New Roads and Street Works Act 1991
[^key-a0506bef4df26548913081910642e578]: S. 60 applied (with modifications) (2.8.2016) by The Midland Metro (Wolverhampton City Centre Extension) Order 2016 (S.I. 2016/684), arts. 1, 5(3)(4) (with arts. 46, 47, Sch. 9 para. 4, Sch. 10 para. 12(2))
[^key-a051e0293219bb32759da589a574e860]: Word in s. 58(3) repealed (29.6.2007 for E., 26.11.2007 for W.) by Traffic Management Act 2004 (c. 18), ss. 51(4), 99(1); S.I. 2007/1890, art. 2, Sch. (with art. 6); S.I. 2007/3174, art. 2, Sch. (with art. 7)
[^key-a068c0860aaee1914b97ef2518d35f46]: S. 56 disapplied (11.1.2010) by The Traffic Management (London Borough of Islington) Permit Scheme Order 2009 (S.I. 2009/3180), art. 1, Sch. Appendix B
[^key-a068d167a62665932c6bc171b404d6e8]: Ss. 54-106 applied (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), arts. 1, 8(4) (with art. 44, Sch. 12)
[^key-a07e415689dd467ffc87d85d1b9fe5b2]: S. 69 applied (26.9.2012) by The Network Rail (Ipswich Chord) Order 2012 (S.I. 2012/2284), arts. 1, 10(2) (with art. 26(2))
[^key-a09644bfa4190ac6cf05675a0a890e64]: S. 58A excluded (8.9.2022) by The Manston Airport Development Consent Order 2022 (S.I. 2022/922), arts. 1, 10(3) (with arts. 5, 40)
[^key-a09bb7e7a1288b55da8737394b2d6276]: S. 69 applied (with modifications) (12.5.2022) by The M54 to M6 Link Road Development Consent Order 2022 (S.I. 2022/475), arts. 1, 9(4)(5)
[^key-a0a238202df41b132b9820fb705b86e1]: Words in s. 130(5) substituted (1.4.2008) by Transport (Scotland) Act 2005 (asp 12), s. 54(2), sch. 3; S.S.I. 2008/15, art. 2(2), sch. 1
[^key-a0cf68e7c3cbde9beb2e591b87ef7334]: S. 55 applied (with modifications) (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 12(4)-(6) (with arts. 4, 45, Sch. 9 paras. 6, 46, 54(1))
[^key-a0d244e9d01118f11d8455bfb0aff6b4]: S. 89 modified (11.1.2010) by The Traffic Management (London Borough of Barnet) Permit Scheme Order 2009 (S.I. 2009/3141), art. 1, Sch. Appendix B
[^key-a0e8abe2277a014797e46616f3746ced]: S. 56 excluded (24.4.2025) by The London Luton Airport Expansion Development Consent Order 2025 (S.I. 2025/463), arts. 1, 9(3) (with Sch. 8 paras. 36(3), 87)
[^key-a0f47333c34d3a1084d643392e51c0cd]: Sch. 3A excluded (25.2.2026) by The A46 Coventry Junctions (Walsgrave) Development Consent Order 2026 (S.I. 2026/125), arts. 1, 10(3) (with arts. 40, 45, Sch. 9)
[^key-a0f88c9817acffe1f1c35a0f1d56d9ee]: S. 54 disapplied (11.1.2010) by The Traffic Management (London Borough of Brent) Permit Scheme Order 2009 (S.I. 2009/3142), art. 1, Sch. Appendix B
[^key-a121e88c022dccc81f5aef1ce86faf62]: Ss. 54-106 applied (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 14(4) (with arts. 15, 62, 76, 87)
[^key-a1261d8b7e54498c50efb5af2d5a5d1a]: S. 69 applied (1.5.2025) by The Viking CCS Carbon Dioxide Pipeline Order 2025 (S.I. 2025/509), arts. 1(2), 11(1)(2) (with art. 41, Sch. 9)
[^key-a12be7d448a1f0d09362109540699fd4]: S. 55 disapplied (31.3.2015) by The Traffic Management (Derbyshire County Council) Permit Scheme Order 2015 (S.I. 2015/107), art. 1, Sch. para. 3.5
