The Building Regulations 2010
These Regulations revoke and replace the Building Regulations 2000 (S.I. 2000/2531) (“the 2000 Regulations”), and consolidate all subsequent amendments to those Regulations with minor amendments. The amendments include removing the requirement, where building work involves inserting insulation into a cavity wall, to submit along with a building notice a statement about the proposed insulating material. The Regulations also insert into Schedule 3 three new types of work that may be carried out under a self-certification scheme, and revise the list of bodies which are able to register persons for the purposes of self-certification. The three new types of work are the installation of cavity wall insulating material, replacement of roof coverings and installation of systems to produce electricity, heat or cooling by microgeneration or from renewable sources. The authorisation of this last category of work supports the implementation of article 14 of European Parliament and Council Directive 2009/28/EC on the promotion of the use of energy from renewable sources (OJ No. L140, 5.6.2009, p.16).
- (5) In this regulation—
- “approved plans” means plans which were part of or accompanied the application for building control approval with full plans of the building work and which was granted building control approval, or plans approved under a requirement imposed on such an approval;
- “complex building” means—a building which is to be constructed on the same foundation plinth or podium as any other building or structure;a building which has more than one storey below ground level;a building where it is proposed use is primarily as a public building where the public or a section of the public has access to the building (whether or not on payment) provided that the building has a capacity for 100 or more visitors;
- “public building” means—a shop or shopping centre,premises where food or drink are sold for consumption on the premises, including a nightclub, social club or dance hall;a stadium, theatre, cinema, concert hall;a sports ground;an exhibition hall or conference centre;a hospital or premises for the provision of health care.
Lapse of building control approval: commencement of work: Wales
46B
- (1) For the purposes of section 32(6) of the Act (lapse of building control approval) work is to be regarded as commenced in accordance with the following paragraphs.
- (2) Where the work consists of the construction of a complex building, work is to be regarded as commenced in relation to that building or the first stage of building work for that building when the foundations supporting the building and the structure of the lowest floor level of that building (but not the other buildings or structures to be supported by those foundations) are completed.
- (3) Where the work consists of—
- (a) the construction of a building and paragraph (2) does not apply, or
- (b) horizontal extension of a building,
work is to be regarded as commenced when the sub-surface structure of the building or the extension including all foundations, any basement level (if any) and the structure of ground floor level is completed.
- (4) Where the work consists of any other building work, and that work will be incorporated into the completed building, then the work is to be regarded as commenced when—
- (a) it reaches the point at which the project requires building control input, and
- (b) without such building control input, at that point, there would be grounds for enforcement.
- (5) In this regulation—
- “complex building” means—a building which is to be constructed on the same foundation plinth or podium as any other building or structure;a building which has more than one storey below ground level;a building where it is proposed use is primarily as a public building where the public or a section of the public has access to the building (whether or not on payment) provided that the building has a capacity for 100 or more visitors;
- “public building” means—a shop or shopping centre;premises where food or drink are sold for consumption on the premises, including a nightclub, social club or dance hall;a stadium, theatre, cinema, concert hall;a sports ground;an exhibition hall or conference centre;a hospital or premises for the provision of health care.
Contravention of certain regulations not to be an offence
47
The following regulations are designated as provisions to which section 35 of the Act (penalty for contravening building regulations) does not apply—
- (a)
- (i) regulation 14A (determination of applications for building control approval with full plans),
- (ii) regulation 15A (consultation in relation fire safety),
- (iii) regulation 16(3D) and (3E) (notice as to commencement of work),
- (iv) regulation 17 (completion certificates),
- (v) regulation 17A (certificate for building occupied before work is completed),
- (vi) regulation 18(6A) (unauthorised building work),
- (vii) regulation 18E(8) and (12) (appeals under section 101A of the Act),
- (viii) regulation 19C(2) (regulator’s notices: grounds for rejection),
- (ix) regulation 19E (regulator’s notices: direction),
- (x) regulation 20(6A) (provisions applicable to self-certification schemes),
- (xi) regulation 20A(7A) (provisions applicable to third party certification schemes),
- (xii) regulation 25A(3A) (consideration of high-efficiency alternative systems for new buildings),
- (xiii) regulation 27(4A) (CO₂ emission rate calculations),
- (xiv) regulation 27A(4A) (fabric energy efficiency rate calculations),
- (xv) regulation 27C(4A) (target primary energy rate calculations for new buildings),
- (xvi) regulation 37(3) (wholesome water consumption calculation),
- (xvii) regulation 41(3A) (sound insulation testing),
- (xviii) regulation 42(4) (mechanical ventilation air flow rate testing),
- (xix) regulation 43(6) (pressure testing),
- (xx) regulation 44(5) (commissioning),
- (xxi) regulation 44ZA(4) (commissioning in respect of a system for on-site electricity generation),
- (xxii) regulation 47B (compliance notices: contents),
- (xxiii) regulation 47C (stop notices: contents),
- (xxiv) regulation 47D(3) (compliance and stop notices: notification),
- (xxv) regulation 47E(2) (compliance and stop notices: withdrawal), and
- (b) regulations 23, 25B and 26, in so far as these Regulations apply to Crown buildings or to building work carried out or proposed to be carried out by Crown authorities.
Compliance notices: excluded provisions
47A
The following provisions of these Regulations are prescribed for the purposes of section 35B(7)(a) of the Act as provisions in relation to which a compliance notice may not be given—
- (a) regulation 14A (determination of applications for building control approval with full plans),
- (b) regulation 15A (consultation in relation fire safety),
- (c) regulation 16(3D) and (3E) (notice as to commencement of work),
- (d) regulation 17 (completion certificates),
- (e) regulation 17A (certificate for building occupied before work is completed),
- (f) regulation 18(6A) (unauthorised building work),
- (g) regulation 18E(8) and (12) (appeals under section 101A of the Act),
- (h) regulation 19C(2) (regulator’s notices: grounds for rejection),
- (i) regulation 19E (regulator’s notices: direction),
- (j) regulation 20(6A) (provisions applicable to self-certification schemes),
- (k) regulation 20A(7A) (provisions applicable to third party certification schemes),
- (l) regulation 25A(3A) (consideration of high-efficiency alternative systems for new buildings),
- (m) regulation 27(4A) (CO₂ emission rate calculations),
- (n) regulation 27A(4A) (fabric energy efficiency rate calculations),
- (o) regulation 27C(4A) (target primary energy rate calculations for new buildings),
- (p) regulation 37(3) (wholesome water consumption calculation),
- (q) regulation 41(3A) (sound insulation testing),
- (r) regulation 42(4) (mechanical ventilation air flow rate testing),
- (s) regulation 43(6) (pressure testing),
- (t) regulation 44(5) (commissioning),
- (u) regulation 44ZA(4) (commissioning in respect of a system for on-site electricity generation),
- (v) regulation 47B (compliance notices: contents),
- (w) regulation 47C (stop notices: contents),
- (x) regulation 47D(3) (compliance and stop notices: notification),
- (y) regulation 47E(2) (compliance and stop notices: withdrawal).
