The A12 Chelmsford to A120 Widening Development Consent Order 2024
Work No. U172 – As shown on sheet 16 of the utilities works plans, the diversion of buried communications cable ducts of 150 metres in length around the proposed Easthorpe Road Roundabout (Work No. 88(b)) within the A12 southbound verge.
Work No. U173 – As shown on sheet 16 of the utilities works plans, the diversion and undergrounding of overhead 11kV electricity cable ducts of 550 metres in length between Easthorpe Road and a point north of the existing A12 and west of Domsey Chase.
Work No. U173A – As shown on sheet 16 of the utilities works plans, the diversion of a buried water main of 350 metres in length south of the realigned Easthorpe Road.
Work No. U173B – As shown on sheet 16 of the utilities works plans, the diversion of a buried water main of 100 metres in length across the eastern end of the proposed realigned Easthorpe Road (Work No. 88(a)).
Work No. U174 – As shown on sheet 17 of the utilities works plans, the diversion of buried communications cable ducts of 350 metres in length around the proposed Wishingwell Farm Roundabout (Work No. 94(b)) within the existing A12 northbound verge.
Work No. U174A – As shown on sheet 17 of the utilities works plans, the diversion of a buried water main of 800 metres in length between Easthorpe Green Farm and to the north of the proposed Wishingwell Farm Roundabout (Work No. 94(b)), within the existing A12 southbound verge.
Work No. U175 – As shown on sheet 17 of the utilities works plans, the diversion of buried communications cable ducts of 350 metres in length from the existing A12 central reservation around the proposed Wishingwell Farm Roundabout (Work No. 94(b)) within the existing A12 southbound verge and returning to the existing A12 central reservation.
Work No. U176 – As shown on sheet 17 of the utilities works plans, the diversion of buried communications cable ducts of 225 metres in length around the proposed Wishingwell Farm Roundabout (Work No. 94(b)) within the A12 southbound verge.
Work No. U177 – As shown on sheet 17 of the utilities works plans, the diversion of buried communications cable ducts of 175 metres in length around the proposed Wishingwell Farm Roundabout (Work No. 94(b)) within the existing A12 southbound verge.
Work No. U178 – As shown on sheets 17 and 18 of the utilities works plans, the diversion of buried communications cable ducts of 1100 metres in length between the existing A12 southbound verge and Wishingwell Farm, via the proposed Wishingwell Overbridge (Work No. 94(c)).
Work No. U179 – As shown on sheet 17 of the utilities works plans, the diversion of buried communications cable ducts of 400 metres in length between Easthorpe Green Farm and the proposed Wishingwell Overbridge (Work No. 94(c)).
Work No. U180 – As shown on sheet 18 of the utilities works plans, the diversion and undergrounding overhead 11kV electricity cable ducts and relocation of pole of 175 metres in length, south of the proposed Potts Green Bridge, Marks Tey.
Work No. U180A – As shown on sheet 18 of the utilities works plans, the diversion of a buried water main of 150 metres in length to the south of the existing access track to Wishingwell Farm.
Work No. U181 – As shown on sheet 18 of the utilities works plans, the diversion of buried communications cable ducts of 25 metres in length to the west of the proposed London Road Roundabout, de-trunked A12 western connection (Work No. 102(c)), southbound verge, Marks Tey.
Work No. U182 – As shown on sheet 18 of the utilities works plans, the diversion of buried communications cable ducts of 700 metres in length between the existing A12 central reservation and the northbound verge of London Road, Marks Tey.
Work No. U183 – As shown on sheet 18 of the utilities works plans, the diversion of buried communications cable ducts of 100 metres in length between Old London Road and the proposed London Road Roundabout, de-trunked A12 western connection (Work No. 102(c)), southbound verge, Marks Tey.
Work No. U184 – As shown on sheet 18 of the utilities works plans, the diversion of buried communications cable ducts of 350 metres in length between Old London Road verge and the proposed A12 (Work No. 68(b)) southbound verge, Marks Tey.
Work No. U184A – As shown on sheet 18 of the utilities works plans, the diversion or protection of a buried water main of 50 metres in length along Old London Road at the realigned Old London Road access, Marks Tey (Work No. 102(e)).
