The National Grid (Hinkley Point C Connection Project) Order 2016

Type Statutory-Instrument
Publication 2016-01-19
Last updated 2017-12-28
State In force
Department King's Printer of Acts of Parliament
PDF Download
articles 1
Reform history JSON API
(1)Area (2)Plot
Sedgemoor District Council – Section A 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 14, 15, 16, 19, 23, 28, 29, 33, 34, 35, 36, 40, 41, 47, 50, 53, 54, 56, 60, 61, 62, 63, 64, 65, 70, 71, 74, 75, 78, 81, 82, 83, 84, 88, 89, 90, 91, 93 & 94
Sedgemoor District Council – Section B 4, 5, 8, 9, 12, 14, 15, 36, 37, 38, 39, 76, 78, 81, 84, 86, 119, 120, 125, 126, 127, 131, 132, 133, 134, 135, 140, 142, 151, 153, 159, 160, 167, 170, 171, 172, 174, 177.1, 177.2, 178, 179, 185, 186, 187, 188, 190, 191, 193, 194, 251, 252, 253, 254, 266, 269, 271, 272, 273, 274, 277, 278, 279, 280, 281, 285, 286, 288, 370, 371, 378, 380, 383, 385, 386, 392, 393, 394, 397, 399, 400, 401, 402, 403, 404, 406, 407, 408, 411, 412, 413, 417, 419, 420, 421, 422, 423, 424, 425, 426, 434, 454, 455, 461, 462, 463, 465, 470, 471, 472, 476, 477, 481, 482, 485, 491, 492, 494, 495, 498, 499, 500, 501, 510, 513, 514, 527, 528, 530, 531, 532, 533, 534, 535, 537, 538, 540, 542, 543, 545, 546, 547, 548, 551, 558, 560, 568, 572, 578, 579, 587, 588, 589, 591, 602, 603.1, 603.2, 603.3, 604.1, 604.2, 611, 612, 615, 619, 620, 625, 626, 627, 630, 631, 641, 654, 659, 660, 666, 676, 677 & 678
Sedgemoor District Council – Section C 1, 2, 14 & 18
Sedgemoor District Council and North Somerset Council – Section C 29 & 30
North Somerset Council – Section C 41, 50, 51, 58, 59, 62, 68, 83, 84, 85, 86, 88, 89, 93, 94, 98, 108, 111,112, 116, 136, 137, 147, 152, 153, 156, 157, 158, 159, 166, 169, 180, 187, 188, 189, 190, 191, 205, 206, 207, 209, 212, 213, 214, 215, 216, 217, 227, 228, 231, 240, 242, 244, 247, 248, 251, 252, 253, 271, 272, 276, 282, 283, 284 & 285
North Somerset Council – Section D 7, 8, 9, 10, 11, 12, 13, 17, 19, 22, 26, 27, 30, 32, 38, 39, 53, 54, 55, 56, 61, 62, 66, 68, 75, 76, 88, 89, 106, 112.1, 112.2, 112.3, 115, 117, 118, 173, 177, 178, 179, 180, 183, 185, 186, 187, 188, 189, 190, 192, 193, 194, 196, 197, 198, 199, 203, 204, 205, 210, 211, 212, 213, 229, 231, 232, 236, 237.1, 237.2, 240, 247, 248, 249, 251, 252, 253, 254, 255, 278, 279, 283, 284, 285, 286, 288, 289, 290, 296, 297, 304, 306, 308, 318.1, 318.2, 319, 321, 329, 339, 341, 345, 348, 349, 351, 352, 361, 367, 371, 372, 391, 394, 413, 416, 419, 422, 424, 430, 434, 438, 452, 453, 455, 464, 484, 485, 492, 494, 504, 506, 511, 514, 517, 521, 522, 529, 530, 544.1, 544.2, 545, 548, 557, 558, 559, 560, 561, 566, 567, 571, 572, 573, 574, 575, 591, 592, 593, 594, 595, 596, 602, 604, 605, 606, 611, 612, 613, 615, 616, 617, 620, 621, 622, 623, 625, 628, 629, 630, 631, 633, 636, 660.1, 660.2, 660.3, 660.4, 660.5, 661, 662, 663.1, 663.2, 664, 665, 666, 667, 668, 669, 670, 672, 673, 674, 675, 677, 678, 764, 765, 768, 769, 770, 771, 775, 776, 777, 780, 781.1, 781.2, 786, 787, 788, 789, 790, 791, 792, 793, 794, 795, 796, 797, 798, 799, 800, 801, 802, 803, 804, 805, 806, 807, 808, 809, 810, 811, 812, 813, 814, 815, 827, 828, 832, 835, 836, 837, 838, 839, 840, 841, 842, 843, 844, 845, 846, 847, 848, 849, 850, 851, 852, 853, 854, 855, 856, 857, 858, 859, 860, 861, 862, 863, 864, 865, 866, 867, 868, 869, 870, 871, 872, 873, 874, 875, 876, 877, 878, 879, 880, 881, 882, 884, 885, 886, 900, 901, 902, 903, 904, 906, 907, 908, 909, 910, 911, 912, 913, 914, 915, 916, 917, 918, 919, 920, 921, 922, 923, 924, 925, 926, 927, 928, 929, 930, 931, 932, 933, 934, 935, 936, 937, 938, 939, 943, 944, 949, 950, 951, 952, 953, 954, 955, 956, 957, 958, 959, 961, 962, 963, 964, 965, 966, 967, 968, 969, 970, 999 & 1000
North Somerset Council – Section E 11, 13, 14, 16, 19, 23, 29, 30, 44, 45, 54, 57, 65, 66, 68, 70, 77, 78, 79, 93, 95.1, 95.2, 96, 97, 98, 99.1, 99.2, 100.1, 100.2, 101, 115, 116, 119, 120, 126, 127, 128, 135, 136, 142, 143, 145, 155, 159, 168, 169, 170, 171, 174, 175, 207, 208, 209 & 210
North Somerset Council – Section F 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 20, 24, 25, 26, 27, 28, 31, 32, 33, 37, 39, 46, 47, 48, 57, 58, 59, 64, 69, 72, 74, 76, 78, 79, 81, 82, 83, 84, 88, 89, 90, 91, 138, 139, 140, 141, 142, 143, 144, 145, 146, 149, 150, 151, 152, 153, 154, 155, 156, 157, 158, 159, 166, 167, 168, 169, 170, 172, 199, 200, 201, 214.1, 214.2, 218, 219.1, 219.2, 222, 223, 224, 225, 228, 229, 232, 234, 235, 240, 243, 249, 253, 255, 258, 276, 278, 282, 284, 285, 293, 298, 302, 304 & 320
North Somerset Council – Section G 38, 39.1, 39.2, 42, 43, 45, 46, 47.1, 47.2, 48, 52, 53, 57, 58.1, 58.2, 59, 61, 64, 65, 69, 84, 107, 108, 111, 116, 118, 134, 137 & 138
North Somerset Council and Bristol City Council – Section G 139
Bristol City Council – Section G 143, 144, 145, 146, 147.1, 147.2, 148, 151, 248, 249, 250, 251, 252.1, 252.2, 253, 254, 255, 256, 257, 258, 259, 260, 262, 263, 264, 265, 266, 267, 268, 269, 270, 271, 272, 273, 274.1, 274.2, 275, 276, 277, 278, 279, 280, 281, 282, 283, 284, 285, 286, 287, 288, 289, 290, 291, 292, 293, 294, 295, 296, 297, 298, 299, 300, 301, 302, 303, 304, 305, 306, 307, 308, 309, 310, 311, 312, 313, 314, 315, 316, 317, 318, 322, 323, 324, 325, 326, 327, 328, 329, 330, 331, 332, 333, 334, 335, 338, 339, 340, 341, 342, 343, 344, 345, 346, 347, 359, 378, 398, 402, 403, 405, 437, 438, 439, 440, 474, 475, 476, 477, 478, 479, 480, 481, 482, 498, 499, 500, 501, 502, 503, 504, 514, 515, 517, 518, 519, 565 & 599

