  • (b) Exolum reasonably requires the removal of any Apparatus;

then the relevant party must give written notice of that requirement to the other.

  • (2) The parties must use their reasonable endeavours to produce a plan of the work proposed and a plan of the proposed position of the Alternative Apparatus to be provided or constructed.
  • (3) The undertaker must afford to Exolum the necessary facilities and rights for the construction of Alternative Apparatus and subsequently the grant of Alternative Rights in accordance with paragraphs 120(1) to 120(5).
  • (4) Any Alternative Apparatus is to be constructed in land owned by the undertaker or in land in respect of which Alternative Rights have been or are guaranteed to be granted to Exolum. The Alternative Apparatus shall be constructed in such manner and in such line or situation as may be agreed between Exolum and the undertaker or in default of agreement settled by arbitration in accordance with article 42 (arbitration).
  • (5) After the details for the works for Alternative Apparatus to be provided or constructed have been agreed or settled in accordance with article 42 (arbitration), and after the grant to Exolum of any such facilities and rights as are referred to in sub-paragraph (3), Exolum must proceed as soon as reasonably practicable using reasonable endeavours to construct and bring into operation the Alternative Apparatus and subsequently to remove (or if agreed between the parties to allow the undertaker to remove) any redundant Apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.
  • (6) The following sub-paragraphs (7) and (8) only apply if—
  • (a) Exolum fails to comply with its obligations under paragraph 10 to remove any redundant Apparatus; and
  • (b) the undertaker has served notice on Exolum specifying the default; and
  • (c) Exolum has failed to remedy the default within 28 days.
  • (7) In the circumstances set out in sub-paragraph (6), if the undertaker then gives notice in writing to Exolum that it desires itself to remove the redundant Apparatus, that work, instead of being executed by Exolum, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of Exolum.
  • (8) Nothing in sub-paragraph (7) authorises the undertaker to execute the placing, installation, bedding, packing, removal, connection or disconnection of any Apparatus, or execute any filling around the Apparatus (where the Apparatus is laid in a trench) within 3000 millimetres of the Apparatus unless that Apparatus is redundant and disconnected from Exolum’s remaining system.

Facilities and Rights for Alternative Apparatus

120

  • (1) Where, in accordance with the provisions of this Schedule, the undertaker affords to Exolum facilities and rights for the construction of Alternative Apparatus and the grant of Alternative Rights, in substitution for Apparatus to be removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and Exolum in accordance with this Part of this Schedule or in default of agreement settled by arbitration in accordance with article 42 (arbitration).
  • (2) Alternative Rights must be granted before any Alternative Apparatus is brought into use.
  • (3) The parties agree that the undertaker must use all reasonable endeavours to procure the grant of the Alternative Rights by way of a 999 year sub-soil lease, substantially in the form of Exolum’s precedent from time to time as amended by written agreement between the parties acting reasonably, or such other form of agreement as the parties otherwise agree acting reasonably.
  • (4) Nothing in this Schedule or contained in the Alternative Rights requires Exolum to divert or remove any Alternative Apparatus.
  • (5) If the facilities and rights to be afforded by the undertaker in respect of any Alternative Apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of Exolum less favourable on the whole to Exolum than the facilities and rights enjoyed by it in respect of the Apparatus to be removed and the terms and conditions to which those facilities and rights are subject, Exolum may refer the matter to arbitration in accordance with article 42 (arbitration).

Retained Apparatus and Alternative Apparatus: protection

121

  • (1) Before commencing the execution of any Restricted Works, the undertaker must submit to Exolum a Plan of the works to be executed and any other information that Exolum may reasonably require to allow Exolum to assess the works.
  • (2) No Restricted Works are to be commenced until the Plan to be submitted to Exolum under paragraph (1) has been approved by Exolum in writing (acting reasonably) and are to be carried out only in accordance with the details submitted under paragraph (1) and in accordance with such reasonable requirements as may be notified to the undertaker in writing in accordance with paragraph (3) by Exolum.
  • (3) Any approval of Exolum in respect of Restricted Works may be given subject to such reasonable requirements as Exolum may require to be made for—
  • (a) the continuing safety and operational viability of any Apparatus;
  • (b) the requirement for Exolum to have reasonable access with or without vehicles to inspect, repair, replace, maintain and ensure the continuing safety and operation or viability of any Apparatus and/or Premises; and
  • (c) the requirement for Exolum to be entitled to watch and inspect the execution of Restricted Works to ensure the continuing safety and operational viability of any Apparatus and ensure compliance with the agreed Plan;

providing such reasonable requirements will be notified to the undertaker in writing.

