The Outer Dowsing Offshore Wind Farm Order 2026
| (1) Road | (2) Extent as shown on the traffic regulation order plan | (3) Note |
|---|---|---|
| Roman Bank | Approximately 493m of road between points TRO1A and TRO2A as shown on sheet 1 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Ember Lane | Approximately 400m of road between points TRO1 and TRO2 as shown on sheet 2 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Langham Road | Approximately 400m of road between points TRO3 and TRO4 as shown on sheet 3 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Lowgate Road | Approximately 400m of road between points TRO5 and TRO6 as shown on sheets 3 and 4 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| A52 (Hogsthorpe) | Approximately 450m of road between points TRO7A and TRO8A as shown on sheet 4 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Listoff Lane | Approximately 400m of road between points TRO7 and TRO8 as shown on sheet 5 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Sloothby High Lane | Approximately 530m of road between points TRO9 andTRO10 as shown on sheet 5 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Path | Approximately 86m of road between points TRO9A and TRO10A as shown on sheet 5 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| South Ings Lane | Approximately 400m of road between points TRO11 and TRO12 as shown on sheet 7 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Marsh Lane | Approximately 662m of road between points TRO13 and TRO14 as shown on sheets 7 and 8 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Ingoldmells Road | Approximately 470m of road between points TRO15 and TRO16 as shown on sheet 9 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Younger’s Lane | Approximately 400m of road between points TRO17 and TRO18 as shown on sheets 9 and 10 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Skegness Road (A158) | Approximately 541m of road between points TRO19 and TRO20 as shown on sheet 11 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 40mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Billgate Lane | Approximately 400m of road between points TRO21 and TRO22 as shown on sheet 11 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Middlemarsh Road | Approximately 400m of road between points TRO23 and TRO24 as shown on sheet 12 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Low Road | Approximately 400m of road between points TRO25 and TRO26 as shown on sheet 12 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Church Lane | Approximately 488m of road between points TRO27 and TRO28 as shown on sheet 14 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| A52 (Croft) | Approximately 200m of road between points TRO29 and TRO30 as shown on sheet 13 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 40mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Wainfleet Road (B1195) | Approximately 826m of road between points TRO31 and TRO32 as shown on sheet 15 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Brewster Lane | Approximately 795m of road between points TRO33 and TRO34 as shown on sheet 16 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Collison Gate | Approximately 472m of road between points TRO35 and TRO36 as shown on sheet 16 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Mill Lane | Approximately 429m of road between points TRO37 and TRO38 as shown on sheet 16 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Church Lane | Approximately 400m of road between points TRO39 and TRO40 as shown on sheet 17 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Hall Gate (Track) | Approximately 85m of road between points TRO39A and TRO40A as shown on sheet 17 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Scald Gate | Approximately 401m of road between points TRO41 and TRO42 as shown on sheet 17 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Burgh Road | Approximately 500m of road between points TRO43 and TRO44 as shown on sheet 18 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Fen Bank (Fodder Dike) | Approximately 400m of road between points TRO45 and TRO46 as shown on sheet 18 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Cranberry Lane | Approximately 400m of road between points TRO47 and TRO48 as shown on sheet 19 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Mill Hill | Approximately 400m of road between points TRO49 and TRO50 as shown on sheet 19 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Howgarth Lane | Approximately 400m of road between points TRO51 and TRO52 as shown on sheet 20 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Skirmore Road | Approximately 200m of road between points TRO51A and TRO52A as shown on sheet 20 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Skirmore Road | Approximately 400m of road between points TRO53 and TRO54 as shown on sheet 20 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Patman’s Lane | Approximately 400m of road between points TRO55 and TRO56 as shown on sheet 21 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Ivery Lane | Approximately 400m of road between points TRO57 and TRO58 as shown on sheets 21 and 22 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Broad Gate | Approximately 400m of road between points TRO59 and TRO60 as shown on sheet 23 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Cragmire Lane | Approximately 400m of road between points TRO61 and TRO62 as shown on sheet 23 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Common Road | Approximately 400m of road between points TRO63 and TRO64 as shown on sheet 23 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Manor Lane | Approximately 460m of road between points TRO65 and TRO66 as shown on sheet 24 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Sea Dyke | Approximately 390m of road between points TRO67 and TRO68 as shown on sheet 24 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Church Road | Approximately 500m of road between points TRO69 and TRO70 as shown on sheet 25 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| B1184 | Approximately 400m of road between points TRO71 and TRO72 as shown on sheet 25 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Cowbroads Lane | Approximately 400m of road between points TRO73 and TRO74 as shown on sheet 25 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Pode Lane | Approximately 408m of road between points TRO75 and TRO76 as shown on sheet 25 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Skipmarsh Lane | Approximately 400m of road between points TRO77 and TRO78 as shown on sheet 26 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Southfields | Approximately 400m of road between points TRO79 and TRO80 as shown on sheet 26 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Ings Drove | Approximately 400m of road between points TRO81 and TRO82 as shown on sheet 26 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Ings Road | Approximately 400m of road between points TRO83 and TRO84 as shown on sheet 27 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Boston Longs Hedges | Approximately 400m of road between points TRO85 and TRO86 as shown on sheet 27 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Lowfields Lane | Approximately 448m of road between points TRO87 and TRO88 as shown on sheet 28 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| A52 (Butterwick) | Approximately 400m of road between points TRO89 and TRO90 as shown on sheet 30 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 40mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Foxhole Lane | Approximately 400m of road between points TRO91 and TRO92 as shown on sheet 30 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Butterwick Road | Approximately 400m of road between points TRO93 and TRO94 as shown on sheet 30 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Shore Road | Approximately 396m of road between points TRO95 and TRO96 as shown on sheet 31 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Church End Road | Approximately 400m of road between points TRO97 and TRO98 as shown on sheet 31 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Clampgate Road | Approximately 400m of road between points TRO99 and TRO100 as shown on sheet 32 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Grovefield Lane | Approximately 400m of road between points TRO101 and TRO102 