The Building Regulations 2010
These Regulations revoke and replace the Building Regulations 2000 (S.I. 2000/2531) (“the 2000 Regulations”), and consolidate all subsequent amendments to those Regulations with minor amendments. The amendments include removing the requirement, where building work involves inserting insulation into a cavity wall, to submit along with a building notice a statement about the proposed insulating material. The Regulations also insert into Schedule 3 three new types of work that may be carried out under a self-certification scheme, and revise the list of bodies which are able to register persons for the purposes of self-certification. The three new types of work are the installation of cavity wall insulating material, replacement of roof coverings and installation of systems to produce electricity, heat or cooling by microgeneration or from renewable sources. The authorisation of this last category of work supports the implementation of article 14 of European Parliament and Council Directive 2009/28/EC on the promotion of the use of energy from renewable sources (OJ No. L140, 5.6.2009, p.16).
- (a) where the dwelling is within a higher-risk building, ensure the application for building control approval in relation to the work is accompanied by a notice which specifies—
- (i) the target fabric energy efficiency rate for the dwelling, calculated and expressed in accordance with the methodology approved pursuant to regulation 24,
- (ii) the fabric energy efficiency rate for the dwelling as designed, calculated and expressed in accordance with the methodology approved pursuant to regulation 24, and
- (iii) a list of specifications to which the dwelling is to be constructed;
- (b) in any other case, not later than the day before the work starts, give the building control authority a notice which specifies the matters set out in paragraphs (i) to (iii) of sub-paragraph (a).
- (3) The person carrying out the work must—
- (a) where the dwelling is within a higher-risk building, ensure the application for a completion certificate in relation to the work is accompanied by—
- (i) a notice which specifies—
- (aa) the target fabric energy efficiency rate for the dwelling, calculated and expressed in accordance with the methodology approved pursuant to regulation 24,
- (bb) the fabric energy efficiency rate for the dwelling as constructed, calculated and expressed in accordance with the methodology approved pursuant to regulation 24, and
- (cc) whether the dwelling has been constructed in accordance with the list of specifications referred to in paragraph (2), and, if not, a list of any changes to those specifications; or
- (ii) a certificate of the sort referred to in paragraph (4) accompanied by the information referred to in sub-paragraphs (aa) to (cc) of paragraph (i);
- (b) in any other case, not later than five days after the work has been completed, give the building control authority a notice which specifies the matters mentioned in sub-paragraphs (aa) to (cc) of sub-paragraph (a)(i) or a certificate of the sort mentioned in sub-paragraph (a)(ii).
- (4) A building control authority is authorised to accept, as evidence that the requirements of regulation 26A have been satisfied, a certificate to that effect by an energy assessor who is accredited to produce energy performance certificates for that category of building.
- (4A) Where the regulator is the building control authority by virtue of section 91ZB of the Act (the regulator: building control authority for other work), it must send a copy of each notice or certificate it receives under this regulation in relation to a building to the local authority for the area in which the building is situated.
- (5) In this Regulation, “specifications” means specifications used for the calculation of the fabric energy efficiency rate.
Fabric performance values calculations
27B
- (1) This regulation applies where a dwelling is erected and regulation 26B applies.
- (2) The person carrying out the work must—
- (a) where the dwelling is within a higher-risk building, ensure the application for building control approval in relation to the work is accompanied by a notice which specifies—
- (i) the target fabric performance values for the dwelling, calculated and expressed by the methodology approved under regulation 24,
- (ii) the fabric energy performance values for the dwelling as designed, calculated and expressed by the methodology approved pursuant to regulation 24, and
- (iii) a list of specifications to which the dwelling is to be constructed;
- (b) in any other case, not later than the day before the work starts give the building control authority a notice which specifies the matters set out in paragraphs (i) to (iii) of sub-paragraph (a).
- (3) The person carrying out the work must—
- (a) where the dwelling is within a higher-risk building, ensure the completion certificate application in relation to the work is accompanied by—
- (i) a notice which specifies—
- (aa) the target fabric performance values for the dwelling, calculated and expressed by the methodology approved pursuant to regulation 24,
- (bb) the fabric energy performance values for the dwelling as constructed, calculated and expressed by the methodology approved pursuant to regulation 24, and
- (cc) whether the dwelling has been constructed by the list of specifications referred to in paragraph (2), and if not, a list of any changes to those specifications, or
- (ii) a certificate of the sort referred to in paragraph (4) accompanied by the information referred to in sub-paragraphs (aa) to (cc) of paragraph (i);
- (b) in any other case, not later than 5 days after the work has been completed give the building control authority a notice which specifies the matters mentioned in sub-paragraphs (aa) to (cc) of sub-paragraph (a)(i) or a certificate of the sort mentioned in sub-paragraph (a)(ii).
- (4) A building control authority is authorised to accept, as evidence that the requirements of regulation 26B have been satisfied, a certificate to that effect by an energy assessor who is accredited to produce energy performance certificates for that category of building.
- (4A) Where the building control authority is a designated local authority under section 91ZD of the Act, it must send a copy of each notice or certificate it receives under this regulation in relation to a building to the local authority for the area in which the building is situated.
- (5) In this regulation, “specifications” means specifications used for the calculation of the fabric performance values.
Target primary energy rate calculations for new buildings
27C
- (1) This regulation applies where a building is erected.
- (2) The person carrying out the work must—
- (a) where the new building is a higher-risk building, ensure the application for building control approval in relation to the work is accompanied by a notice which specifies—
- (i) the target primary energy rate for the building, calculated and expressed in accordance with the methodology approved pursuant to regulation 24,
- (ii) the calculated target primary energy rate for the building as designed, calculated and expressed in accordance with the methodology approved pursuant to regulation 24, and
- (iii) a list of specifications to which the building is to be constructed;
- (b) in any other case, not later than the day before the work starts, give the building control authority a notice which specifies the matters set out in paragraphs (i) to (iii) of sub-paragraph (a).
- (3) The person carrying out the work must—
- (a) where the new building is a higher-risk building, ensure the application for a completion certificate in relation to the work is accompanied by—
- (i) a notice which specifies—
- (aa) the target primary energy rate for the building, calculated and expressed in accordance with the methodology approved pursuant to regulation 24,
- (bb) the calculated target primary energy rate for the building as constructed, calculated and expressed in accordance with the methodology approved pursuant to regulation 24, and
- (cc) whether the building has been constructed in accordance with the list of specifications referred to in paragraph (2), and, if not, a list of any changes to those specifications; or
- (ii) a certificate of the sort referred to in paragraph (4) accompanied by the information referred to in sub-paragraphs (aa) to (cc) of paragraph (i);
- (b) in any other case, not later than five days after the work has been completed, give the building control authority a notice which specifies the matters mentioned in sub-paragraphs (aa) to (cc) of sub-paragraph (a)(i) or a certificate of the sort mentioned in sub-paragraph (a)(ii).
