(1) Private means of access to be stopped up (2) Extent of stopping up (3) New private means of access to be substituted
Private means of access from West Moor Road to West Moor House. Access located at grid reference 417273E; 598730N on Sheet 9 of the rights of way and access plans. New private means of access to be created (9/A) as part of the new highways (side road network) Work No. 16g on Sheet 9 of the rights of way and access plans, reference point 9/c.
Private means of access from Warreners House to existing field network. Access located at grid reference 418250E; 588934N, (1/a) on Sheet 1 of the rights of way and access plans. New private means of access (PA 2/1) to be created as part of the new highways (side road network) Work No. 5a on Sheet 1 of the rights of way and access plans.
Private means of access from Northgate House (demolished) to A1, east as the only mean of access to highway network. Access located at grid reference 418211E; 588632N (1/c) on Sheet 1 of the rights of way and access plans. New private means of access (PA 1/4) to be created as part of the new highways (side road network) Work No. 6 on Sheet 1 of the rights of way and access plans.
Private means of access from Northgate House (demolished) to A1, east as the only mean of access to highway network. Access located at grid reference 418212E; 588668N (1/b) on Sheet 1 of the rights of way and access plans. New private means of access (PA 1/4) to be created as part of the new highways (side road network) Work No. 6 on Sheet 1 of the rights of way and access plans.
Private means of access from Northgate Farm to A1, west as the only mean of access to highway network. Access located at grid reference 418241E; 588639N (1/d) on Sheet 1 of the rights of way and access plans. New private means of access (PA 1/3) to be created as part of the new highways (side road network) Work No. 5a on Sheet 1 of the rights of way and access plans.
Private means of access from Warreners House to A1, west as the only mean of access to highway network. Access located at grid reference 418238E; 588544N (1/e) on Sheet 1 of the rights of way and access plans. New private means of access (PA 1/2) to be created as part of the new highways (side road network) Work No. 5a on Sheet 1 of the rights of way and access plans.
Private means of access from Warreners House to A1, west as the only mean of access to highway network. Access located at grid reference 418390E; 588434N (1/f) on Sheet 1 of the rights of way and access plans. New private means of access (PA 1/2) to be created as part of the new highways (side road network) Work No. 5a on Sheet 1 of the rights of way and access plans.
Private means of access from Warreners House to A1, west as the only mean of access to highway network. Access located at grid reference 418263E; 588330N (1/g) on Sheet 1 of the rights of way and access plans. New private means of access (PA 1/1) to be created as part of the new highways (side road network) Work No. 5a on Sheet 1 of the rights of way and access plans.
Private means of access between the field network to A1, west, is the only means of access to highway network. Access located at grid reference 418470E; 590264N (2/a) on Sheet 2 of the rights of way and access plans. New private means of access (PA 2/2) to be created as part of the new highways (side road network) Work No. 8c on Sheet 2 of the rights of way and access plans.
Private means of access from Beacon Hill and Hebron Hill to A1, west as the only mean of access to highway network. Access located at grid reference 418486E; 590182N (2/b) on Sheet 2 of the rights of way and access plans. New private means of access (PA 2/1) to be created as part of the new highways (side road network) Work No. 8g on Sheet 2 of the rights of way and access plans.
Private means of access from Strafford House to A1, east, as the only mean of access to highway network removed. Access located at grid reference 418352E; 589554 (2/f) on Sheet 2 of the rights of way and access plans. New private means of access (PA 2/4) to be created as part of the new highways (side road network) Work No. 8j on Sheet 2 of the rights of way and access plans.
Private means of access from Low Espley to A1, west as the only mean of access to highway network. Access located at grid reference 418533E; 590912N (3/b) on Sheet 3 of the rights of way and access plans. New private means of access (PA 3/2) to be created as part of the new highways (side road network) Work No. 8c on of Sheets 2 & 3 the rights of way and access plans.
Private means of access between the field network to Beacon Hill, east, is the only means of access to highway network. Access located at grid reference 418549E; 590575N (3/c) on of Sheet 3 the rights of way and access plans. New private means of access (PA 3/1) to be created as part of the new highways (side road network) Work No. 8g on Sheets 2 & 3 of the rights of way and access plans.
Private means of access between the New Houses Farm and Causey Park Road to the north. Access located at grid reference 418599E; 594215N (5/a) on Sheet 5 and Sheet 6 of the rights of way and access plans. New private means of access (PA 5/2) to be created as part of the new highways Work No. 11a on Sheet 5 & 6 of the rights of way and access plans.
Private means of access between the Blackwood Hall and the existing road network. Access located at grid reference 417460E; 598163N (8/a) on Sheet 8 of the rights of way and access plans. New private means of access (PA 8/3) to be created as part of the new highways boundary Work No. 16b on Sheet 8 of the rights of way and access plans.
Private means of access stopped up on public right of way 422/011. Access point 8b located at grid reference 417465E; 597838N, on Sheet 8 of the rights of way and access plans. New 422/011 public right of way alignment to be created, listed as Work No.16a on Sheet 8 of the rights of way and access plans.
Private means of access stopped up on public right of way 115/009. Access point 8c located at grid reference 417467E; 597829N, on Sheet 8 of the rights of way and access plans. New 115/009 public right of way alignment to be created, shown on Sheet 9 of the rights of way and access plans.
Private means of access stopped up on public right of way 115/016 near Duke’s Bank Wood. Access located between grid references 417391E; 600238N (10/a) and 417425E; 600237N (10/b) (34m in length) on Sheet 10 of the rights of way and access plans. New 115/016 Public right of way alignment to be created (PR 10/1 – PR 10/2), shown on Sheet 10 of the rights of way and access plans.
