The Viking CCS Carbon Dioxide Pipeline Order 2025

Type Statutory-Instrument
Publication 2025-04-09
Last updated 2025-08-20
State In force
Department King's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API
  • (4) If alternative apparatus or any part of such apparatus is to be constructed elsewhere other than in land of or land secured by the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (3), in the land in which the alternative apparatus or part of such apparatus is to be constructed, the undertaker must take all steps required in the circumstances to assist Uniper to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.
  • (5) Any alternative apparatus to be constructed in land of or land secured by the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between the undertaker and Uniper.
  • (6) Uniper must, after the alternative apparatus to be provided or constructed has been agreed, and subject to a written agreement having been entered into between the parties and the grant to Uniper of any such facilities and rights as are referred to in sub-paragraph (3) or (4), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.

Expenses

204

  • (1) Subject to the following provisions of this paragraph, the undertaker must pay to Uniper within 30 days of receipt of an invoice, all charges, costs and expenses reasonably anticipated or incurred by Uniper in, or in connection with, the inspection, removal, relaying or replacing, alteration, repair, remediation or restoration of or protection of any apparatus or alternative apparatus or the construction of any new or alternative apparatus which may be required in consequence of the execution of any powers conferred on the undertaker, pursuant to the Order (including in the execution of any authorised development as is referred to in this Part of this Schedule) including—
  • (a) in connection with the cost of the carrying out of any assessment of Uniper’s apparatus under Pipelines Safety Regulations 1996 and Gas Safety (Management) Regulations 1996 reasonably necessary as a consequence of the authorised development;
  • (b) implementing any mitigation measures required as a result of any assessment referred to in sub-paragraph (a) reasonably necessary as a consequence of the authorised development;
  • (c) the approval of plans;
  • (d) the carrying out of protective works, plus a capitalised sum to cover the cost of maintaining and renewing permanent protective works; and
  • (e) the survey of any land, apparatus or works, the inspection and monitoring of works or the installation or removal of any temporary works reasonably necessary in consequence of the execution of any such works referred to in this Part of this Schedule.
  • (2) For the purposes of calculating the sums payable pursuant to sub-paragraph (1) above, in the case of the replacement or removal of apparatus, the following applies—
  • (a) where apparatus is removed under the provisions of this Part of this Schedule and which will not be re-used as part of the apparatus or alternative apparatus, there will be excluded from any sum payable under sub-paragraph (1) the value of the apparatus being removed; and
  • (b) subject to sub-paragraph 203(3)(a), when replacing existing apparatus, there will be deducted from any sum payable under sub-paragraph (1) the value of that apparatus being removed under the provisions of this Part of this Schedule and which is not re-used as part of the apparatus or alternative apparatus, except that the value of any apparatus or alternative apparatus used to replace the apparatus being removed will be included in the sum payable under sub-paragraph (1), such value being agreed between the parties (or as determined in accordance with paragraph 209 (arbitration) prior to any removal or replacement of the apparatus, provided that, in each case, all charges, costs and expenses reasonably incurred, or reasonably anticipated to be incurred, by Uniper in, or in connection with the works required for the removal or replacement of such apparatus will be included in the sum payable under sub-paragraph (1).
  • (3) If, in accordance with sub-paragraph 204(2) of this Part of this Schedule, any existing apparatus is replaced with enhanced apparatus where the undertaker’s consent has not been obtained by Uniper (or where disputed in accordance with paragraph 209 (arbitration), decided not to be necessary), then, if the construction expenses for this replacement surpass the construction expenses that would have been paid for similar or equivalent apparatus then any excess costs will be borne by Uniper, except where it is not possible to obtain similar or equivalent apparatus, full costs will be payable by the undertaker.
  • (4) Any amount which is payable to Uniper in respect of works by virtue of sub-paragraph (1) will, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on Uniper any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.

