The A122 (Lower Thames Crossing) Development Consent Order 2025
- (c) included in a local plan adopted by the relevant planning authority under regulation 26 of The Town and Country Planning (Local Planning) (England) Regulations 2012163; or
- (d) in the absence of (a) to (c), such other proposal as is reasonably considered by the undertaker to constitute the likely route and function of that link road.
Operation of the Orsett Cock roundabout
18
- (1) No part of Work No. 7F is to commence until a scheme for the Orsett Cock roundabout has been submitted to and approved in writing by the Secretary of State, following consultation with the relevant highway authority, the Port of Tilbury London Limited DP World London Gateway, and Thames Enterprise Park.
- (2) The scheme submitted under sub-paragraph (1) must—
- (a) be based on, and informed by—
- (i) appropriate pre-construction monitoring data following the consultation required by sub-paragraph (3); and
- (ii) an assessment, which must include microsimulation modelling, of the likely traffic impacts on the Orsett Cock roundabout arising from the authorised development during the operation of the authorised development; and
- (b) include details, and a programme for the implementation, of—
- (i) the proposed design, and construction of improvements to the Orsett Cock roundabout; and
- (ii) measures that are reasonably necessary to—
- (aa) minimise delays for traffic arising as a result of the operation of the authorised development; and
- (bb) ensure and optimise the performance of the Orsett Cock roundabout.
- (3) The undertaker must consult the relevant highway authority on the methodology proposed for monitoring under sub-paragraph (2)(a)(i), and such consultation must include details of the proposed—
- (a) locations to be monitored;
- (b) time periods to be monitored; and
- (c) method by which the monitoring data will be collected.
- (4) The Orsett Cock roundabout must be included as a location for monitoring in the scheme submitted under paragraph 14 (traffic monitoring) of this Schedule.
- (5) The authorised development must be carried out in accordance with the approved scheme referred to in sub-paragraph (1).
- (6) In considering a scheme submitted for approval under sub-paragraph (1), the Secretary of State), in addition to other matters that the Secretary of State considers relevant, must take into account—
- (a) any representations provided pursuant to paragraph 24(1)(d) (details of consultation) of this Schedule;
- (b) any representations which the undertaker must have duly considered pursuant to paragraph 24(1)(c) of this Schedule but which are not reflected in the scheme submitted for approval; and
- (c) whether the scheme submitted ensures and optimises the performance of the Orsett Cock roundabout.
- (7) In this paragraph, “ensure and optimise the performance” is to be construed to include improving reliable and efficient traffic journeys through the Orsett Cock roundabout having due regard to avoiding impacts on Orsett Village, journeys from the Port of Tilbury and London Gateway port to the strategic road network and the importance of the Orsett Cock roundabout for port operations.
Amendments to approved details
19
With respect to any requirement which requires the authorised development to be carried out in accordance with the details, plans or schemes approved under this Schedule, the approved details, plans or schemes are taken to include any amendments that may subsequently be approved in writing by the Secretary of State, or in the case of any approval under paragraph 13 (travellers’ site in Thurrock), the local planning authority.
Amendments to the control documents
20
No part of the authorised development may commence until the Undertaker has made the amendments to the control documents as set out in in Part 3 (amendments to be made to the control documents) of this Schedule.
PART 2 — PROCEDURE FOR DISCHARGE OF REQUIREMENTS
Applications made to the Secretary of State under Part 1
21
- (1) Where an application has been made to the Secretary of State for any consent, agreement or approval required by a requirement (including consent, agreement or approval in respect of part of a requirement) included in this Order the Secretary of State must give notice to the undertaker of the decision on the application within a period of 8 weeks beginning with—
- (a) the day immediately following that on which the application is received by the Secretary of State;
- (b) the day immediately following that on which further information has been supplied by the undertaker under paragraph 22 (further information); or
- (c) such longer period as may be agreed between the parties.
- (2) Subject to sub-paragraph (3), in the event that the Secretary of State does not determine an application within the period set out in sub-paragraph (1), the Secretary of State is taken to have granted all parts of the application (without any condition or qualification at the end of that period).
- (3) Where—
- (a) an application has been made to the Secretary of State for any consent, agreement or approval required by a requirement included in this Order;
- (b) the Secretary of State does not determine such application within the period set out in sub-paragraph (1); and
- (c) the application is accompanied by a report from a body required to be consulted by the undertaker under the requirement that considers it likely that the subject matter of the application would give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement,
the application is taken to have been refused by the Secretary of State at the end of that period.
Further information
22
- (1) In relation to any part of an application made under this Schedule, the Secretary of State has the right to request such further information from the undertaker as is necessary to enable the Secretary of State to consider the application.
- (2) In the event that the Secretary of State considers such further information to be necessary the Secretary of State must, within 21 business days of receipt of the application, notify the undertaker in writing specifying the further information required and (if applicable) to which part of the application it relates.
- (3) In the event that the Secretary of State does not give such notification within the 21 business day period referred to in sub-paragraph (2) the Secretary of State is deemed to have sufficient information to consider the application and is not subsequently entitled to request further information without the prior agreement of the undertaker.
- (4) Where further information is requested under this paragraph in relation to part only of an application, that part is treated as separate from the remainder of the application for the purposes of calculating the time periods referred to in paragraph 21 (applications made to the Secretary of State under Part 1) and in this paragraph.
Details of consultation
23
- (1) Where any paragraph in this Schedule requires the undertaker to consult with any person or body, the undertaker must—
- (a) notify the person or body of the effect of paragraph 21(3) (applications made to the Secretary of State under Part 1) of this Schedule;
- (b) subject to sub-paragraph (2), provide that person or body with not less than 28 days from the provision of any documents being consulted upon for any response to the consultation;
- (c) give due consideration to any representations made by that person or body about the proposed application; and
- (d) include with its application to the Secretary of State copies of any representations made by that person or body about the proposed application, and a written account of how any such representations have been taken into account in the submitted application.