[^key-a132ade6e5442b7a5ef13e9ee40a9a76]: S. 89 modified (11.1.2010) by The Traffic Management (London Borough of Haringey) Permit Scheme Order 2009 (S.I. 2009/3169), art. 1, Sch. Appendix B
[^key-a16dbe4fab5049db69da7aa41a320048]: S. 105 modified (1.3.2015) by The Traffic Management (West Berkshire Council) Permit Scheme Order 2014 (S.I. 2014/3110), arts. 1, 2, Sch. para. 2.12.2
[^key-a17ee6921584cb5e220e6865a5bf06ed]: S. 59 applied (with modifications) (9.1.2014) by The National Grid (King’s Lynn B Power Station Connection) Order 2013 (S.I. 2013/3200), arts. 1, 9(2)(3)
[^key-a18724e098121f0b10fc1e5e0f414fb8]: S. 68 applied (with modifications) (21.11.2013) by The Network Rail (Redditch Branch Enhancement) Order 2013 (S.I. 2013/2809), arts. 1, 10(2)(3) (with arts. 27(2), 39, Sch. 10 para. 4)
[^key-a1a27326e7549a2181d4f7ee4480f4de]: S. 58A modified (5.9.2011) by The Traffic Management (London Borough of Waltham Forest) Permit Scheme Order 2011 (S.I. 2011/1959), art. 1, Sch. Appendix B
[^key-a1ac533824376067b7381245241d7a8c]: Sch. 3A excluded (24.11.2016) by The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order 2016 (S.I. 2016/1035), arts. 1, 4(3) (with arts. 43, 44)
[^key-a1b0218059792e12095fc441839e5e25]: S. 68 applied (1.5.2025) by The Viking CCS Carbon Dioxide Pipeline Order 2025 (S.I. 2025/509), arts. 1(2), 11(1)(2) (with art. 41, Sch. 9)
[^key-a1b4e6bf224096212acb466914bef912]: Ss. 54-106 applied (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 14(4) (with arts. 15, 62, 76, 87)
[^key-a1b748f293c73bc4682e18cdc2a5890b]: S. 69 applied (with modifcations) (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), arts. 1, 3(4)(5) (with arts. 55-57, Sch. 8 para. 13)
[^key-a1bcc1962d2876bca4f78d62ce4565f2]: S. 55 applied (with modifications) (18.9.2009) by The London Underground (Victoria Station Upgrade) Order 2009 (S.I. 2009/2364), arts. 1, 3(4)-(6)
[^key-a1df4a205eb990303ae6a43bbc1713f3]: S. 60 applied (20.11.2013) by The M1 Junction 10a (Grade Separation) Order 2013 (S.I. 2013/2808), arts. 1, 8(4)(5)
[^key-a2489b1fc85adfc65a73a1490117a065]: S. 56 disapplied (29.4.2013) by The Traffic Management (Rochdale Metropolitan Borough Council) Permit Scheme Order 2013 (S.I. 2013/809), arts. 1, 2, Sch. Appendix C
[^key-a2596293e5210853427c7034a2f48ee3]: S. 76 applied (with modifications) (24.11.2016) by The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order 2016 (S.I. 2016/1035), arts. 1, 4(4)(5) (with arts. 43, 44)
[^key-a25d286d66903b9b4e5766592119a09a]: S. 76 applied (6.11.2012) by The Network Rail (North Doncaster Chord) Order 2012 (S.I. 2012/2635), arts. 1, 14(2)(3) (with art. 35(2))
[^key-a28e77550b797206544661bf79fbde77]: Ss. 54-106 applied (13.11.2025) by The Stonestreet Green Solar Order 2025 (S.I. 2025/1175), arts. 1, 10(3) (with art. 40, Sch. 13)
[^key-a29741673cf09436a12a104fac3fce7b]: S. 56 disapplied (31.3.2015) by The Traffic Management (Derbyshire County Council) Permit Scheme Order 2015 (S.I. 2015/107), art. 1, Sch. para. 3.5
[^key-a2e16f2667876d4125dad2d5e506b179]: S. 76 applied (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 10(4)(5) (with arts. 5, 36)