Indemnity

205

  • (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any of the authorised development or in consequence of the construction, use, maintenance or failure of any of the authorised development by or on behalf of the undertaker or in consequence of any act or default of the undertaker (or any person employed or authorised by them) in the course of carrying out such works, including without limitation works carried out by the undertaker under this Part of this Schedule or any subsidence resulting from any of these works, any loss or damage is caused to any apparatus, alternative apparatus or property of Uniper, or there is any interruption in any services provided, or in the supply of any goods, or in the use of the apparatus or alternative apparatus (as applicable) by Uniper, the undertaker must—
  • (a) bear and pay the costs reasonably and properly incurred by Uniper in making good such loss or damage or in restoring the supply or its use;
  • (b) make compensation to Uniper for any other expenses, loss, damages, penalty or costs incurred by Uniper, by reason or in consequence of any such loss, damage or interruption; and
  • (c) indemnify Uniper for any other expenses, loss, demands, proceedings, damages, claims, penalty or costs incurred by or recovered from Uniper, by reason or in consequence of any such damage or interruption or Uniper becoming liable to any third party (an “Indemnity Claim”).
  • (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to—
  • (a) any damage or interruption to the extent that it is attributable to the act, neglect or default of Uniper or its representatives; or
  • (b) any indirect or consequential loss of any third party (including but not limited to loss of use, revenue, profit, contract, production, increased cost of working or business interruption) arising from any such damage or interruption which is not reasonably foreseeable.
  • (3) Uniper must give the undertaker reasonable notice of an Indemnity Claim and no settlement or compromise is to be made that is prejudicial to the undertaker without the consent of the undertaker (not to be unreasonably withheld) which, if it withholds such consent, it will assume the sole conduct of the Indemnity Claim, provided that if the undertaker does not assume the sole conduct of the Indemnity Claim within 30 days of the Indemnified Claim being notified to it, Uniper, or a person designated by Uniper, may conduct the Indemnity Claim in such manner as it may deem appropriate and the undertaker will indemnify Uniper for any costs and expenses incurred in connection with defending any such Indemnity Claim.
  • (4) The undertaker must assist Uniper, as requested, in connection with an Indemnity Claim (including circumstances where Uniper reasonably believes may give rise to an action, claim or demand by a third party).
  • (5) The undertaker undertakes not to commence construction (and not to permit the commencement of such construction) of the authorised development on any land owned by Uniper or in respect of which Uniper has an easement, wayleave or lease for its apparatus or any other interest or to carry out any works within 15 metres of Uniper’s apparatus (except in respect of any high pressure pipelines) or within 50 metres of Uniper’s high pressure pipelines until the following conditions are satisfied—
  • (a) unless and until Uniper is satisfied acting reasonably (but subject to all necessary regulatory constraints) that the undertaker has first provided the acceptable security (and provided evidence that it will maintain such acceptable security for the construction period of the authorised development from the proposed date of commencement of construction of the authorised development) and Uniper has confirmed the same to the undertaker in writing; and
  • (b) unless and until Uniper is satisfied acting reasonably (but subject to all necessary regulatory constraints) that the undertaker has procured acceptable insurance (and provided evidence to Uniper that it will maintain such acceptable insurance for the construction period of the authorised development from the proposed date of commencement of construction of the authorised development) and Uniper has confirmed the same in writing to the undertaker.
  • (6) The undertaker agrees that if, at any time, the acceptable security or acceptable insurance expires or terminates, ceases to fulfil the criteria of acceptable security or acceptable insurance, ceases to be in full force and effect or becomes invalid or unenforceable for the purpose of this Part of this Schedule or an insolvency-related event occurs in respect of the undertaker, then the relevant security or insurance will no longer constitute acceptable security or acceptable insurance and will promptly be replaced by the undertaker with alternative acceptable security or acceptable insurance as approved by the undertaker, to the extent any acceptable insurance and acceptable security is still required under this Part of this Schedule.
  • (7) In the event that the undertaker fails to comply with sub-paragraph (4) nothing in this Part of this Schedule will prevent Uniper from seeking injunctive relief (or any other equitable remedy) in any court of competent jurisdiction.
  • (8) Uniper must use its reasonable endeavours to mitigate and to minimise any costs, expenses, loss, demands, and penalties to which the indemnity under this paragraph applies where it is within Uniper’s reasonable ability and control to do so and which expressly excludes any obligation to mitigate liability arising from third parties which is outside of Uniper’s control and if reasonably requested to do so by the undertaker Uniper must provide an explanation of how the claim has been minimised, where relevant.

Co-operation

206

  • (1) Where in consequence of the proposed construction of any of the authorised development, Uniper makes requirements for the protection or alteration of apparatus under paragraphs 202(5) or 202(7), the undertaker must use its best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe, efficient and economic operation of Uniper’s apparatus and Uniper must use its best endeavours to cooperate with the undertaker for that purpose.
  • (2) Where Uniper’s consent, agreement or approval is required in relation to plans, documents or other information submitted by Uniper or the taking of action by Uniper, it must not be unreasonably withheld or delayed.

Access

207

If in consequence of the agreement reached in accordance with paragraph 201(1) of this Part or otherwise as granted by this Order the access to any apparatus (including appropriate working areas required to reasonably and safely undertake necessary works by Uniper (or representative) in respect of the apparatus) is materially obstructed, the undertaker must provide such alternative rights and means of access to such apparatus as will enable Uniper (or its representative) to maintain or use the apparatus no less effectively than was possible before such obstruction. For the avoidance of doubt, Uniper (or its representative) will be entitled to access its apparatus in the land at all times.

Confidentiality

208

  • (1) Each party must treat any confidential information as private and confidential. The party in receipt of any confidential information from the other party may not use it for a purpose other than for the performance of its obligations under this Part of this Schedule and must not disclose confidential information received from the other party to any person, provided that a party may disclose confidential information to any of its directors, other officers, employees, contractors, customers, affiliates, insurers, funders, advisers or consultants to the extent that disclosure is reasonably necessary for the purposes of this Part of this Schedule.
  • (2) Sub-paragraph (1) does not apply to confidential information—
  • (a) which is at the date of commencement, or at any time after that date becomes, publicly known other than by breach of sub-paragraph (1);
  • (b) which was known by the receiving party before disclosure by the other party to the receiving party, provided that such confidential information was lawfully obtained; or
  • (c) to the extent disclosure of the confidential information is required by law, the instructions of a competent governmental authority or such competent authority acting on behalf of such governmental authority, or the rules of a relevant and recognised stock exchange.

Arbitration

209

Any difference or dispute arising between the undertaker and Uniper under this Part of this Schedule must be determined by arbitration in accordance with article 48 (arbitration) unless otherwise agreed between those parties acting reasonably.

Notices

210

Any notice, statement, request, plan or any other written communication (including the plan to be provided at paragraph 202) to be given or made in respect of this Part of this Schedule by the undertaker must be given or made in writing to the address stated below or such other address as Uniper may have notified to the undertaker from time to time.

