The Building Regulations 2010
These Regulations revoke and replace the Building Regulations 2000 (S.I. 2000/2531) (“the 2000 Regulations”), and consolidate all subsequent amendments to those Regulations with minor amendments. The amendments include removing the requirement, where building work involves inserting insulation into a cavity wall, to submit along with a building notice a statement about the proposed insulating material. The Regulations also insert into Schedule 3 three new types of work that may be carried out under a self-certification scheme, and revise the list of bodies which are able to register persons for the purposes of self-certification. The three new types of work are the installation of cavity wall insulating material, replacement of roof coverings and installation of systems to produce electricity, heat or cooling by microgeneration or from renewable sources. The authorisation of this last category of work supports the implementation of article 14 of European Parliament and Council Directive 2009/28/EC on the promotion of the use of energy from renewable sources (OJ No. L140, 5.6.2009, p.16).
- (3CA) Subject to paragraphs (3CB) and (3CC), where building work, to which an application for building control approval with full plans relates, relates to the provision of one or more dwellings, or one or more bedspaces in purpose-built student accommodation, and the building which consists of or contains the dwellings or bedspaces is a residential building (as defined in regulation 7 of the BSL Regulations), a notice under paragraph (3C) must also—
- (a) if the levy charging conditions are met , but subject to sub-paragraph (c)—
- (i) include a statement setting out the number of dwellings, if any, to be provided as a result of the building work to which the application for building control approval with full plans relates which are within any of sub-paragraphs (a) to (c) of regulation 8(1) of the BSL Regulations;
- (ii) include a statement setting out the levy charging information, in accordance with regulation 16A (levy charging information), in relation to the application for building control approval with full plans to which the notice relates;
- (iii) include a statement setting out the applicable planning information;
- (iv) be accompanied by evidence as to the matters described in paragraphs (i), (ii) and (iii),
- (b) if the levy charging conditions are not met , but subject to sub-paragraph (c)—
- (i) include a statement setting out the applicable planning information;
- (ii) include a statement explaining how the levy charging conditions are not met;
- (iii) be accompanied by evidence as to the matters described in paragraphs (i) and (ii), ...
- (c) if a statement or evidence required under sub-paragraph (a) or (b) has been given previously in relation to the building work to which the application for building control approval with full plans relates, include a statement to that effect instead of the statement or evidence .
- (3CB) Where the application for building control approval with full plans referred to in paragraph (3CA) is an application relating to building work in respect of which the regulator is the building control authority under section 91ZB(2) of the 1984 Act—
- (a) the evidence required to accompany a notice under paragraph (3C) must instead be sent to the collecting authority together with a statement identifying the application to which the evidence relates;
- (b) the documents referred to in sub-paragraph (a) must be sent to the collecting authority, by the client, on the same day that the notice under paragraph (3C) is sent to the regulator.
- (3CC) Where, in relation to the application for building control approval with full plans referred to in paragraph (3CA), no statement under regulation 14ZA(1)(c) to (f) has previously been required, the notice under paragraph (3C) must include whichever of those statements under regulation 14ZA(1)(c) to (f) that is applicable.
- (3D) The relevant authority may take such steps, including—
- (a) requiring information;
- (b) laying open of work for inspection,
as the authority thinks appropriate to check whether the work is to be regarded as commenced.
- (3E) If the relevant authority are not satisfied the work is to be regarded as commenced they must give the person carrying out the work a notice to that effect (“rejection notice”) within four weeks of the date the notice under paragraph (3C) is given, and the rejection notice must give the reasons for rejection.
- (3F) Where a notice is given under paragraph (3C) and the period referred to in paragraph (3E) expires without a rejection notice being given, then the work is to be regarded as commenced.
- (3G) If the person carrying out the work accepts the rejection notice they may not give a further notice under paragraph (3C) unless, having regard to the reasons given by the relevant authority, they are satisfied the work is to be regarded as commenced.
- (3H) A person who gave the notice under paragraph (3C) may appeal to the First-tier Tribunal against the decision of the relevant authority to reject the notice provided the appeal is made within 21 relevant days beginning with the day after the day on which the relevant authority gives the rejection notice.
- (3I) The First-tier Tribunal may allow an appeal under paragraph (3H) only if it is satisfied that the decision appealed against was wrong on one or more of the following grounds—
- (a) that the decision was based on an error of fact;
- (b) that the decision was wrong in law;
- (c) that the decision was unreasonable; or
- (d) that the decision was made without following the procedures set out in the Act or regulations made under that Act.
- (3J) For the purposes of paragraphs (3C) to (3I) the provisions of regulation 46A (lapse of building control approval: commencement of work) apply to determine whether work is to be regarded as commenced.
- (4) Subject to paragraph (8), a person carrying out building work shall, not more than five days after that work has been completed, give the relevant authority a notice which complies with paragraph (4A).
- (4A) The notice under paragraph (4) must include—
- (a) the name, address, telephone number and (if available) email address of the client;
- (b) the name, address, telephone number and (if available) email address of the principal contractor (or sole contractor) and the principal designer (or sole or lead designer);
- (c) a statement that the building work is complete;
- (d) a statement, signed by the client, confirming that to the best of the client’s knowledge the work complies with all applicable requirements of the building regulations;
- (e) subject to paragraph (4B), a statement given by each principal contractor (or sole contractor) for the work and each principal designer (or sole or lead designer) for the work, signed by the person to which the declaration relates, which includes—
- (i) the name, address, telephone number and (if available) email address of that person;
- (ii) the dates of their appointment, and
- (iii) confirmation—
- (aa) in the case of a principal contractor (or sole contractor), that they fulfilled their duties as a principal contractor under Part 2A (dutyholders and competence) of these Regulations;
- (bb) in the case of a principal designer (or sole or lead designer), that they fulfilled their duties as a principal designer under Part 2A (dutyholders and competence) of these Regulations ;
- (f) if, under regulation 14(1)(g) or (h), building safety levy information was required to be provided with the application for building control approval with full plans in relation to the building work or an updated application in relation to that application, a levy liability statement under paragraph (5B).
- (4B) If for any reason a person carrying out building work is unable to include a statement for a person mentioned under paragraph (4A)(e), the person carrying out the building work must include a statement giving the reasons why that person’s statement has not been included.
- (5) Where a building is being erected to which the Regulatory Reform (Fire Safety) Order 2005 applies, or will apply after the completion of the work , and that building (or any part of it) is to be occupied before completion, the person carrying out that work shall give the relevant authority a notice which complies with paragraph (5A) at least 5 days before the building or any part of it is occupied.
