plant and equipment on to adjoining land; (i) make such investigations in or on the Land which is ancillary for the purposes of exercise of the rights; (j) maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the Land, adjoining land and highway; (k) install, alter, re-lay, maintain, protect, adjust, operate or remove pipes, cables or conduits or apparatus including but not limited to electricity poles, electricity pylons, electricity masts, overhead electricity lines, telecommunications cables and any ancillary equipment and apparatus, public and private drains, connections to watercourses, sewers, ponds or culverts, service media (including the pipes, cables or conduits or apparatus of statutory undertakers and pipes, cables or conduits or apparatus to serve the authorised development); (l) remove and discharge water from the Land and to install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve sewers, drains, pipes, ducts, mains, conduits, flues and to drain into and manage waterflows in any drains, watercourses and culverts, to lay down, install, adjust, alter, construct, create, use, maintain, repair, renew, upgrade, inspect, remove and replace a drainage scheme on the Land (the “drainage works”); (m) inspect, use mechanical excavation (including directional drilling and/or digging), reinstate, remove, move or alter such part or parts of any drainage system on the Land for the purposes of the drainage works (including connecting the drainage works to any land drain as at the date of the drainage works); (n) place and use plant, machinery, structures and temporary structures within the Land, and to erect temporary signage and provide measures for the benefit of public and personnel safety for the purposes of the drainage works; (o) make such investigations in or on the Land as required for the purposes of the drainage works; (p) use or resort to trenchless installation techniques including (but not limited to) directional drilling in connection with the drainage works; (q) erect fencing, gates, walls, barriers or other means of enclosure, and create secure works areas or compounds including temporary trenchless installation technique compounds and working areas for the purposes of the drainage works; (r) construct, lay down, use and remove temporary access roads including any necessary hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram, temporary bridging, culverting or diversion of water courses and drains during any period during which construction, maintenance, repair or renewal of any drainage work is being carried out; (s) fell, lop or cut, coppice wood, uproot trees or hedges or shrubs which now or hereafter may be standing on the Land or other land which would if not felled, lopped, cut or removed obstruct or interfere with the drainage works; (t) retain, repair, improve, renew, remove, relocate and plant trees, shrubs, and hedgerows, to effect landscaping works and other environmental and ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping; (u) install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation works for environmental or ecological mitigation or enhancement works, including temporary works for noise alleviation measures and the installation of temporary barriers for the protection of fauna; and (v) carry out such works (together with associated fencing) required by a planning permission and/or consent now or to be granted over the Land in accordance with any necessary licences relating to protected species and/or wildlife. 2. A restrictive covenant over the Land for the benefit of the remainder of the Order land to: (w) prevent any activity being undertaken on the Land which would interfere with the vertical or lateral support of the Pipeline; (x) prevent anything being done which may interfere with free flow and passage of carbon dioxide along the pipeline or telecommunications through the cables ancillary to the pipeline, or support for the authorised development; (y) prevent, without the written consent of the undertaker, the carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised development; and (z) prevent any activity which would in the reasonable opinion of the undertaker result in the disturbance of the drainage works, ecological mitigation areas or areas of habitat creation including any ploughing or grazing without the prior written consent of the undertaker.
1-21 2-02a 2-04a 5-08 6-27 7-02b 7-03 7-03a 11-07 12-04 12-06 14-11 14-14a 14-20 15-02a 15-09 15-10 15-14 16-28a 16-29 16-30 17-17 17-18 17-19 20-09 1.Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised development to— (aa) pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of laying down, installing, adjusting, altering, constructing, using, maintaining, repairing, renewing, inspecting, removing and replacing the authorised development, the inspection, testing, maintenance, renewal, upgrading, replacement and removal of the pipeline and connection into any adjacent pipeline and associated works, to take plant and equipment on to adjoining land; (bb) make such investigations in or on the Land which is ancillary for the purposes of exercise of the rights; (cc) maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the Land, adjoining land and highway; effect access to the highway including to construct, use, maintain and improve a permanent means of access including visibility splays, and retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the Land, adjoining land and highway; (dd) install, alter, re-lay, maintain, protect, adjust, operate or remove pipes, cables or conduits or apparatus including