- (2) The undertaker may consent, such consent not to be unreasonably withheld, to an extension of period in sub-paragraph (1)(a) so that a person or body has not less than 42 days from provision of any documents being consulted upon to provide a response to the consultation following a request made by a person or body no later than 21 days from receipt of any documents being consulted upon.
- (3) Where sub-paragraph (2) applies a person or body must provide a response to the consultation as soon as reasonably practicable.
Register of requirements
24
- (1) The undertaker must, as soon as practicable following the making of this Order, establish and maintain in an electronic form suitable for inspection by members of the public a register of those requirements contained in Part 1 of this Schedule that provide for further approvals to be given by the Secretary of State.
- (2) The register must set out in relation to each such requirement the status of the requirement, in terms of whether any approval to be given by the Secretary of State has been applied for or given, providing an electronic link to any document containing any approved details.
- (3) The register must be maintained by the undertaker for a period of 3 years following completion of the authorised development.
Anticipatory steps towards compliance with any requirement
25
If before the coming into force of this Order the undertaker or any other person has taken any steps that were intended to be steps towards compliance with any provision of Part 1 of this Schedule, those steps may be taken into account for the purpose of determining compliance with that provision if they would have been valid steps for that purpose had they been taken after this Order came into force.
PART 3 — AMENDMENTS TO BE MADE TO THE CONTROL DOCUMENTS
Amendments to be made to the Code of Construction Practice and the REAC
26
- (1) The Code of Construction Practice (document ref: TR010032/App/6.3) is to be amended as follows.
- (2) In paragraph 1.4.10, for “The Project is committed to avoiding, preventing, reducing or remediating for, as far as reasonably practicable, the adverse effects of the construction and operational activities of the Project on people, businesses and the natural and historic environment.”, substitute “The Project is committed to avoiding, preventing, reducing or remediating the adverse effects of the construction and operational activities of the Project on people, businesses and the natural and historic environment to the extent that is required by relevant law and policy and otherwise as far as reasonably practicable.”.
- (3) Table 7.1 (REAC table) is to be amended as set out in table 1, where—
- (a) column 1 sets out the rows to which and where in those rows the amendments are to be made;
- (b) column 2 sets out how the amendments are to be made; and
- (c) column 3 sets out the text to be substituted, inserted or omitted.
| Where in Table 7.1 the amendment is to be made | How the amendment is to be made | Text to be substituted, inserted or omitted |
|---|---|---|
| Column 5 of row 13 (REAC ref. no. CH004) | At the end of column 5 of that row, insert | “The Thatched Cottage (LB58) shall not be demolished until the undertaker has concluded an agreement with Historic England and Essex Place Services in relation to its relocation or recording. If relocation is agreed, the building shall be dismantled in accordance with a ‘relocation brief’ agreed between the undertaker, Historic England and Essex Place Services before the commencement of dismantling works. If relocation is not agreed, the demolition shall not proceed until the completion and approval of the Level 4 Historic Building Recording.Appraisal of Murrells Cottage (LB96) has identified that this heritage asset could be an “excellent source” of original materials for potential re-use in repairs to listed buildings in the area. Murrells Cottage shall not be demolished until the undertaker has prepared a ‘materials brief’ making provision for the retrieval and storage of salvageable fixtures, fittings and structural components. Demolition must then proceed generally in accordance with the materials brief and salvaged components must be made available for local re-use.” |
| Column 5 of row 22 (REAC ref. no. GS003) | After “land instability”, insert | “and man-made geohazards including landfill at Goshems Farm Landfill” |
| Column 5 of row 63 (REAC ref. no. LV001) | After “diverted utilities,”, insert | “will protect hedgerows and trees identified for protection from removal and otherwise” |
| Column 5 of row (REAC ref. no. LV013) | Omit | “where reasonably practicable” |
| Column 5 of row 90 (REAC ref. no LV028) | Omit | “as far as reasonably practicable” |
| Column 5 of row 99 (REAC ref. no. LV037) | At the first bullet point, for “as far as reasonably practicable”, substitute | “in accordance with commitments Lv001 and LV028” |
| Column 5 of row 215 (REAC ref. no. TB012) | Omit | “, where it is reasonably practicable to erect this number of nest boxes”; and“, where it is reasonably practicable to erect these numbers within retained vegetation” |
| Column 5 of row 232 (REAC ref. no. TB028) | Omit | “, where reasonably practicable,” |
| Column 5 of row 235 (REAC ref. no. TB031) | After “with a view to avoid and/or minimise impacts”, insert | “to the extent that is required by relevant law and policy and otherwise” |
- (4) At the appropriate places in Table 7.1, insert the following entries from table 2—
| Topic | REAC ref. no. | Name | Origin | Commitment | Achievement criteria | Party responsible | Stage | Securing mechanism in DCO |
|---|---|---|---|---|---|---|---|---|
