The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024

Type Statutory-Instrument
Publication 2024-04-17
Last updated 2025-02-07
State In force
Department King's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API
  • (i) provision for the option to be exercised by the undertaker, following consent in writing of the Secretary of State, to pay a financial contribution towards the establishment of measures of equivalent environmental benefit by another party wholly or partly in substitution for the oyster bed restoration measures of equivalent environmental benefit or as an adaptive management measure for the purposes of paragraphs 5‎(f) of this Part of this Schedule. The sum of the contribution to be agreed between the undertaker and the other party in consultation with the MEEB steering group. The Secretary of State shall consult with the relevant statutory nature conservation body prior to granting consent in terms of this paragraph; and
  • (j) provision for the option to be exercised by the undertaker, following consent in writing of the Secretary of State, to collaborate with another party in the delivery of measures of equivalent environmental benefit wholly or partly in substitution for the oyster bed restoration measures of equivalent environmental benefit or as an adaptive management measure for the purposes of paragraphs ‎35‎(f) of this Part of this Schedule. The Secretary of State shall consult with the relevant statutory nature conservation body prior to granting consent in terms of this paragraph.
36

No laying of any cables or cable protection works may be commenced within the Cromer Shoal Chalk Beds MCZ until the MIMP has been approved by the Secretary of State.

37

The undertaker shall not be required to undertake the oyster bed restoration measures of equivalent environmental benefit to the extent that—

  • (a) following consent of the Secretary of State a contribution to the Strategic Compensation Fund has been elected wholly in substitution for the oyster bed restoration measures of equivalent environmental benefit for the purposes of paragraph 35(h) of this Part of this Schedule;
  • (b) following consent of the Secretary of State a financial contribution towards the establishment of measures of equivalent environmental benefit by another party has been elected wholly in substitution for the oyster bed restoration measures of equivalent environmental benefit for the purposes of paragraph 35(i) of this Part of this Schedule; or
  • (c) following consent of the Secretary of State the undertaker has elected to collaborate with another party in the establishment of measures of equivalent environmental benefit by another party has been elected wholly in substitution for the oyster bed restoration measures of equivalent environmental benefit for the purposes of paragraph ‎35(j) of this Part of this Schedule.
38

Subject to paragraph 43 of this Part, the undertaker must implement the measures set out in the MIMP approved by the Secretary of State, unless otherwise agreed in writing by the Secretary of State in consultation with the relevant statutory conservation body and the MMO.

39

The undertaker is not required to implement the MIMP if no external cable protection works are required within the Cromer Shoal Chalk Beds MCZ.

40

The undertaker shall notify the Secretary of State of completion of implementation of the measures set out in the MIMP.

41

Results from the monitoring scheme must be submitted at least annually to the Secretary of State and the members of the MEEB steering group including the relevant statutory nature conservation body. This must include details of the effectiveness of such measures. If the undertaker, or on receipt of the report, the Secretary of State determines that the measures have been ineffective the undertaker must provide proposals to address this. Any proposals to address effectiveness must thereafter be implemented by the undertaker as approved in writing by the Secretary of State in consultation with the relevant statutory nature conservation body.

42

Once the measures have been implemented the undertaker shall provide an annual report to the Secretary of State on the progress of the measures as detailed in the MIMP.

43

The MIMP approved under this Schedule includes any amendments that may subsequently be approved in writing by the Secretary of State. Any amendments to or variations of the approved MIMP must be in accordance with the principles set out in the in-principle MEEB plan and may only be approved where it has been demonstrated to the satisfaction of the Secretary of State that it is unlikely to give rise to any materially new or materially different environmental effects from those considered in the in-principle MEEB plan.

44

In the event of any conflict or inconsistency between the terms of the MIMP and the provisions of this Order, the provisions of this Order shall prevail.