Name - Uniper Pipelines Team

Address - Pipelines Office, Uniper Killingholme Power Station, Chase Hill Road, Killingholme, North Lincolnshire, DN40 3LU

Contact - Lead Pipeline Engineer

SCHEDULE 10 — Arbitration rules

Primary objective

1

  • (1) The primary objective of these arbitration rules is to achieve a fair, impartial, final and binding award on the substantive difference between the parties (save as to costs) within 4 months from the date the arbitrator is appointed pursuant to article 48 (arbitration) of this Order.
  • (2) The parties will first use their reasonable endeavours to settle a dispute amicably through negotiations undertaken in good faith by the senior management of the parties. Any dispute which is not resolved amicably by the senior management of the parties within 20 business days of the dispute arising, or such longer period as agreed in writing by the parties, will be subject to arbitration in accordance with the terms of this Schedule.
  • (3) The arbitration will be deemed to have commenced when a party (“the claimant”) serves a written notice of arbitration on the other party (“the respondent”).

Time periods

2

  • (1) All time periods in these arbitration rules will be measured in business days and this will exclude weekends, bank and public holidays.
  • (2) Time periods will be calculated from the day after the arbitrator is appointed which will be either—
  • (a) the date the arbitrator notifies the parties in writing of his/her acceptance of an appointment by agreement of the parties; or
  • (b) the date the arbitrator is appointed by the Secretary of State.

Timetable

3

  • (1) The timetable for the arbitration will be that set out in sub-paragraphs (2) to (4) below unless amended in accordance with paragraph 5(3).
  • (2) Within 15 days of the arbitrator being appointed, the claimant must provide both the respondent and the arbitrator with—
  • (a) a written statement of claim which describes the nature of the difference between the parties, the legal and factual issues, the claimant’s contentions as to those issues, and the remedy it is seeking; and
  • (b) all statements of evidence and copies of all documents on which it relies, including contractual documentation, correspondence (including electronic documents), legal precedents and expert witness reports.
  • (3) Within 15 days of receipt of the claimant’s statements under sub-paragraph (2) by the arbitrator and respondent, the respondent must provide the claimant and the arbitrator with—
  • (a) a written statement of defence responding to the claimant’s statement of claim, its statement in respect of the nature of the difference, the legal and factual issues in the claimant’s claim, its acceptance of any element(s) of the claimant’s claim, its contentions as to those elements of the claimant’s claim it does not accept;
  • (b) all statements of evidence and copies of all documents on which it relies, including contractual documentation, correspondence (including electronic documents), legal precedents and expert witness reports; and
  • (c) any objections it wishes to make to the claimant’s statements, comments on the claimant’s expert report(s) (if submitted by the claimant) and explanations for the objections.
  • (4) Within five days of the respondent serving its statements sub-paragraph (3), the claimant may make a statement of reply by providing both the respondent and the arbitrator with—
  • (a) a written statement responding to the respondent’s submissions, including its reply in respect of the nature of the difference, the issues (both factual and legal) and its contentions in relation to the issues;
  • (b) all statements of evidence and copies of documents in response to the respondent’s submissions;
  • (c) any expert report in response to the respondent’s submissions;
  • (d) any objections to the statements of evidence, expert reports or other documents submitted by the respondent; and
  • (e) its written submissions in response to the legal and factual issues involved.

Procedure

4

  • (1) The arbitrator will make an award on the substantive difference based solely on the written material submitted by the parties unless the arbitrator decides that a hearing is necessary to explain or resolve any matters.
  • (2) Either party may, within two days of delivery of the last submission, request a hearing giving specific reasons why it considers a hearing is required.
  • (3) Within five days of receiving the last submission, the arbitrator will notify the parties whether a hearing is to be held and the length of that hearing.
  • (4) Within 10 days of the arbitrator advising the parties that he will hold a hearing, the date and venue for the hearing will be fixed by agreement with the parties, save that if there is no agreement the arbitrator must direct a date and venue which he considers is fair and reasonable in all the circumstances. The date for the hearing must not be less than 35 days from the date of the arbitrator’s direction confirming the date and venue of the hearing.
  • (5) A decision will be made by the arbitrator on whether there is any need for expert evidence to be submitted orally at the hearing. If oral expert evidence is required by the arbitrator, then any expert(s) attending the hearing may be asked questions by the arbitrator.
  • (6) There will be no process of examination and cross-examination of experts, but the arbitrator will invite the parties to ask questions of the experts by way of clarification of any answers given by the expert(s) in response to the arbitrator’s questions. Prior to the hearing the procedure for the expert(s) will be that—
  • (a) at least 20 days before a hearing, the arbitrator will provide a list of issues to be addressed by the expert(s);
  • (b) if more than one expert is called, they will jointly confer and produce a joint report or reports within 10 days of the issues being provided; and
  • (c) the form and content of a joint report will be as directed by the arbitrator and must be provided at least five days before the hearing.
  • (7) Within 10 days of a hearing or a decision by the arbitrator that no hearing is to be held the parties may by way of exchange provide the arbitrator with a final submission in connection with the matters in dispute and any submissions on costs. The arbitrator will take these submissions into account in the award.
  • (8) The arbitrator may make other directions or rulings as considered appropriate in order to ensure that the parties comply with the timetable and procedures to achieve an award on the substantive difference within four months of the date on which they are appointed, unless both parties otherwise agree to an extension to the date for the award.
  • (9) If a party fails to comply with the timetable, procedure or any other direction then the arbitrator may continue in the absence of a party or submission or document, and may make a decision on the information before them attaching the appropriate weight to any evidence submitted beyond any timetable or in breach of any procedure and/or direction.
  • (10) The arbitrator’s award must include reasons. The parties will accept that the extent to which reasons are given is to be proportionate to the issues in dispute and the time available to the arbitrator to deliver the award.

