The North Lincolnshire Green Energy Park Order 2025
- (b) in a private street without the consent of the street authority.
- (5) The undertaker must compensate the owners and occupiers of the land for any loss or damage arising by reason of the exercise of the authority conferred by this article, such compensation to be determined, in case of dispute, under Part 1 of the 1961 Act.
- (6) Section 13 (refusal to give possession to acquiring authority) of the 1965 Act applies to entry onto, or possession of land under this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 (application of compulsory acquisition provisions) of the 2008 Act.
PART 6 — OPERATIONS
Felling or lopping of trees
39
- (1) The undertaker may fell or lop or cut back any roots of any tree or shrub near any part of the authorised development if it reasonably believes it to be necessary to do so to prevent the tree or shrub—
- (a) from obstructing or interfering with the construction, maintenance or operation of the authorised development or any apparatus used in connection with the authorised development; or
- (b) from constituting a danger to persons using the authorised development.
- (2) In carrying out any activity authorised by paragraph (1), the undertaker must do no unnecessary damage to any tree or shrub and pay compensation to any person for any loss or damage arising from such activity.
- (3) Any dispute as to a person’s entitlement to compensation under paragraph (2), or as to the amount of compensation, is to be determined under Part 1 (determination of questions of disputed compensation) of the 1961 Act.
- (4) Save in an emergency, the undertaker must not enter any land under paragraph (1) without serving a notice of the intended entry on the owners and occupiers of that land and, where the land is a highway maintainable at the public expense, on the highway authority.
- (5) The notice under paragraph (5) must be served no less than 14 days before entering the land.
- (6) In carrying out any activity authorised by paragraph (1) the duty contained in section 206(1) (replacement of trees) of the 1990 Act does not apply.
Removal of hedgerows
40
- (1) The undertaker may, for the purposes of carrying out the authorised development—
- (a) remove any hedgerows within the Order limits and specified in Part 1 of Schedule 13 (hedgerows);
- (b) remove any important hedgerows within the Order limits and specified in Part 2 of Schedule 13 (important hedgerows); and
- (c) without limitation on the scope of sub-paragraph (a), and with the consent of the local authority in whose area the hedgerow is located, remove or translocate any hedgerow within the Order limits.
- (2) The grant of consent of a local authority in terms of paragraph (1)(c) must not be unreasonably withheld.
- (3) If a local authority fails to notify the undertaker of its decision within 28 days of receiving an application for consent under paragraph (1)(c) the local authority is deemed to have granted consent.
- (4) In carrying out any activity authorised by paragraph, (1) the undertaker must do no unnecessary damage to any hedgerow and pay compensation to any person for any loss or damage arising from such activity.
- (5) Any dispute as to a person’s entitlement to compensation under paragraph 39(2), or as to the amount of compensation, is to be determined under Part 1 (determination of questions of disputed compensation) of the 1961 Act.
- (6) In this article “hedgerow” and “important hedgerow” have the same meaning as in the Hedgerow Regulations 1997[^f00033].
PART 7 — MISCELLANEOUS AND GENERAL
Removal of human remains
41
- (1) Before the undertaker carries out any development or works which will or may disturb any human remains in the specified land, it must remove those human remains from the specified land, or cause them to be removed, in accordance with the following provisions of this article.
- (2) Before any such remains are removed from the specified land, the undertaker must give notice of the intended removal, describing the specified land and stating the general effect of the following provisions of this article, by—
- (a) publishing a notice once in each of two successive weeks in a newspaper circulating in the area of the authorised development; and
- (b) displaying a notice in a conspicuous place on or near to the specified land for a minimum of 28 days.
- (3) As soon as reasonably practicable after the first publication of a notice under paragraph (2), the undertaker must send a copy of the notice to the relevant planning authority.
- (4) At any time within 56 days after the first publication of a notice under paragraph (2) any person who is a personal representative or relative of any deceased person whose remains are interred in the specified land may give notice in writing to the undertaker of that person’s intention to undertake the removal of the remains.
- (5) Where a person has given notice under paragraph (4), and the remains in question can be identified, that person may cause such remains to be—
- (a) removed and re-interred in any burial ground or cemetery in which burials may legally take place; or
- (b) removed to, and cremated in, any crematorium,
and that person must, as soon as reasonably practicable after such re-interment or cremation provide to the undertaker a certificate for the purpose of enabling compliance with paragraph (10).
- (6) If the undertaker is not satisfied that any person giving notice under paragraph (4) is the personal representative or relative as that person claims to be, or that the remains in question can be identified, the question is to be determined on the application of either party in a summary manner by the county court, and the court may make an order specifying who must remove the remains and as to the payment of the costs of the application.
- (7) The undertaker must pay the reasonable expenses of removing and re-interring or cremating the remains of any deceased person under powers conferred by this article.
- (8) If—
- (a) within the period of 56 days referred to in paragraph (4) no notice under that paragraph has been given to the undertaker in respect of any remains in the specified land;
- (b) such notice is given and no application is made under paragraph (6) within 56 days after the giving of the notice but the person who gave the notice fails to remove the remains within a further period of 56 days;
- (c) within 56 days after any order is made by the county court under paragraph (6) any person, other than the undertaker, specified in the order fails to remove the remains; or
- (d) it is determined that the remains to which any such notice relates cannot be identified,
subject to paragraph (9) the undertaker must remove the remains and cause them to be re-interred in such burial ground or cemetery in which burials may legally take place as the undertaker thinks suitable for the purpose; and, so far as possible, remains from individual graves must be reinterred in individual containers which must identifiable by a record prepared with reference to the original position of burial of the remains that they contain.
- (9) If the undertaker is satisfied that any person giving notice under paragraph (4) is the personal representative or relative as that person claims to be and that the remains in question can be identified, but that person does not remove the remains, the undertaker must comply with any reasonable request that person may make in relation to the removal and re-interment or cremation of the remains.
- (10) On the re-interment or cremation of any remains under powers conferred by this article—
- (a) a certificate of re-interment or cremation must be sent by the undertaker to the Registrar General giving the date of re-interment or cremation and identifying the place from which the remains were removed and the place in which they were re-interred or cremated; and
- (b) a copy of the certificate of re-interment or cremation and the record mentioned in paragraph (8) must be sent by the undertaker to the relevant planning authority.
- (11) The removal of the remains of any deceased person under powers conferred by this article must be carried out in accordance with any directions which may be given by the Secretary of State.
- (12) Any jurisdiction or function conferred on the county court by this article may be exercised by the district judge of the court.
- (13) In this article, “the specified land” means any land within the Order limits.
Protective provisions
42
Schedule 14 (protective provisions) has effect.
Application of landlord and tenant law
43
- (1) This article applies to—
- (a) any agreement for leasing to any person the whole or any part of the authorised development or the right to operate the same; and
- (b) any agreement entered into by the undertaker with any person for the construction, maintenance, use or operation of the authorised development, or any part of it,
so far as any such agreement relates to the terms on which any land which is the subject of a lease granted by or under that agreement is to be provided for that person’s use.
- (2) No enactment or rule of law regulating the rights and obligations of landlords and tenants prejudices the operation of any agreement to which this article applies.
- (3) Accordingly, no such enactment or rule of law applies in relation to the rights and obligations of the parties to any lease granted by or under any such agreement so as to—
- (a) exclude or in any respect modify any of the rights and obligations of those parties under the terms of the lease, whether with respect to the termination of the tenancy or any other matter;
- (b) confer or impose on any such party any right or obligation arising out of or connected with anything done or omitted on or in relation to land which is the subject of the lease, in addition to any such right or obligation provided for by the terms of the lease; or
- (c) restrict the enforcement (whether by action for damages or otherwise) by any party to the lease of any obligation of any other party under the lease.
Operational land for purposes of the 1990 Act
44
Development consent granted by this Order is to be treated as specific planning permission for the purposes of section 264(3)(a) of the 1990 Act in relation to the land in respect of which Work Nos. 1, 1A, 1B, 1D, 10, 11 and 14 are authorised.