SCHEDULE 18 — Documents to be certified

The following documents in Table 1 are the list referred to in article 37—

Document Number Examination Library Reference Name Version Date
2.3 REP7-002 Land Plans E July 2023
2.4 Post examination Crown Land Plan E December 2023
2.5 REP3-004 Special Category Land Plan C May 2023
2.6 AS-050 Works Plans (Onshore) D April 2023
2.7 REP8-003 Works Plans (Offshore) D July 2023
2.8 APP-013 Offshore Order Limitsand Grid Coordinates Plan A September 2022
2.9 REP5-002 Access to Works Plan E June 2023
2.10 REP5-003 Streets (to be temporarily stopped up) Plan D June 2023
2.11 REP5-004 Public Rights of Way (tobe temporarily stopped up) Plan E June 2023
2.12 AS-053 Tree Preservation Order and Hedgerow Plan C April 2023
4.1 Post examination Book of Reference I December 2023
5.5.2.1 REP7-017 Habitats Regulations Derogation Provision of Evidence, Annex 2A - Outline Sandwich Tern Compensation Implementation and Monitoring Plan B July 2023
5.5.3.1 APP-073 Habitats Regulations Derogation Provision of Evidence, Annex 3A - Outline Kittiwake Compensation Implementation andMonitoring Plan A September 2022
Environmental Statement Environmental Statement Environmental Statement Environmental Statement Environmental Statement
6.1.1 APP-087 Environmental Statement Chapter 1 - Introduction A September 2022
6.1.2 APP-088 Environmental Statement Chapter 2 - Policy and Legislative Context A September 2022
6.1.3 APP-089 Environmental Statement Chapter 3 - Site Selection & Assessment of Alternatives A September 2022
6.1.4 REP5-021 Environmental Statement Chapter 4 - Project Description C June 2023
6.1.5 APP-091 Environmental Statement Chapter 5 - EIA Methodology A September 2022
6.1.6 APP-092 Environmental Statement Chapter 6 - Marine Geology, Oceanography and Physical Processes A September 2022
6.1.7 APP-093 Environmental Statement Chapter 7 - Marine Water and Sediment Quality A September 2022
6.1.8 APP-094 Environmental Statement Chapter 8 - Benthic Ecology A September 2022
6.1.9 APP-095 Environmental Statement Chapter 9 - Fish and Shellfish Ecology A September 2022
6.1.10 APP-096 Environmental Statement Chapter 10 - Marine Mammal Ecology A September 2022
6.1.11 APP-097 Environmental Statement Chapter 11 - Offshore Ornithology A September 2022
6.1.12 APP-098 Environmental Statement Chapter 12 - Commercial Fisheries A September 2022
6.1.13 APP-099 Environmental Statement Chapter 13 – Shipping Navigation A September 2022
6.1.14 APP-100 Environmental Statement Chapter 14 – Offshore Archaeology and Cultural Heritage A September 2022
6.1.15 APP-101 Environmental Statement Chapter 15 - Aviation and Radar A September 2022
6.1.16 APP-102 Environmental Statement Chapter 16 – Petroleum Industry and Other Marine Users A September 2022
6.1.17 APP-103 Environmental Statement Chapter 17 - Ground Conditions and Contamination A September 2022
6.1.18 APP-104 Environmental Statement Chapter 18 – Water Resources and Flood Risk A September 2022
6.1.19 REP2-022 Environmental Statement Chapter 19 - Land Use, Agriculture and Recreation B March 2023
6.1.20 REP3-026 Environmental Statement Chapter 20 – Onshore Ecology and Ornithology C May 2023
6.1.21 APP-107 Environmental Statement Chapter 21 – Onshore Archaeology and Cultural Heritage A September 2022
6.1.22 APP-108 Environmental Statement Chapter 22 - Air Quality A September 2022
6.1.23 APP-109 Environmental Statement Chapter 23 - Noise and Vibration A September 2022
6.1.24 APP-110 Environmental Statement Chapter 24 - Traffic and Transport A September 2022
6.1.25 APP-111 Environmental Statement Chapter 25 - Seascape and Visual Impact Assessment A September 2022
6.1.26 APP-112 Environmental Statement Chapter 26 – Landscape and Visual Impact Assessment A September 2022
6.1.27 APP-113 Environmental Statement Chapter 27 - Socio- Economics and Tourism A September 2022
6.1.28 APP-114 Environmental Statement Chapter 28 - Health A September 2022
6.1.29 APP-115 Environmental Statement Chapter 29 - Transboundary Impacts A September 2022
6.2.3 APP-116 Environmental Statement Chapter 3 Figures – Site Selection and Assessment of Alternatives A September 2022
6.2.4 REP3-028 Environmental Statement Chapter 4 Figures - Project Description B May 2023
6.2.5 APP-118 Environmental Statement Chapter 5 Figures – EIA Methodology A September 2022
6.2.6 APP-119 Environmental Statement Chapter 6 Figures - Marine Geology, Oceanography and Physical Processes A September 2022
6.2.7 APP-120 Environmental Statement Chapter 7 Figures - Marine Water and Sediment Quality A September 2022
6.2.8 APP-121 Environmental Statement Chapter 8 Figures - Benthic Ecology A September 2022
6.2.9 APP-122 Environmental Statement Chapter 9 Figures – Fish and Shellfish Ecology A September 2022
6.2.11 APP-123 Environmental Statement Chapter 11 Figures - Offshore Ornithology A September 2022
6.2.12 APP-124 Environmental Statement Chapter 12 Figures - Commercial Fisheries A September 2022