Arbitrator’s powers

5

  • (1) The arbitrator has all the powers of the Arbitration Act 1996, including the non-mandatory sections, save where modified by this Schedule.
  • (2) There will be no discovery or disclosure, except that the arbitrator has the power to order the parties to produce such documents as are reasonably requested by another party no later than the statement of reply, or by the arbitrator, where the documents are manifestly relevant, specifically identified and the burden of production is not excessive. Any application and orders should be made by way of a redfern schedule without any hearing.
  • (3) Any time limits fixed in accordance with this procedure or by the arbitrator may be varied by agreement between the parties, subject to any such variation being acceptable to and approved by the arbitrator. In the absence of agreement, the arbitrator may vary the timescales and/or procedure—
  • (a) if the arbitrator is satisfied that a variation of any fixed time limit is reasonably necessary to avoid a breach of the rules of natural justice and then;
  • (b) only for such a period that is necessary to achieve fairness between the parties.
  • (4) On the date the award is made, the arbitrator will notify the parties that the award is completed, signed and dated, and that it will be issued to the parties on receipt of cleared funds for the arbitrator’s fees and expenses.

Costs

6

  • (1) The costs of the arbitration will include the fees and expenses of the arbitrator, the reasonable fees and expenses of any experts and the reasonable legal and other costs incurred by the parties for the arbitration.
  • (2) Subject to sub-paragraph (3), the arbitrator will award recoverable costs on the general principle that each party should bear its own costs.
  • (3) The arbitrator may depart from the general principle in sub-paragraph (2) and make such other costs award as it considers reasonable where a party has behaved unreasonably as defined within the National Planning Practice Guidance or such other guidance as may replace it.

Confidentiality

7

  • (1) Subject to sub-paragraphs (2) and (3), any arbitration hearing and documentation will be open to and accessible by the public.
  • (2) The arbitrator may direct that the whole or part of a hearing is to be private or any documentation to be confidential where it is necessary in order to protect commercially sensitive information.
  • (3) Nothing in this paragraph prevents any disclosure of a document by a party pursuant to an order of a court in England and Wales or where disclosure is required under any enactment.

Signed

Signed by authority of the Secretary of State for Energy Security and Net Zero

David Wagstaff — Deputy Director Energy Infrastructure Planning — Department for Energy Security and Net Zero — 9th April 2025

Explanatory note

(This note is not part of the Order)

EXPLANATORY NOTE

This Order authorises Chrysaor Production (U.K.) Limited (referred to in this Order as the undertaker) to construct, operate and maintain a pipeline for the transport of carbon dioxide from Immingham to Theddlethorpe. This Order imposes requirements in connection with the development and permits the undertaker to acquire, compulsorily or by agreement, land and rights in land and to use land for this purpose.

A copy of the Order plans and book of reference referred to in this Order and certified in accordance with article 44 (certification of plans, etc.) of this Order may be inspected free of charge at the offices of Chrysaor Production (U.K.) Limited at 151 Buckingham Palace Road, London, England, SW1W 9SZ.

Footnotes

1

2008 c. 29. Section 37 was amended by section 137(5) of, and paragraph 5 of Schedule 13 to, the Localism Act 2011 (c. 20).

4

Section 74(2) was amended by paragraph 29 of Schedule 13 to the Localism Act 2011 (c. 20).

6

Section 105(2) was amended by paragraph 50 of Schedule 13 to the Localism Act 2011.

7

Section 114 was amended by paragraph 55 of Schedule 13 to the Localism Act 2011.

8

Section 115 was amended by section 160 of the Housing and Planning Act 2016 (c. 22) and section 43 of the Wales Act 2017 (c. 4).

9

Section 117 was amended by paragraph 58 of Schedule 13 and paragraph 1 of Schedule 25 to the Localism Act 2011.

10

Section 120 was amended by section 140 of, and paragraph 60 of Schedule 13 to, the Localism Act 2011.

11

Section 122 was amended by paragraph 62 of Schedule 13 to the Localism Act 2011.

12

Ibid.

13

Section 132 was amended by section 24 of the Growth and Infrastructure Act 2013 (c. 27).

25

Section 48 was amended by section 124 of the Local Transport Act 2008 (c. 26).

26

“Street authority” is defined in section 49, which was amended by paragraph 117 of Schedule 1 to the Infrastructure Act 2015 (c. 7).

28

Sections 55, 57, 60, 68 and 69 were amended by the Traffic Management Act 2004 (c. 18).

30

1991 c. 56. Section 106 was amended by sections 35(8)(a) and 43(2) of, and paragraph 1 of Schedule 2 to, the Competition and Service (Utilities) Act 1992 (c. 43), sections 36(2) and 99 of the Water Act 2003 (c. 37) and section 32 of, and paragraph 16(1) of Schedule 3 to, the Flood and Water Management Act 2010 (c. 29).

34

Section 4 was amended by sections 184 and 185 of, and paragraph 2 of Schedule 18 to, the Housing and Planning Act 2016 (c. 22).

