The National Grid (Hinkley Point C Connection Project) Order 2016

Type Statutory-Instrument
Publication 2016-01-19
Last updated 2017-12-28
State In force
Department King's Printer of Acts of Parliament
PDF Download
articles 1
Reform history JSON API

(8) (1) Where in consequence of the service on a person under section 5 of this Act of a notice to treat in respect of a right over land consisting of a house, building or manufactory or of a park or garden belonging to a house (“the relevant land”)— (a) a question of disputed compensation in respect of the purchase of the right or the imposition of the restrictive covenant would apart from this section fall to be determined by the Tribunal; and (b) before the Tribunal has determined that question the Tribunal is satisfied that the person has an interest in the whole of the relevant land and is able and willing to sell that land and— (i) where that land consists of a house, building or manufactory, that the right cannot be purchased or the restrictive covenant imposed without material detriment to that land; or (ii) where that land consists of such a park or garden, that the right cannot be purchased or the restrictive covenant imposed without seriously affecting the amenity or convenience of the house to which that land belongs, the National Grid (Hinkley Point C Connection Project) Order2016 (“the Order”) ceases, in relation to that person, to authorise the purchase of the right or imposition of a restriction and is deemed to authorise the purchase of that person’s interest in the whole of the relevant land including, where the land consists of such a park or garden, the house to which it belongs, and the notice is deemed to have been served in respect of that interest on such date as the Tribunal directs. (2) Any question as to the extent of the land in which the Order is deemed to authorise the purchase of an interest by virtue of subsection (1) of this section must be determined by the Tribunal. (3) Where in consequence of a determination of the Tribunal that it is satisfied as mentioned in subsection (1) the Order is deemed by virtue of that subsection to authorise the purchase of an interest in land, the acquiring authority may, at any time within the period of 6 weeks beginning with the date of the determination, withdraw the notice to treat in consequence of which the determination was made; but nothing in this subsection prejudices any other power of the authority to withdraw the notice.

6

The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say—

  • (a) section 9(4) (failure by owners to convey);
  • (b) paragraph 10(3) of Schedule 1 (owners under incapacity);
  • (c) paragraph 2(3) of Schedule 2 (absent and untraced owners); and
  • (d) paragraphs 2(3) and 7(2) of Schedule 4 (common land),

are modified to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily acquired or the restrictive covenant which is to be imposed is vested absolutely in the acquiring authority.

7

Section 11[^f00031] of the 1965 Act (powers of entry) is modified to secure that, as from the date on which the acquiring authority has served notice to treat in respect of any right or restriction, it has power, exercisable in equivalent circumstances and subject to equivalent conditions, to enter for the purpose of exercising that right or enforcing that restrictive covenant (which is deemed for this purpose to have been created on the date of service of the notice); and sections 12[^f00032] (penalty for unauthorised entry) and 13[^f00033] (entry on warrant in the event of obstruction) of the 1965 Act are modified correspondingly.

8

Section 20[^f00034] of the 1965 Act (protection for interests of tenants at will, etc.) applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right or the enforcement of the restrictive covenant in question.

9

Section 22 of the 1965 Act (protection of acquiring authority’s possession where by inadvertence an estate, right or interest has not been got in) is modified as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired or to enforce the restriction imposed, subject to compliance with that section as respects compensation.

SCHEDULE 11 — LAND WHICH MAY BE COMPULSORILY ACQUIRED

(1)Area (2)Plot number of land shown on Land Plans
Sedgemoor District Council – Section A 162 & 175
Sedgemoor District Council – Section B 637 & 645
North Somerset Council – Section D 29, 30, 74.1, 74.2, 74.3, 74.4, 74.5, 75, 118 & 119
Bristol City Council – Section G 599 & 600