as shown on sheet 32 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Grovefield Lane | Approximately 550m of road between points TRO103 and TRO104 as shown on sheets 32 and 33 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Pinfold Lane | Approximately 400m of road between points TRO105 and TRO106 as shown on sheet 33 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Cut End Road | Approximately 400m of road between points TRO107 and TRO108 as shown on sheet 33 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Wood Lane | Approximately 382m of road between points TRO109 and TRO110 as shown on sheet 33 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Wyberton Road | Approximately 587m of road between points TRO111 and TRO112 as shown on sheet 35 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Frampton Roads | Approximately 400m of road between points TRO113 and TRO114 as shown on sheet 37 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Millfield Lane East | Approximately 400m of road between points TRO115 and TRO116 as shown on sheet 36 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Sandholme Lane | Approximately 400m of road between points TRO117 and TRO118 as shown on sheet 38 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Marsh Lane | Approximately 79m of road between points TRO117A and TRO118A as shown on sheet 39 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Marsh Road | Approximately 400m of road between points TRO119 and TRO120 as shown on sheet 39 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Wash Road | Approximately 400m of road between points TRO121 and TRO122 as shown on sheets 42 and 43 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| (1) Road | (2) Extent as shown on the traffic regulation order plan | (3) Note |
| --- | --- | --- |
| Surfleet Bank | Approximately 250m of road between points TRO127 and TRO128 as shown on sheet 47 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Marsh Drove | Approximately 400m of road between points TRO123 and TRO124 as shown on sheets 48 and 49 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| Marsh Road | Approximately 400m of road between points TRO125 and TRO126 as shown on sheets 49 and 50 of the traffic regulation order plan. | Prohibition of vehicle access at any time. No waiting restriction between 7.00am and 7.00pm on Monday to Sunday. Speed limit to be reduced to 30mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
PART 2
| (1) Road | (2) Extent as shown on the traffic regulation order plan | (3) Note |
|---|---|---|
| A16 (Surfleet Bank junction) | Approximately 400m of road between points TRO129 and TRO 130 as shown on sheet 47 of the traffic regulation order plan. | Speed limit to be reduced to 40mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
| (1) Road | (2) Extent as shown on the traffic regulation order plan | (3) Note |
| --- | --- | --- |
| A17 Fosdyke Bridge | Approximately 650m of road between points TRO131 and TRO 132 as shown on sheet 43 of the traffic regulation order plan. | Speed limit to be reduced to 40mph, or to such other speed agreed by the traffic authority, for the duration of the construction of the authorised project. |
SCHEDULE 7 — Land in which only new rights etc. may be acquired
| (1) Number of land shown on land plan | (2) Purpose for which rights may be acquired |
|---|---|
| 01-001, 01-002 | A.All rights and restrictions necessary for the undertaker and/or those authorised by the undertaker— 1. to install the cables by the use of directional drilling or other trenchless techniques only; 2. to retain and use the cables for the purposes of the transmission of electricity and telecommunications; 3. to benefit from continuous vertical and lateral support for the cables; B. A restrictive covenant over the land for the benefit of the remainder of the Order land to— prevent anything being done in or upon the land or any part thereof for the purposes of— the construction of any buildings; or the hard surfacing of the land; prevent the planting of any trees or shrubs on the land without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, or shrubs would not cause damage to the relevant part of the authorised development nor make it materially more difficult to maintain or to access the relevant part of the authorised development); prevent the carrying out of any excavations or works or agricultural practices to a depth greater than 0.75 metre from the surface of the land, without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed, with consent for trench digging requests relating to waterlogging to be determined within 24 hours, if the proposed activity would not cause damage to the relevant part of the authorised development nor make it materially more difficult to access or maintain the authorised development) provided that (for the avoidance of doubt)— ordinary agricultural practices including but not limited to acts of cultivation including soil preparation, ploughing and sub-soiling, not exceeding 0.75 metre in depth from the surface of the land, do not require the consent of the undertaker; and flushing of land drainage systems, maintenance of outfalls and culverts of land drainage systems, clearance of vegetation (by use of machinery or by hand) and the operation of existing land drainage systems do not require the consent of the undertaker provided that no excavations take place to a depth greater than 0.75 metre. |
| 01-004, 01-005, 01-006, 01-007, 01-008, 01-009 | A. All rights and restrictions necessary for the undertaker and/or those authorised by the undertaker— 1. to install the cables by the use of directional drilling or other trenchless techniques only; 2. to retain and use the cables for the purposes of the transmission of electricity and telecommunications; 3. to benefit from continuous vertical and lateral support for the cables; B. A restrictive covenant over the land for the benefit of the remainder of the Order land to— prevent anything being done in or upon the land or any part thereof for the purposes of— the construction of any buildings; or the hard surfacing of the land; prevent the planting of any trees or shrubs on the land without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, or shrubs would not cause damage to the relevant part of the authorised development nor make it materially more difficult to maintain or to access the relevant part of the authorised development); prevent the carrying out of any excavations or works or agricultural practices to a depth greater than 0.75 metre from the surface of the land, without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed, with consent for trench digging requests relating to waterlogging to be determined within 24 hours, if the proposed activity would not cause damage to the relevant part of the authorised development nor make it materially more difficult to access or maintain the authorised development) provided that (for the avoidance of doubt)— ordinary agricultural practices including but not limited to acts of cultivation including soil preparation, ploughing and sub-soiling, not exceeding 0.75 metre in depth from the surface of the land, do not require the consent of the undertaker; and flushing of land drainage systems, maintenance of outfalls and culverts of land drainage systems, clearance of vegetation (by use of machinery or by hand) and the operation of existing land drainage systems do not require the consent of the undertaker provided that no excavations take place to a depth greater than 0.75 metre. |