Compliance notices: contents
47B
- (1) A compliance notice given by a building control authority must be in writing and state—
- (a) that it is a compliance notice under section 35B of the Act;
- (b) the date the notice is given;
- (c) the name or description of the recipient; and
- (d) the consequences of failing to comply with the notice.
- (2) A compliance notice must additionally—
- (a) describe the issue to which the notice relates;
- (b) identify the provision of building regulations, or the requirement imposed by virtue of building regulations, to which the compliance notice relates;
- (c) provide details of the nature of the contravention or likely contravention;
- (d) state that the notice may be withdrawn by the building control authority;
- (e) state that the recipient may apply to the First-tier Tribunal under section 39A(3) of the Act for an extension of the specified period for doing anything set out in the notice and state that any application must be made within 21 relevant days of the date the notice is given;
- (f) state that the recipient may appeal to the First-tier Tribunal under section 39A(1) of the Act and state that any appeal must be made within 21 relevant days of the date the notice is given.
- (3) A compliance notice must relate to no more than one contravention or likely contravention of building regulations or a requirement imposed by virtue of building regulations.
Stop notices: contents
47C
- (1) A stop notice given by a building control authority must be in writing and state—
- (a) that it is a stop notice under section 35C(1)(a), 35C(1)(b) or, as the case may be, 35C(1)(c) of the Act;
- (b) the date the notice is given and whether the notice applies immediately, or where it does not apply immediately, the date when it applies;
- (c) the name or description of the recipient; and
- (d) the consequences of failing to comply with the notice.
- (2) A stop notice must additionally—
- (a) describe the issue to which the notice relates;
- (b) specify—
- (i) in a case within section 35C(1)(a) of the Act, the provision of building regulations or requirement imposed by virtue of building regulations to which the stop notice relates;
- (ii) in a case within section 35C(1)(b) of the Act, the compliance notice to which the stop notice relates;
- (iii) in a case within section 35C(1)(c) of the Act, the provision of building regulations or requirement imposed by virtue of building regulations to which the stop notice relates;
- (c) provide details of the nature of the contravention (including, in a case within section 35C(1)(c) of the Act, the nature of the serious harm that is anticipated);
- (d) state that the recipient may appeal to the First-tier Tribunal under section 39A(5) of the Act and state that any appeal must be made within 21 relevant days of the date the notice is given; and
- (e) state that the recipient may apply to the First-tier Tribunal under section 39A(6) of the Act for a direction.
- (3) A stop notice must relate to—
- (a) in a case within section 35C(1)(a) of the Act, no more than one contravention of a prescribed provision of building regulations or requirement imposed by virtue of such a provision;
- (b) in a case within section 35C(1)(b) of the Act, no more than one compliance notice;
- (c) in a case within section 35C(1)(c) of the Act, no more than one contravention of a provision of building regulations or a requirement imposed by virtue of such a provision.
Compliance notices and stop notices: giving of notices and notification of others
47D
- (1) Paragraph (2) applies where a compliance notice under section 35B of the Act or a stop notice under section 35C(1) of the Act is to be given in relation to work on a site or premises and another form of service under section 94(1) of the Act is not appropriate.
- (2) Where, after reasonable inquiries, the building control authority is satisfied that there is no one to whom a compliance notice or stop notice can be delivered, the notice, or a copy of it, may be affixed to a conspicuous part of the site or premises where the work to which the notice relates is carried out.
- (3) Where a building control authority gives a compliance notice or stop notice, the authority must take reasonable steps to notify the following persons as to the giving of the notice—
- (a) the client, the principal contractor (or sole contractor) and the principal designer (or sole or lead designer) for the work to which the notice relates;
- (b) where the regulator is the building control authority, the local authority for the area in which the building is situated or the proposed building is to be situated;
- (c) where the notice relates to a contravention of Part B of Schedule 1 in relation to a building to which the Regulatory Reform (Fire Safety) Order 2005 applies or will apply after completion of the work, the enforcing authority (within the meaning of article 25 of that Order) for the building or the proposed building;
- (d) where the client is—
- (i) in relation to any work, a private registered provider of social housing,
- (ii) in relation to work other than the erection of a new building, any other registered provider of social housing,
the Regulator of Social Housing;
- (e) where the client is a landlord in relation to any dwelling contained in the building, the local housing authority for the area in which the building is located; and
- (f) where the notice relates to work to an existing higher-risk building, the accountable person who is responsible for the part of the building where the work is carried out.
- (4) In this regulation—
- “accountable person” has the meaning in given in section 72 of the Building Safety Act 2022;
- “the Regulator of Social Housing” is the body established under section 80A of the Housing and Regeneration Act 2008.
Compliance and stop notices: withdrawal
47E
- (1) A building control authority may withdraw a compliance notice or stop notice.
- (2) Where a building control authority withdraws a compliance notice or stop notice it must as soon as reasonably practicable give the recipient a notice in writing to that effect.
Appeal to the First-tier Tribunal in relation to a compliance notice or stop notice
47F
- (1) An appeal to the First-tier Tribunal under section 39A(1) or (5) of the Act must be made by the relevant date.
- (2) The First-tier Tribunal may allow an appeal referred to in paragraph (1) only if it is satisfied that the giving of the compliance notice or stop notice in question was wrong on one or more of the following grounds—
- (a) that the notice was given based on an error of fact;
- (b) that the giving of the notice was wrong in law;
- (c) that the giving of the notice was unreasonable;
- (d) that the notice was given without following the procedures set out in the Act or regulations made under that Act (except regulation 47D(3)).
- (3) If the First-tier Tribunal allows an appeal referred to in paragraph (1) it may quash or vary the compliance notice or stop notice.
- (4) In this regulation the “relevant date” is—
- (a) in the case of an appeal under section 39A(1), within 21 relevant days beginning with the date the compliance notice is given; and
- (b) in the case of an appeal under section 39A(5), within 21 relevant days beginning with the date the stop notice is given.
Application to the First-tier Tribunal in relation to extension of the specified period in a compliance notice
47G
- (1) An application to the First-tier Tribunal under section 39A(3) of the Act in relation to a compliance notice must made within 21 relevant days beginning with the date the compliance notice is given.
- (2) In deciding the question set out in an application under section 39A(3) of the Act the First-tier Tribunal must consider whether the recipient of the notice has demonstrated they are unable to comply within the specified period and it is reasonable to extend it.
Application to the First-tier Tribunal for a direction in relation to a stop notice
47H
In deciding the question set out in an application to the First-tier Tribunal under section 39A(6) of the Act in relation to a stop notice, the First-tier Tribunal must consider whether it is fair and proportionate, having regard to any representations made, to give the direction.