- (5A) The notice under paragraph (5) must include—
- (a) the name, address, telephone number and (if available) email address of the client;
- (b) the name, address, telephone number and (if available) email address of the principal contractor (or sole contractor) and the principal designer (or sole or lead designer);
- (c) the date when the building or any part of it is to be occupied;
- (d) a statement, signed by the client, confirming that to the best of the client’s knowledge, regardless of the completion of the current building work, regulation 38 and Part B of Schedule 1 are currently complied with in relation to those parts of the building which are to be occupied before completion of the work;
- (e) subject to sub-paragraph (f), a statement given by each principal contractor (or sole contractor) for the work and each principal designer (or sole or lead designer) for the work, signed by the person to which the declaration relates, which includes—
- (i) the name, address, telephone number and (if available) email address of that person;
- (ii) the dates of their appointment, and
- (iii) confirmation—
- (aa) in the case of a principal contractor (or sole contractor), that they fulfilled their duties as a principal contractor under Part 2A (dutyholders and competence) of these Regulations;
- (bb) in the case of a principal designer (or sole or lead designer), that they fulfilled their duties as a principal designer under Part 2A (dutyholders and competence) of these Regulations ;
- (f) if a person carrying out building work is unable to include a statement for a person mentioned in sub-paragraph (e), the person carrying out the building work must include a statement giving reasons why that person’s statement has not been included.
- (5B) The “levy liability statement” is a statement, signed by the named client, that—
- (a) a notice of no charge has been received in relation to the application referred to in paragraph (4A)(f), or an updated application relating to it, and has not been cancelled under regulation 43 or 53 of the BSL Regulations, or
- (b) the levy liability amount in relation to the application referred to in paragraph (4A)(f), or the updated application relating to it, has been paid in full,
and for these purposes, “notice of no charge” and “levy liability amount” have the same meaning as in the BSL Regulations.
- (6) A person who fails to comply with paragraphs (1) or (2) shall comply within a reasonable time with any notice given by the relevant authority requiring that person to cut into, lay open or pull down so much of the work as prevents them from ascertaining whether these Regulations have been complied with.
- (7) If the relevant authority have given notice specifying the manner in which any work contravenes the requirements in these Regulations, a person who has carried out any further work to secure compliance with these Regulations shall within a reasonable time after the completion of such further work give notice to the relevant authority of its completion.
- (8) Paragraphs (1) to (4) apply only to a person who is required by regulation 12 to give a building notice or an application for building control approval with full plans.
- (9) Paragraph (1) does not apply where regulation 12(8) applies.
- (10) In this regulation—
- (a) the “levy charging conditions” are—
- (i) the building work to which the application for building control approval with full plans relates would result in a new building which includes residential floorspace, an existing building which includes residential floorspace where previously it had none (whether by extension or change of use), or an existing building with an increased total area of residential floorspace (whether by extension or change of use),
- (ii) the building work to which the application relates is, or is anticipated to be, major residential development or is part of a wider development which is, or is anticipated to be, major residential development, and
- (iii) the named client or, if there is more than one named client, each of them, in relation to the application is not an exempt person;
- (b) subject to sub-paragraph (c), “applicable planning information” is—
- (i) where a statement under regulation 14ZA(1)(a) stated that planning permission is not required, a statement confirming whether or not that remains the case and if it has changed setting out details of the change;
- (ii) where a statement under regulation 14ZA(1)(a) stated that section 33 of the Planning Act 2008 applies, a statement confirming whether or not that remains the case and also identifying the development consent under section 31 of the Planning Act 2008 and if it has changed setting out details of the change;
- (iii) where regulation 14ZA(1)(b)(i) or (iv) applied to the application for building control approval with full plans at the time that application was made, a statement confirming that information identifying the planning permission or prior approval have already been provided but if the planning permission has changed since the time that application was made the statement must set out details of the planning permission as updated;
- (iv) where regulation 14ZA(1)(b)(ii) or (iii) applied to the application for building control approval with full plans at the time that application was made, information identifying the planning permission granted;
- (v) where regulation 14ZA(1)(b)(v) or (vi) applied to the application for building control approval with full plans at the time that application was made, information identifying the prior approval and how the prior approval requirement is satisfied,
but where the planning permission expressly provides for the development to be carried out in phases the reference in paragraph (iii) and (iv) to the planning permission is a reference to the planning permission for the particular phase or phases of the development to which the application for building control approval with full plans relates;
- (c) if, at the date the applicable planning information is to be included in a notice or application, no statement has previously been required under regulation 14ZA(1)(a) or (b), then the “applicable planning information” is whichever of those statements under regulation 14ZA(1)(a) or (b) that is applicable, as updated;
- (d) for the purposes of sub-paragraph (b)(v), a prior approval requirement is satisfied, in relation to a development, if the outcome of the prior approval application is that—
- (i) prior approval is given (or is deemed to be given), or
- (ii) the local planning authority has determined prior approval is not required (where local planning authority has the meaning given in section 336 of TCPA 1990).
- (11) In paragraph (3CA), the references to dwellings do not include references to purpose-built student accommodation.
Levy charging information
16A
- (1) The “levy charging information” is—
- (a) a statement as to whether the previous development condition is met in respect of the relevant building application, and
- (b) the following information in relation to each relevant residential building to which the relevant building application relates—
- (i) the floorspace information in relation to the building on completion of the building work to which the relevant building application relates, and
- (ii) if the building is a relevant residential building at the time the relevant building application was made, the floorspace information in relation to the building at that time.
- (2) Subject to paragraphs (5) to (7), the “relevant building application” means—
- (a) where the levy charging information is required by regulation 16(3CA) to be included in a notice under regulation 16(3C), the application for building control approval with full plans to which the notice relates;
- (b) where the levy charging information is required under regulation 14(1)(h) to be included in an application, the updated application referred to in that regulation.
- (3) The “floorspace information” is—
- (a) the gross internal area of each ordinary residential dwelling;
- (b) the gross internal area of purpose-built student accommodation;
- (c) the gross internal area of each area of communal space for residents;
- (d) in relation to each area of communal space for residents, a statement as to whether it is within—
- (i) regulation 11(1)(a) of the BSL Regulations, or
- (ii) regulation 11(1)(b) of the BSL Regulations;
- (e) in relation to each area of communal space for residents that is within regulation 11(1)(b) of the BSL Regulations—
- (i) the gross internal area of each of the relevant residential units within regulation 11(1)(b)(i), and
- (ii) the gross internal area of each of the other units within regulation 11(1)(b)(ii).
- (4) For the purposes of any calculation under paragraph (3), it is to be assumed that the building work is carried out in accordance with—
- (a) the relevant building application, and
- (b) the planning permission and any agreement under section 106 of TCPA 1990, or as the case may be the development consent under section 31 of the Planning Act 2008, for the development to which the building work relates.
- (5) In the case of a relevant building application that relates to part of a relevant residential building references in this regulation to the relevant residential building are to be treated as references to the part of the building to which the application relates.