Private means of access stopped up on public right of way 115/008 near Duke’s Bank Wood. Access located between grid references 417504E; 600266N and 417649E; 600256N (149.4m in length) on Sheet 10 of the rights of way and access plans. New 115/008 public right of way alignment to be created (PR 10/1 – PR 10/2), shown on Sheet 10 of the rights of way and access plans.
Private means of access from Heckley Cottage to Broxfield. Access located at grid reference 419266E; 617419N on Sheet 12 of the rights of way and access plans. (Point 12/a) New private means of access to be created (PA 12/1) as part of the new highways (side road network) Work No 21a and 26b on Sheet 12 of the rights of way and access plans.
Private means of access from Heckley Fence to Broxfield. Access located at grid reference 418936E; 617293N on Sheet 12 of the rights of way and access plans. (Point 12/b) New private means of access to be created as part of Work No. 27.
Private means of access from the A1 to Broxfield. Access located at grid reference 418975E; 617311N on Sheet 12 of the rights of way and access plans. (Point 12/c) New private means of access to be created as part Work No. 27.
Private means of access from Heckley Fence to Broxfield. Access located at grid reference 418969E; 617303N on Sheet 12 of the rights of way and access plans. (Point 12/d) New private means of access to be created as part of Work No. 27.
Private means of access from the A1 to Broxfield. Access located at grid reference 419286E; 616429N on Sheet 12 of the rights of way and access plans. (Point 12/e) New private means of access to be created (PA 11/1) as part of the new highways (side road network) Work No. 25b on Sheet 11 of the rights of way and access plans.
Private means of access from Rock South Farm and Black Plantation. Access located at grid reference 418438E; 618627N on Sheet 13 of the rights of way and access plans. (Point 13/b) New private means of access to be created (PA 13/2) as part of the new highways (side road network) Work No. 28 on Sheet 13 of the rights of way and access plans.
Private means of access from A1 to field network north of Rock Nab. Access located at grid reference 417709E; 620550N on Sheet 15 of the rights of way and access plans. (Point 15/a) New private means of access to be created (PA 15/1) as part of the new highways (side road network) Work No. 29a on Sheet 15 of the rights of way and access plans.
Private means of access from A1 to field network west of Charlton Mire Junction. Access located at grid reference 417689E; 620647N on Sheet 15 of the rights of way and access plans. (Point 15/b) New private means of access to be created (PA 15/7) as part of the new highways (side road network) Work No. 29h on Sheet 15 of the rights of way and access plans.
Private means of access from Patterson Cottage and West Linkhall. Access located at grid reference 417521E; 621177N on Sheet 15 of the rights of way and access plans. (Point 15/e) New private means of access to be created (PA 15/7) as part of the new highways (side road network) Work No. 29h on Sheet 15 of the rights of way and access plans.
Private means of access from Rock Midstead and Rock Lodge. Access located at grid reference 418067E; 620194N on Sheet 15 of the rights of way and access plans. (Point 15/f) New private means of access to be created (PA 15/5) as part of the new highways Work No. 21b on Sheet 15 of the rights of way and access plans.
Private means of access from Rock Midstead and Rock Lodge. Access located at grid reference 417901E; 620046N on Sheet 15 of the rights of way and access plans. (Point 15/h) New private means of access to be created (15/C) as part of the new highways Work No. 21a and 21b on Sheet 15 of the rights of way and access plans.
Private means of access from Westlink Hall and East Linkhall. Access located at grid reference 417342E; 621437N on Sheet 16 of the rights of way and access plans. (Point 16/b) New private means of access to be created (PA 16/2 and PA 16/3) as part of the new highways (side road network) Work No 29h on Sheet 16 of the rights of way and access plans.
Private means of access from A1 to field network north of West Linkhall. Access located at grid reference 417205E; 621664N on Sheet 16 of the rights of way and access plans. (Point 16/c) New private means of access to be created (PA 16/3) as part of the new highways (side road network) Work No. 22a/23a on Sheet 16 of the rights of way and access plans.
Private means of access from A1 to field network north Shipperton Burn. Access located at grid reference 416974E; 622299N on Sheet 16 of the rights of way and access plans. (Point 16/d) New private means of access to be created (PA 16/3) via existing North Charlton Junction as part of the new highways (side road network) Work No. 23a on Sheet 16 and 17 of the rights of way and access plans.
Private means of access from A1 to field network north Shipperton Burn. Access located at grid reference 417015E; 622420N on Sheet 16 of the rights of way and access plans. (Point 16/e) New private means of access to be created (PA 16/4) as part of the new highways (side road network) Work No. 29l on Sheet 16 of the rights of way and access plans.
Private means of access from A1 to field network north Shipperton Burn. Access located at grid reference 417031E; 622134N on Sheet 16 of the rights of way and access plans. (Point 16/f) New private means of access to be created (PA 16/4) as part of the new highways (side road network) Work No. 29l on Sheet 16 of the rights of way and access plans.
Private means of access from East Linkhall to West Lodge. Access located at grid reference 417173E; 621781N on Sheet 16 of the rights of way and access plans. (Point 16/g) New private means of access to be created (PA 16/4 and PA 15/4) as part of the new highways (side road network) Work No. 29l on Sheet 16 of the rights of way and access plans.
Private means of access from East Linkhall to Charlton Mire Junction. Access located at grid reference 417284E; 621406N on Sheet 16 of the rights of way and access plans. (Point 16/h) New private means of access to be created (PA 16/4 and PA 15/4) as part of the new highways (side road network) Work No. 29l on Sheet 16 of the rights of way and access plans.
Private means of access from West Linkhall to the existing A1. Access located at grid reference 417471E; 621258N on Sheet 16 of the rights of way and access plans. (Point 16/i) New private means of access to be created (PA 16/1) as part of the new highways (side road network) Work No. 29h on Sheet 16 of the rights of way and access plans.