6.2.13 APP-125 Environmental Statement Chapter 13 Figures - Shipping Navigation A September 2022
6.2.14 APP-126 Environmental Statement Chapter 14 Figures - Offshore Archaeology and Cultural Heritage A September 2022
6.2.15 APP-127 Environmental Statement Chapter 15 Figures - Aviation and Radar A September 2022
6.2.16 APP-128 Environmental Statement Chapter 16 Figures - Petroleum Industry and other Marine Users A September 2022
6.2.18 APP-129 Environmental Statement Chapter 18 Figures - Water Resources and Flood Risk A September 2022
6.2.19 REP6-005 Environmental Statement Chapter 19 Figures - Land Use, Agriculture and Recreation C June 2023
6.2.20 APP-131 Environmental Statement Chapter 20 Figures - Onshore Ecology and Ornithology A September 2022
6.2.22 APP-132 Environmental Statement Chapter 22 Figures - Air Quality A September 2022
6.2.23 APP-133 Environmental Statement Chapter 23 Figures - Noise and Vibration A September 2022
6.2.24 APP-134 Environmental Statement Chapter 24 Figures - Traffic and Transport A September 2022
6.2.25 APP-135 Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 1 of 18 A September 2022
6.2.25 APP-136 Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment - Part 2 of 18 A September 2022
6.2.25 APP-137 Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 3 of 18 A September 2022
6.2.25 APP-138 Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 4 of 18 A September 2022
6.2.25 APP-139 Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment - Part 5 of 18 A September 2022
6.2.25 APP-140 Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 6 of 18 A September 2022
6.2.25 APP-141 Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 7 of 18 A September 2022
6.2.25 APP-142 Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment - Part 8 of 18 A September 2022
6.2.25 APP-143 Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment - Part 9 of 18 A September 2022
6.2.25 APP-144 Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment - Part 10 of 18 A September 2022
6.2.25 APP-145 Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 11 of 18 A September 2022
6.2.25 APP-146 Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 12 of 18 A September 2022
6.2.25 APP-147 Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 13 of 18 A September 2022
6.2.25 APP-148 Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 14 of 18 A September 2022
6.2.25 APP-149 Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 15 of 18 A September 2022
6.2.25 APP-150 Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment - Part 16 of 18 A September 2022
6.2.25 APP-151 Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment – Part 17 of 18 A September 2022
6.2.25 APP-152 Environmental Statement Chapter 25 Figures - Seascape and Visual Impact Assessment - Part 18 of 18 A September 2022
6.2.26 APP-153 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 1 of 20 A September 2022
6.2.26 APP-154 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 2 of 20 A September 2022
6.2.26 APP-155 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 3 of 20 A September 2022
6.2.26 APP-156 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 4 of 20 A September 2022
6.2.26 APP-157 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 5 of 20 A September 2022
6.2.26 APP-158 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 6 of 20 A September 2022
6.2.26 APP-159 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 7 of 20 A September 2022
6.2.26 APP-160 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 8 of 20 A September 2022
6.2.26 APP-161 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 9 of 20 A September 2022
6.2.26 APP-162 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment - Part 10 of 20 A September 2022
6.2.26 APP-163 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 11 of 20 A September 2022
6.2.26 APP-164 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 12 of 20 A September 2022
6.2.26 APP-165 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 13 of 20 A September 2022
6.2.26 APP-166 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 14 of 20 A September 2022
6.2.26 APP-167 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 15 of 20 A September 2022
6.2.26 APP-168 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 16 of 20 A September 2022
6.2.26 APP-169 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 17 of 20 A September 2022
6.2.26 APP-170 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment - Part 18 of 20 A September 2022
6.2.26 APP-171 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment – Part 19 of 20 A September 2022
6.2.26 APP-172 Environmental Statement Chapter 26 Figures - Landscape and Visual Impact Assessment - Part 20 of 20 A September 2022