- (6) Subject to paragraph (7), where the relevant building application is a variation application that is treated, for the purposes of the BSL Regulations, as an updated application, references in this regulation to the application are to be treated as references to the updated application comprising the variation application, the original application to which it relates and any other variation applications relating to that original application.
- (7) If the levy charging information is provided in relation to an updated application, the reference in paragraph (1)(b)(ii) to the relevant building application is to be treated as a reference to the original application.
Completion certificates
17
- (1) Subject to paragraph (2B), a relevant authority shall within the specified period give a completion certificate in all cases (including a case where a certificate has already been given under regulation 17A) where they are satisfied, after taking all reasonable steps, that, following completion of building work carried out on a building, the relevant provisions have been complied with in relation to the building.
- (2) The specified period referred to in paragraph (1) is eight weeks starting from the date that notice is received by the relevant authority in accordance with regulation 16(4) of these Regulations or 22A(1) of the Building (Registered Building Control Approvers etc.) (England) Regulations 2024.
- (2A) The relevant provisions referred to in paragraph (1) are any applicable requirements of the following provisions—
- (a) regulation 25A (high-efficiency alternative systems for new buildings);
- (b) regulation 26 (target CO² emission rates for new buildings);
- (c) regulation 26A (target fabric energy efficiency requirements for new dwellings);
- (cc) regulation 26C (target primary energy rates for new buildings);
- (d) regulation 36 (water efficiency of new dwellings);
- (e) regulation 38 (fire safety information); ...
- (f) Schedule 1 ,
- (2B) Where the notice referred to in paragraph (2) was required by regulation 16(4A)(f) to include a levy liability statement, the relevant authority must not give a completion certificate unless it has received a notification under regulation 63(2) or (4) of the BSL Regulations stating that the collecting authority agrees with the levy liability statement.
- (g) regulation 7A (energy performance certificates on construction) of the Energy Performance of Buildings (England and Wales) Regulations 2012.
- (4) A certificate given in accordance with this regulation shall be evidence (but not conclusive evidence) that the requirements specified in the certificate have been complied with.
- (5) The certificate must include a statement describing its evidentiary effect, in terms substantially the same as paragraph (4).
- (6) Where the relevant authority is the regulator, it must send a copy of each certificate it gives under this regulation in relation to a building to the local authority for the area in which the building is situated.
Certificate for building occupied before work is completed
17A
- (1) A relevant authority shall within the specified period give a completion certificate in respect of part or all of a building where building work is being carried out and where all of the following circumstances apply—
- (a) part or all of the building is to be occupied before the work is completed;
- (b) the building is subject to the Regulatory Reform (Fire Safety) Order 2005; and
- (c) the authority is satisfied, after taking all reasonable steps, that, regardless of completion of the current building work, regulation 38 and Part B of Schedule 1 are currently complied with in relation to those parts of the building which are to be occupied before completion of the work.
- (2) The specified period referred to in paragraph (1) is four weeks starting from the date that notice is received by the relevant authority in accordance with regulation 16(5).
- (3) A certificate given in accordance with this regulation shall be evidence (but not conclusive evidence) that the requirements specified in the certificate have been complied with, and the certificate shall contain this wording.
- (4) The certificate must include a statement describing its evidentiary effect, in terms substantially the same as paragraph (3).
- (5) Where the relevant authority is the regulator, it must send a copy of each certificate it gives under this regulation in relation to a building to the local authority for the area in which the building is situated.
Unauthorised building work
18
- (1) This regulation applies where it appears to a relevant authority that unauthorised building work has been carried out on or after 11th November 1985.
- (2) Where this regulation applies, the owner (in this regulation referred to as “the applicant”) may apply in writing to the relevant authority for a regularisation certificate in accordance with this regulation, and shall send with the application—
- (a) a statement that the application is made in accordance with this regulation,
- (b) a description of the unauthorised work,
- (c) so far as is reasonably practicable, a plan of the unauthorised work, and
- (d) so far as is reasonably practicable, a plan showing any additional work required to be carried out to secure that the unauthorised work complies with the requirements relating to building work in the building regulations which were applicable to that work when it was carried out (in this regulation referred to as “the relevant requirements”).
- (3) Where a relevant authority receive an application in accordance with this regulation, they may require the applicant to take such reasonable steps, including laying open the unauthorised work for inspection by the authority, making tests and taking samples, as the authority think appropriate to ascertain what work, if any, is required to secure that the relevant requirements are met.
- (4) When the applicant has taken any such steps required by the relevant authority as are described in paragraph (3), and having had regard to any direction given in accordance with sections 8 and 9 of, and Schedule 2 to, the Act dispensing with or relaxing a requirement in building regulations which applies to the unauthorised work, the relevant authority shall notify the applicant—
- (a) of the work which in their opinion is required to comply with the relevant requirements or those requirements as dispensed with or relaxed, or
- (b) that they cannot determine what work is required to comply with the relevant requirements or those requirements as dispensed with or relaxed, or
- (c) that no work is required to secure compliance with the relevant requirements or those requirements as dispensed with or relaxed.
- (5) Where the relevant authority have been able to satisfy themselves, after taking all reasonable steps for that purpose that—
- (a) the relevant requirements have been satisfied (taking account of any work carried out and any dispensation or relaxation given in accordance with sections 8 and 9 of, and Schedule 2 to, the Act), or
- (b) no work is required to secure that the unauthorised work satisfies the relevant requirements (taking account of any such dispensation or relaxation),
they may give a certificate to that effect (in this regulation referred to as “a regularisation certificate”).
- (6) A regularisation certificate shall be evidence (but not conclusive evidence) that the relevant requirements specified in the certificate have been complied with.
- (6A) Where the relevant authority is the regulator, it must send a copy of each certificate it gives under this regulation in relation to a building to the local authority for the area in which the building is situated.
- (7) Where this regulation applies, regulations 12 and 14 shall not apply, and neither the supply of plans nor the taking of any other action in accordance with this regulation is to be treated as an application for building control approval with full plans in accordance with building regulations.
- (8) In this regulation “unauthorised building work”—
- (a) where the relevant authority is the local authority, means building work, other than work in relation to which an initial notice, an amendment notice, a public body’s notice or a regulator’s notice has effect, which is done without—
- (i) a building notice being given to the local authority;
- (ii) an application for building control approval with full plans of the work being given to the local authority; or
- (iii) a notice of intention to start work being given to the local authority, in accordance with regulation 16(1), where a building notice has been given or an application for building control approval with full plans of the work has been given;
- (b) where the relevant authority is the regulator, means building work which is work in relation to which a regulator’s notice has effect but which is done without—
- (i) a building notice being given to the regulator;
- (ii) an application for building control approval with full plans of the work being given to the regulator; or
- (iii) a notice of intention to start work being given to the regulator, in accordance with regulation 16(1), where a building notice has been given or an application for building control approval with full plans of the work has been given.
