The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022
- (a) on land near Wisley Common (‘Wisley SPA compensation land’), as shown on Sheet 11 of the works plans; and
- (b) on land north of Old Lane (‘Old Lane SPA compensation land’), as shown on Sheet 26 of the works plans.
Work No.58 — Environmental compensation works comprising the enhancement of existing habitat within the Thames Basin Heaths Special Protection Area (SPA), at each of the following locations—
- (a) on land north of Elm Lane (‘Elm Lane SPA enhancement area’), as shown on Sheets 3, 4, 24 and 25 of the works plans;
- (b) on land south of Hut Hill (‘Hut Hill South SPA enhancement area’), as shown on Sheets 3 and 20 of the works plans;
- (c) on land at Cockcrow Hill (‘Cockcrow Hill SPA enhancement area’), as shown on Sheets 4, 5 and 21 of the works plans;
- (d) on land at Ockham Common and Sandpit Hill (‘Ockham Common/Sandpit Hill SPA enhancement area’), as shown on Sheets 4, 5, 13, and 25 of the works plans;
- (e) on land north-west of Pond Farm (‘Pond Farm West SPA enhancement area’), as shown on Sheets 11 and 22 of the works plans;
- (f) on two plots of land south-west of Pond Farm (‘Pond Farm south SPA enhancement area’), as shown on Sheets 20 and 22 of the works plans;
- (g) on land at Wisley Common (‘Wisley Common SPA enhancement area’), as shown on Sheet 21 of the works plans; and
- (h) on land east of Old Lane (‘Ockham Common/Old Lane SPA enhancement area’), as shown on Sheet 25 of the works plans.
Work No.59 — Environmental works in connection with the provision of replacement common land and open space land at Park Barn Farm (‘Park Barn Farm replacement land’), as shown on Sheets 11, 12, 27, 28 and 29 of the works plans, to include the provision of 395 metres of bridleway as shown between point 27/1 on Sheet 27 and point 28/3 on Sheet 28 of the streets, rights of way and access plans.
Work No.60 — Environmental mitigation works on land to the north of the M25 and adjacent to Buxton Wood, to include the creation of new woodland and wood pasture habitat, as shown on Sheets 11 and 27 of the works plans.
Work No.61 — A new or replacement environmental barrier (close boarded fence) at each of the following locations—
- (a) in the verge of the A3 northbound carriageway, commencing at Work No.35(b) (the replacement Cockcrow overbridge) and continuing generally northwards alongside the A3 northbound off-slip and then westwards along the verge of the M25 westbound on-slip at M25 junction 10 including along the edge of Wisley Common, terminating at Footpath 7 Buxton Wood accommodation overbridge, in total 1,750 metres in length, as shown on Sheets 4, 5, 11 and 12 of the works plans;
- (b) in the verge of the M25 eastbound carriageway, commencing 115 metres west of Footpath 7 Buxton Wood accommodation overbridge and continuing generally eastwards alongside the M25 eastbound off-slip at junction 10 and along the edge of Wisley Common and then northwards along the verge of the A3 northbound on-slip, terminating at Work No.35(f) (the new Red Hill Bridleway 12 overbridge), in total 1,860 metres in length as shown on Sheets 5, 6, 11 and 12 of the works plans;
- (c) in the verge of the A3 southbound carriageway, commencing at Work No.35(f) (the new Red Hill Bridleway 12 overbridge) and continuing generally southwards alongside the A3 southbound off-slip and then eastwards along the verge of the M25 eastbound on-slip and along the edge of Chatley Heath Common, terminating 105 metres east of Work No.30(e) (a proposed new superspan portal gantry), in total 970 metres in length, as shown on Sheets 5, 6 and 13 of the works plans;
- (d) in the verge of the M25 westbound carriageway, commencing 120 metres east of Work No.30(e) (a proposed new super span portal gantry) and continuing generally westwards alongside the M25 westbound off-slip at junction 10 and along the edge of Chatley Heath Common and then southwards along the verge of the A3 southbound on-slip, terminating 25 metres south of Work No.35(b) (the replacement Cockcrow overbridge), in total 1,070 metres in length as shown on Sheets 4, 5 and 13 of the works plans.
Utility Diversions
Work No.62 — The diversion of electric cables and associated apparatus and equipment, as follows—
- (a) to accommodate widening of the A3 southbound carriageway, between Elm Lane and Bolder Mere, in total 335 metres in length, as shown on Sheets 2 and 3 of the works plans. To include construction of a new lighting sub-station as shown on Sheet 3 of the Scheme Layout Plans;
- (b) to accommodate widening of the A3 northbound carriageway immediately to the north of the junction between the A3 and Wisley Lane, in total 40 metres in length, as shown on Sheets 2 and 3 of the works plans;
- (c) to accommodate modifications to the access to RHS Wisley Garden at Wisley Lane, in total 70 metres in length, as shown on Sheets 2 and 20 of the works plans;
- (d) to accommodate widening of the A3 northbound carriageway between Wisley Lane and Footpath 17 Cockcrow overbridge, in total 220 metres in length, as shown on Sheets 3 and 4 of the works plans. To include repositioning of a pole mounted transformer to accommodate construction of Work No.35;
- (e) to accommodate widening of the A3 northbound carriageway and the construction of the replacement Cockcrow overbridge, in total 225 metres in length, as shown on Sheet 4 of the works plans;
- (f) to accommodate alteration and widening of the A3 southbound on-slip at M25 junction 10, in total 595 metres in length, as shown on Sheets 4 and 5 of the works plans;
- (g) to accommodate construction of a dedicated free-flow slip lane between the A3 northbound off-slip and the M25 westbound on-slip at M25 junction 10, in total 105 metres in length, as shown on Sheet 5 of the works plans;
- (h) to accommodate widening and improvement of the A3 northbound carriageway in the vicinity of Redhill Road, in total 235 metres in length, as shown on Sheet 6 of the works plans;
- (i) to accommodate widening of the A3 (both carriageways) in the vicinity of Long Orchard Farm and Court Close Farm, in total 40 metres in length, as shown on Sheets 6 and 7 of the works plans;
- (j) to accommodate widening of the A3 northbound carriageway between the access to Long Orchard House and Seven Hills Road, to include the relocation of an existing substation in the vicinity of the Starbucks Drive Thru Café, in total 440 metres in length, as shown on Sheet 7 of the works plans;
- (k) to accommodate improvement of the A3 northbound off-slip at the A3 Painshill junction, in total 445 metres in length, as shown on Sheets 7 and 8 of the works plans;
- (l) to accommodate widening of the A3 southbound on-slip at the A3 Painshill junction and footpath works, in total 210 metres in length, to include relocation of an existing sub-station, as shown on Sheet 8 of the works plans;
- (m) to accommodate construction of a new dedicated slip lane at the A3 Painshill junction connecting the A3 northbound off-slip directly with the A245 Byfleet Road westbound carriageway, in total 85 metres in length, as shown on Sheet 8 of the works plans;
- (n) to accommodate the construction of a new dedicated free-flow slip lane at the A3 Painshill junction connecting the A245 Byfleet Road eastbound carriageway directly with the A3 northbound on-slip, in total 25 metres in length, as shown on Sheet 8 of the works plans;
- (o) to accommodate the construction of a substitute private means of access to the Feltonfleet School, in total 15 metres in length, as shown on Sheet 9 of the works plans;
- (p) to accommodate the construction of a new slip lane between the A245 Byfleet Road westbound carriageway and Seven Hills Road, in total 15 metres in length, to include relocation of an existing switching station, as shown on Sheet 9 of the works plans; and
- (q) to accommodate widening and improvement of the A245 Byfleet Road eastbound carriageway, in total 65 metres in length, as shown on Sheet 9 of the works plans.