PART 4 — PUBLIC RIGHTS OF WAY TO BE STOPPED UP AND FOR WHICH A SUBSTITUTE IS NOT TO BE PROVIDED

(1) Public right of way to be stopped up (2) Extent of stopping up
Permanent stopping up of existing Footpath 423/006 west of Tindale Hill. From grid reference 417751E; 593145N to 418518E; 593449N for a length of 828m shown as between points 5/e and 5/f on Sheet 5 of the rights of way and access plans.
Permanent stopping up of existing Footpath 423/007 between New Houses Farm and Earsdon Moor Farm. From grid reference 418347E; 593794N to 418900E; 593481N for a length of 793m shown as between points 5/c and 5/d on Sheet 5 of the rights of way and access plans.
Permanent stopping up of existing Footpath 129/013 west of Broxfield. From grid reference 419846E; 616687N to 420079E; 617048N for a length of 425m shown as between points 12/g and 18/a on Sheets 12 and 18 of the rights of way and access plans.
Permanent stopping up of existing Footpath 129/014 and 110/004 between access south of Broxfield. From grid reference 419495E; 615921N to 4197328E; 616662N for a length of 791.1m shown as between points 11c and 12h on Sheets 11 and 12 of the rights of way and access plans.
Permanent stopping up of existing byway open to all traffic 129/022 west of Broxfield. From grid reference 419295E; 616432N to 19846E; 616687N for a length of 825.9m shown as between points 12f and 18b on Sheets 12 and 18 of the rights of way and access plans.
Permanent stopping up of existing Footpath 110/003 and 129/009 south of Rock South Farm. From grid reference 419162E; 618882N to 418670E; 618091N for a length of 971m shown as between points 14/a, 13/e and 13/d on Sheets 13 and 14 of the rights of way and access plans.
Permanent stopping up of existing Footpath 129/024 south of Rock Lodge From grid reference 417814E; 619943N, south of Rock Lodge, in a north-easterly direction for a distance of 110 metres, to grid reference 417892E; 620021N, at the western boundary of the existing A1 road, between points 15/m and 15/i on Sheet 15 of the rights of way and access plans.

PART 5 — PRIVATE MEANS OF ACCESS TO BE STOPPED UP AND FOR WHICH A SUBSTITUTE IS NOT TO BE PROVIDED

(1) Private means of access to be stopped up (2) Location of stopping up
Permanent stopping up of existing private access point (13/a). Access located west of Broxfield at grid reference 418763E; 617812N on Sheet 13 of the rights of way and access plans. (Point 13/a).
Permanent stopping up of existing private access point (13/c). Access located at Rock South Farm, grid reference 418466E; 618643N on Sheet 13 of the rights of way and access plans. (Point 13/c).
Permanent stopping up of existing private access point (15/c). Access located at Charlton Mires Junction,grid reference 417708E; 620649N on Sheet 15 of the rights of way and access plans. (Point 15/c).
Permanent stopping up of existing private access point (15/d). Access located at Charlton Mires Junction,grid reference 417702E; 620690N on Sheet 15 of the rights of way and access plans. (Point 15/d).
Permanent stopping up of existing private access point (15/g). Access located at Rock Midstead and Rock Lodge, grid reference 417888E; 620033N on Sheet 15 of the rights of way and access plans. (Point 15/g).

SCHEDULE 5 — PUBLIC RIGHTS OF WAY TO BE TEMPORARILY PROHIBITED AND FOR WHICH A SUBSTITUTE IS TO BE PROVIDED

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SCHEDULE 6 — LAND IN RESPECT OF WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED

(1) Plot Reference Number shown on Land Plans (2) Purpose for which rights over land may be acquired (3) Relevant part of the authorised development or ancillary works
Land Plans – Sheet 1 Land Plans – Sheet 1 Land Plans – Sheet 1
1/4b The construction of new northbound carriageway of the A1 dual carriageway from Warreners House Junction to Highlaws Junction. Access required by utility provider to divert gas, electrical, water lines. Work No. 1a
1/8b The improvement of West View, to include alteration for a new footpath to the east side and new pavement 183m in length with inclusion of 9 no. parking spaces, realignment of turning circle. Access required by utility provider to divert gas main. Work No. 5a
Land Plans – Sheet 2 Land Plans – Sheet 2 Land Plans – Sheet 2
2/9d Construction of new culvert 75m in length. Access for maintenance of structures. Work No. 7
2/3c, 2/4b The construction of new northbound carriageway of the A1 dual carriageway from Warreners House Junction to Highlaws Junction. Access to diverted utilities (gas, water, electricity). Work No. 1a
2/15b, 2/1c Construction of new access track 1450m in length for maintenance of detention basin Access to diverted utilities (gas). Work No. 8c
2/17a Construction of new access track 870m in length for maintenance of drainage swale. Potential access to private property. Work No. 8g
2/14b Widening and resurfacing of Hebron Road as part of Highlaws Junction. Access to diverted utility (electrical). Work No. 8h
2/11c Construction of new access 275m in length for private access. Access to diverted utility (electrical). Work No. 8j
2/2b Alteration and alignment of High Highlaws Road to create single carriageway 2 lane connection to Highlaws Junction retaining existing road for access 240m in length (Break out of carriageway). Work No. 8b
Land Plans – Sheet 3 Land Plans – Sheet 3 Land Plans – Sheet 3
3/1a, 3/6a, 3/5a, 3/2a Construction of new access track 1450m in length for maintenance of detention basin. Vehicle access to diverted utilities (gas). Work No. 8c
3/10b Construction of new access track 870m in length for maintenance of drainage swale. Access for maintenance of badger fencing. Work No. 8g
Land Plans – Sheet 4 Land Plans – Sheet 4 Land Plans – Sheet 4
4/6b Construction of slip road single lane carriageway for northbound on-access to the A1 from Fenrother Junction 220m in length and construction of new access 499m in length for private access. Work No. 9b, 9e
4/20b, 4/23a Construction of 2 no. lane road single carriageway for Fenrother free flow link road 685m in length from Fenrother Lane East to detrunked A1 for local access and detrunked section of old A1 crossing the River Lyne to Fenrother Lane East (realigned) 1166m in length. Access for maintenance of structures. Work No. 10, 9i
Land Plans – Sheet 5 Land Plans – Sheet 5 Land Plans – Sheet 5
5/1c Construction of an access track from Causey Park Road to New House Farm 1363m in length. Access to Badger Fencing. Work No. 11a
Land Plans – Sheet 6 Land Plans – Sheet 6 Land Plans – Sheet 6
6/2c, 6/2s, 6/2x, 6/2t Diversion of National Grid Feeder 13 High Pressure gas main under the (new) A1 carriageway 30m in length. Work No. 12a
6/2c Construction of access track from Causey Park Road to private land 191m in length. Work No. 11b
6/2e Construction of an access track from Causey Park Road to New House Farm 1363m in length and Diversion of National Grid Feeder 13 High Pressure gas main under the (new) A1 carriageway 30m in length. Work No. 11a and Work No. 12a
6/4b Diversion underground of Northern Power Grid Line, 1377m in length and Northern Gas Network Medium Pressure gas main 1233m in length. Work No. 12b
6/2o Construction of an access track from Causey Park Road to New House Farm 1363m in length. Work No. 11a
Land Plans – Sheet 7 Land Plans – Sheet 7 Land Plans – Sheet 7
7/10h The construction of new northbound carriageway of the A1 dual carriageway 6896m in length. Access to diverted utility (gas). Work No. 2b
7/7b Construction of Burgham Park Underbridge. Access for the maintenance of structures. Work No. 14
7/10c, 7/15b The construction of new northbound carriageway of the A1 dual carriageway 6894m in length and construction of new culvert 77m in length. Access to diverted utility (gas) and access to watercourse diversion. Work No. 13, 2a
7/7a The construction of new northbound and southbound carriageway of the A1 dual carriageway 6894m in length. Access for maintenance of fence. Work No. 2a, 2b
7/10g, 7/15a The construction of new northbound carriageway of the A1 dual carriageway 6894m in length and construction of access track from Causey Park Road to private land 191m in length. Access to existing utility (gas) and drainage feature. Work No. 2a, 11
7/15f The construction of new northbound carriageway of the A1 dual carriageway 6896m in length. Access to diverted utility (electrical). Work No. 2b
Land Plans – Sheet 8 Land Plans – Sheet 8 Land Plans – Sheet 8
8/1d, 8/2c, 8/5b, 8/3c, 8/5c, 8/10a, 8/16b The construction of new northbound carriageway of the A1 dual carriageway 6896m in length, construction of new culvert and construction of new access 242m in length for private access off Bywell Road. Access to diverted utility (gas). Work No. 16a, 2b, 15
8/17a Construction of new culvert 76m in length. Access for maintenance of structures. Work No. 15
Land Plans – Sheet 9 Land Plans – Sheet 9 Land Plans – Sheet 9
9/21c, 9/20c Construction of new access 954 in length off Felton Road for maintenance of detention basin. Access for maintenance of structure. Work No. 16h
9/1c, 9/8a Alteration and alignment of West Moor Road to create single carriageway 2 lane connection to West Moor Junction, construction of West Moor Junction single span overbridge and slip road single lane carriageway for northbound on-access to the A1 from West Moor Junction. The construction of new northbound carriageway of the A1 dual carriageway. Access to Environmental Mitigation Area, utility diversion (electricity) and drainage pipe and outfall. Work No. 16d, 16e, 16f, 3a
9/1d Construction and access rights to new outfall from detention basin. Access rights required to Environmental Mitigation Area. Work Nos. 3a, 3b