SCHEDULE 12 — LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

PART 1 — NATIONAL GRID

(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
1, 3, 4, 6, 7, 8, 9, 14, 15, 19, 29, 34, 35, 36, 41, 50, 56, 60, 61, 63, 64, 65, 70, 71, 74, 81, 82, 88, 91 & 94 Dismantling of redundant infrastructure Work No. 4B
2, 5, 10, 16, 23, 28, 33, 40, 47, 53, 54, 62, 75, 78, 83, 84, 89, 90 & 93 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
11, 12, 13, 17, 18, 20, 21, 22, 24, 25, 26, 27, 30, 31, 32, 37, 38, 39, 42, 43, 44, 45, 46, 48, 49, 51, 52, 55, 57, 58, 59, 66, 67, 68, 69, 72, 73, 76, 77, 79, 80, 85, 86, 87, 92, 97, 98, 101, 157 & 158 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
95, 96, 99, 100, 102, 103, 104, 107, 109, 112, 122, 124, 127, 129, 130, 153, 156 & 160 Construction of authorised development Work No. 1B
111, 118, 119, 137, 138, 146, 147, 148, 150, 151, 152 & 155 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 1B
165, 167, 168, 171, 173 & 176 Construction of authorised development Works Nos. 1A and 2A
163, 164 & 166 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1A and 2A
177, 178, 179 & 180 Construction of authorised development Work No. 1A
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
2, 3, 7, 25, 26, 27, 28, 30, 31, 48, 49, 50, 57 & 72 Construction of authorised development Work No. 1B
4, 14, 36, 38, 39, 120, 125, 127, 131, 142, 159, 167, 171, 172, 174, 177.2, 178, 186, 187, 190, 193, 194, 251, 273, 274, 278, 279, 281, 286, 392, 394, 399, 400, 401, 402, 403, 404, 407, 411, 412, 417, 420, 421, 422, 423, 425, 434, 462, 463, 465, 470, 471, 472, 481, 485, 491, 495, 499, 500, 513, 531, 532, 533, 538, 543, 546, 547, 603.2, 603.3, 619, 625, 631, 660, 677 & 678 Dismantling of redundant infrastructure Work No. 4B
5, 12, 15, 37, 76, 119, 140, 151, 170, 177.1, 179, 185, 188, 191, 266, 269, 271, 272, 277, 280, 285, 288, 393, 397, 406, 408, 413, 419, 424, 426, 454, 461, 477, 482, 492, 501, 510, 527, 537, 591, 603.1, 620, 627, 641, 654 & 676 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
11, 16, 17, 40, 121, 122, 138, 139, 165, 166, 168, 169, 173, 175, 176, 180, 181, 182, 183, 184, 189, 192, 255, 267, 268, 270, 275, 276, 282, 283, 284, 287, 395, 396, 398, 405, 409, 410, 414, 415, 416, 418, 427, 459, 460, 464, 466, 478, 483, 484, 486, 496, 508, 509, 512, 621, 642, 653, 675 & 679 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
13, 18, 22, 23, 24, 45 & 46 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1B and 4B
44 & 47 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 1B
58, 59, 60, 69, 70 & 71 Construction of authorised development Works Nos. 1B and 1C
65, 66, 67, 68, 74, 75, 77, 87, 90, 93, 98, 103 & 104 Construction of authorised development Work No. 1C
73, 82 & 83 Construction of authorised development Works Nos. 1B, 1C and 4B
78, 79, 80, & 84 Construction of authorised development Works Nos. 1C and 4B
81 & 86 Construction of authorised development Works Nos. 1C and 4B Removal of pylon foundations only to a depth of 1 metre
85, 88, 89, 91, 92, 94, 95, 99 & 100 Construction of authorised development Works Nos. 1C and 1D
102, 108, 109, 111, 112, 113, 117, 199, 201, 202, 203, 206, 207, 210, 213, 214, 297, 298, 299, 302, 303, 306, 308, 309, 313, 316, 317, 318, 319, 321, 326, 330, 337, 339, 340, 342, 343, 344, 348, 350, 351, 354, 355, 356, 357, 374, 376, 436, 438, 440, 441, 442, 443, 446, 448, 451, 452, 517, 519, 521, 522, 523, 575, 577, 583, 590, 592, 594.1, 594.2, 601,1, 601.2, 605.1, 605.2, 605.3, 606.1, 606.2, 608.1, 608.2, 610, 613, 635 & 639 Construction of authorised development Work No. 1D
118, 154, 156, 488, 489, 518 & 520 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1D and 4B
148, 149, 152, 197, 198, 200, 204, 205, 222, 223, 231, 245, 292, 294, 295, 311, 312, 314, 322, 324, 362, 363, 364 & 447 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 1D
153 Dismantling of redundant infrastructure Works Nos. 1D and 4B
155, 157, 158, 163, 164, 502, 503, 507, 516, 582, 618 & 640 Construction of authorised development Works Nos. 1D and 4B
593, 595 & 596 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1D, 2B, 2C and 4B
597 Construction of authorised development Works Nos. 1D, 2B, 2C and 4B
599 Construction of authorised development Works Nos. 1D, 2B, 2D and 4B
611 & 612 Construction of authorised development Works Nos. 2B, 2D and 4B Removal of pylon foundations only to a depth of 1 metre
614, 615 & 616 Construction of authorised development Works Nos. 1D, 2B and 4B
643, 652, 665, 681 & 682 Construction of authorised development Works Nos. 2B and 4B
636, 646, 651, 655, 661, 669.1, 669.2, 671, 673, 674, 680, 683, 685, 688 & 689 Construction of authorised development Work No. 2B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
664 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
1 & 2 Dismantling of redundant infrastructure Work No. 4B
3, 4, 5, 7, 10, 11, 12, 16 & 17 Construction of authorised development Work No. 2B
18 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
19 & 27 Construction of authorised development Work No. 2B