| 01-010, 01-013, 01-014, 01-015, 01-016 | A. All rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment and— 1 the right to install the cables by way of (but not limited to) digging trenches, the use of directional drilling, auger boring, thrust boring, micro tunnelling or pipe ramming or other similar trenchless techniques; 2. the right to retain and use the cables and jointing installations for the purposes of the transmission of electricity and telecommunications; 3. the right to benefit from continuous vertical and lateral support for the cables and jointing installations; 4. the right to benefit from continuous vertical and lateral support for the pipes, cables, conduits, service media and apparatus installed in, under, or over the land; 5. the right to carry out terrestrial work activities; 6. the right to access adjoining land and highway; 7. the right to place and use plant, vehicles, machinery, materials, drilling fluids, apparatus, equipment and temporary structures on and within the land; 8. the right to remove and discharge water from the land; 9. the right to remove, store and stockpile materials (including excavated material) within the land; 10. the right to retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the land, adjoining land and highway; 11. the right to erect temporary signage and provide measures for the benefit of public and personnel safety; 12. the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges; 13. the right to install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant trees, shrubs and landscaping; 14. the right to install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation and/or enhancement works; 15. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove pipes, cables, conduits, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers); 16. the right to remove archaeological artefacts where they would prevent or cause it to be materially more difficult to undertake terrestrial work activities or where leaving such archaeological artefacts in situ would materially increase the cost of the terrestrial work activities; 17. the right to remove fences, hedges, gates or other barriers during any period during which terrestrial work activities are being undertaken (subject to the prior erection of any temporary stock proof fencing as is reasonably required) and the replacement, replanting or re-instatement of fences, hedges or other barriers; 18. the right to carry out surveys including for site investigation and environmental surveys (including without prejudice to the generality of the foregoing, topographic, drainage, archaeological, geotechnical, geoenvironmental, ecological and ground stability site investigations and surveys), making of boreholes, trial pits and archaeological trenches and field stripping, auger hole sampling and the taking of soil and other samples; 19. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove cable marker posts to identify the location of the cables as required for routine integrity testing; 20. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove temporary access roads, hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram; 21. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove public and private drains, watercourses, sewers, ponds or culverts, and to drain into and manage waterflows in any public and private drains, watercourses, sewers, ponds or culverts including (but not limited to) by way of damming and overpumping; 22. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove supporting or protective structures (including the bridging over of or protection of the apparatus of the statutory undertakers); 23. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove temporary haul roads; 24. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove temporary welfare facilities (including but not limited to portakabins, portaloos and welfare equipment); 25. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove fencing, gates, walls, barriers or other means of enclosure; B. A restrictive covenant over the land for the benefit of the remainder of the Order land to— prevent anything being done in or upon the land or any part thereof for the purposes of— the construction of any buildings; or the hard surfacing of the land; prevent the planting of any trees or shrubs on the land without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, or shrubs would not cause damage to the relevant part of the authorised development nor make it materially more difficult to maintain or to access the relevant part of the authorised development); prevent the carrying out of any excavations or works or agricultural practices to a depth greater than 0.75 metre from the surface of the land, without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed, with consent for trench digging requests relating to waterlogging to be determined within 24 hours, if the proposed activity would not cause damage to the relevant part of the authorised development nor make it materially more difficult to access or maintain the authorised development) provided that (for the avoidance of doubt)— ordinary agricultural practices including but not limited to acts of cultivation including soil preparation, ploughing and sub-soiling, not exceeding 0.75 metre in depth from the surface of the land, do not require the consent of the undertaker; and flushing of land drainage systems, maintenance of outfalls and culverts of land drainage systems, clearance of vegetation (by use of machinery or by hand) and the operation of existing land drainage systems do not require the consent of the undertaker provided that no excavations take place to a depth greater than 0.75 metre. |
| 01-017, 01-017a, 01-018, 02-006, 02-007, 02-008, 02-009, 02-010, 02-011, 02-012, 02-013, 03-008, 03-009, 03-010, 03-013, 03-015, 03-016, 03-017, 03-018, 03-021, 03-022, 03-025, 03-026, 03-028, 03-029, 03-030, 04-004, 04-006, 04-011, 04-012, 04-016, 04-017, 04-018, 04-019, 04-020, 04-021, 04-023, 05-002, 05-003, 05-004, 05-006, 05-007, 05-008, 05-009, 05-010, 05-011, 05-014, 05-015, 05-016, 05-017, 05-018, 05-021, 06-001, 06-002, 06-005, 06-007, 06-008, 06-010, 06-012, 06-017, 06-018, 06-019, 06-021, 07-003, 07-005, 07-006, 07-007, 08-004, 08-005, 08-006, 08-007, 08-013, 08-014, 08-015, 08-016, 09-002, 09-003, 09-004, 09-004a, 09-004b, 09-006, 09-011, 09-018, 09-018a, 09-022, 10-002, 10-004, 10-005, 10-006, 10-011, 10-012, 10-016, 10-017, 10-018, 11-003, 11-006, 11-007, 11-008, 11-010, 11-012, 11-015, 11-016, 11-017, 11-018, 11-019, 11-020, 11-021, 11-022, 11-023, 12-006, 12-007, 12-008, 12-009, 12-010, 12-012, 12-013, 12-018, 12-019, 12-020, 13-001, 13-002, 13-003, 13-004, 13-010, 13-011, 13-018, 13-019, 13-020, 13-021, 14-004, 14-005, 14-006, 14-007, 14-008, 14-009, 14-011, 14-012, 14-013, 14-014, 14-015, 15-004, 15-006, 15-007, 15-008, 15-009, 15-010, 15-011, 15-012, 15-013, 15-015, 15-016, 15-041, 15-042, 15-043, 15-044, 15-046, 15-047, 15-048, 15-049, 15-050, 15-053, 15-054, 15-055, 15-056, 15-057, 16-003, 16-004, 16-005, 16-006, 16-007, 16-009, 16-010, 16-011, 16-012, 16-013, 16-014, 16-015, 16-016, 16-020, 16-021, 16-022, 16-023, 16-024, 16-025, 16-027, 16-029, 16-030, 16-031, 17-001, 17-002, 17-003, 17-006, 17-007, 17-008, 17-009, 17-010, 17-011, 17-012, 17-013, 17-014, 17-015, 17-016, 17-018, 17-021, 17-022, 17-023, 17-024, 17-026, 17-027, 17-028, 17-029, 17-030, 17-034, 17-035, 18-001, 18-002, 18-003, 18-004, 18-005, 18-006, 18-007, 18-009, 18-010, 18-011, 18-013, 18-014, 18-016, 18-017, 18-018, 18-019, 18-021, 18-023, 18-024, 18-025, 18-026, 18-028, 18-030, 18-033, 18-034, 18-037, 18-038, 19-001, 19-002, 19-003, 19-004, 19-006, 19-008, 19-009, 19-010, 19-011, 19-012, 19-013, 19-014, 19-015, 19-016, 19-017, 19-018, 19-019, 19-020, 19-021, 19-022, 19-024, 19-024a, 19-025, 20-004, 20-005, 20-006, 20-008, 21-003, 21-004, 21-005, 21-006, 21-008, 21-009, 21-011, 22-004, 22-005, 22-009, 22-011, 22-012, 22-013, 22-018, 22-021, 22-022, 22-023, 22-026, 22-027, 22-028, 22-031, 22-032, 23-001, 23-002, 23-005, 23-008, 23-009, 23-010, 23-011, 23-012, 23-013, 23-015, 23-016, 23-019, 23-020, 23-021, 23-022, 23-024, 23-026, 23-027, 23-030, 23-032, 23-033, 23-034, 24-002, 24-003, 24-005, 24-010, 24-013, 25-001, 25-002, 25-003, 25-004, 25-005, 25-006, 25-007, 25-008, 25-009, 25-010, 25-011, 25-012, 25-013, 25-014, 25-017, 25-018, 25-019, 25-020, 25-021, 25-022, 25-024, 25-025, 25-026, 25-027, 25-030, 25-031, 25-032, 25-033, 26-003, 26-003a, 26-005, 26-005a, 26-006, 26-007, 26-008, 26-009, 26-009a, 26-009b, 26-011, 26-012, 26-013, 26-014, 26-016, 26-017, 26-018, 26-022, 26-023, 26-024, 27-001, 27-002, 27-005, 27-005a, 27-005b, 27-006, 27-007, 27-008, 27-009, 27-010, 27-011, 27-015, 27-019, 27-021, 27-023, 27-024, 27-027, 27-030, 28-001, 28-002, 28-003, 28-006, 28-007, 28-007a, 28-011, 28-012, 28-014, 28-016, 28-017, 28-018, 28-019, 29-004, 29-005, 29-008, 29-009, 29-010, 29-013, 30-002, 30-005, 30-006, 30-007, 30-008, 30-009, 30-010, 30-013, 30-014, 30-015, 30-016, 30-017, 30-020, 30-021, 30-022, 30-023, 30-024, 31-001, 31-002, 31-003, 31-004, 31-005, 31-006, 31-007, 31-008, 31-009, 31-010, 32-003, 32-004, 32-004a, 32-005, 32-006, 32-007, 32-008, 32-009, 32-010, 32-011, 32-014, 32-015, 32-016, 32-017, 32-018, 32-019, 32-025, 32-026, 33-001, 33-002, 33-003, 33-004, 33-005, 33-008, 33-009, 33-010, 33-012, 33-013, 33-014, 33-015, 33-016, 33-026, 