Work No. U185 – As shown on sheet 18 of the utilities works plans, the diversion of buried communications cable ducts of 725 metres in length between Old London Road verge and A120 Coggeshall Road verge, via the New London Road (Work No. 102(a)), Marks Tey.
Work No. U186 – As shown on sheet 18 of the utilities works plans, the diversion of buried communications cable ducts of 700 metres in length between Old London Road and A120 Coggeshall Road, via the New London Road (Work No. 102(a)), Marks Tey.
Work No. U186A – As shown on sheets 18 and 19 of the utilities works plans, the diversion or protection of a buried foul sewer of 150 metres in length along the A120 Coggeshall Road, Marks Tey.
Work No. U187 – As shown on sheets 18 and 19 of the utilities works plans, the diversion of buried low voltage electricity cable ducts of 700 metres in length between A120 Coggeshall Road northern verge and London Road westbound verge, via Old London Road, Marks Tey.
Work No. U188 – As shown on sheets 18 and 19 of the utilities works plans, the diversion of buried communications cable ducts of 150 metres in length between A120 Coggeshall Road and Station Road, Marks Tey.
Work No. U189 – As shown on sheets 18 and 19 of the utilities works plans, the diversion of buried communications cable ducts of 150 metres in length between A120 Coggeshall Road and Station Road, Marks Tey.
Work No. U190 – As shown on sheets 18 and 19 of the utilities works plans, the diversion of buried communications cable ducts of 150 metres in length between A120 Coggeshall Road and Station Road, Marks Tey.
Work No. U191 – As shown on sheet 18 of the utilities works plans, the diversion of a buried sewer of 550 metres in length between Old London Road and London Road, Marks Tey.
Work No. U192 – As shown on sheet 18 of the utilities works plans, the diversion of buried water main of 375 metres in length between London Road and Old London Road, Marks Tey.
Work No. U193 – As shown on sheet 18 of the utilities works plans, the diversion of buried communications cable ducts of 100 metres in length between Hall Chase and the proposed Hall Chase Roundabout (Work No. 105(a)), Marks Tey.
Work No. U193A – As shown on sheet 18 of the utilities works plans, the diversion or protection of a buried foul sewer of 200 metres in length between Hall Chase and Old London Road, Marks Tey.
Work No. U194 – As shown on sheet 18 of the utilities works plans, the diversion of buried communications cable ducts of 200 metres in length between Hall Chase and the proposed Junction 25 southbound on-slip road (Work No. 68), Marks Tey.
Work No. U195 – As shown on sheet 18 of the utilities works plans, the diversion of buried communications cable ducts of 450 metres in length between the proposed Junction 25 southbound on-slip road (Work No. 68) verge and London Road, Marks Tey.
Work No. U196 – As shown on sheet 18 of the utilities works plans, the diversion of buried 11kV electricity cable ducts of 650 metres in length between Old London Road and London Road, Marks Tey.
Work No. U197 – As shown on sheet 18 of the utilities works plans, the diversion and undergrounding of overhead 11kV electricity cable ducts of 125 metres in length between the proposed Potts Green Bridge (Work No. 100) and the proposed London Road Roundabout (Work No. 102(b)), at a point to the south of the A12.
Work No. U198 – As shown on sheet 19 of the utilities works plans, the diversion of buried 11kV electricity cable ducts of 200 metres in length between Station Road, Marks Tey southbound verge to London Road, Marks Tey northbound verge.
Work No. U199 – As shown on sheet 19 of the utilities works plans, the diversion of a buried water main of 150 metres in length between the A12 and London Road, Marks Tey.
Work No. U200 – As shown on sheet 19 of the utilities works plans, the diversion of a buried water main of 100 metres in length between the A12 northbound verge and the A12 southbound verge, Marks Tey.
Work No. U200A – As shown on sheet 19 of the utilities works plans, the diversion of buried communications cable ducts of 100 metres in length south of Marks Tey Station.