29 & 30 Dismantling of redundant infrastructure Work No. 4B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
28, 31, 32, 36, 38, 39, 40, 42, 45, 46, 48, 49, 52, 57, 60, 63, 67, 69, 70, 79, 80, 81, 82, 87, 90, 92, 95, 97, 100, 104, 105, 107, 109, 110, 113, 114, 117, 118, 120, 121, 124, 126, 127, 130, 131, 133, 135, 138, 144, 146, 148, 149, 150, 155, 163, 164, 168, 170, 173, 175, 177, 178, 192, 194, 195, 197, 198, 200, 201, 203, 204, 218, 219, 220, 221, 223, 224, 226, 229, 230, 232, 237, 239, 241, 243, 246, 250, 254, 255, 266, 269, 270, 273, 275 & 278 Construction of authorised development Work No. 2B
41, 51, 58, 59, 62, 83, 84, 85, 86, 88, 89, 93, 94, 98, 108, 111, 136, 137, 187, 188, 189, 190, 191, 207, 212, 213, 214, 215, 216, 227, 228, 231, 252, 253, 271, 282, 283, 284 & 285 Dismantling of redundant infrastructure Work No. 4B
43, 233 & 256 Construction of authorised development Works Nos. 2B and 4B
50, 68, 112, 116, 147, 158, 159, 169, 205, 206, 209, 217, 240, 242, 247, 251 & 272 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
181, 184, 185, 186, 208, 210 & 211 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
1, 2, 5, 6, 14, 16, 18, 58, 59.1, 59.2, 60 & 64 Construction of authorised development Work No. 2B
7, 8, 9, 11, 12, 13, 112.1, 112.2, 112.3, 115, 117, 188, 189, 197, 203, 205, 210, 211, 213, 229, 248, 249, 253, 254, 278, 279, 283, 284, 285, 289, 290, 296, 304, 306, 318.1, 318.2, 319, 321, 329, 341, 349, 351, 367, 372, 492, 529, 544.1, 544.2, 548, 557, 558, 559, 561, 566, 567, 571, 572, 575, 591, 594, 595, 602, 604, 605, 611, 612, 615, 616, 620, 621, 623, 672, 674, 675, 677, 678, 828, 900, 901, 902, 904, 961, 962, 963, 964, 965, 966, 967, 968, 969 & 970 Dismantling of redundant infrastructure Work No. 4B
10, 76, 106, 187, 194, 198, 212, 232, 252, 288, 297, 308, 339, 345, 361, 371, 522, 530, 545, 573, 596, 606, 617, 622, 673, 827, 832 & 903 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
19 Construction of authorised development Works Nos. 4B and 4C Removal of pylon foundations only to a depth of 1 metre
20 Construction of authorised development Works Nos. 4B and 4C
21, 23, 24, 27, 28, 31, 33.1, 33.2 , 34, 35, 40, 41, 42, 43, 44, 45, 46 & 48 Construction of authorised development Work No. 4C
22, 38 & 39 Dismantling of redundant infrastructure Work No. 4C
25 & 47 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4C
26 & 32 Construction of authorised development Work No. 4C Removal of pylon foundations only to a depth of 1 metre
50 & 51 Construction of authorised development Works Nos. 2B, 3A and 3B
52, 63, 70 & 73 Construction of authorised development Works Nos. 2B and 3A
53 & 61 Construction of authorised development Works Nos. 2B, 3A and 4B
62 Construction of authorised development Works Nos. 2B, 3A and 4B Removal of pylon foundations only to a depth of 1 metre
77, 78, 79, 80, 102, 120 & 121 Construction of authorised development Work No. 3A
84, 85, 90, 92, 95, 214, 307, 309, 310, 334.1, 334.2, 335, 368, 377, 378, 380, 381, 382, 406, 540, 541, 580, 581, 680, 681, 682, 684, 687, 698, 758, 759 & 761 Construction of authorised development Work No. 1E
86, 208, 218, 226, 303, 317, 320, 322, 323, 324, 325, 344, 358, 362, 365, 366, 546, 547, 562, 564, 576, 597, 598, 599, 600, 601, 603, 618, 619, 676 & 826 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
91, 256, 259, 266, 273, 275, 276, 316, 330, 374, 375, 403, 404, 405, 412, 470.1, 470.2, 471.1, 471.2, 475, 476, 480, 488, 489, 493, 495, 549, 551 & 552 Construction of authorised development Works Nos. 1E and 4B
94, 96.1 & 96.2 Construction of authorised development Works Nos. 1E and 4A
104, 105.1, 105.2, 105.3, 110, 111.1, 111.2, 122, 123, 126, 127, 129, 130, 133, 153, 156, 159, 160, 161, 162, 165, 169, 172, 175 & 176 Construction of authorised development Work No. 4A
131, 140, 141, 148, 163, 166, 167, 170, 181, 182 & 184 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4A
173, 178, 179, 180, 185, 186 & 193 Dismantling of redundant infrastructure Work No. 4A
177 Construction of authorised development Work No. 4A Removal of pylon foundations only to a depth of 1 metre
183 Dismantling of redundant infrastructure Work No. 4A Removal of pylon foundations only to a depth of 1 metre
233, 235, 538, 588, 589, 607, 608, 685, 696, 700, 706, 710, 712, 713, 821, 823, 824, 974, 975 & 977 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 1E
246, 263, 264, 268, 269.1, 269.2 , 270.1, 270.2, 271, 272, 299.1, 299.2, 301.1, 301.2, 302, 332.1, 332.2, 333, 337, 338, 369, 370, 373, 384, 386, 398, 399, 402, 407, 408.1, 408.2, 411, 436, 441, 447, 459, 460, 461, 462, 469, 472, 474, 477, 478, 531, 550, 555 & 556 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1E and 4B
326, 327, 328, 331, 563 & 565 Construction of authorised development Work No. 4B
624, 783, 784, 785 & 833 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4B and 4D