35

Section 11(1) was amended by sections 186 to 188 of the Housing and Planning Act 2016 (c. 22) and Schedule 4 to the Acquisition of Land Act 1981 (c. 67).

39

1991 c. 59. Section 66 was amended by paragraph 38 of Schedule 2 to the Flood and Water Management Act 2010 (c. 29) and section 86 of the Water Act 2014 (c. 21).

48

Section 11A was inserted by section 186(3) of the Housing and Planning Act 2016 (c. 22).

49

Section 11B was inserted by section 187(3) of the above Act.

53

Section 104 was amended by section 42(3) of the Flood and Water Management Act 2010 (c. 29).

55

Section 106 was amended by section 4 of the Digital Economy Act 2017 (c. 30).

Editorial notes

57

Art. 1 in force at 1.5.2025, see art. 1(2)

58

Art. 2 in force at 1.5.2025, see art. 1(2)

59

Art. 3 in force at 1.5.2025, see art. 1(2)

60

Art. 4 in force at 1.5.2025, see art. 1(2)

61

Art. 5 in force at 1.5.2025, see art. 1(2)

62

Art. 6 in force at 1.5.2025, see art. 1(2)

63

Art. 7 in force at 1.5.2025, see art. 1(2)

64

Art. 8 in force at 1.5.2025, see art. 1(2)

65

Art. 9 in force at 1.5.2025, see art. 1(2)

66

Art. 10 in force at 1.5.2025, see art. 1(2)

67

Art. 11 in force at 1.5.2025, see art. 1(2)

68

Art. 12 in force at 1.5.2025, see art. 1(2)

69

Art. 13 in force at 1.5.2025, see art. 1(2)

70

Art. 14 in force at 1.5.2025, see art. 1(2)

71

Art. 15 in force at 1.5.2025, see art. 1(2)

72

Art. 16 in force at 1.5.2025, see art. 1(2)

73

Art. 17 in force at 1.5.2025, see art. 1(2)

74

Art. 18 in force at 1.5.2025, see art. 1(2)

75

Art. 19 in force at 1.5.2025, see art. 1(2)

76

Art. 20 in force at 1.5.2025, see art. 1(2)

77

Art. 21 in force at 1.5.2025, see art. 1(2)

78

Art. 22 in force at 1.5.2025, see art. 1(2)

79

Art. 23 in force at 1.5.2025, see art. 1(2)

80

Art. 24 in force at 1.5.2025, see art. 1(2)

81

Art. 25 in force at 1.5.2025, see art. 1(2)

82

Art. 26 in force at 1.5.2025, see art. 1(2)

83

Art. 27 in force at 1.5.2025, see art. 1(2)

84

Art. 28 in force at 1.5.2025, see art. 1(2)

85

Art. 29 in force at 1.5.2025, see art. 1(2)

86

Art. 30 in force at 1.5.2025, see art. 1(2)

87

Art. 31 in force at 1.5.2025, see art. 1(2)

88

Art. 32 in force at 1.5.2025, see art. 1(2)

89

Art. 33 in force at 1.5.2025, see art. 1(2)

90

Art. 34 in force at 1.5.2025, see art. 1(2)

91

Art. 35 in force at 1.5.2025, see art. 1(2)

92

Art. 36 in force at 1.5.2025, see art. 1(2)

93

Art. 37 in force at 1.5.2025, see art. 1(2)

94

Art. 38 in force at 1.5.2025, see art. 1(2)

95

Art. 39 in force at 1.5.2025, see art. 1(2)

96

Art. 40 in force at 1.5.2025, see art. 1(2)

97

Art. 41 in force at 1.5.2025, see art. 1(2)

98

Art. 42 in force at 1.5.2025, see art. 1(2)

99

Art. 43 in force at 1.5.2025, see art. 1(2)

100

Art. 44 in force at 1.5.2025, see art. 1(2)

101

Art. 45 in force at 1.5.2025, see art. 1(2)

102

Art. 46 in force at 1.5.2025, see art. 1(2)

103

Art. 47 in force at 1.5.2025, see art. 1(2)

104

Art. 48 in force at 1.5.2025, see art. 1(2)

105

Sch. 1 Pt. 2 para. 1 in force at 1.5.2025, see art. 1(2)

106

Sch. 2 para. 1 in force at 1.5.2025, see art. 1(2)

107

Sch. 2 para. 2 in force at 1.5.2025, see art. 1(2)

108

Sch. 2 para. 3 in force at 1.5.2025, see art. 1(2)

109

Sch. 2 para. 4 in force at 1.5.2025, see art. 1(2)

110

Sch. 2 para. 5 in force at 1.5.2025, see art. 1(2)

111

Sch. 2 para. 6 in force at 1.5.2025, see art. 1(2)

112

Sch. 2 para. 7 in force at 1.5.2025, see art. 1(2)

113

Sch. 2 para. 8 in force at 1.5.2025, see art. 1(2)

114

Sch. 2 para. 9 in force at 1.5.2025, see art. 1(2)

115

Sch. 2 para. 10 in force at 1.5.2025, see art. 1(2)

116

Sch. 2 para. 11 in force at 1.5.2025, see art. 1(2)

117

Sch. 2 para. 12 in force at 1.5.2025, see art. 1(2)

118

Sch. 2 para. 13 in force at 1.5.2025, see art. 1(2)

119

Sch. 2 para. 14 in force at 1.5.2025, see art. 1(2)