but not limited to electricity poles, electricity pylons, electricity masts, overhead electricity lines, telecommunications cables and any ancillary equipment and apparatus public and private drains, watercourses, sewers, ponds or culverts, service media (including the pipes, cables or conduits or apparatus of statutory undertakers and pipes, cables or conduits or apparatus to serve the authorised development); (ee) remove and discharge water from the Land and to install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve sewers, drains, pipes, ducts, mains, conduits, flues and to drain into and manage waterflows in any drains, watercourses and culverts, to lay down, install, adjust, alter, construct, create, use, maintain, repair, renew, upgrade, inspect, remove and replace a drainage scheme on the Land (the “drainage works”); (ff) inspect, use mechanical excavation (including directional drilling and/or digging), reinstate, remove, move or alter such part or parts of any drainage system on the Land for the purposes of the drainage works (including connecting the drainage works to any land drain as at the date of the drainage works); (gg) place and use plant, machinery, structures and temporary structures within the Land, and to erect temporary signage and provide measures for the benefit of public and personnel safety for the purposes of the drainage works; (hh) make such investigations in or on the Land as required for the purposes of the drainage works; (ii) use or resort to trenchless installation techniques including (but not limited to) directional drilling in connection with the drainage works; (jj) erect fencing, gates, walls, barriers or other means of enclosure, and create secure works areas or compounds including temporary trenchless installation technique compounds and working areas for the purposes of the drainage works; (kk) construct, lay down, use and remove temporary access roads including any necessary hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram, temporary bridging, culverting or diversion of water courses and drains during any period during which construction, maintenance, repair or renewal of any drainage work is being carried out; (ll) fell, lop or cut, coppice wood, uproot trees or hedges or shrubs which now or hereafter may be standing on the Land or other land which would if not felled, lopped, cut or removed obstruct or interfere with the drainage works; (mm) install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding, to effect landscaping works and other environmental and ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping; (nn) install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation works for environmental or ecological mitigation or enhancement works, including temporary works for noise alleviation measures and the installation of temporary barriers for the protection of fauna; and (oo) carry out such works (together with associated fencing) required by a planning permission and/or consent now or to be granted over the Land in accordance with any necessary licences relating to protected species and/or wildlife. 2. A restrictive covenant over the Land for the benefit of the remainder of the Order land to: (pp) prevent any activity being undertaken on the Land which would interfere with the vertical or lateral support of the Pipeline; (qq) prevent anything being done which may interfere with free flow and passage of carbon dioxide along the pipeline or telecommunications through the cables ancillary to the pipeline, or support for the authorised development; (rr) prevent carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised development; and (ss) prevent any activity which would in the reasonable opinion of the undertaker result in the disturbance of the drainage works, ecological mitigation areas or areas of habitat creation including any ploughing or grazing without the prior written consent of the undertaker.
6-07 6-08 6-09 1. Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised development to— (tt) pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of laying down, installing, adjusting, altering, constructing, using, maintaining, repairing, renewing, inspecting, removing and replacing the authorised development, the inspection, testing, maintenance, renewal, upgrading, replacement and removal of the pipeline and connection into any adjacent pipeline and associated works, to take plant and equipment on to adjoining land; (uu) make such investigations in or on the Land which is ancillary for the purposes of exercise of the rights; (vv) maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the Land, adjoining land and highway; effect access to the highway including to construct, use, maintain and improve a permanent means of access including visibility splays, and retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the Land, adjoining land and highway; (ww) place and use plant, machinery, structures and temporary structures within the Land, and to erect temporary signage and provide measures for the benefit of public and personnel safety for the purposes of the drainage works; (xx) erect fencing, gates, walls, barriers or other means of enclosure, and create secure works areas or compounds including temporary trenchless installation technique compounds and working areas for the purposes of the drainage works; (yy) construct, lay down, use and remove temporary access roads including any necessary hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram, temporary bridging, culverting or diversion of water courses and drains during any period