Appeal against refusal to grant certain certificates
18A
- (1) A person (“the appellant”) who has—
- (a) notified a local authority under regulation 16(4) of these Regulations or 22A(1) of the Building (Registered Building Control Approvers etc.) (England) Regulations 2024 and the authority has refused to give a certificate under regulation 17 (completion certificates);
- (b) notified a local authority under regulation 16(5) and the authority has refused to give a certificate under regulation 17A (certificate for building occupied before work is completed); or
- (c) applied to a local authority under regulation 18(2) (unauthorised building work) for a certificate and the authority has refused to give the certificate,
may appeal to the regulator against the decision of the local authority to refuse to provide the certificate provided the appeal is made within 21 relevant days beginning with the day after the day on which the local authority notifies the appellant of the refusal.
- (2) The regulator may allow an appeal under paragraph (1) only if it is satisfied that the decision appealed against was wrong on one or more of the following grounds—
- (a) that the decision was based on an error of fact;
- (b) that the decision was wrong in law;
- (c) that the decision was unreasonable; or
- (d) that the decision was made without following the procedures set out in the Act or regulations made under that Act.
- (3) If the regulator allows an appeal it may quash or vary the decision.
- (4) An appellant aggrieved with the decision of the regulator on an appeal under this regulation may appeal that decision to the First-tier Tribunal within 21 relevant days beginning with the day after the day on which the regulator notifies the appellant of its decision.
- (5) The First-tier Tribunal may allow an appeal referred to in paragraph (4) only if it is satisfied that the decision appealed against was wrong on one or more of the following grounds—
- (a) that the decision was based on an error of fact;
- (b) that the decision was wrong in law;
- (c) that the decision was unreasonable; or
- (d) that the decision was made without following the procedures set out in the Act or regulations made under that Act.
- (6) If the First-tier Tribunal allows an appeal it may quash or vary the decision.
Appeal in relation to sections 20(5) or 39 of the Act
18B
- (1) An appeal to the regulator under section 20(5) of the Act must be made within 21 relevant days beginning with the day after the day on which the local authority notifies the person of its decision.
- (2) Where a person who is aggrieved with the decision of the regulator given on an appeal under section 20(5) or 39 of the Act wishes to appeal that decision by virtue of section 43A(3) of the Act they may appeal to the First-tier Tribunal provided the appeal is made within 21 relevant days beginning with the day after the day on which the regulator notifies them of its decision.
- (3) The First-tier Tribunal may allow an appeal referred to in paragraph (2) only if it is satisfied that the decision appealed against was wrong on one or more of the following grounds—
- (a) that the decision was based on an error of fact;
- (b) that the decision was wrong in law;
- (c) that the decision was unreasonable; or
- (d) that the decision was made without following the procedures set out in the Act or regulations made under that Act.
- (4) If the First-tier Tribunal allows an appeal it may quash or vary the decision.
Appeal to the First-tier Tribunal in relation to certain decisions
18C
- (1) Where, in relation to work which is not higher-risk building work, a person (“the appellant”) has—
- (a) notified the regulator under regulation 16(4) of these Regulations or 22A(1) of the Building (Registered Building Control Approvers etc.) (England) Regulations 2024 and the regulator has refused to give a certificate under regulation 17 (completion certificates);
- (b) notified the regulator under regulation 16(5) and the regulator has refused to give a certificate under regulation 17A (certificate for building occupied before work is completed); or
- (c) applied to the regulator under regulation 18(2) (unauthorised building work) for a certificate and the regulator has refused to give the certificate,
they may appeal to the First-tier Tribunal against the decision of the regulator provided the appeal is made within 21 relevant days beginning with the day after the day on which the regulator notifies the appellant of the refusal.
- (2) An appeal to the First-tier Tribunal under section 19(4), 20(5), 21(4), 22(4) or 39 of the Act must be made within 21 relevant days beginning with the day after the day on which the building control authority notifies the person of its decision.
- (3) The First-tier Tribunal may allow an appeal referred to in paragraph (1) or (2) only if it is satisfied that the decision appealed against was wrong on one or more of the following grounds—
- (a) that the decision was based on an error of fact;
- (b) that the decision was wrong in law;
- (c) that the decision was unreasonable; or
- (d) that the decision was made without following the procedures set out in the Act or regulations made under that Act.
- (4) If the First-tier Tribunal allows an appeal referred to in paragraph (1) or (2) it may quash or vary the decision.
Application to the First-tier Tribunal in relation to certain decisions
18D
- (1) At least five days before making an application to the First-tier Tribunal under section 21(3) or (6), 24(2), 25(2) or (5), 33(6) or 36(3) of the Act the person proposing to make an application (“the applicant”) must notify the building control authority of their intention to make the application.
- (2) An application to the First-tier Tribunal under section 21(3) or (6), 24(2), 25(2) or (5), 33(6) or 36(3) of the Act must be made within 21 relevant days beginning with the day after the day on which the applicant notifies the building control authority under paragraph (1).
- (3) If the First-tier Tribunal allows an appeal it may quash or vary the decision.
Appeals under section 101A of the Act
18E
- (1) A person aggrieved with the refusal of a local authority to consider an application for building control approval, an initial notice or an amendment notice on the grounds that all or part of the work to which the application or notice relates is higher-risk building work may appeal to the Secretary of State provided the appeal is made within 28 relevant days beginning with the day after the day on which the local authority refuses to consider the application.
- (2) An appeal to the Secretary of State under section 101A of the Act must be made in writing, signed by the person who made the original application or one of the persons who gave the original initial notice or amendment notice (in this regulation “the appellant”) and must include the following information—
- (a) the name, address, telephone number and (if available) email address of the appellant;
- (b) a statement explaining why the appellant considers the work proposed in the original application or notice does not include higher-risk building work;
- (c) where the appellant is a registered building control approver, a statement confirming the client agrees to the appeal being made.
- (3) In addition to the information provided for in paragraph (2) the appeal must be accompanied by—
- (a) a copy of the original application or notice given to the local authority (including all documentation that accompanied the application or notice);
- (b) all the information provided to the local authority in relation to the application or notice;
- (c) all the correspondence with the local authority in relation to that application or notice;
- (d) a copy of the notice sent to the regulator under paragraph (4).
- (4) At least two working days before submitting an appeal under section 101A(2) of the Act the appellant must give notice to the regulator of their intention to do so.
- (5) Where the appellant submits an appeal under section 101A of the Act through electronic facilities provided by the Secretary of State for that purpose, they are taken to have consented to the use of electronic communications for all purposes relating to the appeal that are capable of being carried out electronically.
- (6) The deemed consent in paragraph (5) may be revoked by the appellant giving the Secretary of State two weeks’ notice in writing specifying that the notice is given under this regulation.
- (7) An appeal under section 101A of the Act is to be determined by consideration of written representations.
- (8) The Secretary of State must give the local authority which refused to consider the original application or notice the opportunity to make written representations in relation to the appeal.
