The Hornsea Three Offshore Wind Farm Order 2020
- “drainage authority” means— in relation to an ordinary watercourse, the drainage board concerned within the meaning of section 23 (prohibitions of obstructions etc in watercourses) of the Land Drainage Act 1991[^f00053]; and in relation to a main river or any sea defence work, the Environment Agency;
- “drainage work” means any watercourse includes any land that provides or is expected to provide flood storage capacity for any watercourse and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage, flood defence, sea defence or tidal monitoring;
- “ordinary watercourse” has the meaning given in the Land Drainage Act 1991([^f00054]);
- “plans” includes sections, drawings, specifications and method statements; and
- “specified work” means so much of any work or operation authorised by this Order as is in, on, under, over or within 16 metres of a drainage work or is otherwise likely to— affect any drainage work or the volumetric rate of flow of water in or flowing to or from any drainage work; affect the flow, purity, or quality of water in any watercourse; or affect the conservation, distribution or use of water resources.
3
- (1) Before beginning to construct any specified work, the undertaker must submit to the drainage authority plans of the specified work and such further particulars available to it as the drainage authority may within 28 days of the submission of the plans reasonably require.
- (2) Any such specified work must not be constructed except in accordance with such plans as may be approved in writing by the drainage authority or determined under sub-paragraph 3.
- (3) Any approval of the drainage authority required under this paragraph—
- (a) must not be unreasonably withheld or delayed;
- (b) is deemed to have been given if it is neither given nor refused within 2 months of the submission of the plans for approval (or submission of further particulars if required by the drainage authority under sub-paragraph (1))or, in the case of a refusal, if it is not accompanied by a statement of the grounds of refusal; and
- (c) may be given subject to such reasonable requirements as the drainage authority may make for the protection of any drainage work or, where the drainage authority is the Environment Agency, for the protection of water resources for the prevention of pollution or in the discharge of its environmental duties.
- (4) The drainage authority must use its reasonable endeavours to respond to the submission of any plans before the expiration of the period mentioned in sub-paragraph 3(3)(b).
4
Without limiting paragraph 3, the requirements which the drainage authority may make under that paragraph include conditions requiring the undertaker at its own expense to construct such protective works, whether temporary or permanent, during the construction of the specified work (including the provision of flood banks, walls or embankments or other new works and the strengthening, repair or renewal of existing banks, walls or embankments) as are reasonably necessary—
- (a) to safeguard any drainage work against damage; or
- (b) to secure that its efficiency for flood defence purposes is not impaired and that the risk of flooding is not otherwise increased,
by reason of any specified work.
5
- (1) Subject to sub-paragraph (2), any specified work, and all protective works required by the drainage authority under paragraph 4, must be constructed—
- (a) without unreasonable delay in accordance with the plans approved or deemed to have been approved or settled under this Part; and
- (b) to the reasonable satisfaction of the drainage authority,
and an officer of the drainage authority is entitled to watch and inspect the construction of such works.
- (2) The undertaker must give to the drainage authority—
- (a) not less than 14 days’ notice in writing of its intention to commence construction of any specified work; and
- (b) notice in writing of its completion not later than 7 days after the date on which it is brought into use.
- (3) If the drainage authority reasonably requires, the undertaker must construct all or part of the protective works so that they are in place before the construction of the specified work.
- (4) If any part of a specified work or any protective work required by the drainage authority is constructed otherwise than in accordance with the requirements of this Part, the drainage authority may by notice in writing require the undertaker at the undertaker’s expense to comply with the requirements of this Part or (if the undertaker so elects and the drainage authority in writing consents, such consent not to be unreasonably withheld or delayed) to remove, alter or pull down the work and, where removal is required, to restore the site to its former condition to such extent and within such limits as the drainage authority reasonably requires.
- (5) Subject to sub-paragraph (6), if within a reasonable period, being not less than 28 days from the date when a notice under sub-paragraph (4) is served on the undertaker, the undertaker has failed to begin taking steps to comply with the requirements of the notice and subsequently to make reasonably expeditious progress towards their implementation, the drainage authority may execute the works specified in the notice, and any expenditure incurred by it in so doing is recoverable from the undertaker.