Defence to proceedings in respect of statutory nuisance
45
- (1) Where proceedings are brought under section 82(1) (summary proceedings by persons aggrieved by statutory nuisances) of the Environmental Protection Act 1990[^f00034] in relation to a nuisance falling within paragraphs (b), (c), (d), (fb) and (g) of section 79(1) (statutory nuisances and inspections therefor) of that Act no order is to be made, and no fine may be imposed, under section 82(2) of that Act if—
- (a) the defendant shows that the nuisance—
- (i) relates to premises used by the undertaker for the purposes of or in connection with the construction, maintenance or decommissioning of the authorised development and that the nuisance is attributable to the carrying out of the authorised development in accordance with a notice served under section 60 (control of noise on construction sites) or a consent given under section 61 (prior consent for work on construction sites) of the Control of Pollution Act 1974[^f00035]; or
- (ii) is a consequence of the construction, maintenance or decommissioning of the authorised development and that it cannot reasonably be avoided; or
- (b) the defendant shows that the nuisance is a consequence of the use of the authorised development and that it cannot reasonably be avoided.
- (2) Section 61(9) (prior consent for work on construction sites) of the Control of Pollution Act 1974 does not to apply where the consent relates to the use of premises by the undertaker for the purposes of or in connection with the construction or maintenance of the authorised development.
Certification of plans, etc.
46
- (1) The undertaker must, as soon as practicable after the making of this Order, submit to the Secretary of State copies of all documents and plans referred to in Schedule 15 (documents and plans to be certified) for certification that they are true copies of those documents.
- (2) A plan or document so certified is admissible in any proceedings as evidence of the contents of the document of which it is a copy.
- (3) Where a plan or document certified under paragraph (1)—
- (a) refers to a provision of this Order (including in specified requirement) when it was in draft form; and
- (b) identifies that provision by number, or combination of numbers and letters, which is different from the number, or combination of numbers and letters by which the corresponding provision of this Order is identified in the Order made,
the reference in the plan or document concerned must be construed for the purpose of this Order as referring to the provision (if any) corresponding to that provision in the Order as made.
Service of notices
47
- (1) A notice or other document required or authorised to be served for the purposes of this Order may be served—
- (a) by post;
- (b) by delivering it to the person on whom it is to be served or to whom it is to be given or supplied; or
- (c) with the consent of the recipient and subject to paragraphs (6) to (8), by electronic transmission.
- (2) Where the person on whom a notice or other document to be served for the purposes of this Order is a body corporate, the notice or document is duly served if it is served on the secretary or clerk of that body.
- (3) For the purposes of section 7 (references to service by post) of the Interpretation Act 1978[^f00036] as it applies for the purposes of this article, the proper address of any person in relation to the service on that person of a notice or document under paragraph (1) is, if that person has given an address for service, that address and otherwise—
- (a) in the case of the secretary or clerk of that body corporate, the registered or principal office of that body; and
- (b) in any other case, the last known address of that person at that time of service.
- (4) Where for the purposes of this Order a notice or other document is required or authorised to be served on a person as having an interest in, or as the occupier of, land and the name or address of that person cannot be ascertained after reasonable enquiry, the notice may be served by—
- (a) addressing it to that person by the description of “owner”, or as the case may be “occupier”, of the land (describing it); and
- (b) either leaving it in the hands of the person who is or appears to be resident or employed on the land or leaving it conspicuously affixed to some building or object on or near the land.
- (5) Where a notice or other document required to be served or sent for the purposes of this Order is served or sent by electronic transmission the requirement is to be taken to be fulfilled only where—
- (a) the recipient of the notice or other document to be transmitted has given consent to the use of electronic transmission in writing or by electronic transmission;
- (b) the notice or document is capable of being accessed by the recipient;
- (c) the notice or document is legible in all material respects; and
- (d) in a form sufficiently permanent to be used for subsequent reference.
- (6) Where the recipient of a notice or other document served or sent by electronic transmission notifies the sender within seven days of receipt that the recipient requires a paper copy of all or any part of that notice or other document the sender must provide such a copy as soon as reasonably practicable.
- (7) Any consent to the use of an electronic transmission by a person may be revoked by that person in accordance with paragraph (8).
- (8) Where a person is no longer willing to accept the use of electronic transmission for any of the purposes of this Order—
- (a) that person must give notice in writing or by electronic transmission revoking any consent given by that person for that purpose; and
- (b) such revocation is final and takes effect on a date specified by the person in the notice but that date must not be less than seven days after the date on which the notice is given.
- (9) This article does not exclude the employment of any method of service not expressly provided for by it.
Procedure in relation to certain approvals, etc.
48
- (1) Where an application is made to or request is made of a consenting authority for any consent, agreement or approval required or contemplated by any of the provisions of the Order, such consent, agreement or approval, if given, must (unless contrary provision is made in Part 2 of Schedule 1 or in Schedule 14) be given in writing and must not be unreasonably withheld.
- (2) If, within eight weeks after the application or request has been submitted to an authority or an owner as referred to in paragraph (1) of this article (or such longer period as may be agreed in writing with the undertaker) it has not notified the undertaker of its decision (and if it is a disapproval the grounds of disapproval), it is deemed to have approved the application or request.
- (3) Paragraph (2) does not apply in relation to—
- (a) applications made in relation to requirements; or
- (b) applications or requests made pursuant to any article in this Order which provides for deemed consent other than in accordance with paragraph (2).
Arbitration
49
- (1) Any difference under any provision of this Order, unless otherwise provided for, is to be referred to and settled by a single arbitrator to be agreed between the parties or, failing agreement, to be appointed on the application of either party (after giving notice in writing to the other) by the Secretary of State.
- (2) Any matter for which the consent or approval of the Secretary of State is required under any provision of this Order, including the requirements, shall not be subject to arbitration.
SCHEDULE 1 — AUTHORISED DEVELOPMENT
PART 1 — AUTHORISED DEVELOPMENT
In the Borough of North Lincolnshire
1
A nationally significant infrastructure project as defined in sections 14(1)(a) (nationally significant infrastructure projects: general) and 15 (generating stations) of the 2008 Act and associated development within the meaning of section 115(2) (development for which development consent may be granted), comprising the following development and works—
Energy park: ERF infrastructure
Work No. 1 – an electricity generating station located on land at Flixborough Wharf, Lincolnshire, fuelled by refuse derived fuels, with a capacity to process up to 760,000 tonnes of refuse derived fuel per annum, with a gross generation capacity of up to 95 megawatts at ISO conditions comprising the following works—
- (a) fuel reception and storage facilities, consisting of vehicle ramps, a tipping hall, shredder, bunker hall and cranes;
- (b) a combustion system housed within a boiler hall, consisting of three combustion lines and associated boilers;
- (c) a steam turbine and generator housed within a turbine hall with a cooling system;
- (d) a bottom ash handling system, including an ash conveyor housed within a bottom ash hall connecting to Work No. 2;
- (e) a flue gas treatment system, including residue and reagent silos housed within a flue gas treatment hall;
- (f) a silo or tank for the storage of ammonia reagents;
- (g) district heating equipment;
- (h) a tank for the storage of fuel oil;
- (i) a compressed air system;
- (j) a process effluent storage tank;
- (k) a switchyard including a sub-station and battery storage;
- (l) a transformer compound containing the generator transformer;
- (m) utility connections within the works limits;
- (n) pipe racks, pipe runs and cabling;
- (o) fire water pump house and fire water tank;
- (p) internal vehicle access roads, crossings and pedestrian and cycle facilities and routes;
- (q) administration offices and control room, security gatehouse, barriers and enclosures;
- (r) elevated walkway connected to Work Nos. 1C, 2 and 6;
- (s) weighbridges;
- (t) car parking;
- (u) a demineralised water treatment plant and demineralised water storage tanks;
- (v) indoor storage tanks for boiler water treatment chemicals;
- (w) a back-up generator;
- (x) trade effluent treatment plant; and
- (y) two visual barriers.