| HRA | HR013 | Mitigation of in-combination air quality effects on Epping Forest SAC along part of the M25 | ExA Recommendation Report | Appropriate technology and infrastructure would be employed to enable, if required, the enforcement authority to enforce a 60mph speed limit in a westbound direction between junctions 26 and 27 of the M25 to ensure that there is no Adverse Effect on Integrity (“AEoI”) on Epping Forest SAC as a consequence of traffic emissions leading to increases in nitrogen deposition, NOx and/or NH3. Reasonable and appropriate funding would be provided to the highway and enforcement authority to set a 60mph limit and to undertake enforcement activities. Monitoring should commence no later than 6 months after commencement of construction of the A122 Lower Thames Crossing and remain in place for a minimum period of 4 years following commencement of operation to monitor levels of NOx, NO2 and NH3 (which can be used to determine the vehicle emission related nitrogen deposition) compared to pre-operational values. Annual reporting should be undertaken and include a review of relevant evidence, such as monitoring, traffic data and regional pollution in consultation with Natural England. The 60pmh speed limit measures are to be put in place from the commencement of operation. The Secretary of State may determine, upon receipt of a written request from National Highways that has been informed and agreed through consultation with Natural England, that such measures no longer remain required at or after the point of commencement of operation to prevent an AEoI (on the basis of pre-operation monitoring and any additional assessment undertaken by National Highways). If the outcome from monitoring and updated modelling shows relevant increases in nitrogen deposition, and/or NOx and/or NH3 which would lead to an AEoI then that speed limit control and enforcement must be in place, unless otherwise agreed with Natural England. | Establishment of annual monitoring measure and air quality threshold required to avoid AEoI in agreement with Natural England. Provision of speed enforcement technology and infrastructure as agreed with the enforcement authority. | National Highways | Operation | EMP3 Requirement 4 |
| Road Drainage and Water Environment | RDWE 060 | Water Framework Directive Compliance – non-main watercourse | ExA Recommendation Report | No culvert or equivalent covered passage affecting a non-main watercourse is to be constructed until a Structure Water Framework Directive Compliance Plan (SWFDCP) has been prepared for that structure in consultation with the Lead Local Flood Authority and the Internal Drainage Board (if relevant) or any other relevant drainage authority with responsibility for the watercourse, and agreed by the Environment Agency prior to approval by the Secretary of State. A SWFDCP must contain a detailed design for the structure(s) to which it relates to show the dimensions and internal treatments for the structure and must demonstrate either:(a) that the proposed detailed design provides full compliance with the Water Environment (Water Framework Directive) (England and Wales) Regulations 2017 (WFD Regulations), as amended by the Floods and Water (Amendment etc.) (EU Exit) Regulations 2019 (collectively the WFD Regulations); or (b) if full WFD Regulations compliance cannot be achieved, that the proposed detailed design is accompanied by information to explain:(i) why compliance cannot be achieved;(ii) demonstrating that a derogation under Regulation 19 of the WFD Regulations can be obtained; and(iii) demonstrating how the conditions in Regulations 19(3), (4) and (5) are met by the proposed detailed design. | Agreement by the Environment Agency that structures are WFD compliant or that a derogation can be obtained | National Highways | Construction | Requirement 8 |
| Road Drainage and Water Environment | RDWE061 | Drainage Authority consultation | ExA Recommendation Report | When consents and new discharges are sought under Art 19(3) ... of the dDCO the undertaker will seek the views of the drainage authority. | Drainage authorities are consulted on Art 19(3) ... proposals | National Highways | Construction | EMP2 Requirement 4 and Requirement 8 |
| Geology and Soils | GS032 | Minerals and waste consents on land subject to compulsory acquisition or temporary possession | ExA Recommendation Report | Where land that is subject to a remediation or restoration condition or agreement pursuant to a minerals or waste consent is taken as a consequence of compulsory acquisition and or temporary possession, the undertaker indemnifies the former operator or beneficiary of the consent against any liability arising due to enforcement by the local planning authority , where that liability arises during and as a result of the undertaker’s possession of the land. In the case of land possessed temporarily, the indemnity ceases to have effect after the land is returned to the owner. | No outstanding minerals or waste non-compliance or enforcement action on land subject to compulsory acquisition or temporary possession. | National; Highways | Construction and Operation | EMP2 and 3 Requirement 4 |
- (5) After row 28 (REAC ref. no. TB020) of Table 2.1 in Annex C (Preliminary Works Environmental Management Plan), insert the text from table 3—
| Topic | REAC ref. no. | Name | Origin | Commitment | Achievement criteria | Party responsible | Securing mechanism in DCO | Topic |
|---|---|---|---|---|---|---|---|---|
| Terrestrial Biodiversity | TB032 | Agreements to deliver both the offsite mitigation for reintroduction of water voles and the installation and monitoring of barn owl nest boxes | Secretary of State and ES 8.5.46 and 8.5.47 | The undertaker is to enter into agreements with the Essex Wildlife Trust for the provision of—(a) an offsite project reintroducing water voles to catchments within Essex that have suffered from localised extinctions; and(b) a minimum of 12 artificial nest boxes for barn owls to be installed in land managed by the Essex Wildlife Trust >1.5km away from the project boundary and other major roads. | Agreements signed by National Highways and the Essex Wildlife Trust | National Highways | Requirement 4(1) | Terrestrial Biodiversity |
Amendments to be made to the Outline LEMP
27
In the Outline Landscape and Ecology Management Plan (document ref. TR010032/App/6.7), in paragraph 4.1.14, after point (h), insert—
(i) Agree the species and species group monitoring requirements, for non-licensable species impacts, as part of a holistic indicators of success approach to ensure that the compensatory habitats are effective at the ecosystem level and support the populations of species impacted by the proposal.
28
- (1) Appendix 1 (LEMP Terms of Reference) of the Outline Landscape and Ecology Management Plan (document ref. TR010032/APP/6.7, version 3) is to be amended as follows.
- (2) In paragraph 1.4.4, after point (i), insert—
(h) Agree the species and species group monitoring requirements, for non-licensable species impacts, as part of a holistic indicators of success.