625, 628, 629, 630, 636, 660.1, 660.2, 660.3, 660.4, 660.5, 661, 662, 663.1, 663.2, 664, 665, 666, 667, 668, 669, 768, 786, 787, 788, 789, 790, 791, 792, 793, 794, 795, 796, 797, 798, 799, 800, 801, 802, 803, 804, 805, 806, 807, 808, 809, 810, 811, 812, 813, 814, 836, 837, 838, 839, 840, 841, 842, 843, 844, 845, 846, 847, 848, 849, 850, 851, 852, 853, 854, 855, 856, 857, 858, 859, 860, 861, 862, 863, 864, 865, 866, 867, 868, 869, 870, 871, 872, 874, 875, 876, 877, 878, 879, 880, 881, 882, 884, 885, 886, 906, 908, 909, 910, 911, 912, 913, 914, 915, 916, 917, 918, 919, 920, 921, 922, 923, 924, 925, 926, 927, 928, 929, 930, 931, 932, 933, 934, 935, 936, 937, 938, 939, 943, 944, 949, 950, 951, 952, 953, 954, 955, 956, 957, 958 & 959 Dismantling of redundant infrastructure Work No. 4D
626.1, 626.2, 627, 634, 635, 637, 643, 648, 649, 658, 659, 723, 729, 731, 737, 739, 740, 741, 742, 743, 744, 745, 748, 750, 752, 753, 754, 829, 831, 834, 887, 888, 889, 945, 946, 948, 978, 979 & 980 Construction of authorised development Work No. 4D
631, 633, 670, 769, 835, 873 & 907 Dismantling of redundant infrastructure Work No. 4D Removal of pylon foundations only to a depth of 1 metre
632, 639, 640, 641, 642, 650, 651, 671, 905 & 960 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4D
703, 704, 816, 976.1 & 976.2 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1E, 4B and 4D
770, 777, 780 & 781.2 Dismantling of redundant infrastructure Works Nos. 4B and 4D
781.1 & 815 Dismantling of redundant infrastructure Works Nos. 4B and 4D Removal of pylon foundations only to a depth of 1 metre
818 Construction of authorised development Works Nos. 1E and 4D
981, 982, 987, 988, 989, 990, 991, 992, 993, 994, 1002, 1004, 1008, 1009, 1011, 1012, 1013, 1015, 1016, 1017, 1019 & 1020 Construction of authorised development Work No. 4F
995 & 996 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4F
999 & 1000 Dismantling of redundant infrastructure Work No. 4F
1001 Construction of authorised development Work No. 4F Removal of pylon foundations only to a depth of 1 metre
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
1, 4, 6, 7, 163, 222, 232, 238 & 239 Construction of authorised development Work No. 4D
10, 34 & 46 Construction of authorised development Works Nos. 4B and 4D
11 Dismantling of redundant infrastructure Works Nos. 4B and 4D
13, 68, 70, 79, 135, 168, 169, 170, 174 & 175 Dismantling of redundant infrastructure Work No. 4B
22, 109 & 111 Construction of authorised development Work No. 1E
23, 30, 45, 54 & 66 Dismantling of redundant infrastructure Works Nos. 4B and 4D Removal of pylon foundations only to a depth of 1 metre
37, 40, 49, 60, 63, 132, 133, 138, 149, 162, 191 & 194 Construction of authorised development Works Nos. 1E and 4D
53, 112, 113, 154, 167 & 176 Construction of authorised development Works Nos. 1E, 4B and 4D
96, 116 & 120 Dismantling of redundant infrastructure Work No. 4D Removal of pylon foundations only to a depth of 1 metre
97, 98, 99.1, 99.2, 100.1, 100.2, 101, 115, 119, 207 & 208 Dismantling of redundant infrastructure Work No. 4D
117, 118, 121, 122, 123, 134 & 144 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4D
142, 143, 155 & 171 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
172 & 173 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
1, 2, 3, 4, 18, 19, 21, 22, 23, 29, 30, 34, 35, 36 & 202 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
5, 6, 7, 8, 10, 11, 12, 13, 14, 15, 16, 17, 24, 25, 26, 27, 31, 32, 33, 138, 140, 141, 142, 143, 144, 145, 146, 149, 156, 158, 219.1, 222, 224, 225, 228 & 229 Dismantling of redundant infrastructure Work No. 4B
9, 20, 28, 37, 157, 201 & 219.2 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
43, 95, 98, 192, 194 & 213 Construction of authorised development Work No. 4D
45, 94.3, 137, 147, 164, 165, & 262 Construction of authorised development Work No. 1F
46, 48, 57, 72, 76, 88, 89, 90, 150, 151, 152, 153, 154, 155, 166, 214.1, 214.2 & 223 Dismantling of redundant infrastructure Work No. 4D
64, 79, 200, 218 & 249 Dismantling of redundant infrastructure Work No. 4D Removal of pylon foundations only to a depth of 1 metre
87 Construction of authorised development Works Nos. 1E and 1F
148, 163 & 203 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4B and 4D
160 & 161 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1F and 4D
176, 177, 178, 179, 186, 188, 196 & 217 Construction of authorised development Works Nos. 1F and 4D
226, 230, 231, 233, 247 & 248 Construction of authorised development Work No. 4E
227 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4B, 4D, 4E, 4G and 4P
232, 278 & 298 Dismantling of redundant infrastructure Work No. 4G Removal of pylon foundations only to a depth of 1 metre
234, 235, 240, 243, 276, 282 & 293 Dismantling of redundant infrastructure Work No. 4G
253 & 255 Dismantling of redundant infrastructure Work No. 4P
258 Dismantling of redundant infrastructure Work No. 4P Removal of pylon foundations only to a depth of 1 metre
260 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4P
266 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 1F
269, 279, 280, 281, 294, 296, 300, 307, 312, 314, 316, 317 & 322 Construction of authorised development Work No. 4P