[^key-a2e49688c306fb80ef73b6e95f89f8ce]: S. 118(2A)(2B) inserted (1.4.2008) by Transport (Scotland) Act 2005 (asp 12), ss. 23(2), 54(2); S.S.I. 2008/15, art. 2(2), sch. 1 (as amended (5.3.2008) by S.S.I. 2008/90, art. 2)
[^key-a2ec4ab75cce16a1cf07d7d992207e43]: S. 56A excluded (18.12.2024) by The Network Rail (Leeds to Micklefield Enhancements) Order 2024 (S.I. 2024/1284), arts. 1, 4(2) (with Sch. 15)
[^key-a3003b74573f4b445e87e44a14440a30]: S. 56 disapplied (30.3.2015) by The Traffic Management (Brighton and Hove City Council) Permit Scheme Order 2015 (S.I. 2015/90), art. 1, Sch. para. 2.8.1
[^key-a339bf2fc7b2f7e623d7f4153a1af611]: S. 58 excluded (1.5.2025) by The Viking CCS Carbon Dioxide Pipeline Order 2025 (S.I. 2025/509), arts. 1(2), 11(4) (with art. 41, Sch. 9)
[^key-a343a25ce83ebee8f9cc1bf0cb980f4d]: Sch. 3A excluded (22.7.2008) by Crossrail Act 2008 (c. 18), Sch. 14 para. 14(10)
[^key-a351be1f247316bf28351ab0a595c833]: S. 89 modified (25.1.2010) by The Traffic Management (Kent County Council) Permit Scheme Order 2009 (S.I. 2009/3188), art. 1, Sch. Appendix B
[^key-a36cfe4e6aebc4b0be03beb0d3829aec]: S. 64 modified (9.3.2015) by The Traffic Management (Lancashire County Council) Permit Scheme Order 2015 (S.I. 2015/38), arts. 1, 2, Sch. para. 1.8
[^key-a37d861f6454cb990a5868092164569b]: S. 57 applied (15.4.2025) by The A122 (Lower Thames Crossing) Development Consent Order 2025 (S.I. 2025/462), arts. 1, 9(4)(5) (with arts. 5, 43, 53(7), Sch. 14)
[^key-a3a161da454f9f0f4e8e83877159ee80]: S. 69 modified (2.2.2015) by The Traffic Management (Cheshire West and Chester Borough Council) Permit Scheme Order 2014 (S.I. 2014/3106), arts. 1, 2, Sch. para. 1.8
[^key-a3a81f2a8ec1944b68801390f5269a74]: Pt. 3 modified (24.4.2025) by The London Luton Airport Expansion Development Consent Order 2025 (S.I. 2025/463), arts. 1, 9(2) (with Sch. 8 paras. 36(3), 87)
[^key-a3ae3661a2ef8687f8ecdddb54437795]: S. 69 applied (with modifications) (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 9(4)(5) (with arts. 55, 56)
[^key-a3cd4c506c74fdd951f77523b975a6f9]: S. 6(1A) inserted (1.3.2010) by Planning Act 2008 (c. 29), s. 241(8), Sch. 2 para. 49 (with s. 226); S.I. 2010/101, art. 2 (with art. 6)
[^key-a3dffc65af345b35955d315abd315ab8]: S. 72 applied (24.11.2016) by The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order 2016 (S.I. 2016/1035), arts. 1, 4(8) (with arts. 43, 44)
[^key-a414a67a715524543bb2cf05a1122fde]: S. 55 applied (with modifications) (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 10(4)-(6) (with arts. 5, 36)
[^key-a41509ecf18bf66895945c9df5d062d8]: S. 64 modified (30.3.2015) by The Traffic Management (Brighton and Hove City Council) Permit Scheme Order 2015 (S.I. 2015/90), art. 1, Sch. para. 2.8.1
[^key-a4215803118e33e7c818a613e5febbdf]: S. 56A excluded (12.1.2016) by The London Underground (Bank Station Capacity Upgrade) Order 2015 (S.I. 2015/2044), arts. 1, 4(3)
[^key-a4216422049be89cbd8866d24b87c6f0]: S. 76 applied (12.10.2025) by The Gatwick Airport (Northern Runway Project) Development Consent Order 2025 (S.I. 2025/1054), arts. 1, 10(4)(5) (with arts. 5, 9(6), 43, Sch. 9)
[^key-a429f573751a74ba60c4cba11a038e02]: S. 55 disapplied (31.3.2015) by The Traffic Management (Council of the City of Wakefield MDC) Permit Scheme Order 2015 (S.I. 2015/293), arts. 1, 2, Sch., Appendix D