- (3) In paragraph 1.6.1, for “However, should conflicts arise these will be resolved by escalating within the primary organisations.”, substitute “However disputes arise these will be deferred to an independent expert agreed by all parties in line with DCO Article 64 (Arbitration).”.
Amendments to be made to the Design Principles Document
29
The Design Principles Document (document ref. TR010032/APP/7.5, version 7) is to be amended as set out in table 4, where—
- (a) column 1 sets out the documents to which and where in those documents the amendments are to be made;
- (b) column 2 sets out how the amendments are to be made; and
- (c) column 3 sets out the text to be substituted, inserted or omitted.
| Where the amendment is to be made | How the amendment is to be made | Text to be substituted, inserted or omitted |
|---|---|---|
| After paragraph 2.15.1 | Insert | “2.15.2 Where new services and utilities are proposed to be installed within or affecting SSSIs or other irreplaceable habitats, the contractor must confirm that no other reasonable option exists and that the installation options have been reviewed and that the contractor can find no alternative option which causes less harm.” |
| Table 4.2, column 3 of row 5 (DPD ref. PLA.05) | For “Fragmentation of habitats shall be reduced as far as reasonably practicable by avoiding unnecessary barriers to movement and, where necessary, including design features”, substitute | “Fragmentation of habitats shall be reduced as far as practicable by avoiding unnecessary barriers to movement and including design features” |
| Table 4.3, column 3 of row 7 (DPD ref. PRO.07) | After “Tilbury Fields (Work No. OSC5)”, insert a new indent | “Tilbury Viaduct” |
| Table 4.4, column 3 of row 9 (DPD ref. STR.09) | After “single structure as much as is”, omit | “reasonably” |
| Table 4.5, column 3 of row 4 (DPD ref. LST.04) | After “lighting on green bridges shall be minimised and where possible column heights shall be reduced”, insert | “or low-level lighting (e.g. bollard lighting) utilised” |
| Table 4.6, column 3 of row 1 (DPD ref. LSP.01) | After” However, even outside these areas, existing vegetation shall be retained as far as”, omit | “reasonably” |
| Table 5.1, column 3 of row 1 (DPD ref. S1.01) | For “existing planting along the northern edge of the A2 corridor shall be retained as far as reasonably practicable”, substitute | “existing planting along the northern edge of the A2 corridor shall be retained with losses minimised to the extent that is required by relevant law and policy and otherwise as far as practicable” |
| Table 5.1, column 3 of row 1 (DPD ref. S1.01) | After “the A2 corridor as defined in the Environmental Masterplan (Application Document 6.2, Figure 2.4)”, insert | “and where there are no wayleave/ easement, visibility splay or other highway operational safety requirements, then replacement native woodland should be provided at or as near as possible to the point of loss” |
| Table 5.1, column 3 of row 4 (DPD ref. S1.04) | After “main highway’s corridor as far as”, omit | “reasonably” |
| Table 5.5, column 3 of row 11 (DPD ref. S9.11) | After “Where possible, existing vegetation shall be retained”, omit | “as far as reasonably practicable” |
| Appendix A: Planting Palette, the page headed “LE2.11 Woodland – inc Non-native species Innerstand (cont)” | After “Only used on Thong Lane Heavyweight Green Bridge”, insert | “where non-native species are excluded” |
| Appendix D: Detailed Design Multi-disciplinary Workshop Terms of Reference | After paragraph D.1.4.a(iv), insert | “(v) Publish and share how National Highways has taken into account stakeholder feedback, providing a detailed narrative in circumstances where this was not possible, in the spirit of collaborative, open and transparent stakeholder engagement.” |
| Appendix D: Detailed Design Multi-disciplinary Workshop Terms of Reference | After paragraph D.1.5, insert | “D.1.6 Every attempt will be made to resolve disputes within the MDW’s membership. Wherever possible, decisions shall be made by consensus within the MDW meetings. However, should disputes arise these will be deferred to [the SoST or] an independent expert agreed by all parties in line with DCO Article 64 (Arbitration).” |
Amendments to be made to the Consents and Agreements Position Statement
30
In the Consents and Agreements Position Statement (document ref. TR010032/APP/8.3, version 8), after paragraph 4.1.2(a), omit sub-paragraph (b) (Consent to carry out works in a site of Special Scientific interest).
Amendments to be made to the SACR
31
- (1) In the SACR (document ref. TR010032/APP/7.21, version 8) Table A.1 is to be amended as follows.
- (2) In column 4 of row 13 (SACR ref. SACR-013), after “the undertaker must design and carry out Work No MU84 to”, omit “reasonably”.
- (3) After row 33 (SACR ref. SACR-033)—
- (a) insert the following entry from table 5; and
- (b) following the conclusion of the process required by article 65 (financial arrangements for the Kent Downs National Landscape), insert in the place marked with square brackets the financial contribution, pursuant to paragraph (11) of that article.