Work No. U201 – As shown on sheet 19 of the utilities works plans, the diversion of buried communications cable ducts of 1150 metres in length between the Prince of Wales Roundabout and the A12 southbound verge, east of the culverted Roman River, Marks Tey.
Work No. U202 – As shown on sheets 18 and 19 of the utilities works plans, the diversion of buried communications cable ducts of 2700 metres in length between the existing A12 southbound west of the proposed London Road Roundabout, de-trunked A12 western connection (Work No. 102(c)) and the A12 southbound verge east of the culverted Roman River, via London Road and B1408 London Road, Marks Tey.
Work No. U203 – As shown on sheet 19 of the utilities works plans, the diversion of buried communications cable ducts of 50 metres in length along the B1408 London Road, Marks Tey.
Work No. U204 – As shown on sheet 19 of the utilities works plans, the diversion of buried 11kV electricity cable ducts of 50 metres in length between B1408 London Rd, Marks Tey westbound verge and B1408 London Rd, Marks Tey eastbound verge.
Work No. U205 – As shown on sheet 19 of the utilities works plans, the diversion of a buried low voltage electricity cable ducts of 25 metres in length between B1408 London Rd, Marks Tey westbound verge and B1408 London Rd, Marks Tey eastbound verge.
Work No. U206 – As shown on sheet 19 of the utilities works plans, the diversion of buried communications cable ducts of 175 metres in length between B1408 London Rd, Marks Tey westbound verge and B1408 London Road, Marks Tey eastbound verge.
Work No. U207 – As shown on sheets 18 and 19 of the utilities works plans, the diversion of buried communications cable ducts of 2500 metres in length between the existing A12 west of the proposed London Road Roundabout, (Work No. 102(c)) and the A12, east of the culverted Roman River, via London Road, Marks Tey and B1408 London Road, Marks Tey.
Work No. U208 – As shown on sheet 19 of the utilities works plans, the diversion of a buried surface water pipe of 25 metres in length south of the A12 and the Roman River Culvert, Copford.
Other associated development
For the purposes of or in connection with the construction of any of the works and other development mentioned above, ancillary or related development within the Order limits which does not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement, consisting of—
- (a) alteration to the layout of any street permanently or temporarily, including but not limited to increasing or reducing the width of the carriageway of the street by reducing or increasing the width of any kerb, footpath, footway, cycle track or verge within the street; and altering the level of any such kerb, footpath, footway, cycle track or verge;
- (b) works required for the strengthening, improvement, maintenance or reconstruction of any street;
- (c) parking laybys and emergency laybys;
- (d) refurbishment works to any existing bridge;
- (e) the strengthening, alteration or demolition of any building or highway bridge or structure;
- (f) ramps, means of access, non-motorised links, footpaths, footways, cycle tracks and crossing facilities;
- (g) embankments, viaducts, aprons, abutments, shafts, foundations, retaining walls, barriers, pumping stations, parapets, drainage, attenuation tanks, outfalls, ditches, wing walls, highway lighting, gantries, fencing and culverts;
- (h) street works, including breaking up or opening up a street, or any sewer, drain or tunnel under it; tunnelling or boring under a street;
- (i) works to place, alter, maintain, decommission or remove street furniture, traffic signals and apparatus in a street, or apparatus in other land, including mains, sewers, drains, tanks, pipes, cables, connections, ducts, conduits and lights;
- (j) works to alter the course of or otherwise interfere with a watercourse;
- (k) landscaping, noise and visual bunds and barriers, works associated with the provision of ecological mitigation (including artificial badger setts) and other works to mitigate any adverse effects of the construction, maintenance or operation of the authorised development;
- (l) works for the benefit or protection of land and apparatus affected by the authorised development;
- (m) site preparation works, site clearance (including fencing, vegetation removal, demolition of existing structures and the creation of alternative footpaths); earthworks (including soil stripping and storage, site levelling); remediation of contamination;
- (n) the felling of trees;
- (o) the establishment of construction compounds and working sites, storage areas, temporary vehicle parking, construction fencing, perimeter enclosure, security fencing, construction-related buildings, temporary worker accommodation facilities, welfare facilities, construction lighting, haulage roads, protective works to apparatus, and other buildings, machinery, apparatus, works and conveniences;
- (p) the provision of other works including pavement works, kerbing and paved areas works, signing, signals, gantries, road markings works, traffic management measures, temporary roads, temporary widening of carriageways and such other works as are associated with the construction of the authorised development;
- (q) temporary crossings of footpaths, bridleways, footways, cycle tracks, carriageways and watercourses with associated plant crossings or bridging structures (at grade or grade separated);
- (r) pumping for the purposes of dewatering excavations (including borrow pits) and the management of surface water flows and temporary storage, settlement and treatment of surface water flows;
- (s) removal of surfaces for closed or redundant carriageways, accesses or streets; and
- (t) such other works, working sites, storage areas and works of demolition, as may be necessary or expedient for the purposes of, or for purposes ancillary to, the construction of the authorised development.