  • (4) Where reasonably required by either party, in view of the complexity of any proposed works, timescales, phasing or costs, the parties must with due diligence and good faith negotiate a works agreement for the carrying out of Protective Works or the installation of Alternative Apparatus.
  • (5) If in consequence of the works notified to Exolum by the undertaker under paragraph (1), the circumstances in paragraph 119(2) apply, then the parties must follow the procedure in paragraph 119(2) onwards.
  • (6) Nothing in paragraphs (1) to (5) precludes the undertaker from submitting prior to the commencement of works to protect retained Apparatus or to construct Alternative Apparatus (unless otherwise agreed in writing between the undertaker and Exolum) a new Plan, instead of the Plan previously submitted, in which case the parties must re-run the procedure from paragraph (1) onwards.
  • (7) Where Exolum reasonably requires Protective Works, the parties must use their reasonable endeavours to produce a plan of the work proposed and a plan of the proposed position of any physical features to be provided or constructed.
  • (8) The undertaker must afford to Exolum the necessary facilities and rights for the construction of Protective Works and subsequently the grant of Additional Rights in accordance with paragraphs 120(1) to 120(5).
  • (9) Any Protective Works are to be constructed in land owned by the undertaker or in land in respect of which Alternative Rights have been or are guaranteed to be granted to Exolum. The Protective Works must be constructed in such manner and in such line or situation as may be agreed between Exolum and the undertaker or in default of agreement settled by arbitration in accordance with article 42 (arbitration).
  • (10) After the details for the Protective Works to be provided or constructed have been agreed or settled in accordance with article 42 (arbitration), and after the grant to Exolum of any such facilities and rights as are referred to in paragraph 119(3), Exolum must proceed as soon as reasonably practicable using reasonable endeavours to construct and bring into operation the Protective Works.

Cathodic protection testing

122

  • (1) Where in the reasonable opinion of Exolum or the undertaker—
  • (a) the Authorised Development might interfere with the cathodic protection forming part of Apparatus; or
  • (b) any Apparatus might interfere with the proposed or existing cathodic protection forming part of the Authorised Development,

Exolum and the undertaker must co-operate in undertaking the tests which they consider reasonably necessary for ascertaining the nature and extent of such interference and measures for providing or preserving cathodic protection.

  • (2) The Parties must carry out the works and enter into such agreements as are necessary to implement the measures for providing or preserving cathodic protection.

Expenses

123

  • (1) Subject to the following provisions of these paragraphs 123 to 122, the undertaker must pay to Exolum the reasonable and properly incurred costs and expenses (including reasonable staffing costs if work is carried out in-house) incurred by Exolum in, or in connection with—
  • (a) the negotiation of the provisions of this Schedule;
  • (b) undertaking its obligations under this Schedule including—
  • (i) the installation, inspection, removal, alteration, testing or protection of any Apparatus, Alternative Apparatus and Protective Works;
  • (ii) the execution of any other works under this Schedule; and
  • (iii) the review and assessment of Plans;
  • (c) the watching of and inspecting the execution of the Authorised Development, any Restricted Works and any works undertaken by third parties as a result of Authorised Development (including the assessment of Plans); and
  • (d) imposing reasonable requirements for the protection or alteration of Apparatus affected by the Authorised Development or works as a consequence of the Authorised Development in accordance with paragraph 121(3);

together with any administrative costs properly and reasonably incurred by Exolum, provided that none of the above shall make the undertaker liable for costs in relation to any work which Exolum would be expected to undertake as part of its standard business operations.

  • (2) There will be no deduction from any sum payable under paragraph (1) as a result of—
  • (a) the placing of apparatus of a better type, greater capacity or of greater dimensions, or at a greater depth than the existing Apparatus, to the extent Exolum has acted reasonably in procuring such apparatus;
  • (b) the placing of apparatus in substitution of the existing Apparatus that may defer the time for renewal of the existing Apparatus in the ordinary course; or
  • (c) the scrap value (if any) of any Apparatus removed.
  • (3) Upon the submission of proper and reasonable estimates of costs and expenses to be incurred by Exolum, the undertaker shall pay Exolum sufficiently in advance to enable Exolum to undertake its obligations under this Schedule in a manner that is neutral to its cash flow provided that in the event that the costs incurred by Exolum are less than the amount paid by the undertaker pursuant to this paragraph (3) then Exolum must within 35 days of payment being made by Exolum for the costs anticipated in the costs and expenses estimates, repay any overpayment to the undertaker.

Damage to property and other losses

124

  • (1) Subject to paragraphs (2) to (6), the undertaker shall—
  • (a) indemnify Exolum for all reasonably incurred loss, damage, liability, costs and expenses suffered or reasonably incurred by Exolum including but not limited to claims against Exolum made pursuant to the Energy Act 2013 as amended arising out of—
  • (i) the carrying out of works under this Schedule;
  • (ii) the carrying out of the Authorised Development;
  • (iii) the use or occupation of land over or in the vicinity of any Apparatus or in the vicinity of any Premises in connection with the carrying out of the Authorised Development;
  • (iv) any injury or damage whatsoever to any property, real or personal, including the property of Exolum; and
  • (v) any matters arising out of or in connection with this Order;
  • (b) indemnify Exolum against any claim made against, or loss suffered by, Exolum as a result of any act or omission committed by the undertaker’s officers, employees, contractors or agents whilst on or in the vicinity of any Apparatus or Premises for the purposes of carrying out any activity authorised by this Order;
  • (c) pay to Exolum, in accordance with the terms of the provisions of this Part of this Schedule, the cost reasonably incurred by Exolum in making good any damage to the Apparatus (other than Apparatus the repair of which is not reasonably necessary in view of its intended removal or abandonment) arising out of the carrying out of works under this Schedule and arising out of the carrying out of the Authorised Development; and
  • (d) pay to Exolum the cost reasonably incurred by Exolum in stopping, suspending and restoring the supply though its Apparatus in consequence of the carrying out of works under this Schedule or the carrying out of the Authorised Development;

and make reasonable compensation to Exolum for any other expenses, losses, damages, penalty or costs incurred by Exolum by reason or in consequence of any such damage or interruption including all claims by third parties.