| Countryside and Rights of Way Act 2000, Section 85 | SACR-034 | Kent Downs National Landscape | Having regard to the duty of Section 85 of the Countryside and Rights of Way Act 2000 (as amended), to seek to further the purpose of conserving and enhancing the natural beauty of the area of outstanding natural beauty, National Highways will make funding available for appropriate projects to be undertaken within the Kent Downs National Landscape. A total of [£ ] will therefore be made available to the Kent Downs National Landscape team to fund measures and projects that meet a funding criterion that primarily conserves and enhances the natural beauty of the Kent Downs National Landscape. Projects to be funded will be in accordance with the principles of the Kent Downs AONB Management Plan or any superseding document, and will be agreed with the Kent Downs National Landscape team. The fund shall be administered by adopting a process to be agreed between the parties, including timescales for the provision of funds, which shall be substantially in accordance with the process set out in paragraphs 1.1 to 8.2 of Schedule 3 to the unilateral undertaking entered into by National Highways dated 12 December 2023 in relation to the Kent Downs AONB Compensatory Enhancement Fund [REP9-268], subject to the following modifications:(a) in paragraph 1.1, for “£4,240,000 for an AONB Compensatory Enhancement Fund to fund measures and projects that meet the funding criteria set out in paragraph 4.2 of this Schedule (the “Fund”) which includes £600,000 to manage and administer the Fund (together being “the AONB Contribution”)” substitute “[£] (“the AONB Enhancement Contribution”) for an AONB Enhancement Fund to fund measures and projects that meet the funding criteria set out in paragraph 4.2 of this Schedule (the “Fund”)”;(b) in paragraph 3.1, for “AONB Compensatory Enhancement Fund Awards Panel”substitute “AONB Enhancement Fund Awards Panel”; (c) in paragraph 4.1 for “During the Construction Period and for three years thereafter” substitute “From Commencement and for up to three years following the opening of the Authorised Development”. | National Highways | Kent Downs National Landscape | From commencement and up to three years following opening |
|---|---|---|---|---|---|---|
SCHEDULE 3 — TEMPORARY CLOSURE, ALTERATION, DIVERSION AND RESTRICTION OF USE OF STREETS AND PRIVATE MEANS OF ACCESS
of the streets subject to temporary restrictions of use plans.
of the streets subject to temporary restrictions of use plans.
SCHEDULE 4 — PERMANENT STOPPING UP OF STREETS AND PRIVATE MEANS OF ACCESS
PART 1 — HIGHWAYS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED
as shown on sheet 45 of the rights of way and access plans.
PART 2 — HIGHWAYS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS NOT TO BE PROVIDED
| (1) Highway to be stopped up | (2) Extent of stopping up |
|---|---|
| A2 westbound off-slip to Brewers Road (Halfpence Lane) roundabout | Existing section of public road between points 2/J and 2/K as shown on sheet 4 of the rights of way and access plans. |
| A2 westbound on-slip from Brewers Road (Halfpence Lane) roundabout | Existing section of public road between points 12/C and 12/D as shown on sheet 4 of the rights of way and access plans. |
| A2 westbound to Cobham services slip | Existing section of public road, between points 7/A and 7/B as shown on sheet 6 of the rights of way and access plans. |
| Street (cul-de-sac) off Henhurst Road | Existing section of public road between points 8/A and 8/H as shown on sheet 6 of the rights of way and access plans. |
| NS367 | Existing section of public right of way between points 8/A and 8/U as shown on sheet 6 of the rights of way and access plans. |
| Low Street Lane | Existing section of public road, between points 16/A and 16/B as shown on sheet 24 of the rights of way and access plans. |
| FP60 | Existing section of public right of way between points 15/E and 15/F as shown on sheet 24 of the rights of way and access plans. |
| Hornsby Lane | Existing section of public road, between points 22/A and 22/B as shown on sheet 28 of the rights of way and access plans. |
| Long Lane | Existing section of public right of way between points 25/D and 25/F as shown on sheet 29 of the rights of way and access plans. |
| FP97 | Existing section of public right of way between points 25/H and 25/I as shown on sheet 29 of the rights of way and access plans. |
| Bridleway BR206 | Existing section of public right of way between points 22/J and 22/D as shown on sheet 32 of the rights of way and access plans. |
| FP207 | Existing section of public right of way between points 31/D and 31/E as shown on sheet 33 of the rights of way and access plans. |
| FP251 | Existing section of public right of way between points 38/L and 38/M as shown on sheet 42 of the rights of way and access plans. |
| Layby on northern side of Ockendon Road to the west of FP230 and the M25 | Existing section of public road, between points 39/C and 39/D as shown on sheet 42 of the rights of way and access plans. |
PART 3 — OTHER STREETS OR PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED
| (1) Street or private means of access to be stopped up | (2) Extent of stopping up | (3) New street or private means of access to be substituted |
|---|---|---|
| Private means of access from Thong Lane to Inn on the Lake | Existing private means of access stopped up between points 6/E and 6/AK as shown on sheet 4 of the rights of way and access plans. | A new means of access between points 6/4 and 6/42 as shown on sheet 4 of the rights of way and access plans. |
| Private means of access from Henhurst road roundabout | Existing private means of access stopped up between points 8/L and 7/C shown on sheet 6 of the rights of way and access plans. | A new means of access between points 8/11 and 8/24 as shown on sheet 6 of the rights of way and access plans. |