- (9) The Secretary of State may give any other person an opportunity to make written representations in relation to the appeal.
- (10) The Secretary of State may, by notice in writing, require the local authority in question to provide specified information, or provide copies of specified documents, by the date specified in the notice (that date must be no fewer than 7 days after the date the notice is given).
- (11) Before determining the appeal the Secretary of State may—
- (a) hold any meeting with the appellant, the local authority or any other person,
- (b) undertake any site visit,
as the Secretary of State considers appropriate.
- (12) The Secretary of State must determine the appeal within 8 weeks of the date on which the appeal is received and the decision in relation to the appeal must be given in writing to the appellant.
- (13) For the purposes of section 101A(6) of the Act, an appeal to the High Court under section 101A(6) of the Act may be made within 28 relevant days beginning with the day after the day on which the Secretary of State gives the decision to the appellant under paragraph (12).
- (14) The Secretary of State may appoint a person to determine the appeal instead of the Secretary of State.
- (15) At any time before a person appointed under this regulation has determined the appeal the Secretary of State may—
- (a) revoke that person’s appointment;
- (b) appoint another person to determine the appeal instead.
- (16) A person appointed under paragraph (14) has the same powers and duties in relation to determination of an appeal under section 101A of the Act as the Secretary of State and, in particular, where the appeal is determined by a person appointed under this regulation their decision is to be treated as the decision of the Secretary of State.
Appeal in relation to section 42 of the Act: Wales
18F
An appeal to the High Court under section 42 of the Act against the decision of the Welsh Ministers who determined an appeal of a building control authority refusing to relax building regulations, must be made within 15 ... days beginning with the date the Welsh Ministers gave notice of their decision.
Appeal to the magistrates’ court in relation to certain decisions: Wales
18G
- (1) An appeal to the magistrates’ court under section 19(4), 21(4) or 22(4) of the Act must be made within 15 ... days beginning with the day after the day on which the building control authority notifies the person of its decision.
- (2) The magistrates’ court may allow an appeal referred to in paragraph (1) only if it is satisfied that the decision appealed against was wrong on one or more of the following grounds—
- (a) that the decision was based on an error of fact;
- (b) that the decision was wrong in law;
- (c) that the decision was unreasonable;
- (d) that the decision was made without following the procedures set out in the Act or regulations made under that Act.
- (3) If the magistrates’ court allows an appeal referred to in paragraph (1) it may quash or vary the decision.
Application to the magistrates’ court in relation to certain decisions: Wales
18H
- (1) At least 5 ... days before making an appeal to the magistrates’ court under section 21(3) or (6), 24(2), 25(2) or (5), 33(6) or 36(3) of the Act the person proposing to make an appeal (“the appellant”) must notify the building control authority of their intention to make the appeal.
- (2) An application to the magistrates’ court under section 21(3) or (6), 24(2), 25(2) or (5), 33(6) or 36(3) of the Act must be made within 15 ... days beginning with the day on which the applicant notifies the building control authority under paragraph (1).
- (3) If the magistrates’ court allows an appeal it may quash or vary the decision.
Appeals under section 101A of the Act: Wales
18I
- (1) A person aggrieved with the refusal of a building control authority to consider an application for building control approval, an initial notice or an amendment notice on the grounds that all or part of the work to which the application or notice relates is higher-risk building work may appeal to the Welsh Ministers under section 101A of the Act provided the appeal is made within 20 ... days beginning with the day after the day on which the building control authority refuses to consider the application.
- (2) An appeal to the Welsh Ministers under section 101A of the Act must be made in writing, signed by the person who made the original application or one of the persons who gave the original initial notice or amendment notice (in this regulation “the appellant”) and must include the following information—
- (a) the name, address, telephone number and (if available) email address of the appellant;
- (b) a statement explaining why the appellant considers the work proposed in the original application or notice does not include higher-risk building work;
- (c) where the appellant is a registered building control approver, a statement confirming the client agrees to the appeal being made.
- (3) In addition to the information provided for in paragraph (2) the appeal must be accompanied by—
- (a) a copy of the original application or notice given to the building control authority (including all documentation that accompanied the application or notice);
- (b) all the information provided to the building control authority in relation to the application or notice;
- (c) all the correspondence with the building control authority in relation to that application or notice;
- (d) a copy of the notice sent to the building control authority under paragraph (4).
- (4) At least 2 ... days before submitting an appeal under section 101A(2) of the Act the appellant must give notice to the building control authority of their intention to do so.
- (5) Where the appellant submits an appeal under section 101A of the Act through electronic facilities provided by the Welsh Ministers for that purpose, they are taken to have consented to the use of electronic communications for all purposes relating to the appeal that are capable of being carried out electronically.
- (6) The deemed consent in paragraph (5) may be revoked by the appellant giving the Welsh Ministers 10 working days’ notice in writing specifying that the notice is given under this regulation.
- (7) An appeal under section 101A of the Act is to be determined by consideration of written representations.
- (8) The Welsh Ministers must give the building control authority which refused to consider the original application or notice the opportunity to make written representations in relation to a section 101A application.
- (9) The Welsh Ministers may give any other person an opportunity to make written representations in relation to the appeal.
- (10) The Welsh Ministers may, by notice in writing, require the building control authority in question to provide specified information, or provide copies of specified documents, by the date specified in the notice (that date must be no fewer than 5 ... days after the date the notice is given).
- (11) Before determining a section 101A application the Welsh Ministers may as they consider appropriate—
- (a) hold any meeting with the appellant, the building control authority or any other person;
- (b) undertake any site visit.
- (12) The Welsh Ministers must determine the appeal within 40 ... days of the date on which the appeal is received and the decision in relation to the appeal must be given in writing to the appellant (and where the appellant is not the client, a copy of the decision must be given to them).
- (13) A copy of the decision made by the Welsh Ministers must be sent to the building control authority.
- (14) For the purposes of section 101A(6) of the Act, an appeal to the High Court under section 101A(6) of the Act may be made within 20 ... days beginning with the day after the day on which the Welsh Ministers gave their decision to the appellant under paragraph (12).
- (15) The Welsh Ministers may appoint a person to determine a section 101A application instead of the Welsh Ministers.
- (16) At any time before a person appointed under this regulation has determined the appeal the Welsh Ministers may—
- (a) revoke that person’s appointment;
- (b) appoint another person to determine the appeal instead.
- (17) A person appointed under paragraph (15) has the same powers and duties in relation to determination of a section 101A application as the Welsh Ministers and, in particular, where the appeal is determined by a person appointed under this regulation their decision is to be treated as the decision of the Welsh Ministers.