SCHEDULE 2 — REQUIREMENTS
PART 1 — REQUIREMENTS
Interpretation
1
In this Schedule—
- “approving authority” means the Secretary of State or, as the case may be, the local highway authority;
- “begin” for the purposes of sections 154 of the 2008 Act, means beginning to carry out any material operation (as defined in section 56(4) of the 1990 Act) forming part of the authorised development;
- “commence” in relation to any part of the authorised development referred to in the provisions of this Schedule means beginning to carry out any material operation (as defined in section 56(4) of the 1990 Act) in respect of that part of the authorised development other than operations consisting of pre-commencement works, and “commencement” is to be construed accordingly;
- “contaminated land” has the same meaning as that given in section 78A(2)103 (preliminary) of the Environmental Protection Act 1990;
- “County Archaeologist” means the individual appointed as such by the relevant planning authority;
- “design principles” means the document of that description listed in Schedule 12 (documents to be certified) certified by the Secretary of State as the design principles for the purposes of this Order;
- “DMRB” means the Design Manual for Roads and Bridges, which accommodates all current standards, advice and other documents relating to the design, assessment and operation of trunk roads and motorways, or any equivalent replacement to the DMRB published;
- “Ecological Clerk of Works” means the individual appointed as such by the undertaker;
- “European protected species” has the same meaning as in regulations 42 (European protected species of animals) and 46 (European protected species of plants) of the Conservation of Habitats and Species Regulations 2017104;
- “First Iteration EMP” means the document of that description listed in Schedule 10 (documents to be certified), being the first iteration of the environmental management plan produced in accordance with the DMRB during the preliminary design stage and certified by the Secretary of State as the First Iteration EMP for the purposes of this Order, which includes an outline plan for the following—archaeological management plan;construction compound management plan;contaminated land management plan;dust management plan;emergency procedures and record of any environmental incidents;energy and resource use management plan;haul road management plan;invasive species management plan;landscape and ecology management plan;materials management plan;noise and vibration management plan;site waste management plan;soil handling management plan; andwater management plan;
- “flood risk assessment” means the document of that description listed in Schedule 12 (documents to be certified) certified by the Secretary of State as the flood risk assessment for the purposes of this Order;
- “outline construction traffic management plan” means the document of that description listed in Schedule 12 certified by the Secretary of State as the outline construction traffic management plan for the purposes of this Order;
- “pre-commencement plan” means the document of that description listed in Schedule 12 and certified by the Secretary of State as the pre-commencement plan for the purposes of this Order;
- “pre-commencement works” means—archaeological investigations and mitigation works;ecological surveys and mitigation works;investigations for the purpose of assessing ground conditions;remedial work in respect of any contamination or other adverse ground conditions;erection of any temporary means of enclosure;receipt and erection of construction plant and equipment;treatment and removal of any invasive species;construction compound establishment works;site clearance works;temporary haul roads, temporary hard standing and temporary access works;installation of temporary drainage;engineering surveys; andtemporary display of site notices or advertisements.