120

Sch. 2 para. 15 in force at 1.5.2025, see art. 1(2)

121

Sch. 2 para. 16 in force at 1.5.2025, see art. 1(2)

122

Sch. 2 para. 17 in force at 1.5.2025, see art. 1(2)

123

Sch. 2 para. 18 in force at 1.5.2025, see art. 1(2)

124

Sch. 2 para. 19 in force at 1.5.2025, see art. 1(2)

125

Sch. 2 para. 20 in force at 1.5.2025, see art. 1(2)

126

Sch. 2 para. 21 in force at 1.5.2025, see art. 1(2)

127

Sch. 2 para. 22 in force at 1.5.2025, see art. 1(2)

128

Sch. 2 para. 23 in force at 1.5.2025, see art. 1(2)

129

Sch. 2 para. 24 in force at 1.5.2025, see art. 1(2)

130

Sch. 2 para. 25 in force at 1.5.2025, see art. 1(2)

131

Sch. 2 para. 26 in force at 1.5.2025, see art. 1(2)

132

Sch. 2 para. 27 in force at 1.5.2025, see art. 1(2)

133

Sch. 2 para. 28 in force at 1.5.2025, see art. 1(2)

134

Sch. 2 para. 29 in force at 1.5.2025, see art. 1(2)

135

Sch. 8 para. 1 in force at 1.5.2025, see art. 1(2)

136

Sch. 8 para. 2 in force at 1.5.2025, see art. 1(2)

137

Sch. 8 para. 3 in force at 1.5.2025, see art. 1(2)

138

Sch. 8 para. 4 in force at 1.5.2025, see art. 1(2)

139

Sch. 9 para. 1 in force at 1.5.2025, see art. 1(2)

140

Sch. 9 para. 2 in force at 1.5.2025, see art. 1(2)

141

Sch. 9 para. 3 in force at 1.5.2025, see art. 1(2)

142

Sch. 9 para. 4 in force at 1.5.2025, see art. 1(2)

143

Sch. 9 para. 5 in force at 1.5.2025, see art. 1(2)

144

Sch. 9 para. 6 in force at 1.5.2025, see art. 1(2)

145

Sch. 9 para. 7 in force at 1.5.2025, see art. 1(2)

146

Sch. 9 para. 8 in force at 1.5.2025, see art. 1(2)

147

Sch. 9 para. 9 in force at 1.5.2025, see art. 1(2)

148

Sch. 9 para. 10 in force at 1.5.2025, see art. 1(2)

149

Sch. 9 para. 11 in force at 1.5.2025, see art. 1(2)

150

Sch. 9 para. 12 in force at 1.5.2025, see art. 1(2)

151

Sch. 9 para. 13 in force at 1.5.2025, see art. 1(2)

152

Sch. 9 para. 14 in force at 1.5.2025, see art. 1(2)

153

Sch. 9 para. 15 in force at 1.5.2025, see art. 1(2)

154

Sch. 9 para. 16 in force at 1.5.2025, see art. 1(2)

155

Sch. 9 para. 17 in force at 1.5.2025, see art. 1(2)

156

Sch. 9 para. 18 in force at 1.5.2025, see art. 1(2)

157

Sch. 9 para. 19 in force at 1.5.2025, see art. 1(2)

158

Sch. 9 para. 20 in force at 1.5.2025, see art. 1(2)

159

Sch. 9 para. 21 in force at 1.5.2025, see art. 1(2)

160

Sch. 9 para. 22 in force at 1.5.2025, see art. 1(2)

161

Sch. 9 para. 23 in force at 1.5.2025, see art. 1(2)

162

Sch. 9 para. 24 in force at 1.5.2025, see art. 1(2)

163

Sch. 9 para. 25 in force at 1.5.2025, see art. 1(2)

164

Sch. 9 para. 26 in force at 1.5.2025, see art. 1(2)

165

Sch. 9 para. 27 in force at 1.5.2025, see art. 1(2)

166

Sch. 9 para. 28 in force at 1.5.2025, see art. 1(2)

167

Sch. 9 para. 29 in force at 1.5.2025, see art. 1(2)

168

Sch. 9 para. 30 in force at 1.5.2025, see art. 1(2)

169

Sch. 9 para. 31 in force at 1.5.2025, see art. 1(2)

170

Sch. 9 para. 32 in force at 1.5.2025, see art. 1(2)

171

Sch. 9 para. 33 in force at 1.5.2025, see art. 1(2)

172

Sch. 9 para. 34 in force at 1.5.2025, see art. 1(2)

173

Sch. 9 para. 35 in force at 1.5.2025, see art. 1(2)

174

Sch. 9 para. 36 in force at 1.5.2025, see art. 1(2)

175

Sch. 9 para. 37 in force at 1.5.2025, see art. 1(2)

176

Sch. 9 para. 38 in force at 1.5.2025, see art. 1(2)

177

Sch. 9 para. 39 in force at 1.5.2025, see art. 1(2)

178

Sch. 9 para. 40 in force at 1.5.2025, see art. 1(2)

179

Sch. 9 para. 41 in force at 1.5.2025, see art. 1(2)

180

Sch. 9 para. 42 in force at 1.5.2025, see art. 1(2)

181

Sch. 9 para. 43 in force at 1.5.2025, see art. 1(2)

182

Sch. 9 para. 44 in force at 1.5.2025, see art. 1(2)

183

Sch. 9 para. 45 in force at 1.5.2025, see art. 1(2)