| Private means of access from Henhurst road roundabout to National Rail | Existing private means of access stopped up between points 8/J and 8/Q as shown on sheet 6 of the rights of way and access plans. | A new means of access between points 8/5 and 8/23 as shown on sheet 6 of the rights of way and access plans. |
| Private means of access to drainage pond from Hever Court Road | Existing private means of access stopped between points 10/H and 10/K as shown on sheet 6 of the rights of way and access plans. | A new means of access between points 10/19 and 10/20 as shown on sheet 6 of the rights of way and access plans. |
| High House lane | Existing private means of access stopped up between points 19/A and 19/B and between point 19/C and 19/J as shown on sheet 28 of the rights of way and access plans. | New private means of access between points 19/1 and 19/2 and between points 19/3 and 19/5 as shown on sheet 28 of the rights of way and access plans. |
| Private means of access between Brentwood Road and FP79 | Existing private means of access stopped up between points 21/D and 21/E as shown on sheet 28 of the rights of way and access plans. | A new private means of access between points 20/2 and 21/4 as shown on sheet 28 of the rights of way and access plans. |
| Private means of access running alongside FP79 | Existing private means of access stopped up between points 21/A and 21/B as shown on sheet 28 of the rights of way and access plans. | New private means of access between points 21/1 and 21/5 and between points 20/2 and 21/4 as shown on sheet 28 of the rights of way and access plans. |
| Heath Road | Existing private mean of access, between points 24/C and 24/F as shown on sheet 29 of the rights of way and access plans. | A new private means of access between points 24/4 and 24/5 as shown on sheet 29 of the rights of way and access plans. |
| Gammonfields Way | Existing private means of access linking to bridleway BR223 between points 25/A, 25/J and 25/D as shown on sheet 29 of the rights of way and access plans. | A new highway with horse-riding track in the verge between points 25/1 and 25/2 as shown on sheet 29 of the rights of way and access plans. |
| Woolings Close | Existing private means of access, at point 28/A as shown on sheet 29 of the rights of way and access plans. | A new road between points 28/1 and 28/3 as shown on sheet 29 of the rights of way and access plans. |
| Private means of access to industrial premises off the A1013 east of Rectory Road | Existing private means of access, at point 23/D as shown on sheet 32 of the rights of way and access plans. | A new private means of access at point 23/6 as shown on sheet 32 of the rights of way and access plans. |
| Private means of access off Stifford Clays Road | Existing means of access, between points 32/C and 32/D as shown on sheet 33 of the rights of way and access plans. | A new private means of access between points 32/3, 32/6 and 32/5 as shown on sheet 33 of the rights of way and access plans. |
| Green Lane | Existing private means of access, between points 33/A and 33/B as shown on sheet 33 of the rights of way and access plans. | A new private means of access between points 33/1 and 33/4 as shown on sheet 33 of the rights of way and access plans. |
| Private means of access to pylon adjacent to M25 | Existing private means of access, between points 41/C and 41/E as shown on sheet 45 of the rights of way and access plans. | A new private means of access as shown on sheets 44 and 45 between points 41/4 and 41/5 on sheet 45 of the rights of way and access plans. |
PART 4 — OTHER STREETS OR PRIVATE MEANS OF ACCESS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS NOT TO BE PROVIDED
| (1) Street or private means of access to be stopped up | (2) Extent of stopping up |
|---|---|
| Private means of access (path to HS1 railway line) from Thong Lane | Existing private means of access between points 6/F and 6/G as shown on sheet 4 of the rights of way and access plans. |
| Private means of access from Thong Lane to drainage pond and land north of HS1 railway line | Existing private means of access between points 6/H on sheet 4 and 6/I on sheet 6 and between points 6/J and 6/K and 6/L and 6/M as shown on sheets 4 and 6 of the rights of way and access plans. |
| Private means of access (field access) from Thong Lane | Existing private means of access at point 6/N as shown on sheet 4 of the rights of way and access plans. |
| Private means of access from Henhurst Road | Existing private means of access between points 8/I, 8/H and 8/K as shown on sheet 6 of the rights of way and access plans. |
| Private means of access to sub station | Existing private means of access at point 13/A as shown on sheet 6 of the rights of way and access plans. |
| Private means of access to drainage pond | Existing private means of access at point 13/B as shown on sheet 6 of the rights of way and access plans. |
| Private means of access (field access) from Muckingford Road near High Ash | Existing private means of access at point 15/O as shown on sheet 24 of the rights of way and access plans. |
| Private means of access (field access) from Heath Road | Existing private means of access at point 24/G as shown on sheet 29 of the rights of way and access plans. |
| Gammonfields Way | Existing private means of access between points 25/D and 25/B as shown on sheet 29 of the rights of way and access plans. |
| Mill Lane | Existing private means of access, between points 22/C and 22/K and between points 22/J and 22/D as shown on sheet 32 of the rights of way and access plans. |
| Private means of access from south-eastern quadrant of M25 junction 29 roundabout | Existing private means of access between points 41/H, 41/K and 41/J as shown on sheet 45 of the rights of way and access plans. |
SCHEDULE 5 — CLASSIFICATION OF ROADS, ETC.