Work No. 1A –three emissions stacks, consisting of ERF stack windshield, back up boilers stack windshield and back-up generator stack, and associated emissions monitoring system.
Work No. 1B –carbon capture utilisation and storage facility capable of capturing at least 54,387 tonnes of CO² per annum including carbon dioxide storage tanks.
Work No. 1C –associated development being a visitors centre containing offices, exhibition space and visitor accommodation with elevated walkway connected to Work Nos. 1, 2 and 6.
Work No. 1D –a cooling system consisting of air-cooled condensers or air blast chillers.
Work No. 2 comprising associated development—
- (z) a bottom ash and flue gas residue handling and treatment facility;
- (aa) a concrete block manufacturing facility; and
- (bb) offices and elevated walkway connected to Work Nos 1, 1C and 6.
Rail infrastructure
Work No. 3 –associated development being reinstatement of the railway line between Flixborough Wharf and the Dragonby sidings including new sidings and two footbridges across the railway line and three user worked crossings.
Work No. 4 –associated development being a railhead, sidings and associated equipment to allow loading and unloading.
Energy park: supporting infrastructure
Work No. 5 –associated development being a new access road linking the B1216 and Stather Road, stopping up of the section of Stather Road between Neap House and Bellwin Drive, improvements to footpaths and the junction between the B1216 and A1077 and section of elevated walkway that connects to Work Nos. 1, 1C, 2 and 6.
Work No. 7 –associated development being a hydrogen electrolyser, associated infrastructure, equipment required to inject hydrogen into the gas grid.
Work No. 8 –associated development being an electric and hydrogen vehicle refuelling station, with hydrogen production and equipment required to inject hydrogen into the gas grid and offices.
Work No. 9 –associated development being a battery storage facility capable of peak discharge of 30MWe, with associated infrastructure including site roads, offices, control equipment, transformers and rectifiers.
DHPWN
Work No. 10 –associated development being private wire networks linking Work No. 1 with Work No. 2, Work No. 6, Work No. 7, Work No. 8, Work No. 9 and to end users outside of the Order limits.
Landscaping, mitigation and utility works
Work No. 12 –associated development being hard and soft landscaping and the construction of landscape features including a wetland area and ecological mitigation works.
Work No. 15B –associated development being construction access, temporary laydown areas to allow for storage of materials and working areas in connection with Work Nos. 1-14.
2 In connection with and in addition to Work Nos. 1, 1A to 1D and 2 to 14, to the extent that they do not otherwise form part of any such work, other associated development within the Order limits, being associated development within the meaning of section 115(2) of the 2008 Act (development for which development consent may be granted), including— a temporary lighting, including lighting columns; b security fencing, gates, boundary treatment and other means of enclosure; c closed circuit television cameras and columns and other security measures; d surface and foul water drainage systems, oil-water separators, including channelling, culverting, crossings and works to existing drainage ditches and systems; e electric, gas, water, telecommunication and other infrastructure connections and works, and works to alter such services and utilities connections; f hard and soft landscaping; g biodiversity mitigation and enhancement measures; h site establishment and preparation works, including site clearance (including vegetation removal); earthworks (including soil stripping and storage and site levelling) and excavations; temporary fencing; the creation of temporary construction access points; and the temporary alteration of the position of services and utilities apparatus and connections; i vehicle access roads, crossings, parking, and pedestrian and cycle facilities and routes, and such other works as may be necessary or expedient for the purposes of or in connection with the construction, operation and maintenance of the works in this Schedule 1 which do not give rise to any materially new or materially different environmental effects from those assessed in the environmental statement.
PART 2 — PARAMETERS TABLE
| (1) Component | (1) Component | (2) Maximum dimensions (m) | (2) Maximum height above Finished Floor Level (FFL) (m) | (2) Maximum height AOD (m) |
|---|---|---|---|---|
| ERF (Work No. 1) | Tipping hall | 87.5 x 60 | 31 | 37.6 |
| Bunker hall | 92 x 40 | 43 | 49.6 | |
| Boiler hall | 105 x 60 | 55 | 61.6 | |
| Flue gas treatment hall | 41 x 60 | 45 | 51.6 | |
| Turbine hall | 80 x 37 | 25 | 31.6 | |
| Bottom ash hall | 37 x 37 | 25 | 31.6 | |
| Transformer compound | 52 x 22 | 10 | 16.6 | |
| Switchyard | 93 x 44 | 10 | 14.6 | |
| Offices and admin facilities | 30 x 100 | 43 | 49.6 | |
| Fire water tank | 11.3 diameter | 19.3 | 25.9 | |
| Fire water pumphouse | 6 x 6 | 6.5 | 13.1 | |
| Gatehouses | 32 x 12 | 5 | 11.6 | |
| Visual barriers | 4.5 | 11.1 | ||
| ERF stack windshield (Work No. 1A) | ERF stack windshield (Work No. 1A) | 10 diameter | 120 | 126.6 |
| Back up boilers stack windshield (Work No. 1A) | Back up boilers stack windshield (Work No. 1A) | 3 diameter | 53 | 59.6 |
| Back-up generator stack (Work No. 1A) | Back-up generator stack (Work No. 1A) | 0.85 diameter | 55 | 61.6 |
| Carbon capture utilisation and storage facility (Work No. 1B) | Carbon capture utilisation and storage facility (Work No. 1B) | 79 x 66 | 50 | 56.6 |
| Carbon dioxide storage tanks (Work No. 1B) | Carbon dioxide storage tanks (Work No. 1B) | 28 x 20 | 20 | 26.6 |
| Visitor centre (Work No. 1C) | Visitor centre (Work No. 1C) | 41 x 36 | 16 | 19.05 |
| Elevated walkway (Work No. 1 and 1C) | Elevated walkway (Work No. 1 and 1C) | 700 x 4 | 12 | 17.05 |
| Air-cooled condensers/Air blast chillers (Work No. 1D) | Air-cooled condensers/Air blast chillers (Work No. 1D) | 75 x 35 | 50 | 56.6 |
| RHTF and CBMF (Work No. 2) | process building and storage areas | 280 x 130 | 25 | 30.1 |
| Admin buildings | 62 x 10 | 21 | 26.1 | |
| Rail Infrastructure (Work No. 3) | Footbridge No. 1 | 55.385 | ||
| Rail Infrastructure (Work No. 3) | Footbridge No. 2 | 48.561 | ||
| Access road (Work No. 5) | Access road (Work No. 5) | 5.2 | ||
| Plastic recycling facility (Work No. 6) | Pre-processed material storage | 65 x 35 | 10 | 13.9 |
| Heat exchange building | 35 x 17 | 15 | 18.9 | |
| Post processed storage | 5 x 16.4 | 15 | 18.9 | |
| Electrical rooms | 15 x 7 | 10 | 13.9 | |
| Process building | 130 x 80 | 25 | 28.9 | |
| Admin building | 62 x 10 | 21 | 24.9 | |
| Hydrogen electrolyser (Work No. 7) | Northern Gas AGI | 60 x 60 | 5 | 9.6 |
| Hydrogen electrolyser (Work No. 7) | Northern hydrogen production and storage facility | 100 x 25 | 8 | 12.6 |
| Vehicle refuelling station (Work No. 8) | Vehicle refuelling station (Work No. 8) | 95 x 80 | 12.5 | 15.5 |
| Hydrogen refuelling station (Work No. 8) | Southern Gas AGI | 60 x 60 | 5 | 10.1 |
| Hydrogen refuelling station (Work No. 8) | Southern hydrogen production and storage facility | 100 x 25 | 8 | 11.6 |
| Battery storage facility (Work No. 9) | Battery storage facility (Work No. 9) | 115 x 58 | 8.5 | 11.5 |
SCHEDULE 2 — REQUIREMENTS
PART 1 — REQUIREMENTS
Interpretation
1
In this Schedule—
- “coming into operation” or “come into operation” means the date on which the commissioning of the relevant part of the authorised development is completed so that that part becomes operational;
- “combined heat and power assessment” means the document of that name identified in Schedule 15 and which is certified by the Secretary of State as the combined heat and power assessment for the purposes of this Order under article 46;
- “commissioning” means the process of assuring that all systems and components of any phase of the authorised development as the context requires, are tested to verify that they function and are operable in accordance with the design objectives, specifications and operational requirements of the undertaker;
- “energy park works” means Work Nos. 1, 1A, 1B, 1C, 1D, 2, 6, 7, 8, 9 and 12;
- “PPDW CEMP” means a permitted preliminary development works construction environmental management plan as described in section 5.3 of the CoCP;
- “operation” or “operational” means the operational running of the relevant part of the authorised development;
- “northern spur” means the part of the district heating network (Work No. 11) along the B1216 and A1077 on works plans B4, running east across works plans B5 and B6 and ending with either option A on works plans B7 or option B on works plans B8, in accordance with article 24 (compulsory acquisition of land);
- “railway reinstatement works” means Work Nos. 3 and 4;
- “waste area” means the area shown on the waste area plan; and
- “waste area plan” means the document named the east midlands waste area plan identified in Schedule 15 and which is certified by the Secretary of State as the waste area plan for the purposes of this Order under article 46.