PART 4 — Supervision of Building Work Otherwise than by Local Authorities
Supervision of building work otherwise than by local authorities
19
- (1) Regulations 12 (giving of a building notice or deposit of plans), 16 (notice of commencement and completion of certain stages of work), 17 (completion certificates), 17A (Certificate for building occupied before work is completed) 20 (provisions applicable to self-certification schemes), 27 (CO₂ emission rate calculations), 27A (fabric energy efficiency rate calculations), 27C (target primary energy rate calculations for new buildings), ... 37 (wholesome water consumption calculation), 41 (sound insulation testing), 42 (mechanical ventilation air flow rate testing), 43 (pressure testing), 44 (commissioning) ... shall not apply in respect of any work specified in an initial notice, an amendment notice or a public body's notice, which is in force.
- (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Regulator’s notices: description of work and connection
19A
For the purposes of section 91ZB(1) of the Act, a regulator’s notice may be given in relation to any building work (which is not higher-risk building work) where—
- (a) the client for the building work is proposing to undertake higher-risk building work on the same site;
- (b) the regulator’s notice includes all the building work to be carried out on the site which is not higher-risk building work; and
- (c) the client has appointed the same principal contractor for the building work and the higher-risk building work.
Regulator’s notices: content of notices
19B
A regulator’s notice must be in writing and must include—
- (a) the name, address, telephone number and (if available) email address of the client for the project to which the notice relates;
- (b) a statement that the notice is a regulator’s notice under section 91ZB of the Act;
- (c) the location of the proposed building work to which the regulator’s notice is to apply;
- (d) a description of the proposed building work to which the regulator’s notice is to apply, including a statement explaining how that work is connected to higher-risk work and the location on the site of that higher-risk building work;
- (e) a statement giving the date it is proposed the building work will start and how long it is proposed to take to complete;
- (f) a plan to a scale of not less than 1:1250 showing—
- (i) the size and position of the building, or the building as extended, and its relationship to adjoining boundaries;
- (ii) the boundaries of the curtilage of the building, or the building as extended, and the size, position and use of every other building or proposed building within that curtilage;
- (iii) the width and position of any street on or within the boundaries of the curtilage of the building or the building as extended;
- (g) a declaration, signed by the client and signed by an employee of the regulator who is authorised to do so, confirming—
- (i) the client and the regulator consent to the giving of the notice;
- (ii) the proposed building work to which the notice relates includes no higher-risk building work;
- (iii) the proposed building work falls within the requirements of regulation 19A (regulator’s notices: description of work and connection);
- (iv) they understand the proposed building work is to be subject to the procedural requirements of these Regulations.
Regulator’s notices: grounds for rejection
19C
- (1) The following grounds are prescribed for the purposes of section 91ZC(2) of the Act—
- (a) the conditions in regulation 19A (regulator’s notices: description of work and connection) are not satisfied in relation to the work specified in the notice;
- (b) the work specified in the notice is not within the area of the local authority;
- (c) that an application for building control approval, an initial notice or a public body’s notice has been given in relation to the work (or any part of it);
- (d) the notice does not comply with the requirements of regulation 19B (regulator’s notices: content of notices).
- (2) For the purposes of section 91ZC(3) of the Act a notice of rejection must be given within five days of the day on which the regulator’s notice is given.
Regulator’s notices: appeals
19D
- (1) An appeal to the First-tier Tribunal under section 91ZC(4) of the Act must be made within 21 relevant days beginning with the day after the day on which the local authority notifies the person under section 91ZC(3) of the Act.
- (2) The First-tier Tribunal may allow an appeal under section 91ZC(4) of the Act only if it is satisfied that the decision appealed against was wrong on one or more of the following grounds—
- (a) that the decision was based on an error of fact;
- (b) that the decision was wrong in law;
- (c) that the decision was unreasonable; or
- (d) that the decision was made without following the procedures set out in the Act or regulations made under that Act.
- (3) If the First-tier Tribunal allows an appeal it may quash or vary the decision.
- (4) The power of the First-tier Tribunal to award costs does not apply in relation to an appeal under this regulation.
Regulator’s notices: direction
19E
- (1) In relation to work which is the subject of a regulator’s notice, the regulator may make a direction as to the way in which any of the following documents are given (which may include specifying cases where they must be given electronically via a website address provided for that purpose by the regulator)—
- (a) a building notice under regulation 13 (particulars and plans where a building notice is given);
- (b) an application under regulation 14 (applications for building control approval with full plans);
- (c) any notice under regulation 16 (notices in relation to building work);
- (d) an application under regulation 18 (unauthorised building work);
- (e) any documents that are required to accompany any notice or application referred to in sub-paragraph (a) to (d);
- (f) a notice under regulation 25A(2), 27(2) or (3), 27A(2) or (3), 27C(2) or (3), 37(1), 38(2B) or (2G), 41(4), 42(2), 43(2), 44(3) and 44ZA(2);
- (g) a copy of results under regulation 41(2).
- (2) A direction must specify the date on which it comes into effect, which must not be earlier than seven days after it is published.
- (3) Where the regulator has made and published a direction in accordance with this regulation, an application (or any document that accompanied the application) of the type mentioned in the direction must, from the date specified in the direction, be given in accordance with the direction.
- (4) The regulator may, by a further direction, amend or revoke a direction made under this regulation.
Regulator’s notices: local land charges
19F
The functions of local authorities under the Local Land Charges Act 1975, as they relate to building work for which the regulator is the building control authority by reason of a regulator’s notice under section 91ZB of the Building Act 1984, are prescribed for the purposes of paragraph (b) of the definition of “relevant function” in paragraph 2(5) of Schedule 3 to the Building Safety Act 2022.
PART 5 — Self-certification schemes and third party certification schemes
Provisions applicable to self-certification schemes
20
- (1) This regulation applies to the extent that the building work consists only of work of a type described in column 1 of the Table in Schedule 3 and the work is carried out by a person who is described in the corresponding entry in column 2 of that Table in respect of that type of work.
- (1A) Where this regulation applies and the building work in question relates to a higher-risk building, the client must make the person carrying out the work aware that the building is a higher-risk building.
- (2) Where this regulation applies, the building control authority are authorised to accept, as evidence that the requirements of regulations 4 and 7 have been satisfied, a certificate to that effect by the person carrying out the work.
- (3) Where this regulation applies, the person carrying out the work shall, not more than 30 days after the completion of the work—
- (a) give to the occupier a copy of the certificate referred to in paragraph (2); and
- (b) give to the building control authority—
- (i) notice to that effect, or
- (ii) the certificate referred to in paragraph (2).
- (3A) A building control authority shall store in a retrievable form copies of the notices and certificates given to it in accordance with paragraph (3)(b).
- (3B) If the whole or part of the work was paid for using a green deal plan, the person carrying out the work must include—
- (a) in the certificate referred to in paragraph (2); and
- (b) in the notice given to the building control authority referred to in paragraph (3)(b)(i),
a statement to that effect.