- (4) A building control authority is authorised to accept, as evidence that the requirements of regulation 26C have been satisfied, a certificate to that effect by an energy assessor who is accredited to produce energy performance certificates for that category of building.
- (4A) Where the regulator is the building control authority by virtue of section 91ZB of the Act (the regulator: building control authority for other work), it must send a copy of each notice or certificate it receives under this regulation in relation to a building to the local authority for the area in which the building is situated.
- (5) In this regulation, “specifications” means specifications used for the calculation of the target primary energy rate.
Consequential improvements to energy performance
28
- (1) Paragraph (2) applies to an existing building with a total useful floor area over 1,000m² where the proposed building work consists of or includes—
- (a) an extension;
- (b) the initial provision of any fixed building services; or
- (c) an increase to the installed capacity of any fixed building services.
- (2) Subject to paragraph (3), where this paragraph applies, such work, if any, shall be carried out as is necessary to ensure that the building complies with the requirements of Part L of Schedule 1.
- (3) Nothing in paragraph (2) requires work to be carried out if it is not technically, functionally and economically feasible.
Energy performance certificates
29
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Recommendation reports
29A
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Energy assessors
30
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Related party disclosures
31
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Duty of care
32
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Right to copy documents
33
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Application of building regulations to educational buildings, buildings of statutory undertakers and Crown Buildings
34
- (1) Regulations 11(3), 21, 23(1)(a), 25 25(a), 25A, 25B, 26 ... and 35(1) apply (in so far as applicable by virtue of regulation 21) to—
- (a) educational buildings and buildings of statutory undertakers (notwithstanding section 4(1) of the Act);
- (b) Crown buildings; and
- (c) building work carried out or proposed to be carried out by Crown authorities.
- (2) In this regulation “educational buildings and buildings of statutory undertakers” means buildings which fall within paragraphs (a), (b) or (c) of section 4(1) of the Act.
Interpretation of Part 6
35
- (1) In this Part—
- “building” means the building as a whole or parts of it that have been designed or altered to be used separately;
- “building envelope” in relation to a building means the walls, floor, roof, windows, doors, roof windows and roof-lights;
- “Crown authority” means the Crown Estate Commissioners, a Minister of the Crown, a government department, any other person or body whose functions are performed on behalf of the Crown (not being a person whose functions are performed on behalf of Her Majesty in her private capacity), or a person acting in right of the Duchy of Lancaster or the Duchy of Cornwall;
- “Crown interest” means an interest belonging to Her Majesty in right of the Crown, or belonging to a Government Department, or held in trust for Her Majesty for the purposes of a government department;
- “Crown building” means a building in which there is a Crown interest or a Duchy interest;
- “Duchy interest” means an interest belonging to her Majesty in right of the Duchy of Lancaster, or belonging to the Duchy of Cornwall;
- “energy assessor” means an individual who is a member of an accreditation scheme approved by the Secretary of State in accordance with regulation 22 (accreditation schemes) of the Energy Performance of Buildings (England and Wales) Regulations 2012; ...
- “energy performance certificate” means a certificate which complies with the requirements of regulation 9 (energy performance certificates) or 9A (energy performance certificates in respect of excluded buildings) of the Energy Performance of Buildings (England and Wales) Regulations 2012;”;
- “energy performance of a building” means the calculated or measured amount of energy needed to meet the energy demand associated with a typical use of the building, which includes, inter alia, energy used for heating, cooling, ventilation, hot water and lighting;
- “fabric energy efficiency” means the space heating and cooling requirements per square metre of floor area of a new dwelling;
- “major renovation” means the renovation of a building where more than 25% of the surface area of the building envelope undergoes renovation; ...
- “nearly zero-energy building” means a building that has a very high energy performance, as determined in accordance with a methodology approved under regulation 24, where the nearly zero or very low amount of energy required should be covered to a very significant extent by energy from renewable sources, including energy from renewable sources produced on-site or nearby;
- “new dwelling” does not include a dwelling that is formed by a material change of use of a building.
- ...
- (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
PART 7 — Water Efficiency
Water efficiency of new dwellings
36
- (1) The potential consumption of wholesome water by persons occupying a new dwelling must not exceed the requirement in paragraph (2).
- (2) The requirement referred to in paragraph (1) is either—
- (a) 125 litres per person per day; or
- (b) in a case to which paragraph (3) applies, the optional requirement of 110 litres per person per day,
as measured in either case in accordance with a methodology approved by the Secretary of State.
- (3) This paragraph applies where the planning permission under which the building work is carried out—
- (a) specifies the optional requirement in paragraph (2)(b); and
- (b) makes it a condition that that requirement must be complied with.
- (4) In this Part, “new dwelling” does not include a dwelling that is formed by a material change of use of a building within the meaning of regulation 5(g).
Wholesome water consumption calculation
37
- (1) Where regulation 36 applies, the person carrying out the work must give the building control authority a notice which specifies—
- (a) which of the requirements in regulation 36(2)(a) or (b) applies to the dwelling; and
- (b) the potential consumption of wholesome water per person per day in relation to the completed dwelling.
- (2) The person carrying out the work must—
- (a) where the dwelling is within a higher-risk building, ensure the notice accompanies the application for a completion certificate in relation to the work;
- (b) in any other case, give the notice to the building control authority not later than five days after the work has been completed.
- (3) Where the regulator is the building control authority by virtue of section 91ZB of the Act (the regulator: building control authority for other work), it must send a copy of each notice it receives under this regulation in relation to a building to the local authority for the area in which the building is situated.
PART 7A — Automatic fire suppression systems
Provision of automatic fire suppression systems
37A
- (1) This regulation applies where building work consists of the erection or material change of use of a building in relation to—
- (a) care homes , which means places at which a care home service, within the meaning of Part 1 of the Regulation and Inspection of Social Care (Wales) Act 2016, is provided wholly or mainly to persons aged 18 or over;
- (aa) care homes for children, which means places at which a care home service, within the meaning of Part 1 of the Regulation and Inspection of Social Care (Wales) Act 2016, is provided wholly or mainly to persons aged under 18, but not—
- (i) an institution within the further education sector as defined by section 91(3) of the Further and Higher Education Act 1992;
- (ii) a place at which accommodation is provided for the purposes of—
- (aa) a holiday;
- (bb) a leisure, recreational, sporting, cultural or educational activity;
unless a person under 18 is accommodated there for more than 28 days in any 12 month period;
- (b) rooms for residential purposes other than rooms in—
- (i) a hostel providing temporary accommodation to those who are ordinarily resident elsewhere;
- (ii) an hotel;
- (iii) a prison or young offender institution; and
- (iv) a hospital;
- (c) dwelling-houses and flats,
subject to paragraphs (4) and (5).