Compliance notices: excluded provisions: Wales
47I
The following provisions of these Regulations are prescribed as provisions in relation to which a compliance notice may not be given under section 35B(7)(a) of the Act—
- (a) regulation 14D (determination of applications for building control approval with full plans: Wales);
- (b) regulation 15B (consultation in relation fire safety: Wales);
- (c) regulation 16(2B) and (2C) (notice as to commencement of work);
- (d) regulation 17 (completion certificates);
- (e) regulation 17A (certificate for building occupied before work is completed);
- (f) regulation 18(6A) (unauthorised building work);
- (g) regulation 18I(8) and (12) (appeals under section 101A of the Act: Wales);
- (h) regulation 20(6A) (provisions applicable to self-certification schemes);
- (i) regulation 25A(3A) (consideration of high-efficiency alternative systems for new buildings);
- (j) regulation 27(4A) (CO2 emission rate calculations);
- (k) regulation 27A(4A) (primary energy rate calculations);
- (l) 27B(4A) (fabric performance values calculations);
- (m) regulation 27C(5) (energy efficiency rating calculations);
- (n) regulation 37(3) (wholesome water consumption calculation);
- (o) regulation 41(3A) (sound insulation testing);
- (p) regulation 42(4) (mechanical ventilation air flow rate testing);
- (q) regulation 43(6) (pressure testing);
- (r) regulation 44(5) (commissioning);
- (s) regulation 44ZA(4) (commissioning in respect of a system for on-site electricity generation);
- (t) 44ZAA(3) (particulars of connection to public electronic communications network);
- (u) regulation 47J (compliance notices: contents: Wales);
- (v) regulation 47K (stop notices: contents: Wales);
- (w) regulation 47L(3) (compliance notices and stop notices: giving of notices and notification of others: Wales);
- (x) regulation 47M(2) (compliance and stop notices: withdrawal: Wales).
Compliance notices: contents: Wales
47J
- (1) A compliance notice given by a building control authority must be in writing and state—
- (a) that it is a compliance notice under section 35B of the Act,
- (b) the date the notice is given,
- (c) the name or description of the recipient, and
- (d) the consequences of failing to comply with the notice.
- (2) A compliance notice must additionally—
- (a) describe the issue to which the notice relates,
- (b) identify the provision of building regulations, or the requirement imposed by virtue of building regulations, to which the compliance notice relates,
- (c) provide details of the nature of the contravention or likely contravention,
- (d) state that the notice may be withdrawn by the building control authority,
- (e) state that the recipient may apply to the magistrates’ court under section 39A(3) of the Act for an extension of the specified period for doing anything set out in the notice and state that any application must be made within 15 ... days of the date the notice is given, and
- (f) state that the recipient may appeal to the magistrates’ court under section 39A(1) of the Act and state that any appeal must be made within 15 ... days of the date the notice is given.
- (3) A compliance notice must relate to no more than one contravention or likely contravention of building regulations or a requirement imposed by virtue of building regulations.
Stop notices: contents: Wales
47K
- (1) A stop notice given by a building control authority must be in writing and state—
- (a) that it is a stop notice under section 35C(1)(a), 35C(1)(b) or, as the case may be, 35C(1)(c) of the Act,
- (b) the date the notice is given and whether the notice applies immediately, or where it does not apply immediately, the date when it applies,
- (c) the name or description of the recipient, and
- (d) the consequences of failing to comply with the notice.
- (2) A stop notice must additionally—
- (a) describe the issue to which the notice relates,
- (b) specify—
- (i) in a case within section 35C(1)(a) of the Act, the provision of building regulations or requirement imposed by virtue of building regulations to which the stop notice relates;
- (ii) in a case within section 35C(1)(b) of the Act, the compliance notice to which the stop notice relates;
- (iii) in a case within section 35C(1)(c) of the Act, the provision of building regulations or requirement imposed by virtue of building regulations to which the stop notice relates,
- (c) provide details of the nature of the contravention (including, in a case within section 35C(1)(c) of the Act, the nature of the serious harm that is anticipated),
- (d) state that the recipient may appeal to the magistrates’ court under section 39A(5) of the Act and state that any appeal must be made within 15 ... days of the date the notice is given, and
- (e) state that the recipient may apply to the magistrates’ court under section 39A(6) of the Act for a direction.
- (3) A stop notice must relate to—
- (a) in a case within section 35C(1)(a) of the Act, no more than one contravention of a prescribed provision of building regulations or requirement imposed by virtue of such a provision;
- (b) in a case within section 35C(1)(b) of the Act, no more than one compliance notice;
- (c) in a case within section 35C(1)(c) of the Act, no more than one contravention of a provision of building regulations or a requirement imposed by virtue of such a provision.
Compliance notices and stop notices: giving of notices and notification to others: Wales
47L
- (1) Paragraph (2) applies where a compliance notice under section 35B of the Act or a stop notice under section 35C(1) of the Act is to be given in relation to work on a site or premises and another form of service under section 94(1) of the Act is not appropriate.
- (2) Where, after reasonable inquiries, the building control authority is satisfied that there is no one to whom a compliance notice or stop notice can be delivered, the notice, or a copy of it, may be affixed to a conspicuous part of the site or premises where the work to which the notice relates is carried out.
- (3) Where a building control authority gives a compliance notice or stop notice, the authority must take reasonable steps to notify the following persons as to the giving of the notice—
- (a) the client, the principal contractor (or sole contractor) and the principal designer (or sole or lead designer) for the work to which the notice relates,
- (b) where the notice relates to a contravention of Part B of Schedule 1 in relation to a building to which the Regulatory Reform (Fire Safety) Order 2005 applies or will apply after completion of the work, the enforcing authority (within the meaning of article 25 of that Order) for the building or the proposed building,
- (c) where the client is a landlord in relation to any dwelling contained in the building, the local housing authority for the area in which the building is located, and
- (d) where the notice relates to work to an existing higher-risk building, the responsible person who is responsible for the part of the building where the work is carried out.
Compliance and stop notices: withdrawal: Wales
47M
- (1) A building control authority may withdraw a compliance notice or stop notice.
- (2) Where the building control authority withdraws a compliance notice or stop notice it must as soon as reasonably practicable give the recipient a notice in writing to that effect.
Appeal to magistrates’ court in relation to a compliance notice or stop notice: Wales
47N
- (1) An appeal to the magistrates’ court under section 39A(1) or (5) of the Act must be made by the relevant date.
- (2) The magistrates’ court may allow an appeal referred to in paragraph (1) only if it is satisfied that the giving of the compliance notice or stop notice in question was wrong on one or more of the following grounds—
- (a) that the notice was given based on an error of fact;
- (b) that the giving of the notice was wrong in law;
- (c) that the giving of the notice was unreasonable;
- (d) that the notice was given without following the procedures set out in the Act or regulations made under that Act (except regulation 47L(3)).
- (3) If the magistrates’ court allows an appeal referred to in paragraph (1) it may quash or vary the compliance notice or stop notice.
- (4) In this regulation the “relevant date” is—
- (a) in the case of an appeal under section 39A(1), within 15 ... days beginning with the date the compliance notice is given, and
- (b) in the case of an appeal under section 39A(5), within 15 ... days beginning with the date the stop notice is given.
Application to the magistrates’ court in relation to extension of the specified period in a compliance notice: Wales
47O
- (1) An application to the magistrates’ court under section 39A(3) of the Act in relation to a compliance notice must be made within 15 ... days beginning with the date the compliance notice is given.