- “protected species” means species which are subject to protection under the laws of England or which are European protected species;
- “Second Iteration EMP” means the second iteration of the environmental management plan produced in accordance with the DMRB containing detailed plans relating to the construction phase of the authorised development substantially in accordance with the First Iteration EMP;
- “Third Iteration EMP” means the third iteration of the environmental management plan produced in accordance with the DMRB containing detailed plans relating to the operational and maintenance phase of the authorised development substantially in accordance with the First Iteration EMP; and
- “Traffic Signs Manual” means the Traffic Signs Manual published by the Department for Transport, which contains guidance to traffic authorities on the use of traffic signs and road markings on the highway network, or any equivalent replacement to be published.
Time limits
2
The authorised development must not begin later than the expiration of 5 years beginning with the date on which this Order comes into force.
Second Iteration EMP
3
- (1) No part of the authorised development is to commence until the Second Iteration EMP for that part has been submitted to and approved in writing by the Secretary of State, following consultation with the relevant planning authority and the Environment Agency on matters related to its functions.
- (2) The authorised development must be constructed in accordance with the Second Iteration EMP.
Third Iteration EMP
4
- (1) Following completion of construction of the authorised development the Third Iteration EMP must be submitted to the Secretary of State for approval in writing, following consultation with the relevant planning authority and the Environment Agency on matters related to its functions.
- (2) The authorised development must be operated and maintained in accordance with the Third Iteration EMP as so approved.
Landscaping
5
- (1) No part of the authorised development is to commence until a landscaping scheme for that part has been submitted to and approved in writing by the Secretary of State following consultation with the relevant planning authority on matters related to its functions.
- (2) The landscaping scheme for each part must reflect the applicable mitigation measures set out in the First Iteration EMP and the landscaping principles set out in the environmental masterplan.
- (3) The authorised development must be landscaped in accordance with the approved landscaping scheme for that part.
- (4) A landscaping scheme prepared under sub-paragraph (1) must include details of landscaping works, including—
- (a) location, number, species, mix, size and planting density of any proposed planting;
- (b) cultivation, importing of materials and other operations to ensure plant establishment;
- (c) proposed finished ground levels;
- (d) existing trees to be retained, with measures for their protection during the construction period; and
- (e) implementation timetables for all landscaping works.
- (5) All landscaping works must be carried out to a reasonable standard in accordance with the relevant recommendations of appropriate British Standards or other recognised codes of good practice.
- (6) Any tree or shrub planted as part of the landscaping scheme that, within a period of 5 years after planting, is removed, dies or becomes, in the opinion of the relevant planning authority, seriously damaged or diseased, must be replaced in the first available planting season with a specimen of the same species and size as that originally planted, unless the Secretary of State, following consultation with the relevant planning authority, gives consent to a variation.
Contaminated Land and groundwater
6
- (1) In the event that contaminated land, including groundwater, is found at any time when carrying out the authorised development, which was not previously identified in the environmental statement, it must be reported as soon as reasonably practicable to the Secretary of State, the Environment Agency and the relevant planning authority, and the undertaker must complete a risk assessment of the contamination in consultation with the relevant planning authority and the Environment Agency on matters related to their functions.
- (2) Where the risk assessment prepared in accordance with sub-paragraph (1) determines that remediation of the contaminated land is necessary, a written scheme and programme for the remedial measures to be taken to render the land fit for its intended purpose and to prevent any impacts on controlled waters must be submitted to and approved in writing by the Secretary of State, following consultation by the undertaker with the relevant planning authority and the Environment Agency on matters related to their functions.
- (3) Remediation must be carried out in accordance with the approved scheme.
Archaeology
7
- (1) No part of the authorised development is to commence until for that part a written scheme of investigation for the investigation and mitigation of areas of archaeological interest, reflecting the mitigation measures included in chapter 7 of the environmental statement and the archaeological mitigation strategy, has been prepared in consultation with the relevant planning authority, agreed with the County Archaeologist and submitted to and approved in writing by the Secretary of State.
- (2) The authorised development must be carried out in accordance with the archaeological mitigation strategy and written scheme of investigation referred to in sub-paragraph (1) unless otherwise agreed in writing by the Secretary of State.