PART 1 — SPECIAL ROADS
| (1) Road | (2) Extent |
|---|---|
| M2 eastbound | Between points 2/6 and 2/9 as shown on sheet 1 of the classification of roads plans. |
| A289 southbound to M2 southbound | Between points 2/7 and 2/18 as shown on sheet 1 of the classification of roads plans. |
| M2 westbound | Between points 2/2 and 2/8 as shown on sheet 1 of the classification of roads plans. |
| M2 northbound to A289 northbound | Between points 2/2 and 2/31 as shown on sheet 1 of the classification of roads plans. |
| M25 northbound | Improved M25 northbound carriageway, between points 37/1 on sheet 4 and 37/2 on sheet 5, as shown on sheets 4 and 5 of the classification of roads plans. |
| M25 southbound | Improved M25 southbound carriageway, between points 37/3 on sheet 4 and 37/4 on sheet 5, as shown on sheets 4 and 5 of the classification of roads plans. |
| A122 Lower Thames Crossing northbound to M25 northbound | Between points 1/9 and 37/7 as shown on sheet 4 of the classification of roads plans. |
| M25 northbound to M25 junction 29 link road | Between point 37/5 and 37/6 as shown on sheet 4 of the classification of roads plans. |
| M25 northbound on-slip at M25 junction 29 | Between points 37/17 and 37/10 as shown on sheet 5 of the classification of roads plans. |
| M25 southbound off-slip at M25 junction 29 | Between points 37/13 and 37/18 as shown on sheet 5 of the classification of roads plans. |
| M25 southbound on-slip at M25 junction 29 | Between points 37/19 and 37/12 as shown on sheet 5 of the classification of roads plans. |
PART 2 — TRUNK ROADS
| (1) Road | (2) Extent |
|---|---|
| A2 eastbound | Between points 2/5 and 2/9 as shown on sheet 1 of the classification of roads plans. |
| A2 westbound | Between points 2/1 and 2/8 as shown on sheet 1 of the classification of roads plans. |
| A2 eastbound Link road slip to Brewers Road | Between points 5/4 and 5/5 as shown on sheet 1 of the classification of roads plans. |
| A2 westbound Link road slip to Cobham roundabout | Between points 2/20 and 2/40 as shown on sheet 1 of the classification of roads plans. |
| A2 westbound to Cobham roundabout | Between points 2/3 and 2/39 as shown on sheet 1 of the classification of roads plans. |
| Hever Court Road roundabout to A2 eastbound | Between points 2/15 and 2/25 as shown on sheet 1 of the classification of roads plans. |
| A122 Lower Thames Crossing southbound to Gravesend East junction south | Between points 2/16 and 8/4 as shown on sheet 1 of the classification of roads plans. |
| A122 Lower Thames Crossing southbound to A2 westbound | Between points 2/16 and 2/21 as shown on sheet 1 of the classification of roads plans. |
| Brewers Road to A2 Eastbound link road | Between points 5/4 and 5/6 as shown on sheet 1 of the classification of roads plans. |
| A2 westbound link road | Between points 2/19 and 2/10 as shown on sheet 1 of the classification of roads plans. |
| A2 eastbound link road | Between points 11/2 and 2/11 as shown on sheet 1 of the classification of roads plans. |
| Hever Court Road roundabout to A122 Lower Thames Crossing northbound link | Between points 2/15 and 1/3 as shown on sheet 1 of the classification of roads plans. |
| A2 eastbound to Gravesend East Junction north | Between points 2/5 and 10/15 as shown on sheet 1 of the classification of roads plans. |
| A2 westbound | Between points 2/1 and 2/19 as shown on sheet 1 of the classification of roads plans. |
| A2 eastbound to A122 Lower Thames Crossing northbound link | Between points 2/17 and 1/2 as shown on sheet 1 of the classification of roads plans. |
| A122 Lower Thames Crossing southbound to A2 westbound link | Between points 1/1 and 2/16 as shown on sheet 1 of the classification of roads plans. |
| A2 westbound link road to A122 Lower Thames Crossing northbound link | Between points 2/22 and 1/3 as shown on sheet 1 of the classification of roads plans. |
| A2 westbound to A122 Lower Thames Crossing northbound link | Between points 2/24 and 1/5 as shown on sheet 1 of the classification of roads plans. |
| A122 Lower Thames Crossing southbound to A2 eastbound | Between points 1/4 and 2/13 as shown on sheet 1 of the classification of roads plans. |
| A122 Lower Thames Crossing southbound to A2 eastbound link road | Between points 1/1 and 11/2 as shown on sheet 1 of the classification of roads plans. |
| A2 westbound entry slip road from Gravesend East junction south | Between points 8/9 and 2/34 as shown on sheet 1 of the classification of roads plans. |
| A122 Lower Thames Crossing northbound | Between points 1/3 on sheet 1 and 37/6 on sheet 4, as shown on sheets 1, 2, 3 and 4 of the classification of roads plans. |
| A122 Lower Thames Crossing southbound | Between points 1/4 on sheet 1 and 1/10 on sheet 4, as shown on sheets 1, 2, 3 and 4 of the classification of roads plans. |
| A13 westbound to A122 Lower Thames Crossing northbound and to A122 Lower Thames Crossing southbound | Between points 29/8 and 1/15 as shown on sheet 3 of the classification of roads plans. |
| A13 westbound to A122 Lower Thames Crossing southbound | Between points 1/15 and 1/16 as shown on sheet 3 of the classification of roads plans. |
| A13 westbound to A122 Lower Thames Crossing northbound, from diverge point with A13 westbound to A122 Lower Thames Crossing southbound | Between points 1/15 on sheet 3 and 1/31 on sheet 4, as shown on sheets 3 and 4 of the classification of roads plans. |
| A1089 northbound to A122 Lower Thames Crossing northbound | Between points 1/12 on sheet 3 and 1/14 on sheet 4, as shown on sheets 3 and 4 of the classification of roads plans. |
| A1089 northbound to A122 Lower Thames Crossing southbound | Between points 1/13 and 1/22 as shown on sheet 3 of the classification of roads plans. |
| A122 Lower Thames Crossing northbound to Orsett Cock roundabout and A13 eastbound | Between points 1/18 and 29/5 as shown on sheet 3 of the classification of roads plans. |
| A122 Lower Thames Crossing northbound and southbound to A13 eastbound | Between points 29/5 and 1/19 as shown on sheet 3 of the classification of roads plans. |
| A122 Lower Thames Crossing northbound and southbound to the merge with the A13 eastbound link to Orsett Cock roundabout | Between points 29/5 and 1/20 as shown on sheet 3 of the classification of roads plans. |