- (3C) Such a statement that relates to a part of the work must specify which part was paid for using the green deal plan.
- (3D) In this regulation, “green deal plan” has the meaning given in section 1 of the Energy Act 2011.
- (4) Paragraph (3) of this regulation does not apply where a person carries out any building work described in Schedule 4.
- (5) A certificate given in accordance with this regulation shall be evidence (but not conclusive evidence) that the requirements specified in the certificate have been complied with , and the certificate shall contain this wording.
- (6) The certificate must include a statement describing its evidentiary effect, in terms substantially the same as paragraph (5).
- (6A) Where the regulator is the building control authority by virtue of section 91ZB of the Act (the regulator: building control authority for other work), it must send a copy of each notice or certificate it receives under this regulation in relation to a building to the local authority for the area in which the building is situated.
- (6A) Where the building control authority is a designated local authority under section 91ZD of the Act, it must send a copy of each notice or certificate it receives under this regulation in relation to a building to the local authority for the area in which the building is situated.
Provisions applicable to third party certification schemes
20A
- (1) This regulation applies to the extent that the building work consists only of work of a type described in column 1 of the Table in Schedule 3A and the work is inspected by a third party certifier described in column 2 of that Table and appointed in accordance with regulation 12(6)(c).
- (1A) Where this regulation applies and the building work in question relates to a higher-risk building, the client must make the person carrying out the work aware that the building is a higher-risk building.
- (2) Where this regulation applies, the building control authority are authorised to accept, as evidence that the requirements of regulations 4 and 7 have been complied with, a certificate to that effect by the third party certifier.
- (3) Where this regulation applies, the person carrying out the building work must, not more than 7 days after the completion of the work, notify the third party certifier that the work has been completed.
- (4) Where the third party certifier, having taken all reasonable steps to ascertain that it is the case, is satisfied within the limits of professional skill and care that the requirements of regulation 4 and 7 have been complied with, the third party certifier must, not more than 30 days after receiving notification of completion of the work under paragraph (3)—
- (a) give the occupier a copy of the certificate referred to in paragraph (2); and
- (b) give to the building control authority—
- (i) notice to that effect, or
- (ii) the certificate referred to in paragraph (2).
- (5) If the third party certifier is unable to certify that the requirements of regulations 4 and 7 have been complied with and therefore cannot provide the certificate referred to in paragraph (2), the third party certifier must notify the building control authority to that effect.
- (6) A certificate given in accordance with this regulation shall be evidence (but not conclusive evidence) that the requirements specified in the certificate have been complied with.
- (7) The certificate shall include a statement describing its evidentiary effect, in terms substantially the same as paragraph (6).
- (7A) Where the regulator is the building control authority by virtue of section 91ZB of the Act (the regulator: building control authority for other work), it must send a copy of each notice or certificate it receives under this regulation in relation to a building to the local authority for the area in which the building is situated.
PART 6 — Energy Efficiency Requirements
Application of energy efficiency requirements
21
- (1) The energy efficiency requirements apply to—
- (a) the erection of any building of a kind falling within this paragraph;
- (b) the extension of any such building, other than an extension to which paragraph (4) applies; and
- (c) the carrying out of any work to or in connection with any such building or extension.
- (2) A building falls within paragraph (1) if it—
- (a) is a roofed construction having walls;
- (b) uses energy to condition the indoor climate; and
- (c) does not fall within one or more of the categories listed in paragraph (3).
- (3) The categories referred to in paragraph (2)(c) are—
- (a) buildings which are—
- (i) listed in accordance with section 1 of the Planning (Listed Buildings and Conservation Areas) Act 1990 or section 76 of the Historic Environment (Wales) Act 2023;
- (ii) in a conservation area designated in accordance with section 69 of the Planning (Listed Buildings and Conservation Areas) Act 1990 or section 158 of the Historic Environment (Wales) Act 2023; or
- (iii) included in the schedule of monuments maintained under section 1 of the Ancient Monuments and Archaeological Areas Act 1979 or section 3 of the Historic Environment (Wales) Act 2023,
where compliance with the energy efficiency requirements would unacceptably alter their character or appearance;
- (b) buildings which are used primarily or solely as places of worship;
- (c) temporary buildings with a planned time of use of two years or less, industrial sites, workshops and non-residential agricultural buildings with low energy demand;
- (d) stand-alone buildings other than dwellings with a total useful floor area of less than 50m².
- (4) This paragraph applies to any extension of a building falling within class 7 in Schedule 2 except a conservatory or porch—
- (a) where any wall, door or window separating the conservatory or porch from that building has been removed and not replaced with a wall, door or window; ...
- (b) into which the building's heating system has been extended to heat the conservatory or porch; or
- (c) in which a fixed heating appliance has been provided to heat the conservatory or porch.
- (5) In this regulation, the following terms have the same meaning as in European Parliament and Council Directive 2010/31/EU of 19 May 2010 on the energy performance of buildings (recast) —
- (i) “industrial sites”;
- (ii) “low energy demand”;
- (iii) “non-residential agricultural buildings”;
- (iv) “places of worship”;
- (v) “stand-alone”;
- (vi) “total useful floor area”;
- (vii) “workshops”.
Requirements relating to a change to energy status
22
Where there is a change to a building's energy status, such work, if any, shall be carried out as is necessary to ensure that the building complies with the applicable requirements of Part L of Schedule 1.
Requirements for the renovation or replacement of thermal elements
23
- (1) Where the renovation of an individual thermal element—
- (a) constitutes a major renovation; or
- (b) amounts to the renovation of more than 50% of the element’s surface area;
the renovation must be carried out so as to ensure that the whole of the element complies with paragraph L1(a)(i) of Schedule 1, in so far as that is technically, functionally and economically feasible.
- (2) Where the whole or any part of an individual thermal element is proposed to be replaced and the replacement—
- (a) constitutes a major renovation; or
- (b) (in the case of part replacement) amounts to the replacement of more than 50% of the thermal element’s surface area;
the whole of the thermal element must be replaced so as to ensure that it complies with paragraph L1(a)(i) of Schedule 1, in so far as that is technically, functionally and economically feasible.
Methodology of calculation and expression of energy performance
24
- (1) The Secretary of State shall approve—
- (a) a methodology of calculation of the energy performance of buildings, including methods for calculating asset ratings and operational ratings of buildings; and
- (b) ways in which the energy performance of buildings, as calculated in accordance with the methodology, shall be expressed.
- (2) In this regulation—
- “asset rating” means an energy performance indicator determined from the amount of energy estimated to meet the different needs associated with a standardised use of the building; and
- “operational rating” means an energy performance indicator determined from the amount of energy consumed during the occupation of a building over a period of time and the energy demand associated with a typical use of the building over that period.
Minimum energy performance requirements for new buildings
25
Minimum energy performance requirements shall be approved by the Secretary of State, calculated and expressed in accordance with the methodology approved pursuant to regulation 24, for—
- (a) new buildings (which shall include new dwellings), in the form of target CO₂ emission rates; ...