284 Construction of authorised development Work No. 4P Removal of pylon foundations only to a depth of 1 metre
325 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1F, 4G and 4P
326, 327, 328, 329 & 330 Construction of authorised development Works Nos. 1F and 4P
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
23.1, 23.2, 24.1, 24.2, 25, 112 & 113 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4G
35, 70, 71, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81 & 86 Construction of authorised development Work No. 1F
39.1, 39.2, 42 & 43 Dismantling of redundant infrastructure Work No. 4G
82 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1F and 4G
111 & 138 Dismantling of redundant infrastructure Work No. 4G Removal of pylon foundations only to a depth of 1 metre
120, 122, 124, 125, 127 & 130 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 1G and 4G
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
139 Dismantling of redundant infrastructure Work No. 4G
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
143, 144, 145, 146, 148, 248, 249, 250, 251, 252.1, 252.2, 253, 254, 255, 256, 257, 258, 259, 262, 263, 264, 265, 266, 267, 268, 270, 271, 272, 273, 274.1, 274.2, 275, 276, 277, 278, 279, 280, 281, 282, 283, 284, 285, 286, 287, 288, 289, 290, 291, 292, 293, 294, 295, 296, 297, 298, 299, 300, 301, 303, 304, 305, 306, 307, 308, 309, 310, 311, 312, 313, 315, 316, 317, 318, 322, 323, 324, 325, 326, 327, 329, 330, 331, 332, 333 & 334 Dismantling of redundant infrastructure Work No. 4G
147.1, 147.2, 260, 269, 302, 314 & 328 Dismantling of redundant infrastructure Work No. 4G Removal of pylon foundations only to a depth of 1 metre
171, 172, 173, 176, 177, 229, 369, 370, 494, 495, 510, 533, 535, 538, 540, 544, 546, 548 & 549 Construction of authorised development Work No. 1G
236, 241, 242, 243, 244, 245, 361, 365, 366, 507, 508 & 509 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 1G
261, 319, 320 & 321 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4G
335 Dismantling of redundant infrastructure Works Nos. 4G and 4H Removal of pylon foundations only to a depth of 1 metre
336 Construction of authorised development Work No. 4K
337 Construction of authorised development Works Nos. 4I and 4K
338, 339, 340, 341, 342, 343, 344, 345, 346, 347, 359, 437, 438, 439, 474, 475, 476, 477, 478, 479, 480, 481, 482.1, 482.2 , 498.1, 498.2 , 504, 517, 518 & 519 Dismantling of redundant infrastructure Work No. 4H
351, 352.1, 352.2, 353.1, 353.2, 355, 383, 384, 399, 400, 401, 402, 403, 404, 406, 407, 408 & 441 Construction of authorised development Works Nos. 1G and 4I
380 Construction of authorised development Work No. 4I
397 & 409 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4H
398, 405, 440 & 502 Dismantling of redundant infrastructure Work No. 4H Removal of pylon foundations only to a depth of 1 metre
562 & 564 Construction of authorised development Works Nos. 4M and 4N
565 Dismantling of redundant infrastructure Work No. 4N
572 & 575 Construction of authorised development Works Nos. 1G, 4L, 4M and 4N
593.1, 593.2, 594, 596 & 597 Construction of authorised development Work No. 5
604, 605, 606, 607, 609 & 610 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4L, 4M, 4N, 4O and 5
608 & 611 Construction of authorised development Works Nos. 4L, 4M, 4N, 4O and 5
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
558 & 559 Construction of authorised development Works Nos. 4M and 4N
560 Construction of authorised development Works Nos. 1G, 4L, 4M and 4N
573 Construction of authorised development Work No. 4L
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
561 Construction of authorised development Works Nos. 4M and 4N
574 Construction of authorised development Work No. 4L
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
6, 9, 11, 24, 25, 81.1 & 81.2 Construction of authorised development Work No. 6E
29 & 30 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 6B, 6D and 6E
32 Construction of authorised development Works Nos. 6B, 6D and 6E
33, 34, 60 & 64 Construction of authorised development Works Nos. 6A, 6C and 6E
35, 37 & 65 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 6A, 6C and 6E
36 & 94 Construction of authorised development Works Nos. 6A and 6C
43, 44 & 45 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 6A and 6C
53 Construction of authorised development Works Nos. 6C and 6E
61 & 63 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 6A, 6B, 6C, 6D and 6E
82, 86 & 87 Dismantling of redundant infrastructure Works Nos. 6B and 6D Removal of pylon foundations only to a depth of 1 metre
83, 84 & 85 Dismantling of redundant infrastructure Works Nos. 6B and 6D
88 Dismantling of redundant infrastructure Work No. 6B
89, 90, 91 & 92 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 6B and 6D
111 Construction of authorised development Work No. 6A
114 & 117 Construction of authorised development Works Nos. 6C and 6D
115 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 6C