  • (2) The fact that any act or thing may have been done by Exolum on behalf of the undertaker or in accordance with a Plan approved by Exolum or in accordance with any requirement of Exolum or under its supervision shall not, subject to paragraph (4), excuse the undertaker from liability under the provisions of paragraph (1).
  • (3) Nothing in paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the negligent act, neglect or default of Exolum, its officers, servants, contractors or agents.
  • (4) The undertaker and Exolum shall at all times take reasonable steps to prevent and mitigate any loss, damage, liability, claim, cost or expense (whether indemnified or not) which either suffers in connection with this Schedule.
  • (5) The undertaker warrants that it will use reasonable endeavours to ensure—
  • (a) the information it or any of its employees, agents or contractors provide to Exolum about the Plans or the Authorised Development and on which Exolum relies in the design of and carrying out of any works is accurate; and
  • (b) the undertaker or any of its employees, agents or contractors have exercised all the reasonable skill, care and diligence to be expected of a qualified and experienced member of their respective profession.
  • (6) Exolum must give to the undertaker reasonable notice of any such claim or demand to which paragraph (1) applies.

Insurance

125

  • (1) The undertaker must not carry out any Restricted Works unless and until Exolum has confirmed to the undertaker in writing that it is satisfied acting reasonably (but subject to all necessary regulatory constraints) that the undertaker (or its contractor) has procured acceptable professional indemnity insurance and public liability insurance with minimum cover of £25 million per event, with respect to the carrying out of the works.
  • (2) The undertaker shall maintain such insurance for the construction period of the any Restrictive Works from the proposed date of Commencement of such works.

Co-operation and reasonableness

126

  • (1) Where Apparatus is required to be protected, altered, diverted or removed under this Schedule, the undertaker must use all reasonable endeavours to co-ordinate the execution of any works under this Part of this Schedule—
  • (a) in the interests of safety;
  • (b) in the interest of the efficient and economic execution of both Exolum’s works and the Authorised Development; and
  • (c) taking into account the need to ensure the safe and efficient operation of the Apparatus and carrying out of Exolum’s functions.
  • (2) Exolum must use its reasonable endeavours to co-operate with the undertaker for the purposes outlined in paragraph (1).
  • (3) The undertaker and Exolum will act reasonably in respect of any given term of this Schedule and, in particular, (without prejudice to generality) where any approval, consent or expression of satisfaction is required by this Part of this Schedule it must not be unreasonably withheld or delayed.

Emergency circumstances

127

  • (1) The undertaker acknowledges that Exolum provides services to His Majesty’s Government, using the Apparatus, which may affect any works to be carried under this Schedule and the Authorised Development.
  • (2) In the following circumstances, Exolum may on written notice to the undertaker immediately suspend all works that necessitate the stopping or suspending of the supply of product through any Apparatus under this Schedule and Exolum shall not be in breach of its obligations under this Schedule—
  • (a) circumstances in which, in the determination of the Government, there subsists a material threat to national security, or a threat or state of hostility or war or other crisis or national emergency (whether or not involving hostility or war); or
  • (b) circumstances in which a request has been received, and a decision to act upon such request has been taken, by the Government for assistance in relation to the occurrence or anticipated occurrence of a major accident, crisis or natural disaster; or
  • (c) circumstances in which a request has been received from or on behalf of NATO, the EU, the UN, the International Energy Agency (or any successor agency thereof) or the government of any other state for support or assistance pursuant to the United Kingdom’s international obligations and a decision to act upon such request has been taken by the Government; or
  • (d) any circumstances identified as such by the COBRA committee of the Government (or any successor committee thereof); or
  • (e) any situation in connection with which the Government requires fuel capacity, including where the United Kingdom is engaged in any planned or unplanned military operations within the United Kingdom or overseas.
  • (3) The parties agree to act in good faith and in all reasonableness to agree any revisions to any schedule, programme or costs estimate (which shall include costs of demobilising and remobilising any workforce, and any costs to protect the Apparatus “mid-works”) to account for the suspension.
  • (4) Exolum shall not be liable for any costs, expenses, losses or liabilities the undertaker incurs as a result of the suspension of any activities under paragraphs (2) to (3) or delays caused by it.