- (3) A programme of archaeological reporting, post excavation and publication required as part of the archaeological mitigation strategy and written scheme of investigation referred to in sub-paragraph (1) must be agreed with the County Archaeologist and implemented within a timescale agreed with the County Archaeologist and deposited with the Historic Environment Record of the relevant planning authority within two years of the date of completion of the authorised development or such other period as may be agreed in writing by the relevant planning authority.
- (4) Any archaeological remains not previously identified which are revealed when carrying out the authorised development must be subject to appropriate mitigation as set out in the archaeological mitigation strategy and agreed with the County Archaeologist.
- (5) No construction operations are to take place within 10 metres of the remains referred to in sub-paragraph (4) for a period of 14 days from the date they are identified unless otherwise agreed in writing by the Secretary of State.
Protected species
8
- (1) In the event that any protected species which were not previously identified in the environmental statement or nesting birds are found at any time when carrying out the authorised development the undertaker must—
- (a) cease the relevant parts of the relevant works and report it immediately to the Ecological Clerk of Works; and
- (b) prepare a written scheme for the protection and mitigation measures of such protected species or nesting birds when carrying out the authorised development.
- (2) The undertaker must implement the written scheme prepared under sub-paragraph (1)(b) immediately and construction in the area specified in the written scheme must not recommence until any necessary licences are obtained to enable mitigation measures to be implemented.
Traffic management
9
- (1) No part of the authorised development is to commence until for that part a traffic management plan for the construction of the authorised development, substantially in accordance with the outline construction traffic management plan, has been submitted to and approved in writing by the Secretary of State following consultation with the relevant local highway authority.
- (2) The authorised development must be constructed in accordance with the approved traffic management plan.
Detailed design
10
- (1) Subject to the provisions of this Order, the detailed design for the authorised development must accord with—
- (a) the preliminary scheme design shown on the works plans and the engineering drawings and sections;
- (b) the principles set out in the environmental masterplan; and
- (c) the design principles,
unless otherwise agreed in writing by the Secretary of State following consultation with the relevant planning authority and relevant local highway authority on matters related to their functions, provided that the Secretary of State is satisfied that any amendments would not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.
- (2) Where amended details are approved by the Secretary of State under paragraph (1), those details are deemed to be substituted for the corresponding plans sections and the undertaker must make those amended details available in electronic form for inspection by members of the public.
- (3) No part of the authorised development is to commence until, for that part, a report has been submitted to, and, following consultation with the relevant local planning authority, approved by the Secretary of State, demonstrating that—
- (a) the undertaker has engaged with relevant stakeholders on refinements to detailed design for that part of the authorised development;
- (b) the undertaker has had regard to the relevant stakeholders’ comments; and
- (c) any refinements to the detailed design for that part of the authorised development arising as a result of that engagement should accord with the ... and design principles.
Surface and foul water drainage
11
- (1) No part of the authorised development is to commence until for that part written details of the surface and foul water drainage system, reflecting the mitigation measures in chapter 14 of the environmental statement and including means of pollution control, have been submitted to and approved in writing by the Secretary of State following consultation with the relevant local authority and the Environment Agency on matters relating to their functions.
- (2) The surface and foul water drainage system must be constructed in accordance with the approved details referred to in paragraph (1) unless otherwise agreed in writing by the Secretary of State following consultation with the relevant local authority and the Environment Agency on matters relating to their functions, provided that the Secretary of State is satisfied that any amendments to the approved details would not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.
- (3) In this paragraph, “relevant local authority” means a county council or district council in whose area the part of the authorised development in question is located.
Flood risk assessment
12
- (1) Subject to sub-paragraph (2), the authorised development must be carried out in accordance with the flood risk assessment, including the mitigation measures detailed in it, so that no part of the authorised development is predicted to result in any exceedance of the flood levels to properties and land shown in the flood risk assessment.
- (2) Sub-paragraph (1) does not apply in any circumstance where the undertaker proposes to carry out a part of the authorised development otherwise than in accordance with the flood risk assessment but either demonstrates to the Environment Agency’s satisfaction that the part of the authorised development concerned would not result in a material exceedance of the flood levels shown in the flood risk assessment or that all affected landowners accept the predicted exceedance of the flood levels shown in the flood risk assessment.