33-027, 33-028, 33-029, 33-035, 33-036, 33-037, 33-038, 33-038a, 33-039, 33-040, 34-003, 34-004, 34-005, 34-006, 34-007, 34-014, 34-015, 34-016, 34-018, 34-019, 34-020, 34-023, 37-001, 37-002, 37-003, 37-004, 37-009, 37-011, 37-012, 38-005, 38-006, 38-007, 38-008, 39-001, 39-002, 39-003, 39-004, 39-005, 39-006, 39-007, 39-008, 39-009, 39-014, 39-015, 39-016, 40-007, 40-010, 41-002, 41-003, 42-015, 42-016, 42-017, 42-018, 42-019, 42-020, 42-021, 42-022, 42-023, 42-024, 42-025, 43-001, 43-002, 43-003, 43-004, 43-005, 43-006, 43-007, 43-008, 43-009, 43-010, 43-011, 43-012, 43-013, 43-014, 43-015, 43-016, 43-017, 43-018, 43-019, 43-020, 43-021, 44-001, 44-002, 44-003, 44-004, 44-005, 44-006, 44-007, 44-008, 44-009, 44-010, 44-011, 44-012, 44-013, 44-014, 45-025, 45-026, 45-027, 45-028, 45-029, 45-030, 45-031, 45-032, 45-032a | A. All rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment and— 1. the right to install the cables by way of (but not limited to) digging trenches, the use of directional drilling, auger boring, thrust boring, micro tunnelling or pipe ramming or other similar trenchless techniques; 2. the right to retain and use the cables and jointing installations for the purposes of the transmission of electricity and telecommunications; 3. the right to benefit from continuous vertical and lateral support for the cables and jointing installations; 4. the right to benefit from continuous vertical and lateral support for the pipes, cables, conduits, service media and apparatus installed in, under, or over the land; 5. the right to carry out terrestrial work activities; 6. the right to access adjoining land and highway; 7. the right to place and use plant, vehicles, machinery, materials, drilling fluids, apparatus, equipment and temporary structures on and within the land; 8. the right to remove and discharge water from the land; 9. the right to remove, store and stockpile materials (including excavated material) within the land; 10. the right to retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the land, adjoining land and highway; 11. the right to erect temporary signage and provide measures for the benefit of public and personnel safety; 12. the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges; 13. the right to install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant trees, shrubs and landscaping; 14. the right to install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation and/or enhancement works; 15. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove pipes, cables, conduits, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers); 16. the right to remove archaeological artefacts where they would prevent or cause it to be materially more difficult to undertake terrestrial work activities or where leaving such archaeological artefacts in situ would materially increase the cost of the terrestrial work activities; 17. the right to remove fences, hedges, gates or other barriers during any period during which terrestrial work activities are being undertaken (subject to the prior erection of any temporary stock proof fencing as is reasonably required) and the replacement, replanting or re-instatement of fences, hedges or other barriers; 18. the right to carry out surveys including for site investigation and environmental surveys (including without prejudice to the generality of the foregoing, topographic, drainage, archaeological, geotechnical, geoenvironmental, ecological and ground stability site investigations and surveys), making of boreholes, trial pits and archaeological trenches and field stripping, auger hole sampling and the taking of soil and other samples; 19. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove cable marker posts to identify the location of the cables as required for routine integrity testing; 20. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove temporary access roads, hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram; 21. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove public and private drains, watercourses, sewers, ponds or culverts, and to drain into and manage waterflows in any public and private drains, watercourses, sewers, ponds or culverts including (but not limited to) by way of damming and overpumping; 22. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove supporting or protective structures (including the bridging over of or protection of the apparatus of the statutory undertakers); 23. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove temporary haul roads; 24. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove temporary barriers for the protection of fauna; 25. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove temporary noise alleviation measures; 26. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove temporary paths and bridleways for public use; 27. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove temporary welfare facilities (including but not limited to portakabins, portaloos and welfare equipment); 28. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove fencing, gates, walls, barriers or other means of enclosure; B. A restrictive covenant over the land for the benefit of the remainder of the Order land to— prevent anything being done in or upon the land or any part thereof for the purposes of— the construction of any buildings; or the hard surfacing of the land; prevent the planting of any trees or shrubs on the land without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, or shrubs would not cause damage to the relevant part of the authorised development nor make it materially more difficult to maintain or to access the relevant part of the authorised development); prevent the carrying out of any excavations or works or agricultural practices to a depth greater than 0.75 metre from the surface of the land, without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed, with consent for trench digging requests relating to waterlogging to be determined within 24 hours, if the proposed activity would not cause damage to the relevant part of the authorised development nor make it materially more difficult to access or maintain the authorised development) provided that (for the avoidance of doubt)— ordinary agricultural practices including but not limited to acts of cultivation including soil preparation, ploughing and sub-soiling, not exceeding 0.75 metre in depth from the surface of the land, do not require the consent of the undertaker; and flushing of land drainage systems, maintenance of outfalls and culverts of land drainage systems, clearance of vegetation (by use of machinery or by hand) and the operation of existing land drainage systems do not require the consent of the undertaker provided that no excavations take place to a depth greater than 0.75 metre. |
| 09-012, 09-013, 09-016, 09-017 | A. All rights and restrictions necessary for the undertaker and/or those authorised by the Undertaker— 1. to install the cables by the use of directional drilling or other trenchless techniques only; 2. to retain and use the Cables for the purposes of the transmission of electricity and telecommunications; 3. to benefit from continuous vertical and lateral support for the cables; 4. to access the land temporarily (and during the construction phase of the authorised project only) with or without vehicles and machinery so as to remove materials (arising as a result of works to install the cables) from the land; 5. to access the land temporarily with or without vehicles and machinery to carry out surveys including for site investigation and environmental surveys (including without prejudice to the generality of the foregoing, topographic, drainage, archaeological, geotechnical, geoenvironmental, ecological and ground stability site investigations and surveys), making of boreholes, trial pits and archaeological trenches and field stripping, auger hole sampling and the taking of soil and other samples; B. A restrictive covenant over the land for the benefit of the remainder of the Order land to prevent anything being done in or upon the land or any part thereof which interferes with or might interfere with the exercise of the rights or the use of the cables or in any way render the cables in breach of any statute or regulation for the time being in force and applicable thereto. |