Work No.63 — The diversion of gas pipelines, as follows—
- (a) to accommodate widening and improvement of the A3 between the A3 Ockham Park junction and M25 junction 10, in total 2,375 metres in length, as shown on Sheets 1, 2, 3 and 4 of the works plans;
- (b) to accommodate widening of the A3 northbound carriageway and construction of the new Red Hill Bridleway overbridge, in total 210 metres in length, as shown on Sheet 6 of the works plans;
- (c) to accommodate widening and improvement of the A3 southbound carriageway between Court Close Farm and the A3 Painshill junction, in total 1,235 metres in length, to include the diversion of gas pipeline connections at the Gas Valve Compound, as shown on Sheets 6, 7 and 8 of the works plans;
- (d) to accommodate widening of the A3 northbound carriageway between the access to Long Orchard House and Seven Hills Road, in total 425 metres in length, as shown on Sheet 7 of the works plans; and
- (e) to accommodate widening of the M25 eastbound off-slip and westbound on-slip at M25 junction 10, in total 200 metres in length, as shown on Sheet 12 of the works plans.
Work No.64 — The diversion of water pipelines, as follows—
- (a) to accommodate widening of the A3 northbound on-slip and A3 northbound carriageway between the A3 Ockham Park junction and Hut Hill, to include the relocation of existing water hydrants, in total 1,570 metres in length, as shown on Sheets 1, 2 and 3 of the works plans;
- (b) to accommodate widening of the A3 northbound carriageway in the vicinity of the Cockcrow Overbridge, in total 305 metres in length, as shown on Sheet 4 of the works plans;
- (c) to accommodate the alteration of M25 junction 10 and improvement of the A3 northbound off-slip and A3 northbound on-slip at M25 junction 10, in total 805 metres in length, as shown on Sheets 4 and 5 of the works plans;
- (d) to accommodate construction of Work No.35(f) (the new ‘Red Hill Bridleway overbridge’), in total 100 metres in length, as shown on Sheet 6 of the works plans;
- (e) to accommodate widening of the A3 southbound carriageway to the south of Court Close Farm, in total 15 metres in length, as shown on Sheet 6 of the works plans;
- (f) to accommodate widening of the A3 northbound carriageway between the access to Long Orchard Farm and Seven Hills Road, to include the relocation of existing water hydrants, in total 590 metres in length, as shown on Sheets 6 and 7 of the works plans;
- (g) to accommodate widening of the A3 southbound carriageway to the north of Court Close Farm, in total 25 metres in length, as shown on Sheet 7 of the works plans;
- (h) to accommodate widening of the A3 southbound carriageway to the south of the Gas Valve Compound, in total 15 metres in length, as shown on Sheet 7 of the works plans;
- (i) to accommodate improvement of the A3 northbound off-slip at the A3 Painshill junction and construction of a new dedicated slip lane, in total 20 metres in length, as shown on Sheet 8 of the works plans;
- (j) to accommodate improvement of the A3 southbound on-slip at the A3 Painshill junction and works to construct a new footpath (Work No.41) in the vicinity of West Lodge at Painshill Park, in total 55 metres in length, as shown on Sheet 8 of the works plans; and
- (k) to accommodate widening and improvement of the A245 Byfleet Road eastbound carriageway, to the east of the B365 Seven Hills Road junction, in total 50 metres in length, as shown on Sheet 9 of the works plans.
Work No.65— The diversion of telecommunication cables, media cables and equipment, as follows—
- (a) to accommodate widening of the A3 southbound carriageway between the A3 Ockham Park junction and the A3 Painshill junction, to include the diversion of cables at M25 junction 10, in total 4,825 metres in length, as shown on Sheets 1, 2, 3, 4, 5, 6, 7 and 8 of the works plans;
- (b) to accommodate widening of the A3 northbound carriageway at the junction between the A3 and Wisley Lane, in total 70 metres in length, as shown on Sheets 2 and 3 of the works plans;
- (c) to accommodate modifications to the entrance to RHS Wisley Garden at Wisley Lane, in total 95 metres in length, as shown on Sheets 2 and 20 of the works plans;
- (d) to accommodate widening of the A3 northbound carriageway in the vicinity of Footpath 17 Cockcrow overbridge, in total 260 metres in length, as shown on Sheet 4 of the works plans;
- (e) to accommodate widening of the A3 northbound carriageway between the access to Long Orchard Farm and the diverge for the A3 northbound off-slip at the A3 Painshill junction, in total 800 metres in length, as shown on Sheets 6, 7 and 8 of the works plans;
- (f) to accommodate construction of a new dedicated slip lane at the A3 Painshill junction connecting the A3 northbound off-slip directly with the A245 Byfleet Road westbound carriageway, in total 120 metres in length, as shown on Sheet 8 of the works plans;
- (g) to accommodate improvement and widening of the A245 westbound carriageway between the A3 Painshill junction and Old Byfleet Road, in total 465 metres in length, as shown on Sheets 8 and 9 of the works plans; and
- (h) to accommodate widening of the A245 eastbound carriageway, between the B365 Seven Hills Road junction and Old Byfleet Road, in total 135 metres in length, as shown on Sheet 9 of the works plans.