SCHEDULE 9 — DEEMED MARINE LICENCE

PART 1 — INTRODUCTORY

Interpretation

1
  • (1) In this licence—
  • “the 2008 Act” means the Planning Act 2008[^f00027];
  • “the 2009 Act” means the Marine and Coastal Access Act 2009[^f00028];
  • “authorised development” has the meaning given in paragraph 4;
  • “Environmental Statement” means the environmental statement (May 2014 – Documents 5.1 to 5.7.3.13, 5.8.1 to 5.19, 5.22.1, 5.22.2.1 to 5.22.3, 5.23.1 to 5.23.4, and 5.24), the environmental statement advertisement for consultation on increased pylon height within Bristol Port, Avonmouth (June 2015 - Document 5.34.2), the National Grid’s report of environmental statement sensitivity test advertisement (March 2015 – Document 8.8) and the documents contained in or named in the consolidated errata and changes (June 2015 – Document 5.30.B.1, 5.30.B.2 and 5.30.B.3) submitted by National Grid to support its application, as set out in the Guide to the Application Document 1.7I including Document 5.21.2A incorrectly referred to as superseded, Document 5.22.1A referred to as the latest when it is supplementary, but excluding Document 5.27 which does not form part of the Environmental Statement;
  • “licence holder” means the undertaker and any agent, contractor or sub-contractor acting on its behalf;
  • “licensed activity” means any activity described in Part 2 of this licence;
  • “maintain” includes inspect, repair, adjust, alter, remove, reconstruct or replace the authorised development, provided such works do not give rise to any materially new or materially different environmental effects to those identified in the Environmental Statement, and any derivative of “maintain” must be construed accordingly;
  • “mean high water springs” means the average of high water heights occurring at the time of the spring tides;
  • “MMO” means the Marine Management Organisation;
  • “Public Rights of Navigation Plan” means the plan listed in Part 4 of Schedule 2 (plans) to the Order and certified as the Public Rights of Navigation Plan by the Secretary of State under article 44 of the Order
  • “the Order” means the National Grid (Hinkley Point C Connection Project) Order 2016;
  • “SAC habitat” means the habitat within a Special Area of Conservation entered in the Register of European Sites, held by the Department for Environment, Food and Rural Affairs;
  • “the undertaker” means National Grid Electricity Transmission plc (registered company number 2366977);
  • “vessel” means every description of vessel, however propelled or moved, and includes a non-displacement craft, a personal watercraft, a barge, a jack up barge, a seaplane or helicopter on the surface of the water, a hydrofoil vessel, a hovercraft or any other amphibious vehicle and any other thing constructed or adapted for movement through, in or over water and which is at the time in, on or over water.
  • “Works Plans” means the plans listed in Part 8 of Schedule 2 (plans) to the Order and certified as the Works Plans by the Secretary of State under article 44 of the Order, references to a particular Works Plan must be construed accordingly
  • (2) Unless otherwise specified, all geographical co-ordinates given in this Schedule are in latitude and longitude degrees and minutes to two decimal places.

Addresses

2
  • (1) Unless otherwise advised in writing by the MMO, the address for postal correspondence with the MMO for the purposes of this licence is the Marine Management Organisation, Marine Licensing Team, Lancaster House, Newcastle Business Park, Newcastle upon Tyne, NE4 7YH and where contact to the MMO Local Office is required, the following contact details should be used: The Fish Quay, Sutton Harbour, Plymouth, Devon PL4 0LH, Tel: 01752 228 001 Fax: 01752 221 239.
  • (2) Unless otherwise advised in writing by the MMO, the address for electronic communication with the MMO for the purposes of this licence is marine.consent@marinemanagement.org.uk and where contact to the MMO Local Office is required, the following address should be used: plymouth@marinemanagement.org.uk.

PART 2 — LICENSED ACTIVITIES

3

Subject to the licence conditions in Part 4 of this licence, this licence authorises the licence holder to carry out any licensable marine activities under section 66(1) of the 2009 Act which involve the construction, alteration or improvement of any works in or over the sea or on or under the sea bed and which—

  • (a) form part of the authorised development; and
  • (b) are not exempt from requiring a marine licence by virtue of any provision made under section 74 of the 2009 Act.
4

In this licence, “authorised development” means—

  • (a) Work No. 1G – LD, as set out in Schedule 1 to the Order, concerning the route south of River Avon to Seabank Substation, namely—
  • (i) Works to construct a 400kV overhead electric line, between pylon P-LD106 and Seabank 400kV Substation. The route is 8.3km in length commencing at pylon P-LD106 on Works Plan section G sheet 2 and terminating at Seabank 400kV Substation on Works Plan section G sheet 7 and consists of 27 pylons and the installation of conductors, insulators and fittings.
  • (ii) The works include installation and construction of a temporary site compound along the route of the overhead electric line, as shown on Works Plan section G sheet 3, containing welfare facilities, material lay down and parking areas.
  • (b) Any other development authorised by the Order, which is development within the meaning of section 32 of the 2008 Act, and more particularly the installation of a 400kV overhead electric line, in the vicinity of, and over, the River Avon as is shown hatched on Section G, Sheet 1 of the Public Rights of Navigation Plan.

PART 3 — ENFORCEMENT

5

Any breach of this licence does not constitute a breach of the Order but is subject to the enforcement regime in Chapter 3 of Part 4 of the 2009 Act as a licence deemed to have been granted under section 149A of that Act.

PART 4 — CONDITIONS

6

For such of the licensable marine activities that involve the construction, alteration or improvement of works in or over the sea or on or under the sea bed, the conditions below apply to any person who for the time being owns, occupies or enjoys any use of those works.

7

Should the licence holder become aware that any of the information on which the granting of this licence was based has changed or is likely to change, the licence holder must notify the MMO at the earliest opportunity.

Prior to the commencement of the works

8
  • (1) The licence holder must submit a detailed method statement at least 20 business days prior to the commencement of the first licensed marine activity for approval by the MMO.
  • (2) The authorised development must be undertaken in accordance with the approved method statement.
9

The licence holder must inform the MMO and Environment Agency in writing of the intended start date and the likely duration of licensed activities on a site at least 10 business days prior to the commencement of the first licensed marine activity.

10

The licence holder must ensure that it inform the MMO in writing of all contractor and vessel details at least 10 business days prior to commencement of any licensed marine activity.

11

The licence holder must inform the MMO Local Office in writing of the timetable of the licensed activities at least 10 business days prior to commencement of any licensed marine activity.

12

The licence holder must inform the relevant harbour authorities in writing of the licensed marine activities (including timetable, contractor and vessel details) at least 20 business days prior to commencement of any licensed activity. The contact details are as follows—

  • (1) Marine Department, The Bristol Port Company, Avonmouth Docks, Avonmouth, Bristol BS11 9AT, marine.admin@bristolport.co.uk, Tel: 0117 982 0000
  • (2) Bristol City Docks, Harbour Office, Underfall Yard, Cumberland Road, Bristol BS1 6XG, harbour.office@bristol.gov.uk, Tel: 0117 903 1484, 0117 903 1487.

Upon commencement of the works

13

Should vessels be used on the surface of the water, temporary ground protection in the form of trackway or similar must be used to protect the salt marsh SAC habitats when taking the pilot bonds to the vessels.

14

Should vessels be used on the surface of the water: the vessels must only be used at periods of high tide to avoid disturbing intertidal habitats.

15

The licence holder must ensure that any coatings and treatments used are approved by the Health and Safety Executive as suitable for use in the marine environment and are used in accordance with Environment Agency Pollution Prevention Guidelines.

16

The licence holder must ensure suitable bunding or storage facilities are employed to prevent the release of fuel oils, lubricating fluids and chemicals associated with vessels, plant and equipment into the marine environment.

17

The licence holder must ensure that any oil, fuel or chemical spill within the marine environment is reported to the MMO, Marine Pollution Response Team—

  • Within Office hours: 0870 785 1050
  • Outside Office hours: 07770 977 825
  • At all times if other numbers out of order 0845 051 8486
  • Email: dispersants@marinemanagement.org.uk
18

Any construction materials that are misplaced below mean high water springs and cannot be recovered must be located and their position notified to the MMO Local Office and the MMO as deemed Licensing Authority within 48 hours.

19

The licence holder must ensure that the MMO Local Office is notified in writing of the completion of the works within 10 business days following the completion of any of the works.