- (b) new dwellings, in the form of target fabric energy efficiency rates ; and
- (c) new buildings in the form of target primary energy rates.
Consideration of high-efficiency alternative systems for new buildings
25A
- (1) Before construction of a new building starts, the person who is to carry out the work must analyse and take into account the technical, environmental and economic feasibility of using high-efficiency alternative systems (such as the following systems) in the construction, if available—
- (a) decentralised energy supply systems based on energy from renewable sources;
- (b) cogeneration;
- (c) district or block heating or cooling, particularly where it is based entirely or partially on energy from renewable sources; and
- (d) heat pumps.
- (2) The person carrying out the work must—
- (a) where the new building is a higher-risk building, ensure the application for building control approval in relation to the work is accompanied by a notice which states that the analysis referred to in paragraph (1) has been undertaken, is documented, and the documentation is available to the regulator for verification purposes;
- (b) in any other case, not later than the beginning of the day before the day on which the work starts, give the building control authority a notice which states that the analysis referred to in paragraph (1) has been undertaken, is documented, and the documentation is available to the authority for verification purposes; and
- (c) ensure that a copy of the analysis is available for inspection at all reasonable times on request by an officer of the building control authority.
- (3) An authorised officer of the building control authority may require production of the documentation in order to verify that this regulation has been complied with.
- (3A) Where the regulator is the building control authority by virtue of section 91ZB of the Act (the regulator: building control authority for other work), it must send a copy of each notice it receives under this regulation in relation to a building to the local authority for the area in which the building is situated.
- (4) The analysis referred to in paragraph (1)—
- (a) may be carried out for individual buildings or for groups of similar buildings or for common typologies of buildings in the same area; and
- (b) in so far as it relates to collective heating and cooling systems, may be carried out for all buildings connected to the system in the same area.
- (5) In this regulation—
- (a) “cogeneration” means simultaneous generation in one process of thermal energy and one or both of the following—
- (i) electrical energy;
- (ii) mechanical energy;
- (b) “district or block heating or cooling” means the distribution of thermal energy in the form of steam, hot water or chilled liquids, from a central source of production through a network of multiple buildings or sites, for the use of space or process heating or cooling;
- (c) “energy from renewable sources” means energy from renewable non-fossil sources, namely wind, solar, aerothermal, geothermal, hydrothermal and ocean energy, hydropower, biomass, landfill gas, sewage treatment plant gas and biogases; and
- (d) “heat pump” means a machine, a device or installation that transfers heat from natural surroundings such as air, water or ground to buildings or industrial applications by reversing the natural flow of heat such that it flows from a lower to a higher temperature. (For reversible heat pumps, it may also move heat from the building to the natural surroundings.)
Nearly zero-energy requirements for new buildings
25B
Where a building is erected, it must be a nearly zero-energy building.
New buildings: minimum energy performance requirements
25C
Minimum energy performance requirements must be approved by the Welsh Ministers, calculated and expressed in accordance with the methodology approved pursuant to regulation 24, for—
- (a) new buildings ..., in the form of target primary energy ... rates; and
- (b) when a dwelling is erected, in the form of target fabric performance values.
Energy efficiency rating
25D
Energy efficiency ratings must be approved by the Welsh Ministers, applying the methodology of calculation and expression of the energy performance of buildings approved pursuant to regulation 24 for new buildings.
CO2 emission rates for new buildings
26
Where a building is erected, it shall not exceed the target CO₂ emission rate for the building that has been approved pursuant to regulation 25 , applying the methodology of calculation and expression of the energy performance of buildings approved pursuant to regulation 24.
Fabric energy efficiency rates
26A
Where a dwelling is erected, it shall not exceed the target fabric energy efficiency rate for the dwelling that has been approved pursuant to regulation 25, applying the methodology of calculation and expression of the energy performance of buildings approved pursuant to regulation 24.
Fabric performance values for new dwellings
26B
Where a dwelling is erected, it must not exceed the target fabric performance values for the dwelling which have been approved pursuant to regulation 25C(b) , applying the methodology of calculation and expression of the energy performance of buildings approved pursuant to regulation 24.
Target primary energy rates for new buildings
26C
Where a building is erected it must not exceed the target primary energy rate for the building which has been approved pursuant to regulation 25(c), applying the methodology of calculation and expression of the energy performance of buildings approved pursuant to regulation 24.
CO2 emission rate calculations
27
- (1) This regulation applies where a building is erected and regulation 26 applies.
- (2) The person carrying out the work must—
- (a) where the new building is a higher-risk building, ensure the application for building control approval in relation to the work is accompanied by a notice which specifies—
- (i) the target CO₂ emission rate for the building, calculated and expressed in accordance with the methodology approved pursuant to regulation 24,
- (ii) the CO₂ emission rate for the building as designed, calculated and expressed in accordance with the methodology approved pursuant to regulation 24, and
- (iii) a list of specifications to which the building is to be constructed;
- (b) in any other case, not later than the day before the work starts, give the building control authority a notice which specifies the matters set out in paragraphs (i) to (iii) of sub-paragraph (a).
- (3) The person carrying out the work must—
- (a) where the new building is a higher-risk building, ensure the application for a completion certificate in relation to the work is accompanied by—
- (i) a notice which specifies—
- (aa) the target CO₂ emission rate for the building, calculated and expressed in accordance with the methodology approved pursuant to regulation 24,
- (bb) the CO₂ emission rate for the building as constructed, calculated and expressed in accordance with the methodology approved pursuant to regulation 24, and
- (cc) whether the building has been constructed in accordance with the list of specifications referred to in paragraph (2), and, if not, a list of any changes to those specifications; or
- (ii) a certificate of the sort referred to in paragraph (4) accompanied by the information referred to in sub-paragraphs (aa) to (cc) of paragraph (i);
- (b) in any other case, not later than five days after the work has been completed, give the building control authority a notice which specifies the matters mentioned in sub-paragraphs (aa) to (cc) of sub-paragraph (a)(i) or a certificate of the sort mentioned in sub-paragraph (a)(ii).
- (4) A building control authority are authorised to accept, as evidence that the requirements of regulation 26 have been satisfied, a certificate to that effect by an energy assessor who is accredited to produce energy performance certificates for that category of building.
- (4A) Where the regulator is the building control authority by virtue of section 91ZB of the Act (the regulator: building control authority for other work), it must send a copy of each notice or certificate it receives under this regulation in relation to a building to the local authority for the area in which the building is situated.
- (5) In this regulation, “specifications” means specifications used for the calculation of the CO₂ emission rate.
Fabric energy efficiency rate calculations
27A
- (1) This regulation applies where a dwelling is erected and regulation 26A applies.
- (2) The person carrying out the work must—
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.