Other relevant works
In connection with the construction of any of those works, further development within the Order limits consisting of—
- (a) alteration of the layout of any street permanently or temporarily, including but not limited to increasing or reducing the width of the carriageway of the street by reducing or increasing the width of any kerb, footpath, footway, cycle track or verge within the street; and altering the level of any such kerb, footpath, footway, cycle track or verge;
- (b) works required for the strengthening, improvement, maintenance or reconstruction of any street;
- (c) works required for the strengthening, alteration, refurbishment or demolition of any existing bridge, building or structure;
- (d) the remediation of any carriageway made redundant by the stopping up of any public highway or means of access;
- (e) ramps, means of access (including private means of access), non-motorised links, footpaths, footways, bridleways, cycle tracks and crossing facilities;
- (f) embankments, cuttings, aprons, abutments, shafts, foundations, retaining walls, parapets, wingwalls, barriers (including road restraint/safety barriers), new and replacement highway lighting, fencing and drainage works (including carrier drains, filter drains, outfalls, culverts, headwalls, ditches, attenuation earthwork ditches, soakaways, catchpits and pollution control measures);
- (g) the erection of highway boundary fencing, anti-dazzle fencing and the realignment of existing highway fencing along the edge of Wisley Common and other common land at Chatley Heath;
- (h) street works, including breaking up or opening a street, or any sewer, drain or tunnel under it; tunnelling or boring under a street;
- (i) works to place, alter, divert, relocate, remove, protect or maintain street furniture, apparatus, services, plant and other equipment in a street, or in other land, including mains, sewers, drains, pipes, hydrants, cables and ducts and associated cabinets, lights, CCTV, radar and traffic detection equipment;
- (j) works to alter the course of, or otherwise interfere with a watercourse, including private water supplies;
- (k) landscaping, environmental barriers, works associated with the provision of ecological mitigation and other works to mitigate any adverse effects of the construction, maintenance or operation of the authorised development;
- (l) works for the benefit or protection of land affected by the authorised development;
- (m) site preparation works, site clearance (including fencing, vegetation removal, demolition of existing structures and the creation of alternative footpaths); earthworks (including soil stripping and storage, site levelling); and remediation of contamination;
- (n) the felling of trees;
- (o) the establishment of construction compounds and working sites, storage areas, temporary vehicle parking, temporary site hoarding, fencing and perimeter enclosure, security fencing, construction-related buildings, welfare facilities, temporary worker accommodation facilities for vehicle recovery crew, vehicle recovery and customer care facilities, construction lighting, haulage roads and other machinery, apparatus, works and conveniences;
- (p) the provision of other works including pavement works, carriageway surfacing, kerbing and paved areas works, signing, signals, the modification or demolition of existing gantries, new and replacement highway safety barriers, road markings, traffic management measures including temporary roads, temporary earthworks and construction site accesses and such other works as are associated with the construction of the authorised development; and
- (q) such other works, working sites storage areas, works of demolition or works of whatever nature, as may be necessary or expedient for the purposes of, or for purposes associated with or ancillary to, the construction, operation or maintenance of the authorised development which do not give rise to any materially new or materially different environmental effects to those assessed in the environmental statement.
SCHEDULE 2 — REQUIREMENTS
PART 1 — REQUIREMENTS
Interpretation
1
In this Schedule—
- “Bolder Mere mitigation and enhancement area” means the area within which environmental mitigation and enhancement measures will be undertaken, to prevent any deterioration in the classification status of Bolder Mere as a surface water body and to ensure compliance with relevant environmental objectives in accordance with the Water Environment (Water Framework Directive) (England and Wales) Regulations 2017282, (as provided for by Work No.55 in Schedule 1 (authorised development));
- “CEMP” means any construction environmental management plan prepared and approved under requirement 3;
- “commence” means beginning to carry out any material operation (as defined in section 56(4) of the 1990 Act) forming part of the authorised development other than operations consisting of non-intrusive investigations and surveys, ecological surveys and pre-construction ecological mitigation, investigations for the purpose of assessing and monitoring ground conditions and levels, and the temporary display of site notices or advertisements, and “commencement” is to be construed accordingly;
- “common land” has the same meaning as “common” in sections 131 and 132 of the 2008 Act and “open space” has the same meaning as in those sections;
- “completed” in relation to a relevant part of the authorised development, means the relevant part of the authorised development is completed and fully open for traffic and “completion” is to be construed accordingly;
- “County Archaeologist” means the individual appointed as such by Surrey County Council;
- “Ecological Clerk of Works” means the individual appointed as such by the undertaker;
- “European protected species” has the same meaning as in regulations 42 (European protected species of animals) and 46 (European protected species of plants) of the Conservation of Habitats and Species Regulations 2017283;
- “Habitats Regulations Assessment” means the report of that description certified under article 45 (certification of documents, etc.);
- “HEMP” means the Handover Environmental Management Plan prepared by the undertaker;
- “Landscape and Ecology Management and Monitoring Plan” means the plan contained in Appendix 7.20 of the Environmental Statement certified under article 45 (certification of documents, etc.);
- “Outline CEMP” means the outline construction environmental management plan certified under article 45 (certification of documents, etc.);
- “pre-construction ecological mitigation” means any non-intrusive preparatory works of an environmental character;
- “protected species” means species which are subject to protection under the laws of England or which are European protected species;
- “REAC” means the Register of Environmental Actions and Commitments certified under article 45 (certification of documents, etc.);
- “replacement land” means the replacement land identified in Part 4 of Schedule 10;
- “requirement consultee” means a body that is specified in any requirement within this Schedule as a body to be consulted prior to the undertaker making an application to discharge the relevant requirement;
- “RHS Tree Protection Plan” means the plan of that description certified under article 45 (certification of documents, etc.);
- “Scheme Layout Plans” means the plans of that description certified under article 45 (certification of documents, etc.);
- “SPA Management and Monitoring Plan” means the document of that name which forms part of the environmental statement;
- “suitably qualified and experienced ecologist” means an ecologist who is a full member of the Chartered Institute of Ecology and Environmental Management and having at least 10 years of relevant experience;
- “Thames Basin Heaths Special Protection Area (SPA) compensation land” means the land outside the existing SPA boundary and which is to be acquired or used for the purposes of creating compensatory habitat to offset the loss of existing SPA habitat (as provided for by Work No.57 in Schedule 1 (authorised development));
- “Thames Basin Heaths Special Protection Area (SPA) enhancement area” means the area within the existing SPA boundary and within which compensatory ecological enhancement measures will be implemented to offset other potential adverse effects on the SPA (as provided for by Work No.58 in Schedule 1 (authorised development));
- “Water Framework Directive Assessment Report” means the report of that description certified under article 45 (certification of documents, etc.).
Time limits
2
The authorised development must not commence later than the expiration of 5 years beginning with the date on which this Order comes into force.
Construction and handover environmental management plans
3
- (1) No part of the authorised development is to commence until a CEMP, substantially in accordance with the outline CEMP, for that part has been submitted to and approved in writing by the Secretary of State, following consultation with the relevant planning authority and the local highway authority.
- (2) The CEMP must be written in accordance with the principles of ISO14001 and reflect the commitments made in the REAC and mitigation measures detailed in the Environmental Statement, to avoid, reduce or mitigate environmental effects or risks during construction. The CEMP must—
- (a) contain a record of all sensitive environmental features that have the potential to be affected by the construction of the authorised development, including an environmental constraints map;
- (b) require adherence to the workings hours of 07:30 to 18:00 on Mondays to Fridays and 08:00 to 19:00 on Saturdays, except for—
- (i) night-time closures for bridge demolition and installation or other works requiring the full or partial closure of, or otherwise adversely affecting the operation of the M25 and A3 carriageways;
- (ii) any oversize deliveries or deliveries where daytime working would be excessively disruptive to normal traffic operation;
- (iii) the provision of services at compounds, including CCTV and vehicle recovery;
- (iv) works associated with the diversion of existing utilities;
- (v) junction tie-in works;
- (vi) works associated with traffic management and signal changes;
- (vii) cases of emergency; and
- (viii) as otherwise agreed by the relevant planning authority or local highway authority in advance.