184

Sch. 9 para. 46 in force at 1.5.2025, see art. 1(2)

185

Sch. 9 para. 47 in force at 1.5.2025, see art. 1(2)

186

Sch. 9 para. 48 in force at 1.5.2025, see art. 1(2)

187

Sch. 9 para. 49 in force at 1.5.2025, see art. 1(2)

188

Sch. 9 para. 50 in force at 1.5.2025, see art. 1(2)

189

Sch. 9 para. 51 in force at 1.5.2025, see art. 1(2)

190

Sch. 9 para. 52 in force at 1.5.2025, see art. 1(2)

191

Sch. 9 para. 53 in force at 1.5.2025, see art. 1(2)

192

Sch. 9 para. 54 in force at 1.5.2025, see art. 1(2)

193

Sch. 9 para. 55 in force at 1.5.2025, see art. 1(2)

194

Sch. 9 para. 56 in force at 1.5.2025, see art. 1(2)

195

Sch. 9 para. 57 in force at 1.5.2025, see art. 1(2)

196

Sch. 9 para. 58 in force at 1.5.2025, see art. 1(2)

197

Sch. 9 para. 59 in force at 1.5.2025, see art. 1(2)

198

Sch. 9 para. 60 in force at 1.5.2025, see art. 1(2)

199

Sch. 9 para. 61 in force at 1.5.2025, see art. 1(2)

200

Sch. 9 para. 62 in force at 1.5.2025, see art. 1(2)

201

Sch. 9 para. 63 in force at 1.5.2025, see art. 1(2)

202

Sch. 9 para. 64 in force at 1.5.2025, see art. 1(2)

203

Sch. 9 para. 65 in force at 1.5.2025, see art. 1(2)

204

Sch. 9 para. 66 in force at 1.5.2025, see art. 1(2)

205

Sch. 9 para. 67 in force at 1.5.2025, see art. 1(2)

206

Sch. 9 para. 68 in force at 1.5.2025, see art. 1(2)

207

Sch. 9 para. 69 in force at 1.5.2025, see art. 1(2)

208

Sch. 9 para. 70 in force at 1.5.2025, see art. 1(2)

209

Sch. 9 para. 71 in force at 1.5.2025, see art. 1(2)

210

Sch. 9 para. 72 in force at 1.5.2025, see art. 1(2)

211

Sch. 9 para. 73 in force at 1.5.2025, see art. 1(2)

212

Sch. 9 para. 74 in force at 1.5.2025, see art. 1(2)

213

Sch. 9 para. 75 in force at 1.5.2025, see art. 1(2)

214

Sch. 9 para. 76 in force at 1.5.2025, see art. 1(2)

215

Sch. 9 para. 77 in force at 1.5.2025, see art. 1(2)

216

Sch. 9 para. 78 in force at 1.5.2025, see art. 1(2)

217

Sch. 9 para. 79 in force at 1.5.2025, see art. 1(2)

218

Sch. 9 para. 80 in force at 1.5.2025, see art. 1(2)

219

Sch. 9 para. 81 in force at 1.5.2025, see art. 1(2)

220

Sch. 9 para. 82 in force at 1.5.2025, see art. 1(2)

221

Sch. 9 para. 83 in force at 1.5.2025, see art. 1(2)

222

Sch. 9 para. 84 in force at 1.5.2025, see art. 1(2)

223

Sch. 9 para. 85 in force at 1.5.2025, see art. 1(2)

224

Sch. 9 para. 86 in force at 1.5.2025, see art. 1(2)

225

Sch. 9 para. 87 in force at 1.5.2025, see art. 1(2)

226

Sch. 9 para. 88 in force at 1.5.2025, see art. 1(2)

227

Sch. 9 para. 89 in force at 1.5.2025, see art. 1(2)

228

Sch. 9 para. 90 in force at 1.5.2025, see art. 1(2)

229

Sch. 9 para. 91 in force at 1.5.2025, see art. 1(2)

230

Sch. 9 para. 92 in force at 1.5.2025, see art. 1(2)

231

Sch. 9 para. 93 in force at 1.5.2025, see art. 1(2)

232

Sch. 9 para. 94 in force at 1.5.2025, see art. 1(2)

233

Sch. 9 para. 95 in force at 1.5.2025, see art. 1(2)

234

Sch. 9 para. 96 in force at 1.5.2025, see art. 1(2)

235

Sch. 9 para. 97 in force at 1.5.2025, see art. 1(2)

236

Sch. 9 para. 98 in force at 1.5.2025, see art. 1(2)

237

Sch. 9 para. 99 in force at 1.5.2025, see art. 1(2)

238

Sch. 9 para. 100 in force at 1.5.2025, see art. 1(2)

239

Sch. 9 para. 101 in force at 1.5.2025, see art. 1(2)

240

Sch. 9 para. 102 in force at 1.5.2025, see art. 1(2)

241

Sch. 9 para. 103 in force at 1.5.2025, see art. 1(2)

242

Sch. 9 para. 104 in force at 1.5.2025, see art. 1(2)

243

Sch. 9 para. 105 in force at 1.5.2025, see art. 1(2)

244

Sch. 9 para. 106 in force at 1.5.2025, see art. 1(2)

245

Sch. 9 para. 107 in force at 1.5.2025, see art. 1(2)

246

Sch. 9 para. 108 in force at 1.5.2025, see art. 1(2)