Commencement and phasing of the authorised development and notices
2
- (1) The authorised development must not be commenced after the expiration of five years from the date this Order comes into force.
- (2) The authorised development must not be commenced until a written scheme setting out the proposed phasing of the authorised development has been submitted to and approved by the relevant planning authority and the approved phasing scheme must be complied with thereafter.
- (3) The undertaker must notify the relevant planning authority within seven days of each of the following events occurring—
- (a) the start of commissioning of any part of the authorised development; and
- (b) the coming into operation of any part of the authorised development.
Detailed design
3
- (1) In relation to any part of the authorised development no development of that part may commence, save for any preliminary works, until details of the following have been submitted to and approved by the relevant planning authority—
- (a) the siting, design, external appearance and dimensions of all buildings and structures comprising the authorised development which are to be retained;
- (b) the colours, materials and surface finishes of all new permanent buildings and structures referred to in sub-paragraph (a);
- (c) the permanent circulation roads, vehicle parking and hardstanding; and
- (d) grounds levels and heights of all permanent buildings and structures.
- (2) The details submitted and approved under sub-paragraph (1) must be in accordance with the design process and codes set out in the design principles and codes, and the flood risk assessment and must take into account any results of preliminary ground investigations, including ongoing archaeological investigations, topographical surveys and ground gas monitoring.
- (3) The authorised development must be carried out in accordance with the details approved under sub-paragraph (1) for the relevant part of the authorised development.
Environmental management
4
- (1) The preliminary works may not commence until a PPDW CEMP has been submitted to and approved by the relevant planning authority and the preliminary works must be carried out in accordance with the approved PPDW CEMP unless otherwise agreed in writing by the relevant planning authority.
- (2) No part of the authorised development may commence, save for the preliminary works, until a construction environmental management plan for that part has been submitted to and approved by the relevant planning authority following consultation with the Environment Agency and Natural England to the extent the construction environmental management plan relates to matters relevant to their functions.
- (3) The construction environmental management plan submitted and approved must be in accordance with the CoCP and incorporate the following—
- (a) dust management plan;
- (b) remediation strategy;
- (c) spill response plan;
- (d) asbestos management plan;
- (e) construction flood management plan;
- (f) construction waste management plan;
- (g) protected species management plan;
- (h) invasive non-native species management plan;
- (i) soil management plan;
- (j) community relations plan;
- (k) construction noise and vibration management plan;
- (l) construction ornithology management plan; and
- (m) piling and foundation works management plan.
- (4) All construction works associated with the authorised development must be carried out in accordance with the approved construction environmental management plan for the relevant part of the authorised development unless otherwise agreed with the relevant planning authority.
- (5) No part of the energy park works or railway reinstatement works may come into operation until a detailed operational environmental management plan for that part has been submitted to and approved by the relevant planning authority to the extent that such a plan is necessary to supplement the environmental management system required under the environmental permit.
- (6) The detailed operational environmental management plan submitted and approved must be in accordance with the OEMP.
- (7) The detailed operational environmental management plan in respect of the energy park works must also be in accordance with any conditions in the environmental permit and incorporate the following (to the extent such matters are not covered in the environmental management system required under the environmental permit)—
- (a) noise management plan;
- (b) waste management plan; and
- (c) surface water discharge strategy.
- (8) The maintenance and operation of the authorised development must be carried out in accordance with the approved detailed operational environmental management plan for the relevant part of the authorised development unless otherwise agreed with the relevant planning authority.
- (9) No part of the energy park works may come into operation until either:
- (a) the undertaker has submitted to the relevant planning authority a report which demonstrates that the emissions from the authorised development will not exceed 1% of the critical load of acid deposition for the authorised development alone on the Risby Warren SSSI and the relevant planning authority, in consultation with Natural England, has approved the report; or
- (b) the undertaker has secured alternative adequate mitigation or compensation of the identified residual effects at the Risby Warren SSSI arising from the authorised development alone and this mitigation or compensation has been approved by the relevant planning authority, in consultation with Natural England.
Lighting scheme
5
- (1) No part of the energy park works or railway reinstatement works may come into operation until a scheme for all permanent external lighting has been submitted to and approved by the relevant planning authority.
- (2) The scheme submitted and approved under sub-paragraph (1) must be in accordance with the principles of the indicative lighting strategy and include measures to minimise and otherwise mitigate any artificial light emissions during the operation of the authorised development.
- (3) The scheme must be implemented as approved prior to the coming into operation of the authorised development and maintained throughout the operation of the authorised development unless otherwise agreed by the relevant planning authority.
Landscape design
6
- (1) No part of the energy park works or railway reinstatement works may commence until a landscaping scheme has been submitted to and approved by the relevant planning authority following consultation with Natural England to the extent the landscaping scheme relates to matters relevant to their functions.
- (2) The scheme submitted and approved under sub-paragraph (1) must be in accordance with the indicative landscape and biodiversity plans, the plans in appendix I (biodiversity net gain report) of the ecology and nature conservation chapter of the environmental statement in order to deliver the biodiversity net gain, and design process and codes set out in the design principles and codes and must include details of all hard and soft landscaping works, including—
- (a) materials, and the number, species, sizes and planting positions of any planting;
- (b) measures to protect any existing shrub and tree planting that is to be retained;
- (c) hard surfacing materials;
- (d) an implementation plan; and
- (e) a future maintenance plan.
- (3) The scheme must be implemented within a period of 12 months beginning with the coming into operation of the authorised development and maintained as approved during the operation of the authorised development, unless otherwise agreed with the relevant planning authority.
Landscape and ecology management
7
- (1) No part of the energy park works or railway reinstatement works may come into operation until a landscape and biodiversity management and monitoring plan for that part has been submitted to and approved by the relevant planning authority following consultation with Natural England to the extent the landscape and biodiversity management and monitoring plan relates to matters relevant to their functions.
- (2) The landscape and biodiversity management and monitoring plan submitted and approved must be in accordance with the principles in the outline LBMMP and must include an implementation timetable, including monitoring and maintenance activities.
- (3) The plan approved under sub-paragraph (1) must be implemented and delivered as approved and in accordance with the approved timetable.
Water Resources Assessment
8
- (1) No part of the energy park works may commence, save for the preliminary works, until a Water Resources Assessment is submitted to and agreed with Anglian Water following consultation with the Environment Agency on matters relating to their function and subsequently approved by the relevant planning authority. The Water Resources Assessment will include a scheme to deal with the supply of water during both construction and operation of the authorised development including final process design, maximum daily demand, and water efficiency measures.
- (2) The scheme submitted and approved under sub-paragraph (1) must be in accordance with the environmental statement and for the operational water supply must be included in the operational environmental management plan submitted pursuant to Requirement 4(5) – (7) and for the construction water supply must be included in an update to the construction environment management plan submitted pursuant to Requirement 4(2).