- (c) include the following management plans and method statements for undertaking the authorised development—
- (i) an arboricultural method statement setting out details of the trees to be retained and measures for their protection during construction;
- (ii) the control of noise and vibration;
- (iii) the control of dust, odour and smoke;
- (iv) construction site artificial lighting;
- (v) the management of materials;
- (vi) the management and storage of topsoil;
- (vii) the management of site waste;
- (viii) the protection and drainage of surface water and groundwater;
- (ix) the protection of ecological habitats and species;
- (x) the control of invasive species; and
- (xi) pollution prevention plan and procedures for dealing with any unexpected environmental emergencies;
- (d) set out the arrangements for monitoring and recording compliance with environmental commitments during construction; and
- (e) contain a community relations strategy.
- (3) The authorised development must be constructed in accordance with the approved CEMP.
- (4) The undertaker must prepare a HEMP by the end of the construction, commissioning and handover stage of the authorised development, in accordance with the process set out in the approved CEMP.
- (5) The HEMP must address the matters set out in the approved CEMP that are relevant to the operation and maintenance of the authorised development, and must contain—
- (a) the environmental information needed for the future maintenance and operation of the authorised development;
- (b) the long-term commitments to aftercare, monitoring and maintenance activities relating to the environmental features and mitigation measures that will be required to ensure the continued long-term effectiveness of the environmental design and mitigation measures and the prevention of unexpected environmental impacts during the operation of the authorised development; and
- (c) a record of the consents, commitments and permissions resulting from liaison with statutory bodies.
- (6) The authorised development must be operated and maintained in accordance with the HEMP.
Traffic management during construction
4
- (1) No part of the authorised development comprising the alteration or improvement of the M25 or A3 is to commence until a traffic management plan relevant to that part of the authorised development has been submitted to and approved in writing by the Secretary of State, following consultation with the relevant planning authority and the local highway authority.
- (2) The authorised development must be constructed in accordance with the traffic management plan approved under sub-paragraph (1).
Detailed design
5
- (1) The authorised development must be designed in detail and carried out so that it is compatible with the preliminary scheme design shown on the works plans, the Scheme Layout Plans and the engineering drawings and sections, unless otherwise agreed in writing by the Secretary of State, following consultation with the relevant planning authority and the local highway authority on matters related to their functions and provided that the Secretary of State is satisfied that any amendments would not give rise to any materially new or materially different environmental effects in comparison with those described in the environmental statement.
- (2) Where amended details are approved by the Secretary of State under sub-paragraph (1), those details are deemed to supersede the corresponding drawings and plans certified under article 45 and the undertaker must make those amended details available in electronic form for inspection by members of the public and undertake the works in accordance with the approved amended details.
Landscaping
6
- (1) The authorised development must be landscaped in accordance with a landscaping scheme which sets out details of all proposed hard and soft landscaping works and which has been submitted to and approved in writing by the Secretary of State, following consultation with the relevant planning authority.
- (2) The landscaping scheme must reflect the mitigation measures set out in the REAC and must be substantially in accordance with the Scheme Layout Plans and the Landscape and Ecology Management and Monitoring Plan. It must reflect the results of any arboricultural walkover surveys undertaken in accordance with British Standard 5837:2012 and requirement 3.
- (3) The landscaping scheme prepared under sub-paragraph (1) must include details of—
- (a) location, number, species mix, size and planting density of any proposed planting;
- (b) cultivation, importing of materials and other operations to ensure plant establishment;
- (c) existing trees to be retained, with measures for their protection during the construction period;
- (d) proposed finished ground levels;
- (e) hard landscaping and materials, minor structures and street furniture associated with any new public right of way or upgraded public right of way proposed to support sustainable travel movement along the A3 corridor or for the purposes of providing improved access to the replacement land; and
- (f) a timetable for the implementation of the landscaping works.
- (4) All landscaping works must be carried out in accordance with the relevant recommendations of appropriate British Standards or other recognised codes of good practice.
- (5) Any tree or shrub planted as part of the authorised development that, within a period of 10 years after planting, is removed, dies or becomes in the opinion of the relevant planning authority, seriously damaged or diseased, must be replaced in the first available planting season with a specimen of the same species and size as that originally planted, unless the Secretary of State, following consultation with the relevant planning authority on matters related to its function, gives consent to a variation.
Design, layout and implementation of Replacement Land
7
- (1) No part of the authorised development comprising the creation of an area of replacement land (Work No.59) is to commence until for that part details of the layout and design of the land have been submitted to and approved in writing by the Secretary of State, following consultation with the relevant planning authority and with the prospective owner of the replacement land. The details must include—
- (a) a landscaping scheme for the replacement land in accordance with requirement 6;
- (b) the extent, methods and timing of any tree felling or other vegetation clearance required within the boundary of the replacement land to render the land suitable for public recreational access;
- (c) measures for the management and protection of any ancient woodland, veteran trees or trees which are the subject of a tree preservation order, if present within the boundary of the relevant part of the replacement land;
- (d) the location and extent of any translocation of ancient woodland soils if proposed within the relevant part of the replacement land;
- (e) the detailed alignment and surface treatment of any proposed new paths or public rights of way to be created through the replacement land;
- (f) any measures, including street furniture and signage to be provided for the purposes of supporting, promoting and managing non-motorised public access to the land;
- (g) boundary treatment measures, including details of any new fencing, gates and barriers necessary to manage public access both within the replacement land and to restrict access to other adjoining land;
- (h) timetable for the implementation, completion and opening of the replacement land for public access; and
- (i) a scheme for the maintenance and management of the replacement land, including details of any environmental monitoring measures.
- (2) The authorised development must be carried out, maintained, managed and monitored in accordance with the details approved under sub-paragraph (1).
Thames Basin Heaths Special Protection Area (SPA) Compensatory Habitat Creation and Enhancement Measures
8
- (1) Details of the compensatory habitat creation and enhancement measures to be undertaken in respect of the Thames Basin Heaths SPA (on the compensation land (Work No.57) and in the enhancement areas (Work No.58)) must be submitted to and approved in writing by the Secretary of State, following consultation with the relevant planning authority, Surrey County Council and Natural England. The details must be substantially in accordance with the preliminary Scheme design shown on the Scheme Layout Plans and must reflect the measures set out in the Environmental Statement, the REAC and in the Habitats Regulations Assessment. The details must include—
- (a) existing vegetation to be retained and any new planting species proposed within the Thames Basin Heaths SPA compensation land, including details of establishment methods;
- (b) the extent, methods and timing of any tree felling and stump removal required within the SPA enhancement areas;
- (c) the extent and depth of any topsoil removal necessary for the purposes of re-establishing heathland habitat;
- (d) measures for the protection of habitats and species within the SPA to be adopted during the enhancement works;
- (e) measures to support and manage public recreational access within the compensation land and enhancement areas which comprise common land or open space, including any new signage, gates, styles where proposed and consistent with ecological conservation management objectives;
- (f) a timetable for the completion of the environmental mitigation and enhancement works (Work Nos. 57 and 58); and
- (g) a scheme for the maintenance, management and monitoring of the compensatory habitat creation and enhancement measures in respect of the Thames Basin Heaths SPA that reflects the measures set out in the SPA Management and Monitoring Plan.