during which construction, maintenance, repair or renewal of any drainage work is being carried out; (zz) fell, lop or cut, coppice wood, uproot trees or hedges or shrubs which now or hereafter may be standing on the Land or other land which would if not felled, lopped, cut or removed obstruct or interfere with the drainage works; (aaa) remove and relocate trees, shrubs, hedgerows,; (bbb) install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation works for environmental or ecological mitigation or enhancement works, including temporary works for noise alleviation measures and the installation of temporary barriers for the protection of fauna; and (ccc) carry out such works (together with associated fencing) required by a planning permission and/or consent now or to be granted over the Land in accordance with any necessary licences relating to protected species and/or wildlife. 2. A restrictive covenant over the Land for the benefit of the remainder of the Order land to prevent anything being done which may interfere with free flow and passage of carbon dioxide along the pipeline or telecommunications through the cables ancillary to the pipeline, or support for the authorised development.
28-03 1. Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised development to— (ddd) pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of laying down, installing, adjusting, altering, constructing, using, maintaining, repairing, renewing, inspecting, removing and replacing the authorised development, the inspection, testing, maintenance, renewal, upgrading, replacement and removal of the pipeline and connection into any adjacent pipeline and associated works, to take plant and equipment on to adjoining land; (eee) make such investigations in or on the Land which is ancillary for the purposes of exercise of the rights; (fff) place and use plant, machinery, structures and temporary structures within the Land, and to erect temporary signage and provide measures for the benefit of public and personnel safety for the purposes of the drainage works; (ggg) erect fencing, gates, walls, barriers or other means of enclosure, and create secure works areas or compounds including temporary trenchless installation technique compounds and working areas for the purposes of the drainage works; (hhh) install, alter, re-lay, maintain, protect, adjust, operate or remove pipes, cables or conduits or apparatus including but not limited to electricity poles, electricity pylons, electricity masts, overhead electricity lines, telecommunications cables and any ancillary equipment and apparatus public and private drains, watercourses, sewers, ponds or culverts, service media (including the pipes, cables or conduits or apparatus of statutory undertakers and pipes, cables or conduits or apparatus to serve the authorised development); (iii) construct, lay down, use and remove temporary access roads including any necessary hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram, temporary bridging, culverting or diversion of water courses and drains during any period during which construction, maintenance, repair or renewal of any drainage work is being carried out; (jjj) install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding, to effect landscaping works and other environmental and ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping; (kkk) install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation works for environmental or ecological mitigation or enhancement works, including temporary works for noise alleviation measures and the installation of temporary barriers for the protection of fauna; and (lll) carry out such works (together with associated fencing) required by a planning permission and/or consent now or to be granted over the Land in accordance with any necessary licences relating to protected species and/or wildlife. 2. A restrictive covenant over the Land for the benefit of the remainder of the Order land to: (mmm) prevent any activity being undertaken on the Land which would interfere with the vertical or lateral support of the Pipeline; (nnn) prevent anything being done which may interfere with free flow and passage of carbon dioxide along the pipeline or telecommunications through the cables ancillary to the pipeline, or support for the authorised development; (ooo) prevent carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised development; and (ppp) prevent any activity which would in the reasonable opinion of the undertaker result in the disturbance of the ecological or environmental mitigation areas without the prior written consent of the undertaker.
9-04 16-03a 1. Rights for the purposes of the construction, installation, operation, maintenance and decommissioning of the authorised development to pass and re-pass with or without vehicles, plant, machinery, apparatus, equipment and materials for the purposes of surveying or investigating the land. 2. A restrictive covenant over the Land for the benefit of the remainder of the Order land to: (qqq) prevent any activity being undertaken on the Land which would interfere with the vertical or lateral support of the Pipeline; (rrr) prevent anything being done which may interfere with free flow and passage of carbon dioxide along the pipeline or telecommunications through the cables ancillary to the pipeline, or support for the authorised development; and (sss) prevent carrying out operations or actions (including but not limited to blasting and piling) which may obstruct, interrupt, or interfere with the exercise of the rights or damage the authorised development.