- (2) In deciding the question set out in an application under section 39A(3) of the Act the magistrates’ court must consider whether the recipient of the notice has demonstrated they are unable to comply within the specified period and it is reasonable to extend it.
Application to the magistrates’ court for a direction in relation to a stop notice: Wales
47P
- (1) In deciding the question set out in an application to the magistrates’ court under section 39A(6)(a) of the Act in relation to a stop notice, the magistrates’ court must consider whether it is fair and proportionate, having regard to any representations made, to give the direction.
Electronic service of documents
48
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Transitional provisions: interpretation
49
In regulations 50 to 53—
- “the 2009 Regulations” means the Building (Amendment No. 2) Regulations 2009 ;
- ...
Transitional provisions: work already started before 1st October
50
- (1) Subject to paragraph (2), where before 1st October 2010 building work is started in accordance with—
- (a) a building notice given to, or full plans deposited with, a local authority under regulation 12(2A) of the Building Regulations 2000 (giving of a building notice or deposit of plans) and a notice given to the local authority under regulation 15(1) of those Regulations (notice of commencement and completion of certain stages of work);
- (b) an initial notice or an amendment notice given in accordance with section 47(1) (giving and acceptance of initial notice) or 51A(2) of the Act (variation of work to which initial notice relates);
- (c) a public body's notice given in accordance with section 54 (giving, acceptance and effect of public body's notice) of the Act,
the Building Regulations 2000 as last amended by the 2009 Regulations shall continue to apply to that building work.
- (2) Where before 1st October 2010 building work is started in accordance with an initial notice which is varied by an amendment notice given on or after that date, the Building Regulations 2000 as last amended by the 2009 Regulations shall continue to apply to so much of the building work as could have been carried out under that initial notice if the amendment notice had not been given.
- (3) Where before 1st October 2010 building work is started to which regulation 12(5)(a) or (b) of the Building Regulations applies, the Building Regulations 2000 as last amended by the 2009 Regulations shall continue to apply to that building work.
Transitional provisions: work for which notification is not required
51
Where before 1st October 2010 a contract is entered into for the provision of building work to which regulation 12(5)(a) or (b) of the Building Regulations 2000 applies, the Building Regulations 2000 as last amended by the 2009 Regulations shall continue to apply to that work.
Transitional provisions: notice given or plans deposited before 1st October 2010
52
- (1) Subject to paragraph (2), the Building Regulations 2000 as last amended by the 2009 Regulations shall continue to apply in relation to building work where—
- (a) before 1st October 2010 a building notice, an initial notice, a plans certificate, an amendment notice or a public body's notice has been given to, or full plans deposited with, a local authority; and
- (b) the work is carried out or is to be carried out in accordance with any such notice or plans, whether with or without any departure from such plans,
provided that the work is started before 1st October 2011.
- (2) Where an initial notice given before 1st October 2010 is varied by an amendment notice given on or after that date, the Building Regulations 2000 as last amended by the 2009 Regulations shall continue to apply to so much of the building work as could have been carried out under that initial notice if the amendment notice had not been given, provided that the work is started before 1st October 2011.
Transitional and saving provisions: earlier Building Regulations
53
- (1) If immediately before 1st October 2010 any of the transitional provisions listed in paragraph (2) applied in relation to building work, the Regulations specified in Schedule 5 shall continue to apply in relation to that building work in accordance with that provision as if these Regulations had not been made.
- (2) The provisions are—
- (3) Regulation 22A of the Building Regulations 2000 (time limit for prosecution for contravention of certain regulations) shall continue to have effect in relation to contraventions of building regulations committed before 22nd September 2008 as if the 2009 Regulations had not been made.
- (4) If immediately before 1st October 2010 regulation 23 of the Building Regulations 2000 applied in relation to building work, the Regulations specified in Schedule 3 to those Regulations shall continue to apply in relation to that building work in accordance with that transitional provision as if these Regulations had not been made.
Revocations and consequential amendments
54
- (1) The Regulations specified in the first column of the table in Schedule 5 are revoked to the extent specified in relation to each in the third column of that table.
- (2) Schedule 6, which contains consequential amendments to the Building (Local Authority Charges) Regulations 2010 and the Energy Performance of Buildings (Certificates and Inspections) (England and Wales) Regulations 2007, has effect.
Review of Part 9A and Part R of Schedule 1
55
- (1) Before the end of each review period the Secretary of State must—
- (a) carry out a review of Part 9A and Part R of Schedule 1; and
- (b) publish a report setting out the conclusions of the review.
- (2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
- (3) The report must in particular—
- (a) set out the objectives intended to be achieved by the regulatory provision in Part 9A and Part R of Schedule 1;
- (b) assess the extent to which those objectives have been achieved;
- (c) assess whether those objectives remain appropriate; and
- (d) if those objectives remain appropriate, assess the extent to which they could be achieved in another way that imposes less onerous regulatory provision.
- (4) In this regulation, “review period” means—
- (a) the period of five years beginning on the 9th May 2016; and
- (b) subject to paragraph (5), each successive period of five years.
- (5) If a report under this regulation is published before the last day of the review period to which it relates, the next review period will begin with the day on which that report is published.
Review of Part 9B and Part S of Schedule 1
56
- (1) The Secretary of State must from time to time—
- (a) carry out a review of the regulatory provision contained in Part 9B of, and Part S of Schedule 1 to, these Regulations; and
- (b) publish a report setting out the conclusions of that review.
- (2) The first report must be published before 15th June 2027.
- (3) Subsequent reports must be published at intervals not exceeding 5 years.
- (4) Section 30(4) of the Small Business, Enterprise and Employment Act 2015 requires that a report published under this regulation must, in particular—
- (a) set out the objectives intended to be achieved by the regulatory provision referred to in paragraph (1)(a);
- (b) assess the extent to which those objectives are achieved;
- (c) assess whether those objectives remain appropriate; and
- (d) if those objectives remain appropriate, assess the extent to which they could be achieved in another way which involves less onerous regulatory provision.
- (5) In this regulation, “regulatory provision” has the same meaning as in sections 28 to 32 of the Small Business, Enterprise and Employment Act 2015 (see section 32 of that Act).
SCHEDULE 1 — Requirements
B1. The building shall be designed and constructed so that there are appropriate provisions for the early warning of fire, and appropriate means of escape in case of fire from the building to a place of safety outside the building capable of being safely and effectively used at all material times.
Requirement B1 does not apply to any prison provided under section 33 of the Prison Act 1952 (power to provide prisons etc).
Requirement B3(3) does not apply to material alterations to any prison provided under section 33 of the Prison Act 1952.
E1. Dwelling-houses, flats and rooms for residential purposes shall be designed and constructed in such a way that they provide reasonable resistance to sound from other parts of the same building and from adjoining buildings.
Requirement E3 only applies to corridors, stairwells, hallways and entrance halls which give access to the flat or room for residential purposes.
Requirement G5 applies only to dwellings and to buildings containing one or more rooms for residential purposes.
Requirement H1 does not apply to the diversion of water which has been used for personal washing or for the washing of clothes, linen or other articles to collection systems for reuse.
Requirements J1 and J2 apply only to fixed combustion appliances (including incinerators).