9/6o, 9/6n, 9/6l, 9/6j, 9/6i, 9/6h, 9/6d, 9/2iii The alteration of the existing River Coquet bridge to carry northbound traffic on 2 no. lanes in a single carriageway 230m. Access to bridge structure. Work No. 3a
9/6d, 9/12a, 9/12b, 9/12c, 9/6p Construction of the River Coquet bridge, southbound carriageways, in parallel to the eastern side. Access to bridge structure. Work No. 3b
9/12a, 9/12b, 9/129/ The construction of the River Coquet bridge piers and access areas. Work No. 4
9/13ii The construction of the River Coquet bridge piers, scour protection. Access for maintenance of bridge and scour protection.
Land Plans – Sheet 10 Land Plans – Sheet 10 Land Plans – Sheet 10
10/1d, 10/3a Construction of new culvert 137m in length. Access for maintenance of structures. Work No. 19
10/2c, 10/1b The alteration of the existing River Coquet bridge to carry northbound traffic on 2 no. lanes in a single carriageway and construction of new northbound carriageway of the A1 dual carriageway. Access to bridge structure. Work No. 3a
10/10a, 10/11a, 10/1l, 10/9a, 10/2m, 10/2l Extension of Parkwood Subway. Access to drainage pipe, drainage tank, culvert and River Coquet bridge. Work No. 18
10/5e, 10/1o Construction of new culvert 137m in length. Access to drainage pipe. Work No. 19
Land Plans – Sheet 11 Land Plans – Sheet 11 Land Plans – Sheet 11
11/1g, 11/1j, 11/1l Construction and maintenance access for realignment of 66kV electrical cable to service the Middlemoor Wind Farm. Work No. 24
11/4f Construction and access rights to new outfall from detention basin. Work No. 21b (Ancillary Works)
11/1a Creation of new public right of way. Work No. 26 (Ancillary Works)
11/1h Access rights to the 66kV electrical cable to service the Middlemoor Wind Farm. Work No. 24 (Ancillary Works)
Land Plans – Sheet 12 Land Plans – Sheet 12 Land Plans – Sheet 12
12/1a, 12/2a, 12/3a Construction of new maintenance access track to detention basin (662m in length). Work No. 26
12/3s 12/3y, 12/3dd Construction and maintenance access for realignment of 66kV electrical cable to service the Middlemoor Wind Farm. Work No. 24
12/3ff, 12/3gg, 12/3hh, 12/3ii, 12/3m, 12/3t, 12/3n, 12/3x, 12/3dd, 12/3bb, 12/dd, 12/3ee Access rights to the 66kV electrical cable to service the Middlemoor Wind Farm. Work No. 24 (Ancillary Works)
12/4a Access rights over new maintenance access track to detention basin. Work No. 26 (Ancillary Works)
12/3cc Creation of new byway. Access rights to the 66kV electrical cable to service the Middlemoor Wind Farm. Work No. 27 (Ancillary Works)
12/3b, 12/3c, 12/3d Creation of new byway. Work No. 27 (Ancillary Works)
12/3k Creation of new bridleway. Work No. 26 (Ancillary Works)
Land Plans – Sheet 13 Land Plans – Sheet 13 Land Plans – Sheet 13
13/1a, 13/1b, 13/1c Access rights over new maintenance access track to detention basin. Work No. 21a, 28 (Ancillary Works)
13/1d, 13/1k, 13/5a Creation of new public right of way. Work No. 11a (Ancillary Works)
13/1f Creation of new byway. Work No. 27 (Ancillary Works)
13/1p Creation of new byway. Realignment and access rights over 66kV electrical cable to service the Middlemoor Wind Farm. Work No. 24
14/4i Realignment and access rights over 66kV electrical cable to service the Middlemoor Wind Farm. Stopping up of local access and construction of turnaround. Work No 24.
13/2c, 13/6b, 13/5d, 14/1f, 14/4e, 13/1n Realignment and access rights over 66kV electrical cable to service the Middlemoor Wind Farm. Work No. 24
13/1h Access rights over utility diversion. Work No. 27 (Ancillary Works)
Land Plans – Sheet 14 Land Plans – Sheet 14 Land Plans – Sheet 14
14/4e, 14/4j, 14/6c Access rights associated with stopping up of existing access road. Work No. 24, 30b (Ancillary Works)
14/6b Realignment and access rights over 66kV electrical cable to service the Middlemoor Wind Farm. Stopping up of local access and construction of turnaround. Access rights associated with stopping up of existing access road. Work No. 24
Land Plans – Sheet 15 Land Plans – Sheet 15 Land Plans – Sheet 15
15/4f, 5/24b Realignment and access rights over 66kV electrical cable to service the Middlemoor Wind Farm. Work No. 24
15/1e, 15/1g, 15/23e Access to traffic sign. Work No. 29c, 29k (Ancillary Works)
15/24d, 15/24e, 15/26c 15/27a, 15/18h Access rights to the 66kV electrical cable to service the Middlemoor Wind Farm. Work No. 24 (Ancillary Works)
15/1j Construction and access rights over utility diversion. Work No. 29c, 29e, 29g, 29h (Ancillary Works)
15/6b, 15/6c, 5/6e Construction and access rights over new outfall from detention basin. Work No. 24, 31 (Ancillary Works)
15/18c Creation of new public right of way. Access rights to the 66kV electrical cable to service the Middlemoor Wind Farm. Work No. 24 (Ancillary Works)
15/24c Creation of new public right of way. Work No. 24 (Ancillary Works)
Land Plans – Sheet 16 Land Plans – Sheet 16 Land Plans – Sheet 16
16/1a, Access rights to and over utility diversion. Work No. 23a, 35 (Ancillary Works)
16/3ee, 16/3y, 16/3z, 16/5a Construction and access rights over new agricultural track and utility diversion. Work No. 32
16/3i, 16/3j, 16/3k, 16/4b, 16/4d Construction and access rights over utility diversion. Work No. 23b (Ancillary Works)
16/5e Realignment and access rights over 66kV electrical cable to service the Middlemoor Wind Farm. Work No. 24 (Ancillary Works)
16/9e, 16/10b Environmental mitigation works. Work No. 23b, 24 (Ancillary Works)
16/3h, 16/5g, 16/11a Realignment and access rights over 66kV electrical cable to service the Middlemoor Wind Farm and other utility diversions. Work No. 4
Land Plans – Sheet 17 Land Plans – Sheet 17 Land Plans – Sheet 17
7/2a, 17/5a, 17/6b, 17/6g Construction and access rights over utility diversion. Work No. 23a, 23b (Ancillary Works)
Land Plans – Sheet 18 Land Plans – Sheet 18 Land Plans – Sheet 18
18/3b, 18/2b, 18/3a, 18/2a, 18/1a Access rights to the 66kV electrical cable to service the Middlemoor Wind Farm. Work No. 24, 27, 21b (Ancillary Works)
18/3b, 18/2b, 18/3a, 18/2a, 18/1a Access required for the construction of Heckley Fence Overbridge and associated ramps over the widened A1 (330m in length) Work No. 24, 27, 21b (Ancillary Works)
18/3b, 18/2b, 18/3a, 18/2a, 18/1a Access required for the construction of new southbound carriageway of the A1 dual carriageway from Denwick Burn to Rock Lodge Work No. 24, 27, 21b (Ancillary Works)