PART 2 — WESTERN POWER DISTRIBUTION

(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
1, 3, 4, 6, 7, 8, 9, 14, 15, 19, 29, 34, 35, 36, 41, 50, 56, 60, 61, 63, 64, 65, 70, 71, 74, 81, 82, 88, 91 & 94 Dismantling of redundant infrastructure Work No. 4B
2, 5, 10, 16, 23, 28, 33, 40, 47, 53, 54, 62, 75, 78, 83, 84, 89, 90 & 93 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
11, 12, 13, 17, 18, 20, 21, 22, 24, 25, 26, 27, 30, 31, 32, 37, 38, 39, 42, 43, 44, 45, 46, 48, 49, 51, 52, 55, 57, 58, 59, 66, 67, 68, 69, 72, 73, 76, 77, 79, 80, 85, 86, 87, 92, 97, 98, 101, 157 & 158 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
4, 8, 9, 14, 36, 38, 39, 78, 84, 120, 125, 126, 127, 131, 132, 133, 134, 142, 153, 159, 160, 167, 171, 172, 174, 177.2, 178, 186, 187, 190, 193, 194, 251, 252, 253, 254, 273, 274, 278, 279, 281, 286, 371, 378, 380, 383, 385, 392, 394, 399, 400, 401, 402, 403, 404, 407, 411, 412, 417, 420, 421, 422, 423, 425, 434, 455, 462, 463, 465, 470, 471, 472, 476, 481, 485, 491, 494, 495, 498, 499, 500, 513, 514, 528, 530, 531, 532, 533, 534, 538, 540, 542, 543, 546, 547, 548, 551, 560, 572, 579, 587, 588, 589, 602, 603.2, 603.3, 604.2, 615, 619, 625, 626, 630, 631, 660, 666, 677 & 678 Dismantling of redundant infrastructure Work No. 4B
5, 12, 15, 37, 76, 81, 86, 119, 135, 140, 151, 170, 177.1, 179, 185, 188, 191, 266, 269, 271, 272, 277, 280, 285, 288, 370, 386, 393, 397, 406, 408, 413, 419, 424, 426, 454, 461, 477, 482, 492, 501, 510, 527, 535, 537, 545, 558, 568, 578, 591, 603.1, 604.1, 611, 612, 620, 627, 641, 654, 659 & 676 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
10, 11, 13, 16, 17, 18, 19, 20, 22, 23, 24, 34, 40, 42, 45, 46, 73, 79, 80, 82, 83, 115, 118, 121, 122, 129, 130, 138, 139, 154, 156, 165, 166, 168, 169, 173, 175, 176, 180, 181, 182, 183, 184, 189, 192, 255, 256, 257, 258, 259, 260, 261, 262, 263, 264, 265, 267, 268, 270, 275, 276, 282, 283, 284, 287, 359, 368, 373, 381, 384, 388, 391, 395, 396, 398, 405, 409, 410, 414, 415, 416, 418, 427, 428, 429, 433, 435, 437, 439, 450, 459, 460, 464, 466, 469, 478, 479, 480, 483, 484, 486, 488, 489, 490, 496, 502, 503, 504, 506, 507, 508, 509, 511, 512, 515, 516, 518, 520, 525, 526, 536.1, 536.2, 539, 541, 544, 549, 550, 556, 559, 562, 569, 581, 582, 584, 586, 593, 595, 596, 597, 599, 609.1, 609.2, 609.3, 609.4, 614, 616, 617, 618, 621, 622, 623, 624, 632, 633, 634, 640, 642, 643, 644, 649, 650.1, 650.2 , 652, 653, 665, 675, 679, 681 & 682 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
664 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
1 & 2 Dismantling of redundant infrastructure Work No. 4B
6, 13, 15 & 19 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
14 & 18 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
25 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
29 & 30 Dismantling of redundant infrastructure Work No. 4B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
33, 34, 37, 42, 43, 44, 47, 53, 56, 61, 64, 65, 66, 67, 71, 76, 77, 78, 91, 96, 99, 106, 107, 114, 115, 117, 119, 122, 123, 125, 128, 129, 132, 134, 139, 145, 146, 154, 160, 161, 162, 167, 168, 171, 172, 176, 181, 182, 183, 184, 185, 186, 196, 202.1, 202.2, 204, 208, 210, 211, 219, 220, 221, 225, 233, 234, 249, 255, 256, 257, 267, 268, 273, 274, 277, 280 & 281 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
41, 51, 58, 59, 62, 83, 84, 85, 86, 88, 89, 93, 94, 98, 108, 111, 136, 137, 152, 153, 156, 157, 166, 180, 187, 188, 189, 190, 191, 207, 212, 213, 214, 215, 216, 227, 228, 231, 252, 253, 271, 276, 282, 283, 284 & 285 Dismantling of redundant infrastructure Work No. 4B
50, 68, 112, 116, 147, 158, 159, 169, 205, 206, 209, 217, 240, 242, 244, 247, 248, 251 & 272 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
3, 15 & 57 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4B and 4C
4 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4A and 4B
7, 8, 9, 11, 12, 13, 17, 52, 53, 54, 55, 56, 61, 66, 68, 75, 88, 89, 112.1, 112.2, 112.3, 115, 117, 118, 188, 189, 190, 196, 197, 203, 204, 205, 210, 211, 213, 229, 231, 237.1, 237.2, 240, 243, 248, 249, 251, 253, 254, 255, 278, 279, 283, 284, 285, 286, 289, 290, 296, 304, 306, 318.1, 318.2, 319, 321, 329, 341, 348, 349, 351, 352, 367, 372, 394, 416, 419, 422, 424, 434, 452, 453, 467, 484, 485, 492, 504, 506, 514, 517, 529, 544.1, 544.2, 548, 557, 558, 559, 560, 561, 566, 567, 571, 572, 574, 575, 591, 592, 593, 594, 595, 602, 604, 605, 611, 612, 613, 615, 616, 620, 621, 623, 672, 674, 675, 677, 678, 775, 776, 828, 900, 901, 902, 904, 961, 962, 963, 964, 965, 966, 967, 968, 969 & 970 Dismantling of redundant infrastructure Work No. 4B
10, 62, 76, 106, 187, 194, 198, 199, 212, 232, 236, 247, 252, 288, 297, 308, 339, 345, 361, 371, 391, 413, 430, 438, 455, 464, 494, 511, 521, 522, 530, 545, 573, 596, 606, 617, 622, 673, 827, 832 & 903 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
18 & 20 Construction of authorised development Works Nos. 4B and 4C
19 Construction of authorised development Works Nos. 4B and 4C Removal of pylon foundations only to a depth of 1 metre
21, 23, 24, 27, 28, 29, 31, 33.1, 33.2 , 34, 35, 40, 41, 42, 43, 44, 45, 46 & 48 Construction of authorised development Work No. 4C
22, 30, 38 & 39 Dismantling of redundant infrastructure Work No. 4C
25 & 47 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4C
26 & 32 Construction of authorised development Work No. 4C Removal of pylon foundations only to a depth of 1 metre