SCHEDULE 9 — Modification of compensation and compulsory purchase enactments for creation of new rights

Compensation enactments

1

The enactments for the time being in force with respect to compensation for the compulsory purchase of land apply, with the necessary modifications as respects compensation, in the case of a compulsory acquisition under this Order of a right by the creation of a new right or imposition of a restrictive covenant as they apply as respects compensation for the compulsory purchase of land and interests in land.

2

  • (1) Without limitation on the scope of paragraph 1, the 1961 Act has effect subject to the following modification-
  • (2) For section 5A (5A) (relevant valuation date) of the 1961 Act substitute—
  • (a) (5A)If—
  • (i) the acquiring authority enters on land for the purposes of exercising a right in pursuance of a notice of entry under section 11(1) of the Compulsory Purchase Act 1965 (as modified by paragraph 5(5) of Schedule 9 to the HyNet Carbon Dioxide Pipeline Order 2024).
  • (ii) the acquiring authority is subsequently required by a determination under paragraph 12 of Schedule 2A to the Compulsory Purchase Act 1965 (as substituted by paragraph 4(8) of Schedule 9 to the HyNet Carbon Dioxide Pipeline Order 2024) to acquire an interest in the land; and
  • (iii) the acquiring authority enters on and takes possession of that land, the authority is deemed for the purposes of sub-section (3)(a) to have entered on that land when it entered on that land for the purpose of exercising that right.

3

  • (1) Without limitation on the scope of paragraph (1), the Land Compensation Act 197338 has effect subject to the modifications set out in sub-paragraph (2).
  • (2) In section 44(1) (compensation for injurious affection), as it applies to compensation for injurious affection under section 7 (measure of compensation in case of severance) of the 1965 Act as substituted by paragraph 5(3) of this Schedule—
  • (a) for “land is acquired or taken from” substitute “a right or restrictive covenant over land is purchased from or imposed on”; and
  • (b) for “acquired or taken from him” substitute “over which the right is exercisable or the restrictive covenant enforceable.”

Application of Part 1 of the 1965 Act

4

  • (1) Part 1 (compulsory purchase under Acquisition of Land Act of 1946) of the 1965 Act, as applied by section 125 (application of compulsory acquisition provisions) of the 2008 Act (and modified by article 33 (modification of Part 1 of the 1965 Act) to the acquisition of land under article 25 (compulsory acquisition of land), applies to the compulsory acquisition of a right by the creation of a new right, or to the imposition of a restrictive covenant under article 27 (compulsory acquisition of rights and restrictive covenants)—
  • (a) with the modifications specified in paragraph 5; and
  • (b) with such other modifications as may be necessary.

5

  • (1) The modifications referred to in sub-paragraph (1) are as follows.
  • (2) References in the 1965 Act to land are, in the appropriate contexts, to be read (according to the requirements of the particular context) as referring to, or as including references to—
  • (a) the right acquired or to be acquired, or the restriction imposed or to be imposed; or
  • (b) the land over which the right is or is to be exercisable, or the restriction is or is to be enforceable.
  • (3) For section 7 (measure of compensation in case of severance) of the 1965 Act substitute—

(7) In assessing the compensation to be paid by the acquiring authority under this Act, regard must be had not only to the extent (if any) to which the value of the land over which the right is to be acquired or the restrictive covenant is to be imposed is depreciated by the acquisition of the right or the imposition of the covenant but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act.

  • (4) The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say—
  • (a) section 9(4) (failure by owners to convey);
  • (b) paragraph 10(3) of Schedule 1 (owners under incapacity);
  • (c) paragraph 2(3) of Schedule 2 (absent and untraced owners); and
  • (d) paragraphs 2(3) and 7(2) of Schedule 4 (common land);

are modified so as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily acquired or the restrictive covenant which is to be imposed is vested absolutely in the acquiring authority.