20

The licence holder must ensure that any equipment, temporary structures, waste and debris associated with the works are removed within 20 business days of completion of any of the works.

21
  • (1) The licence holder must ensure that if maintenance is required which involves a licensable marine activity (“marine licensable maintenance works”), a methodology for such maintenance must be submitted to the MMO for agreement in writing at least 28 business days prior to commencement of any maintenance works amounting to licensable marine activity.
  • (2) No marine licensable maintenance works referred to in paragraph 21(1) may commence without prior written approval from the MMO.
  • (3) This condition does not apply to maintenance works which are taken in an emergency, in accordance with section 86 of the 2009 Act.

SCHEDULE 10 — MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS

Compensation enactments

1

The enactments for the time being in force with respect to compensation for the compulsory purchase of land apply, with the necessary modifications as respects compensation, in the case of a compulsory acquisition under this Order of a right by the creation of a new right or imposition of a restriction as they apply as respects compensation on the compulsory purchase of land and interests in land.

2
  • (1) Without limitation on the scope of paragraph (1), the Land Compensation Act 1973[^f00029] has effect subject to the modifications set out in sub-paragraphs (2) and (3).
  • (2) In section 44(1) (compensation for injurious affection), as it applies to compensation for injurious affection under section 7 of the 1965 Act as substituted by paragraph 4—
  • (a) for “land is acquired or taken from” substitute “a right or restrictive covenant over land is purchased from or imposed on”; and
  • (b) for “acquired or taken from him” substitute “over which the right is exercisable or the restrictive covenant enforceable”.
  • (3) For section 58(1)[^f00030] (determination of material detriment where part of house etc. proposed for compulsory acquisition), as it applies to determinations under section 8 of the 1965 Act as substituted by paragraph 5 substitute—

(1) In determining under section 8(1) or 34(2) of the Compulsory Purchase Act 1965, or section 166(2) of the Town and Country Planning Act 1990 whether— (a) a right over or a restrictive covenant affecting land consisting of a house, building or manufactory can be taken or imposed without material detriment or damage to the house, building or manufactory; or (b) a right over or a restrictive covenant affecting land consisting of a park or garden belonging to a house can be taken or imposed without seriously affecting the amenity or convenience of the house, the Upper Tribunal must take into account not only the effect of the acquisition of the right or imposition of the restrictive covenant but also the use to be made of the right or restrictive covenant proposed to be acquired or imposed, and, in a case where the right or restrictive covenant is proposed to be acquired or imposed for works or other purposes extending to other land, the effect of the whole of the works and the use to be made of the other land.

Application of the 1965 Act

3
  • (1) The 1965 Act has effect with the modifications necessary to make it apply to the compulsory acquisition under this Order of a right by the creation of a new right, or to the imposition under this Order of a restrictive covenant, as it applies to the compulsory acquisition under this Order of land, so that, in appropriate contexts, references in that Act to land must be read (according to the Requirements of the particular context) as referring to, or as including references to—
  • (a) the right acquired or to be acquired, or the restriction imposed or to be imposed; or
  • (b) the land over which the right is or is to be exercisable, or the restriction is or is to be enforceable.
  • (2) Without limitation on the scope of sub-paragraph (1), Part 1 of the 1965 Act applies in relation to the compulsory acquisition under this Order of a right by the creation of a new right or, in relation to the imposition of a restriction, with the modifications specified in the following provisions of this Schedule.
4

For section 7 of the 1965 Act (measure of compensation) substitute—

(7) In assessing the compensation to be paid by the acquiring authority under this Act, regard must be had not only to the extent (if any) to which the value of the land over which the right is to be acquired or the restrictive covenant is to be imposed is depreciated by the acquisition of the right or the imposition of the covenant but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act.

5

For section 8 of the 1965 Act (provisions as to divided land) substitute—

(8) (1) Where in consequence of the service on a person under section 5 of this Act of a notice to treat in respect of a right over land consisting of a house, building or manufactory or of a park or garden belonging to a house (“the relevant land”)— (a) a question of disputed compensation in respect of the purchase of the right or the imposition of the restrictive covenant would apart from this section fall to be determined by the Tribunal; and (b) before the Tribunal has determined that question the Tribunal is satisfied that the person has an interest in the whole of the relevant land and is able and willing to sell that land and— (i) where that land consists of a house, building or manufactory, that the right cannot be purchased or the restrictive covenant imposed without material detriment to that land; or (ii) where that land consists of such a park or garden, that the right cannot be purchased or the restrictive covenant imposed without seriously affecting the amenity or convenience of the house to which that land belongs, the National Grid (Hinkley Point C Connection Project) Order2016 (“the Order”) ceases, in relation to that person, to authorise the purchase of the right or imposition of a restriction and is deemed to authorise the purchase of that person’s interest in the whole of the relevant land including, where the land consists of such a park or garden, the house to which it belongs, and the notice is deemed to have been served in respect of that interest on such date as the Tribunal directs. (2) Any question as to the extent of the land in which the Order is deemed to authorise the purchase of an interest by virtue of subsection (1) of this section must be determined by the Tribunal. (3) Where in consequence of a determination of the Tribunal that it is satisfied as mentioned in subsection (1) the Order is deemed by virtue of that subsection to authorise the purchase of an interest in land, the acquiring authority may, at any time within the period of 6 weeks beginning with the date of the determination, withdraw the notice to treat in consequence of which the determination was made; but nothing in this subsection prejudices any other power of the authority to withdraw the notice.

6

The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say—

  • (a) section 9(4) (failure by owners to convey);
  • (b) paragraph 10(3) of Schedule 1 (owners under incapacity);
  • (c) paragraph 2(3) of Schedule 2 (absent and untraced owners); and
  • (d) paragraphs 2(3) and 7(2) of Schedule 4 (common land),

are modified to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily acquired or the restrictive covenant which is to be imposed is vested absolutely in the acquiring authority.

7

Section 11[^f00031] of the 1965 Act (powers of entry) is modified to secure that, as from the date on which the acquiring authority has served notice to treat in respect of any right or restriction, it has power, exercisable in equivalent circumstances and subject to equivalent conditions, to enter for the purpose of exercising that right or enforcing that restrictive covenant (which is deemed for this purpose to have been created on the date of service of the notice); and sections 12[^f00032] (penalty for unauthorised entry) and 13[^f00033] (entry on warrant in the event of obstruction) of the 1965 Act are modified correspondingly.

8

Section 20[^f00034] of the 1965 Act (protection for interests of tenants at will, etc.) applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right or the enforcement of the restrictive covenant in question.

9

Section 22 of the 1965 Act (protection of acquiring authority’s possession where by inadvertence an estate, right or interest has not been got in) is modified as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired or to enforce the restriction imposed, subject to compliance with that section as respects compensation.

SCHEDULE 11 — LAND WHICH MAY BE COMPULSORILY ACQUIRED

(1)Area (2)Plot number of land shown on Land Plans
Sedgemoor District Council – Section A 162 & 175
Sedgemoor District Council – Section B 637 & 645
North Somerset Council – Section D 29, 30, 74.1, 74.2, 74.3, 74.4, 74.5, 75, 118 & 119
Bristol City Council – Section G 599 & 600