63, 67, 69, 74.1, 74.2, 74.3, 74.4, 74.5 77, 83, 86, 87, 102, 200, 208, 217, 218, 219, 220.1, 220.2, 221, 223, 224, 225, 226, 227, 228, 233, 234, 235, 241, 242, 244, 245, 246, 250, 257, 258.1, 258.2 , 262, 263, 264, 265, 267, 268, 269.1, 269.2 , 270.1, 270.2, 271, 272, 274, 277, 280, 282, 287, 291, 292, 293, 294, 295, 299.1, 299.2, 301.1, 301.2, 302, 303, 305.1, 305.2, 307, 311, 315.1, 315.2, 316, 317, 320, 322, 323, 324, 325, 332.1, 332.2, 333, 336, 337, 338, 340, 343, 344, 346, 350, 354, 355, 356, 357.1, 357.2, 358, 359, 362, 363, 364, 365, 366, 369, 370, 373, 376, 377, 378, 383, 384, 385, 386, 387, 388, 390, 392, 393, 395, 396, 397, 398, 399, 400.1, 400.2 , 402, 407, 408.1, 408.2, 409, 410, 411, 414, 417, 418, 420, 425, 427, 428, 429, 431, 432, 436, 437, 439, 440, 441, 442, 445, 446, 447, 448, 449, 450, 451, 454, 456, 457, 458, 459, 460, 461, 462, 466, 468.1, 468.2, 469, 472, 473, 474, 477, 478, 479, 481, 482, 483, 486, 490, 491, 500, 502, 503, 505, 507, 510, 512, 513, 515, 516, 518, 523, 531, 532, 546, 547, 550, 555, 556, 562, 564, 568, 569, 570, 576, 585, 587, 588, 589, 590, 597, 598, 599, 600, 601, 603, 607, 608, 609, 618, 619, 676, 680, 685, 686, 687 & 826 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
65 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4A, 4B and 4C
104, 105.1, 105.2, 105.3, 110, 111.1, 111.2, 120, 121, 122, 123, 126, 127, 129, 130, 133, 153, 156, 159, 160, 161, 162, 165, 169, 172, 175, 176 & 177 Construction of authorised development Work No. 4A
131, 140, 141, 148, 163, 166, 167, 170, 181, 182 & 184 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4A
173, 178, 179, 180, 185, 186, 192 & 193 Dismantling of redundant infrastructure Work No. 4A
183 Dismantling of redundant infrastructure Work No. 4A Removal of pylon foundations only to a depth of 1 metre
256, 266, 273, 275, 276, 326, 327, 328, 330, 331, 470.1, 470.2, 471.1, 471.2, 475, 476, 480, 488, 489, 493, 495, 549, 551, 552, 563 & 565 Construction of authorised development Work No. 4B
624, 702, 703, 704, 707, 759, 760, 762, 772, 782.1, 782.2, 783, 784, 785, 816, 817, 833, 976.1 & 976.2 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4B and 4D
625, 628, 629, 630, 636, 660.1, 660.2, 660.3, 660.4, 660.5, 661, 662, 663.1, 663.2, 664, 665, 666, 667, 668, 669, 768, 786, 787, 788, 789, 790, 791, 792, 793, 794, 795, 796, 797, 798, 799, 800, 801, 802, 803, 804, 805, 806, 807, 808, 809, 810, 811, 812, 813, 814, 836, 837, 838, 839, 840, 841, 842, 843, 844, 845, 846, 847, 848, 849, 850, 851, 852, 853, 854, 855, 856, 857, 858, 859, 860, 861, 862, 863, 864, 865, 866, 867, 868, 869, 870, 871, 872, 874, 875, 876, 877, 878, 879, 880, 881, 882, 884, 885, 886, 906, 908, 909, 910, 911, 912, 913, 914, 915, 916, 917, 918, 919, 920, 921, 922, 923, 924, 925, 926, 927, 928, 929, 930, 931, 932, 933, 934, 935, 936, 937, 938, 939, 943, 944, 949, 950, 951, 952, 953, 954, 955, 956, 957, 958 & 959 Dismantling of redundant infrastructure Work No. 4D
626.1, 626.2, 627, 634, 635, 637, 643, 648, 649, 658, 659, 723, 729, 731, 737, 739, 740, 741, 742, 743, 744, 745, 748, 750, 752, 753, 754, 818, 829, 831, 834, 887, 888, 889, 945, 946, 948, 978, 979 & 980 Construction of authorised development Work No. 4D
631, 633, 670, 769, 835, 873 & 907 Dismantling of redundant infrastructure Work No. 4D Removal of pylon foundations only to a depth of 1 metre
632, 639, 640, 641, 642, 650, 651, 671, 905 & 960 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4D
758 Construction of authorised development Works Nos. 4B and 4D
764, 765, 770, 777, 780 & 781.2 Dismantling of redundant infrastructure Works Nos. 4B and 4D
771, 781.1 & 815 Dismantling of redundant infrastructure Works Nos. 4B and 4D Removal of pylon foundations only to a depth of 1 metre
981, 982, 987, 988, 989, 990, 991, 992, 993, 994, 1002, 1004, 1008, 1009, 1011, 1012, 1013, 1015, 1016, 1017, 1019 & 1020 Construction of authorised development Work No. 4F
995 & 996 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4F
999 & 1000 Dismantling of redundant infrastructure Work No. 4F
1001 Construction of authorised development Work No. 4F Removal of pylon foundations only to a depth of 1 metre
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
1, 4, 6, 7, 33, 37, 40, 49, 50, 59, 60, 63, 132, 133, 138, 146, 149, 162, 163, 191, 194, 222, 232, 238 & 239 Construction of authorised development Work No. 4D
10, 34, 43, 46, 53, 94, 103, 104, 109, 110, 112, 113, 154, 167 & 176 Construction of authorised development Works Nos. 4B and 4D
11, 16, 19, 29 & 93 Dismantling of redundant infrastructure Works Nos. 4B and 4D
13, 14, 68, 70, 77, 79, 105, 127, 128, 135, 136, 145, 159, 168, 169, 170, 174 & 175 Dismantling of redundant infrastructure Work No. 4B
23, 30, 45, 54 & 66 Dismantling of redundant infrastructure Works Nos. 4B and 4D Removal of pylon foundations only to a depth of 1 metre
44, 57, 65, 96, 116 & 120 Dismantling of redundant infrastructure Work No. 4D Removal of pylon foundations only to a depth of 1 metre
78, 126, 142, 143, 155 & 171 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
95.1, 95.2, 97, 98, 99.1, 99.2, 100.1, 100.2, 101, 115, 119, 207, 208, 209 & 210 Dismantling of redundant infrastructure Work No. 4D
117, 118, 121, 122, 123, 134 & 144 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4D
160 Construction of authorised development Works Nos. 4B and 4D
131, 137, 172 & 173 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
1, 2, 3, 4, 18, 19, 21, 22, 23, 29, 30, 34, 35, 36 & 202 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4B