  • (5) Section 11 (powers of entry) of the 1965 Act is modified so as to secure that, where the acquiring authority has served notice to treat in respect of any right or restriction, as well as the notice of entry required by sub-section (1) of that section (as it applies to a compulsory acquisition), it has power, exercisable in equivalent circumstances and subject to equivalent conditions, to enter for the purpose of exercising that right or enforcing that restrictive covenant; and sections 11A39 (powers of entry: further notices of entry), 11B40 (counter-notice requiring possession to be taken on specified date), 12 (unauthorised entry) and 13 (refusal to give possession to acquiring authority) of the 1965 Act are modified correspondingly.
  • (6) Section 20 (tenants at will, etc.) of the 1965 Act applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right or the enforcement of the restrictive covenant in question.
  • (7) Section 22 (interests omitted from purchase) of the 1965 Act as modified by article 32(4) is also modified so as to enable the acquiring authority in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired, subject to compliance with that section as respects compensation.
  • (8) For Schedule 2A of the 1965 Act substitute—

SCHEDULE2A (1) (1) This Schedule applies where an acquiring authority serves a notice to treat in respect of a right over, or a restrictive covenant affecting, the whole or part of a house, building or factory and have not executed a general vesting declaration under section 4 (execution of declaration) of the 1981 Act as applied by article 30 (application of the 1981 Act) of the HyNet Carbon Dioxide Pipeline Order 2024 in respect of the land to which the notice to treat relates. (2) But see article 31 (acquisition of subsoil or airspace only) of the HyNet Carbon Dioxide Pipeline Order 2024 which excludes the acquisition of subsoil or airspace only from this Schedule. (3) In this Schedule, “house” includes any park or garden belonging to a house. (2) A person who is able to sell the house, building or factory (“the owner”) may serve a counter-notice requiring the acquiring authority to purchase the owner’s interest in the house, building or factory. (3) A counter-notice under paragraph 3 must be served within the period of 28 days beginning with the day on which the notice to treat was served. (4) On receiving a counter-notice, the acquiring authority must decide whether to— (a) withdraw the notice to treat; (b) accept the counter-notice; or (c) refer the counter-notice to the Upper Tribunal. (5) The authority must serve notice of their decision on the owner within the period of 3 months beginning with the day on which the counter-notice is served (“the decision period”). (6) If the authority decide to refer the counter-notice to the Upper Tribunal they must do so within the decision period. (7) If the authority do not serve notice of a decision within the decision period it is to be treated as if it had served notice of a decision to withdraw the notice to treat at the end of that period. (8) If the authority serve notice of a decision to accept the counter-notice, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in the house, building or factory. (9) On a referral under paragraph (6), the Upper Tribunal must determine whether the acquisition of the right or the imposition of the restrictive covenant would— (a) in the case of a house, building or factory, cause material detriment to the house, building or factory; or (b) in the case of a park or garden, seriously affect the amenity or convenience of the house to which the park or garden belongs. (10) In making the determination, the Upper Tribunal must take into account— (a) the effect of the acquisition of the right or the imposition of the covenant; (b) the use to be made of the right or covenant proposed to be acquired or imposed; and (c) if the right or covenant is proposed to be acquired or imposed for works or other purposes extending to other land, the effect of the whole of the works and the use of the other land. (11) If the Upper Tribunal determines that the acquisition of the right or the imposition of the covenant would have either of the consequences described in paragraph 9, it must determine how much of the house, building or factory the acquiring authority ought to be required to take. (12) If the Upper Tribunal determines that the acquiring authority ought to be required to take some or all of the house, building or factory, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in that land. (13) (1) If the Upper Tribunal determines that the acquiring authority ought to be required to take some or all of the house, building or factory, the acquiring authority may at any time within the period of six weeks beginning with the day on which the Upper Tribunal makes its determination withdraw the notice to treat in relation to that land. (2) If the acquiring authority withdraws the notice to treat under this paragraph it must pay the person on whom the notice was served compensation for any loss or expense caused by the giving and withdrawing of the notice. (14) Any dispute as to the compensation is to be determined by the Upper Tribunal.

SCHEDULE 10 — Protective provisions

PART 1 — Protection for electricity, gas, water and sewerage undertakers

1

The provisions of this Part have effect unless otherwise agreed in writing between the undertaker and the utility undertaker in question.