6.2.27 APP-173 Environmental Statement Chapter 27 Figures – Socio-Economics and Tourism A September 2022
6.2.28 APP-174 Environmental Statement Chapter 28 Figures - Health A September 2022
6.3.21.1.3 APP-230b Environmental Statement - Figures A September 2022
6.3.21.2.2 APP-234 Environmental Statement Annex 21.2.2 - Figures to Appendix 21.2 A September 2022
6.3.21.4.2 APP-238 Environmental Statement Annex 21.4.2 - Onshore Substation Setting Assessment Figures A September 2022
6.3.21.5.2 APP-241 Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures – Part 1 of 12 A September 2022
6.3.21.5.2 APP-242 Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures – Part 2 of 12 A September 2022
6.3.21.5.2 APP-243 Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures – Part 3 of 12 A September 2022
6.3.21.5.2 APP-244 Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures – Part 4 of 12 A September 2022
6.3.21.5.2 APP-245 Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures – Part 5 of 12 A September 2022
6.3.21.5.2 APP-246 Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures - Part 6 of 12 A September 2022
6.3.21.5.2 APP-247 Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures – Part 7 of 12 A September 2022
6.3.21.5.2 APP-248 Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures - Part 8 of 12 A September 2022
6.3.21.5.2 APP-249 Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures - Part 9 of 12 A September 2022
6.3.21.5.2 APP-250 Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures - Part 10 of 12 A September 2022
6.3.21.5.2 APP-251 Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures – Part 11 of 12 A September 2022
6.3.21.5.2 APP-252 Environmental Statement Annex 21.5.2 - Offshore Infrastructure Setting Assessment Figures – Part 12 of 12 A September 2022
6.3.3.1 APP-175 Environmental Statement Appendix 3.1 – Onshore Substation Site Selection Report A September 2022
6.3.3.2 APP-176 Environmental Statement Appendix 3.2 - Cable Landfall Concept Study A September 2022
6.3.3.3 APP-177 Environmental Statement Appendix 3.3. – Onshore Main Construction Compound Site Selection Report A September 2022
6.3.4.1 REP7-024 Environmental Statement Appendix 4.1 – Crossing Schedule E July 2023
6.3.4.2 APP-179 Environmental Statement Appendix 4.2 - Greenhouse Gas Footprint Assessment A September 2022
6.3.6.1 APP-180 Environmental Statement Appendix 6.1 - Physical Processes Method Statement A September 2022
6.3.6.2 APP-181 Environmental Statement Appendix 6.2 – Wave Climate Assessment A September 2022
6.3.6.3 APP-182 Environmental Statement Appendix 6.3 - Sedimentary Processes in the Cromer Shoal Chalk Beds MCZ A September 2022
6.3.6.4 APP-183 Environmental Statement Appendix 6.4 - Sheringham Shoal Nearshore Cable Route - BGS Shallow Geological Assessment A September 2022
6.3.8.1 APP-184 Environmental Statement Appendix 8.1 - DEP Benthic Characterisation Report A September 2022
6.3.8.2 APP-185 Environmental Statement Appendix 8.2 - SEP Benthic Characterisation Report A September 2022
6.3.8.3 APP-186 Environmental Statement Appendix 8.3 - DEP Benthic Habitat Report A September 2022
6.3.8.4 APP-187 Environmental Statement Appendix 8.4 – SEP Benthic Habitat Report A September 2022
6.3.8.5 APP-188 Environmental Statement Appendix 8.5 - DEP and SEP Benthic Habitat Mapping A September 2022
6.3.8.6 APP-189 Environmental Statement Appendix 8.6 – MarESA Biotope Sensitivities A September 2022
6.3.9.1 APP-190 Environmental Statement Appendix 9.1 - Fish and Shellfish Ecology Technical Report A September 2022
6.3.10.1 APP-191 Environmental Statement Appendix 10.1 – Marine Mammal Consultation Responses, Information and Survey Data A September 2022
6.3.10.2 REP8-019 Environmental Statement Appendix 10.2 - Underwater Noise Modelling Report C July 2023
6.3.10.3 APP-193 Environmental Statement Appendix 10.3 - Marine Mammal Cumulative Impact Assessment (CIA) Screening A September 2022
6.3.10.4 APP-194 Environmental Statement Appendix 10.4 - Marine Mammal Unexploded Ordnance (UXO) Assessment A September 2022
6.3.11.1 APP-195 Environmental Statement Appendix 11.1 - Offshore Ornithology Technical Report A September 2022
6.3.11.2 APP-196 Environmental Statement Appendix 11.2 - Information to Inform the Offshore Ornithology Cumulative Impact Assessment A September 2022
6.3.12.1 APP-197 Environmental Statement Appendix 12.1 - Commercial Fisheries Technical Report A September 2022
6.3.13.1 APP-198 Environmental Statement Appendix 13.1 - Navigation Risk Assessment A September 2022
6.3.14.1 APP-199 Environmental Statement Appendix 14.1 - Archaeological Assessment of Geophysical Data A September 2022
6.3.14.2 APP-200 Environmental Statement Appendix 14.2 - Archaeological Assessment of Geophysical Data - Addendum A September 2022
6.3.14.3 APP-201 Environmental Statement Appendix 14.3 - Stage 1 Archaeological Assessment of Geophysical Data A September 2022