- (2) The compensatory habitat creation and enhancement measures must be carried out and maintained, managed and monitored in accordance with the details approved under sub-paragraph (1).
- (3) Unless otherwise approved by the Secretary of State in writing, following consultation with Natural England, the compensatory habitat creation measures on the proposed Thames Basin Heaths SPA compensation land must be begun before any part of the authorised development within the boundary of the SPA may commence.
- (4) No trees may be felled or other preparatory works undertaken within the SPA enhancement areas (Work No.58) until the methods and timing for such works have been approved in writing by the Secretary of State under sub-paragraph (1).
Cockcrow Green Bridge
9
- (1) No part of the authorised development comprising the construction of the replacement Footpath 17 Cockcrow Bridge (Work No.35(b)) is to commence until details of the bridge design features, substantially in accordance with the preliminary design shown on the Engineering Drawings and Sections have been approved in writing by the Secretary of State, following consultation with the relevant planning authority, Natural England and the local highway authority.
- (2) Work No.35(b) must be constructed in accordance with the details approved under sub-paragraph (1) unless otherwise agreed by the Secretary of State.
- (3) Notwithstanding sub-paragraphs (1) and (2), the Secretary of State may approve under this requirement a bridge design excluding any soft verge wildlife crossing.
Bolder Mere Mitigation and Enhancement Area
10
- (1) No part of Work No.5(c) is to commence until details of the environmental mitigation and enhancement measures to be undertaken in the Bolder Mere mitigation and enhancement area (Work No.55) have been submitted to and approved in writing by the Secretary of State, following consultation with the Environment Agency, Natural England, Surrey County Council and the relevant planning authority. The details must substantially accord with the measures described in the environmental statement and in the Water Framework Directive Assessment Report and must include—
- (a) details of any vegetation to be removed to improve the hydrosere of the shore of Bolder Mere;
- (b) the extent, shape and species composition of the replicate marginal vegetation to be provided alongside the proposed retaining wall, including the method of implementation;
- (c) a timetable for the completion of the environmental mitigation and enhancement works (Work No.55); and
- (d) a scheme for the maintenance, management and environmental monitoring of the mitigation and enhancement measures at Bolder Mere.
- (2) The environmental mitigation and enhancement works must be carried out, maintained, managed and monitored in accordance with the details approved under sub-paragraph (1) and must be begun before any part of Work No.5(c) may commence.
- (3) No part of Work No.5(c) is to commence until details of the surface water drainage and pollution control measures for that part of the A3 southbound carriageway adjoining the proposed Bolder Mere retaining wall, reflecting the results of a detailed drainage survey, have been submitted to and approved in writing by the Secretary of State, following consultation with the Environment Agency, Natural England, Surrey County Council and the relevant planning authority.
- (4) The authorised development must be constructed in accordance with the detailed drainage scheme approved under sub-paragraph (3).
Buxton Wood Environmental Mitigation Area
11
- (1) No part of the authorised development comprising Work No.25 (improvement, realignment and widening of the M25 eastbound off-slip at M25 junction 10) is to open to traffic until details of the mitigation measures to be undertaken as part of Work No.60 have been submitted to and approved in writing by the Secretary of State, following consultation with the relevant planning authority.
- (2) Details to be approved under sub-paragraph (1) must be substantially in accordance with the measures described in the environmental statement and the REAC. The details must include—
- (a) a landscaping scheme in accordance with requirement 6;
- (b) a timetable for the completion of the mitigation works; and
- (c) a scheme for the maintenance, management and monitoring of the mitigation measures.
- (3) The authorised development must be carried out, maintained, managed and monitored in accordance with the details approved under sub-paragraph (1) unless otherwise agreed by the Secretary of State following consultation with the relevant planning authority.
Stratford Brook Environmental Mitigation Area
12
- (1) No part of the authorised development comprising Work No.33(b) (the new Stratford Brook underbridge) or Work No.54 (environmental mitigation works on land adjoining Stratford Brook) is to commence until details of the mitigation measures to be undertaken have been submitted to and approved in writing by the Secretary of State, following consultation with the Environment Agency and the relevant planning authority.
- (2) Details to be approved under sub-paragraph (1) must be substantially in accordance with the measures described in the environmental statement, the REAC and the Water Framework Directive Assessment. The details must include—
- (a) a timetable for the completion of the mitigation works; and
- (b) a scheme for the maintenance, management and monitoring of the mitigation measures.
- (3) The authorised development must be carried out, maintained, managed and monitored in accordance with the details approved under sub-paragraph (1) unless otherwise agreed by the Secretary of State following consultation with the Environment Agency, and under any necessary licences.
Contaminated land and groundwater
13
- (1) No part of the authorised development involving intrusive ground works is to commence until for that part a site investigation and risk assessment have been submitted to and approved in writing by the Secretary of State, following consultation with the Environment Agency and the relevant planning authority.
- (2) An investigation and assessment under sub-paragraph (1) must include—
- (a) details of any existing sources of contamination within the Order limits that may be affected by the carrying out of the authorised development;
- (b) any reasonably required protective measures to ensure that the carrying out of the authorised development does not make worse any adverse conditions or risks associated with such existing sources of contamination; and
- (c) appropriate remediation strategies and mitigation measures to address any historic contamination within the Order limits which is shown to be having significant unacceptable effects on the environment within the context of the proposed works.
- (3) An investigation and assessment under sub-paragraph (1) must be carried out in accordance with the Department for Environment, Food and Rural Affairs’ and the Environment Agency’s ‘Model Procedures for the Management of Land Contamination’ Contaminated Land Report 11 document.
- (4) The steps and measures identified as necessary for the purposes of carrying out the authorised development must be implemented in accordance with details approved under sub-paragraph (1).
- (5) In the event that contaminated material, including groundwater, is found at any time when carrying out the authorised development, which was not previously assessed in the environmental statement or a risk assessment approved under sub-paragraph (1), the undertaker must cease construction in the vicinity of that contamination and undertake a risk assessment of the contamination in consultation with the Environment Agency and relevant planning authority.
- (6) Where the undertaker determines that remediation is necessary, a written scheme and programme for the remedial measures to be undertaken must be submitted to and approved in writing by the Secretary of State, following consultation with the Environment Agency and the relevant planning authority.
- (7) Remedial measures must be carried out in accordance with the scheme approved under sub-paragraph (6).
Archaeology
14
- (1) No part of the authorised development is to commence until for that part a written scheme for the investigation and mitigation of areas of archaeological interest, reflecting the mitigation measures set out in the environmental statement and REAC, has been submitted to and approved in writing by the Secretary of State, following consultation with the relevant planning authority and the County Archaeologist.
- (2) A written scheme prepared under sub-paragraph (1) may include provision for further sub-written schemes of investigation if required (evaluation or detailed excavation or watching brief) for any area and any phase of the works, for which approval must be sought separately in accordance with sub-paragraph (1).