Requirement J3 applies only to fixed combustion appliances located in dwellings.
Requirement J4 applies only to fixed combustion appliances (including incinerators).
K1. Stairs, ladders and ramps shall be so designed, constructed and installed as to be safe for people moving between different levels in or about the building.
Requirement K1 applies only to stairs, ladders and ramps which form part of the building.
Requirement K2(a) applies only to stairs and ramps which form part of the building.
Requirement K4 does not apply to dwellings.
K1. Stairs, ladders and ramps shall be so designed, constructed and installed as to be safe for people moving between different levels in or about the building.
Requirement K1 applies only to stairs, ladders and ramps which form part of the building.
Requirement K2(a) applies only to stairs and ramps which form part of the building.
Requirement K5.1 does not apply to dwellings.
Requirement K5.2 does not apply to dwellings.
Requirement K5.3 does not apply to dwellings.
Requirement M2 does not apply where suitable access to the extension is provided through the building that is extended.
Requirement M3 does not apply where there is reasonable provision for sanitary conveniences elsewhere in the building, such that people occupied in, or otherwise having occasion to enter the extension, can gain access to and use those sanitary conveniences.
| Access to and use of buildings other than dwellings | Access to and use of buildings other than dwellings |
|---|---|
| M1.Reasonable provision must be made for people to—(a) gain access to; and(b) use, the building and its facilities. | Requirement M1 does not apply toany part of a building that is used solely to enable the building or any service or fitting in the building to be inspected, repaired or maintained. |
| Access to extensions to buildings other than dwellings | Access to extensions to buildings other than dwellings |
| M2.Suitable independent access must be provided to the extension where reasonably practicable. | Requirement M2 does not apply where suitable access to the extension is provided through the building that is extended. |
| Sanitary conveniences in extensions to buildings other than dwellings | Sanitary conveniences in extensions to buildings other than dwellings |
| M3.If sanitary conveniences are provided in any building that is to be extended, reasonable provision shall be made within the extension for sanitary conveniences. | Requirement M3 does not apply where there is reasonable provision for sanitary conveniences elsewhere in the building, such that people occupied in, or otherwise having occasion to enter the extension, can gain access to and use those sanitary conveniences. |
| Access to and use of dwellings | Access to and use of dwellings |
| Category 1- visitable dwelling M4(1).Reasonable provision must be made for people to—(a) gain access to; and(b) use, the dwelling and its facilitiesCategory 2- accessible and adaptable dwellingsM4(2) optional requirement(1) Reasonable provision must be made for people to—(a) gain access to; and(b) use, the dwelling and its facilities.(2) The provision made must be sufficient to—(a) meet the needs of occupants with differing needs, including some older or disabled people; and(b) to allow adaptation of the dwelling to meet the changing needs of occupants over time.Category 3- wheelchair user dwellingsM4(3) optional requirement(1) Reasonable provision must be made for people to—(a) gain access to; and(b) use, the dwelling and its facilities.(2) The provision made must be sufficient to—(a) allow simple adaptation of the dwelling to meet the needs of occupants who use wheelchairs; or(b) meet the needs of occupants who use wheelchairs. | Requirement M4(1) does not apply to:(a) an extension to a dwelling; or(b) any part of a building that is used solely to enable the building or any service or fitting in the building to be inspected, repaired or maintained.Optional requirement M4(2)—(a) may apply only in relation to a dwelling that is erected;(b) will apply in substitution for requirement M4(1);(c) does not apply where optional requirement M4(3) applies;(d) does not apply to any part of a building that is used solely to enable the building or any service or fitting in the building to be inspected, repaired or maintained.Optional requirement M4(3)—(a) may apply only in relation to a dwelling that is erected;(b) will apply in substitution for requirement M4(1);(c) does not apply where optional requirement M4(2) applies;(d) does not apply to any part of a building that is used solely to enable the building or any service or fitting in the building to be inspected, repaired or maintained.Optional requirement M4(3)(2)(b) applies only where the planning permission under which the building work is carried out specifies that it shall be complied with. |
Requirement N2 does not apply to dwellings.
Requirement N3 does not apply to dwellings.
| Overheating mitigation | Overheating mitigation |
|---|---|
| O1(1) Reasonable provision must be made in respect of a dwelling, institution or any other building containing one or more rooms for residential purposes, other than a room in a hotel (“residences”) to—(a) limit unwanted solar gains in summer;(b) provide an adequate means to remove heat from the indoor environment.(2) In meeting the obligations in paragraph (1)—(a) account must be taken of the safety of any occupant, and their reasonable enjoyment of the residence; and(b) mechanical cooling may only be used where insufficient heat is capable of being removed from the indoor environment without it. | |
| Overheating Mitigation | Overheating Mitigation |
| --- | --- |
| O1.—(1) Reasonable provision must be made to—(a) limit unwanted solar gains in summer;(b) provide an adequate means to remove heat from the indoor environment.(2) In meeting the obligations in sub-paragraph (1)—(a) account must be taken of the safety of any occupant, and their reasonable enjoyment of the building; and(b) mechanical cooling may only be used where insufficient heat is capable of being removed from the indoor environment without it. | Requirement O1 applies only to the erection of the following buildings—(a) a dwelling;(b) an institution; or(c) any other building containing one or more rooms for residential purposes (other than a room in a hotel). |
| Unauthorised access | Unauthorised access |
| --- | --- |
| Q1Reasonable provision must be made to deter and resist unauthorised access to—(a) any dwelling; and(b) any part of a building from which access can be gained to a flat within the building. | Requirement Q1 applies only in relation to new dwellings.Requirement Q1 applies only when a dwelling is erected. |
| Gigabit-ready physical infrastructure | Gigabit-ready physical infrastructure |
| --- | --- |
| RA1.—(1) Building work must be carried out so as to ensure that each dwelling or building that consists of one or more dwellings is equipped with gigabit-ready physical infrastructure that extends from a network termination point for gigabit-capable public electronic communications networks and reaches—(a) a distribution point, or(b) where the person carrying out the building work (“the developer”) has no right to install gigabit-ready physical infrastructure in land in which it would have to be installed if it were to reach a distribution point, as close as is reasonably practicable to a distribution point, or(c) where the developer has no such right and requirement RA2 is excluded or modified by regulation 44ZC, and would be so excluded or modified even if the gigabit-ready physical infrastructure were required to reach as close as is reasonably practicable to a distribution point—(i) as close as is reasonably practicable to a location at which a distribution point is likely to be installed within the relevant 2-year period (a “likely future location”), or(ii) where there is no likely future location that is closer to the building than the closest distribution point already installed, an access point for gigabit-capable public electronic communications networks, or(d) where the developer has no right to install gigabit-ready physical infrastructure in land beyond the building, an access point for gigabit-capable public electronic communications networks.(2) Where the work concerns a building containing more than one dwelling, the work must be carried out so as to ensure that the building is equipped in addition with a common access point for gigabit-capable public electronic communications networks.(3) In this paragraph—“distribution point” means a distribution point for a gigabit-capable public electronic communications network;“the relevant 2-year period” means the period of 2 years beginning with the earlier of the following—(a) the day on which a building notice, initial notice or public body’s notice relating to work to which this paragraph applies is given; or(b) the day on which an application for building control approval with full plans relating to building work to which this paragraph applies is given. | Requirements RA1 and RA2 apply to the erection of a dwelling or of a building that contains one or more dwellings. |