- (2) For the purposes of this regulation a material change of use comprises or includes—
- (a) a change of use within regulation 5(a), (b), (c), (d), (g), (h) or (i);
- (b) a change in the purposes for which or the circumstances in which a building is used, so that after that change the building is used—
- (i) as a building described in paragraph (1)(a) where previously it was used as a building described in paragraph (1)(aa), or
- (ii) as a building described in paragraph (1)(aa) where previously it was used as a building described in paragraph (1)(a).
- (2A) Regulation 6 does not apply to the material change of use described in paragraph (2)(b).
- (3) A building to which this regulation applies must be provided with an automatic fire suppression system which is installed and operates in accordance with the requirements set in regulation 37B.
- (4) This regulation does not apply to buildings which are—
- (a) listed in accordance with section 76 of the Historic Environment (Wales) Act 2023;
- (b) in a conservation area designated in accordance with section 158 of the Historic Environment (Wales) Act 2023; or
- (c) included in the schedule of monuments maintained under section 3 of the Historic Environment (Wales) Act 2023,
where installation of a fire suppression system would unacceptably alter their character or appearance.
- (5) This regulation does not apply to temporary buildings with a planned time of use of two years or less.
Requirements of automatic fire suppression systems
37B
For the purposes of regulation 37A(3), the requirements of an automatic fire suppression system are the requirements set out in any document approved and issued under section 6 of the Building Act 1984 for the purpose of providing practical guidance as to the requirements of regulation 37A.
PART 8 — Information to be Provided by the Person Carrying Out Work
Fire safety information
38
- (1) This regulation applies where building work—
- (a) consists of or includes the erection or extension of a relevant building; or
- (b) is carried out in connection with a relevant change of use of a building,
and Part B of Schedule 1 imposes a requirement in relation to the work.
- (2) The person carrying out the work must give fire safety information to the responsible person no later than—
- (a) where the building, proposed building or extension to which the building work relates is not occupied during the building work, the date of completion of the work or the date of occupation of the building or the extension, whichever is the earlier;
- (b) in any other case, the date of completion of the work.
- (2A) The responsible person must give the person carrying out the work a notice acknowledging receipt of the fire safety information and confirming the information provided is sufficient to enable them to understand, operate and maintain the building (and the fire safety systems in it) after the building work in question.
- (2B) Subject to paragraph (2D), the person carrying out the work must give a notice to the relevant authority—
- (a) confirming that they have given the fire safety information to the responsible person pursuant to paragraph (2), and
- (b) stating that they have received the notice from the responsible person pursuant to paragraph (2A) or where they have not received the notice, stating the steps taken to obtain the notice from the responsible person and the dates they were taken.
- (2C) The notification under paragraph (2B) must be given no later than—
- (a) where regulation 20 (provisions applicable to self-certification schemes) applies to the work, 30 days after the date referred to in paragraph (2),
- (b) in any other case, five days after the date referred to in paragraph (2).
- (2D) Paragraphs (2B) and (2C) do not apply where regulation 20A (provisions applicable to third party certification schemes) applies to the work and instead paragraphs (2E) to (2G) apply.
- (2E) Where this paragraph applies, the person carrying out the work must notify the third party certifier appointed under regulation 12(6)(c)—
- (a) confirming that they have given the fire safety information to the responsible person pursuant to paragraph (2), and
- (b) stating that they have received the notice from the responsible person pursuant to paragraph (2A) or where they have not received the notice, stating the steps taken to obtain the notice from the responsible person and the dates they were taken.
- (2F) The notification under paragraph (2E) must be given no later than seven days after the date referred to in paragraph (2).
- (2G) Within 30 days of receiving the notification under paragraph (2E) the third party certifier appointed under regulation 12(6)(c) must notify the relevant authority confirming receipt of the notification under paragraph (2E).
- (3) In this regulation—
- (a) “fire safety information” means information relating to the design and construction of the building or extension, and the services, fittings and equipment provided in or in connection with the building or extension which will assist the responsible person to operate and maintain the building or extension with reasonable safety;
- (b) a “relevant building” is a building to which the Regulatory Reform (Fire Safety) Order 2005 applies, or will apply after the completion of building work;
- (c) a “relevant change of use” is a material change of use where, after the change of use takes place, the Regulatory Reform (Fire Safety) Order 2005 will apply, or continue to apply, to the building; and
- (d) “responsible person” has the meaning given by article 3 of the Regulatory Reform (Fire Safety) Order 2005.
Information about ventilation
39
- (1) This regulation applies where paragraph F1(1) of Schedule 1 imposes a requirement in relation to building work.
- (2) The person carrying out the work shall not later than five days after the work has been completed give sufficient information to the owner about the building's ventilation system and its maintenance requirements so that the ventilation system can be operated in such a manner as to provide adequate means of ventilation.
Information about use of fuel and power
40
- (1) This regulation applies where paragraph L1 of Schedule 1 imposes a requirement in relation to building work.
- (2) The person carrying out the work shall not later than five days after the work has been completed provide to the owner sufficient information about the building, the fixed building services and their maintenance requirements so that the building can be operated in such a manner as to use no more fuel and power than is reasonable in the circumstances.
Information about systems for on-site generation of electricity
40A
- (1) This regulation applies to building work in respect of a building in relation to which paragraph L2 of Schedule 1 applies.
- (2) The person carrying out the work must, not later than five days after the work has been completed, provide to the owner sufficient information about the system for on-site electricity generation in respect of its operation and maintenance requirements so that the system may be operated and maintained in such a manner as to produce the maximum electricity that is reasonable in the circumstances and delivers this electricity to the optimal place for use.
Information about overheating
40B
- (1) This regulation applies to building work in respect of a building where Part O of Schedule 1 applies where Part O of Schedule 1 imposes a requirement in relation to building work.
- (2) The person carrying out the work must, not later than five days after the work has been completed, give sufficient information to the owner about the provision made in accordance with Part O so that the systems in place further to Part O can be operated in such a manner as to protect against overheating.
PART 9 — Testing and Commissioning
Sound insulation testing
41
- (1) Subject to paragraph (4) below, this regulation applies to—
- (a) building work in relation to which paragraph E1 of Schedule 1 imposes a requirement; and
- (b) work which is required to be carried out to a building to ensure that it complies with paragraph E1 of Schedule 1 by virtue of regulation 6(1)(f) or 6(2)(b).
- (2) Where this regulation applies, the person carrying out the work shall, for the purpose of ensuring compliance with paragraph E1 of Schedule 1—
- (a) ensure that appropriate sound insulation testing is carried out in accordance with a procedure approved by the Secretary of State; and
- (b) give a copy of the results of the testing referred to in sub-paragraph (a) to the building control authority.
- (3) The results of the testing referred to in paragraph (2)(a) shall be—
- (a) recorded in a manner approved by the Secretary of State; and
- (b) given—
- (i) in the case where the building work is higher-risk building work, to the regulator with the application for a completion certificate in relation to the work;
- (ii) in any other case, to the building control authority not later than the date on which the notice required by regulation 16(4) of these Regulations or 22A(1) of the Building (Registered Building Control Approvers etc.) (England) Regulations 2024 is given.