6.3.15.1 APP-202 Environmental Statement Appendix 15.1 - Technical Report including Radar Line of Sight Images A September 2022
6.3.15.2 APP-203 Environmental Statement Appendix 15.2 - Surveillance Minimum Altitude Chart Analysis A September 2022
6.3.16.1 APP-204 Environmental Statement Appendix 16.1 – Vessel Access Study A September 2022
6.3.16.2 APP-205 Environmental Statement Appendix 16.2 - Helicopter Access Study A September 2022
6.3.17.1 REP3-032 Environmental Statement Appendix 17.1 - Land Quality Desk Study and Preliminary Risk Assessment Report B May 2023
6.3.17.2 APP-207 Environmental Statement Appendix 17.2 - Waste Assessment (Onshore Development) A September 2022
6.3.18.1 REP3-034 Environmental Statement Appendix 18.1 - Water Framework Directive Compliance Assessment B May 2023
6.3.18.2 AS-023-AS-030 Environmental Statement Appendix 18.2 - Flood Risk Assessment B October 2022
6.3.18.2.1 REP3-036 Environmental Statement Appendix 18.2.1 – Annex 18.2.1 – Onshore Substation Drainage Study C May 2023
6.3.18.3 REP3-038 Environmental Statement Appendix 18.3 – Geomorphological Baseline Survey Technical Report B May 2023
6.3.19.1 REP5-023 Environmental Statement Appendix 19.1 – Public Right of Way and Cycle Route Crossings B June 2023
6.3.20.1 REP3-040 Environmental Statement Appendix 20.1 - Extended Phase 1 Habitat Survey Report B May 2023
6.3.20.2 REP3-042 Environmental Statement Appendix 20.2 - Great Crested Newt Survey Report B May 2023
6.3.20.3 APP-216 Environmental Statement Appendix 20.3 - Bat Activity Survey Report A September 2022
6.3.20.4 REP3-044 Environmental Statement Appendix 20.4 - Wintering Birds Survey Report B May 2023
6.3.20.5 REP3-046 Environmental Statement Appendix 20.5 – Breeding Birds Survey Report B May 2023
6.3.20.6 REP3-048 Environmental Statement Appendix 20.6 – Initial Biodiversity Net Gain Assessment B May 2023
6.3.20.7 REP3-050 Environmental Statement Appendix 20.7 - Onshore Ecology Desk Study B May 2023
6.3.20.8 APP-221 Environmental Statement Appendix 20.8 – Reptile Survey Report A September 2022
6.3.20.9 REP3-052 Environmental Statement Appendix 20.9 – White Clawed Crayfish Survey Report B May 2023
6.3.20.10 APP-223 Environmental Statement Appendix 20.10 - Bat (Roosting) Survey Report A September 2022
6.3.20.11 APP-224 Environmental Statement Appendix 20.11 - Invertebrate Survey Report A September 2022
6.3.20.12 APP-225 Environmental Statement Appendix 20.12 - National Vegetation Classification (NVC) Survey Report A September 2022
6.3.20.13 REP3-054 Environmental Statement Appendix 20.13 - Riparian Mammals (Water Vole and Otter) Survey Report B May 2023
6.3.20.14 APP-227 Environmental Statement Appendix 20.14 - Badger Confidential Appendix A September 2022
6.3.20.15 APP-228 Environmental Statement Appendix 20.15 - Arboricultural Survey Report A September 2022
6.3.21.1 APP-229 Environmental Statement Appendix 21.1 - Onshore Archaeological Desk- Based (Baseline) Assessment A September 2022
6.3.21.1.1 APP-230 Environmental Statement Appendix 21.1.1 - Designated Heritage Assets A September 2022
6.3.21.1.2 APP-230a Environmental Statement - Non-designated Heritage Assets A September 2022
6.3.21.1.4 APP-231 Environmental Statement Appendix 21.1.4 - Heritage Site Walkover Survey A September 2022
6.3.21.2 APP-232 Environmental Statement Appendix 21.2 - Aerial Photographic, LiDAR Data and Historic Map Regression Analysis A September 2022
6.3.21.2.1 APP-233 Environmental Statement Appendix 21.2 – Annex 21.2.1 - Metadata to Appendix 21.2 A September 2022
6.3.21.3 APP-235 Environmental Statement Appendix 21.3 - Aerial Photography and Historic Map Regression Addendum A September 2022
6.3.21.4 APP-236 Environmental Statement Appendix 21.4 – Onshore Substation Setting Assessment A September 2022
6.3.21.4.1 APP-237 Environmental Statement Appendix 21.4 – Annex 21.4.1 - Onshore Substation Setting Assessment Screening Tables A September 2022
6.3.21.5 APP-239 Environmental Statement Appendix 21.5 - Offshore Infrastructure Setting Assessment A September 2022
6.3.21.5.1 APP-240 Environmental Statement Appendix 21.5.1 – Annex 21.5.1 - Offshore Infrastructure Setting Assessment Screening Tables A September 2022
6.3.21.6 APP-253 Environmental Statement Appendix 21.6 - Priority Archaeological Geophysical Survey (Part 1 of 5) A September 2022
6.3.21.6 APP-254 Environmental Statement Appendix 21.6 - Priority Archaeological Geophysical Survey (Part 2 of 5) A September 2022
6.3.21.6 APP-255 Environmental Statement Appendix 21.6 - Priority Archaeological Geophysical Survey (Part 3 of 5) A September 2022
6.3.21.6 APP-256 Environmental Statement Appendix 21.6 - Priority Archaeological Geophysical Survey (Part 4 of 5) A September 2022
6.3.21.6 APP-257 Environmental Statement Appendix 21.6 – Priority Archaeological Geophysical Survey (Part 5 of 5) A September 2022
6.3.21.7 APP-258 Environmental Statement Appendix 21.7 - Archaeological and Geoarchaeological Monitoring Assessment A September 2022