| A122 Lower Thames Crossing southbound to Orsett Cock roundabout and A13 eastbound | Between points 1/23 and 1/24 as shown on sheet 3 of the classification of roads plans. |
| Orsett Cock roundabout to A1089 southbound | Between points 1/17 and 39/3 as shown on sheet 3 of the classification of roads plans. |
| A122 Lower Thames Crossing northbound to M25 junction 29 northbound link road | Between points 1/9 and 37/6 as shown on sheet 4 of the classification of roads plans. |
| M25 northbound to M25 junction 29 link road | Between point 37/6 on sheet 4 and point 37/16 on sheet 5, as shown on sheets 4 and 5 of the classification of roads plans. |
| M25 northbound to A127 westbound dedicated off-slip | Between points 37/20 and 37/21 as shown on sheet 5 of the classification of roads plans. |
PART 3 — GLA ROADS
| (1) Road | (2) Extent |
|---|---|
| M25 to A127 westbound link (A127 westbound entry slip road from M25 junction 29) | Between point 37/16 and 37/8 as shown on sheet 5 of the classification of roads plans. |
| A127 eastbound to M25 link (A127 eastbound exit slip road to M25 junction 29) | Between point 37/9 and 37/17 as shown on sheet 5 of the classification of roads plans. |
PART 4 — CLASSIFIED ROADS
| (1) Road | (2) Extent |
|---|---|
| Brewers Road | Between points 5/1 and 5/4 as shown on sheet 1 of the classification of roads plans. |
| New local road between Cobham roundabout and Halfpence Lane roundabout | Between points 6/1 and 2/37 as shown on sheet 1 of the classification of roads plans. |
| New local road between Cobham roundabout and Henhurst Road roundabout | Between points 2/38 and 7/1 as shown on sheet 1 of the classification of roads plans. |
| Cobham roundabout | Length of road comprising entire roundabout at point 2/4 as shown on sheet 1 of the classification of roads plans. |
| Henhurst Road roundabout | Length of road comprising entire roundabout at point 7/4 as shown on sheet 1 of the classification of roads plans. |
| Henhurst Road | Between points 7/3 and 7/2 as shown on sheet 1 of the classification of roads plans. |
| Gravesend East junction south roundabout | Length of road comprising entire roundabout at point 8/1 as shown on sheet 1 of the classification of roads plans. |
| Gravesend East junction south roundabout to Henhurst roundabout | Between points 8/8 and 8/6 as shown on sheet 1 of the classification of roads plans. |
| Gravesend East junction south roundabout to Gravesend East junction north roundabout | Between points 8/10 and 8/3 as shown on sheet 1 of the classification of roads plans. |
| Gravesend East junction north roundabout | Length of road comprising entire roundabout at point 10/1 as shown on sheet 1 of the classification of roads plans. |
| Hever Court Road roundabout | Length of road comprising entire roundabout at point 10/16 as shown on sheet 1 of the classification of roads plans. |
| Hever Court Road to Gravesend East junction north | Between points 10/3 and 10/13 as shown on sheet 1 of the classification of roads plans. |
| Gravesend East junction north roundabout to Hever Court Road roundabout | Between points 10/14 and 10/16 as shown on sheet 1 of the classification of roads plans. |
| Hever Court Road roundabout to Valley drive | Between points 10/17 and 10/2 as shown on sheet 1 of the classification of roads plans. |
| Thong Lane over A2 | Between points 6/2 and 6/3 as shown on sheet 1 of the classification of roads plans. |
| Thong Lane over A122 Lower Thames Crossing | Between points 6/5 and 6/6 as shown on sheet 1 of the classification of roads plans. |
| Muckingford Road | Between points 15/2 and 15/7 as shown on sheet 3 of the classification of roads plans. |
| Brentwood Road | Between points 20/1 and 20/3 as shown on sheets 3 of the classification of roads plans. |
| A1013 Stanford Road | Between points 23/4 and 23/1 as shown on sheet 3 of the classification of roads plans. |
| B188 Baker Street | Between points 27/1 and 27/2 as shown on sheet 3 of the classification of roads plans. |
| Orsett Cock roundabout to A13 westbound link | Between points 29/6 and 29/7 as shown on sheet 3 of the classification of roads plans. |
| A13 eastbound link to Orsett Cock roundabout | Between points 30/1 and 30/2 as shown on sheet 3 of the classification of roads plans. |
| Stifford Clays Road | Between points 32/1 and 32/4 as shown on sheets 3 of the classification of roads plans. |
| B186 North Road | Between points 35/1 and 35/4 as shown on sheet 4 of the classification of roads plans. |
| B1421 Ockendon Road | Between points 38/1 and 38/2 as shown on sheet 4 of the classification of roads plans. |
| M25 Junction 29 roundabout | Length of road comprising entire roundabout at point 37/15 as shown on sheet 5 of the classification of roads plans. |
| M25 southbound to A127 eastbound link | Between point 37/18 and 37/14 as shown on sheet 5 of the classification of roads plans. |
| A127 westbound to M25 southbound link | Between point 37/11 and 37/19 as shown on sheet 5 of the classification of roads plans. |
PART 5 — UNCLASSIFIED ROADS
| (1) Road | (2) Extent |
|---|---|
| Park Pale | Between points 4/6 and 4/4 as shown on sheet 1 of the classification of roads plans. |
| Hoford Road | Between points 18/2 and 18/5 as shown on sheet 3 of the classification of roads plans. |
| Hornsby Lane | Between points 22/1 and 22/4 and between points 22/2 and 22/3 as shown on sheet 3 of the classification of roads plans. |
| Rectory Road | Between points 23/2 and 23/5 as shown on sheet 3 of the classification of roads plans. |
| Heath Road | Between points 24/1 and 24/2 as shown on sheet 3 of the classification of roads plans. |
| Gammonfields Way and Long Lane | Between points 25/1 and 25/2 as shown on sheet 3 of the classification of roads plans |
| Access roads off Muckingford Road | Between points 15/5 and 15/6, and between points 15/3 and 15/4, as shown on sheet 3 of the classification of roads plans. |
| Woolings Close | Between points 28/1 and 31/1 as shown on sheet 3 of the classification of roads plans. |
PART 6 — OTHER PUBLIC RIGHTS OF WAY AND PERMISSIVE PATHS
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.