SCHEDULE 7 — MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS AND IMPOSITION OF RESTRICTIVE COVENANTS

Compensation enactments

1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Application of Part 1 of the 1965 Act

4

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

SCHEDULE 8 — LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

(1) Plot Reference Number shown on Land Plans (2) Purpose for which temporary possession may be taken (3) Relevant part of the authorised development or ancillary works
Land Plans - Sheet 1 Land Plans - Sheet 1 Land Plans - Sheet 1
1/4d Construction of new northbound carriageway of the A1 dual carriageway from Warreners House Junction to Highlaws Junction. Temporary land take required to facilitate construction activities. Work No. 1a
1/4a Topsoil storage of construction of new northbound carriageway of the A1 dual carriageway from Warreners House Junction to Highlaws Junction and alteration of existing A1 to provide southbound dual carriageway from Warreners House Junction to Highlaws Junction. Work No. 1a, 1b
1/9a, 1/10a, 1/11b, 1/11a, 1/12a, 1/13a, 1/9c Construction of new access track 832m in length to the north of the West View turning circle, new access track 150m in length to Warreners House and new access track 326m in length to private land. Work No. 5b, 5c and 5d
1/8a, 1/8c, 1/8d Construction works for improvement of West View, to include alteration for a new footpath to the east side and new pavement 183m in length with inclusion of 9 no. parking spaces, realignment of turning circle. Work No. 5a
Land Plans - Sheet 2 Land Plans - Sheet 2 Land Plans - Sheet 2
2/17c Construction of new access track 870m in length for maintenance of drainage swale and widening and resurfacing of Hebron Road. Access to private property and construction access to divert utility (telecom). Work No. 8g, 8h
2/1e Construction of new northbound carriageway of the A1 and alteration of existing A1 dual carriageway from Warreners House Junction to Highlaws and temporary land take required to facilitate construction activities, top soil storage. Work No. 1a, 1b
2/1d Construction of new access track 1450m in length for maintenance of detention basin. Access to divert utilities (electricity). Work No. 8c
2/1a Alteration and alignment of High Highlaws Road. Access for fencing construction. Work No. 8b
2/14c Access to divert utilities (electricity). Work No. 8h
2/9b, 2/9e, 2/11b, 2/8b The alteration of existing A1 to provide southbound dual carriageway from Warreners House Junction to Highlaws. Work No. 1b
2/11d, 2/11h, 2/11f, 2/11e Construction of slip road single lane carriageway for southbound on-access to the A1. Access track to private properties. Work No. 8j
2/18b Widening and resurfacing of Hebron Road as part of Highlaws Junction. Work No. 8h
2/7b Construction of new access track 326m in length to private land. Work No. 5d
2/3a, 2/4a Construction of new northbound carriageway of the A1 dual carriageway. Work No. 1a
Land Plans - Sheet 3 Land Plans - Sheet 3 Land Plans - Sheet 3
3/11g Course of the River Lyne, running east/west under the proposed existing bridge structure. Work No. 10a
3/15a Detrunked section of old A1 crossing the River Lyne to Fenrother Lane East. Maintenance access track. Work No. 10a
3/13b Construction of new northbound carriageway of the A1 dual carriageway. Area for associated environmental mitigation. Work No. 2b
3/1b Construction of new access track 1450m in length for maintenance of detention basin. Access to diverted utilities (gas). Work No. 8c
3/10c Construction of new access track off Hebron Road to private properties and land. Work No. 8g
Land Plans - Sheet 4 Land Plans - Sheet 4 Land Plans - Sheet 4
4/5b, 4/6a Construction of new access 499m in length for private access. Access to private property. Work No. 9e
4/7a Alteration and alignment of Fenrother Lane West to create single carriageway 2 lane connection. Temporary construction area for realignment works. Work No. 9b
4/9c, 4/5e, 4/21a Construction of new northbound carriageway of the A1 dual carriageway, Construction of slip road single lane carriageway for southbound off-access to Fenrother Junction and 2 no. lane road single carriageway for Fenrother. Temporary land take required to facilitate construction activities. Work No. 2b, 9l, 9f
4/23b Detrunked section of old A1 from Portland House to Bockenfield Bridge. Work No 10b
4/20a, 4/11g, 4/17a, 4/16a, 4/15a, 4/12b Detrunked section of old A1 crossing the River Lyne to Fenrother Lane East. Work No. 10a
4/11a Temporary Construction of 2no. lane road single carriageway for Fenrother. Work No. 9i
4/5a, 4/8a Construction of new access 195m in length for private access. New access track off Fenrother Lane (West) to private land. Work No. 9a
4/1a, 4/4a, 4/2a/ 4/3a Alteration and alignment of Fenrother Lane West to create single carriageway 2 lane connection. Alteration and alignment of Fenrother Lane West. Work No. 9b
4/4b, 4/8b, 4/8d, 4/11c, 4/11d Construction of new northbound and southbound carriageway of the A1 dual carriageway. Access to diverted utility (electricity). Work No. 2a, 2b
Land Plans - Sheet 5 Land Plans - Sheet 5 Land Plans - Sheet 5
5/1d, 5/1f, 5/1h Construction of an access track from Causey Park Road to New Houses Farm. Access to attenuation basin. Work No. 11a
5/10a Detrunked section of old A1 from Portland House to Bockenfield Bridge. Detrunking of section of old A1. Work No.10b
5/1g, 5/7a, 5/3c, 5/6b, 5/4c, 5/8b Construction of new southbound carriageway. Work No. 2b
5/1a, 5/3a, 5/4a, 5/5a Construction of new northbound carriageway and an access track from Causey Park Road to New Houses Farm. Temporary work on access to diverted utility (electricity). Work No. 11a, 2a