5, 6, 7, 8, 10, 11, 12, 13, 14, 15, 16, 17, 24, 25, 26, 27, 31, 32, 33, 138, 139, 140, 141, 142, 143, 144, 145, 146, 149 156, 158, 159, 219.1, 222, 224, 225, 228 & 229 Dismantling of redundant infrastructure Work No. 4B
9, 20, 28, 37, 157, 201 & 219.2 Dismantling of redundant infrastructure Work No. 4B Removal of pylon foundations only to a depth of 1 metre
38, 40, 41, 45, 60, 160, 161, 162 & 165 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4D
39, 64, 79, 81, 200, 218 & 249 Dismantling of redundant infrastructure Work No. 4D Removal of pylon foundations only to a depth of 1 metre
43, 67, 95, 98, 137, 176, 177, 178, 179, 186, 188, 192, 194, 196, 213 & 217 Construction of authorised development Work No. 4D
46, 47, 48, 57, 58, 59, 69, 72, 74, 76, 78, 82, 83, 84, 88, 89, 90, 91, 150, 151, 152, 153, 154, 155, 166, 167, 168, 169, 170, 172, 199, 214.1, 214.2 & 223 Dismantling of redundant infrastructure Work No. 4D
148, 163, 203 & 204 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4B and 4D
226, 230, 231, 233, 247 & 248 Construction of authorised development Work No. 4E
227 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4B, 4D, 4E, 4G and 4P
232, 278, 298 & 320 Dismantling of redundant infrastructure Work No. 4G Removal of pylon foundations only to a depth of 1 metre
234, 235, 240, 243, 276, 282, 293, 302 & 304 Dismantling of redundant infrastructure Work No. 4G
253, 255 & 285 Dismantling of redundant infrastructure Work No. 4P
258 Dismantling of redundant infrastructure Work No. 4P Removal of pylon foundations only to a depth of 1 metre
260 & 264 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4P
267, 269, 279, 280, 281, 288, 294, 296, 300, 307, 312, 314, 316, 317, 322, 326, 327, 328, 329 & 330 Construction of authorised development Work No. 4P
284 Construction of authorised development Work No. 4P Removal of pylon foundations only to a depth of 1 metre
303, 313 & 325 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4G and 4P
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
38, 39.1, 39.2, 42, 43, 45, 46, 47.1, 47.2, 48, 52,57, 58.1, 58.2, 59, 64, 69, 84, 107, 118, 134 & 137 Dismantling of redundant infrastructure Work No. 4G
53, 61, 65, 108, 111, 116 & 138 Dismantling of redundant infrastructure Work No. 4G Removal of pylon foundations only to a depth of 1 metre
23.1, 23.2, 24.1, 24.2, 25, 82, 112, 113, 119, 120, 121, 122, 124, 125, 127, 128 & 130 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4G
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
139 Dismantling of redundant infrastructure Work No. 4G
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
143, 144, 145, 146, 148, 151, 248, 249, 250, 251, 252.1, 252.2, 253, 254, 255, 256, 257, 258, 259, 262, 263, 264, 265, 266, 267, 268, 270, 271, 272, 273, 274.1, 274.2, 275, 276, 277, 278, 279, 280, 281, 282, 283, 284, 285, 286, 287, 288, 289, 290, 291, 292, 293, 294, 295, 296, 297, 298, 299, 300, 301, 303, 304, 305, 306, 307, 308, 309, 310, 311, 312, 313, 315, 316, 317, 318, 322, 323, 324, 325, 326, 327, 329, 330, 331, 332, 333 & 334 Dismantling of redundant infrastructure Work No. 4G
147.1, 147.2, 260, 269, 302, 314 & 328 Dismantling of redundant infrastructure Work No. 4G Removal of pylon foundations only to a depth of 1 metre
261, 319, 320 & 321 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4G
335 Dismantling of redundant infrastructure Works Nos. 4G and 4H Removal of pylon foundations only to a depth of 1 metre
336 Construction of authorised development Work No. 4K
337 Construction of authorised development Works Nos. 4I and 4K
338, 339, 340, 341, 342, 343, 344, 345, 346, 347, 359, 378, 437, 438, 439, 474, 475, 476, 477, 478, 479, 480, 481, 482.1, 482.2 , 498.1, 498.2 , 499, 500, 501, 503, 504, 514, 515, 517, 518 & 519 Dismantling of redundant infrastructure Work No. 4H
351, 352.1, 352.2, 353.1, 353.2, 355, 380, 383, 384, 399, 400, 401, 402, 403, 404, 406, 407, 408 & 441 Construction of authorised development Work No. 4I
397 & 409 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Work No. 4H
398, 405, 440 & 502 Dismantling of redundant infrastructure Work No. 4H Removal of pylon foundations only to a depth of 1 metre
562 & 564 Construction of authorised development Works Nos. 4M and 4N
563, 570, 571, 572 & 575 Construction of authorised development Works Nos. 4L, 4M and 4N
565 Dismantling of redundant infrastructure Work No. 4N
572 Construction of authorised development Works Nos. 4L, 4M and 4N
599 Dismantling of redundant infrastructure Work No. 4L Removal of pylon foundations only to a depth of 1 metre
604, 605, 606, 607, 609 & 610 Access to land for the purpose of carrying out the authorised development including the power to carry out any ancillary works necessary to facilitate that access Works Nos. 4L, 4M, 4N and 4O
608 & 611 Construction of authorised development Works Nos. 4L, 4M, 4N and 4O
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
558 & 559 Construction of authorised development Works Nos. 4M and 4N
560 Construction of authorised development Works Nos. 4L, 4M and 4N
573 Construction of authorised development Work No. 4L
(1)Plot number of land shown on Land Plan (2)Purpose for which temporary possession may be taken (3)Relevant part of the authorised development (4)Element of Work in respect of which land is not required to be re-instated
--- --- --- ---
561 Construction of authorised development Works Nos. 4M and 4N
574 Construction of authorised development Work No. 4L

SCHEDULE 13 — TRAFFIC REGULATION

PART 1 — TEMPORARY PROHIBITION OF VEHICULAR ACCESS AND NO WAITING AND SPEED RESTRICTION

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.