[^key-a437fa1726f67a03ad2d94694e3c74c8]: S. 68 applied (with modifications) (2.4.2004) by The Docklands Light Railway (Woolwich Arsenal Extension) Order 2004 (S.I. 2004/757), arts. 1, 3(3)(4)
[^key-a44fdc56969ba34651233295544aa1e3]: S. 69 modified (11.1.2010) by The Traffic Management (London Borough of Barnet) Permit Scheme Order 2009 (S.I. 2009/3141), art. 1, Sch. Appendix B
[^key-a45a24bb06238a4886df033a821f4bc8]: Pt. 3 modified (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 10(1)(2) (with art. 5, Sch. 27 para. 36)
[^key-a4727c0024adeb4e97da58b68d2c315a]: Words in s. 116(2) repealed (1.4.2008) by Transport (Scotland) Act 2005 (asp 12), ss. 19(5)(a), 54(2); S.S.I. 2008/15, art. 2(2), sch. 1
[^key-a47f8a7ec7206e006d8b59c3dd6213a6]: S. 76 applied (with modifications) (9.1.2014) by The National Grid (King’s Lynn B Power Station Connection) Order 2013 (S.I. 2013/3200), arts. 1, 9(2)(3)
[^key-a488006a7c6c7eff33d0e7b6e970ebd0]: S. 57 applied (with modifications) (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 12(4)(5) (with Sch. 8 Pt. 6 para. 19)
[^key-a49576c921cf582e9ae42b078fda4889]: S. 55 excluded (E.) (1.4.2008) by The Traffic Management Permit Scheme (England) Regulations 2007 (S.I. 2007/3372), regs. 1(1), 36(c) (with reg. 35)
[^key-a49a8286410b79231f51855a43c0cc45]: S. 75 applied (with modifications) (22.11.2006) by The Docklands Light Railway (Stratford International Extension) Order 2006 (S.I. 2006/2905), arts. 1, 3(4)(5) (with art. 43)
[^key-a49fb641e5c66a63eb2de2da1cff2306]: S. 55 applied (with modifications) (27.2.2025) by The Associated British Ports (Immingham Green Energy Terminal) Order 2025 (S.I. 2025/165), arts. 1, 8(4)-(6) (with arts. 48, 59, Sch. 14)
[^key-a4dd3e1be746cc6b7d07690d55999d1d]: S. 69 applied (1.9.2021) by The Network Rail (Teddington Station Access for All) Order 2021 (S.I. 2021/937), arts. 1, 3(3)(g)
[^key-a4f5db639a01987f7506a50ec1aafe58]: S. 55 applied (with modifications) (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), arts. 1, 12(4)(5)(b)(6) (with art. 51)
[^key-a5173744b236391971d7067d50beb986]: S. 57 applied (with modifications) (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), arts. 1, 14(1)(2) (with arts. 41, 42, Sch. 16)
[^key-a51a1556c1f89e1e365372356abbf7e0]: S. 77 applied (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 12(4)(5) (with arts. 4, 45, Sch. 9 paras. 6, 46, 54(1))
[^key-a51d82489ef40c44974f509c849e251b]: Pt. 3A inserted (19.6.2025 for specified purposes) by Data (Use and Access) Act 2025 (c. 18), ss. 56(1), 142(1)(2)(h) (with s. 60(1))
[^key-a5375f9fd405e355274b4dc2d9a167f7]: Word in s. 70(4A) substituted (E.) (1.4.2008) by The Street Works (Registers, Notices, Directions and Designations) (England) Regulations 2007 (S.I. 2007/1951), regs. 1(1), 17 (with reg. 19); and word in s. 70(4A) substituted (W.) (1.4.2008) by The Street Works (Registers, Notices, Directions and Designations) (Wales) Regulations 2008 (S.I. 2008/101), regs. 1, 17(2) (with reg. 19)