Land Plans - Sheet 6 Land Plans - Sheet 6 Land Plans - Sheet 6
6/2i, 6/2d, 6/2f, 6/2l, 6/2k, 6/2n Construction of access track from Causey Park Road to private land. Access to detention basin. Work No. 11b
6/2j Construction of new southbound carriageway and access track from Causey Park Road to private land. Access to diverted utility (electrical). Work No. 2a, 11b
6/2h, 6/2q Construction of an access track from Causey Park Road to New Houses Farm. Access to detention basin and badger fencing. Work No. 11a
6/2b Construction of an access track from Causey Park Road to New Houses Farm and diversion of National Grid gas main. Access to diverted. Work No. 12a, 11a
6/4d Diversion underground of electrical line 1377m in length and gas main 1233m in length. Access to diverted utility (electrical and gas). Work No. 12b
6/2v, 6/4c Diversion underground of electrical line 1377m in length and gas main 1233m in length. Access required for utility diversion (electrical and gas). Work No. 12b
6/7a, 6/8a, 6/9a, 6/10b, 6/14a, 6/13a Detrunked section of old A1 from Portland House to Bockenfield Bridge. Work No. 10b
6/2r, 6/12a, 6/2y Diversion underground of electrical line 1377m in length and gas main 1233m in length. Access to diverted utilities (gas and electrical). Work No. 12b
6/2u Diversion underground of electrical line, including under the A1 and gas main. Work No. 12a, 12b
Land Plans - Sheet 7 Land Plans - Sheet 7 Land Plans - Sheet 7
7/11a, 7/11b Detrunked section of old A1 from Portland House to Bockenfield Bridge. Work No. 10b
7/4a, 7/9c, 7/7d Construction access of Burgham Park Underbridge as an integral single span bridge. Work No. 14
7/1a Access for construction of new southbound carriageway of the A1 dual carriageway. Work No. 2a
7/9b, 7/8a, 7/7c, 7/10b Access for construction of new southbound carriageway of the A1 dual carriageway. Work No. 2a
7/10d Access for construction of new southbound and northbound carriageway of the A1 dual carriageway and Burgham Park Underbridge as an integral single span bridge. Temporary land take required to facilitate construction activities. Work No. 2a, 2b, 14
7/10e, 7/15e Construction of new northbound carriageway. Access to diverted utility (gas). Work No. 2b
7/15c Construction of new southbound carriageway of A1. Access to diverted utility (electrical). Work No. 2a
7/15g, 7/15l Access for construction of new northbound carriageway. Work No. 2b
Land Plans - Sheet 8 Land Plans - Sheet 8 Land Plans - Sheet 8
8/1a, 8/6a, 8/4a Access for construction of alteration and realignment of Bywell Road to West Moor Road, and new culvert and two open engineered ditches. Work No. 16b, 17
8/9a, 8/7b Access for the construction of roundabout carriageway 130m in length at West Moor Junction and Felton Moor Road. Work No. 16l
8/8b Access for the construction of roundabout carriageway 130m in length at West Moor Junction and Felton Moor Road and new culvert and two open engineered ditches. Work No. 16l, 17
8/3a, 8/2b, 8/10b 8/16a, 8/14a, 8/1c Access for construction of new southbound carriageway of A1 and new access 242m in length for private access off Bywell Road. Work No. 16a, 2a
Land Plans - Sheet 9 Land Plans - Sheet 9 Land Plans - Sheet 9
9/2b, 9/2f, 9/2c Access to bridge structure for alteration of the existing River Coquet bridge. Work No. 3a
9/1a Establishment of temporary fencing and permanent hedgerow on the highway perimeter. Work No. 3a
9/18f, 9/23b, 9/21b, 9/20b Access for construction of new access 954m in length off Felton Road for maintenance of detention basin. Work No. 16h
9/2a Construction of new southbound carriageway of the A1 dual carriageway. Required for environmental Mitigation. Work No. 3a
9/25a, 9/24a Temporary land take required to facilitate construction activities of realignment and resurfacing of Felton Road as part of West Moor Junction. Work No. 16i
9/20d Topsoil storage area for construction of new northbound and southbound carriageway of the A1 dual carriageway. Work No. 3a, 3b
9/22c Access for construction of new link road from West Moor Junction roundabout to Bockenfield Bridge. Work No. 16l
9/13a, 9/7b, 9/12a Access for alteration and realignment of Bywell Road to West Moor Road. Work No. 16b
9/8b, 9/1e Access construction of West Moor Junction single span overbridge and slip road single lane carriageway for northbound on-access to the A1 from West Moor Junction. Work No. 16e, 16f
9/1d Required for environmental mitigation for construction of West Moor Junction single span overbridge and slip road single lane carriageway for northbound on-access to the A1 from West Moor Junction and alteration and alignment of West Moor Road. Work No. 16d, 16e, 16f
9/4a Mitigation for construction of West Moor Junction single span overbridge and alteration and alignment of West Moor Road. Work No. 16d, 16e
Land Plans - Sheet 10 Land Plans - Sheet 10 Land Plans - Sheet 10
10/2g, 10/2h, 10/1h, 10/3f, 10/i Access for construction of new northbound carriageway of the A1 dual carriageway. Work No. 3a
10/3l, 10/8a Construction of new access, parcel required for access to drainage pipe. Work No. 20
10/5d, 10/1m Access for construction of new culvert. Work No. 19
10/5b Construction of new access and construction of new southbound carriageway of the A1 dual carriageway. Work No. 20 and 3b
10/2d, 10/3d, 10/1c, 10/2e, 10/2a, 10/1a Access for construction of new northbound carriageway of the A1 dual carriageway and alteration of the existing River Coquet bridge. Work No. 3a
10/1e, 10/2f Access for construction of new culvert 137m in length. Work No. 19
10/1n, 10/2j, 10/4b, 10/2k Access for construction of new southbound carriageway of the A1 dual carriageway. Work No. 3b