| Connection to gigabit-capable network | Connection to gigabit-capable network |
| RA2. Each dwelling must in addition be provided with a connection to a gigabit-capable public electronic communications network. | |
| High-speed ready in-building physical infrastructure | High-speed ready in-building physical infrastructure |
| R1(1) Building work must be carried out so as to ensure that the building is equipped with a high-speed ready in-building physical infrastructure, up to a network termination point for high-speed electronic communications networks.(2) Where the work concerns a building containing more than one dwelling, the work must be carried out so as ensure that the building is equipped in addition with a common access point for high-speed electronic communications networks. | Requirement R1 applies , other than building work to which paragraph RA1 applies, to building work that consists of—(a) the erection of a building; or(b) major renovation works to a building. |
| The erection of new residential buildings | The erection of new residential buildings |
| --- | --- |
| S1(1) A new residential building with associated parking must have access to electric vehicle charge points as provided for in paragraph (2).(2) The number of associated parking spaces which have access to electric vehicle charge points must be—(a) the total number of associated parking spaces, where there are fewer associated parking spaces than there are dwellings contained in the residential building; or(b) the number of associated parking spaces that is equal to the total number of dwellings contained in the residential building, where there are the same number of associated parking spaces as, or more associated parking spaces than, there are dwellings.(3) Cable routes for electric vehicle charge points must be installed in any associated parking spaces which do not, in accordance with paragraph (2), have an electric vehicle charge point where—(a) a new residential building has more than 10 associated parking spaces; and(b) there are more associated parking spaces than there are dwellings contained in the residential building. | |
| Dwellings resulting from a material change of use | Dwellings resulting from a material change of use |
| S2Where one or more dwellings with associated parking result from a building, or a part of a building, undergoing a material change of use at least one associated parking space for the use of each such dwelling must have access to an electric vehicle charge point. | |
| Residential buildings undergoing major renovation | Residential buildings undergoing major renovation |
| S3Where a residential building undergoing major renovation will have more than 10 associated parking spaces after the major renovation is completed—(a) at least one associated parking space for the use of each dwelling must have access to an electric vehicle charge point;(b) cable routes for electric vehicle charge points must be installed in all additional associated parking spaces. | |
| Erection of new buildings which are not residential buildings or mixed-use buildings | Erection of new buildings which are not residential buildings or mixed-use buildings |
| S4Where a new building which is not a residential building or a mixed-use building has more than 10 parking spaces—(a) one of those parking spaces must have access to one electric vehicle charge point; and(b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces. | |
| Buildings undergoing major renovation which are not residential buildings or mixed-use buildings | Buildings undergoing major renovation which are not residential buildings or mixed-use buildings |
| S5Where a building undergoing major renovation, which is not a residential building or a mixed-use building, will have more than 10 parking spaces after the major renovation is completed—(a) one of those parking spaces must have access to one electric vehicle charge point; and(b) cable routes for electric vehicle charge points must be installed in a minimum of one fifth of the total number of remaining parking spaces. | |
| The erection of new mixed-use buildings and mixed-use buildings undergoing major renovation | The erection of new mixed-use buildings and mixed-use buildings undergoing major renovation |
| S6(1) The requirements of paragraph S1 apply in respect of the part of the new mixed-use building that contains one or more dwellings and the associated parking spaces that are assigned to those dwellings.(2) The requirements of paragraph S3 apply in respect of the part of the mixed-use building that is undergoing major renovation that contains one or more dwellings and the associated parking spaces that are assigned to those dwellings.(3) The requirements of paragraph S4 apply in respect of the part of the new mixed-use building that contains one or more new premises that are not dwellings and the parking spaces that are assigned to those premises.(4) The requirements of paragraph S5 apply in respect of the part of the mixed-use building that is undergoing major renovation that contains one or more premises that are not dwellings and the parking spaces that are assigned to those premises. |
T1
- (1) Toilet accommodation in buildings other than dwellings—
- (a) must consist of—
- (i) reasonable provision for male and female single-sex toilets, or
- (ii) where space precludes provision of single-sex toilets, universal toilets, and
- (b) may consist of universal toilets in addition to single-sex toilets.
- (2) In this requirement—
- “single-sex toilet” means toilet facilities which—are intended for the exclusive use of persons of the same sex, andprovide washbasins and hand-drying facilities in—either the toilet room or cubicle, ora separate area intended for use only by persons of that sex.
- “universal toilet” means toilet facilities which—are provided in a fully enclosed room which contains a water-closet and washbasin and hand-drying facilities, andis intended for individual use by persons of either sex.
Requirement T1 does not apply to—
- (a) en-suite facilities in individual rooms for residential purposes;
- (b) residential rooms in care homes as defined at section 3 of the Care Standards Act 2000;
- (c) schools as defined in section 4 of the Education Act 1996;
- (d) premises, or part of any premises, used wholly or mainly for early years provision within the meaning of section 20 of the Childcare Act 2006 by an early years provider to whom section 40 of the Childcare Act 2006 (Duty to implement Early Years Foundation Stage) applies;
- (e) cellular accommodation in custodial facilities.
SCHEDULE 2 — Exempt Buildings and Work
CLASS 1
Buildings controlled under other legislation
1
- (1) Any building in which explosives are manufactured or stored under a licence granted under the Explosives Regulations 2014 where—
- (a) the whole building is used for that manufacture or storage, and either
- (b) a minimum separation distance of greater than 0 metres is prescribed by virtue of regulation 27(1) of, and Schedule 5 to, those Regulations; or
- (c) a minimum separation distance of 0 metres is prescribed by virtue of the provisions referred to in paragraph (b) and the assent of the local authority was required by regulation 13(3) of those Regulations or would have been so required but for regulation 13(4)(b), (c), (d), (e), (f) or (g) of those Regulations.
- (2) Where only a part of a building is used for the manufacture or storage of explosives under a licence granted under the Explosives Regulations 2014 and —
- (a) a minimum separation distance of greater than 0 metres is prescribed by virtue of regulation 27(1) of, and Schedule 5 to, those Regulations; or
- (b) a minimum separation distance of 0 metres is prescribed by virtue of the provisions referred to in paragraph (a) and the assent of the local authority was required by regulation 13(3) of those Regulations or would have been so required but for regulation 13(4)(b), (c), (d), (e), (f) or (g) of those Regulations,
that part of the building where the licence specifies that that manufacture or storage may take place.
2
Any building (other than a building containing a dwelling or a building used for office or canteen accommodation) erected on a site in respect of which a licence under the Nuclear Installations Act 1965 is for the time being in force.
3
A building included in the schedule of monuments maintained under section 1 of the Ancient Monuments and Archaeological Areas Act 1979 or under section 3 of the Historic Environment (Wales) Act 2023.