| 45-046a, 45-054, 45-058, 45-062, 46-016, 46-023, 46-024, 46-025, 47-032, 47-033, 48-014, 48-015, 48-017, 48-018, 48-019, 48-020, 48-021, 48-022, 48-023, 48-024, 48-025, 49-007, 49-008, 49-009, 49-010, 50-002, 50-003, 50-004, 50-005, 50-006, 50-006a, 50-007, 50-007a, 51-001, 51-001a, 51-002, 51-003, 51-004, 51-005, 51-006, 51-007, 51-008, 51-009, 51-010, 51-011, 51-012, 51-013, 51-014, 51-015 | A. All rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment and— 1. the right to install the cables by way of (but not limited to) digging trenches, the use of directional drilling, auger boring, thrust boring, micro tunnelling or pipe ramming or other similar trenchless techniques; 2. the right to retain and use the cables and jointing installations for the purposes of the transmission of electricity and telecommunications; 3. the right to benefit from continuous vertical and lateral support for the cables and jointing installations; 4. the right to benefit from continuous vertical and lateral support for the pipes, cables, conduits, service media and apparatus installed in, under, or over the land; 5. the right to carry out terrestrial work activities; 6. the right to access adjoining land and highway; 7. the right to place and use plant, vehicles, machinery, materials, drilling fluids, apparatus, equipment and temporary structures on and within the land; 8. the right to remove and discharge water from the land; 9. the right to remove, store and stockpile materials (including excavated material) within the land; 10. the right to erect temporary signage and provide measures for the benefit of public and personnel safety; 11. the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges; 12. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove pipes, cables, conduits, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers); 13. the right to remove archaeological artefacts where they would prevent or cause it to be materially more difficult to undertake terrestrial work activities or where leaving such archaeological artefacts in situ would materially increase the cost of the terrestrial work activities; 14. the right to remove fences, hedges, gates or other barriers during any period during which terrestrial work activities are being undertaken (subject to the prior erection of any temporary stock proof fencing as is reasonably required) and the replacement, replanting or re-instatement of fences, hedges or other barriers; 15. the right to carry out surveys including for site investigation and environmental surveys (including without prejudice to the generality of the foregoing, topographic, drainage, archaeological, geotechnical, geoenvironmental, ecological and ground stability site investigations and surveys), making of boreholes, trial pits and archaeological trenches and field stripping, auger hole sampling and the taking of soil and other samples; 16. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove cable marker posts to identify the location of the cables as required for routine integrity testing; 17. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove temporary access roads, hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram; 18. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove public and private drains, watercourses, sewers, ponds or culverts, and to drain into and manage waterflows in any public and private drains, watercourses, sewers, ponds or culverts including (but not limited to) by way of damming and overpumping; 19. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove supporting or protective structures (including the bridging over of or protection of the apparatus of the statutory undertakers); 20. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove temporary haul roads; 21. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove temporary welfare facilities (including but not limited to portakabins, portaloos and welfare equipment); 22. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove fencing, gates, walls, barriers or other means of enclosure; B. A restrictive covenant over the land for the benefit of the remainder of the Order land to— prevent anything being done in or upon the land or any part thereof for the purposes of— the construction of any buildings; or the hard surfacing of the land; prevent the planting of any trees or shrubs on the land without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, or shrubs would not cause damage to the relevant part of the authorised development nor make it materially more difficult to maintain or to access the relevant part of the authorised development); prevent the carrying out of any excavations or works or agricultural practices to a depth greater than 0.75 metre from the surface of the land, without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed, with consent for trench digging requests relating to waterlogging to be determined within 24 hours, if the proposed activity would not cause damage to the relevant part of the authorised development nor make it materially more difficult to access or maintain the authorised development) provided that (for the avoidance of doubt)— ordinary agricultural practices including but not limited to acts of cultivation including soil preparation, ploughing and sub-soiling, not exceeding 0.75 metre in depth from the surface of the land, do not require the consent of the undertaker; and flushing of land drainage systems, maintenance of outfalls and culverts of land drainage systems, clearance of vegetation (by use of machinery or by hand) and the operation of existing land drainage systems do not require the consent of the undertaker provided that no excavations take place to a depth greater than 0.75 metre. |
| 15-032, 15-035, 15-028, 15-033, 15-031, 15-030, 15-034, 15-036, 15-029 | A. All rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment and— 1. the right to carry out terrestrial work activities; 2. the right to access adjoining land and highway including use of the existing or any replacement bridge; 3. the right to place and use plant, vehicles, machinery, materials, drilling fluids, apparatus, equipment and temporary structures on and within the land; 4. the right to construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, protect, make safe, replace and remove the bridge and supporting structures on or over or in the land; 5. the right to remove, store and stockpile materials (including excavated material) within the land; 6. the right to retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the land, adjoining land and highway; 7. the right to erect temporary signage and provide measures for the benefit of public and personnel safety; 8. the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges; 9. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove pipes, cables, conduits, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers); 10. the right to remove archaeological artefacts where they would prevent or cause it to be materially more difficult to undertake terrestrial work activities or where leaving such archaeological artefacts in situ would materially increase the cost of the terrestrial work activities; 11. the right to remove fences, hedges, gates or other barriers during any period during which terrestrial work activities are being undertaken (subject to the prior erection of any temporary stock proof fencing as is reasonably required) and the replacement, replanting or re-instatement of fences, hedges or other barriers; 12. the right to carry out surveys including for site investigation and environmental surveys (including without prejudice to the generality of the foregoing, topographic, drainage, archaeological, geotechnical, geoenvironmental, ecological and ground stability site investigations and surveys), making of boreholes, trial pits and archaeological trenches and field stripping, auger hole sampling and the taking of soil and other samples; 13. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram; 14. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove supporting or protective structures (including the bridging over of or protection of the apparatus of the statutory undertakers); 15. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove fencing, gates, walls, barriers or other means of enclosure. |