[^key-a547b67456236a962a9f699f3268fb13]: S. 77 applied (25.2.2026) by The A46 Coventry Junctions (Walsgrave) Development Consent Order 2026 (S.I. 2026/125), arts. 1, 10(4)(5) (with arts. 40, 45, Sch. 9)
[^key-a54c9642e93b111e1bb6ad630bea4a97]: S. 54 applied (with modifications) (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 12(4)-(6) (with Sch. 8 Pt. 6 para. 19)
[^key-a562afe94b7e92fb5b691d0fbf64f4d2]: Words in Sch. 3 para. 9(1)(a) inserted (5.3.2015) by Infrastructure Act 2015 (c. 7), s. 57(1), Sch. 1 para. 124(a)(ii); S.I. 2015/481, reg. 2(a)
[^key-a588d46fbc3a521c875d39ca603cbadd]: S. 88 modified (18.2.2013) by The Traffic Management (London Borough of Bexley) Permit Scheme Order 2012 (S.I. 2012/3102), arts. 1, 2, Sch. Appendix B
[^key-a591fdf83f5cdab70c2130da2f74474f]: S. 53 disapplied (30.3.2015) by The Traffic Management (Milton Keynes Council) Permit Scheme Order 2015 (S.I. 2015/91), art. 1, Sch. para. 2.7.1
[^key-a59af84c89fbf31997361eb61f654765]: S. 116(3A) substituted for s. 116(3) (1.4.2008) by Transport (Scotland) Act 2005 (asp 12), ss. 19(5)(b), 54(2); S.S.I. 2008/15, art. 2(2), sch. 1
[^key-a5c1c5b81ea3452edf12119f4cfa0543]: S. 115(3A) inserted (1.4.2008) by Transport (Scotland) Act 2005 (asp 12), ss. 20(5), 54(2); S.S.I. 2008/15, art. 2(2), sch. 1
[^key-a5c3c23714ffed036ba005b672f3a04d]: S. 66 disapplied (5.9.2011) by The Traffic Management (London Borough of Southwark) Permit Scheme Order 2011 (S.I. 2011/1957), art. 1, Sch. Appendix B
[^key-a5cae4a21076f797bf480c072727c5dd]: S. 56 disapplied (5.11.2012) by The Traffic Management (Southend-On-Sea Borough Council) Permit Scheme Order 2012 (S.I. 2012/2548), arts. 1, 2, Sch. Appendix B
[^key-a5d74c11fd77dc8804ebb6216f7d666a]: S. 58 excluded (11.1.2023) by The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022 (S.I. 2022/1406), arts. 1, 4(2) (with art. 34(2), Sch. 12 paras. 5, 47, 79)
[^key-a5dc212a16eb222898e2bb7b29fec22a]: S. 62(2) excluded (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), art. 1, Sch. 19 Pt. 1 para. 4(5)
[^key-a60c56e925bf0cdc85f9e1414324170e]: S. 56 excluded (18.9.2009) by The London Underground (Victoria Station Upgrade) Order 2009 (S.I. 2009/2364), arts. 1, 3(3)
[^key-a61d921165402ce39a02322e36f15f94]: S. 55 applied (with modifications) (2.9.2022) by The A47 North Tuddenham to Easton Development Consent Order 2022 (S.I. 2022/911), arts. 1, 10(4)-(6) (with arts. 4, 53)
[^key-a623d024e04751068e1c999d696e75d0]: S. 89 modified (2.3.2015) by The Traffic Management (Knowsley Metropolitan Borough Council) Permit Scheme Order 2015 (S.I. 2015/34), arts. 1, 2, Sch. para. 1.8
[^key-a626be099a70f0aad940c4f8dda80f0a]: S. 55 disapplied (11.1.2010) by The Traffic Management (London Borough of Ealing) Permit Scheme Order 2009 (S.I. 2009/3163), art. 1, Sch. Appendix B
[^key-a62815e1b0529bd4d1ed335cb860b15b]: S. 55 applied (with modifications) (22.3.2005) by The Midland Metro (Wednesbury to Brierley Hill and Miscellaneous Amendments) Order 2005 (S.I. 2005/927), art. 3(3)-(5) (with art. 51)
[^key-a63f66d1f788b653486cb252fd9ae821]: S. 57 disapplied (11.1.2010) by The Traffic Management (London Borough of Wandsworth) Permit Scheme Order 2009 (S.I. 2009/3189), art. 1, Sch. Appendix B