- (6) In the event of any dispute as to whether sub-paragraph (4) is properly applicable to any work in respect of which notice has been served under that sub-paragraph, or as to the reasonableness of any requirement of such a notice, the drainage authority must not except in emergency exercise the powers conferred by sub-paragraph (4) until the dispute has been finally determined.
6
- (1) Subject to sub-paragraph (5) the undertaker must from the commencement of the construction of any specified work maintain in good repair and condition and free from obstruction any drainage work that is situated within the limits of deviation on land held by the undertaker for the purposes of or in connection with the specified work, whether or not the drainage work is constructed under the powers conferred by this Order or is already in existence.
- (2) If any drainage work that the undertaker is liable to maintain is not maintained to the reasonable satisfaction of the drainage authority, the drainage authority may by notice in writing require the undertaker to repair and restore the work, or any part of such work, or (if the undertaker so elects and the drainage authority in writing consents, such consent not to be unreasonably withheld or delayed), to remove the work and restore the site to its former condition, to such extent and within such limits as the drainage authority reasonably requires.
- (3) If, within a reasonable period being not less than 28 days beginning with the date on which a notice in respect of any drainage work is served under sub-paragraph (2) on the undertaker, the undertaker has failed to begin taking steps to comply with the reasonable requirements of the notice and has not subsequently made reasonably expeditious progress towards their implementation, the drainage authority may do what is necessary for such compliance and may recover any expenditure reasonably incurred by it in so doing from the undertaker.
- (4) In the event of any dispute as to the reasonableness of any requirement of a notice served under sub-paragraph (2), the drainage authority must not except in a case of emergency exercise the powers conferred by sub-paragraph (3) until the dispute has been finally determined.
- (5) This paragraph does not apply to—
- (a) drainage works that are vested in the drainage authority or that the drainage authority or another person is liable to maintain and is not prevented by this Order from so doing; and
- (b) any obstruction of a drainage work for the purpose of a work or operation authorised by this Order and carried out in accordance with the provisions of this Part.
7
If by reason of the construction of any specified work or of the failure of any such work the efficiency of any drainage work for flood defence purposes is impaired, or the drainage work is otherwise damaged, the impairment or damage must be made good by the undertaker to the reasonable satisfaction of the drainage authority and, if the undertaker fails to do so, the drainage authority may make good the impairment or damage and recover from the undertaker the expense reasonably incurred by it in doing so.
8
The undertaker must indemnify the drainage authority in respect of all costs, charges and expenses that the drainage authority may reasonably incur, have to pay or may sustain—
- (a) in the examination or approval of plans under this Part;
- (b) in inspecting the construction of any specified work or any protective works required by the drainage authority under this Part; and
- (c) in carrying out of any surveys or tests by the drainage authority that are reasonably required in connection with the construction of the specified work.
9
- (1) Without limiting the other provisions of this Part, the undertaker must indemnify the drainage authority in respect of all claims, demands, proceedings, costs, damages, expenses or loss that may be made or taken against, recovered from or incurred by, the drainage authority by reason of—
- (a) any damage to any drainage work so as to impair its efficiency for the purposes of flood defence;
- (b) any raising or lowering of the water table in land adjoining the authorised development or any sewers, drains and watercourses; or
- (c) any flooding or increased flooding of any such land; and
- (d) where the drainage authority is the Environment Agency, inadequate water quality in any watercourse or other surface waters or in any groundwater,
that is caused by the construction of any specified work or any act or omission of the undertaker, its contractors, agents or employees whilst engaged on the work.
- (2) The drainage authority must give to the undertaker reasonable notice of any such claim or demand, and no settlement or compromise may be made without the agreement of the undertaker which agreement must not be unreasonably withheld or delayed.
10
The fact that any work or thing has been executed or done by the undertaker in accordance with a plan approved or deemed to be approved by the drainage authority, or to its satisfaction, or in accordance with any directions or award of an arbitrator, does not relieve the undertaker from any liability under this Part.
11
Any dispute between the undertaker and the drainage authority under this Part, if the parties agree, must be determined by arbitration under article 37 (arbitration), but otherwise must be determined by the Secretary of State for Environment, Food and Rural Affairs and the Secretary of State for Business, Energy and Industrial Strategy acting jointly on a reference to them by the undertaker or the drainage authority, after notice in writing by one to the other.
PART 8 — FOR THE PROTECTION OF NORFOLK VANGUARD
1
The provisions of this Part apply for the protection of Vanguard unless otherwise agreed in writing between the undertaker and Vanguard.
2
In this Part—
- “apparatus” means the cables, structures or other infrastructure owned, occupied or maintained by Vanguard or its successor in title within the Norfolk Vanguard Order land;
- “construction” includes execution, placing, altering, replacing, reconstruction, relaying, maintenance, extensions, enlargement and removal; and “construct” and “constructed” must be construed accordingly;
- “Crossing Area” means the land within land parcels 16-001, 16-002, 16-003 and 16-004 shown on the land plans and described in the book of reference;
- “Norfolk Vanguard Order” means the Norfolk Vanguard Offshore Wind Farm Order as granted by the Secretary of State on 1 July 2020;
- “Norfolk Vanguard Order land” means Order land as defined in the Norfolk Vanguard Order;
- “plans” includes sections, drawings, specifications, designs, design data, software, soil reports, calculations, descriptions (including descriptions of methods of construction), staging proposals, programmes and details of the extent, timing and duration of any proposed occupation of the Norfolk Vanguard Order land;
- “proposed Norfolk Vanguard Cable Corridor” means the proposed location for any electrical circuit(s) and construction compound(s) permitted by the Norfolk Vanguard Order within the Norfolk Vanguard Order land;
- “specified works” means so much of any works or operations authorised by this Order (or authorised by any planning permission intended to operate in conjunction with this Order) as is— within the Crossing Area; in, on, under, over or within 25 metres of the proposed Norfolk Vanguard Cable Corridor or any apparatus; or may in any way adversely affect any apparatus; and
- “Vanguard” means an undertaker with the benefit of all or part of the Norfolk Vanguard Order for the time being.
3
The consent of Vanguard under this Part is not required where the Norfolk Vanguard Order has expired without the authorised development having been commenced pursuant to requirement 1 of Schedule 1 to the Norfolk Vanguard Order.
4
Where conditions are included in any consent granted by Vanguard pursuant to this Part, the undertaker must comply with the conditions if it chooses to implement or rely on the consent, unless the conditions are waived or varied in writing by Vanguard.
5
The undertaker must not under the powers of this Order—
- (a) acquire, extinguish, suspend, override or interfere with any rights that Vanguard has in respect of any apparatus or the proposed Norfolk Vanguard Cable Corridor;
- (b) acquire the Norfolk Vanguard Order land or acquire any new rights or impose restrictive covenants or exercise any powers of temporary use over or in relation to the Norfolk Vanguard Order land without the consent of Vanguard, which must not be unreasonably withheld or delayed but which may be made subject to reasonable conditions.
6
- (1) The undertaker must not under the powers of this Order carry out any specified works without the consent of Vanguard, which must not be unreasonably withheld or delayed but which may be made subject to reasonable conditions and if Vanguard does not respond within 30 days then consent is deemed to be given.
- (2) Subject to obtaining consent pursuant to sub-paragraph (1) and before beginning to construct any specified works, the undertaker must submit plans of the specified works to Vanguard and must submit such further particulars available to it that Vanguard may reasonably require.
- (3) Any specified works must be constructed without unreasonable delay in accordance with the plans approved in writing by Vanguard.
- (4) Any approval of Vanguard required under this paragraph may be made subject to such reasonable conditions as may be required for the protection or alteration of any apparatus or the proposed Norfolk Vanguard Cable Corridor or for securing access to any apparatus or the proposed Norfolk Vanguard Cable Corridor.
- (5) Without limiting sub-paragraph (1), it is not reasonable for Vanguard to withhold or delay any consent or approval under this Part in relation to specified works in, on, under, or over the Crossing Area solely on the basis of thermal interaction where the plans of the specified works submitted under sub-paragraph (2) demonstrate that all reasonable steps have been taken to minimise thermal interaction between the specified works and any apparatus or the proposed Norfolk Vanguard Cable Corridor.
- (6) Where Vanguard requires any protective works to be carried out either by themselves or by the undertaker (whether of a temporary or permanent nature) such protective works must be carried out to Vanguard’s reasonable satisfaction.
- (7) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any specified works, new plans instead of the plans previously submitted, and the provisions of this paragraph shall apply to and in respect of the new plans.
7
- (1) The undertaker must give to Vanguard not less than 28 days’ written notice of its intention to commence the construction of the specified works and, not more than 14 days after completion of their construction, must give Vanguard written notice of the completion.
- (2) The undertaker is not required to comply with paragraph 6 or sub-paragraph (1) in a case of emergency, but in that case it must give to Vanguard notice as soon as is reasonably practicable and a plan, section and description of those works as soon as reasonable practicable subsequently and must comply with paragraph 6 in so far as is reasonably practicable in the circumstances.
8
The undertaker must at all reasonable times during construction of the specified works allow Vanguard and its servants and agents access to the specified works and all reasonable facilities for inspection of the specified works.
9
- (1) After the purpose of any temporary works has been accomplished, the undertaker must with all reasonable dispatch, or after a reasonable period of notice in writing from Vanguard requiring the undertaker to do so, remove the temporary works in, on, under, over, or within the Crossing Area.
- (2) If the undertaker fails to remove the temporary works within a reasonable period of receipt of a notice pursuant to sub-paragraph (1), Vanguard may remove the temporary works and may recover the reasonable costs of doing so from the undertaker.
10
If in consequence of the exercise of the powers conferred by this Order the access to any apparatus is materially obstructed, the undertaker must provide such alternative means of access to such apparatus as will enable Vanguard to maintain or use the apparatus no less effectively than was possible before the obstruction.
11
The undertaker must not exercise the powers conferred by this Order to prevent or interfere with the access by Vanguard to the proposed Norfolk Vanguard Cable Corridor.
12
To ensure its compliance with this Part, the undertaker must before carrying out any works or operations pursuant to this Order within the Crossing Area request up-to-date written confirmation from Vanguard of the location of any apparatus or the proposed Norfolk Vanguard Cable Corridor.
13
The undertaker and Vanguard must each act in good faith and use reasonable endeavours to co-operate with, and provide assistance to, each other as may be required to give effect to the provisions of this Part.
14
The undertaker must pay to Vanguard the reasonable expenses incurred by Vanguard in connection with the approval of plans, inspection of any specified works or the alteration or protection of any apparatus or the proposed Norfolk Vanguard Cable Corridor.
15
- (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any specified works, any damage is caused to any apparatus or there is any interruption in any service provided, or in the supply of any goods, by Vanguard, or Vanguard becomes liable to pay any amount to any third party, the undertaker must—
- (a) bear and pay the cost reasonably incurred by Vanguard in making good such damage or restoring the service or supply; and
- (b) compensate Vanguard for any other expenses, loss, demands, proceedings, damages, claims, penalty or costs incurred by or recovered from Vanguard, by reason or in consequence of any such damage or interruption or Vanguard becoming liable to any third party as aforesaid.
- (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of Vanguard, its officers, servants, contractors or agents.
- (3) Vanguard must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise shall be made, unless payment is required in connection with a statutory compensation scheme without first consulting the undertaker and considering its representations.
- (4) Vanguard must use its reasonable endeavours to mitigate in whole or in part and to minimise any costs, expenses, loss, demands, and penalties to which the indemnity under this paragraph 15 applies. If requested to do so by the undertaker, Vanguard shall provide an explanation of how the claim has been minimised. The undertaker shall only be liable under this paragraph 15 for claims reasonably incurred by Vanguard.
- (5) The fact that any work or thing has been executed or done with the consent of Vanguard and in accordance with any conditions or restrictions prescribed by Vanguard or in accordance with any plans approved by Vanguard or to its satisfaction or in accordance with any directions or award of any arbitrator does not relieve the undertaker from any liability under this Part.
16
Any dispute arising between the undertaker and Vanguard under this Part must be determined by arbitration under article 37 (arbitration).
PART 9 — FOR THE PROTECTION OF NORFOLK BOREAS
1
The provisions of this Part apply for the protection of Boreas unless otherwise agreed in writing between the undertaker and Boreas.
2
In this Part—
- “apparatus” means the cables, structures or other infrastructure owned, occupied or maintained by Boreas or its successor in title within the Norfolk Boreas Order Land;
- “Boreas” means an undertaker with the benefit of all or part of the Norfolk Boreas Order for the time being;
- “construction” includes execution, placing, altering, replacing, reconstruction, relaying, maintenance, extensions, enlargement and removal; and “construct” and “constructed” must be construed accordingly;
- “Crossing Area” means the land within land parcels 16-001, 16-002, 16-003 and 16-004 shown on the land plans and described in the book of reference;
- “Norfolk Boreas Order” means a development consent order granted by the Secretary of State following an application by Norfolk Boreas Limited for the Norfolk Boreas Offshore Wind Farm ;
- “Norfolk Boreas Order land” means Order land as defined in the Norfolk Boreas Order;
- “plans” includes sections, drawings, specifications, designs, design data, software, soil reports, calculations, descriptions (including descriptions of methods of construction), staging proposals, programmes and details of the extent, timing and duration of any proposed occupation of the Norfolk Boreas Order land;
- “proposed Norfolk Boreas Cable Corridor” means the proposed location for any electrical circuit(s) and construction compound(s) permitted by the Norfolk Boreas Order within the Norfolk Boreas Order land; and
- “specified works” means so much of any works or operations authorised by this Order (or authorised by any planning permission intended to operate in conjunction with this Order) as is— within the Crossing Area; in, on, under, over or within 25 metres of the proposed Norfolk Boreas Cable Corridor or any apparatus; or may in any way adversely affect any apparatus.
3
The consent of Boreas under this Part is not required where the Norfolk Boreas Order has expired without the authorised development having been commenced pursuant to any requirement of Schedule 1 to the Norfolk Boreas Order.
4
Where conditions are included in any consent granted by Boreas pursuant to this Part, the undertaker must comply with the conditions if it chooses to implement or rely on the consent, unless the conditions are waived or varied in writing by Boreas.
5
The undertaker must not under the powers of this Order—
- (a) acquire, extinguish, suspend, override or interfere with any rights that Boreas has in respect of any apparatus or the proposed Norfolk Boreas Cable Corridor;
- (b) acquire the Norfolk Boreas Order land or acquire any new rights or impose restrictive covenants or exercise any powers of temporary use over or in relation to the Norfolk Boreas Order land without the consent of Boreas, which must not be unreasonably withheld or delayed but which may be made subject to reasonable conditions.
6
- (1) The undertaker must not under the powers of this Order carry out any specified works without the consent of Boreas, which must not be unreasonably withheld or delayed but which may be made subject to reasonable conditions and if Boreas does not respond within 30 days then consent is deemed to be given.
- (2) Subject to obtaining consent pursuant to sub-paragraph (1) and before beginning to construct any specified works, the undertaker must submit plans of the specified works to Boreas and must submit such further particulars available to it that Boreas may reasonably require.
- (3) Any specified works must be constructed without unreasonable delay in accordance with the plans approved in writing by Boreas.
- (4) Any approval of Boreas required under this paragraph may be made subject to such reasonable conditions as may be required for the protection or alteration of any apparatus or the proposed Norfolk Boreas Cable Corridor or for securing access to any apparatus or the proposed Norfolk Boreas Cable Corridor;
- (5) Without limiting sub-paragraph (1), it is not reasonable for Boreas to withhold or delay any consent or approval under this Part in relation to specified works in, on, under, or over the Crossing Area solely on the basis of thermal interaction where the plans of the specified works submitted under sub-paragraph (2) demonstrate that all reasonable steps have been taken to minimise thermal interaction between the specified works and any apparatus or the proposed Norfolk Boreas Cable Corridor.
- (6) Where Boreas requires any protective works to be carried out either by themselves or by the undertaker (whether of a temporary or permanent nature) such protective works must be carried out to Boreas’s reasonable satisfaction.
- (7) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any specified works, new plans instead of the plans previously submitted, and the provisions of this paragraph shall apply to and in respect of the new plans.
7
- (1) The undertaker must give to Boreas not less than 28 days’ written notice of its intention to commence the construction of the specified works and, not more than 14 days after completion of their construction, must give Boreas written notice of the completion.
- (2) The undertaker is not required to comply with paragraph 6 or sub-paragraph (1) in a case of emergency, but in that case it must give to the Boreas notice as soon as is reasonably practicable and a plan, section and description of those works as soon as reasonable practicable subsequently and must comply with paragraph 6 in so far as is reasonably practicable in the circumstances.
8
The undertaker must at all reasonable times during construction of the specified works allow Boreas and its servants and agents access to the specified works and all reasonable facilities for inspection of the specified works.
9
- (1) After the purpose of any temporary works has been accomplished, the undertaker must with all reasonable dispatch, or after a reasonable period of notice in writing from Boreas requiring the undertaker to do so, remove the temporary works in, on, under, over, or within the Crossing Area.
- (2) If the undertaker fails to remove the temporary works within a reasonable period of receipt of a notice pursuant to sub-paragraph (1), Boreas may remove the temporary works and may recover the reasonable costs of doing so from the undertaker.
10
If in consequence of the exercise of the powers conferred by this Order the access to any apparatus is materially obstructed, the undertaker must provide such alternative means of access to such apparatus as will enable Boreas to maintain or use the apparatus no less effectively than was possible before the obstruction.
11
The undertaker must not exercise the powers conferred by this Order to prevent or interfere with the access by Boreas to the proposed Norfolk Boreas Cable Corridor.
12
To ensure its compliance with this Part, the undertaker must before carrying out any works or operations pursuant to this Order within the Crossing Area request up-to-date written confirmation from Boreas of the location of any apparatus or the proposed Norfolk Boreas Cable Corridor.
13
The undertaker and Boreas must each act in good faith and use reasonable endeavours to co-operate with, and provide assistance to, each other as may be required to give effect to the provisions of this Part.
14
The undertaker must pay to Boreas the reasonable expenses incurred by Boreas in connection with the approval of plans, inspection of any specified works or the alteration or protection of any apparatus or the proposed Norfolk Boreas Cable Corridor.
15
- (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any specified works, any damage is caused to any apparatus or there is any interruption in any service provided, or in the supply of any goods, by Boreas, or Boreas becomes liable to pay any amount to any third party, the undertaker must—
- (a) bear and pay the cost reasonably incurred by Boreas in making good such damage or restoring the service or supply; and
- (b) compensate Boreas for any other expenses, loss, demands, proceedings, damages, claims, penalty or costs incurred by or recovered from Boreas, by reason or in consequence of any such damage or interruption or Boreas becoming liable to any third party as aforesaid.
- (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of Boreas, its officers, servants, contractors or agents.
- (3) Boreas must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise shall be made, unless payment is required in connection with a statutory compensation scheme without first consulting the undertaker and considering its representations.
- (4) Boreas must use its reasonable endeavours to mitigate in whole or in part and to minimise any costs, expenses, loss, demands, and penalties to which the indemnity under this paragraph 15 applies. If requested to do so by the undertaker, Boreas shall provide an explanation of how the claim has been minimised. The undertaker shall only be liable under this paragraph 15 for claims reasonably incurred by Boreas.
- (5) The fact that any work or thing has been executed or done with the consent of Boreas and in accordance with any conditions or restrictions prescribed by Boreas or in accordance with any plans approved by Boreas or to its satisfaction or in accordance with any directions or award of any arbitrator does not relieve the undertaker from any liability under this Part.
16
Any dispute arising between the undertaker and Boreas under this Part must be determined by arbitration under article 37 (arbitration).
SCHEDULE 10
PART 1 — REMOVAL OF HEDGEROWS
| (1) Area | (2) Location of hedgerow |
|---|---|
| North Norfolk District | The hedgerow shown between points 1a and 1b on sheet 1 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 2a and 2b on sheet 1 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 3a and 3b on sheet 1 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 4a and 4b on sheet 1 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 5a and 5b on sheet 1 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 7a and 7b on sheet 1 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 8a and 8b on sheet 1 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 9a and 9b on sheet 2 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 10a and 10b on sheet 2 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 11a and 11b on sheet 2 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 12a and 12b on sheet 2 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 13a and 13b on sheet 3 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 14a and 14b on sheet 3 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 15a and 15b on sheet 3 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 16a and 16b on sheet 3 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 17a and 17b on sheet 3 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 18a and 18b on sheet 3 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 19a and 19b on sheet 3 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 20a and 20b on sheet 3 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 21a and 21b on sheet 3 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 22a and 22b on sheet 3 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 22b and 22c on sheet 3 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 23a and 23b on sheet 3 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 25a and 25b on sheets 3 and 4 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 26a and 26b on sheets 3 and 4 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 27a and 27b on sheets 3 and 4 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 29a and 29b on sheet 4 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 30a and 30b on sheet 4 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 32a and 32b on sheet 4 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 33a and 33b on sheet 4 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 34a and 34b on sheet 4 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 39a and 39b on sheet 5 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 43a and 43b on sheet 7 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 44a and 44b on sheet 7 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 45a and 45b on sheet 7 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 47a and 47b on sheet 7 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 50a and 50b on sheet 8 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 51a and 51b on sheet 8 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 52a and 52b on sheet 8 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 53a and 53b on sheet 8 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 54a and 54b on sheet 8 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 55a and 55b on sheet 8 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 56a and 56b on sheet 8 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 57a and 57b on sheets 8 and 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 58a and 58b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 59a and 59b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 60a and 60b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 61a and 61b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 62a and 62b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 63a and 63b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 64a and 64b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 65a and 65b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 66a and 66b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 67a and 67b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 68a and 68b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 69a and 69b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 70a and 70b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 71a and 71b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 72a and 72b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 73a and 73b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 74a and 74b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 75a and 75b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 76a and 76b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 77a and 77b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 78a and 78b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 80a and 80b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 81a and 81b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 82a and 82b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 83a and 83b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 85a and 85b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 85c and 85d on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 85e and 85f on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 86a and 86b on sheet 9 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 87a and 87b on sheet 10 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 88a and 88b on sheet 10 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 89a and 89b on sheet 10 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 90a and 90b on sheet 10 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 92a and 92b on sheet 10 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 93a and 93b on sheet 10 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 94a and 94b on sheet 10 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 95a and 95b on sheet 10 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 96a and 96b on sheet 10 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 97a and 97b on sheet 10 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 98a and 98b on sheet 10 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 100a and 100b on sheet 10 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 102a and 102b on sheet 10 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 103a and 103b on sheet 11 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 104a and 104b on sheet 11 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 105a and 105b on sheet 11 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 106a and 106b on sheet 11 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 107a and 107b on sheet 11 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 108a and 108b on sheet 11 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 109a and 109b on sheet 11 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 110a and 110b on sheet 11 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 111a and 111b on sheet 11 of the tree preservation order and hedgerow plan |
| North Norfolk District | The hedgerow shown between points 112a and 112b on sheet 12 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 115a and 115b on sheet 12 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 116a and 116b on sheet 12 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 122a and 122b on sheet 13 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 123a and 123b on sheet 13 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 124a and 124b on sheet 13 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 125a and 125b on sheet 13 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 128a and 128b on sheet 13 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 129a and 129b on sheet 13 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 131a and 131b on sheet 14 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 132a and 132b on sheet 14 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 133a and 133b on sheet 14 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 134a and 134b on sheet 14 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 135a and 135b on sheet 14 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 136a and 136b on sheet 14 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 137a and 137b on sheet 14 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 138a and 138b on sheet 14 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 139a and 139b on sheet 14 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 140a and 140b on sheet 14 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 141a and 141b on sheet 15 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 142a and 142b on sheet 15 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 143a and 143b on sheet 15 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 144a and 144b on sheet 15 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 145a and 145b on sheet 15 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 146a and 146b on sheet 15 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 147a and 147b on sheet 16 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 149a and 149b on sheet 16 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 150a and 150b on sheet 16 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 152a and 152b on sheet 16 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 155a and 155b on sheet 17 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 156a and 156b on sheet 17 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 157a and 157b on sheet 18 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 158a and 158b on sheet 18 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 160a and 160b on sheet 18 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 161a and 161b on sheet 18 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 162a and 162b on sheet 18 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 163a and 163b on sheet 19 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 164a and 164b on sheet 19 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 165a and 165b on sheet 19 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 167a and 167b on sheet 19 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 168a and 168b on sheet 19 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 169a and 169b on sheet 19 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 170a and 170b on sheet 20 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 171a and 171b on sheet 20 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 172a and 172b on sheet 20 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 177a and 177b on sheet 20 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 178a and 178b on sheet 20 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 179a and 179b on sheet 21 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 180a and 180b on sheet 21 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 181a and 181b on sheet 21 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 182a and 182b on sheet 21 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 183a and 183b on sheet 21 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 184a and 184b on sheet 21 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 185a and 185b on sheet 21 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 186a and 186b on sheet 21 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 187a and 187b on sheet 21 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 188a and 188b on sheet 21 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 190a and 190b on sheet 22 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 191a and 191b on sheet 22 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 192a and 192b on sheet 22 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 193a and 193b on sheet 23 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 194a and 194b on sheet 23 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 195a and 195b on sheet 23 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 196a and 196b on sheet 23 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 197a and 197b on sheet 23 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 199a and 199b on sheet 23 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 201a and 201b on sheet 24 of the tree preservation order and hedgerow plan |
| Broadland District | The hedgerow shown between points 202a and 202b on sheet 24 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 208a and 208b on sheet 24 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 209a and 209b on sheet 25 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 210a and 210b on sheet 25 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 211a and 211b on sheet 25 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 213a and 213b on sheet 25 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 215a and 215b on sheet 26 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 216a and 216b on sheet 26 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 217a and 217b on sheet 26 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 218a and 218b on sheet 26 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 219a and 219b on sheet 26 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 220a and 220b on sheet 26 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 221a and 221b on sheet 26 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 223a and 223b on sheet 26 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 224a and 224b on sheet 26 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 225a and 225b on sheet 26 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 226a and 226b on sheet 26 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 227a and 227b on sheet 26 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 232a and 232b on sheet 27 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 233a and 233b on sheet 27 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 234a and 234b on sheet 27 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 235a and 235b on sheet 27 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 236a and 236b on sheet 27 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 237a and 237b on sheet 27 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 238a and 238b on sheet 27 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 239a and 239b on sheets 27 and 28 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 240a and 240b on sheets 27 and 28 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 241a and 241b on sheets 27 and 28 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 242a and 242b on sheet 28 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 243a and 243b on sheet 28 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 246a and 246b on sheet 28 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 246c and 246d on sheet 28 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 247a and 247b on sheet 28 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 248a and 248b on sheet 28 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 252a and 252b on sheet 28 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 253a and 253b on sheets 28 and 29 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 254a and 254b on sheet 28 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 256a and 256b on sheet 28 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 258a and 258b on sheets 28 and 29 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 259a and 259b on sheets 28 and 29 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 262a and 262b on sheet 29 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 263a and 263b on sheet 29 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 264a and 264b on sheet 29 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 266a and 266b on sheet 29 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 267a and 267b on sheet 29 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 268a and 268b on sheet 29 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 269a and 269b on sheet 29 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 270a and 270b on sheet 29 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 271a and 271b on sheet 29 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 272a and 272b on sheet 29 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 275a and 275b on sheet 30 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 276a and 276b on sheet 30 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 278a and 278b on sheet 30 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 281a and 281b on sheet 30 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 282a and 282b on sheet 30 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 283a and 283b on sheet 30 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 284a and 284b on sheet 30 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 285a and 285b on sheet 30 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 286a and 286b on sheet 30 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 287a and 287b on sheet 30 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 288a and 288b on sheet 30 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 289a and 289b on sheet 30 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 290a and 290b on sheet 30 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 291a and 291b on sheet 30 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 292a and 292b on sheet 31 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 293a and 293b on sheet 31 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 294a and 294b on sheet 31 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 296a and 296b on sheet 32 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 297a and 297b on sheet 31 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 298a and 298b on sheet 32 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 299a and 299b on sheet 31 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 300a and 300b on sheet 31 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 301a and 301b on sheet 32 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 303a and 303b on sheet 32 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 304a and 304b on sheet 32 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 306a and 306b on sheet 31 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 308a and 308b on sheet 32 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 310a and 310b on sheet 32 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 311a and 311b on sheet 32 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 312a and 312b on sheet 32 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 313a and 313b on sheet 32 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 314a and 314b on sheet 33 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 315a and 315b on sheet 33 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 317a and 317b on sheet 31 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 319a and 319b on sheet 31 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 322a and 322b on sheet 33 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 326a and 326b on sheet 33 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 329a and 329b on sheet 33 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 338a and 338b on sheet 34 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 340a and 340b on sheet 34 of the tree preservation order and hedgerow plan |
| South Norfolk District | The hedgerow shown between points 341a and 341b on sheets 35 and 36 of the tree preservation order and hedgerow plan |
PART 2 — REMOVAL OF IMPORTANT HEDGEROWS
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.