| 45-002, 45-003, 45-004, 45-006, 45-007, 45-009, 45-010, 45-011, 45-012, 45-013, 45-014, 45-016, 45-017, 45-018, 45-019, 45-020, 45-022, 45-034, 45-035, 45-036, 45-037, 45-038, 45-042, 45-043, 45-044, 45-045, 45-046, 45-047, 45-048, 45-049, 45-049a, 45-051, 45-051a, 45-052, 45-052a, 45-055, 45-056, 45-057, 45-059, 45-060, 45-061, 45-063, 45-064, 45-065, 45-065a, 45-067, 45-069, 45-073, 46-001, 46-004, 46-005, 46-007, 46-009, 46-010, 46-011, 46-012, 46-013, 46-014, 46-015, 46-018, 46-019, 46-020, 46-027, 46-028, 46-029, 46-030, 46-031, 46-032, 46-034, 46-035, 46-037a, 46-036, 46-038, 46-039, 46-040, 46-042, 46-043, 46-044a, 46-045, 46-046, 46-047, 47-007, 47-010, 47-012, 47-013, 47-014, 47-015, 47-016, 47-018, 47-019, 47-020, 47-021, 47-022, 47-023, 47-024, 47-025, 47-027, 47-036, 47-037, 47-038, 48-001, 48-003, 48-004, 48-008, 48-009, 48-010, 48-011, 48-013 | A. All rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment and— 1. the right to carry out terrestrial work activities; 2. the right to access adjoining land and highway; 3. the right to place and use plant, vehicles, machinery, materials, apparatus, equipment and temporary structures on and within the land; 4. the right to remove and discharge water from the land; 5. the right to remove, store and stockpile materials (including excavated material) within the land; 6. the right to retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the land, adjoining land and highway; 7. the right to erect temporary signage and provide measures for the benefit of public and personnel safety; 8. the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges; 9. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove pipes, cables, conduits, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers); 10. the right to remove archaeological artefacts where they would prevent or cause it to be materially more difficult to undertake terrestrial work activities or where leaving such archaeological artefacts in situ would materially increase the cost of the terrestrial work activities; 11. the right to remove fences, hedges, gates or other barriers during any period during which terrestrial work activities are being undertaken (subject to the prior erection of any temporary stock proof fencing as is reasonably required) and the replacement, replanting or re-instatement of fences, hedges or other barriers; 12. the right to carry out surveys including for site investigation and environmental surveys (including without prejudice to the generality of the foregoing, topographic, drainage, archaeological, geotechnical, geoenvironmental, ecological and ground stability site investigations and surveys), making of boreholes, trial pits and archaeological trenches and field stripping, auger hole sampling and the taking of soil and other samples; 13. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram; 14. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove public and private drains, watercourses, sewers or culverts, and to drain into and manage waterflows in any public and private drains, watercourses, sewers or culverts; 15. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove supporting or protective structures (including the bridging over of or protection of the apparatus of the statutory undertakers); 16. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove temporary paths and bridleways for public use; 17. the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove fencing, gates, walls, barriers or other means of enclosure; B. A restrictive covenant over the land for the benefit of the remainder of the Order land to— prevent anything being done in or upon the land or any part thereof for the purposes of— the construction of any buildings; or the hard surfacing of the land; prevent the planting of any trees or shrubs on the land without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, or shrubs would not cause damage to the relevant part of the authorised development nor make it materially more difficult to maintain or to access the relevant part of the authorised development); prevent the carrying out of any excavations or works or agricultural practices to a depth greater than 0.75 metre from the surface of the land, without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed, with consent for trench digging requests relating to waterlogging to be determined within 24 hours, if the proposed activity would not cause damage to the relevant part of the authorised development nor make it materially more difficult to access or maintain the authorised development) provided that (for the avoidance of doubt)— ordinary agricultural practices including but not limited to acts of cultivation including soil preparation, ploughing and sub-soiling, not exceeding 0.75 metre in depth from the surface of the land, do not require the consent of the undertaker; and flushing of land drainage systems, maintenance of outfalls and culverts of land drainage systems, clearance of vegetation (by use of machinery or by hand) and the operation of existing land drainage systems do not require the consent of the undertaker provided that no excavations take place to a depth greater than 0.75 metre. |
| 01-011, 01-012, 09-007, 09-008, 09-009, 09-010, 15-019, 15-025, 15-038, 15-039, 45-041a, 46-022, 46-041, 47-006, 47-008, 47-009, 47-014a | A. All rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment and— 1. the right to carry out terrestrial work activities; 2. the right to access adjoining land and highway. |
SCHEDULE 8 — Modification of compensation and compulsory purchase enactments for creation of new rights and imposition of new restrictions
Compensation enactments
1
The enactments for the time being in force with respect to compensation for the compulsory purchase of land apply, with the necessary modifications as respects compensation, in the case of a compulsory acquisition under this Order of a right by the creation of a new right or the imposition of a restrictive covenant as they apply as respects compensation on the compulsory purchase of land and interests in land.
2
- (1) Without prejudice to the generality of paragraph 1, the Land Compensation Act 1973[^f00073] has effect subject to the modifications set out in sub-paragraphs (2).
- (2) In section 44(1) (compensation for injurious affection) of the Land Compensation Act 1973, as it applies to compensation for injurious affection under section 7 of the 1965 Act as substituted by paragraph 5—
- (a) for “land is acquired or taken from” substitute “a right or restrictive covenant over land is purchased from or imposed on”; and
- (b) for “acquired or taken from him” substitute “over which the right is exercisable or the restrictive covenant enforceable”.
3
- (1) Without limitation on the scope of paragraph 1, the 1961 Act has effect subject to the modification set out in sub-paragraph (2).
(2) For section 5A(5A) (relevant valuation date) of the 1961 Act substitute—
(5A) If— (a) the acquiring authority enters on land for the purpose of exercising a right in pursuance of a notice of entry under section 11(1) (powers of entry) of the 1965 Act (as modified by paragraph 7 of Schedule 8 to the Outer Dowsing Offshore Wind Farm Order 2026); and (b) the acquiring authority is subsequently required by a determination under paragraph 12 of Schedule 2A (counter-notice requiring purchase of land not in notice to treat) to the 1965 Act (as substituted by paragraph 10 of Schedule 8 to the Outer Dowsing Offshore Wind Farm Order 2026) to acquire an interest in the land, and (c) the acquiring authority enters on and takes possession of that land, the authority is deemed for the purposes of subsection (3)(a) to have entered on that land where it entered on that land for the purpose of exercising that right.
Application of the 1965 Act
4
- (1) The 1965 Act has effect with the modifications necessary to make it apply to the compulsory acquisition under this Order of a right by the creation of a new right, or to the imposition under this Order of a restrictive covenant, as it applies to the compulsory acquisition under this Order of land, so that, in appropriate contexts, references in that Act to land are read (according to the requirements of the particular context) as referring to, or as including references to—
- (a) the right acquired or to be acquired or the restriction imposed or to be imposed; or
- (b) the land over which the right is or is to be exercisable, or the restriction is or is to be enforceable.
- (2) Without prejudice to the generality of sub-paragraph (1), Part 1 of the 1965 Act applies in relation to the compulsory acquisition under this Order of a right by the creation of a new right or the imposition of a restriction with the modifications specified in the following provisions of this Schedule.