- (3) A written scheme prepared under sub-paragraph (1) must contain details of the arrangements and timescales within which the undertaker and the County Archaeologist will agree the manner in which any further investigation and recording is to be carried out in the event of any archaeological remains, not previously identified, being revealed during construction.
- (4) The authorised development must be carried out in accordance with the written scheme of investigation approved under sub-paragraph (1).
- (5) In the event of any archaeological remains, not previously identified, being revealed when carrying out the authorised development, the said remains must be retained in situ and reported to the County Archaeologist as soon as is reasonably practicable from the date they are identified. No construction operations are to take place within 10 metres of the remains for a period of 14 days from the date on which the County Archaeologist is notified, unless otherwise agreed in writing by the County Archaeologist. Any revealed remains must be subject to appropriate mitigation to be determined in consultation with the County Archaeologist, in accordance with the written scheme approved under sub-paragraph (1) and within the timescales agreed under sub-paragraph (3).
- (6) If having been notified under sub-paragraph (5) the County Archaeologist determines in writing that the archaeological remains require further investigation, no construction operations may resume within 10 metres of the remains until provision has been made for the further investigation and recording of the remains, in accordance with details to be approved in writing by the County Archaeologist within the timescales agreed under sub-paragraph (3).
- (7) Where the undertaker or the County Archaeologist is of the view that the revealed remains referred to in sub-paragraph (5) may be of national significance the findings must be reported to Historic England. No construction operations may resume within 10 metres of the remains until the significance of the remains has been determined in consultation with Historic England and suitable provision is made for their analysis and recording in accordance with a scheme to be agreed in writing by Historic England.
- (8) On completion of the authorised development suitable resources and provisions for the long-term storage of the archaeological archive will be agreed with the County Archaeologist.
- (9) A copy of any analysis, reporting or publication required as part of the written scheme of investigation approved under sub-paragraph (1) must be deposited with the Historic Environment Record of the relevant planning authority within three years of the date of completion of the authorised development or such other period as may be agreed in writing by the County Archaeologist.
Protected species
15
- (1) No part of the authorised development is to commence until for that part, final pre-construction survey work has been carried out to establish whether European or nationally protected species are present on any of the land affected or likely to be affected by any part of the authorised development.
- (2) In the event that a European or other protected species or nesting birds not previously identified in the environmental statement are found at any time when carrying out the authorised development, the undertaker must cease construction of the relevant part of the works near their location, or any works within 10m of nesting birds, and report it as soon as practicable to the Ecological Clerk of Works.
- (3) Construction of the relevant part of the works must not resume until either—
- (a) the nesting birds, if relevant, have fledged and the nest is no longer in use; or
- (b) a suitably qualified and experienced ecologist, holding the relevant and appropriate licence for the species in question, determines that the relevant works do not require a protected species licence, or
- (c) any necessary licences for the protection and mitigation of the species have been obtained from Natural England.
Fencing
16
Any permanent and temporary fencing and other means of enclosure for the authorised development must be constructed and installed in accordance with the Manual of Contract Documents for Highway Works maintained by or on behalf of the undertaker except where any departures from that manual are agreed in writing by the Secretary of State.
Restoration and/or landscaping of land used temporarily for construction
17
- (1) Within three months of the authorised development being completed, a scheme for the restoration and/or landscaping of any Order land used temporarily for construction purposes, substantially in accordance with the Scheme Layout Plans and to include a programme for the said restoration and/or landscaping work, must be submitted to and approved in writing by the Secretary of State, following consultation with the relevant planning authority.
- (2) The restoration of the land subject to sub-paragraph (1) must be carried out, maintained, managed and where relevant monitored in accordance with the approved restoration scheme.
- (3) In so far as the land used temporarily is land within the boundary of the Thames Basin Heaths Special Protection Area or within the boundary of the Ockham and Wisley Commons Site of Special Scientific Interest, the restoration scheme under sub-paragraph (1) must be submitted to and approved in writing by the Secretary of State, following consultation with the relevant planning authority, Surrey County Council and Natural England and must—
- (a) make suitable provision for habitat restoration measures to support the relevant site’s qualifying species and features;
- (b) incorporate the measures described in the environmental statement and the Habitats Regulations Assessment where relevant;
- (c) demonstrate how opportunities have been taken to achieve biodiversity gains and support enhancement of the site’s nature conservation value within the restoration proposals; and
- (d) include a scheme for the maintenance, management and monitoring of the said land.
- (4) In so far as the land used temporarily is common land or open space, the restoration scheme under sub-paragraph (1) must make suitable provision for landscape and access measures to support use of the land as common land or open space and must include a scheme for the maintenance and management of the said land. The relevant details must be submitted to and approved in writing by the Secretary of State, following consultation with the relevant planning authority and Surrey County Council.
Protection of certain tree roots at RHS Garden Wisley
18
No soil level changes (excavation or filling), other works or access of any sort within the BS5837 and its provisions relating to root protection areas of the trees and as shown on the RHS Tree Protection Plan, are to be undertaken unless an arboricultural method statement describing the works or access and showing their location on a plan has been approved in writing by the Secretary of State following consultation with the owner of RHS Garden Wisley. The works shall be undertaken in accordance with the approved arboricultural method statement.
Works in the village of Ripley
19
- (1) No part of the development comprising Work No.33 (‘the Wisley Lane Diversion’) is to open for traffic until a scheme for the management of traffic flows along the B2215 through the village of Ripley has been submitted to and approved in writing by the Secretary of State following consultation with the local highway authority and the local planning authority.
- (2) Unless proposed by the undertaker and agreed in writing by the local highway authority, the scheme to be submitted to the Secretary of State must—
- (a) comprise two gateway features, two puffin crossings, speed cushions and speed tables, or similar measures, all to be provided along a 1km stretch of the B2215 that lies between the existing village entrance signs;
- (b) contain a cost estimate for the design and construction of the proposed works and specify arrangements by which either—
- (i) the undertaker will provide funds to the local highway authority to cover the approved cost (being either the cost estimate as referred to above or if the Secretary of State considers that another figure is appropriate then that other figure) of the local highway authority designing and constructing the approved works; or
- (ii) the undertaker will undertake the design and construction of the approved works at its own expense up to the value of the approved cost pursuant to an appropriate agreement with the local highway authority.
- (3) The scheme to be submitted to the Secretary of State must include a timetable for implementation and completion of the approved scheme for the management of traffic flows along the B2215 through the village of Ripley and the works must be implemented and completed in accordance with the approved scheme.
Approvals and amendments to approved details
20
With respect to any requirement that stipulates the authorised development must be carried out in accordance with the details approved under this Schedule, the approved details are taken to include any amendments that may subsequently be approved in accordance with the provisions of the relevant requirement.
PART 2 — PROCEDURE FOR DISCHARGE OF REQUIREMENTS
Applications made under requirements
21
- (1) Where an application has been made to the Secretary of State for any consent, agreement or approval required by a requirement (including consent, agreement or approval in respect of part of a requirement) included in this Order, the Secretary of State must give notice to the undertaker of the decision on the application within a period of 8 weeks beginning with—
- (a) the day immediately following that on which the application is received by the Secretary of State;
- (b) the day immediately following that on which further information has been supplied by the undertaker under paragraph 23; or
- (c) such longer period as may be agreed between the parties.