6.3.22.1 APP-259 Environmental Statement Appendix 22.1 - Construction Dust and Fine Particulate Matter Assessment Methodology A September 2022
6.3.22.2 APP-260 Environmental Statement Appendix 22.2 – Air Quality Assessment Traffic Data A September 2022
6.3.22.3 APP-261 Environmental Statement Appendix 22.3 - Air Quality Background Pollutant Concentrations A September 2022
6.3.22.4 APP-262 Environmental Statement Appendix 22.4 - Designated Ecological Sites and Critical Level and Load Values in the Air Quality Study Area A September 2022
6.3.22.5 APP-263 Environmental Statement Appendix 22.5 - Air Quality Ecological Receptor Assessment Tables A September 2022
6.3.23.1 APP-264 Environmental Statement Appendix 23.1 – Baseline Noise Survey A September 2022
6.3.23.2 APP-265 Environmental Statement Appendix 23.2 - Road Traffic Noise Assessment A September 2022
6.3.23.3 APP-266 Environmental Statement Appendix 23.3 - Construction Noise Assessment A September 2022
6.3.23.4 APP-267 Environmental Statement Appendix 23.4 – Onshore Substation Operational Noise Assessment A September 2022
6.3.24.1 APP-268 Environmental Statement Appendix 24.1 - Transport Assessment A September 2022
6.3.24.1.1 APP-269 Environmental Statement Appendix 24.1.1 - Transport Assessment Annexes A September 2022
6.3.24.2 APP-270 Environmental Statement Appendix 24.2 - Abnormal Indivisible Load (AIL) Study A September 2022
6.3.24.3 APP-271 Environmental Statement Appendix 24.3 - Pedestrian Delay Assessment A September 2022
6.3.24.4 APP-272 Environmental Statement Appendix 24.4 - Cumulative Traffic Flows A September 2022
6.3.24.5 APP-273 Environmental Statement Appendix 24.5 - Interaction Between Impacts A September 2022
6.3.25.1 APP-274 Environmental Statement Appendix 25.1 – Seascape and Visual Impact Assessment Annexes A September 2022
6.3.26.1 APP-275 Environmental Statement Appendix 26.1 - Landscape and Visual Impact Assessment Annexes A September 2022
6.3.27.1 APP-276 Environmental Statement Appendix 27.1 – Socio- Economics Construction Costs and Sourcing Assumptions Note A September 2022
6.3.27.2 APP-277 Environmental Statement Appendix 27.2 – Socio- Economics and Tourism Technical Baseline A September 2022
6.3.27.3 APP-278 Environmental Statement Appendix 27.3 – Socio- Economics Impact Assessment A September 2022
6.3.28.1 Post-examination Environmental Statement Appendix 28.1 - Sheringham and Dudgeon Extension Projects EMF Assessment B July 2024
6.3.28.2 APP-280 Environmental Statement Appendix 28.2 - Health Baseline Statistics A September 2022
6.5 REP8-021 Schedule of Mitigation and Mitigation Route Map B July 2023
13.2 REP3-089 Collision Risk Modelling (CRM) Updates (EIA Context) Technical Note B May 2023
13.5 REP3-093 Marine Processes Technical Note (Revision B) (Clean) B May 2023
14.28 REP2-049 Auk Construction Phase Displacement Assessment (EIA Context) Technical Note A March 2023
14.31 REP3-097 Addendum to the Flood Risk Assessment B May 2023
14.32 REP2-053 Addendum to Environmental Statement Chapter 20 Onshore Ecology and Ornithology A March 2023
14.34 REP5-045 Onshore Substation Hydraulic Modelling Report C June 2023
16.14 REP7-056 Marine Mammals Technical Note and Addendum B July 2023
17.2 AS-063 Supplemental Environmental Information to support the Applicant’s material change request A April 2023
19.21 REP5-063 Gannet and Auk Cumulative Displacement Updates Technical Note A June 2023
Other documents Other documents Other documents Other documents Other documents
9.3 REP3-056 Design and Access Statement B May 2023
9.4 REP1-013 Draft Marine Mammal Mitigation Protocol B February 2023
9.5 REP7-029 Offshore in Principle Monitoring Plan C July 2023
9.6 APP-290 In Principle Site Integrity Plan for the Southern North Sea Special Area of Conservation A September 2022
9.7 REP7-031 Outline Cromer Shoal Chalk Beds Marine Conservation Zone Cable Specification, Installation And Monitoring Plan B July 2023
9.8 REP7-033 Outline Fisheries Liaison and Co-existence Plan B July 2023
9.9 REP3-058 Outline Offshore Operations and Maintenance Plan C May 2023
9.10 REP7-035 Outline Project Environmental Management Plan D July 2023
9.11 APP-298 Outline Written Scheme of Investigation (Offshore) A September 2022
9.12 APP-299 Outline Marine Traffic Monitoring Plan A September 2022
9.16 REP5-027 Outline Construction Traffic Management Plan D June 2023
9.17 REP8-023 Outline Code of Construction Practice G July 2023
9.18 REP5-031 Outline Landscape Management Plan D June 2023
9.19 Post examination Outline Ecological Management Plan F December 2023
9.20 REP3-070 Outline Operational Drainage Strategy ... C May 2023
9.21 REP2-031 Outline Written Scheme of Investigation (Onshore) C March 2023
9.22 APP-309 Outline Public Rights of Way Strategy A September 2022
9.23 REP3-072 Outline Skills and Employment Plan B May 2023
. . . . . . . . . . . . . . .