[^key-a64f5581d19ec09eae4645f1133b6e0f]: Ss. 54-106 applied (7.7.2014) by The East Anglia ONE Offshore Wind Farm Order 2014 (S.I. 2014/1599), arts. 1, 8(3) (with arts. 37, 38, Sch. 9 para. 19)
[^key-a67362a012f32cda60d5c73b8d247e98]: S. 66 disapplied (11.1.2010) by The Traffic Management (London Borough of Enfield) Permit Scheme Order 2009 (S.I. 2009/3165), art. 1, Sch. Appendix B
[^key-a68aec743e9eb5952a0de22487f15293]: S. 76 applied (11.1.2023) by The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022 (S.I. 2022/1406), arts. 1, 4(4) (with art. 34(2), Sch. 12 paras. 5, 47, 79)
[^key-a69fbaeeff575357656ed696415485a8]: Pt. 3 excluded (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), s. 64(1), Sch. 32 para. 1(3) (with Sch. 32 para. 1(1))
[^key-a6a8568b0e5bcbbf04e081d94e8f38f4]: S. 66 disapplied (5.9.2011) by The Traffic Management (London Borough of Newham) Permit Scheme Order 2011 (S.I. 2011/1962), art. 1, Sch. Appendix B
[^key-a6aafc8e3c915d8e779dd4c95613a662]: S. 56 excluded (25.6.2025) by The M5 Junction 10 Development Consent Order 2025 (S.I. 2025/795), arts. 1, 12(3) (with arts. 4, 43, Sch. 9)
[^key-a6bf787deb3b6c936337278133c91dc6]: Sch. 3A excluded (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 11(3) (with arts. 5, 53, Sch. 8 paras. 6, 64)
[^key-a6dac45515ad62b2b971ebfd44cb88a1]: S. 75 applied (12.10.2025) by The Gatwick Airport (Northern Runway Project) Development Consent Order 2025 (S.I. 2025/1054), arts. 1, 10(4)(5) (with arts. 5, 9(6), 43, Sch. 9)
[^key-a71de9b6ca416fa18616b53113618cc7]: S. 55 applied (with modifications) (16.5.2008) by The London Gateway Port Harbour Empowerment Order 2008 (S.I. 2008/1261), arts. 1, 6(3)-(5) (with arts. 41(1), 45, 54(2), 55, 56, 57, 58(6))
[^key-a7383af8ed1dd209a8cac7d0d2318f04]: S. 77 applied (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1, 12(4)(5)(j) (with art. 3(1))
[^key-a73e787c2bcfe5196ae55cf93d1b5022]: S. 136 applied (with modifications) (8.5.2006) by Edinburgh Tram (Line One) Act 2006 (asp 7), s. 7(6)(7) (with ss. 76, 84)
[^key-a7453b3856495ae0f9b31267f2e948de]: S. 57 applied (25.2.2026) by The A46 Coventry Junctions (Walsgrave) Development Consent Order 2026 (S.I. 2026/125), arts. 1, 10(4)(5) (with arts. 40, 45, Sch. 9)
[^key-a76cb9c18dec444131aee12e7e78849c]: S. 68 applied (30.9.2025) by The M60/M62/M66 Simister Island Interchange Development Consent Order 2025 (S.I. 2025/1018), arts. 1, 11(4)(5) (with arts. 5, 34, Sch. 9)
[^key-a77f8e414f7a12d21124bb185ead5d36]: Words in s. 104(1) inserted (19.6.2025 for specified purposes) by Data (Use and Access) Act 2025 (c. 18), ss. 57(6)(a)(i), 142(1)(2)(h) (with s. 60(1))
[^key-a78d5a2f76c3fd7de15b3bad660cd8a8]: S. 58 excluded (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 11(3)
[^key-a790cc2efc605cb344e25750f5fd4b5b]: S. 74 modified (11.1.2010) by The Traffic Management (London Borough of Barnet) Permit Scheme Order 2009 (S.I. 2009/3141), art. 1, Sch. Appendix B
[^key-a79923733f4ecdd11ec3f57dbed99e69]: S. 89 modified (31.3.2015) by The Traffic Management (Council of the City of Wakefield MDC) Permit Scheme Order 2015 (S.I. 2015/293), arts. 1, 2, Sch., Appendix D