SCHEDULE 12 — LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

PART 1 — NATIONAL GRID

(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
1, 3, 4, 6, 7, 8, 9, 14, 15, 19, 29, 34, 35, 36, 41, 50, 56, 60, 61, 63, 64, 65, 70, 71, 74, 81, 82, 88, 91 & 94 Dismantling of redundant infrastructure Work No. 4B
2, 5, 10, 16, 23, 28, 33, 40, 47, 53, 54, 62, 75, 78, 83, 84, 89, 90 & 93 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
11, 12, 13, 17, 18, 20, 21, 22, 24, 25, 26, 27, 30, 31, 32, 37, 38, 39, 42, 43, 44, 45, 46, 48, 49, 51, 52, 55, 57, 58, 59, 66, 67, 68, 69, 72, 73, 76, 77, 79, 80, 85, 86, 87, 92, 97, 98, 101, 157 & 158 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
95, 96, 99, 100, 102, 103, 104, 107, 109, 112, 122, 124, 127, 129, 130, 153, 156 & 160 Construction of authorised development Work No. 1B
111, 118, 119, 137, 138, 146, 147, 148, 150, 151, 152 & 155 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 1B
165, 167, 168, 171, 173 & 176 Construction of authorised development Works Nos. 1A and 2A
163, 164 & 166 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1A and 2A
177, 178, 179 & 180 Construction of authorised development Work No. 1A
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
2, 3, 7, 25, 26, 27, 28, 30, 31, 48, 49, 50, 57 & 72 Construction of authorised development Work No. 1B
4, 14, 36, 38, 39, 120, 125, 127, 131, 142, 159, 167, 171, 172, 174, 177.2, 178, 186, 187, 190, 193, 194, 251, 273, 274, 278, 279, 281, 286, 392, 394, 399, 400, 401, 402, 403, 404, 407, 411, 412, 417, 420, 421, 422, 423, 425, 434, 462, 463, 465, 470, 471, 472, 481, 485, 491, 495, 499, 500, 513, 531, 532, 533, 538, 543, 546, 547, 603.2, 603.3, 619, 625, 631, 660, 677 & 678 Dismantling of redundant infrastructure Work No. 4B
5, 12, 15, 37, 76, 119, 140, 151, 170, 177.1, 179, 185, 188, 191, 266, 269, 271, 272, 277, 280, 285, 288, 393, 397, 406, 408, 413, 419, 424, 426, 454, 461, 477, 482, 492, 501, 510, 527, 537, 591, 603.1, 620, 627, 641, 654 & 676 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
11, 16, 17, 40, 121, 122, 138, 139, 165, 166, 168, 169, 173, 175, 176, 180, 181, 182, 183, 184, 189, 192, 255, 267, 268, 270, 275, 276, 282, 283, 284, 287, 395, 396, 398, 405, 409, 410, 414, 415, 416, 418, 427, 459, 460, 464, 466, 478, 483, 484, 486, 496, 508, 509, 512, 621, 642, 653, 675 & 679 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
13, 18, 22, 23, 24, 45 & 46 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1B and 4B
44 & 47 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 1B
58, 59, 60, 69, 70 & 71 Construction of authorised development Works Nos. 1B and 1C
65, 66, 67, 68, 74, 75, 77, 87, 90, 93, 98, 103 & 104 Construction of authorised development Work No. 1C
73, 82 & 83 Construction of authorised development Works Nos. 1B, 1C and 4B
78, 79, 80, & 84 Construction of authorised development Works Nos. 1C and 4B
81 & 86 Construction of authorised development Works Nos. 1C and 4B Removal of pylon foundations only to a depth of 1 metre
85, 88, 89, 91, 92, 94, 95, 99 & 100 Construction of authorised development Works Nos. 1C and 1D
102, 108, 109, 111, 112, 113, 117, 199, 201, 202, 203, 206, 207, 210, 213, 214, 297, 298, 299, 302, 303, 306, 308, 309, 313, 316, 317, 318, 319, 321, 326, 330, 337, 339, 340, 342, 343, 344, 348, 350, 351, 354, 355, 356, 357, 374, 376, 436, 438, 440, 441, 442, 443, 446, 448, 451, 452, 517, 519, 521, 522, 523, 575, 577, 583, 590, 592, 594.1, 594.2, 601,1, 601.2, 605.1, 605.2, 605.3, 606.1, 606.2, 608.1, 608.2, 610, 613, 635 & 639 Construction of authorised development Work No. 1D
118, 154, 156, 488, 489, 518 & 520 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1D and 4B
148, 149, 152, 197, 198, 200, 204, 205, 222, 223, 231, 245, 292, 294, 295, 311, 312, 314, 322, 324, 362, 363, 364 & 447 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 1D
153 Dismantling of redundant infrastructure Works Nos. 1D and 4B
155, 157, 158, 163, 164, 502, 503, 507, 516, 582, 618 & 640 Construction of authorised development Works Nos. 1D and 4B
593, 595 & 596 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1D, 2B, 2C and 4B
597 Construction of authorised development Works Nos. 1D, 2B, 2C and 4B
599 Construction of authorised development Works Nos. 1D, 2B, 2D and 4B
611 & 612 Construction of authorised development Works Nos. 2B, 2D and 4B Removal of pylon foundations only to a depth of 1 metre
614, 615 & 616 Construction of authorised development Works Nos. 1D, 2B and 4B
643, 652, 665, 681 & 682 Construction of authorised development Works Nos. 2B and 4B
636, 646, 651, 655, 661, 669.1, 669.2, 671, 673, 674, 680, 683, 685, 688 & 689 Construction of authorised development Work No. 2B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
664 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
1 & 2 Dismantling of redundant infrastructure Work No. 4B
3, 4, 5, 7, 10, 11, 12, 16 & 17 Construction of authorised development Work No. 2B
18 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
19 & 27 Construction of authorised development Work No. 2B
29 & 30 Dismantling of redundant infrastructure Work No. 4B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
28, 31, 32, 36, 38, 39, 40, 42, 45, 46, 48, 49, 52, 57, 60, 63, 67, 69, 70, 79, 80, 81, 82, 87, 90, 92, 95, 97, 100, 104, 105, 107, 109, 110, 113, 114, 117, 118, 120, 121, 124, 126, 127, 130, 131, 133, 135, 138, 144, 146, 148, 149, 150, 155, 163, 164, 168, 170, 173, 175, 177, 178, 192, 194, 195, 197, 198, 200, 201, 203, 204, 218, 219, 220, 221, 223, 224, 226, 229, 230, 232, 237, 239, 241, 243, 246, 250, 254, 255, 266, 269, 270, 273, 275 & 278 Construction of authorised development Work No. 2B
41, 51, 58, 59, 62, 83, 84, 85, 86, 88, 89, 93, 94, 98, 108, 111, 136, 137, 187, 188, 189, 190, 191, 207, 212, 213, 214, 215, 216, 227, 228, 231, 252, 253, 271, 282, 283, 284 & 285 Dismantling of redundant infrastructure Work No. 4B
43, 233 & 256 Construction of authorised development Works Nos. 2B and 4B
50, 68, 112, 116, 147, 158, 159, 169, 205, 206, 209, 217, 240, 242, 247, 251 & 272 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
181, 184, 185, 186, 208, 210 & 211 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
1, 2, 5, 6, 14, 16, 18, 58, 59.1, 59.2, 60 & 64 Construction of authorised development Work No. 2B
7, 8, 9, 11, 12, 13, 112.1, 112.2, 112.3, 115, 117, 188, 189, 197, 203, 205, 210, 211, 213, 229, 248, 249, 253, 254, 278, 279, 283, 284, 285, 289, 290, 296, 304, 306, 318.1, 318.2, 319, 321, 329, 341, 349, 351, 367, 372, 492, 529, 544.1, 544.2, 548, 557, 558, 559, 561, 566, 567, 571, 572, 575, 591, 594, 595, 602, 604, 605, 611, 612, 615, 616, 620, 621, 623, 672, 674, 675, 677, 678, 828, 900, 901, 902, 904, 961, 962, 963, 964, 965, 966, 967, 968, 969 & 970 Dismantling of redundant infrastructure Work No. 4B