Signed

Signed by authority of the Secretary of State for Energy Security and Net Zero

David Wagstaff — Deputy Director Energy Infrastructure Planning — Department for Energy Security and Net Zero — 17th April 2024

Explanatory note

(This note is not part of the Order)

EXPLANATORY NOTE

This Order grants development consent for, and authorises the construction, operation and maintenance of two offshore generating stations located in the North Sea approximately 13.6km and 24.8km from the Norfolk coast together with associated development. The Order authorises the compulsory purchase of land and rights in land and the right to use land and to override easements and other rights.

This Order also grants deemed marine licences under Part 4 of the Marine and Coastal Access Act 2009 in connection with the wind farms. The marine licences impose conditions in connection with the deposits and works for which they grant consent.

A copy of the plans and book of reference referred to in this Order and certified in accordance with article 37 (certification of plans and documents, etc.) of this Order may be inspected free of charge at the offices of Norfolk County Council, County Hall, Martineau Lane, Norwich, Norfolk, NR1 2DH.

Footnotes

[^f00001]: 2008 c. 29. Section 37 was amended by Chapter 6 of Part 6 of, and Schedule 13 to, the Localism Act 2011 (c. 20).

[^f00002]: S.I. 2009/2264.

[^f00003]: Section 61 was amended by section 128(2) and Schedule 13, paragraph 18 to the Localism Act 2011 (c. 20) and by section 26 of the Infrastructure Act 2015 (c. 7).

[^f00004]: Section 65 was amended by Schedule 13, paragraph 22(2) and Schedule 25, paragraph 1 to the Localism Act 2011 (c. 20) and by section 27(1) of the Infrastructure Act 2015 (c. 7).

[^f00005]: S.I. 2010/2013, amended by S.I. 2012/635.

[^f00006]: Section 74 was amended by sections 128(2) and 237 and by Schedule 13, paragraph 29 and Schedule 25, paragraph 1, to the Localism Act 2011 (c. 20).

[^f00007]: S.I. 2017/572.

[^f00008]: Section 104 was amended by section 58(5) of the Marine and Coastal Access Act 2009 (c. 23) and by section 128(2) and Schedule 13, paragraphs 1 and 49(1) to (6) of the Localism Act 2011 (c. 20).

[^f00009]: Section 132 was amended by section 24(3) of the Growth and Infrastructure Act 2013 (c. 27).

[^f00010]: Sections 114, 115 and 120 were amended by sections 128(2) and 140 and Schedule 13, paragraphs 1, 55(1), (2) and 60(1) and (3) of the Localism Act 2011 (c. 20). Relevant amendments were made to section 115 by section 160(1) to (6) of the Housing and Planning Act 2016 (c. 22)

[^f00011]: 1961 c. 33.

[^f00012]: 1965 c. 56.

[^f00013]: 1980 c. 66.