5
For section 7 of the 1965 Act (measure of compensation in case of severance) substitute the following section—
(7) In assessing the compensation to be paid by the acquiring authority under this Act, regard must be had not only to the extent (if any) to which the value of the land over which the right is to be acquired or the restrictive covenant is to be imposed is depreciated by the acquisition of the right or the imposition of the covenant but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act.
6
The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say—
- (a) section 9(4) (refusal to convey, failure to make title, etc.);
- (b) paragraph 10(3) of Schedule 1 (conveyance of the land or interest);
- (c) paragraph 2(3) of Schedule 2 (absent and untraced owners); and
- (d) paragraphs 2(3) and 7(2) of Schedule 4 (common land),
7
are so modified as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily acquired or the restrictive covenant which is to be imposed is vested absolutely in the acquiring authority.Section 11 of the 1965 Act (powers of entry) is so modified as to secure that, as from the date on which the acquiring authority has served notice to treat in respect of any right or restrictive covenant, as well as the notice of entry required by subsection (1) of that section (as it applies to compulsory acquisition under article 20 (compulsory acquisition of land) of this Order, it has power, exercisable in equivalent circumstances and subject to equivalent conditions, to enter for the purpose of exercising that right or enforcing that restrictive covenant (which is deemed for this purpose to have been created on the date of service of the notice); and sections 11A (powers of entry: further notices of entry) [^f00074], 11B (counter-notice requiring possession to be taken on specified date)[^f00075], 12 (unauthorised entry)[^f00076] and 13 (refusal to give possession to acquiring authority)[^f00077] of the 1965 Act are modified correspondingly.
8
Section 20 of the 1965 Act (tenants at will, etc.)[^f00078] applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right or the enforcement of the restrictive covenant in question.
9
Section 22 of the 1965 Act (interests omitted from purchase) is so modified as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired or enforce the restrictive covenant imposed, subject to compliance with that section as respects compensation.
10
For Schedule 2A to the 1965 Act substitute—
SCHEDULE2A (1) (1) This Schedule applies where an acquiring authority serve a notice to treat in respect of a right over, or restrictive covenant affecting, the whole or part of a house, building or factory and have not executed a general vesting declaration under section 4 (execution of declaration) of the 1981 Act as applied by article 22 (application of the Compulsory Purchase (Vesting Declarations) Act 1981) of the Outer Dowsing Offshore Wind Farm Order 2026 in respect of the land to which the notice to treat relates. (2) But see article 24(3) (acquisition of subsoil or airspace only) of the Outer Dowsing Offshore Wind Farm Order 2026, which excludes the acquisition of subsoil or airspace from this Schedule. (2) In this Schedule, “house” includes any park or garden belonging to a house. (3) A person who is able to sell the house, building or factory (“the owner”) may serve a counter-notice requiring the acquiring authority to purchase the owner’s interest in the house, building or factory. (4) A counter-notice under paragraph 3 must be served within the period of 28 days beginning with the day on which the notice to treat was served. (5) On receiving a counter-notice, the acquiring authority must decide whether to— (a) withdraw the notice to treat, (b) accept the counter-notice, or (c) refer the counter-notice to the Upper Tribunal. (6) The acquiring authority must serve notice of their decision on the owner within the period of three months beginning with the day on which the counter-notice is served (“the decision period”). (7) If the acquiring authority decide to refer the counter-notice to the Upper Tribunal they must do so within the decision period. (8) If the acquiring authority do not serve notice of a decision within the decision period they are to be treated as if they had served notice of a decision to withdraw the notice to treat at the end of that period. (9) If the acquiring authority serve notice of a decision to accept the counter-notice, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in the house, building or factory. (10) On a referral under paragraph 7, the Upper Tribunal must determine whether the acquisition of the right or the imposition of the restrictive covenant would— (a) in the case of a house, building or factory, cause material detriment to the house, building or factory, or (b) in the case of a park or garden, seriously affect the amenity or convenience of the house to which the park or garden belongs. (11) In making its determination, the Upper Tribunal must take into account— (a) the effect of the acquisition of the right or the imposition of the covenant, (b) the use to be made of the right or covenant proposed to be acquired or imposed, and (c) if the right or covenant is proposed to be acquired or imposed for works or other purposes extending to other land, the effect of the whole of the works and the use of the other land. (12) If the Upper Tribunal determines that the acquisition of the right or the imposition of the covenant would have either of the consequences described in paragraph 10, it must determine how much of the house, building or factory the acquiring authority ought to be required to take. (13) If the Upper Tribunal determines that the authority ought to be required to take some or all of the house, building or factory, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in that land. (14) (1) If the Upper Tribunal determines that the acquiring authority ought to be required to take some or all of the house, building or factory, the acquiring authority may at any time within the period of 6 weeks beginning with the day on which the Upper Tribunal makes its determination withdraw the notice to treat in relation to that land. (2) If the acquiring authority withdraws the notice to treat under this paragraph they must pay the person on whom the notice was served compensation for any loss or expense caused by the giving and withdrawal of the notice. (3) Any dispute as to the compensation is to be determined by the Upper Tribunal.