Dispute Resolution

128

  • (1) The undertaker and Exolum must use their reasonable endeavours to secure the amicable resolution of any dispute or difference arising between them out of or in connection with this Part of this Schedule in accordance with the following provisions.
  • (2) The undertaker and Exolum must each nominate a representative who will meet to try to resolve the matter. If the matter is not resolved at that level within ten working days of either the undertaker or Exolum requesting such a meeting (or such longer period as may be agreed between the undertaker and Exolum) the matter may at the request of either the undertaker or Exolum be referred for discussion at a meeting to be attended by a senior executive from each party.
  • (3) If the meeting between senior executives fails to result in a settlement within 20 working days of the date of the request for such a meeting (or if it is not possible to convene a meeting within this period) unless otherwise agreed in writing between the undertaker and Exolum, the dispute or difference will be determined by arbitration in accordance with article 42 (arbitration).

Miscellaneous

129

No failure or delay by a party to exercise any right or remedy provided under this Part of this Schedule or by law will constitute a waiver of that or any other right or remedy, nor will it prevent or restrict the further exercise of that or any other right or remedy. No single or partial exercise of such right or remedy will prevent or restrict the further exercise of that or any other right or remedy.

PART 11 — FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS

130

For the protection of any operator, referred to in this Part of this Schedule, the following provisions have effect, unless otherwise agreed in writing between the undertaker and the operator.

131

In this Part of this Schedule—

  • the 2003 Act” means the Communications Act 2003[^f00072];
  • electronic communications apparatus” has the same meaning as in the electronic communications code[^f00073];
  • the electronic communications code” has the same meaning as in section 106 (application of the electronic communications code) of the 2003 Act[^f00074];
  • electronic communications code network” means— so much of an electronic communications network or infrastructure system provided by an electronic communications code operator as is not excluded from the application of the electronic communications code by a direction under section 106 of the 2003 Act; and an electronic communications network which the Secretary of State is providing or proposing to provide;
  • electronic communications code operator” means a person in whose case the electronic communications code is applied by a direction under section 106 of the 2003 Act;
  • infrastructure system” has the same meaning as in the electronic communications code and references to providing an infrastructure system are to be construed in accordance with paragraph 7(2) of that code; and
  • operator” means the operator of an electronic communications code network.

132

The exercise of the powers conferred by article 32 (statutory undertakers) is subject to Part 10 (undertaker’s works affecting electronic communications apparatus) of the electronic communications code.

133

  • (1) Subject to sub-paragraphs (2) to (3), if as a result of the authorised development or its construction, or of any subsidence resulting from any of the authorised development—
  • (a) any damage is caused to any electronic communications apparatus belonging to an operator (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of the authorised development), or other property of an operator; or
  • (b) there is any interruption in the supply of the service provided by an operator,

the undertaker must bear and pay the cost reasonably incurred by the operator in making good such damage or restoring the supply and make reasonable compensation to that operator for any other reasonable expenses, loss, damages, penalty or costs incurred by it, by reason, or in consequence of, any such damage or interruption.

  • (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of an operator, its officers, servants, contractors or agents.
  • (3) The operator must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise of the claim or demand is to be made without the consent of the undertaker and if such consent, is withheld, the undertaker has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.

134

Any difference arising between the undertaker and the operator under this Part of this Schedule must be referred to and settled by arbitration under article 42 (arbitration).

135

This Part of this Schedule does not apply to—

  • (a) any apparatus in respect of which the relations between the undertaker and an operator are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act;
  • (b) any damage, or any interruption, caused by electro-magnetic interference arising from the construction or use of the authorised development.

136

Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and an operator in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.

SCHEDULE 16 — PROCEDURE FOR DISCHARGE OF REQUIREMENTS

Interpretation

1

In this Schedule—

  • requirement consultee” means any body or authority named in a requirement as a body to be consulted by the relevant planning authority in discharging that requirement; and
  • start date” means the date of the notification given by the Secretary of State under paragraph 4(2)(c).

Applications made under requirement

2

  • (1) For an application for discharge of a requirement to be valid, the undertaker must provide the following information to the relevant planning authority electronically via email (unless otherwise agreed between the parties)—
  • (a) a covering letter which includes confirmation of the requirement to which the submission relates;
  • (b) a statement to confirm whether it is likely that the subject matter of the application will give rise to any materially new or materially different environmental effects compared to those in the environmental statement, and if it will then it must be accompanied by information setting out what those effects are;
  • (c) confirmation that the application has been notified and provided to the requirement consultees in accordance with sub-paragraph (5), if the provision governing or requiring the application specifies that consultation with a requirement consultee is required. Such confirmation to include contact details for the requirement consultees;
  • (d) the respective detailed management plan, drawing or other written information to discharge the requirement as required by the requirement; and
  • (e) payment of the discharge of requirement application fee in accordance with paragraph (5).
  • (2) Where a valid application has been made to the relevant planning authority for any discharge, the relevant planning authority must give notice to the undertaker of its decision on the application within a period of ten weeks beginning with the later of—
  • (a) the day immediately following that on which the application is received by the authority;
  • (b) the day immediately following that on which further information has been supplied by the undertaker under paragraph 3; or
  • (c) such longer period that is agreed in writing by the undertaker and the relevant planning authority.
  • (3) Subject to paragraph 4, in the event that the relevant planning authority does not determine an application within the period set out in sub-paragraph (1), the relevant planning authority is to be taken to have granted all parts of the application (without any condition or qualification) at the end of that period.
  • (4) Where an application has been made to the relevant planning authority for any consent, agreement or approval required by a requirement included in this Order and the relevant planning authority does not determine the application within the period set out in sub-paragraph (2) and is accompanied by a report pursuant to sub-paragraph (2)(b) which states that the subject matter of such application is likely to give rise to any materially new or materially different environmental effects compared to those in the environmental statement then the application is to be taken to have been refused by the relevant planning authority at the end of that period.
  • (5) At the same time as submitting an application to the relevant planning authority for any consent, agreement or approval required by a requirement, the undertaker must also give notice of such application, and provide a copy of the application electronically via email (unless otherwise agreed between the parties), to any requirement consultee, if the provision governing or requiring the application specifies that consultation with a requirement consultee is required. As part of the notification to any requirement consultee, the undertaker must include a statement that refers to—
  • (a) the timeframes in which the requirement consultee can request any further information from the undertaker (via the relevant planning authority) as prescribed in paragraph 3(7)(a) and the consequences of the failure to meet those timescales as prescribed in paragraph 3(7)(b); and
  • (b) the timeframes in which the requirement consultee must give notice to the relevant planning authority of its comments on the application as prescribed in paragraph 3(7)(d) and the consequences of the failure to meet those timescales as prescribed in paragraph 3(7)(e).

Further information and consultation

3

  • (1) In relation to any application made under paragraph 2(2), the relevant planning authority may request such reasonable further information from the undertaker as is necessary to enable it to consider the application.
  • (2) In the event that the relevant planning authority considers such reasonable further information to be necessary and the provision governing or requiring the application does not specify that consultation with a requirement consultee is required, the relevant planning authority must, within 15 working days of receipt of the application, notify the undertaker in writing specifying the reasonable further information required.
  • (3) If the provision governing or requiring the application specifies that consultation with a requirement consultee is required, the relevant planning authority must notify the undertaker in writing specifying any reasonable further information the relevant planning authority considers necessary or that is requested by the requirement consultee within 20 working days of receipt of the application (or such other period as is agreed in writing between the undertaker and the relevant planning authority).
  • (4) In the event that the relevant planning authority does not give notification as specified in sub-paragraph (2) or (3) it is deemed to have sufficient information to consider the application and is not thereafter entitled to request further information without the prior agreement of the undertaker.
  • (5) Where further information is requested under this paragraph in relation to part only of an application, that part is to be treated as separate from the remainder of the application for the purposes of calculating time periods in paragraph 2 and paragraph 3.
  • (6) Where further information is requested under this paragraph and provided by the undertaker, any notification reasonably given by the relevant planning authority that the information provided is inadequate and requesting additional information must be received by the undertaker within five working days, or such longer period as is agreed (including where the quantity of information is substantial or requirement consultees are involved) of the day on which the undertaker has provided the further information in response to the original request, and where no such notification is received the relevant planning authority is deemed to have sufficient information to consider the application and is not thereafter entitled to request further information without the prior agreement of the undertaker.
  • (7) If the provision governing or requiring the application specifies that consultation with a requirement consultee is required—
  • (a) A requirement consultee is required to notify the relevant planning authority in writing specifying any reasonable further information it considers necessary in order to comment on the application within 15 working days of receipt of the application pursuant to paragraph 2(5);
  • (b) If a requirement consultee does not give notification as specified in sub-paragraph (a) it is deemed to have sufficient information to comment on the application and is not thereafter entitled to request further information without the prior agreement of the undertaker and relevant planning authority;
  • (c) At the same time as providing any further information to the relevant planning authority pursuant to a request under paragraph (2), if the undertaker has been notified of further information requested by a requirement consultee, the undertaker must also give any further information to the requirement consultee;
  • (d) A requirement consultee is required to notify the relevant planning authority in writing of any comments on the application within 15 working days of receipt of the application from the undertaker pursuant to paragraph 2(5), or the receipt of any further information pursuant to sub-paragraph (c) (where further information has been requested); and
  • (e) If a requirement consultee does not give notification as specified in sub-paragraph (d) it is deemed to have no comments on the application.

Appeals

4

  • (1) The undertaker may appeal in the event that—
  • (a) the relevant planning authority refuses an application for any consent, agreement or approval required by a requirement included in this Order or grants it subject to conditions;
  • (b) the relevant planning authority is deemed to have refused an application pursuant to paragraph 2(4);
  • (c) on receipt of a request for further information pursuant to paragraph 3 the undertaker considers that either the whole or part of the specified information requested by the relevant planning authority is not reasonably required or not necessary for consideration of the application; or
  • (d) on receipt of any further information requested, the relevant planning authority notifies the undertaker that the information provided is inadequate and requests additional information which the undertaker considers is not reasonably required or not necessary for consideration of the application.
  • (2) The steps to be followed in the appeal process are as follows—
  • (a) any appeal by the undertaker must be made within 42 days of the date of the notice of the decision or the determination, or (where no determination has been made) the expiry of the time period set out in paragraph 2(2), giving rise to the appeal referred to in sub-paragraph (1);
  • (b) the undertaker must submit the appeal documentation to the Secretary of State and must on the same day provide copies of the appeal documentation to the relevant planning authority and any requirement consultee;
  • (c) the Secretary of State must appoint a person to determine the appeal as soon as reasonably practicable and must forthwith notify the appeal parties of the identity of the appointed person and the address to which all correspondence for the appointed person’s attention should be sent;
  • (d) a person appointed pursuant to sub-paragraph (c) must—
  • (i) be a person who is professionally qualified to express an opinion on the subject matter of the appeal;
  • (ii) act objectively and independently of the parties who are involved in the appeal or who have appointed the person to determine the appeal; and
  • (iii) conduct themselves in compliance with any relevant code of practice adopted by any professional body of which they are a member;
  • (e) the relevant planning authority and any requirement consultee must submit written representations to the appointed person in respect of the appeal within 10 working days of the start date and must ensure that copies of their written representations are sent to each other and to the undertaker on the day on which they are submitted to the appointed person;
  • (f) the undertaker may make any counter-submissions to the appointed person within 10 working days of receipt of written representations pursuant to sub-paragraph (e);
  • (g) the appointed person must make their decision and notify it to the appeal parties, with reasons, as soon as reasonably practicable and in any event within 30 working days of the deadline for the receipt of counter-submissions pursuant to sub-paragraph (f); and
  • (h) the appointment of the person pursuant to sub-paragraph (c) may be undertaken by a person appointed by the Secretary of State for this purpose instead of by the Secretary of State.
  • (3) In the event that the appointed person considers that further information is necessary to enable the appointed person to consider the appeal they must, within five working days of the appointed person’s appointment, notify the appeal parties in writing specifying the further information required.
  • (4) Any further information required pursuant to sub-paragraph (3) must be provided by the relevant party to the appointed person and the other appeal parties on the date specified by the appointed person (the “specified date”), and the appointed person must notify the appeal parties of the revised timetable for the appeal on or before that day. The revised timetable for the appeal must require submission of written representations to the appointed person within 10 working days of the specified date, but otherwise the process and time limits set out in sub-paragraphs (2)(e) to (2)(g) of sub-paragraph (2) apply.
  • (5) The appointed person may—
  • (a) allow or dismiss the appeal; or
  • (b) reverse or vary any part of the decision of the relevant planning authority (whether the appeal relates to that part of it or not),

and may deal with the application as if it had been made to them in the first instance.

  • (6) The appointed person may proceed to a decision on an appeal taking into account only such written representations as have been sent within the relevant time limits and in the sole discretion of the appointed person such written representations as have been sent outside of the relevant time limits.
  • (7) The appointed person may proceed to a decision even though no written representations have been made within the relevant time limits, if it appears to them that there is sufficient material to enable a decision to be made on the merits of the case.
  • (8) The decision of the appointed person on an appeal is to be final and binding on the parties, unless proceedings are brought by a claim for judicial review.
  • (9) If an approval is given by the appointed person pursuant to this Schedule, it is to be deemed to be an approval for the purpose of Schedule 2 (requirements) as if it had been given by the relevant planning authority. The relevant planning authority may confirm any determination given by the appointed person in identical form in writing but a failure to give such confirmation (or a failure to give it in identical form) is not to be taken to affect or invalidate the effect of the appointed person’s determination.
  • (10) Save where a direction is given pursuant to sub-paragraph (11) requiring the costs of the appointed person to be paid by the relevant planning authority, the reasonable costs of the appointed person must be met by the undertaker.
  • (11) On application by the relevant planning authority or the undertaker, the appointed person may give directions as to the costs of the appeal parties and as to the parties by whom the costs of the appeal are to be paid. In considering whether to make any such direction and the terms on which it is to be made, the appointed person must have regard to advice on planning appeals and award costs published in Planning Practice Guidance: Appeals (March 2014) or any circular or guidance which may from time to time replace it.

Fees

5

  • (1) Where an application is made to the relevant planning authority for a discharge, a fee is to apply and must be paid to the relevant planning authority for each application.
  • (2) The fee payable for each application under sub-paragraph (1) is as follows—
  • (a) a fee of £2,578 for the first application for the discharge of each of the requirements 5 (detailed design approval), 7 (battery safety management), 8 (landscape and ecology management plan), 10 (drainage), 12 (construction environmental management plan), 13 (operational environmental management plan), 14 (construction traffic management plan), 18 (soil management plan) and 19 (decommissioning and restoration);
  • (b) a fee of £588 for each subsequent application for the discharge of each of the requirements listed in paragraph (a) and any application under requirement 5 in respect of the requirements listed in paragraph (a); and
  • (c) a fee of £298 for any application for the discharge of—
  • (i) any other requirements not listed in paragraph (a);
  • (ii) any application under requirement 4 (requirement for written approval) in respect of requirements not listed in paragraph (a); and
  • (iii) any approval required by a document referred to by any requirement or a document approved pursuant to any requirement.
  • (3) Where an application under sub-paragraph (1) is made and a fee payable on or after 1 April 2025, then section 18A of the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012 (as amended by the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits (England) Amendment Regulations 2023) will apply as modified by this Order, so that “the relevant amount” means the fee payable under sub paragraph (2)(a), (2)(b) or (2)(c) above.
  • (4) Any fee paid under this Schedule must be refunded to the undertaker within four weeks of—
  • (a) the application being rejected as invalidly made; or
  • (b) the relevant planning authority failing to determine the application within the relevant period in paragraph 2(3) unless—
  • (i) within that period the undertaker agrees, in writing, that the fee is to be retained by the relevant planning authority and credited in respect of a future application; or
  • (ii) a longer period of time for determining the application has been agreed pursuant to paragraph 2(3) of this Schedule, as applicable.

Pre-application engagement

6

Where the undertaker engages with the relevant planning authority or requirement consultee ahead of submitting an application pursuant to paragraph 2(2) by providing a draft version of documents proposed to be submitted with such application, the relevant planning authority or requirement consultee (as relevant) must, within 5 working days of receipt of the draft documents (or such other period as is agreed in writing between the undertaker and the relevant planning authority or requirement consultee (as relevant)), notify the undertaker of comments on the draft documents either by email or in a meeting, and the undertaker will note this timescale in its correspondence providing any draft documents to the relevant planning authority or requirement consultee (as relevant).

Signed

Signed by authority of the Secretary of State for Energy Security and Net Zero

David Wagstaff — Deputy Director, Energy Infrastructure Planning — Department for Energy Security and Net Zero — 8th April 2026

Explanatory note

(This note is not part of the Order)

EXPLANATORY NOTE

This Order authorises Springwell Energy farm Limited (referred to in this Order as the undertaker) to construct, operate, maintain and decommission a ground mounted solar photovoltaic generating station with a gross electrical output capacity over 50 megawatts and associated development. The Order would permit the undertaker to acquire, compulsorily or by agreement, land and rights in land and to use land for this purpose.

A copy of the Order plans and the book of reference mentioned in the Order and certified in accordance with article 41 (certification of plans and documents, etc.) of this Order may be inspected free of charge during working hours at North Kesteven District Council, District Council Offices, Kesteven Street, Sleaford, Lincolnshire, NG34 7EF and at Lincolnshire County Council, County Offices, Newland, Lincoln, LN1 1YL.

Footnotes

[^f00001]: 2008 c. 29. Section 37 was amended by section 137(5) of, and paragraph 5 of Schedule 13 to, the Localism Act 2011 (c. 20).

[^f00002]: S.I. 2009/2264.

[^f00003]: S.I. 2010/103.

[^f00004]: As amended by paragraph 29(1) and (3) of Part 1 of Schedule 13 to the Localism Act 2011 (c. 20).

[^f00005]: S.I. 2017/572.

[^f00006]: Section 104 was amended by section 58(5) of the Marine and Coastal Access Act 2009 (c. 23) and by paragraph 49 of Part 1 of Schedule 13 to the Localism Act 2011 (c. 20).

[^f00007]: As amended by paragraph 55 of Part 1 of Schedule 13 to the Localism Act 2011 (c. 20).

[^f00008]: As amended by section 160 of the Housing and Planning Act 2016 (c. 22) and section 43 of the Wales Act 2017 (c. 4).

[^f00009]: As amended by paragraph 58 of Part 1 of Schedule 13 and paragraph 1 of Part 20 of Schedule 25 to the Localism Act 2011 (c. 20).

[^f00010]: As amended by section 140 of, and paragraph 60 of Part 1 of Schedule 13 to, the Localism Act 2011 (c. 20).

[^f00011]: As amended by paragraph 62 of Part 1 of Schedule 13 to the Localism Act 2011 (c. 20).

[^f00013]: 1961 c. 33.

[^f00014]: 1965 c. 56.

[^f00015]: 1980 c. 66.

[^f00016]: 1981 c. 66.

[^f00017]: 1984 c. 27.

[^f00018]: 1989 c. 29.

[^f00019]: 1990 c. 8.

[^f00020]: 1991 c. 22.

[^f00021]: 2008 c. 29.

[^f00022]: “highway” is defined in section 328(1). For “highway authority” see section 1.

[^f00023]: 1981 c. 67.

[^f00024]: 2003 c. 21.

[^f00025]: “street authority” is defined in section 49, which was amended by paragraph 117 of Schedule 1 to the Infrastructure Act 2015 (c.7).

[^f00026]: 2006 c. 46.

[^f00027]: Section 121A was inserted by paragraph 70 of Schedule 8 to the 1991 Act and subsequently amended by section 271 of the Greater London Authority Act 1999 (c. 29); section 1(6) of, and paragraphs 70 and 95 of Schedule 1 to, the Infrastructure Act 2015; and S.I. 1999/1920 and S.I. 2001/1400.

[^f00028]: 1991 c. 59. Section 23 was amended by paragraph 192(2) of Schedule 22 to the Environment Act 1995 (c. 25), paragraphs 25 and 32 of Schedule 2 to the Flood and Water Management Act 2010 (c. 29) and S.I. 2013/755.

[^f00029]: Section 32 was amended by S.I. 2013/755.

[^f00030]: Section 66 was amended by paragraphs 25 and 38 of Schedule 2 to the Flood and Water Management Act 2010 and section 86 of the Water Act 2014 (c. 21).

[^f00031]: 2017 c. 20.

[^f00032]: Section 9 was amended by section 4 of, and paragraph 141 of Schedule 2 to, the Planning (Consequential Provisions) Act 1990 (c. 11) and S.I. 2013/755. There are other amendments to section 9 that are not relevant to this Order.

[^f00033]: S.I. 2010/948, amended by S.I. 2011/987; there are other amending instruments but none are relevant to this Order.

[^f00034]: 1990 c. 43.

[^f00035]: S.I. 2016/362.

[^f00036]: S.I. 2011/935.

[^f00037]: 2004 c. 18.

[^f00038]: 1991 c. 56.

[^f00039]: S.I. 2016/1154.

[^f00040]: 1991 c. 57.

[^f00041]: Section 153(4A) was inserted by section 200(1) and (2) of the Housing and Planning Act 2016.

[^f00042]: Section 11 was amended by section 34(1) of, and paragraph 14(3) of Schedule 4 to, the Acquisition of Land Act 1981 (c. 67), section 3 of, and Part 1 of Schedule 1 to, the Housing (Consequential Provisions) Act 1985 (c. 71), section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), sections 186, 187 and 188 of, and paragraph 6 of Schedule 14 and paragraph 3 of Schedule 16 to, the Housing and Planning Act 2016 and S.I. 2009/1307.

[^f00043]: Section 4 as amended by section 184 and 185 of, and paragraphs 1 and 2 of Schedule 18 to, the Housing and Planning Act 2016.

[^f00044]: 2003 c. 21.

[^f00045]: S.I. 1997/1160.

[^f00046]: 1978 c. 30.

[^f00047]: 1981 c. 67.

[^f00048]: 1977 c. i.

[^f00049]: 1832 c. xciv.

[^f00050]: 1800 c. lxx.

[^f00051]: 1809 c. lxxv.

[^f00052]: 1840 c. xc.

[^f00053]: 1826 c. xxxiv.

[^f00054]: 1814 c. lv.

[^f00055]: 1832 c. lxx.

[^f00056]: 1871 c. lx.

[^f00057]: S.I. 2011/1455.

[^f00058]: 1971 c. xiii.

[^f00059]: 1762 c. 32.

[^f00060]: 1973 c. 26.

[^f00061]: Section 11 was amended by section 34(1) of, and Schedule 4 to, the Acquisition of Land Act 1981 (c. 67), section 3 of, and Part 1 of Schedule 1 to, the Housing (Consequential Provisions) Act 1985 (c. 71), section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), sections 186(2), 187(2) and 188 of, and paragraph 6 of Schedule 14 and paragraph 3 of Schedule 16 to, the Housing and Planning Act 2016 (c. 22) and S.I. 2009/1307.

[^f00062]: Section 11A was inserted by section 186(3) of the Housing and Planning Act 2016.

[^f00063]: Section 11B was inserted by section 187(3) of the Housing and Planning Act 2016.

[^f00064]: Section 12 was amended by section 56(2) of, and Part 1 of Schedule 9 to, the Courts Act 1971 (c. 23) and paragraphs (2) and (4) of Schedule 16 to the Housing and Planning Act 2016.

[^f00065]: Section 13 was amended by sections 62(3), 139(4) to (9) and 146 of, and paragraphs 27 and 28 of Schedule 13 and Part 3 of Schedule 23 to, the Tribunals, Courts and Enforcement Act 2007 (c. 15).

[^f00066]: Section 20 was amended by paragraph 4 of Schedule 15 to the Planning and Compensation Act 1991 (c. 34) and S.I. 2009/1307.

[^f00067]: 1989 c. 29.

[^f00068]: 1991 c. 56.

[^f00069]: 1986 c. 44. A new section 7 was substituted by section 5 of the Gas Act 1995 (c. 45) and was further amended by section 76 of the Utilities Act 2000 (c. 27).

[^f00070]: 2003 c. 21.

[^f00071]: 1989 c. 29. The definition of “electricity plant” (in section 64) was amended by paragraphs 24 and 38(1) and (3) of Schedule 6 to the Utilities Act 2000 (c. 27).

[^f00072]: 2003 c. 21.

[^f00073]: See section 106. Section 106 was amended by section 4(3) to (9) of the Digital Economy Act 2017 (c. 30).

[^f00074]: See section 106. Section 106 was amended by section 4(3) to (9) of the Digital Economy Act 2017 (c. 30).

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.