[^key-a7c12f6bd71fff081da79a949ba743fe]: Pt. 4 modified (8.5.2007) by Airdrie Bathgate Railway and Linked Improvements Act 2007 (asp 19), s. 13 (with ss. 48, 59)
[^key-a7c42abed31fb9eda4bd65e7ac40b564]: S. 60 applied (with modifications) (7.9.2016) by The Hornsea Two Offshore Wind Farm Order 2016 (S.I. 2016/844), arts. 1(2), 10(2)(e) (with arts. 37, 38)
[^key-a7e4909e9c159152f8f4d50e842db2f1]: S. 167(5A)(5B) inserted (19.6.2025 for specified purposes) by Data (Use and Access) Act 2025 (c. 18), ss. 56(3), 142(1)(2)(h) (with s. 60(1))
[^key-a7f191d96da504dc2574001df93a0209]: S. 58A modified (29.4.2013) by The Traffic Management (Oldham Borough Council) Permit Scheme Order 2013 (S.I. 2013/808), arts. 1, 2, Sch. Appendix C
[^key-a7f3566e6acd76ff1d3b7086f831b758]: S. 85 applied (13.7.2022) by The A47 Blofield to North Burlingham Development Consent Order 2022 (S.I. 2022/738), arts. 1, 37(7)(a) (with arts. 4, 50)
[^key-a80d057ec3e676b7d0946ce443a33a33]: S. 58A excluded (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 12(3) (with art. 4)
[^key-a8165ec0c02604792fbc462c32c38684]: S. 68 applied (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), arts. 1, 9(4)(5) (with arts. 5, 44)
[^key-a823616e1cb0bddbbe012010f6262e88]: S. 74 modified (11.1.2010) by The Traffic Management (London Borough of Redbridge) Permit Scheme Order 2009 (S.I. 2009/3179), art. 1, Sch. Appendix B
[^key-a843a64fa089fd81eb1b8684ab5dc4ff]: S. 54 applied (with modifications) (11.1.2023) by The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022 (S.I. 2022/1406), arts. 1, 4(4)(5) (with art. 34(2), Sch. 12 paras. 5, 47, 79)
[^key-a86979747120925fff55b517f9ac05e3]: S. 59 applied (with modifications) (25.3.2022) by The Bridgwater Tidal Barrier Order 2022 (S.I. 2022/299), arts. 1, 3(4)(5) (with art. 55)
[^key-a89041e68303e2070d08a44b22e83ec3]: S. 58 excluded (28.7.2025) by virtue of The Mona Offshore Wind Farm Order 2025 (S.I. 2025/870), arts. 1, 11(4) (with arts. 37, 38, Sch. 10)
[^key-a890a6f67f98c23c079ef60fac5aa364]: S. 55 applied (with modifications) (21.10.2014) by The Central Bedfordshire Council (Woodside Link Houghton Regis) Development Consent Order 2014 (S.I. 2014/2637), arts. 1, 8(4)-(6)
[^key-a89a26c148c07e872a9861c002d0df1a]: S. 57 applied (with modifications) (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 9(4)(5) (with arts. 55, 56)
[^key-a8a17d82c921aafb21f41882957536b3]: S. 58A excluded (9.6.2009) by The Nottingham Express Transit System Order 2009 (S.I. 2009/1300), arts. 1, 4(3) (with Sch. 13 para. 14(2), Sch. 14 para. 19, Sch. 16)
[^key-a8acbe6896119d31af9b0d9eb390bbb8]: S. 69 modified (18.2.2013) by The Traffic Management (London Borough of Bexley) Permit Scheme Order 2012 (S.I. 2012/3102), arts. 1, 2, Sch. Appendix B
[^key-a8ce8b12da98d64722f26de2490b28c2]: S. 74 modified (11.1.2010) by The Traffic Management (London Borough of Islington) Permit Scheme Order 2009 (S.I. 2009/3180), art. 1, Sch. Appendix B
[^key-a8e038d4452847132665d205edc9530d]: S. 77 applied (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), arts. 1, 12(4)(5) (with arts. 4, 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 84)