- (3) The scheme approved under sub-paragraph (1) must be implemented as approved throughout the construction and operation of the energy park works unless agreed otherwise by the relevant planning authority following consultation with the Environment Agency and Anglian Water as necessary.
- (4) For the purposes of this Requirement—
- (a) “Anglian Water” means Anglian Water Services Limited, the statutory water supply provider for the North Lincolnshire Green Energy Park under the Water Industry Act 1991 and responsible for ensuring the cumulative impacts of development do not compromise the supply of water for domestic purposes; and
- (b) “Water Resources Assessment” includes all designs, drawings, specifications, resource assessments, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe the source and supply of water for construction and operation.
Surface water drainage
9
- (1) No part of the energy park works may commence, save for the preliminary works, until details of the permanent surface water drainage systems, including a future maintenance plan, have been submitted to and approved by the relevant planning authority following consultation by the undertaker with the lead local flood authority, Scunthorpe and Gainsborough Water Management Board and the Environment Agency on matters related to their function.
- (2) The details submitted and approved under sub-paragraph (1) must be in accordance with the principles set out in the indicative drainage strategy and the design process and codes set out in the design principles and codes.
- (3) The scheme approved under sub-paragraph (1) must be implemented as approved prior to the development coming into operation and maintained as approved throughout the operation of the authorised development unless otherwise agreed with the relevant planning authority.
Foul water drainage
10
- (1) No part of the energy park works may commence, save for the preliminary works, until details of the permanent foul water drainage systems, including a future maintenance plan, have been submitted to and approved by the relevant planning authority following consultation with the Environment Agency on matters related to their function.
- (2) The details submitted and approved under sub-paragraph (1) must be in accordance with the principles set out in the indicative drainage strategy.
- (3) The scheme approved under sub-paragraph (1) must be implemented as approved prior to the development coming into operation and maintained as approved throughout the operation of the authorised development unless otherwise agreed by the relevant planning authority.
Construction traffic management and travel planning
11
- (1) No part of the authorised development may commence, save for the preliminary works, until a construction traffic management plan and a construction workers travel plan for that part has been submitted to and approved by the relevant planning authority.
- (2) The construction traffic management plan submitted and approved under sub-paragraph (1) must be in accordance with the CLP.
- (3) The construction traffic management plan and construction workers travel plan approved under sub-paragraph (1) must be implemented as approved throughout the construction of the authorised development unless otherwise agreed with the relevant planning authority.
Archaeology
12
- (1) No part of the authorised development is to commence until the undertaker has completed the following sequence of measures for that part of the authorised development—
- (a) commissioned a programme of exploratory archaeological investigation of areas within the Order limits that provides for the identification and evaluation of the extent, character and significance of archaeological remains in any areas of the Order limits where previous evaluation investigations have not taken place or are incomplete;
- (b) submitted to the relevant planning authority for approval a written scheme of investigation setting out the details of the programme of evaluation for the relevant planning authority to approve prior to commencement of the evaluation investigations;
- (c) completed the evaluation investigations and submitted final reports to the relevant planning authority in accordance with the details and timings of the approved written scheme of investigation, provided that the evaluation investigations must be timed so that the results can inform the scope of the archaeological mitigation measures, referred to in sub-paragraph (2);
- (d) submitted to the relevant planning authority for approval an updated archaeological impact assessment of the significance of all identified and potential heritage assets and the impact of the authorised development on that significance; and
- (e) submitted to the relevant planning authority for approval an overarching archaeological mitigation strategy that details all mitigation measures to preserve, and if necessary enhance, all heritage assets affected by the authorised development.
- (2) No part of the authorised development is to commence until a programme of archaeological mitigation measures for that part of the authorised development informed by the evaluation investigations referred to in sub-paragraph (1) and by earlier phases of investigation has been implemented in accordance with the approved overarching archaeological mitigation strategy and further written schemes of investigation for archaeological fieldwork which have been approved in writing by the relevant planning authority. The overarching archaeological mitigation strategy and written schemes of investigation must include and make provision for the following elements—
- (a) mitigation fieldwork including measures to ensure the preservation in situ or by record of archaeological features of identified importance;
- (b) post mitigation fieldwork methodologies for assessment and analysis;
- (c) reporting and dissemination of findings, including publication of significant results;
- (d) preparation of site archive, arrangements and timetable for deposition and sustainable management at a store approved in writing by the relevant planning authority;
- (e) a timetable including sufficient notification to ensure that the mitigation fieldwork is undertaken and completed in accordance with the mitigation strategy before commencement of the relevant part of the authorised development;
- (f) curatorial monitoring arrangements, including the notification in writing to the North Lincolnshire Historic Environment Record Office of the commencement of archaeological works and the opportunity to monitor such works;
- (g) a list of all staff involved in the implementation of the mitigation strategy, including sub-contractors and specialists, their responsibilities and qualifications;
- (h) any arrangements for community involvement; and
- (i) measures to enhance the interpretation and public appreciation of heritage assets.
- (3) The approved mitigation measures must be carried out in accordance with the written scheme of mitigation measures.
Flood risk
13
- (1) No part of the authorised development may commence, save for the preliminary works, until a detailed flood mitigation strategy, including the flood defences forming part of Work No. 13, an implementation timetable and long-term maintenance arrangements, has for that part, been submitted to and approved by the relevant planning authority in consultation with the Environment Agency.
- (2) No part of the energy park works may be commissioned until a flood management plan, which must include an evacuation route plan and flood resilience implementation plan, has, for that part, been submitted to and approved by the relevant planning authority.
- (3) The schemes submitted and approved under sub-paragraphs (1) and (2) must be in accordance with the principles in the flood risk assessment unless otherwise agreed by the relevant planning authority in consultation with the Environment Agency and the lead local flood authority.
- (4) The schemes approved under sub-paragraphs (1) and (2) must be implemented as approved prior to the coming into operation of the energy park works and maintained throughout the operation of the energy park works unless otherwise agreed with the relevant planning authority.
Operational travel plan
14
- (1) The energy park works must not come into operation until a travel plan has been submitted to and approved by the relevant planning authority.
- (2) The plan submitted and approved under sub-paragraph (1) must be in accordance with the framework travel plan unless otherwise agreed by the relevant planning authority.
- (3) The plan approved under sub-paragraph (1) must be implemented as approved throughout the operation of the authorised development unless otherwise agreed by the relevant planning authority.
New highway access
15
- (1) The undertaker must not commence development of the energy park works or railway reinstatement works, excluding any preliminary works, until the new access road (Work No. 5) has been constructed to base course level and connected to the public highway.
- (2) As part of constructing the new access road to base course level under sub-paragraph (1), the undertaker must carry out such parts of Work Nos. 10 and 11 as fall within the land in respect of which Work No. 5 is authorised.
- (3) Prior to the energy recovery facility (Work No. 1) coming into operation the undertaker must complete the new access road (Work No. 5) to the reasonable satisfaction of the relevant planning authority, in consultation with the relevant highway authority, and make it available for public use.
Fuel Type
16
- (1) Only refuse derived fuel comprising of processed waste from municipal, household, commercial and industrial sources may be used in the combustion system in Work No. 1 (b), except for the purposes of start-up or support firing when gas or fuel oil may be used.
- (2) Not less than—
- (a) 350,000 tonnes; or
- (b) 50%,
- (c) of the refuse derived fuel processed at the authorised development per operational year (whichever is the lower) must originate from within the waste area unless otherwise agreed by the relevant planning authority.
- (3) From the date of coming into operation of Work No. 1 (ERF) until the date Work No. 1 (ERF) has been decommissioned in accordance with requirement 16 (Decommissioning) (unless otherwise agreed by the relevant planning authority), the undertaker must maintain a written record, retained at the authorised development, of the quantity of the refuse derived fuel received from the waste area treated by the authorised development for each operational year.