- (2) Subject to sub-paragraphs (3) and (4), in the event that the Secretary of State does not determine an application within the period set out in sub-paragraph (1), the Secretary of State is taken to have granted all parts of the application (without any condition or qualification) at the end of that period.
- (3) Where—
- (a) An application has been made to the Secretary of State for any consent, agreement or approval required by a requirement in this Order;
- (b) the Secretary of State does not determine such application within the period set out in sub-paragraph (1); and
- (c) the application is accompanied by a report that considers it likely that the subject matter of the application is to give rise to materially new or materially different environmental effects in comparison with those reported in the environmental statement,
then the application is taken to have been refused by the Secretary of State at the end of that period.
- (4) Sub-paragraph (2) does not apply to an application made to the Secretary of State under requirement 8 (Thames Basin Heaths Special Protection Area (SPA) Compensatory Habitat Creation and Enhancement Measures) and requirement 17(3) (restoration and/or landscaping of land used temporarily for construction).
- (5) Where approval or agreement must be obtained under any of the requirements included in this Schedule, the request or submission for approval must be in writing and approval or agreement must be given in writing.
Pre-application consultation
22
- (1) With respect to any requirement which requires details to be submitted to the Secretary of State for approval under this Schedule, the details submitted must be accompanied by a summary report setting out the consultation undertaken by the undertaker to inform the details submitted and an account as to how the undertaker has had regard to the responses received.
- (2) At the time of submitting an application to the Secretary of State, the undertaker must provide a copy of the summary report to the requirement consultees referred to in the requirement under which approval is being sought.
- (3) The undertaker must ensure that any consultation responses are reflected in the details submitted to the Secretary of State for approval under this Schedule, but only where it is appropriate, reasonable and feasible to do so, taking into account considerations including, but not limited to, cost and engineering practicality.
- (4) Where the consultation responses are not reflected in the details submitted to the Secretary of State for approval, the undertaker must state in the summary report referred to under sub-paragraph (1) the reasons why the consultation responses have not been reflected in the submitted details.
Further information
23
- (1) In relation to any application to which this Schedule applies, or part of any application, the Secretary of State has the right to request such further information from the undertaker as is necessary to enable the Secretary of State to consider the application.
- (2) In the event that the Secretary of State considers such further information to be necessary the Secretary of State must, within 21 business days of receipt of the application, notify the undertaker in writing specifying the further information required and (if applicable) to which part of the application it relates. In the event that the Secretary of State does not give such notification within this 21 day period the Secretary of State is deemed to have sufficient information to consider the application and is not subsequently entitled to request further information without the prior agreement of the undertaker.
- (3) Where further information is requested under this paragraph in relation to part only of an application, that part is treated as separate from the remainder of the application for the purposes of calculating the time periods referred to in paragraph 21 (applications made under requirements) and in this paragraph.
- (4) In this paragraph, “business day” means a day other than Saturday or Sunday, which is not a bank holiday under section 1 (bank holidays) of the Banking and Financial Dealings Act 1971284.
Register of requirements
24
- (1) The undertaker must, as soon as practicable following the making of this Order, establish and maintain in an electronic form suitable for inspection by members of the public a register of those requirements contained in Part 1 of this Schedule that provide for further approvals to be given by the Secretary of State.
- (2) The register must set out in relation to each such requirement the status of the requirement, in terms of whether any approval to be given by the Secretary of State has been applied for or given, providing an electronic link to any document containing any approved details.
- (3) The register must be maintained by the undertaker for a period of 3 years following completion of the authorised development.
Anticipatory steps towards compliance with any requirement
25
If before this Order came into force the undertaker or any other person has taken any steps that were intended to be steps towards compliance with any provision of Part 1 of this Schedule, those steps may be taken into account for the purpose of determining compliance with that provision if they would have been valid steps for that purpose had they been taken after this Order came into force.
SCHEDULE 3 — CLASSIFICATION OF ROADS, ETC.
PART 1 — SPECIAL ROADS
| (1) Highway | (2) Extent |
|---|---|
| M25 eastbound | Improved M25 eastbound carriageway, as shown between points 10/1 and 10/2 on Sheet 10 of the streets, rights of way and access plans, comprising 40 metres and between point 10/3 on Sheet 10 and point 18/2 on Sheet 18 of the streets, rights of way and access plans, comprising 5,580 metres. |
| M25 eastbound on-slip at M25 junction 10 | Altered slip road, as shown between point 5/20 on Sheet 5 and point 14/2 on Sheet 14 of the streets, rights of way and access plans, comprising 955 metres. |
| M25 eastbound off-slip at M25 junction 10 | Improved slip road, as shown between point 11/2 on Sheet 11 and point 5/12 on Sheet 5 of the streets, rights of way and access plans, comprising 900 metres. |
| M25 westbound | Improved M25 westbound carriageway, as shown between point 18/1 on Sheet 18 and point 10/4 on Sheet 10 of the streets, rights of way and access plans, comprising 6,050 metres. |
| M25 westbound on-slip at M25 junction 10 | Improved slip road, as shown between point 5/9 on Sheet 5 and point 11/1 on Sheet 11 of the streets, rights of way and access plans, comprising 1,225 metres. |
| M25 westbound off-slip at M25 junction 10 | Altered slip road, as shown between point 14/1 on Sheet 14 and point 5/21 on Sheet 5 of the streets, rights of way and access plans, comprising 800 metres. |
| A3 northbound to M25 westbound dedicated free-flow slip lane at M25 junction 10 | New slip lane, as shown between point 5/3 on Sheet 5 and point 12/5 on Sheet 12 of the streets, rights of way and access plans, comprising 205 metres. |
| M25 eastbound to A3 northbound dedicated free-flow slip lane at M25 junction 10 | New slip lane, as shown between point 12/4 on Sheet 12 and point 5/15 on Sheet 5 of the streets, rights of way and access plans, comprising 225 metres. |
| A3 southbound to M25 eastbound dedicated free-flow slip lane at M25 junction 10 | New slip lane, as shown between point 5/18 on Sheet 5 and point 13/1 on Sheet 13 of the streets, rights of way and access plans, comprising 210 metres. |