- (3A) Where the regulator is the building control authority by virtue of section 91ZB of the Act (the regulator: building control authority for other work), it must send a copy of the results of the testing it receives under this regulation in relation to a building to the local authority for the area in which the building is situated.
- (4) Where building work consists of the erection of a dwelling-house or a building containing flats, this regulation does not apply to any part of the building in relation to which the person carrying out the building work notifies the building control authority—
- (i) in the case of building work which is higher-risk building work, not later than the date on which the application for building control approval for the work is submitted,
- (ii) in any other case, not later than the date on which notice of intention to start work is given under regulation 16(1),
that, for the purposes of achieving compliance of the work with paragraph E1 of Schedule 1, the person is using one or more design details approved by Robust Details Limited, provided that—
- (a) the notification specifies—
- (i) the part or parts of the building in respect of which the person is using the design detail;
- (ii) the design detail concerned; and
- (iii) the unique number issued by Robust Details Limited in respect of the specified use of that design detail; and
- (b) the building work carried out in respect of the part or parts of the building identified in the notification is in accordance with the design detail specified in the notification.
Mechanical ventilation air flow rate testing
42
- (1) This regulation applies where paragraph F1(1) of Schedule 1 imposes a requirement in relation to the creation of a new dwelling by building work.
- (2) The person carrying out the work shall, for the purpose of ensuring compliance with paragraph F1(1) of Schedule 1—
- (a) ensure that testing of the mechanical ventilation air flow rate is carried out in accordance with a procedure approved by the Secretary of State; and
- (b) give notice of the results of the testing to the building control authority .
- (3) The notice referred to in paragraph (2)(b) shall—
- (a) record the results and the data upon which they are based in a manner approved by the Secretary of State; and
- (b) be given to the building control authority not later than five days after the final test is carried out.
- (4) Where the regulator is the building control authority by virtue of section 91ZB of the Act (the regulator: building control authority for other work), it must send a copy of each notice it receives under this regulation in relation to a building to the local authority for the area in which the building is situated.
Pressure testing
43
- (1) This regulation applies to the erection of a building in relation to which paragraph L1(a)(i) of Schedule 1 imposes a requirement.
- (2) Where this regulation applies, the person carrying out the work shall, for the purpose of ensuring compliance with regulation 26 and regulation 26A and paragraph L1(a)(i) of Schedule 1—
- (a) ensure that—
- (i) pressure testing is carried out in such circumstances as are approved by the Secretary of State; and
- (ii) the testing is carried out in accordance with a procedure approved by the Secretary of State; and
- (b) subject to paragraph (5), give notice of the results of the testing to the building control authority.
- (3) The notice referred to in paragraph (2)(b) shall—
- (a) record the results and the data upon which they are based in a manner approved by the Secretary of State; and
- (b) be given to the building control authority not later than seven days after the final test is carried out.
- (4) A building control authority are authorised to accept, as evidence that the requirements of paragraph (2)(a)(ii) have been satisfied, a certificate to that effect by a person who is registered by ... Elmhurst Energy Systems Limited or the Air Tightness Testing and Measurement Association in respect of pressure testing for the air tightness of buildings.
- (5) Where such a certificate contains the information required by paragraph (3)(a), paragraph (2)(b) does not apply.
- (6) Where the regulator is the building control authority by virtue of section 91ZB of the Act (the regulator: building control authority for other work), it must send a copy of each notice or certificate it receives under this regulation in relation to a building to the local authority for the area in which the building is situated.
- (6) Where the building control authority is a designated local authority under section 91ZD of the Act, it must send a copy of each notice or certificate it receives under this regulation in relation to a building to the local authority for the area in which the building is situated.
Commissioning
44
- (1) This regulation applies to building work in relation to which paragraph F1(2) of Schedule 1 imposes a requirement, but does not apply to the provision or extension of any fixed system for mechanical ventilation or any associated controls where testing and adjustment is not possible.
- (2) This regulation also applies to building work in relation to which paragraph L1(b) of Schedule 1 imposes a requirement, but does not apply to the provision or extension of any fixed building service where testing and adjustment is not possible or would not affect the energy efficiency of that fixed building service.
- (3) Where this regulation applies the person carrying out the work shall, for the purpose of ensuring compliance with paragraph F1(2) or L1(b) of Schedule 1, give to the building control authority a notice confirming that the fixed building services have been commissioned in accordance with a procedure approved by the Secretary of State.
- (4) The notice must be given—
- (a) in the case where the building work is higher-risk building work for which an application for a completion certificate is required, to the regulator with the application;
- (b) in any other case, to the building control authority—
- (i) not later than the date on which the notice required by regulation 16(4) is required to be given; or
- (ii) where that regulation does not apply, not more than 30 days after completion of the work.
- (5) Where the regulator is the building control authority by virtue of section 91ZB of the Act (the regulator: building control authority for other work), it must send a copy of each notice it receives under this regulation in relation to a building to the local authority for the area in which the building is situated.
Commissioning in respect of a system for on-site electricity generation
44ZA
- (1) This regulation applies to building work in respect of a building in relation to which paragraph L2 of Schedule 1 imposes a requirement, but does not apply to the provision or extension of any system for on-site electricity generation where testing and adjustment is not possible.
- (2) Where this regulation applies the person carrying out the work must, for the purpose of ensuring compliance with paragraph L2 of Schedule 1, give to the building control authority a notice confirming that the system for on-site electricity generation has been commissioned.
- (3) The notice must be given—
- (a) in the case where the building work is higher-risk building work for which an application for a completion certificate is required, to the regulator with the application;
- (b) in any other case, to the building control authority—
- (i) not later than the date on which the notice required by regulation 16(4) of these Regulations or 22A(1) of the Building (Registered Building Control Approvers etc.) (England) Regulations 2024 is required to be given; or
- (ii) where that regulation does not apply, not more than 30 days after completion of the work.
- (4) Where the regulator is the building control authority by virtue of section 91ZB of the Act (the regulator: building control authority for other work), it must send a copy of each notice it receives under this regulation in relation to a building to the local authority for the area in which the building is situated.
PART 9A — Infrastructure for electronic communications
Exemptions from paragraphs RA1 and RA2 of Schedule 1
44ZB
- (1) The requirements of paragraphs RA1 and RA2 of Schedule 1 (gigabit-ready physical infrastructure and connection to gigabit-capable network) do not apply to buildings—
- (a) to be occupied by the Ministry of Defence or the armed forces of the Crown, or
- (b) to be otherwise occupied for purposes connected to national security.
- (2) The requirements of paragraph RA1 of Schedule 1 do not apply in relation to a building if all the following conditions are met—
- (a) the building is situated in an area that is isolated from public electronic communications networks of any of the kinds mentioned in regulation 44ZC(2) or (3),
- (b) paragraph RA2 of that Schedule does not apply because the case falls within regulation 44ZC(4), and
- (c) the prospect of a connection with a network of any of the kinds mentioned in regulation 44ZC(2) or (3) is considered too remote to justify equipping the building with gigabit-ready physical infrastructure or an access point.