SCHEDULE 9 — Land of which temporary possession may be taken
| (1) Area | (2) Number of land shown on land plan | (3) Purpose for which temporary possession may be taken | (4) Relevant part of the authorised project |
|---|---|---|---|
| District of Boston | 33-019, 33-020, 33-021, 33-022, 33-023, 33-024, 33-025, 34-010, 34-011, 34-012, 34-013, 38-003, 38-004, 38-009, 42-004, 43-023, 43-024, 43-029, 43-030, 43-031, 43-032, 43-033, 43-034, 43-035, 43-042, 43-043, 43-044, 43-045, 43-046, 43-047, 44-027, 44-028, 44-029 | Temporary use (including laying of temporary vehicular access tracks, bellmouths and associated footpaths) to facilitate construction of Work Nos. 15, 16, 17 and 19. | Work No. 18 |
| District of East Lindsey | 04-013, 05-005, 07-010, 07-011, 08-001, 08-002, 08-003, 08-008, 10-014, 12-016, 13-012, 14-001, 14-002, 14-003, 15-018, 15-020, 15-021, 15-022, 15-023, 15-024, 15-026, 15-027, 15-045, 15-051, 16-001, 16-002, 20-001 | Temporary use (including laying of temporary vehicular access tracks, bellmouths and associated footpaths) to facilitate construction of Work Nos. 15, 19 and 22. | Work No. 18 |
| District of South Holland | 49-001, 49-002, 49-003, 49-004 | Temporary use (including laying of temporary vehicular access tracks, bellmouths and associated footpaths) to facilitate construction of Work Nos. 15, 16, 17 and 19. | Work No. 18 |
| District of Boston | 23-023, 26-025, 27-003, 27-004, 27-004a, 29-007, 29-011, 29-012, 30-001, 33-011, 33-030, 33-031, 34-009, 34-021, 34-022, 36-002, 36-003, 36-004, 39-013, 39-021, 42-003, 43-026, 43-027, 43-028, 43-038, 43-039, 43-040, 43-041, 45-040, 47-029, 49-005, 49-006 | Temporary use (consisting of temporary works areas to support construction activities; temporary construction ramps; storage areas to assist with the onshore transmission works; and vehicular access tracks, bellmouths and footpaths) to facilitate construction of Work No. 15. | Work No. 19 |
| District of East Lindsey | 02-001, 02-002, 04-014, 07-008, 07-009, 07-012, 08-009, 10-013, 10-015, 10-019, 13-013, 13-014, 15-017, 15-037, 15-040, 15-052, 18-020, 20-002, 20-003 | Temporary use (consisting of temporary works areas to support construction activities; temporary construction ramps; storage areas to assist with the onshore transmission works; and vehicular access tracks, bellmouths and footpaths) to facilitate construction of Work Nos. 13, 14, 15 and 22. | Work No. 19 |
| District of South Holland | 45-040 47-004 47-029 49-005 49-006 | Temporary use (consisting of temporary works areas to support construction activities; temporary construction ramps; storage areas to assist with the onshore transmission works; and vehicular access tracks, bellmouths and footpaths) to facilitate construction of Work Nos. 15, 16, 17, 20, 23, 24 and 25. | Work No. 19 |
| District of Boston | 33-017, 33-018, 34-025, 35-001, 35-002, 35-003, 36-005, 36-006, 36-007, 36-008, 39-022, 39-023, 42-005, 42-006, 42-007, 42-008, 42-009, 42-010, 42-013, 42-014, 43-022 | Temporary use (highway alterations including widening of the highway, provision of passing bays, culverting and drainage works) to facilitate construction of Work No. 15. | Work No. 21 |
| District of East Lindsey | 17-036, 17-037, 20-009 | Temporary use (highway alterations including widening of the highway, provision of passing bays, culverting and drainage works) to facilitate construction of Work No. 15. | |
| District of Boston | 21-010, 22-001, 22-002, 22-003, 22-006, 22-007, 22-008, 22-010, 22-014, 22-015, 22-016, 22-017, 22-019, 22-020, 22-024, 22-025, 22-029, 22-029a, 22-030, 23-003, 23-004, 23-006, 23-007, 23-014, 23-017, 23-018, 23-025, 23-028, 23-029, 23-031, 23-035, 24-001, 24-004, 24-006, 24-007, 24-008, 24-009, 24-011, 24-012, 25-015, 25-016, 25-023, 25-028, 25-029, 26-001, 26-002, 26-004, 26-015, 26-019, 26-020, 26-021, 27-012, 27-013, 27-014, 27-016, 27-017, 27-018, 27-020, 27-022, 27-025, 27-026, 27-028, 27-029, 28-004, 28-008, 28-009, 28-010, 28-013, 28-015, 29-001, 29-002, 29-003, 29-006, 30-003, 30-004, 30-011, 30-012, 30-018, 30-019, 32-001, 32-002, 32-012, 32-013, 32-020, 32-021, 32-022, 32-023, 32-024, 33-006, 33-007, 33-032, 33-033, 33-034, 34-001, 34-002, 34-008, 34-017, 34-024, 37-005, 37-006, 37-007, 37-008, 37-010, 38-001, 38-002, 39-010, 39-011, 39-012, 39-017, 39-018, 39-019, 40-001, 40-002, 40-003, 40-006, 40-008, 40-009, 41-001, 42-001, 42-002, 42-011, 42-012, 42-026, 43-025, 43-036, 44-015, 44-016, 44-017, 44-018, 44-019, 44-020, 44-021, 44-022, 44-023, 44-024, 44-025, 44-026, 45-023, 45-024, 45-033 | Temporary use (including enabling works) for vehicular access to facilitate the construction of Work Nos. 15, 19, and 24. | Enabling accesses |
| District of East Lindsey | 01-019, 02-003, 02-004, 02-005, 02-014, 02-015, 02-016, 02-017, 02-018, 02-019, 02-020, 02-021, 03-001, 03-002, 03-003, 03-004, 03-005, 03-006, 03-007, 03-011, 03-012, 03-014, 03-019, 03-020, 03-023, 03-024, 03-027, 03-031, 04-001, 04-002, 04-003, 04-005, 04-007, 04-008, 04-009, 04-010, 04-015, 04-022, 05-001, 05-012, 05-013, 05-019, 05-020, 06-003, 06-004, 06-006, 06-009, 06-011, 06-013, 06-014, 06-015, 06-016, 06-020, 07-001, 07-002, 07-004, 08-010, 08-011, 08-012, 08-017, 09-001, 09-005, 09-005a, 09-005b, 09-005c, 09-014, 09-015, 09-019, 09-020, 09-021, 10-001, 10-003, 10-007, 10-008, 10-009, 10-010, 10-020, 10-021, 10-022, 11-001, 11-002, 11-004, 11-005, 11-009, 11-013, 11-014, 12-001, 12-002, 12-003, 12-004, 12-011, 12-014, 12-015, 12-017, 13-005, 13-006, 13-007, 13-008, 13-009, 13-015, 13-016, 13-017, 14-010, 14-016, 15-001, 15-002, 15-003, 15-005, 15-014, 16-008, 16-017, 16-018, 16-019, 16-026, 16-028, 17-004, 17-005, 17-017, 17-019, 17-020, 17-025, 17-031, 17-032, 17-033, 18-008, 18-012, 18-015, 18-022, 18-027, 18-029, 18-031, 18-032, 18-035, 18-036, 19-005, 19-007, 19-023, 20-007, 21-001, 21-002, 21-007 | Temporary use (including enabling works) for vehicular access to facilitate the construction of Work Nos. 13, 14, 15, 19 and 22. | Enabling accesses |
| District of South Holland | 45-039, 45-053, 45-066, 45-070, 45-071, 45-072, 46-026, 47-001, 47-002, 47-003, 47-028, 47-030, 47-034, 47-035, 48-016, 49-011, 50-001 | Temporary use (including enabling works) for vehicular access to facilitate the construction of Work Nos. 15, 16, 17, 19, 20, 23, 24 and 25. | Enabling accesses |
SCHEDULE 10 — Deemed marine licence under the 2009 Act - generation assets
PART 1 — Licensed Marine Activities
1
- (1) In this licence—
- “the 2004 Act” means the Energy Act 2004[^f00079];
- “the 2008 Act” means the Planning Act 2008[^f00080];
- “the 2009 Act” means the Marine and Coastal Access Act 2009[^f00081];
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.