| M25 westbound to A3 southbound dedicated free-flow slip lane at M25 junction 10 | New slip lane, as shown between point 13/2 on Sheet 13 and point 5/4 on Sheet 5 of the streets, rights of way and access plans, comprising 250 metres. |
PART 2 — TRUNK ROADS
| (1) Highway | (2) Extent |
|---|---|
| M25 junction 10, circulatory carriageway | For the entire extent of the altered M25 junction 10 circulatory carriageway, as shown between points 5/6 and 5/7 on Sheet 5 of the streets, rights of way and access plans, comprising 725 metres. |
| A3 northbound | Improved A3 northbound carriageway, as shown between point 1/1 on Sheet 1 and point 8/12 on Sheet 8 of the streets, rights of way and access plans, comprising 5,325 metres. |
| A3 northbound on-slip at the A3 Ockham Park junction | Improved slip road, as shown between points 1/15 and 1/16 on Sheet 1 of the streets, rights of way and access plans, comprising 90 metres and between point 1/16 on Sheet 1 and point 2/2 on Sheet 2 of the streets, rights of way and access plans, comprising 650 metres. |
| A3 northbound off-slip at M25 junction 10 | Improved slip road, as shown between point 4/11 on Sheet 4 and point 5/8 on Sheet 5 of the streets, rights of way and access plans, comprising 315 metres. |
| A3 northbound on-slip at M25 junction 10 | Improved slip road, as shown between point 5/14 on Sheet 5 and point 6/2 on Sheet 6 of the streets, rights of way and access plans, comprising 465 metres. |
| A3 northbound off-slip at the A3 Painshill junction | Improved slip road, as shown between point 7/3 on Sheet 7 and point 8/5 on Sheet 8 of the streets, rights of way and access plans, comprising 685 metres. |
| A3 northbound on-slip at the A3 Painshill junction | Improved slip road, as shown between points 8/10 and 8/11 on Sheet 8 of the streets, rights of way and access plans, comprising 120 metres. |
| A3 southbound | Improved A3 southbound carriageway, as shown between point 8/13 on Sheet 8 and point 1/2 on Sheet 1 of the streets, rights of way and access plans, comprising 5,530 metres. |
| A3 southbound off-slip at the A3 Painshill junction | Improved slip road, as shown between points 8/14 and 8/15 on Sheet 8 of the streets, rights of way and access plans, comprising 245 metres. |
| A3 southbound on-slip at the A3 Painshill junction | Improved slip road, as shown between point 8/19 on Sheet 8 and point 7/2 on Sheet 7 of the streets, rights of way and access plans, comprising 785 metres. |
| A3 southbound off-slip at M25 junction 10 | Altered slip road, as shown between point 6/1 on Sheet 6 and point 5/19 on Sheet 5 of the streets, rights of way and access plans, comprising 305 metres. |
| A3 southbound on-slip at M25 junction 10 | Altered slip road, as shown between point 5/5 on Sheet 5 and point 4/1 on Sheet 4 of the streets, rights of way and access plans, comprising 870 metres. |
| A3 southbound off-slip at the A3 Ockham Park junction | Improved slip road, as shown between point 2/1 on Sheet 2 and point 1/22 on Sheet 1 of the streets, rights of way and access plans, comprising 380 metres. |
PART 3 — CLASSIFIED ROADS
| (1) Highway | (2) Extent |
|---|---|
| A Roads | A Roads |
| A3 Painshill junction (A245) | For the entire extent of the improved Painshill junction, as shown between points 8/3 and 8/4 on Sheet 8 of the streets, rights of way and access plans, comprising 430 metres. |
| A3 northbound to A245 westbound dedicated slip road at the A3 Painshill junction | New slip road, as shown between points 8/1 and 8/2 on Sheet 8 of the streets, rights of way and access plans, comprising 180 metres. |
| A245 Byfleet Road westbound | Improved A245 westbound carriageway, as shown between point 8/6 on Sheet 8 and point 9/1 on Sheet 9 of the streets, rights of way and access plans, comprising 540 metres. |
| A245 Byfleet Road eastbound | Improved A245 eastbound carriageway, as shown between point 9/2 and 9/4 on Sheet 9 and between point 8/27 and 8/9 on Sheet 8 of the streets, rights of way and access plans, comprising 190 metres. |
| A245 Portsmouth Road (eastbound) | A245 eastbound carriageway at the tie-in with the improved Painshill junction, as shown between points 8/16 and 8/17 on Sheet 8 of the streets, rights of way and access plans, comprising 170 metres. |
| A245 Portsmouth Road (westbound) | A245 westbound carriageway at the tie-in with the improved Painshill junction, as shown between points 8/17 and 8/18 on Sheet 8 of the streets, rights of way and access plans, comprising 170 metres. |
| B Roads | B Roads |
| A3 Ockham Park junction (B2039) | For the entire extent of the improved A3 Ockham Park junction circulatory carriageway forming part of the B2039, as shown between points 1/20 and 1/21 on Sheet 1 of the streets, rights of way and access plans, comprising 420 metres. |
| B2115 Portsmouth Road | At the tie-in with the A3 Ockham Park junction, as shown between points 1/6 and 1/7 on Sheet 1 of the streets, rights of way and access plans, comprising 235 metres. |
| B2039 Ockham Road North | At the tie-in with the A3 Ockham Park junction, as shown between points 1/27 and 1/28 on Sheet 1 of the streets, rights of way and access plans, comprising 60 metres. |
| B2039 | At the tie-in between the A3 Ockham Park junction circulatory carriageway and the Mill Lane junction, as shown between points 1/16 and 1/17 on Sheet 1 of the streets, rights of way and access plans, comprising 75 metres. |
| B365 Seven Hills Road (north of the A245 Byfleet Road junction) | Improved B365 Seven Hills Road at the tie-in with the A245 Byfleet Road junction, as shown between points 9/9 and 9/10 on Sheet 9 of the streets, rights of way and access plans, comprising 110 metres. |
| Classified unnumbered roads | Classified unnumbered roads |
| Old Lane | At the tie-in, as shown between points 4/2 and 4/3 on Sheet 4 of the streets, rights of way and access plans, comprising 145 metres and as shown between points 24/3 and 24/4 on Sheet 24 of the streets, rights of way and access plans, comprising 145 metres. |
PART 4 — UNCLASSIFIED ROADS
| (1) Highway | (2) Extent |
|---|---|
| Mill Lane | At the tie-in with the improved B2039 Ockham Park junction, as shown between points 1/18 and 1/19 on Sheet 1 of the streets, rights of way and access plans, comprising 55 metres. |
| Wisley Lane | New and improved road, as shown between point 1/25 on Sheet 1 and point 20/3 on Inset A of Sheet 20 of the streets, rights of way and access plans, comprising 1,905 metres. |
| Seven Hills Road (south of the A245 Byfleet Road junction and currently classified as B365) | Improved road and road to be declassified, as shown between point 7/1 on Sheet 7 and point 9/8 on Sheet 9 of the streets, rights of way and access plans, comprising 190 metres. |
| A245 Byfleet Road westbound to Seven Hills Road dedicated slip-road | New road, as shown between points 9/6 and 9/7 on Sheet 9 of the streets, rights of way and access plans, comprising 40 metres. |
| Elm Lane | Improved unclassified road, as shown between point 23/1 on Sheet 23 and point 24/1 on Sheet 24 of the streets, rights of way and access plans, comprising 240 metres. |
| Byway Open to All Traffic – Byway 525 (Elm Lane) | Improved Byway Open to All Traffic, as shown between points 24/1 and 24/2 on Sheet 24 of the streets, rights of way and access plans, comprising 565 metres. |
PART 5 — SPEED LIMITS
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.