Cases in which paragraph RA2 of Schedule 1 modified or excluded
44ZC
- (1) The requirement in paragraph RA2 of Schedule 1 has effect subject to paragraphs (2) to (4).
- (2) Where a person carrying out building work of the kind described in the second column of paragraph RA1 of Schedule 1 (“the developer”)—
- (a) is unable to secure the provision of a connection with a gigabit-capable public electronic communications network for a cost not exceeding the cost cap, but
- (b) is able to secure the provision of a connection with a high-speed public electronic communications network for such a cost,
paragraph RA2 of Schedule 1 is to be read as requiring the provision of a connection with a high-speed public electronic communications network.
- (3) Where the developer—
- (a) is unable to secure the provision of a connection with a high-speed public electronic communications network for a cost not exceeding the cost cap, but
- (b) is able to secure the provision of a connection with a USO-standard public electronic communications network for such a cost,
paragraph RA2 of Schedule 1 is to be read as requiring the provision of a connection with a USO-standard public electronic communications network.
- (4) Where the developer is unable to secure the provision of a connection with a USO-standard public electronic communications network for a cost not exceeding the cost cap, paragraph RA2 of Schedule 1 does not apply.
- (5) In paragraphs (2) to (4)—
- “high-speed public electronic communications network” means a public electronic communications network that is a high-speed electronic communications network;
- “USO-standard public electronic communications network” means a public electronic communications network that provides at least the minimum download speed for the time being specified by virtue of section 65(2B)(a) of the Communications Act 2003 in the universal service order (as defined by section 151(1) of that Act).
- (6) The developer is to be treated as being able to secure the provision of a connection mentioned in any of paragraphs (2) to (4) for a cost not exceeding the cost cap unless—
- (a) the developer has invited at least two suitable providers to make, before the end of the 30th day after the date of the invitation, an offer to provide a connection of the kind mentioned in the paragraph in question, and
- (b) none of those providers has before that time offered to provide that connection free of charge or at a cost not exceeding the cost cap.
- (7) The cost cap is £2,000 in respect of each dwelling.
- (8) In calculating the cost to the developer of securing the provision of a connection—
- (a) there is to be included value added tax;
- (b) there is to be excluded—
- (i) the cost to the developer of installing gigabit-ready physical infrastructure in accordance with paragraph RA1 of Schedule 1,
- (ii) administrative costs of the developer, and
- (iii) the cost to an end-user (as defined by section 151(1) of the Communications Act 2003) of the provision of a public electronic communications service.
- (9) In paragraph (6)(a) “suitable provider” means the provider of a public electronic communications network whom the developer reasonably considers to be likely to be able to provide the connection referred to.
Particulars of connection to public electronic communications network
44ZAA
- (1) This regulation applies to building work consisting of the erection of a dwelling or a building that is to contain one or more dwellings.
- (2) Not later than the day before the work described in paragraph (1) starts, the person carrying out that work shall supply to the building control authority—
- (a) particulars of any public electronic communications network in relation to which a connection is to be provided,
- (b) if an exemption in regulation 44ZB is proposed to be relied on, evidence in support of the exemption, and
- (c) if regulation 44ZC is proposed to be relied on—
- (i) evidence of the matters mentioned in regulation 44ZC(6)(a) and (b), and
- (ii) if paragraph RA1(1)(c)(i) or (ii) of Schedule 1 is also proposed to be relied on, evidence of the steps taken to establish whether, and if so where, a distribution point for a gigabit-capable public electronic communications network (as defined by regulation 44C) is likely to be installed, in a location relevant for the purposes of paragraph RA1(1)(c), within the period of 2 years beginning with the day on which either a building notice, initial notice or public body’s notice is given..
- (3) Where the building control authority is a designated local authority under section 91ZD of the Act, it must send a copy of the information it receives under this regulation in relation to a building to the local authority for the area in which the building is situated.
Exemptions from paragraphs RA1 and RA2 of Schedule 1
44ZB
- (1) The requirements of paragraphs RA1 and RA2 of Schedule 1 (gigabit-ready physical infrastructure and connection to gigabit-capable network) do not apply to buildings—
- (a) to be occupied by the Ministry of Defence or the armed forces of the Crown, or
- (b) to be otherwise occupied for purposes connected to national security.
- (2) The requirements of paragraph RA1 of Schedule 1 do not apply in relation to a building if all the following conditions are met—
- (a) the building is situated in an area that is isolated from public electronic communications networks of any of the kinds mentioned in regulation 44ZC(2) or (3),
- (b) paragraph RA2 of that Schedule does not apply because the case falls within regulation 44ZC(4), and
- (c) the prospect of a connection with a network of any of the kinds mentioned in regulation 44ZC(2) or (3) is considered too remote to justify equipping the building with gigabit-ready physical infrastructure or an access point.
Cases in which paragraph RA2 of Schedule 1 modified or excluded
44ZC
- (1) The requirement in paragraph RA2 of Schedule 1 has effect subject to paragraphs (2) to (4).
- (2) Where a person carrying out building work of the kind described in the second column of paragraph RA1 of Schedule 1 (“the developer”)—
- (a) is unable to secure the provision of a connection with a gigabit-capable public electronic communications network for a cost not exceeding the cost cap, but
- (b) is able to secure the provision of a connection with a high-speed public electronic communications network for such a cost,
paragraph RA2 of Schedule 1 is to be read as requiring the provision of a connection with a high-speed public electronic communications network.
- (3) Where the developer—
- (a) is unable to secure the provision of a connection with a high-speed public electronic communications network for a cost not exceeding the cost cap, but
- (b) is able to secure the provision of a connection with a USO-standard public electronic communications network for such a cost,
paragraph RA2 of Schedule 1 is to be read as requiring the provision of a connection with a USO-standard public electronic communications network.
- (4) Where the developer is unable to secure the provision of a connection with a USO-standard public electronic communications network for a cost not exceeding the cost cap, paragraph RA2 of Schedule 1 does not apply.
- (5) In paragraphs (2) to (4)—
- “high-speed public electronic communications network” means a public electronic communications network that is a high-speed electronic communications network;
- “USO-standard public electronic communications network” means a public electronic communications network that provides at least the minimum download speed for the time being specified by virtue of section 65(2B)(a) of the Communications Act 2003in the universal service order (as defined by section 151(1) of that Act).
- (6) The developer is to be treated as being able to secure the provision of a connection mentioned in any of paragraphs (2) to (4) for a cost not exceeding the cost cap unless—
- (a) the developer has invited at least two suitable providers to make, before the end of the 30th day after the date of the invitation, an offer to provide a connection of the kind mentioned in the paragraph in question, and
- (b) none of those providers has before that time offered to provide that connection free of charge or at a cost not exceeding the cost cap.