2

In this Part—

  • “alternative apparatus” means alternative apparatus adequate to enable the utility undertaker in question to fulfil its statutory functions in a manner no less efficient than previously;
  • “apparatus” means—in the case of a utility undertaker within paragraph (a) of the definition of that term, electric lines or electrical plant (as defined in the Electricity Act 198941, belonging to or maintained by that licence holder;in the case of a utility undertaker within paragraph (b) of the definition of that term, any mains, pipes or other apparatus belonging to or maintained by that gas transporter within the meaning of Part 1 of the Gas Act 198642 for the purposes of gas supply;in the case of a utility undertaker within paragraph (c) of the definition of that term, mains, pipes or other apparatus belonging to or maintained by that water undertaker for the purposes of water supply; andin the case of a utility undertaker within paragraph (d) of the definition of that term—any drain or works vested in the sewerage undertaker under the Water Industry Act 199143; andany sewer which is so vested or is the subject of a notice of intention to adopt given under section 102(4) (adoption of sewers and disposal works) of that Act or an agreement to adopt made under section 104 (agreements to adopt sewer, drain or sewerage disposal works, at future date) of that Act44,and includes a sludge main, disposal main (within the meaning of section 219 (general interpretation) of that Act) or sewer outfall and any manholes, ventilating shafts, pumps or other accessories forming part of any such sewer, drain or works, and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;
  • “functions” includes powers and duties;
  • “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over or upon land;
  • “plan” includes all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe the works to be executed; and
  • “utility undertaker” means—any licence holder within the meaning of Part 1 of the Electricity Act 1989;a gas transporter within the meaning of Part 1 of the Gas Act 1986;a water undertaker within the meaning of the Water Industry Act 1991; anda sewerage undertaker within the meaning of Part 1 of the Water Industry Act 1991,for the area of the authorised development, and in relation to any apparatus, means the utility undertaker to whom it belongs or by whom it is maintained.

On street apparatus

3

This Part does not apply to apparatus in respect of which the relations between the undertaker and the utility undertaker are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act.

Acquisition of land

4

Regardless of any provision of this Order or anything shown on the land plans, the undertaker must not acquire any apparatus otherwise than by agreement.

Removal of apparatus

5

  • (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or requires that the utility undertaker’s apparatus is relocated or diverted, that apparatus must not be removed under this Part, and any right of a utility undertaker to maintain that apparatus in that land must not be extinguished until alternative apparatus has been constructed and is in operation to the reasonable satisfaction of the utility undertaker in question.
  • (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, the undertaker must give to the utility undertaker in question 28 days’ written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed; and in that case (or if in consequence of the exercise of any of the powers conferred by this Order a utility undertaker reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to the utility undertaker the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus.
  • (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2) in the land in which the alternative apparatus or part of such apparatus is to be constructed, the utility undertaker in question must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably possible use reasonable endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.
  • (4) Any alternative apparatus to be constructed in land of the undertaker under this Part must be constructed in such manner and in such line or situation as may be agreed between the utility undertaker in question and the undertaker or in default of agreement settled by arbitration in accordance with article 47 (arbitration).
  • (5) The utility undertaker in question must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 47 (arbitration), and after the grant to the utility undertaker of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part.
  • (6) Regardless of anything in sub-paragraph (5), if the undertaker gives notice in writing to the utility undertaker in question that the undertaker desires itself to execute any work, or part of any work, in connection with the construction or removal of apparatus in any land of the undertaker, that work, instead of being executed by the utility undertaker, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of the utility undertaker.
  • (7) Nothing in sub-paragraph (6) authorises the undertaker to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 300 millimetres of the apparatus.

Facilities and rights for alternative apparatus

6

  • (1) Where, in accordance with the provisions of this Part, the undertaker affords to a utility undertaker facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and the utility undertaker in question or in default of agreement settled by arbitration in accordance with article 47 (arbitration).
  • (2) In settling those terms and conditions in respect of alternative apparatus to be constructed in or along the authorised development, the arbitrator must—

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.