- (4) From the date of coming into operation of Work No. 1 (ERF) until the date Work No. 1 (ERF) has been decommissioned in accordance with requirement 16 (Decommissioning) (unless otherwise agreed by the relevant planning authority), on or prior to 1 February each year, the undertaker must provide to the relevant planning authority a report for the preceding operational year (the “waste catchment report”). The waste catchment report must identify the total tonnage of refuse derived fuel received from the waste area processed at the authorised development for the operational year.
Decommissioning
17
- (1) Within two years of the date that the undertaker decides to end commercial operation of the energy park works, the undertaker must submit to the relevant planning authority for its approval a decommissioning plan, including a timetable for its implementation and a decommissioning environmental management plan which shall include, but not be limited to, matters such as flood risk.
- (2) The plan submitted to and approved under sub-paragraph (1) must be implemented as approved unless otherwise agreed with the relevant planning authority.
Combined heat and power
18
- (1) No part of the energy park works may be commissioned until a scheme for the provision of steam or hot water pass-outs has been submitted to and approved by the relevant planning authority.
- (2) The scheme submitted under sub-paragraph (1) must as a minimum comply with the conditions relating to steam and hot water pass-outs within any environmental permit granted in respect of the authorised development.
- (3) The scheme approved under sub-paragraph (1) must be implemented as approved prior to the coming into operation of the authorised development and maintained throughout the operation of the authorised development.
- (4) Prior to the energy park works coming into operation, the undertaker will construct the northern spur.
- (5) No later than the date that is 18 months after the date of the energy park works coming into operation, the undertaker must submit to the relevant planning authority for its approval a report (“the CHP review”) updating the combined heat and power assessment.
- (6) The CHP review submitted must—
- (a) consider the opportunities that reasonably exist for the export of heat from Work No. 11 at the time of submission of the CHP review; and
- (b) include a list of actions (if any) that the undertaker is reasonably and practicably able to take (without material additional cost to the undertaker) to increase the potential for the export of heat from Work No. 11.
- (7) The undertaker must take such actions as are included, within the timescales specified, in the approved CHP review.
- (8) The relevant planning authority must consult with the Environment Agency before approving any CHP review.
Commissioning
19
- (1) Notice of the intended completion of commissioning of Work Nos. 1 (ERF), 1B (CCUS) and 2(b) (CBMF) must be given to the relevant planning authority where practicable prior to such completion.
- (2) Work No. 1B (CCUS) must be constructed and commissioned within 6 months of the commissioning of Work No. 1 (ERF) and Work No. 2(b) (CBMF) must be constructed and commissioned within 12 months of the commissioning of Work No. 1B except that these timescales may be amended where it has been demonstrated to the satisfaction of the relevant planning authority that the alternative timescales sought are unlikely to give rise to any materially new or materially different environmental effects from those assessed in the environmental statement.
Carbon Capture
20
- (1) Once commissioned, Work No. 1B (CCUS) must capture a minimum quantity of CO2 which equates to the lesser of 54,387 tonnes per annum or 8.37% of the weight of the ERF waste throughput per annum from the date that the CCUS is commissioned until the energy park works are decommissioned.
- (2) Within 28 days of the date which is one calendar year from the date Work No. 1B comes into operation, the undertaker must submit a report to the relevant planning authority confirming the amount of CO2 captured during the previous year of operation and must continue to submit such reports annually until the energy park works are decommissioned.
Rail
21
- (1) The undertaker must use reasonable endeavours to complete all necessary works forming part of Work No.3 to such an extent as to facilitate the use of the railway by rail freight importing or exporting waste or other materials within 12 months of construction of the new access road (Work No. 5) to base course level as per requirement 15 and in any event must complete Work No. 3 prior to commissioning of Work No. 1
- (2) Following completion of Work No. 3 the undertaker must retain, manage and keep the railway forming part of the authorised development available for use throughout the construction and operation of the authorised development.
Local employment and skills
22
- (1) No part of the authorised development, save for the preliminary works, may commence until a detailed employment and skills plan (which must be in accordance with the outline employment and skills policy) has been submitted to and approved by the relevant planning authority.
- (2) The employment and skills plan shall identify opportunities for individuals and businesses based in the region of Greater Lincolnshire to access employment opportunities associated with the construction, operation and maintenance of the authorised development.
- (3) The employment and skills plan approved under sub-paragraph (1) must be implemented as approved.
Noise
23
The rating level (LAr) of noise from the operation of the authorised development shall not exceed: 45 dB LAr for any fifteen-minute period between 23:00 and 07:00; and 50 dB LAeq for any one-hour period between 07:00 and 23:00, determined one metre free-field external to any window or door of any existing permanent residential premises using the definitions and methods described in ‘Methods for rating and assessing industrial and commercial sound’ British Standards Institution BS4142 2014+A1:2019.
PRF
24
- (1) Notice of the intended completion of commissioning of the plastic recycling facility (Work No. 6) must be given to the relevant planning authority where practicable prior to such completion. Approved details and amendments to them.
- (2) Prior to the coming into operation of Work No. 1 (ERF) the plastic recycling Facility (Work No. 6) must have been constructed and commissioned.
- (3) The plastic recycling facility (Work No. 6) shall only treat plastic waste received from suppliers who are also supplying the undertaker with refuse derived fuel used to fuel the combustion system in Work No. 1 (b).
25
Where a requirement requires the authorised development to be constructed in accordance with details approved by the relevant planning authority, the approved details are taken to include any amendments subsequently approved by the relevant planning authority.
Amendments agreed by the relevant planning authority
26
- (1) Where the words “unless otherwise agreed by the relevant planning authority” appear in the requirements—
- (a) whenever the undertaker requests that the relevant planning authority provides its agreement in accordance with those words, the undertaker must provide the relevant planning authority with information on compliance with any document listed in the relevant requirement and any other relevant certified document; and
- (b) any such approval or agreement may only be given in relation to non-material amendments and where it has been demonstrated to the satisfaction of that authority that the subject matter of the approval or agreement sought will not give rise to any materially new or materially different environmental effects from those assessed in the environmental statement.
- (2) In cases where the requirement or the relevant sub-paragraph requires consultation with specified persons, any such approval or agreement must not be given without the relevant planning authority having first consulted with those persons.
Requirement for written approval
27
Where under any of the requirements the approval or agreement of the relevant planning authority or another person is required, that approval or agreement must be provided in writing.
Anticipatory steps towards compliance with any requirement
28
- (1) If before this Order came into force the undertaker or any other person took any steps that were intended to be steps towards compliance with any provision of this Schedule, those steps must be taken into account for the purpose of determining compliance with that provision if they would have been valid steps for that purpose had they been taken after this Order came into force.
- (2) Any document submitted to the relevant planning authority which the undertaker considers may constitute a step referred to at sub-paragraph (1) must include a statement that it is likely to engage sub-paragraph (1).
PART 2 — PROCEDURE FOR DISCHARGE OF REQUIREMENTS
Applications made under requirements
29
- (1) Where an application has been made to the discharging authority for any consent, agreement or approval required by a requirement (including consent, agreement or approval in respect of part of a requirement) included in this Order—
- (a) the undertaker must give the discharging authority sufficient information to identify the requirement(s) to which the application relates;
- (b) the undertaker must provide such particulars, and the request be accompanied by such plans and drawings as are reasonably considered necessary to deal with the application.
- (2) The discharging authority must give notice to the undertaker of the decision on the application before the end of the decision period.
- (3) For the purposes of sub-paragraph (2), the decision period is—
- (a) where no information is requested under paragraph 31 (further information), 8 weeks from the day immediately following that on which the application is received by the discharging authority;
- (b) where further information is requested under paragraph 31 (further information), 8 weeks from the day immediately following that on which further information has been supplied by the undertaker under paragraph 31; or
- (c) such longer period as may be agreed between the undertaker and the discharging authority in writing before the end of the period in sub-paragraph (a) or (b).
- (4) In determining any application made under sub-paragraph (1), the discharging authority may—
- (a) give or refuse its consent, agreement or approval; or
- (b) give its consent, agreement or approval subject to reasonable conditions,
and where consent, agreement or approval is refused or granted subject to conditions the discharging authority must provide its reasons for that decision with the notice of the decision pursuant to sub-paragraph (2).