10/1k Access for extension of Parkwood Subway including associated embankments, hardstanding for land access and other substructure and superstructure elements. Work No. 18
Land Plans - Sheet 11 Land Plans - Sheet 11 Land Plans - Sheet 11
11/1b Access required for the alteration of existing A1 to provide northbound dual carriageway from Denwick Burn to Rock Lodge. Work No. 21a
11/1k, 1/1n, 11/2c, 11/2d, 11/3c Alteration and realignment of road markings and new/relocation of ADS signs. Work No. 21a, 21b (Ancillary Works)
11/4b, 11/1e, 11/1f, 11/4c, Temporary works for utility diversions. Work No. 24, 21b (Ancillary Works)
11/4e Construction of outfall from new detention basin. Work No. 21b (Ancillary Works)
Land Plans - Sheet 12 Land Plans - Sheet 12 Land Plans - Sheet 12
12/3i, 12/3h Access required for the construction of Heckley Fence Overbridge and associated ramps over the widened A1. Work No. 27
12/3j, 12/3q, 12/3f Temporary works for utility diversions. Work No. 21a (Ancillary Works)
12/3u Access required for the construction of northbound carriageway of the A1. Work No. 21a
Land Plans - Sheet 13 Land Plans - Sheet 13 Land Plans - Sheet 13
13/1e Establishment of fencing on the highway perimeter. Work No. 21a, 27, 28 (Ancillary Works)
13/1q Establishment of a storage area and associated access. Work No. 27 (Ancillary Works)
Land Plans - Sheet 14 Land Plans - Sheet 14 Land Plans - Sheet 14
14/1a, 14/2a Alteration and realignment of road markings and new/relocation of signs. Work No. 29a (Ancillary Works)
14/1b, 14.1d, 14/4b, 14/4g Establishment of temporary fencing and permanent hedgerow on the highway perimeter. It will also support the alteration of existing A1 to provide northbound dual carriageway from Denwick Burn to Rock Lodge and realignment. Work No. 21a
14-5a Establishment of fencing on the highway perimeter. Work No. 28 (Ancillary Works)
14/16 Establishment of a storage area and associated access. Work No. 24 (Ancillary Works)
15/7a Establishment of fencing on the highway perimeter. Work No. 28 (Ancillary Works)
Land Plans - Sheet 15 Land Plans - Sheet 15 Land Plans - Sheet 15
15/1b, 15/1h, Realignment and resurfacing of B6347, as part of the new Charlton Mires Junction. Work No. 29c
15/3l, 15/8c, 15/2c, 15/9a, 15/2e, 15/3o. Access required for realignment and resurfacing of B6341 (528m in length). Work No. 29a
15/6f Access for realignment of the 66kV electrical cable to service the Middlemoor Wind Farm and construction of Kittycarter Burn diversion. Work No. 24, 31
15/6g Access required for realignment and resurfacing of B6347, as part of the new Charlton Mires Junction. Work No. 29k
15/18e Alteration of existing A1 to provide the northbound carriageway of the A1 dual carriageway from Denwick Burn to Rock Lodge. Work No. 21a
15/11a Realignment and resurfacing of Rock Nab access (56m in length). Work No. 29b
15/10a, 15/10b Access required for realignment and resurfacing of B6341 and Rock Nab access. Work No. 9a, 9b
15/26a, 15/25a, 15/22b Environmental mitigation works. Alteration and realignment of road markings and new/relocation of signs. Work No. 29k, 30a (Ancillary Works)
15/21b, 15/4d, 15/4c Temporary access to adjacent works. Work No. 21a, 29a (Ancillary Works)
15/4a Landscaping works. Work No. 29h (Ancillary Works)
15/1a Lowering of tributary bank. Work No. 29h, 34 (Ancillary Works)
15/1h, 15/6d Establishment of a storage area and associated access. Work No. 24, 29 (Ancillary Works)
15/23d, 15/18d Establishment of fencing on the highway perimeter. Work No. 24, 22b (Ancillary Works)
15/18a, 15/8b. 15/3b, 15/3c, 15/19b, 15/20a Alteration and realignment of road markings and new/relocation of signs. Work No. 29a, 29b (Ancillary Works)
Land Plans - Sheet 16 Land Plans - Sheet 16 Land Plans - Sheet 16
16/4c, 16/3l, 16/11c, 16/5f Temporary works for utility diversions. Work No. 23, 24, 29h, 29l (Ancillary Works)
61/9d Environmental mitigation works. Work No. 23b, 24 (Ancillary Works)
16/5c Access required for the construction of new agricultural track, 169m in length. Work No. 22
16/5h Construction of local access road linking Charlton Mires Junction and West Linkhall, (714m in length). Work No. 29h
16/5i Access required for the construction of a southbound slip road as part of Charlton Mires Junction. Work No. 29l
16/1b Temporary access to adjacent works. Landscaping works. Work No. 23a, 24 (Ancillary Works)
Land Plans - Sheet 17 Land Plans - Sheet 17 Land Plans - Sheet 17
17/1a, 17/2a, 17/2b, 17/2c, 17/2d, 17/2e, 17/2f, 17/2g, 17/3a, 17/4a, 17/6a, 17/6d, 17/6e, 17/6h Alteration and realignment of road markings and new/relocation of ADS signs. Work No. 23a, 24 (Ancillary Works)
Land Plans - Sheet 18 Land Plans - Sheet 18 Land Plans - Sheet 18
19/1a Establishment of a site compound and associated access. Non-lineal works. (Construction Compounds)

SCHEDULE 9 — TREES AND HEDGEROWS

PART 1 — REMOVAL OF HEDGEROWS

(1) Location of hedgerow (2) Work to be carried out (3) Relevant part of the authorised development
Hedgerow located between grid references 419613E; 615496N and 419825E; 614931N on Sheet 22 of the vegetation clearance plan (H73). The hedgerow will be removed to facilitate alteration of existing A1 to provide northbound dual carriageway from Denwick Burn to Rock Lodge (604.36m in length). Work No. 21a
Hedgerow located between grid references 419547E; 615741N and 419864E; 614931N on Sheet 22 of the vegetation clearance plan (H95). The hedgerow will be removed to facilitate construction of new southbound carriageway of the A1 dual carriageway from Denwick Burn to Rock Lodge and realignment of the 66kV electrical cable to service the Middlemoor Wind Farm (870.49m in length). Work No. 21b and 24

PART 2 — REMOVAL OF IMPORTANT HEDGEROWS

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.