- (7) The cost cap is £2,000 in respect of each dwelling.
- (8) In calculating the cost to the developer of securing the provision of a connection—
- (a) there is to be included value added tax;
- (b) there is to be excluded—
- (i) the cost to the developer of installing gigabit-ready physical infrastructure in accordance with paragraph RA1 of Schedule 1,
- (ii) administrative costs of the developer, and
- (iii) the cost to an end-user (as defined by section 151(1) of the Communications Act 2003) of the provision of a public electronic communications service.
- (9) In paragraph (6)(a) “suitable provider” means the provider of a public electronic communications network whom the developer reasonably considers to be likely to be able to provide the connection referred to.
Application of paragraph R1 of Schedule 1 to educational buildings, buildings of statutory undertakers and Crown buildings
44A
- (1) The requirements of paragraph R1 (in-building physical infrastructure for high-speed electronic communications networks) of Schedule 1 apply (insofar as applicable to other buildings) also to—
- (a) educational buildings and buildings of statutory undertakers (notwithstanding section 4(1) of the Act);
- (b) Crown buildings; and
- (c) building work carried out or proposed to be carried out by Crown authorities.
- (2) In this regulation “educational buildings and buildings of statutory undertakers” means buildings that fall within paragraphs (a), (b) or (c) of section 4(1) of the Act
Exemptions from paragraph R1 of Schedule 1
44B
The requirements of paragraph R1 (in-building physical infrastructure for high-speed electronic communications networks) of Schedule 1 do not apply to the following types of building or building work—
- (a) buildings which are—
- (i) listed in accordance with section 1 of the Planning (Listed Buildings and Conservation Areas) Act 1990 section 76 of the Historic Environment (Wales) Act 2023, or
- (ii) in a conservation area designated in accordance with section 69 of that Act section 158 of the Historic Environment (Wales) Act 2023, or
- (iii) included in the schedule of monuments maintained under section 1 of the Ancient Monuments and Archaeological Areas Act 1979 section 3 of the Historic Environment (Wales) Act 2023,
where compliance with paragraph R1 of Schedule 1 would unacceptably alter their character or appearance;
- (b) buildings—
- (i) occupied by the Ministry of Defence or the armed forces of the Crown, or
- (ii) otherwise occupied for purposes connected to national security;
- (c) buildings situated in isolated areas where the prospect of high-speed connection is considered too remote to justify equipping the building with high-speed ready in-building physical infrastructure or an access point;
- (d) major renovation works in cases in which the cost of compliance with paragraph R1 of Schedule 1 would be disproportionate to the benefit gained.
Interpretation of Part 9A and of Part R of Schedule 1
44C
In this Part and in Part R of Schedule 1—
- “access point” means a physical point, located inside or outside the building, accessible to undertakings providing or authorised to provide public communications networks, where connection to the high-speed ready in-building physical infrastructure , or as the case requires the gigabit-ready physical infrastructure, is made available;
- “gigabit-capable electronic communications network” means an electronic communications network that is capable of delivering broadband access services at download speeds of at least 1,000 Mbps;
- “gigabit-capable public electronic communications network” means a public electronic communications network that is a gigabit-capable electronic communications network;
- “gigabit-ready physical infrastructure” means physical infrastructure or installations, including elements under joint ownership, intended to host wired or wireless gigabit-capable public electronic communications networks;
- “high-speed electronic communications network” means an electronic communications network which is capable of delivering broadband access services at speeds of at least 30 Mbps;
- “high-speed ready in-building physical infrastructure” means in-building physical infrastructure intended to host elements, or enable delivery, of high-speed electronic communications networks;
- “in-building physical infrastructure” means physical infrastructure or installations at the end-user’s location, including elements under joint ownership, intended to host wired or wireless access networks, where such access networks are capable of delivering electronic communications services and connecting the building access point with the network termination point;
- “major renovation works” means works at the end-user’s location encompassing structural modifications of the entire in-building physical infrastructure, or of a significant part of it;
- “network termination point” means a physical point at which an occupier is provided with access to high-speed electronic communications networks.
- “public electronic communications network” has the meaning and “public electronic communications service” have the meanings given by section 151(1) of the Communications Act 2003.
PART 9B — Infrastructure for the charging of electric vehicles
Application of paragraph S1 of Schedule 1 (the erection of new residential buildings)
44D
- (1) The requirements of paragraph S1 of Schedule 1 apply in relation to the erection of a new residential building with associated parking as follows.
- (2) The number of electric vehicle charge points that must be installed is the maximum number of electric vehicle charge points that it is possible to install at an average sum of £3600 or less for the connection cost of each electric vehicle charge point connection (“the £3600 cap”).
- (3) If it is not possible to completely fulfil the requirements of paragraph S1(2) of Schedule 1 as a result of the operation of the £3600 cap, cable routes for electric vehicle charge points must be installed in the associated parking spaces that would otherwise be required to have electric vehicle charge points, but for the operation of the £3600 cap.
- (4) Where the new residential building has, or will have, associated parking that is situated within a covered car park—
- (a) if there are or will be any associated parking spaces situated in a position other than in a covered car park—
- (i) the requirements of paragraph S1 of Schedule 1 must first be applied in relation to those parking spaces; then
- (ii) if the number of associated parking spaces, which are situated in a position other than in a covered car park, is insufficient to completely fulfil the requirements of paragraph S1(2) of Schedule 1, cable routes for electric vehicle charge points must be installed in—
- (aa) the number of parking spaces in the covered car park which, when added to the number of associated parking spaces which are situated in a position other than in the covered car park, corresponds to the total number of dwellings with associated parking, where the total number of associated parking spaces is 10 or less;
- (bb) all the associated parking spaces in the covered car park, where the total number of associated parking spaces is both less than the number of dwellings with associated parking and 10 or less; and
- (cc) all the associated parking spaces in the covered car park, where the total number of associated parking spaces is more than 10;
- (b) if all the associated parking spaces are situated in a covered car park, cable routes for electric vehicle charge points must be installed—
- (i) where there are 10 or fewer parking spaces—
- (aa) in the number of associated parking spaces in the covered car park which corresponds to the total number of dwellings with associated parking;
- (bb) in all the parking spaces where there are fewer parking spaces than there are dwellings;
- (ii) in all the parking spaces in the covered car park, where there are more than 10 parking spaces.
Application of paragraph S2 of Schedule 1 (dwellings resulting from a material change of use)
44E
- (1) The requirements of paragraph S2 of Schedule 1 apply to a building, or a part of a building, undergoing a material change of use to result in one or more dwellings as follows.