247

Sch. 9 para. 109 in force at 1.5.2025, see art. 1(2)

248

Sch. 9 para. 110 in force at 1.5.2025, see art. 1(2)

249

Sch. 9 para. 111 in force at 1.5.2025, see art. 1(2)

250

Sch. 9 para. 112 in force at 1.5.2025, see art. 1(2)

251

Sch. 9 para. 113 in force at 1.5.2025, see art. 1(2)

252

Sch. 9 para. 114 in force at 1.5.2025, see art. 1(2)

253

Sch. 9 para. 115 in force at 1.5.2025, see art. 1(2)

254

Sch. 9 para. 116 in force at 1.5.2025, see art. 1(2)

255

Sch. 9 para. 117 in force at 1.5.2025, see art. 1(2)

256

Sch. 9 para. 118 in force at 1.5.2025, see art. 1(2)

257

Sch. 9 para. 119 in force at 1.5.2025, see art. 1(2)

258

Sch. 9 para. 120 in force at 1.5.2025, see art. 1(2)

259

Sch. 9 para. 121 in force at 1.5.2025, see art. 1(2)

260

Sch. 9 para. 122 in force at 1.5.2025, see art. 1(2)

261

Sch. 9 para. 123 in force at 1.5.2025, see art. 1(2)

262

Sch. 9 para. 124 in force at 1.5.2025, see art. 1(2)

263

Sch. 9 para. 125 in force at 1.5.2025, see art. 1(2)

264

Sch. 9 para. 126 in force at 1.5.2025, see art. 1(2)

265

Sch. 9 para. 127 in force at 1.5.2025, see art. 1(2)

266

Sch. 9 para. 128 in force at 1.5.2025, see art. 1(2)

267

Sch. 9 para. 129 in force at 1.5.2025, see art. 1(2)

268

Sch. 9 para. 130 in force at 1.5.2025, see art. 1(2)

269

Sch. 9 para. 131 in force at 1.5.2025, see art. 1(2)

270

Sch. 9 para. 132 in force at 1.5.2025, see art. 1(2)

271

Sch. 9 para. 133 in force at 1.5.2025, see art. 1(2)

272

Sch. 9 para. 134 in force at 1.5.2025, see art. 1(2)

273

Sch. 9 para. 135 in force at 1.5.2025, see art. 1(2)

274

Sch. 9 para. 136 in force at 1.5.2025, see art. 1(2)

275

Sch. 9 para. 137 in force at 1.5.2025, see art. 1(2)

276

Sch. 9 para. 138 in force at 1.5.2025, see art. 1(2)

277

Sch. 9 para. 139 in force at 1.5.2025, see art. 1(2)

278

Sch. 9 para. 140 in force at 1.5.2025, see art. 1(2)

279

Sch. 9 para. 141 in force at 1.5.2025, see art. 1(2)

280

Sch. 9 para. 142 in force at 1.5.2025, see art. 1(2)

281

Sch. 9 para. 143 in force at 1.5.2025, see art. 1(2)

282

Sch. 9 para. 144 in force at 1.5.2025, see art. 1(2)

283

Sch. 9 para. 145 in force at 1.5.2025, see art. 1(2)

284

Sch. 9 para. 146 in force at 1.5.2025, see art. 1(2)

285

Sch. 9 para. 147 in force at 1.5.2025, see art. 1(2)

286

Sch. 9 para. 148 in force at 1.5.2025, see art. 1(2)

287

Sch. 9 para. 149 in force at 1.5.2025, see art. 1(2)

288

Sch. 9 para. 150 in force at 1.5.2025, see art. 1(2)

289

Sch. 9 para. 151 in force at 1.5.2025, see art. 1(2)

290

Sch. 9 para. 152 in force at 1.5.2025, see art. 1(2)

291

Sch. 9 para. 153 in force at 1.5.2025, see art. 1(2)

292

Sch. 9 para. 154 in force at 1.5.2025, see art. 1(2)

293

Sch. 9 para. 155 in force at 1.5.2025, see art. 1(2)

294

Sch. 9 para. 156 in force at 1.5.2025, see art. 1(2)

295

Sch. 9 para. 157 in force at 1.5.2025, see art. 1(2)

296

Sch. 9 para. 158 in force at 1.5.2025, see art. 1(2)

297

Sch. 9 para. 159 in force at 1.5.2025, see art. 1(2)

298

Sch. 9 para. 160 in force at 1.5.2025, see art. 1(2)

299

Sch. 9 para. 161 in force at 1.5.2025, see art. 1(2)

300

Sch. 9 para. 162 in force at 1.5.2025, see art. 1(2)

301

Sch. 9 para. 163 in force at 1.5.2025, see art. 1(2)

302

Sch. 9 para. 164 in force at 1.5.2025, see art. 1(2)

303

Sch. 9 para. 165 in force at 1.5.2025, see art. 1(2)

304

Sch. 9 para. 166 in force at 1.5.2025, see art. 1(2)

305

Sch. 9 para. 167 in force at 1.5.2025, see art. 1(2)

306

Sch. 9 para. 168 in force at 1.5.2025, see art. 1(2)

307

Sch. 9 para. 169 in force at 1.5.2025, see art. 1(2)

308

Sch. 9 para. 170 in force at 1.5.2025, see art. 1(2)

309

Sch. 9 para. 171 in force at 1.5.2025, see art. 1(2)

310

Sch. 9 para. 172 in force at 1.5.2025, see art. 1(2)

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.