[^f00014]: 1981 c. 66.

[^f00015]: 1989 c. 29.

[^f00016]: 1990 c. 8.

[^f00017]: 1991 c. 22.

[^f00018]: 2003 c. 21.

[^f00019]: 2004 c. 20.

[^f00020]: 2008 c. 29.

[^f00021]: 2009 c. 23.

[^f00022]: S.I. 2016/1154.

[^f00023]: S.I. 2017/1012.

[^f00024]: S.I. 2022/911.

[^f00025]: Ministerial Order 2016/4.

[^f00026]: 2010 c. 29.

[^f00027]: 1981 c. 67.

[^f00028]: 1991 c. 59. Section 109 has been repealed.

[^f00029]: 1991 c. 59.

[^f00030]: 2017 c. 20.

[^f00031]: S.I. 1997/1160. Regulation 6 was amended by paragraph 35 of Schedule 1 to S.I. 2015/377.

[^f00032]: 1990 c. 43. Section 82 was amended by sections 101 and 102 of the Clean Neighbourhoods and Environment Act 2005 (c. 16).

[^f00033]: Section 79 was amended by paragraph 89 of Schedule 22 to Environment Act 1995 (c. 25).

[^f00034]: 1974 c. 40. Section 61 was amended by Schedule 7 to the Building Act 1984 (c. 55), paragraph 15 of Schedule 15 to the Environmental Protection Act 1990 (c. 43) and Schedule 24 to the Environment Act 1995.

[^f00035]: Sections 55, 57, 60, 68 and 69 were amended by the Traffic Management Act 2004 (c. 18).

[^f00036]: 1991 c. 56. Section 106 was amended by section 35(8) and 43(2) of and paragraph 1 of Schedule 2 to the Competition and Service (Utilities) Act 1992 (c. 43) and sections 36(2) and 99 of the Water Act 2003 (c. 37).

[^f00037]: Section 13 was amended by section 139 of, and paragraph 28(2) of Schedule 13 and paragraph 1 of Schedule 23 to, the Tribunals, Courts and Enforcement Act 2007 (c. 15).

[^f00038]: As defined in Part 3 of Schedule 14 (For the Protection of Network Rail Infrastructure Limited).

[^f00039]: Amended by sections 184 and 185 of and paragraph 2 of Schedule 18 to the Housing and Planning Act 2016 (c. 22).

[^f00040]: S.I. 1997/1160.

[^f00041]: Section 206(1) was amended by paragraph 11 of Schedule 8 to the Planning Act 2008 (c. 29).

[^f00042]: 1978 c. 30. Section 7 was amended by paragraph 19 of Schedule 10 to the Road Traffic Regulation Act 1984 (c. 27).

[^f00043]: Section 78 was amended by section 43(2) of the Planning and Compulsory Purchase Act 2004 (c. 5), paragraph 3(b) of Schedule 10 to the Planning Act 2008 (c. 29), section 123(3) of, and paragraph 11 of Schedule 12 to, the Localism Act 2011 (c. 20), paragraph 8 of Schedule 1 to the Growth and Infrastructure Act 2013 (c. 27) and paragraph 12 of Schedule 4 to the Infrastructure Act 2015 (c. 7). Section 79 was amended by section 18 of, and paragraph 19 of Schedule 7 to, the Planning and Compensation Act 1991 (c. 34) and by paragraph 4 of Schedule 10 to the Planning Act 2008.

[^f00044]: Section 105(2) was substituted by section 69(3) of the Energy Act 2008 (c. 32).

[^f00045]: S.I. 2012/2920.

[^f00046]: 1973 c. 26.

[^f00047]: 2004 c. 20. Section 105 was amended by section 69 of the Energy Act 2003 (c. 32).

[^f00048]: 2008 c. 29.

[^f00049]: 2009 c. 23

[^f00050]: S.I. 2017/1013.

[^f00051]: OJ L 206, 22.9.1992, p.7-50.

[^f00052]: Ministerial Order 2016/4.

[^f00053]: S.I. 2016/765.

[^f00054]: 1991 c. 59. Section 23 was amended by paragraph 192 of Schedule 22 to, the Environment Act 1995 (c. 25), and by paragraph 32 of Schedule 2 to, the Flood and Water Management Act 2010 (c. 29).

[^f00055]: S.I. 2022/138.

[^f00056]: S.I. 2021/1414.

[^f00057]: 1996 c. 23

1

Nationally significant infrastructure projects as defined in sections 14 and 15 of the 2008 Act located in the North Sea approximately 14 kilometres and 25 kilometres to the north of the north Norfolk coast, comprising—

2

The grid coordinates for that part of the authorised development which is seaward of MHWS are specified below—

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk