The East Anglia TWO Offshore Wind Farm Order 2022

Type Statutory-Instrument
Publication 2022-03-31
Last updated 2022-12-22
State In force
Department King's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API
(1) (2)
Number of land shown on land plan Purpose for which rights may be acquired
1, 2 the right to install the cables by the use of directional drilling or other trenchless techniques only; the right to retain and use the cables and for the purposes of the transmission of electricity and telecommunications; the right to benefit from continuous vertical and lateral support for the cables and jointing installations; a restrictive covenant over the land for the benefit of the remainder of the Order land— to prevent anything to be done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto); to prevent anything to be done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project); to prevent anything to be done by way of excavation of any kind in the land nor any activities which increase or decrease ground cover or soil levels in any manner whatsoever without the consent in writing of the undertaker save as are reasonably required for agricultural activities or are required to be carried out by National Grid in order to exercise their rights in relation to their apparatus (if any) within the land; and to prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the cables.
4, 5, 6 all rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment; the right to carry out terrestrial work activities; the right to install the cables by the use of directional drilling or other trenchless techniques only; the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove pipes, cables, conduits, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers); the right to remove and discharge water from the land; the right to retain and use the cables, for the purposes of the transmission of electricity and telecommunications; the right to benefit from continuous vertical and lateral support for the cables, transition bays and jointing installations; a restrictive covenant over the land for the benefit of the remainder of the Order land— to prevent anything to be done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto); to prevent anything to be done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project); to prevent anything to be done by way of excavation of any kind in the land nor any activities which increase or decrease ground cover or soil levels in any manner whatsoever without the consent in writing of the undertaker save as are reasonably required for agricultural activities or are required to be carried out by National Grid in order to exercise their rights in relation to their apparatus (if any) within the land; and to prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the cables, transition bays and jointing installations.
7 all rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment; the right to carry out terrestrial work activities; the right to install the cables by way of (but not limited to) digging trenches, the use of directional drilling, auger boring, thrust boring, micro tunnelling or pipe ramming or other similar trenchless techniques; the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove— public and private drains, watercourses, sewers, ponds or culverts, and to drain into and manage waterflows in any public and private drains, watercourses, sewers, ponds or culverts including (but not limited to) by way of damming and overpumping; temporary welfare facilities (including but not limited to portakabins, portaloos and welfare equipment); cable marker posts to identify the location of the cables as required for routine integrity testing; pipes, cables, conduit, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers); hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram; temporary paths and bridleways for public use; temporary access roads; temporary haul roads; temporary noise alleviation measures; temporary barriers for the protection of fauna; supporting or protective structures (including the bridging over of or protection of the apparatus of the statutory undertakers); temporary fencing, gates, walls, barriers or other means of enclosure. the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges for the purpose of enabling rights to pass and repass and for the purposes of terrestrial work activities; the right to remove and discharge water from the land; the right to install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation and/or enhancement works; the right to install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping; the right to erect temporary signage and provide measures for the benefit of public and personnel safety; the right to retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the land, adjoining land and highway; the right to remove fences, hedges, gates or other barriers during any period during which terrestrial work activities is to occur (subject to the prior erection of any temporary stock proof fencing as is reasonably required) and the replacement, replanting or re-instatement of fences, hedges or other barriers; the right to remove, store and stockpile materials (including excavated material) within the land; the right to remove archaeological artefacts where they would prevent or cause it to be materially more difficult to undertake terrestrial work activities or where leaving such archaeological artefacts in situ would materially increase the cost of the terrestrial work activities; the right to retain and use the cables, transition bays and jointing installations for the purposes of the transmission of electricity and telecommunications; the right to benefit from continuous vertical and lateral support for the cables, transition bays and jointing installations; a restrictive covenant over the land for the benefit of the remainder of the Order land— to prevent anything to be done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto); to prevent anything to be done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project); to prevent anything to be done by way of excavation of any kind in the land nor any activities which increase or decrease ground cover or soil levels in any manner whatsoever without the consent in writing of the undertaker save as are reasonably required for agricultural activities or are required to be carried out by National Grid in order to exercise their rights in relation to their apparatus (if any) within the land; to prevent the planting or growing within the land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised project nor make it materially more difficult or expensive to access the relevant part of the authorised project); and to prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the cables, transition bays and jointing installations.
11, 12, 13, 14, 15, 16, 25, 27, 28 , 30 , 39, 40, 41, 42, 47, 49, 50, 54, 55, 56, 58, 59, 60, 61, 63, 64, 65, 66, 67, 69, 70, 74, 80, 82, 83, 85, 92, 93 all rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment; the right to carry out terrestrial work activities; the right to install the cables by way of (but not limited to) digging trenches, the use of directional drilling, auger boring, thrust boring, micro tunnelling or pipe ramming or other similar trenchless techniques; the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove— public and private drains, watercourses, sewers, ponds or culverts, and to drain into and manage waterflows in any public and private drains, watercourses, sewers, ponds or culverts including (but not limited to) by way of damming and overpumping; temporary welfare facilities (including but not limited to portakabins, portaloos and welfare equipment); cable marker posts to identify the location of the cables as required for routine integrity testing; pipes, cables, conduit, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers); hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram; temporary paths and bridleways for public use; temporary access roads; temporary haul roads; temporary noise alleviation measures; temporary barriers for the protection of fauna; supporting or protective structures (including the bridging over of or protection of the apparatus of the statutory undertakers); temporary fencing, gates, walls, barriers or other means of enclosure. the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges for the purpose of enabling rights to pass and repass and for the purposes of terrestrial work activities; the right to remove and discharge water from the land; the right to install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation and/or enhancement works; the right to install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping; the right to erect temporary signage and provide measures for the benefit of public and personnel safety; the right to retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the land, adjoining land and highway; the right to remove fences, hedges, gates or other barriers during any period during which terrestrial work activities is to occur (subject to the prior erection of any temporary stock proof fencing as is reasonably required) and the replacement, replanting or re-instatement of fences, hedges or other barriers; the right to remove, store and stockpile materials (including excavated material) within the land; the right to remove archaeological artefacts where they would prevent or cause it to be materially more difficult to undertake terrestrial work activities or where leaving such archaeological artefacts in situ would materially increase the cost of the terrestrial work activities; the right to retain and use the cables and jointing installations for the purposes of the transmission of electricity and telecommunications; the right to benefit from continuous vertical and lateral support for the cables and jointing installations; a restrictive covenant over the land for the benefit of the remainder of the Order land— to prevent anything to be done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto); to prevent anything to be done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project); to prevent anything to be done by way of excavation of any kind in the land nor any activities which increase or decrease ground cover or soil levels in any manner whatsoever without the consent in writing of the undertaker save as are reasonably required for agricultural activities or are required to be carried out by National Grid in order to exercise their rights in relation to their apparatus (if any) within the land; to prevent the planting or growing within the land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised project nor make it materially more difficult or expensive to access the relevant part of the authorised project); and to prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the cables and jointing installations.
67, 69, 70, 80, 82, 83, 85, 86, 88, 93 the right to pass and repass with or without plant, vehicles, machinery, materials, drilling fluids, apparatus and equipment to access adjoining land and highway; the right to retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the land, adjoining land and highway; the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges for the purposes of enabling rights to pass and repass; the right to remove and discharge water from the land; the right to erect temporary signage and provide measures for the benefit of public and personnel safety; the right to remove fences, hedges, gates or other barriers during any period during which terrestrial work activities are being undertaken (subject to the prior erection of any temporary stock proof fencing as is reasonably required) and the replacement, replanting or re-instatement of fences, hedges or other barriers.
87 the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove— temporary barriers for the protection of fauna; temporary paths and bridleways for public use; temporary access roads; temporary fencing, gates, walls, barriers or other means of enclosure. the right to pass and repass with or without plant, vehicles, machinery, materials, apparatus and equipment to access adjoining land and highway; the right to place and use plant, vehicles, machinery, materials, apparatus, equipment and temporary structures on and within the land; the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges; the right to remove and discharge water from the land; the right to install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation and/or enhancement works; the right to install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant trees, shrubs and landscaping; the right to erect temporary signage and provide measures for the benefit of public and personnel safety; the right to remove fences, hedges, gates or other barriers during any period during which terrestrial work activities in respect of the authorised project is to occur (subject to the prior erection of any temporary stock proof fencing as is reasonably required) and the replacement, replanting or re-instatement of fences, hedges or other barriers; the right to remove, store and stockpile materials (including excavated material) within the land; a restrictive covenant over the land for the benefit of the remainder of the Order land— to prevent anything to be done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto); and to prevent anything to be done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project).
115 all rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment, and to— lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove— electricity poles, electricity pylons, electricity masts, overhead electricity lines, telecommunications cables and any ancillary equipment and apparatus (including but not limited to the use of scaffolding) and any other works as necessary; public and private drains, watercourses, sewers, ponds or culverts, and to drain into and manage waterflows in any public and private drains, watercourses, sewers, ponds or culverts including (but not limited to) by way of damming and overpumping; temporary welfare facilities (including but not limited to portakabins, portaloos and welfare equipment); pipes, cables, conduit, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers); temporary noise alleviation measures; temporary barriers for the protection of fauna; supporting or protective structures (including the bridging over of or protection of the apparatus of the statutory undertakers); hard standing and other material (including but not limited to matting, aggregate, trackway, stone, tarmacadam, terram); temporary access roads; temporary haul roads; temporary paths and bridleways for public use; fencing, gates, walls, barriers or other means of enclosure. retain and use electricity poles, electricity pylons, electricity masts, overhead electricity lines, telecommunications cables and all ancillary equipment and apparatus for the purposes of the transmission of electricity and telecommunications and for any other purpose ancillary to the authorised project; pass and repass with or without plant, vehicles, machinery, materials, drilling fluids, apparatus and equipment to access adjoining land and highway; place and use plant, vehicles, machinery, materials, drilling fluids, apparatus, equipment and temporary structures on and within the land; fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges for the purpose of enabling rights to pass and repass; fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges and remove roots of trees, shrubs and hedges which may obstruct or interfere with electricity poles, electricity pylons, overhead electricity lines, telecommunications cables and any ancillary equipment and apparatus (including but not limited to scaffolding); carry out surveys including for site investigation and environmental surveys (including without prejudice to the generality of the foregoing, topographic, drainage, archaeological, geotechnical, geoenvironmental, ecological and ground stability site investigations and surveys), making of boreholes, trial pits and archaeological trenches and field stripping, auger hole sampling and the taking of soil and other samples; remove and discharge water from the land; install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation and/or enhancement works; install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping; benefit from continuous vertical and lateral support for the electricity poles, electricity pylons, overhead electricity lines, telecommunications cables and any ancillary equipment and apparatus (including but not limited to scaffolding); erect temporary signage and provide measures for the benefit of public and personnel safety; retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the land, adjoining land and highway; remove fences, hedges, gates or other barriers during any period during which terrestrial work activities in respect of the authorised project is to occur (subject to the prior erection of any temporary stock proof fencing as is reasonably required) and the replacement, replanting or re-instatement of fences, hedges or other barriers; remove, store and stockpile materials (including excavated material) within the land; remove archaeological artefacts where they would prevent or cause it to be materially more difficult to undertake terrestrial work activities or where leaving such archaeological artefacts in situ would materially increase the cost of the terrestrial work activities; a restrictive covenant over the land for the benefit of the remainder of the Order land to— to prevent anything to be done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto); to prevent anything to be done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project); to prevent anything to be done by way of excavation of any kind in the land nor any activities which increase or decrease ground cover or soil levels in any manner whatsoever without the consent in writing of the undertaker save as are reasonably required for agricultural activities or are required to be carried out by National Grid in order to exercise their rights in relation to their apparatus (if any) within the land; to prevent the planting or growing within the land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised project nor make it materially more difficult or expensive to access the relevant part of the authorised project); and to prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the cables, transition bays and jointing installations.
100, 101, 102, 103, 104, 104A, 104B, 104C all rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment and to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove— public and private drains, watercourses, sewers, ponds or culverts, and to drain into and manage waterflows in any public and private drains, watercourses, sewers, ponds or culverts including (but not limited to) by way of damming and overpumping; temporary welfare facilities (including but not limited to portakabins, portaloos and welfare equipment); pipes, cables, conduits, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers); the right to remove, store and stockpile materials (including excavated material) within the land; the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges; the right to benefit from continuous vertical and lateral support for the pipes, cables, conduits, service media and apparatus installed in, under, or over the land.
43, 46, 57, 72, 77, 95, 96, 97 all rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment; the right to carry out terrestrial work activities; the right to install the cables by way of (but not limited to) digging trenches, the use of directional drilling, auger boring, thrust boring, micro tunnelling or pipe ramming or other similar trenchless techniques; the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove— public and private drains, watercourses, sewers, ponds or culverts, and to drain into and manage waterflows in any public and private drains, watercourses, sewers, ponds or culverts including (but not limited to) by way of damming and overpumping; pipes, cables, conduit, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers); hard standing and other surface materials including (but not limited to) matting, aggregate, trackway, stone, tarmacadam, terram; temporary noise alleviation measures; temporary barriers for the protection of fauna; supporting or protective structures (including the bridging over of or protection of the apparatus of the statutory undertakers); temporary fencing, gates, walls, barriers or other means of enclosure. the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges for the purpose of enabling rights to pass and repass and for the purposes of terrestrial work activities; the right to remove and discharge water from the land; the right to install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation and/or enhancement works; the right to erect temporary signage and provide measures for the benefit of public and personnel safety; the right to remove archaeological artefacts where they would prevent or cause it to be materially more difficult to undertake terrestrial work activities or where leaving such archaeological artefacts in situ would materially increase the cost of the terrestrial work activities; the right to retain and use the cables, and jointing installations, for the purposes of the transmission of electricity and telecommunications; the right to benefit from continuous vertical and lateral support for the cables and jointing installations.
22, 23, 24 all rights and restrictions necessary for the undertaker and/or those authorised by the undertaker to enter onto, pass and repass and remain on the land with or without all necessary plant, vehicles, machinery, materials, drilling fluids, apparatus, temporary structures and equipment; the right to carry out terrestrial work activities; the right to install the cables by way of (but not limited to) digging trenches, the use of directional drilling, auger boring, thrust boring, micro tunnelling or pipe ramming or other similar trenchless techniques; the right to lay down, construct, install, retain, adjust, alter, test, use, maintain, repair, renew, upgrade, inspect, survey, cleanse, re-lay, connect into, divert, protect, make safe, make incapable of operation, replace and remove— public and private drains, watercourses, sewers, ponds or culverts, and to drain into and manage waterflows in any public and private drains, watercourses, sewers, ponds or culverts including (but not limited to) by way of damming and overpumping; cable marker posts to identify the location of the cables as required for routine integrity testing; pipes, cables, conduit, service media or apparatus that are used for the purposes of transmitting or distributing electricity, communications, gas, oil, water supply, sewerage and drainage (including the pipes, cables, conduits, service media or apparatus of statutory undertakers); temporary paths and bridleways for public use; temporary access roads; temporary haul roads; temporary noise alleviation measures; temporary barriers for the protection of fauna; supporting or protective structures (including the bridging over of or protection of the apparatus of the statutory undertakers); temporary fencing, gates, walls, barriers or other means of enclosure. the right to fell, prune, cut, coppice, alter, lop, uproot and replant trees, shrubs and hedges, and remove roots of trees, shrubs and hedges for the purpose of enabling rights to pass and repass and for the purposes of terrestrial work activities; the right to remove and discharge water from the land; the right to install, execute, implement, retain, repair, improve, renew, relocate, maintain and carry out mitigation, maintenance, remediation and/or enhancement works; the right to install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodland, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping; the right to erect temporary signage and provide measures for the benefit of public and personnel safety; the right to retain, maintain, straighten, widen, repair, alter, upgrade and use existing access routes for the purposes of accessing the land, adjoining land and highway; the right to remove fences, hedges, gates or other barriers during any period during which terrestrial work activities is to occur (subject to the prior erection of any temporary stock proof fencing as is reasonably required) and the replacement, replanting or re-instatement of fences, hedges or other barriers; the right to remove, store and stockpile materials (including excavated material) within the land; the right to remove archaeological artefacts where they would prevent or cause it to be materially more difficult to undertake terrestrial work activities or where leaving such archaeological artefacts in situ would materially increase the cost of the terrestrial work activities; the right to retain and use the cables for the purposes of the transmission of electricity and telecommunications; the right to benefit from continuous vertical and lateral support for the cables; a restrictive covenant over the land for the benefit of the remainder of the Order land— to prevent anything to be done in or upon the land or any part thereof for the purpose of the erection of any buildings or construction erection or works of any kind (including the foundations or footings thereto); to prevent anything to be done by way of hard surfacing of the land with concrete of any kind or with any other material or surface whatsoever without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed if the proposed surfacing would not cause damage to relevant part of the authorised project nor make it materially more difficult or expensive to maintain the authorised project); to prevent anything to be done by way of excavation of any kind in the land nor any activities which increase or decrease ground cover or soil levels in any manner whatsoever without the consent in writing of the undertaker save as are reasonably required for agricultural activities or are required to be carried out by National Grid in order to exercise their rights in relation to their apparatus (if any) within the land; to prevent the planting or growing within the land of any trees, shrubs or underwood without the consent in writing of the undertaker (such consent not to be unreasonably withheld or delayed provided that the proposed trees, shrubs or underwood would not cause damage to the relevant part of the authorised project nor make it materially more difficult or expensive to access the relevant part of the authorised project); and to prevent anything being done which may interfere with free flow and passage of electricity or telecommunications through the cables or support for the cables.

SCHEDULE 8 — Modification of compensation and compulsory purchase enactments for creation of new rights and imposition of new restrictions

Compensation enactments

1

The enactments for the time being in force with respect to compensation for the compulsory purchase of land apply, with the necessary modifications as respects compensation, in the case of a compulsory acquisition under this Order of a right by the creation of a new right or the imposition of a restrictive covenant as they apply as respects compensation on the compulsory purchase of land and interests in land.

2

  • (1) Without prejudice to the generality of paragraph 1, the Land Compensation Act 197339 has effect subject to the modifications set out in sub-paragraphs (2) and (3).
  • (2) In section 44(1) (compensation for injurious affection), as it applies to compensation for injurious affection under section 7 of the 1965 Act as substituted by paragraph 4—
  • (a) for “land is acquired or taken from” substitute “a right or restrictive covenant over land is purchased from or imposed on”; and
  • (b) for “acquired or taken from him” substitute “over which the right is exercisable or the restrictive covenant enforceable”.

3

  • (1) Without limitation on the scope of paragraph 1, the 1961 Act has effect subject to the modification set out in sub-paragraph (2).
  • (2) For section 5A(5A) (relevant valuation date) of the 1961 Act substitute—

(5A) If— (a) the acquiring authority enters on land for the purpose of exercising a right in pursuance of a notice of entry under section 11(1) (powers of entry) of the 1965 Act (as modified by paragraph 6 of Schedule 8 to the East Anglia ONE North Offshore Wind Farm Order 2022); and (b) the acquiring authority is subsequently required by a determination under paragraph 12 of Schedule 2A (counter-notice requiring purchase of land not in notice to treat) to the 1965 Act (as substituted by paragraph 9 of Schedule 8 to the East Anglia ONE North Offshore Wind Farm Order 2022) to acquire an interest in the land, and (c) the acquiring authority enters on and takes possession of that land, the authority is deemed for the purposes of subsection (3)(a) to have entered on that land where it entered on that land for the purpose of exercising that right.

Application of the 1965 Act

4

  • (1) The 1965 Act has effect with the modifications necessary to make it apply to the compulsory acquisition under this Order of a right by the creation of a new right, or to the imposition under this Order of a restrictive covenant, as it applies to the compulsory acquisition under this Order of land, so that, in appropriate contexts, references in that Act to land are read (according to the requirements of the particular context) as referring to, or as including references to—
  • (a) the right acquired or to be acquired or the restriction is to be imposed; or
  • (b) the land over which the right is or is to be exercisable.
  • (2) Without prejudice to the generality of sub-paragraph (1), Part 1 of the 1965 Act applies in relation to the compulsory acquisition under this Order of a right by the creation of a new right or the imposition of a restriction with the modifications specified in the following provisions of this Schedule.

5

For section 7 of the 1965 Act (measure of compensation in case of severance) substitute the following section—

(7) In assessing the compensation to be paid by the acquiring authority under this Act, regard must be had not only to the extent (if any) to which the value of the land over which the right is to be acquired or the restrictive covenant is to be imposed is depreciated by the acquisition of the right or the imposition of the covenant but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act.

6

The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say—

  • (a) section 9(4) (refusal to convey, failure to make title, etc.);
  • (b) paragraph 10(3) of Schedule 1 (conveyance of the land or interest);
  • (c) paragraph 2(3) of Schedule 2 (absent and untraced owners); and
  • (d) paragraphs 2(3) and 7(2) of Schedule 4 (common land),

7

Section 11 of the 1965 Act (powers of entry) is so modified as to secure that, as from the date on which the acquiring authority has served notice to treat in respect of any right or restrictive covenant, as well as the notice of entry required by subsection (1) of that section (as it applies to compulsory acquisition under article 20 (compulsory acquisition of rights)), it has power, exercisable in equivalent circumstances and subject to equivalent conditions, to enter for the purpose of exercising that right or enforcing that restrictive covenant (which is deemed for this purpose to have been created on the date of service of the notice); and sections 11A (powers of entry: further notices of entry), 11B (counter-notice requiring possession to be taken on specified date), 12 (unauthorised entry) and 13 (refusal to give possession to acquiring authority) of the 1965 Act is modified correspondingly.

8

Section 20 of the 1965 Act (tenants at will, etc.) applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right or the enforcement of the restrictive covenant in question.

9

Section 22 of the 1965 Act (interests omitted from purchase) is so modified as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired or enforce the restrictive covenant imposed, subject to compliance with that section as respects compensation.

10

For Schedule 2A to the 1965 Act substitute—

SCHEDULE 2A (1) This Schedule applies where an acquiring authority serve a notice to treat in respect of a right over, or restrictive covenant affecting, the whole or part of a house, building or factory and have not executed a general vesting declaration under section 4 (execution of declaration) of the 1981 Act as applied by article 22 (application of the Compulsory Purchase (Vesting Declarations) Act 1981) of the East Anglia TWO Offshore Wind Farm Order 2022 in respect of the land to which the notice to treat relates. (2) In this Schedule, “house” includes any park or garden belonging to a house. (3) A person who is able to sell the house, building or factory (“the owner”) may serve a counter-notice requiring the acquiring authority to purchase the owner’s interest in the house, building or factory. (4) A counter-notice under paragraph 3 must be served within the period of 28 days beginning with the day on which the notice to treat was served. (5) On receiving a counter-notice, the acquiring authority must decide whether to— (a) withdraw the notice to treat, (b) accept the counter-notice, or (c) refer the counter-notice to the Upper Tribunal. (6) The acquiring authority must serve notice of their decision on the owner within the period of 3 months beginning with the day on which the counter-notice is served (“the decision period”). (7) If the acquiring authority decide to refer the counter-notice to the Upper Tribunal they must do so within the decision period. (8) If the acquiring authority do not serve notice of a decision within the decision period they are to be treated as if they had served notice of a decision to withdraw the notice to treat at the end of that period. (9) If the acquiring authority serve notice of a decision to accept the counter-notice, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in the house, building or factory. (10) On a referral under paragraph 7, the Upper Tribunal must determine whether the acquisition of the right or the imposition of the restrictive covenant would— (a) in the case of a house, building or factory, cause material detriment to the house, building or factory, or (b) in the case of a park or garden, seriously affect the amenity or convenience of the house to which the park or garden belongs. (11) In making its determination, the Upper Tribunal must take into account— (a) the effect of the acquisition of the right or the imposition of the covenant, (b) the use to be made of the right or covenant proposed to be acquired or imposed, and (c) if the right or covenant is proposed to be acquired or imposed for works or other purposes extending to other land, the effect of the whole of the works and the use of the other land. (12) If the Upper Tribunal determines that the acquisition of the right or the imposition of the covenant would have either of the consequences described in paragraph 10, it must determine how much of the house, building or factory the acquiring authority ought to be required to take. (13) If the Upper Tribunal determines that the authority ought to be required to take some or all of the house, building or factory, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in that land. (14) (1) If the Upper Tribunal determines that the acquiring authority ought to be required to take some or all of the house, building or factory, the acquiring authority may at any time within the period of 6 weeks beginning with the day on which the Upper Tribunal makes its determination withdraw the notice to treat in relation to that land. (2) If the acquiring authority withdraws the notice to treat under this paragraph they must pay the person on whom the notice was served compensation for any loss or expense caused by the giving and withdrawal of the notice. (3) Any dispute as to the compensation is to be determined by the Upper Tribunal.

SCHEDULE 9 — Land of which temporary possession may be taken

(1) (2) (3) (4)
Area Number of land shown on land plan Purpose for which temporary possession may be taken Relevant part of the authorised project
District of East Suffolk 1, 2, 4 to 9, 11 to 131, 133 to 136, 144, 146 to 160, 163 to 182 Construction and carrying out of the authorised project Work Nos. 6 to 43
District of East Suffolk 7, 11 to 13, 15, 16, 25, 27, 28, 30, 31, 39 to 43, 47, 49, 50, 54 to 56, 65 to 67, 69, 70, 74, 80, 82, 83, 85, 92, 93, 99, 104, 104A, 104B, 104C, 107to 116, 119 to 121, 127 to 131, 133 to 135, 144, 146, 147, 152, 153 and 182 Worksites for construction and the carrying out of the authorised project Work Nos. 8, 9, 11, 13, 15 to 19, 22, 23, 26, 30 to 35 and 37 to 43
District of East Suffolk 8, 9, 16, 29, 31, 34 to 38, 42 to 45, 47, 48, 51 to 54, 56, 58 to 60, 62, 69 to 71, 73, 74, 80, 89 to 93, 95, 96, 108 and 127 Access for carrying out the authorised project Work Nos. 7, 11, 15, 17, 18, 19, 20, 23, 26 and 34
District of East Suffolk 7, 8, 16, 39, 47, 65, 66, 84, 108 to 113 Construction consolidation sites Work Nos. 7, 8, 11, 16, 18, 22, 27, 31 and 42
District of East Suffolk 7, 8, 11 to 16, 22 to 25, 27, 28, 30, 31, 39 to 43, 46, 47, 49, 50, 54 to 61, 63 to 67, 69, 70, 72, 74, 75, 77, 80, 82, 83, 85, 92, 93, 95, 96, 97 107 to 116, 117, 123, 127 to 131, 133, 135, 136, 144, 146, 147, 152, 153, 177 to 180 and 182 Laying of temporary vehicular access tracks, haul roads, hard standings and improvements to tracks Work Nos. 7, 8, 9, 11, 12, 13, 14, 15 to 23, 26, 30, 31 32, 34, 35 and 37 to 43
District of East Suffolk 7, 8, 11 to 16, 22 to 27, 28, 30, 39 to 43, 47, 49, 50, 58 to 61, 63 to 67, 69, 78, 79, 80 to84, 85, 92, 98, 99, 104, 104C, 105 to 116, 127 to 131, 133, 135, 144, 146, 147 and 182 Temporary diversion of public rights of way Work Nos. 7, 8, 9, 11, 12, 13, 16 to 23, 25, 26, 27, 33 and 37 to 43
District of East Suffolk 26 Creation of habitat for flora and fauna and other ecological measures Work No. 14
District of East Suffolk 50, 54 and 55 Temporary bridge arrangements over the Hundred River Work No. 19
District of East Suffolk 17 to 21, 32, 33, 76, 117, 122 to 126, 148 to 160, 163 to 180 Clear vegetation to increase the visibility swathes Work Nos. 10, 15, 23 and 34 to 37
District of East Suffolk 8, 8A Temporary water supply Work No. 7

SCHEDULE 10 — Protective Provisions

PART 1 — Protection for electricity, gas, water and sewerage undertakers

Application

1

For the protection of the affected undertakers referred to in this part of this Schedule the following provisions have effect unless otherwise agreed in writing between the undertaker and the affected undertaker concerned.

2

In this part of this Schedule—

  • “affected undertaker” means—any licence holder within the meaning of Part 1 (electricity supply) of the 1989 Act (an “electricity undertaker”);a gas transporter within the meaning of Part 1 (gas supply) of the Gas Act 1986 40 (a “gas undertaker”);a water undertaker within the meaning of Part 1 (preliminary) of the Water Industry Act 199141 (a “water undertaker”); anda sewerage undertaker within the meaning of Part 1 (preliminary) of the Water Industry Act 1991 (a “sewerage undertaker”),for the area of the authorised development but, for the avoidance of doubt, does not include the undertakers specified in Part 3, Part 4, Part 5, Part 6, Part 7 or Part 8 of this Schedule, and in relation to any apparatus, means the undertaker to whom it belongs or by whom it is maintained;
  • “alternative apparatus” means alternative apparatus adequate to enable the affected undertaker in question to fulfil its statutory functions in a manner not less efficient than previously;
  • “apparatus” means—in the case of an electricity undertaker, electric lines or electrical plant (as defined in the 1989 Act), belonging to or maintained by that affected undertaker;in the case of a gas undertaker, any mains, pipes or other apparatus belonging to or maintained by a gas transporter for the purposes of gas supply;in the case of a water undertaker, mains, pipes or other apparatus belonging to or maintained by that affected undertaker for the purposes of water supply; andin the case of a sewerage undertaker—any drain or works vested in the affected undertaker under the Water Industry Act 1991; andany sewer which is so vested or is the subject of a notice of intention to adopt given under section 102(4) of that Act or an agreement to adopt made under section 104 of that Act,and includes a sludge main, disposal main (within the meaning of section 219 of that Act) or sewer outfall and any manholes, ventilating shafts, pumps or other accessories forming part of any such sewer, drain or works, and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;
  • “functions” includes powers and duties; and
  • “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over or upon land.

Precedence of the 1991 Act in respect of apparatus in the streets

3

This part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and the affected undertaker are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act.

No acquisition etc. except by agreement

4

Regardless of any provision in this Order or anything shown on the land plans, the undertaker must not acquire any apparatus otherwise than by agreement.

Removal of apparatus

5

  • (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed, that apparatus must not be removed under this part of this Schedule and any right of an affected undertaker to maintain that apparatus in that land must not be extinguished until alternative apparatus has been constructed and is in operation to the reasonable satisfaction of the affected undertaker in question.
  • (2) If, for the purpose of executing any works in, on or under any land purchased, held, or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it must give to the affected undertaker in question written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order an affected undertaker reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to the affected undertaker the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus.
  • (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2), in the land in which the alternative apparatus or part of such apparatus is to be constructed, the affected undertaker in question must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably possible use all reasonable endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.
  • (4) Any alternative apparatus to be constructed in land of the undertaker under this part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between the affected undertaker in question and the undertaker or in default of agreement settled by arbitration in accordance with article 37 (arbitration).
  • (5) The affected undertaker in question must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 37 (arbitration), and after the grant to the affected undertaker of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this part of this Schedule.
  • (6) Regardless of anything in sub-paragraph (5), if the undertaker gives notice in writing to the affected undertaker in question that it desires itself to execute any work, or part of any work in connection with the construction or removal of apparatus in any land controlled by the undertaker, that work, instead of being executed by the affected undertaker, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of the affected undertaker.
  • (7) Nothing in sub-paragraph (6) authorises the undertaker to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 300 millimetres of the apparatus.

Facilities and rights for alternative apparatus

6

  • (1) Where, in accordance with the provisions of this part of this Schedule, the undertaker affords to an affected undertaker facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and the affected undertaker in question or in default of agreement settled by arbitration in accordance with article 37 (arbitration).
  • (2) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to the affected undertaker in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to that affected undertaker as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.

Retained apparatus

7

  • (1) Not less than 28 days before starting the execution of any works of the type referred to in paragraph 5(2) that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 5(2), the undertaker must submit to the affected undertaker in question a plan, section and description of the works to be executed.
  • (2) Those works must be executed only in accordance with the plan, section and description submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by the affected undertaker for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and the affected undertaker is entitled to watch and inspect the execution of those works.
  • (3) Any requirements made by an affected undertaker under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which a plan, section and description under sub-paragraph (1) are submitted to it.
  • (4) If an affected undertaker in accordance with sub-paragraph (3) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 1 to 6 apply as if the removal of the apparatus had been required by the undertaker under paragraph 5(2).
  • (5) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan, section and description instead of the plan, section and description previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan, section and description.
  • (6) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency but in that case it must give to the affected undertaker in question notice as soon as is reasonably practicable and a plan, section and description of those works as soon as reasonably practicable subsequently and must comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances.

8

  • (1) Subject to the following provisions of this paragraph, the undertaker must repay to an affected undertaker the reasonable expenses incurred by that affected undertaker in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus (including costs or compensation payable in connection with the acquisition of land for that purpose) which may be required in consequence of the execution of any such works as are referred to in paragraph 5(2).
  • (2) There must be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this part of this Schedule, that value being calculated after removal.
  • (3) If in accordance with the provisions of this part of this Schedule—
  • (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
  • (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 37 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the affected undertaker in question by virtue of sub-paragraph (1) must be reduced by the amount of that excess.

  • (4) For the purposes of sub-paragraph (3)—
  • (a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
  • (b) where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.
  • (5) An amount which apart from this sub-paragraph would be payable to an affected undertaker in respect of works by virtue of sub-paragraph (1) must, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the affected undertaker any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.

Expenses and costs

9

  • (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any such works referred to in paragraph 5(2), any damage is caused to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of an affected undertaker, or there is any interruption in any service provided, or in the supply of any goods, by any affected undertaker, the undertaker must—
  • (a) bear and pay the cost reasonably incurred by that affected undertaker in making good such damage or restoring the supply; and
  • (b) make reasonable compensation to that affected undertaker for any other expenses, loss, damages, penalty or costs incurred by the affected undertaker,

by reason or in consequence of any such damage or interruption.

  • (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of an affected undertaker, its officers, servants, contractors or agents.
  • (3) An affected undertaker must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise may be made without the consent of the undertaker which, if it withholds such consent, shall have the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.

10

Nothing in this part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and an affected undertaker in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.

PART 2 — Protection for operators of electronic communications code networks

1

  • (1) For the protection of any operator, the following provisions have effect unless otherwise agreed in writing between the undertaker and the operator.
  • (2) In this part of this Schedule—
  • “electronic communications apparatus” has the same meaning as in the electronic communications code;
  • “the electronic communications code” has the same meaning as in Chapter 1 of Part 2 of the 2003 Act;
  • “electronic communications code network” means—so much of an electronic communications network or infrastructure system provided by an electronic communications code operator as is not excluded from the application of the electronic communications code by a direction under section 106 (application of the electronics communications code) of the 2003 Act; andan electronic communications network which the Secretary of State is providing or proposing to provide;
  • “electronic communications code operator” means a person in whose case the electronic communications code is applied by a direction under section 106 of the 2003 Act;
  • “infrastructure system” has the same meaning as in the electronic communications code and references to providing an infrastructure system are to be construed in accordance with paragraph 7 of that code; and
  • “operator” means the operator of an electronic communications code network.

2

The exercise of the powers of article 28 (statutory undertakers) are subject to Part 10 of Schedule 3A (the electronics communications code) to the Communications Act 2003.

3

  • (1) Subject to sub-paragraphs (2) to (4), if as the result of the authorised development or their construction, or of any subsidence resulting from any of those works—
  • (a) any damage is caused to any electronic communications apparatus belonging to an operator (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works, or other property of an operator); or
  • (b) there is any interruption in the supply of the service provided by an operator, the undertaker must bear and pay the cost reasonably incurred by the operator in making good such damage or restoring the supply and must—
  • (i) make reasonable compensation to an operator for loss sustained by it; and
  • (ii) indemnify an operator against claims, demands, proceedings, costs, damages and expenses which may be made or taken against, or recovered from, or incurred by, an operator by reason, or in consequence of, any such damage or interruption.
  • (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of an operator, its officers, servants, contractors or agents.
  • (3) The operator must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise of the claim or demand may be made without the consent of the undertaker which, if it withholds such consent, shall have the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
  • (4) Any difference arising between the undertaker and the operator under this paragraph must be referred to and settled by arbitration under article 37 (arbitration).

4

This part of this Schedule does not apply to—

  • (a) any apparatus in respect of which the relations between the undertaker and an operator are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act; or
  • (b) any damage, or any interruption, caused by electro-magnetic interference arising from the construction or use of the authorised development.

5

Nothing in this part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and an operator in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.

PART 3 — Protection for Anglian Water Services Limited

1

For the protection of Anglian Water, the following provisions of this Schedule have effect unless otherwise agreed in writing between the undertaker and Anglian Water.

2

In this part of this schedule—

  • “alternative apparatus” means alternative apparatus adequate to enable Anglian Water to fulfil its statutory functions in not less efficient a manner than previously;
  • “Anglian Water” means Anglian Water Services Limited (company number 02366656);

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.