- (2) The requirements of paragraph S2 of Schedule 1 apply—
- (a) if—
- (i) the circumstances specified in regulation 5(a), (b) or (g) apply; and
- (ii) the material change of use involves building work being done which includes work being done to any of the following—
- (aa) to a car park that is located within the site boundary of the building, where the nature of the work is such that it would be reasonable to expect that work to include enabling the requirements of paragraph S2 of Schedule 1 to be fulfilled;
- (bb) the electrical infrastructure of a car park, where that car park is located within the site boundary of the building;
- (cc) the electrical infrastructure of the building, where a car park is located inside the building;
- (b) subject to paragraph (3), if an electric vehicle charge point for each dwelling resulting from a building, or a part of a building, undergoing a material change of use can be accommodated within the incoming electrical supply to the building without having to upgrade the capacity of the incoming electrical supply to the building; and
- (c) if the building is not one in relation to which paragraph (4) applies.
- (3) If paragraph (2)(a) and (c) applies, but electric vehicle charge points for some but not all of the dwellings resulting from a building, or a part of a building, undergoing a material change of use can be accommodated within the incoming electrical supply to that building—
- (a) the requirements of paragraph S2 of Schedule 1 apply in respect of the maximum number of electric vehicle charge points that can be accommodated within the incoming electrical supply; and
- (b) cable routes for electric vehicle charge points must be installed in the associated parking spaces that would otherwise have been required under paragraph S2 of Schedule 1 to have had electric vehicle charge points installed.
- (4) The requirements of paragraph S2 of Schedule 1 do not apply if a building, or a part of a building, is—
- (a) listed in accordance with section 1 of the Planning (Listed Buildings and Conservation Areas) Act 1990;
- (b) in a conservation area designated in accordance with section 69 of that Act; or
- (c) included in the schedule of monuments maintained under section 1 of the Ancient Monuments and Archaeological Areas Act 1979,
where compliance with the requirements of paragraph S2 of Schedule 1 would unacceptably alter the building’s character or appearance.
- (5) If the building, or a part of a building, undergoing a material change of use to result in one or more dwellings has, or will have, associated parking that is situated within a covered car park—
- (a) if there are or will be any associated parking spaces situated in a position other than in a covered car park—
- (i) the requirements of paragraph S2 of Schedule 1 must first be applied in relation to those associated parking spaces; then
- (ii) if the number of associated parking spaces, which are situated in a position other than in a covered car park, is insufficient to completely fulfil the requirements of paragraph S2 of Schedule 1, cable routes for electric vehicle charge points must be installed in—
- (aa) all the associated parking spaces in the covered car park, where the total number of parking spaces is less than the number of such dwellings with associated parking; or
- (bb) the number of associated parking spaces in the covered car park which, when added to the number of associated parking spaces which are situated in a position other than in a covered car park, corresponds to the total number of such dwellings with associated parking;
- (b) if all the associated parking spaces are situated in a covered car park, cable routes for electric vehicle charge points must be installed in—
- (i) all those associated parking spaces, where there are fewer parking spaces than there are such dwellings with associated parking; or
- (ii) the number of those associated parking spaces that corresponds to the total number of such dwellings with associated parking.
Application of paragraph S3 of Schedule 1 (residential buildings undergoing major renovation)
44F
- (1) The requirements of paragraph S3 of Schedule 1 apply to a residential building undergoing major renovation as follows.
- (2) The requirements of paragraph S3 of Schedule 1 apply if—
- (a) the major renovation involves building work being done which includes work being done to any of the following—
- (i) a car park that is located within the site boundary of the building, where the nature of the work is such that it would be reasonable to expect that work to include enabling the requirements of paragraph S3 of Schedule 1 to be fulfilled;
- (ii) the electrical infrastructure of a car park, where the car park is located within the site boundary of the building;
- (iii) the electrical infrastructure of the building, where a car park is located inside the building;
- (b) the residential building will have more than 10 associated parking spaces upon completion of that work;
- (c) subject to paragraph (3), all the required electric vehicle charge points can be accommodated within the incoming electrical supply to the building;
- (d) the cost of installing all the required electric vehicle charge points and cable routes for electric vehicle charge points does not exceed 7% of the total cost of the major renovation; and
- (e) the residential building is not one in relation to which paragraph (5) applies.
- (3) If paragraph (2)(a), (b) and (e) applies, but all the required electric vehicle charge points cannot be accommodated within the incoming electrical supply to the building—
- (a) the requirements of paragraph S3 of Schedule 1 apply in respect of the maximum number of electric vehicle charge points that can be accommodated within the incoming electrical supply to the building; and
- (b) cable routes for electric vehicle charge points must be installed in all remaining associated parking spaces.
- (4) If the cost of installing the required electric vehicle charge points and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation—
- (a) the residential building is exempt from the requirement to install any electric vehicle charge point; and
- (b) cable routes for electric vehicle charge points must be installed in all associated parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.
- (5) The requirements of paragraph S3 of Schedule 1 do not apply to a residential building which is undergoing major renovation for the principal purpose of improving the fire safety of the external walls or roof of the building.
- (6) If a residential building undergoing major renovation has, or will have more than 10 associated parking spaces—
- (a) if there are or will be any associated parking spaces situated in a position other than in a covered car park—
- (i) the requirements of paragraph S3 of Schedule 1 must first be applied in relation to those associated parking spaces; then
- (ii) cable routes for electric vehicle charge points must be installed in all the associated parking spaces in the covered car park;
- (b) if all the associated parking spaces are situated in a covered car park, cable routes for electric vehicle charge points must be installed in all the parking spaces in the covered car park.
Application of paragraph S4 of Schedule 1 (erection of new buildings which are not residential buildings or mixed-use buildings)
44G
- (1) The requirements of paragraph S4 of Schedule 1 apply to the erection of a new building which is not a residential building or a mixed-use building (“new building”) as follows.
- (2) If such a new building has, or will have, within its site boundary, more than 10 parking spaces—
- (a) if there are or will be any parking spaces situated in a position other than in a covered car park—
- (i) the requirements of paragraph S4 of Schedule 1 must first be applied in relation to those parking spaces; then
- (ii) if the number of parking spaces which are situated in a position other than in a covered car park is insufficient to completely fulfil the requirements of paragraph S4 of Schedule 1, cable routes for electric vehicle charge points must be installed in a sufficient number of parking spaces in the covered car park in order to ensure compliance with the requirements of paragraph S4(b) of Schedule 1;
- (b) if all the parking spaces are situated in a covered car park, cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of those parking spaces.
Application of paragraph S5 of Schedule 1 (buildings undergoing major renovation which are not residential buildings or mixed-use buildings)
44H
- (1) The requirements of paragraph S5 of Schedule 1 apply to a building undergoing major renovation, which is not a residential building or a mixed-use building, as follows.
- (2) The requirements of paragraph S5 of Schedule 1 apply to such a building if—
- (a) the major renovation involves building work being done which includes work being done to any of the following—
- (i) a car park that is located within the site boundary of the building, where the nature of the work is such that it would be reasonable to expect the requirements of paragraph S5 of Schedule 1 to be fulfilled;
- (ii) the electrical infrastructure of a car park, where the car park is located within the site boundary of the building;
- (iii) the electrical infrastructure of the building, where a car park is located inside the building;
- (b) upon completion of that major renovation, the building will have more than 10 parking spaces situated within the site boundary of the building;
- (c) the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points does not exceed 7% of the total cost of the major renovation.