Fees
30
- (1) Where an application is made to the discharging authority for consent, agreement or approval in respect of a requirement, a fee prescribed under regulation 16(1)(b) of the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012[^f00037] (as may be amended or replaced from time to time) is to be paid to that authority.
- (2) Any fee paid under this Schedule must be refunded to the undertaker within 42 days of—
- (a) the application being rejected as invalidly made; or
- (b) the discharging authority failing to determine the application within the decision period as determined under paragraph 29(3),
unless within that period the undertaker agrees, in writing, that the fee is to be retained by the discharging authority and credited in respect of a future application.
Further information
31
- (1) In relation to any part of an application made under this Schedule, the discharging authority has the right to request such further information from the undertaker as is necessary to enable it to consider the application.
- (2) In the event that the discharging authority considers such further information to be necessary the discharging authority must, as soon as reasonably practicable and within 20 business days of receipt of the application, notify the undertaker in writing specifying the further information required and (if applicable) to which part of the application it relates.
- (3) In the event that the discharging authority does not give such notification within that 20 business day period it is deemed to have sufficient information to consider the application and is not subsequently entitled to request further information without the prior agreement of the undertaker.
- (4) Where further information is requested under this paragraph in relation to part only of an application, that part is to be treated as separate from the remainder of the application for the purposes of calculating the time periods referred to in paragraph 29 (applications made under requirements) and in this paragraph.
Appeals
32
- (1) The undertaker may appeal to the Secretary of State in the event that—
- (a) the discharging authority refuses an application for any agreement or approval required by a requirement included in this Order;
- (b) the discharging authority does not give notice of its decision to the undertaker within the decision period as determined in paragraph 29;
- (c) on receipt of a request for further information pursuant to paragraph 31 (further information) the undertaker considers that either the whole or part of the specified information requested by the discharging authority is not reasonably necessary for consideration of the application; or
- (d) on receipt of any further information requested, the discharging authority notifies the undertaker that the information provided is inadequate and requests additional information which the undertaker considers is not reasonably necessary for consideration of the application.
- (2) The appeal process is as follows—
- (a) the undertaker must submit the appeal documentation to the Secretary of State, a copy of the application submitted to the discharging authority and any supporting documentation which the undertaker may wish to provide (“the appeal documentation”);
- (b) the undertaker must on the same day provide copies of the appeal documentation to the discharging authority and any requirement consultee (if applicable) required to be consulted pursuant to the article or requirement which is the subject of the appeal;
- (c) as soon as is practicable after receiving the appeal documentation, but in any event within 20 business days of receiving the appeal documentation, the Secretary of State must appoint a person and forthwith notify the appeal parties of the identity of the appointed person and the address to which all correspondence for that person’s attention should be sent;
- (d) the discharging authority and any requirement consultee (if applicable) must submit written representations to the appointed person in respect of the appeal within 20 business days of the date on which the appeal parties are notified of the appointment of a person under paragraph (c) and must ensure that copies of their written representations are sent to each other and to the undertaker on the day on which they are submitted to the appointed person; and
- (e) the appeal parties must make any counter-submissions to the appointed person within 20 business days of receipt of written representations pursuant to paragraph (d) above.
- (3) The appointed person must make their decision and notify it to the appeal parties, with reasons, as soon as reasonably practicable. If the appointed person considers that further information is necessary to consider the appeal, the appointed person must, as soon as practicable, notify the appeal parties in writing specifying the further information required, the appeal party from whom the information is sought, and the date by which the information is to be submitted.
- (4) Any further information required pursuant to sub-paragraph (3) must be provided by the appeal party from whom the information is sought to the appointed person and to other appeal parties by the date specified by the appointed person. Any written representations concerning matters contained in the further information must be submitted to the appointed person, and made available to all appeal parties, within 20 business days of that date.
- (5) On an appeal under this paragraph, the appointed person may—
- (a) allow or dismiss the appeal; or
- (b) reverse or vary any part of the decision of the discharging authority (whether the appeal relates to that part of it or not),
and may deal with the application as if it had been made to the appointed person in the first instance.
- (6) The appointed person may proceed to a decision on an appeal taking into account only such written representations as have been sent within the time limits prescribed, or set by the appointed person, under this paragraph.
- (7) The appointed person may proceed to a decision even though no written representations have been made within those time limits, if it appears to the appointed person that there is sufficient material to enable a decision to be made on the merits of the case.
- (8) The decision of the appointed person on an appeal is final and binding on the parties, and a court may entertain proceedings for questioning the decision only if the proceedings are brought by a claim for judicial review.
- (9) If an approval is given by the appointed person pursuant to this Schedule, it is deemed to be an approval for the purpose of Part 1 of this Schedule (requirements) as if it had been given by the discharging authority. The discharging authority may confirm any determination given by the appointed person in identical form in writing but a failure to give such confirmation (or a failure to give it in identical form) may not be taken to affect or invalidate the effect of the appointed person’s determination.
- (10) Save where a direction is given pursuant to sub-paragraph (11) requiring the costs of the appointed person to be paid by the discharging authority, the reasonable costs of the appointed person must be met by the undertaker.
- (11) On application by the discharging authority or the undertaker, the appointed person may give directions as to the costs of the appeal parties and as to the parties by whom the costs of the appeal are to be paid. In considering whether to make any such direction and the terms on which it is to be made, the appointed person must have regard to the Planning Practice Guidance: Appeals (March 2014) on the award of costs, or any guidance which may from time to time replace it.
Interpretation
33
In this Schedule—
- “the appeal parties” means the discharging authority, the requirement consultee and the undertaker;
- “business day” means a day other than Saturday or Sunday, which is not Christmas Day, Good Friday or a bank holiday under section 1 (bank holidays) of the Banking and Financial Dealings Act 1971[^f00038];
- “discharging authority” means that person or body responsible for approving details pursuant to the requirements in Part 1 of this Schedule.