[^key-a8e253fc20b88ef081e1b1fbb8530688]: S. 55 disapplied (5.9.2011) by The Traffic Management (London Borough of Lambeth) Permit Scheme Order 2011 (S.I. 2011/1958), art. 1, Sch. Appendix B
[^key-a8f9b67b25cc9f204dda9678fca27258]: S. 77 applied (29.3.2017) by The Glyn Rhonwy Pumped Storage Generating Station Order 2017 (S.I. 2017/330), arts. 1, 12(2)(3)(i) (with art. 31)
[^key-a9054832640d56dbfe39366febd4e9d0]: S. 58A modified (11.1.2010) by The Traffic Management (London Borough of Enfield) Permit Scheme Order 2009 (S.I. 2009/3165), art. 1, Sch. Appendix B
[^key-a90c7b5c062a8d30599e278fb0c7119f]: S. 54 applied (with modifications) (9.1.2014) by The National Grid (King’s Lynn B Power Station Connection) Order 2013 (S.I. 2013/3200), arts. 1, 9(2)-(4)
[^key-a9141994bb3eb05ea5a3f62cf3945731]: S. 59 applied (with modifications) (18.9.2014) by The A556 (Knutsford to Bowdon Improvement) Development Consent Order 2014 (S.I. 2014/2269), arts. 1, 8(4)(5)
[^key-a92ad8af3cb9882f05f5bdfc14e8291c]: S. 55 applied (with modifications) (24.4.2025) by The London Luton Airport Expansion Development Consent Order 2025 (S.I. 2025/463), arts. 1, 9(4)-(6) (with Sch. 8 paras. 36(3), 87)
[^key-a933ef45f7caa8125ce92f4e5a09066e]: S. 69 applied (with modifications) (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 11(5)
[^key-a958bb14b43f9f5a03cb1fa57de6e523]: S. 54 disapplied (31.3.2015) by The Traffic Management (City of Bradford Metropolitan District Council) Permit Scheme Order 2015 (S.I. 2015/330), arts. 1, 2, Sch., Appendix D
[^key-a95dc9e69fe1b33a444018485a7ab962]: S. 69 applied (22.10.2025) by The A46 Newark Bypass Development Consent Order 2025 (S.I. 2025/1090), arts. 1, 13(4)(5) (with arts. 4, 9, 51, Sch. 9)
[^key-a97099f700e4f3906030bb220d5aa731]: S. 74 modified (30.3.2015) by The Traffic Management (Southampton City Council) Permit Scheme Order 2015 (S.I. 2015/105), art. 1, Sch. para. 2.8.1 (with Sch. para. 2.8.2)
[^key-a989042511df652d41ad1f34b8651205]: S. 88 modified (12.6.2012) by The Traffic Management (Leeds City Council) Permit Scheme Order 2012 (S.I. 2012/1295), arts. 1, 2, Sch. Appendix D
[^key-a998e00c76feefe7f16272e8660293d9]: Words in s. 51(3) substituted (13.3.2026) by Planning and Infrastructure Act 2025 (c. 34), ss. 49(6), 118(1)(z5) (with s. 116); S.I. 2026/292, reg. 2
[^key-a9ef05d47a3eb28f6d1aa4ece2fcc61e]: S. 54 disapplied (29.4.2013) by The Traffic Management (The Council of the City of Manchester) Permit Scheme Order 2013 (S.I. 2013/811), arts. 1, 2, Sch. Appendix C
[^key-a9fcd80c15ccfc2c30b5c8b659074c44]: S. 66 disapplied (29.4.2013) by The Traffic Management (The Council of the City of Manchester) Permit Scheme Order 2013 (S.I. 2013/811), arts. 1, 2, Sch. Appendix C
[^key-aa0b68e9d224e568ad1396c42fd0e99d]: S. 54 applied (with modifications) (3.10.2018) by The A19/A184 Testo's Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 9(4)-(6) (with arts. 3(3), 5)
[^key-aa0cb21c72561c909c621285d9523d92]: Words in s. 115(3) substituted (1.4.2008) by Transport (Scotland) Act 2005 (asp 12), s. 54(2), sch. 3; S.S.I. 2008/15, art. 2(2), sch. 1
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.