- (3) If the cost of installing the required electric vehicle charge point and cable routes for electric vehicle charge points exceeds 7% of the total cost of the major renovation—
- (a) such a building is exempt from the requirement to install the electric vehicle charge point; and
- (b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of parking spaces, except where the cost of that installation exceeds 7% of the total cost of the major renovation.
- (4) If such a building has, or will have, within its site boundary, more than 10 parking spaces—
- (a) if there are or will be any parking spaces situated in a position other than in a covered car park—
- (i) the requirements of paragraph S5 of Schedule 1 must first be applied in relation to those parking spaces; then
- (ii) if the number of parking spaces which are situated in a position other than in a covered car park is insufficient to completely fulfil the requirements of paragraph S5 of Schedule 1, cable routes for electric vehicle charge points must be installed in the number of parking spaces in the covered car park in order to ensure compliance with the requirements of paragraph S5(b) of Schedule 1;
- (b) if all the parking spaces are situated in a covered car park, cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of those parking spaces.
Application of paragraph S6 of Schedule 1 (the erection of new mixed-use buildings and mixed-use buildings undergoing major renovation)
44I
- (1) The requirements of paragraph S6 of Schedule 1 apply to the erection of a new mixed-use building and a mixed-use building undergoing major renovation as follows.
- (2) The requirements of paragraph S6 of Schedule 1 apply if, upon completion, such a mixed-use building will have at least one parking space situated within the site boundary of the building.
- (3) If such a mixed-use building has, or will have, within its site boundary, a covered car park—
- (a) if there are or will be any parking spaces situated in a position other than in a covered car park—
- (i) the requirements of paragraph S6 of Schedule 1 must first be applied in relation to those parking spaces; then
- (ii) if the number of parking spaces, which are situated in a position other than in a covered car park, is insufficient to completely fulfil the requirements of paragraph S6 of Schedule 1, cable routes for electric vehicle charge points must be installed in accordance with—
- (aa) regulation 44D(4)(a), in relation to the associated parking spaces for one or more dwellings in a new mixed-use building;
- (bb) regulation 44F(6)(a), in relation to the associated parking spaces for one or more dwellings in a mixed-use building undergoing major renovation;
- (cc) regulation 44G(2)(a), in relation to the parking spaces for one or more premises that are not dwellings in a new mixed-use building;
- (dd) regulation 44H(4)(a), in relation to the parking spaces for one or more premises that are not dwellings in a mixed-use building undergoing major renovation;
- (b) if all the parking spaces are situated in a covered car park, cable routes for electric vehicle charge points must be installed in accordance with—
- (i) regulation 44D(4)(b), in relation to the associated parking spaces for one or more dwellings in a new mixed-use building;
- (ii) regulation 44F(6)(b), in relation to the associated parking spaces for one or more dwellings in a mixed-use building undergoing major renovation;
- (iii) regulation 44G(2)(b), in relation to the parking spaces for one or more new premises that are not dwellings in a new mixed-use building;
- (iv) regulation 44H(4)(b), in relation to the parking spaces for one or more premises that are not dwellings in a mixed-use building undergoing major renovation.
Minimum standards of an electric vehicle charge point
44J
- (1) For the purposes of this Part and Part S of Schedule 1, an electric vehicle charge point must meet the following minimum standards.
- (2) It must be capable of providing a reasonable power output for each parking space for which it is intended to be used.
- (3) It must be run on a dedicated circuit.
- (4) It must be compatible with all vehicles which may require access to it.
Interpretation of this Part and Part S of Schedule 1
44K
In this Part and Part S of Schedule 1—
- “associated parking”, or “associated parking space”, in relation to a building, means any parking space that is available within the site boundary of the building, for the use by the occupant of, or a visitor to, a dwelling in the building, including any parking space which is for the use of any occupant of, or any visitor to, any dwelling in a building containing more than one dwelling;
- “building envelope” in relation to a building means the walls, floor, roof, windows, doors, roof windows and roof-lights;
- “cable route” means a safe, unobstructed route from the power supply to the envisaged electric vehicle charge point location, for electrical cabling to be installed in the future;
- “carport” means a shelter for one or more vehicles that—has a roof;has one or more open sides; andis not situated underneath or inside a building;
- “connection cost” means the cost of upgrades needed to the electricity system in order to accommodate an electric vehicle charge point, excluding the cost of any building work or the cost of the electric vehicle charge point itself;
- “covered car park” means one or more parking spaces which are situated beneath a roof, but it does not include a carport or a residential garage;
- “electric vehicle” means a vehicle that is capable of being propelled by electrical power derived from a storage battery;
- “electric vehicle charge point” means a device intended for charging a vehicle that is capable of being propelled by electrical power derived from a storage battery (or for discharging electricity stored in such a vehicle);
- “major renovation” means the renovation of a building where more than 25% of the surface area of the building envelope undergoes renovation;
- “mixed-use building” means a building which contains—one or more dwellings; andone or more premises that are not dwellings;
- “residential building”—means a building which contains one or more dwellings; anddoes not include a mixed-use building;
- “residential garage” means a structure with at least three enclosed sides and a roof for housing one or more vehicles, for the sole use of the occupant of, or a visitor to, a single dwelling;
- “site boundary”, in relation to a building in respect of which building work is being carried out, means the boundary of the land, upon which that building is situated, that is controlled or owned by the same person who owns—that building; orin the case of the erection of a new building, the land upon which building work is being carried out;
- “vehicle” means a vehicle that is intended or adapted for use on roads.
PART 10 — Miscellaneous
Testing of building work
45
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Sampling of material
46
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Lapse of building control approval: commencement of work
46A
- (1) For the purposes of section 32(6) of the Act (lapse of building control approval) work is to be regarded as commenced in accordance with the following paragraphs.
- (2) Where the work consists of the construction of a complex building, work is to be regarded as commenced in relation to that building or the first stage of building work for that building when the foundations supporting the building and the structure of the lowest floor level of that building (but not the other buildings or structures to be supported by those foundations) are completed.
- (3) Where the work consists of—
- (a) the construction of a building and paragraph (2) does not apply; or
- (b) horizontal extension of a building,
work is to be regarded as commenced when the sub-surface structure of the building or the extension including all foundations, any basement level (if any) and the structure of ground floor level is completed.
- (4) Where the work consists of any other building work then work is to be regarded as commenced, where a statement under—
- (a) regulation 14(1)(f)(vii), or
- (b) regulation 12(1)(e)(viii) of the Building (Higher-Risk Buildings Procedures) (England) Regulations 2023,
sets outs details of the work which the client considers amounts to 15% of the proposed work, when the work detailed in the statement is completed.
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.