10, 76, 106, 187, 194, 198, 212, 232, 252, 288, 297, 308, 339, 345, 361, 371, 522, 530, 545, 573, 596, 606, 617, 622, 673, 827, 832 & 903 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
19 Construction of authorised development Works Nos. 4B and 4C Removal of pylon foundations only to a depth of 1 metre
20 Construction of authorised development Works Nos. 4B and 4C
21, 23, 24, 27, 28, 31, 33.1, 33.2 , 34, 35, 40, 41, 42, 43, 44, 45, 46 & 48 Construction of authorised development Work No. 4C
22, 38 & 39 Dismantling of redundant infrastructure Work No. 4C
25 & 47 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4C
26 & 32 Construction of authorised development Work No. 4C Removal of pylon foundations only to a depth of 1 metre
50 & 51 Construction of authorised development Works Nos. 2B, 3A and 3B
52, 63, 70 & 73 Construction of authorised development Works Nos. 2B and 3A
53 & 61 Construction of authorised development Works Nos. 2B, 3A and 4B
62 Construction of authorised development Works Nos. 2B, 3A and 4B Removal of pylon foundations only to a depth of 1 metre
77, 78, 79, 80, 102, 120 & 121 Construction of authorised development Work No. 3A
84, 85, 90, 92, 95, 214, 307, 309, 310, 334.1, 334.2, 335, 368, 377, 378, 380, 381, 382, 406, 540, 541, 580, 581, 680, 681, 682, 684, 687, 698, 758, 759 & 761 Construction of authorised development Work No. 1E
86, 208, 218, 226, 303, 317, 320, 322, 323, 324, 325, 344, 358, 362, 365, 366, 546, 547, 562, 564, 576, 597, 598, 599, 600, 601, 603, 618, 619, 676 & 826 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
91, 256, 259, 266, 273, 275, 276, 316, 330, 374, 375, 403, 404, 405, 412, 470.1, 470.2, 471.1, 471.2, 475, 476, 480, 488, 489, 493, 495, 549, 551 & 552 Construction of authorised development Works Nos. 1E and 4B
94, 96.1 & 96.2 Construction of authorised development Works Nos. 1E and 4A
104, 105.1, 105.2, 105.3, 110, 111.1, 111.2, 122, 123, 126, 127, 129, 130, 133, 153, 156, 159, 160, 161, 162, 165, 169, 172, 175 & 176 Construction of authorised development Work No. 4A
131, 140, 141, 148, 163, 166, 167, 170, 181, 182 & 184 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4A
173, 178, 179, 180, 185, 186 & 193 Dismantling of redundant infrastructure Work No. 4A
177 Construction of authorised development Work No. 4A Removal of pylon foundations only to a depth of 1 metre
183 Dismantling of redundant infrastructure Work No. 4A Removal of pylon foundations only to a depth of 1 metre
233, 235, 538, 588, 589, 607, 608, 685, 696, 700, 706, 710, 712, 713, 821, 823, 824, 974, 975 & 977 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 1E
246, 263, 264, 268, 269.1, 269.2 , 270.1, 270.2, 271, 272, 299.1, 299.2, 301.1, 301.2, 302, 332.1, 332.2, 333, 337, 338, 369, 370, 373, 384, 386, 398, 399, 402, 407, 408.1, 408.2, 411, 436, 441, 447, 459, 460, 461, 462, 469, 472, 474, 477, 478, 531, 550, 555 & 556 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1E and 4B
326, 327, 328, 331, 563 & 565 Construction of authorised development Work No. 4B
624, 783, 784, 785 & 833 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4B and 4D
625, 628, 629, 630, 636, 660.1, 660.2, 660.3, 660.4, 660.5, 661, 662, 663.1, 663.2, 664, 665, 666, 667, 668, 669, 768, 786, 787, 788, 789, 790, 791, 792, 793, 794, 795, 796, 797, 798, 799, 800, 801, 802, 803, 804, 805, 806, 807, 808, 809, 810, 811, 812, 813, 814, 836, 837, 838, 839, 840, 841, 842, 843, 844, 845, 846, 847, 848, 849, 850, 851, 852, 853, 854, 855, 856, 857, 858, 859, 860, 861, 862, 863, 864, 865, 866, 867, 868, 869, 870, 871, 872, 874, 875, 876, 877, 878, 879, 880, 881, 882, 884, 885, 886, 906, 908, 909, 910, 911, 912, 913, 914, 915, 916, 917, 918, 919, 920, 921, 922, 923, 924, 925, 926, 927, 928, 929, 930, 931, 932, 933, 934, 935, 936, 937, 938, 939, 943, 944, 949, 950, 951, 952, 953, 954, 955, 956, 957, 958 & 959 Dismantling of redundant infrastructure Work No. 4D
626.1, 626.2, 627, 634, 635, 637, 643, 648, 649, 658, 659, 723, 729, 731, 737, 739, 740, 741, 742, 743, 744, 745, 748, 750, 752, 753, 754, 829, 831, 834, 887, 888, 889, 945, 946, 948, 978, 979 & 980 Construction of authorised development Work No. 4D
631, 633, 670, 769, 835, 873 & 907 Dismantling of redundant infrastructure Work No. 4D Removal of pylon foundations only to a depth of 1 metre
632, 639, 640, 641, 642, 650, 651, 671, 905 & 960 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4D
703, 704, 816, 976.1 & 976.2 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1E, 4B and 4D
770, 777, 780 & 781.2 Dismantling of redundant infrastructure Works Nos. 4B and 4D
781.1 & 815 Dismantling of redundant infrastructure Works Nos. 4B and 4D Removal of pylon foundations only to a depth of 1 metre
818 Construction of authorised development Works Nos. 1E and 4D
981, 982, 987, 988, 989, 990, 991, 992, 993, 994, 1002, 1004, 1008, 1009, 1011, 1012, 1013, 1015, 1016, 1017, 1019 & 1020 Construction of authorised development Work No. 4F
995 & 996 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4F
999 & 1000 Dismantling of redundant infrastructure Work No. 4F
1001 Construction of authorised development Work No. 4F Removal of pylon foundations only to a depth of 1 metre
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
1, 4, 6, 7, 163, 222, 232, 238 & 239 Construction of authorised development Work No. 4D
10, 34 & 46 Construction of authorised development Works Nos. 4B and 4D
11 Dismantling of redundant infrastructure Works Nos. 4B and 4D
13, 68, 70, 79, 135, 168, 169, 170, 174 & 175 Dismantling of redundant infrastructure Work No. 4B
22, 109 & 111 Construction of authorised development Work No. 1E
23, 30, 45, 54 & 66 Dismantling of redundant infrastructure Works Nos. 4B and 4D Removal of pylon foundations only to a depth of 1 metre
37, 40, 49, 60, 63, 132, 133, 138, 149, 162, 191 & 194 Construction of authorised development Works Nos. 1E and 4D
53, 112, 113, 154, 167 & 176 Construction of authorised development Works Nos. 1E, 4B and 4D
96, 116 & 120 Dismantling of redundant infrastructure Work No. 4D Removal of pylon foundations only to a depth of 1 metre
97, 98, 99.1, 99.2, 100.1, 100.2, 101, 115, 119, 207 & 208 Dismantling of redundant infrastructure Work No. 4D
117, 118, 121, 122, 123, 134 & 144 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4D
142, 143, 155 & 171 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
172 & 173 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
1, 2, 3, 4, 18, 19, 21, 22, 23, 29, 30, 34, 35, 36 & 202 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
5, 6, 7, 8, 10, 11, 12, 13, 14, 15, 16, 17, 24, 25, 26, 27, 31, 32, 33, 138, 140, 141, 142, 143, 144, 145, 146, 149, 156, 158, 219.1, 222, 224, 225, 228 & 229 Dismantling of redundant infrastructure Work No. 4B
9, 20, 28, 37, 157, 201 & 219.2 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
43, 95, 98, 192, 194 & 213 Construction of authorised development Work No. 4D
45, 94.3, 137, 147, 164, 165, & 262 Construction of authorised development Work No. 1F
46, 48, 57, 72, 76, 88, 89, 90, 150, 151, 152, 153, 154, 155, 166, 214.1, 214.2 & 223 Dismantling of redundant infrastructure Work No. 4D
64, 79, 200, 218 & 249 Dismantling of redundant infrastructure Work No. 4D Removal of pylon foundations only to a depth of 1 metre
87 Construction of authorised development Works Nos. 1E and 1F
148, 163 & 203 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4B and 4D
160 & 161 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1F and 4D
176, 177, 178, 179, 186, 188, 196 & 217 Construction of authorised development Works Nos. 1F and 4D
226, 230, 231, 233, 247 & 248 Construction of authorised development Work No. 4E
227 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4B, 4D, 4E, 4G and 4P
232, 278 & 298 Dismantling of redundant infrastructure Work No. 4G Removal of pylon foundations only to a depth of 1 metre
234, 235, 240, 243, 276, 282 & 293 Dismantling of redundant infrastructure Work No. 4G
253 & 255 Dismantling of redundant infrastructure Work No. 4P
258 Dismantling of redundant infrastructure Work No. 4P Removal of pylon foundations only to a depth of 1 metre
260 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4P
266 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 1F
269, 279, 280, 281, 294, 296, 300, 307, 312, 314, 316, 317 & 322 Construction of authorised development Work No. 4P
284 Construction of authorised development Work No. 4P Removal of pylon foundations only to a depth of 1 metre
325 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1F, 4G and 4P
326, 327, 328, 329 & 330 Construction of authorised development Works Nos. 1F and 4P
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
23.1, 23.2, 24.1, 24.2, 25, 112 & 113 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4G
35, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81 & 86 Construction of authorised development Work No. 1F
39.1, 39.2, 42 & 43 Dismantling of redundant infrastructure Work No. 4G
82 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1F and 4G
111 & 138 Dismantling of redundant infrastructure Work No. 4G Removal of pylon foundations only to a depth of 1 metre
120, 122, 124, 125, 127 & 130 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1G and 4G
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
139 Dismantling of redundant infrastructure Work No. 4G
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
143, 144, 145, 146, 148, 248, 249, 250, 251, 252.1, 252.2, 253, 254, 255, 256, 257, 258, 259, 262, 263, 264, 265, 266, 267, 268, 270, 271, 272, 273, 274.1, 274.2, 275, 276, 277, 278, 279, 280, 281, 282, 283, 284, 285, 286, 287, 288, 289, 290, 291, 292, 293, 294, 295, 296, 297, 298, 299, 300, 301, 303, 304, 305, 306, 307, 308, 309, 310, 311, 312, 313, 315, 316, 317, 318, 322, 323, 324, 325, 326, 327, 329, 330, 331, 332, 333 & 334 Dismantling of redundant infrastructure Work No. 4G
147.1, 147.2, 260, 269, 302, 314 & 328 Dismantling of redundant infrastructure Work No. 4G Removal of pylon foundations only to a depth of 1 metre
171, 172, 173, 176, 177, 229, 369, 370, 494, 495, 510, 533, 535, 538, 540, 544, 546, 548 & 549 Construction of authorised development Work No. 1G
236, 241, 242, 243, 244, 245, 361, 365, 366, 507, 508 & 509 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 1G
261, 319, 320 & 321 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4G
335 Dismantling of redundant infrastructure Works Nos. 4G and 4H Removal of pylon foundations only to a depth of 1 metre
336 Construction of authorised development Work No. 4K
337 Construction of authorised development Works Nos. 4I and 4K
338, 339, 340, 341, 342, 343, 344, 345, 346, 347, 359, 437, 438, 439, 474, 475, 476, 477, 478, 479, 480, 481, 482.1, 482.2 , 498.1, 498.2 , 504, 517, 518 & 519 Dismantling of redundant infrastructure Work No. 4H
351, 352.1, 352.2, 353.1, 353.2, 355, 383, 384, 399, 400, 401, 402, 403, 404, 406, 407, 408 & 441 Construction of authorised development Works Nos. 1G and 4I
380 Construction of authorised development Work No. 4I
397 & 409 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4H
398, 405, 440 & 502 Dismantling of redundant infrastructure Work No. 4H Removal of pylon foundations only to a depth of 1 metre
562 & 564 Construction of authorised development Works Nos. 4M and 4N
565 Dismantling of redundant infrastructure Work No. 4N
572 & 575 Construction of authorised development Works Nos. 1G, 4L, 4M and 4N
593.1, 593.2, 594, 596 & 597 Construction of authorised development Work No. 5
604, 605, 606, 607, 609 & 610 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4L, 4M, 4N, 4O and 5
608 & 611 Construction of authorised development Works Nos. 4L, 4M, 4N, 4O and 5
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
558 & 559 Construction of authorised development Works Nos. 4M and 4N
560 Construction of authorised development Works Nos. 1G, 4L, 4M and 4N
573 Construction of authorised development Work No. 4L
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
561 Construction of authorised development Works Nos. 4M and 4N
574 Construction of authorised development Work No. 4L
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
6, 9, 11, 24, 25, 81.1 & 81.2 Construction of authorised development Work No. 6E
29 & 30 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 6B, 6D and 6E
32 Construction of authorised development Works Nos. 6B, 6D and 6E
33, 34, 60 & 64 Construction of authorised development Works Nos. 6A, 6C and 6E
35, 37 & 65 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 6A, 6C and 6E
36 & 94 Construction of authorised development Works Nos. 6A and 6C
43, 44 & 45 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 6A and 6C
53 Construction of authorised development Works Nos. 6C and 6E
61 & 63 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 6A, 6B, 6C, 6D and 6E
82, 86 & 87 Dismantling of redundant infrastructure Works Nos. 6B and 6D Removal of pylon foundations only to a depth of 1 metre
83, 84 & 85 Dismantling of redundant infrastructure Works Nos. 6B and 6D
88 Dismantling of redundant infrastructure Work No. 6B
89, 90, 91 & 92 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 6B and 6D
111 Construction of authorised development Work No. 6A
114 & 117 Construction of authorised development Works Nos. 6C and 6D
115 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 6C

PART 2 — WESTERN POWER DISTRIBUTION

(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
1, 3, 4, 6, 7, 8, 9, 14, 15, 19, 29, 34, 35, 36, 41, 50, 56, 60, 61, 63, 64, 65, 70, 71, 74, 81, 82, 88, 91 & 94 Dismantling of redundant infrastructure Work No. 4B
2, 5, 10, 16, 23, 28, 33, 40, 47, 53, 54, 62, 75, 78, 83, 84, 89, 90 & 93 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
11, 12, 13, 17, 18, 20, 21, 22, 24, 25, 26, 27, 30, 31, 32, 37, 38, 39, 42, 43, 44, 45, 46, 48, 49, 51, 52, 55, 57, 58, 59, 66, 67, 68, 69, 72, 73, 76, 77, 79, 80, 85, 86, 87, 92, 97, 98, 101, 157 & 158 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
4, 8, 9, 14, 36, 38, 39, 78, 84, 120, 125, 126, 127, 131, 132, 133, 134, 142, 153, 159, 160, 167, 171, 172, 174, 177.2, 178, 186, 187, 190, 193, 194, 251, 252, 253, 254, 273, 274, 278, 279, 281, 286, 371, 378, 380, 383, 385, 392, 394, 399, 400, 401, 402, 403, 404, 407, 411, 412, 417, 420, 421, 422, 423, 425, 434, 455, 462, 463, 465, 470, 471, 472, 476, 481, 485, 491, 494, 495, 498, 499, 500, 513, 514, 528, 530, 531, 532, 533, 534, 538, 540, 542, 543, 546, 547, 548, 551, 560, 572, 579, 587, 588, 589, 602, 603.2, 603.3, 604.2, 615, 619, 625, 626, 630, 631, 660, 666, 677 & 678 Dismantling of redundant infrastructure Work No. 4B
5, 12, 15, 37, 76, 81, 86, 119, 135, 140, 151, 170, 177.1, 179, 185, 188, 191, 266, 269, 271, 272, 277, 280, 285, 288, 370, 386, 393, 397, 406, 408, 413, 419, 424, 426, 454, 461, 477, 482, 492, 501, 510, 527, 535, 537, 545, 558, 568, 578, 591, 603.1, 604.1, 611, 612, 620, 627, 641, 654, 659 & 676 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
10, 11, 13, 16, 17, 18, 19, 20, 22, 23, 24, 34, 40, 42, 45, 46, 73, 79, 80, 82, 83, 115, 118, 121, 122, 129, 130, 138, 139, 154, 156, 165, 166, 168, 169, 173, 175, 176, 180, 181, 182, 183, 184, 189, 192, 255, 256, 257, 258, 259, 260, 261, 262, 263, 264, 265, 267, 268, 270, 275, 276, 282, 283, 284, 287, 359, 368, 373, 381, 384, 388, 391, 395, 396, 398, 405, 409, 410, 414, 415, 416, 418, 427, 428, 429, 433, 435, 437, 439, 450, 459, 460, 464, 466, 469, 478, 479, 480, 483, 484, 486, 488, 489, 490, 496, 502, 503, 504, 506, 507, 508, 509, 511, 512, 515, 516, 518, 520, 525, 526, 536.1, 536.2, 539, 541, 544, 549, 550, 556, 559, 562, 569, 581, 582, 584, 586, 593, 595, 596, 597, 599, 609.1, 609.2, 609.3, 609.4, 614, 616, 617, 618, 621, 622, 623, 624, 632, 633, 634, 640, 642, 643, 644, 649, 650.1, 650.2 , 652, 653, 665, 675, 679, 681 & 682 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
664 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
1 & 2 Dismantling of redundant infrastructure Work No. 4B
6, 13, 15 & 19 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
14 & 18 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
25 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
29 & 30 Dismantling of redundant infrastructure Work No. 4B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
33, 34, 37, 42, 43, 44, 47, 53, 56, 61, 64, 65, 66, 67, 71, 76, 77, 78, 91, 96, 99, 106, 107, 114, 115, 117, 119, 122, 123, 125, 128, 129, 132, 134, 139, 145, 146, 154, 160, 161, 162, 167, 168, 171, 172, 176, 181, 182, 183, 184, 185, 186, 196, 202.1, 202.2, 204, 208, 210, 211, 219, 220, 221, 225, 233, 234, 249, 255, 256, 257, 267, 268, 273, 274, 277, 280 & 281 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
41, 51, 58, 59, 62, 83, 84, 85, 86, 88, 89, 93, 94, 98, 108, 111, 136, 137, 152, 153, 156, 157, 166, 180, 187, 188, 189, 190, 191, 207, 212, 213, 214, 215, 216, 227, 228, 231, 252, 253, 271, 276, 282, 283, 284 & 285 Dismantling of redundant infrastructure Work No. 4B
50, 68, 112, 116, 147, 158, 159, 169, 205, 206, 209, 217, 240, 242, 244, 247, 248, 251 & 272 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
3, 15 & 57 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4B and 4C
4 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4A and 4B
7, 8, 9, 11, 12, 13, 17, 52, 53, 54, 55, 56, 61, 66, 68, 75, 88, 89, 112.1, 112.2, 112.3, 115, 117, 118, 188, 189, 190, 196, 197, 203, 204, 205, 210, 211, 213, 229, 231, 237.1, 237.2, 240, 243, 248, 249, 251, 253, 254, 255, 278, 279, 283, 284, 285, 286, 289, 290, 296, 304, 306, 318.1, 318.2, 319, 321, 329, 341, 348, 349, 351, 352, 367, 372, 394, 416, 419, 422, 424, 434, 452, 453, 467, 484, 485, 492, 504, 506, 514, 517, 529, 544.1, 544.2, 548, 557, 558, 559, 560, 561, 566, 567, 571, 572, 574, 575, 591, 592, 593, 594, 595, 602, 604, 605, 611, 612, 613, 615, 616, 620, 621, 623, 672, 674, 675, 677, 678, 775, 776, 828, 900, 901, 902, 904, 961, 962, 963, 964, 965, 966, 967, 968, 969 & 970 Dismantling of redundant infrastructure Work No. 4B
10, 62, 76, 106, 187, 194, 198, 199, 212, 232, 236, 247, 252, 288, 297, 308, 339, 345, 361, 371, 391, 413, 430, 438, 455, 464, 494, 511, 521, 522, 530, 545, 573, 596, 606, 617, 622, 673, 827, 832 & 903 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
18 & 20 Construction of authorised development Works Nos. 4B and 4C
19 Construction of authorised development Works Nos. 4B and 4C Removal of pylon foundations only to a depth of 1 metre
21, 23, 24, 27, 28, 29, 31, 33.1, 33.2 , 34, 35, 40, 41, 42, 43, 44, 45, 46 & 48 Construction of authorised development Work No. 4C
22, 30, 38 & 39 Dismantling of redundant infrastructure Work No. 4C
25 & 47 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4C
26 & 32 Construction of authorised development Work No. 4C Removal of pylon foundations only to a depth of 1 metre
63, 67, 69, 74.1, 74.2, 74.3, 74.4, 74.5 77, 83, 86, 87, 102, 200, 208, 217, 218, 219, 220.1, 220.2, 221, 223, 224, 225, 226, 227, 228, 233, 234, 235, 241, 242, 244, 245, 246, 250, 257, 258.1, 258.2 , 262, 263, 264, 265, 267, 268, 269.1, 269.2 , 270.1, 270.2, 271, 272, 274, 277, 280, 282, 287, 291, 292, 293, 294, 295, 299.1, 299.2, 301.1, 301.2, 302, 303, 305.1, 305.2, 307, 311, 315.1, 315.2, 316, 317, 320, 322, 323, 324, 325, 332.1, 332.2, 333, 336, 337, 338, 340, 343, 344, 346, 350, 354, 355, 356, 357.1, 357.2, 358, 359, 362, 363, 364, 365, 366, 369, 370, 373, 376, 377, 378, 383, 384, 385, 386, 387, 388, 390, 392, 393, 395, 396, 397, 398, 399, 400.1, 400.2 , 402, 407, 408.1, 408.2, 409, 410, 411, 414, 417, 418, 420, 425, 427, 428, 429, 431, 432, 436, 437, 439, 440, 441, 442, 445, 446, 447, 448, 449, 450, 451, 454, 456, 457, 458, 459, 460, 461, 462, 466, 468.1, 468.2, 469, 472, 473, 474, 477, 478, 479, 481, 482, 483, 486, 490, 491, 500, 502, 503, 505, 507, 510, 512, 513, 515, 516, 518, 523, 531, 532, 546, 547, 550, 555, 556, 562, 564, 568, 569, 570, 576, 585, 587, 588, 589, 590, 597, 598, 599, 600, 601, 603, 607, 608, 609, 618, 619, 676, 680, 685, 686, 687 & 826 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
65 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4A, 4B and 4C
104, 105.1, 105.2, 105.3, 110, 111.1, 111.2, 120, 121, 122, 123, 126, 127, 129, 130, 133, 153, 156, 159, 160, 161, 162, 165, 169, 172, 175, 176 & 177 Construction of authorised development Work No. 4A
131, 140, 141, 148, 163, 166, 167, 170, 181, 182 & 184 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4A
173, 178, 179, 180, 185, 186, 192 & 193 Dismantling of redundant infrastructure Work No. 4A
183 Dismantling of redundant infrastructure Work No. 4A Removal of pylon foundations only to a depth of 1 metre
256, 266, 273, 275, 276, 326, 327, 328, 330, 331, 470.1, 470.2, 471.1, 471.2, 475, 476, 480, 488, 489, 493, 495, 549, 551, 552, 563 & 565 Construction of authorised development Work No. 4B
624, 702, 703, 704, 707, 759, 760, 762, 772, 782.1, 782.2, 783, 784, 785, 816, 817, 833, 976.1 & 976.2 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4B and 4D
625, 628, 629, 630, 636, 660.1, 660.2, 660.3, 660.4, 660.5, 661, 662, 663.1, 663.2, 664, 665, 666, 667, 668, 669, 768, 786, 787, 788, 789, 790, 791, 792, 793, 794, 795, 796, 797, 798, 799, 800, 801, 802, 803, 804, 805, 806, 807, 808, 809, 810, 811, 812, 813, 814, 836, 837, 838, 839, 840, 841, 842, 843, 844, 845, 846, 847, 848, 849, 850, 851, 852, 853, 854, 855, 856, 857, 858, 859, 860, 861, 862, 863, 864, 865, 866, 867, 868, 869, 870, 871, 872, 874, 875, 876, 877, 878, 879, 880, 881, 882, 884, 885, 886, 906, 908, 909, 910, 911, 912, 913, 914, 915, 916, 917, 918, 919, 920, 921, 922, 923, 924, 925, 926, 927, 928, 929, 930, 931, 932, 933, 934, 935, 936, 937, 938, 939, 943, 944, 949, 950, 951, 952, 953, 954, 955, 956, 957, 958 & 959 Dismantling of redundant infrastructure Work No. 4D
626.1, 626.2, 627, 634, 635, 637, 643, 648, 649, 658, 659, 723, 729, 731, 737, 739, 740, 741, 742, 743, 744, 745, 748, 750, 752, 753, 754, 818, 829, 831, 834, 887, 888, 889, 945, 946, 948, 978, 979 & 980 Construction of authorised development Work No. 4D
631, 633, 670, 769, 835, 873 & 907 Dismantling of redundant infrastructure Work No. 4D Removal of pylon foundations only to a depth of 1 metre
632, 639, 640, 641, 642, 650, 651, 671, 905 & 960 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4D
758 Construction of authorised development Works Nos. 4B and 4D
764, 765, 770, 777, 780 & 781.2 Dismantling of redundant infrastructure Works Nos. 4B and 4D
771, 781.1 & 815 Dismantling of redundant infrastructure Works Nos. 4B and 4D Removal of pylon foundations only to a depth of 1 metre
981, 982, 987, 988, 989, 990, 991, 992, 993, 994, 1002, 1004, 1008, 1009, 1011, 1012, 1013, 1015, 1016, 1017, 1019 & 1020 Construction of authorised development Work No. 4F
995 & 996 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4F
999 & 1000 Dismantling of redundant infrastructure Work No. 4F
1001 Construction of authorised development Work No. 4F Removal of pylon foundations only to a depth of 1 metre
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
1, 4, 6, 7, 33, 37, 40, 49, 50, 59, 60, 63, 132, 133, 138, 146, 149, 162, 163, 191, 194, 222, 232, 238 & 239 Construction of authorised development Work No. 4D
10, 34, 43, 46, 53, 94, 103, 104, 109, 110, 112, 113, 154, 167 & 176 Construction of authorised development Works Nos. 4B and 4D
11, 16, 19, 29 & 93 Dismantling of redundant infrastructure Works Nos. 4B and 4D
13, 14, 68, 70, 77, 79, 105, 127, 128, 135, 136, 145, 159, 168, 169, 170, 174 & 175 Dismantling of redundant infrastructure Work No. 4B
23, 30, 45, 54 & 66 Dismantling of redundant infrastructure Works Nos. 4B and 4D Removal of pylon foundations only to a depth of 1 metre
44, 57, 65, 96, 116 & 120 Dismantling of redundant infrastructure Work No. 4D Removal of pylon foundations only to a depth of 1 metre
78, 126, 142, 143, 155 & 171 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
95.1, 95.2, 97, 98, 99.1, 99.2, 100.1, 100.2, 101, 115, 119, 207, 208, 209 & 210 Dismantling of redundant infrastructure Work No. 4D
117, 118, 121, 122, 123, 134 & 144 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4D
160 Construction of authorised development Works Nos. 4B and 4D
131, 137, 172 & 173 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
1, 2, 3, 4, 18, 19, 21, 22, 23, 29, 30, 34, 35, 36 & 202 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
5, 6, 7, 8, 10, 11, 12, 13, 14, 15, 16, 17, 24, 25, 26, 27, 31, 32, 33, 138, 139, 140, 141, 142, 143, 144, 145, 146, 149 156, 158, 159, 219.1, 222, 224, 225, 228 & 229 Dismantling of redundant infrastructure Work No. 4B
9, 20, 28, 37, 157, 201 & 219.2 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
38, 40, 41, 45, 60, 160, 161, 162 & 165 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4D
39, 64, 79, 81, 200, 218 & 249 Dismantling of redundant infrastructure Work No. 4D Removal of pylon foundations only to a depth of 1 metre
43, 67, 95, 98, 137, 176, 177, 178, 179, 186, 188, 192, 194, 196, 213 & 217 Construction of authorised development Work No. 4D
46, 47, 48, 57, 58, 59, 69, 72, 74, 76, 78, 82, 83, 84, 88, 89, 90, 91, 150, 151, 152, 153, 154, 155, 166, 167, 168, 169, 170, 172, 199, 214.1, 214.2 & 223 Dismantling of redundant infrastructure Work No. 4D
148, 163, 203 & 204 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4B and 4D
226, 230, 231, 233, 247 & 248 Construction of authorised development Work No. 4E
227 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4B, 4D, 4E, 4G and 4P
232, 278, 298 & 320 Dismantling of redundant infrastructure Work No. 4G Removal of pylon foundations only to a depth of 1 metre
234, 235, 240, 243, 276, 282, 293, 302 & 304 Dismantling of redundant infrastructure Work No. 4G
253, 255 & 285 Dismantling of redundant infrastructure Work No. 4P
258 Dismantling of redundant infrastructure Work No. 4P Removal of pylon foundations only to a depth of 1 metre
260 & 264 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4P
267, 269, 279, 280, 281, 288, 294, 296, 300, 307, 312, 314, 316, 317, 322, 326, 327, 328, 329 & 330 Construction of authorised development Work No. 4P
284 Construction of authorised development Work No. 4P Removal of pylon foundations only to a depth of 1 metre
303, 313 & 325 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4G and 4P
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
38, 39.1, 39.2, 42, 43, 45, 46, 47.1, 47.2, 48, 52,57, 58.1, 58.2, 59, 64, 69, 84, 107, 118, 134 & 137 Dismantling of redundant infrastructure Work No. 4G
53, 61, 65, 108, 111, 116 & 138 Dismantling of redundant infrastructure Work No. 4G Removal of pylon foundations only to a depth of 1 metre
23.1, 23.2, 24.1, 24.2, 25, 82, 112, 113, 119, 120, 121, 122, 124, 125, 127, 128 & 130 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4G
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
139 Dismantling of redundant infrastructure Work No. 4G
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
143, 144, 145, 146, 148, 151, 248, 249, 250, 251, 252.1, 252.2, 253, 254, 255, 256, 257, 258, 259, 262, 263, 264, 265, 266, 267, 268, 270, 271, 272, 273, 274.1, 274.2, 275, 276, 277, 278, 279, 280, 281, 282, 283, 284, 285, 286, 287, 288, 289, 290, 291, 292, 293, 294, 295, 296, 297, 298, 299, 300, 301, 303, 304, 305, 306, 307, 308, 309, 310, 311, 312, 313, 315, 316, 317, 318, 322, 323, 324, 325, 326, 327, 329, 330, 331, 332, 333 & 334 Dismantling of redundant infrastructure Work No. 4G
147.1, 147.2, 260, 269, 302, 314 & 328 Dismantling of redundant infrastructure Work No. 4G Removal of pylon foundations only to a depth of 1 metre
261, 319, 320 & 321 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4G
335 Dismantling of redundant infrastructure Works Nos. 4G and 4H Removal of pylon foundations only to a depth of 1 metre
336 Construction of authorised development Work No. 4K
337 Construction of authorised development Works Nos. 4I and 4K
338, 339, 340, 341, 342, 343, 344, 345, 346, 347, 359, 378, 437, 438, 439, 474, 475, 476, 477, 478, 479, 480, 481, 482.1, 482.2 , 498.1, 498.2 , 499, 500, 501, 503, 504, 514, 515, 517, 518 & 519 Dismantling of redundant infrastructure Work No. 4H
351, 352.1, 352.2, 353.1, 353.2, 355, 380, 383, 384, 399, 400, 401, 402, 403, 404, 406, 407, 408 & 441 Construction of authorised development Work No. 4I
397 & 409 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4H
398, 405, 440 & 502 Dismantling of redundant infrastructure Work No. 4H Removal of pylon foundations only to a depth of 1 metre
562 & 564 Construction of authorised development Works Nos. 4M and 4N
563, 570, 571, 572 & 575 Construction of authorised development Works Nos. 4L, 4M and 4N
565 Dismantling of redundant infrastructure Work No. 4N
572 Construction of authorised development Works Nos. 4L, 4M and 4N
599 Dismantling of redundant infrastructure Work No. 4L Removal of pylon foundations only to a depth of 1 metre
604, 605, 606, 607, 609 & 610 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4L, 4M, 4N and 4O
608 & 611 Construction of authorised development Works Nos. 4L, 4M, 4N and 4O
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
558 & 559 Construction of authorised development Works Nos. 4M and 4N
560 Construction of authorised development Works Nos. 4L, 4M and 4N
573 Construction of authorised development Work No. 4L
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
561 Construction of authorised development Works Nos. 4M and 4N
574 Construction of authorised development Work No. 4L

SCHEDULE 13 — TRAFFIC REGULATION

PART 1 — TEMPORARY PROHIBITION OF VEHICULAR ACCESS AND NO WAITING AND SPEED RESTRICTION

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.