SCHEDULE 3 — STREETS SUBJECT TO STREET WORKS
| (1) Area | (2) Streets subject to street works | (3) Description of street works |
|---|---|---|
| The rights of way and access plans – Sheet 1 | The rights of way and access plans – Sheet 1 | The rights of way and access plans – Sheet 1 |
| In the Borough of North Lincolnshire | Brumby Common Lane and verge, Scunthorpe between points SW1 and SW2 | Installation of the DHPWN (Work Nos. 10 and 11). |
| The rights of way and access plans – Sheet 2 | The rights of way and access plans – Sheet 2 | The rights of way and access plans – Sheet 2 |
| In the Borough of North Lincolnshire | West of M181 between points SW3 and SW4 | Installation of the DHPWN (Work Nos. 10 and 11). |
| The rights of way and access plans – Sheet 3 | The rights of way and access plans – Sheet 3 | The rights of way and access plans – Sheet 3 |
| In the Borough of North Lincolnshire | A18 Doncaster Road between points SW5 and SW6 | Installation of the DHPWN (Work Nos. 10 and 11). |
| The rights of way and access plans – Sheet 4 | The rights of way and access plans – Sheet 4 | The rights of way and access plans – Sheet 4 |
| In the Borough of North Lincolnshire Flixborough Parish Council | B1216 Ferry Road West between points SW7 and SW8 | The creation of a new roundabout at the junction with the new spine road. Installation of the DHPWN (Work Nos. 10 and 11). |
| In the Borough of North Lincolnshire Flixborough Parish Council | B1216 Ferry Road West between points SW8 and SW9 | Installation of the DHPWN (Work Nos. 10 and 11). |
| In the Borough of North Lincolnshire Flixborough Parish Council | A1077 Phoenix Parkway between points SW10 and SW11 including the eastern and western junctions with Ferry Road West | The creation of a new staggered toucan crossing, extension of the existing exit lane towards Ferry Road West with the associated road marking, re-shape of the existing traffic islands, realignment of the kerb line located at the north of the crossing and the creation of a new shared footway that connects to the junction with Ferry Road West and Main Avenue. Installation of the DHPWN (Work Nos. 10 and 11). |
| In the Borough of North Lincolnshire Flixborough Parish Council | A1077 Phoenix Parkway between points SW11 and SW12 | Installation of the DHPWN (Work Nos. 10 and 11). |
| In the Borough of North Lincolnshire Flixborough Parish Council | Holyrood Drive between points SW13 and SW14 | Installation of the DHPWN (Work Nos. 10 and 11). |
| The rights of way and access plans – Sheet 5 | The rights of way and access plans – Sheet 5 | The rights of way and access plans – Sheet 5 |
| In the Borough of North Lincolnshire Flixborough Parish Council | First Avenue between points SW16 and SW17 | Improvements including the creation of a segregated cycle track, the realignment of the southern kerbline and new road marking. Installation of the DHPWN (Work Nos. 10 and 11) and other utilities. |
| In the Borough of North Lincolnshire Flixborough Parish Council | Bellwin Drive between points SW17 and SW18 | Installation of the DHPWN (Work Nos. 10 and 11) and other utilities. |
| In the Borough of North Lincolnshire Flixborough Parish Council | The junction of Bellwin Drive and Stather Road between points SW18 and SW19 | Improvements and widening including the creation of a segregated cycle track, realignment of Stather Road and Bellwin Drive with associated road marking, creation of a new junction with a ghost island arranged to the new spine road and new junction to the proposed employee parking area for the ERF. Installation of the DHPWN (Work Nos. 10 and 11) and other utilities. |
| In the Borough of North Lincolnshire Flixborough Parish Council | North of Stather Road between points SW19 and SW20 | Installation of the DHPWN (Work Nos. 10 and 11) and other utilities. |
| In the Borough of North Lincolnshire Flixborough Parish Council | First Avenue between points SW20 and SW17 | Installation of the DHPWN (Work Nos. 10 and 11) and other utilities. |
| In the Borough of North Lincolnshire Flixborough Parish Council | First Avenue between points SW20 and SW21 | Installation of the DHPWN (Work Nos. 10 and 11) and other utilities. |
| The rights of way and access plans – Sheet 9 | The rights of way and access plans – Sheet 9 | The rights of way and access plans – Sheet 9 |
| In the Borough of North Lincolnshire | A1077 Phoenix Parkway between points SW15 (also on Sheet 4) and SW22 | Installation of the DHPWN (Work Nos. 11 and 12). |
| In the Borough of North Lincolnshire | A1077 Phoenix Avenue and Clayfield Road roundabout between points SW22 and SW23 | Installation of the DHPWN (Work Nos. 10 and 11). |
| The rights of way and access plans – Sheet 10 | The rights of way and access plans – Sheet 10 | The rights of way and access plans – Sheet 10 |
| In the Borough of North Lincolnshire | A1077 Phoenix Parkway between points SW23 (Sheet 9) and SW24 | Installation of the DHPWN (Work Nos. 10 and 11). |
| In the Borough of North Lincolnshire | A1077 Phoenix Parkway and Normanby Road roundabout between points SW24 and SW25 | Installation of the DHPWN (Work Nos. 10 and 11). |
| In the Borough of North Lincolnshire | Normanby Road, Warren Road, Bessemer Way and Mannaberg Way between points SW25 and SW26 | Installation of the DHPWN (Work Nos. 10 and 11). |
SCHEDULE 4 — STREETS TO BE PERMANENTLY STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED
| (1) Area | (2) Street to be stopped up | (3) Extent of stopping up | (4) New street to be substituted |
|---|---|---|---|
| The rights of way and access plans – Sheets 4 and 5 | The rights of way and access plans – Sheets 4 and 5 | The rights of way and access plans – Sheets 4 and 5 | The rights of way and access plans – Sheets 4 and 5 |
| In the Borough of North Lincolnshire Flixborough Parish Council | Reference A1 to A2 Part of Stather Road | Reference A1 to A2 from point A1 located 40 metres north of Neap House to point A2 located at the junction between Stather Road and Bellwin Drive, a distance of 1020 metres | Reference B1 to B2 To be substituted by a new highway from point B1 located on the B1216 Ferry Road West running in a northern direction to a point B2 located 146 metres east of Bellwin Drive, a distance of 1410 metres |
SCHEDULE 5 — PUBLIC RIGHTS OF WAY
PART 1 — PUBLIC RIGHTS OF WAY TO BE TEMPORARILY SUSPENDED
| (1) Area | (2) Footpath to be temporarily suspended or diverted | (3) Extent of temporary suspension | (4) Diversion to be provided |
|---|---|---|---|
| The rights of way and access plans – Sheet 6 | The rights of way and access plans – Sheet 6 | The rights of way and access plans – Sheet 6 | The rights of way and access plans – Sheet 6 |
| In the Borough of North Lincolnshire Flixborough Parish Council | Public footpath FLIX175 from its junction with Stather Road to the railway crossing point | Between points E1 and E2, a distance of 116 metres | No |
| In the Borough of North Lincolnshire Flixborough Parish Council | Public footpath FLIX178 in the vicinity of the railway crossing point | Between points E3 and E4, a distance of 47.5 metres | No |
| The rights of way and access plans – Sheet 9 | The rights of way and access plans – Sheet 9 | The rights of way and access plans – Sheet 9 | The rights of way and access plans – Sheet 9 |
| In the Borough of North Lincolnshire | Public footpath SCUN 175 at the crossing with the A1077 Phoenix Parkway | Between points E5 and E6, a distance of 21 metres | Yes |
| In the Borough of North Lincolnshire | Cycle track NCN 169 at the crossing with the A1077 Phoenix Parkway | Between points E5 and E6, a distance of 21 metres | Yes |
PART 2 — NEW PUBLIC RIGHTS OF WAY TO BE CREATED
| (1) Area | (2) Length of footpath/pedestrian-cycle path |
|---|---|
| The rights of way and access plans – Sheet 4 | The rights of way and access plans – Sheet 4 |
| In the Borough of North Lincolnshire Flixborough Parish Council | Reference CCF1 to CCF2 A cycle track in the verge on the northern side of the B1216 Ferry Road West from point CCF1 in a south eastern direction to point CCF2, a distance of 501 metres |
| In the Borough of North Lincolnshire Flixborough Parish Council | Reference CCF3 to CCF5 (Sheet 5) A cycle track in the verge on the northern side of Ferry Road West from point CCF3 (east of the A1077 Phoenix Parkway) in a north western direction to point CCF2 on the new spine road and then in a northern direction to Point CCF4 on Stather Road and then in a western direction to point CCF5 at the junction with Bellwin Drive, a distance of 2090 metres |
| In the Borough of North Lincolnshire Flixborough Parish Council | Reference CCF6 to CCF7 A cycle track from point CCF6 on the new spine road in a western direction to point CCF7 on Stather Road, a distance of 330 metres |
| In the Borough of North Lincolnshire Flixborough Parish Council | Reference FP1 to FP2 A footpath from point FP1 on the new spine road in an eastern direction along Lysaght’s drain to point FP2, a distance of 921 metres |
| The rights of way and access plans – Sheet 5 | The rights of way and access plans – Sheet 5 |
| In the Borough of North Lincolnshire Flixborough Parish Council | Reference CCF8 to CCF9 A cycle track in the verge on the south side of First Avenue from point CCF8 in a north eastern direction to point CCF9, a distance of 150 metres |
| In the Borough of North Lincolnshire Flixborough Parish Council | Reference FP3 to FP4 A footpath from point FP3 on Stather Road in a north western direction to point FP4 on existing public right of way FLIX 304, a distance of 412 metres |
| The rights of way and access plans – Sheet 6 | The rights of way and access plans – Sheet 6 |
| In the Borough of North Lincolnshire Flixborough Parish Council | Reference FP6 to FP5 A footpath from point FP6 on existing public right of way FLIX 178 in a south western direction to point FP5, a distance of 97 metres |
SCHEDULE 6
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.