CLASS 2
Buildings not frequented by people
1
Subject to paragraph 2, a detached building—
- (a) into which people do not normally go; or
- (b) into which people go only intermittently and then only for the purpose of inspecting or maintaining fixed plant or machinery.
2
The description of buildings in paragraph 1 does not include a building where any point of the building is less than one and a half times its height from—
- (a) any point of a building into which people can or do normally go; or
- (b) the nearest point of the boundary of the curtilage of that building,
whichever is the nearer.
CLASS 3
Greenhouses and agricultural buildings
1
Subject to paragraph 3, a greenhouse.
2
A building used, subject to paragraph 3, for agriculture, or a building principally for the keeping of animals, provided in each case that—
- (a) no part of the building is used as a dwelling;
- (b) no point of the building is less than one and a half times its height from any point of a building which contains sleeping accommodation; and
- (c) the building is provided with a fire exit which is not more than 30 metres from any point in the building.
3
The descriptions of buildings in paragraphs 1 and 2 do not include a greenhouse or a building used for agriculture if the principal purpose for which they are used is retailing, packing or exhibiting.
4
In paragraph 2, “agriculture” includes horticulture, fruit growing, the growing of plants for seed and fish farming.
CLASS 4
Temporary buildings
A building which is not intended to remain where it is erected for more than 28 days.
CLASS 5
Ancillary buildings
1
A building on a site, being a building which is intended to be used only in connection with the disposal of buildings or building plots on that site.
2
A building on the site of construction or civil engineering works, which is intended to be used only during the course of those works and contains no sleeping accommodation.
3
A building, other than a building containing a dwelling or used as an office or showroom, erected for use on the site of and in connection with a mine or quarry.
CLASS 6
Small detached buildings
1
A detached single storey building, having a floor area which does not exceed 30m², which contains no sleeping accommodation and is a building—
- (a) no point of which is less than one metre from the boundary of its curtilage; or
- (b) which is constructed substantially of non-combustible material.
2
A detached building designed and intended to shelter people from the effects of nuclear, chemical or conventional weapons, and not used for any other purpose, if—
- (a) its floor area does not exceed 30m²; and
- (b) the excavation for the building is no closer to any exposed part of another building or structure than a distance equal to the depth of the excavation plus one metre.
3
A detached building, having a floor area which does not exceed 15m², which contains no sleeping accommodation.
CLASS 7
Extensions
The extension of a building by the addition at ground level of—
- (a) a conservatory, porch, covered yard or covered way; or
- (b) a carport open on at least two sides;
where the floor area of that extension does not exceed 30m², provided that in the case of a conservatory or porch which is wholly or partly glazed, the glazing satisfies the requirements of Part K4, K5.1, K5.2, K5.3, and K5.4 Part N of Schedule 1.
SCHEDULE 3 — Self-certification Schemes and Exemptions from Requirement to Give Building Notice or an application for building control approval with full plans
| Column 1**Type of Work | Column 2**Person carrying out work |
|---|---|
| 1. Installation of a heat-producing gas appliance. This paragraph does not apply to the provision of a masonry chimney. | A person, or an employee of a person, who is a member of a class of persons approved in accordance with regulation 3 of the Gas Safety (Installation and Use) Regulations 1998. |
| 2. Installation of—(a) an oil-fired combustion appliance; or(b) oil storage tanks and the pipes connecting them to combustion appliances. This paragraph does not apply to the provision of a masonry chimney. | A person registered in respect of that type of work by Association of Plumbing and Heating Contractors (Certification) Limited, Blue Flame Certification Limited, Building Engineering Services Competence Assessment Limited, Certsure LLP, ... or NAPIT Registration Limited, Oil Firing Technical Association Limited, .... |
| 3. Installation of a solid fuel-burning combustion appliance other than a biomass appliance. This paragraph does not apply to the provision of a masonry chimney. | A person registered in respect of that type of work by Association of Plumbing and Heating Contractors (Certification) Limited, Building Engineering Services Competence Assessment Limited, Certsure LLP, HETAS Limited, NAPIT Registration Limited or Oil Firing Technical Association Limited, .... |
| 4. Installation of a heating or hot water system, or its associated controls. | A person, or an employee of a person, who is a member of a class of persons approved in accordance with regulation 3 of the Gas Safety (Installation and Use) Regulations 1998, or a person registered in respect of that type of work by Association of Plumbing and Heating Contractors (Certification) Limited, ... Blue Flame Certification Limited, Building Engineering Services Competence Assessment Limited, Certsure LLP, HETAS Limited, NAPIT Registration Limited or Oil Firing Technical Association Limited, .... |
| 5. Installation of a mechanical ventilation or air conditioning system or associated controls, in a building other than a dwelling, that does not involve work on a system shared with parts of the building occupied separately. | A person registered in respect of that type of work by Blue Flame Certification Limited, Building Engineering Services Competence Assessment Limited, Certsure LLP or NAPIT Registration Limited, .... |
| 6. Installation of an air conditioning or ventilation system in a dwelling, that does not involve work on a system shared with other dwellings. | A person registered in respect of that type of work by Blue Flame Certification Limited, Building Engineering Services Competence Assessment Limited, Certsure LLP or NAPIT Registration Limited, .... |
| 7. Installation of an energy efficient lighting system or electric heating system, or associated electrical controls, in buildings other than dwellings. | A person registered in respect of that type of work by Blue Flame Certification Limited ..., Certsure LLP or NAPIT Registration Limited, .... |
| 8. Installation of fixed low or extra-low voltage electrical installations in dwellings. | A person registered in respect of that type of work by ... ... Blue Flame Certification Limited ..., Certsure LLP, NAPIT Registration Limited or Oil Firing Technical Association Limited, .... |
| 9. Installation of fixed low or extra-low voltage electrical installations in dwellings, as a necessary adjunct to or arising out of other work being carried out by the registered person. | A person registered in respect of that type of work by Association of Plumbing and Heating Contractors (Certification) Limited, ... Blue Flame Certification Limited ..., Certsure LLP or NAPIT Registration Limited, .... |
| 10. Installation, as a replacement, of a window, rooflight, roof window or door in an existing dwelling. | A person registered in respect of that type of work by Assure Certification Limited, ... ... Blue Flame Certification Limited, CERTASS Limited, Certsure LLP, by Fensa Limited under the Fenestration Self-Assessment Scheme or by NAPIT Registration Limited ..., .... |
| 11. Installation, as a replacement, of a window, rooflight, roof window or door in an existing building other than a dwelling. This paragraph does not apply to glass which is load bearing or structural or which forms part of glazed curtain walling or a revolving door. | A person registered in respect of that type of work by Assure Certification Limited, ... Blue Flame Certification Limited, CERTASS Limited, Certsure LLP, by Fensa Limited under the Fenestration Self-Assessment Scheme or by NAPIT Registration Limited ..., .... |
| 12. Installation of a sanitary convenience, sink, washbasin, bidet, fixed bath, shower or bathroom in a dwelling, that does not involve work on shared or underground drainage. | A person registered in respect of that type of work by Association of Plumbing and Heating Contractors (Certification) Limited, ... Building Engineering Services Competence Assessment Limited, Certsure LLP, HETAS Limited or NAPIT Registration Limited, .... |
| 13. Installation of a wholesome cold water supply or a softened wholesome cold water supply. | A person registered in respect of that type of work by Association of Plumbing and Heating Contractors (Certification) Limited, ... Building Engineering Services Competence Assessment Limited, Certsure LLP, HETAS Limited or NAPIT Registration Limited, .... |
| 14. Installation of a supply of non-wholesome water to a sanitary convenience fitted with a flushing device, that does not involve work on shared or underground drainage. | A person registered in respect of that type of work by Association of Plumbing and Heating Contractors (Certification) Limited, ... Building Engineering Services Competence Assessment Limited, Certsure LLP, HETAS Limited or NAPIT Registration Limited, .... |
| 15. Installation in a building of a system to produce electricity, heat or cooling—(a) by microgeneration; or(b) from renewable sources (as defined in Directive 2009/28/EC of the European Parliament and of the Council on the promotion of the use of energy from renewable sources). | A person registered in respect of that type of work by Association of Plumbing and Heating Contractors (Certification) Limited, ... Building Engineering Services Competence Assessment Limited, Certsure LLP, HETAS Limited, NAPIT Registration Limited or Oil Firing Technical Association Limited, .... |
| 16. Installation, as a replacement, of the covering of a pitched or flat roof and work carried out by the registered person as a necessary adjunct to that installation. This paragraph does not apply to the installation of solar panels. | A person registered in respect of that type of work by NAPIT Registration Limited or the National Federation of Roofing Contractors Limited. |
| 17. Insertion of insulating material into the cavity walls of an existing building. | A person registered in respect of that type of work by Blue Flame Certification Limited, CERTASS Limited, The Insulation Assurance Authority Limited ... under the Cavity Wall Insulation Self Certification Scheme, by Certsure LLP or NAPIT Registration Limited, .... |
| 18. Installation of insulating material to the internal walls of a building, not including the installation of flexible thermal linings. | A person registered in respect of that type of work by Blue Flame Certification Limited, British Board of Agrément, CERTASS Limited, Certsure LLP or NAPIT Registration Limited, .... |
| 19. Installation of insulating material to the external walls of a building, not including insulation of demountable-clad buildings. | A person registered in respect of that type of work by Blue Flame Certification Limited, British Board of Agrément, CERTASS Limited, Certsure LLP or NAPIT Registration Limited, .... |
| 20. Installation of insulating material to the external and internal walls of a building (“hybrid insulation”), not including insulation of demountable-clad buildings, and not including the installation of flexible thermal linings. | A person registered in respect of that type of work by Blue Flame Certification Limited, British Board of Agrément, CERTASS Limited, Certsure LLP or NAPIT Registration Limited .... |
SCHEDULE 3A — Third Party Certification Schemes and Exemptions from Requirement to Give Building Notice or an application for building control approval with full plans
| Column 1**Type of work | Column 2**Person inspecting work |
|---|---|
| Electrical installations in dwellings. | A person registered in respect of that type of work by ... NAPIT Registration Limited .... |
SCHEDULE 4 — Descriptions of Work where no Building Notice or an application for building control approval with full plans Required
1
Work consisting of—
- (a) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
- (b) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
- (c) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
- (d) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
- (e) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
- (f) in relation to an existing fixed building service, which is not a fixed internal or external lighting system—
- (i) replacing any part which is not a combustion appliance,
- (ii) adding an output device, or
- (iii) adding a control device,
where testing and adjustment of the work is not possible or would not affect the use by the fixed building service of no more fuel and power than is reasonable in the circumstances;
- (g) providing a self-contained fixed building service, which is not a fixed internal or external lighting system, where—
- (i) it is not a combustion appliance (other than a fixed flueless gas cooker),
- (ii) any electrical work associated with its provision is exempt from the requirement to give a building notice or an application for building control approval with full plans by virtue of regulation 9 or 12(6A),
- (iii) testing and adjustment is not possible or would not affect its energy efficiency, and
- (iv) in the case of a mechanical ventilation appliance, the appliance is not installed in a room containing an open-flued combustion appliance whose combustion products are discharged through a natural draught flue;
- (h) replacing an external door (where the door together with its frame has not more than 50% of its internal face area glazed);
- (i) in existing buildings other than dwellings, providing fixed internal lighting where no more than 100m² of the floor area of the building is to be served by the lighting;
- (j) replacing—
- (i) a sanitary convenience with one that uses no more water than the one it replaces,
- (ii) a washbasin, sink or bidet,
- (iii) a fixed bath,
- (iv) a shower,
- (v) a rainwater gutter, or
- (vi) a rainwater downpipe,
where the work does not include any work to underground drainage, and includes no work to the hot or cold water system or above ground drainage, which may prejudice the health or safety of any person on completion of the work;
- (k) in relation to an existing cold water supply—
- (i) replacing any part,
- (ii) adding an output device, or
- (iii) adding a control device;
- (l) providing a hot water storage system that has a storage vessel with a capacity not exceeding 15 litres, where any electrical work associated with its provision is exempt from the requirement to give a building notice or an application for building control approval with full plans by virtue of regulation 9 or 12(6)(b);
- (m) installation of thermal insulation in a roof space or loft space where—
- (i) the work consists solely of the installation of such insulation, and
- (ii) the work is not carried out in order to comply with any requirement of these Regulations.
2
Work which—
- (a) is not in a kitchen, or a special location;
- (b) does not involve work on a special installation; and
- (c) consists of—
- (i) adding light fittings and switches to an existing circuit, or
- (ii) adding socket outlets and fused spurs to an existing ring or radial circuit.
3
Work on—
- (a) telephone wiring or extra-low voltage wiring for the purposes of communications, information technology, signalling, control and similar purposes, where the wiring is not in a special location;
- (b) equipment associated with the wiring referred to in sub-paragraph (a);
- (c) pre-fabricated equipment sets and associated flexible leads with integral plug and socket connections.
3A
Installation of thermal insulation to suspended timber floors where the work—
- (a) consists of the installation of such insulation only; and
- (b) the work is not carried out in order to comply with any requirements of these Regulations.
4
For the purposes of this Schedule—
- “kitchen” means a room or part of a room which contains a sink and food preparation facilities;
- “self-contained” in relation to a fixed building service means consisting of a single appliance and any associated controls which is neither connected to, nor forms part of, any other fixed building service;
- “special installation” means an electric floor or ceiling heating system, an outdoor lighting or electric power installation, an electricity generator, or an extra-low voltage lighting system which is not a pre-assembled lighting set bearing the CE marking referred to in regulation 39 of the Electrical Equipment (Safety) Regulations 2016;
- “special location” means a location within the limits of the relevant zones specified for a bath, a shower, a swimming or paddling pool or a hot air sauna in the Wiring Regulations, seventeenth edition, published by the Institution of Electrical Engineers and the British Standards Institution as BS 7671: 2008.
SCHEDULE 4A — Green deal information
PART 1 — Green deal information to be included in energy performance certificates
1
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
7
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
10
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.