Noise mitigation
13
- (1) No part of the authorised development is to commence until written details of the proposed noise mitigation for the use and operation of that part of the authorised development, including—
- (a) noise barriers, and
- (b) noise bunds,
has been submitted to and approved in writing by the Secretary of State, following consultation with the relevant planning authority.
- (2) The locations for the mitigation measures referred to in paragraph (1) must reflect the locations and extents shown on the environmental masterplan.
- (3) The written details referred to in paragraph (1) must—
- (a) reflect the mitigation measures for operation included in Chapter 12, Noise and Vibration, of the environmental statement; or
- (b) where it materially differs from these measures, demonstrate that the mitigation proposed would not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.
- (4) The noise mitigation measures must be provided in accordance with the approved details.
- (5) The noise mitigation measures referred to in sub-paragraph (1)... must be retained and maintained following their being provided.
Boreham operation phase traffic mitigation measures
14
- (1) No part of the authorised development is to open to traffic until a scheme of operation phase traffic mitigation for the B1137 in Boreham has been submitted to and approved by the local highway authority, provided that it is satisfied that any scheme of operation would not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.
- (2) The operation phase traffic mitigation scheme for Boreham must include provision for the following operational phase traffic mitigation—
- (a) a new controlled pedestrian crossing on the B1137 in the vicinity of Boreham Co-op (grid reference 575330, 210021);
- (b) road safety posters in the vicinity of Orchard Cottages (grid reference 576394, 210658), Boreham Recreation Ground (grid reference 575848, 2103190) and outside of the Little Hedgehogs Day nursery (grid reference 575444, 210081);
- (c) installation of average speed cameras on the B1137 (excluding ongoing operation, maintenance/calibration and enforcement) within Boreham as defined by the extent of 30mph speed limit shown between reference A.010 and A.011 on the traffic regulation measures speed limit plans;
- (d) installation of average speed cameras (but not including provision for their ongoing operation, maintenance /calibration and enforcement) on the B1137 between Boreham and Hatfield Peverel defined by the extent of 40mph speed limit shown between reference A.011 and A.012 on the traffic regulation measures speed limit plans; and
- (e) minor road narrowing (similar to the existing provision at the southern entry to Boreham village) at three new locations—
- (i) the northern entry to Boreham village;
- (ii) between the northern entry to Boreham village and Waltham Road; and
- (iii) in the vicinity of the pedestrian entrance to the recreation ground.
- (3) The scheme of operation phase traffic mitigation for the B1137 in Boreham must be implemented in accordance with the approved details.
- (4) No part of the authorised development is to open for public use until the approved scheme has been implemented and delivered by the undertaker.
Messing operation phase traffic mitigation measures
15
- (1) No part of the authorised development is to open to traffic until a scheme of operation phase traffic mitigation for Messing has been submitted to and approved by the local highway authority, provided that it is satisfied that any scheme of operation would not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.
- (1A) The scheme must include an assessment of improvements to the B1023 or another suitable corridor for walking, cycling and horse riding users, to help off-set the impacts of increased traffic on this route.
- (2) The operation phase traffic mitigation scheme must include provision for the following operational phase traffic mitigation—
- (a) gateway features for signage in accordance with Traffic Signs Manual Chapter 3: Figure 8-21, and speed limit roundels in accordance with the 2016 Regulations and Directions diagram 1065 at Lodge Rd (grid reference 589938, 219356), Kelvedon Rd (grid reference 589511, 218861) and Harborough Hall Road (grid reference 590233, 218566) marking the extents of the existing 30mph speed limit;
- (b) “unsuitable for heavy goods vehicles” signage in accordance with the 2016 Regulations and Directions diagram 820 at the junction of the B1023 and Yewtree Farm Road (grid reference 587881, 218631), the junction of Harborough Hall Road and B1022 (grid reference 590573, 218228), the junction of the B1023 and Oak Road (grid reference 588820, 217131), and the junction of the B1022 and Oak Road (grid reference 589505, 217275;
- (c) an average speed camera system covering the B1023 between Inworth Road roundabout and the existing 30mph terminal on the northern approach to Tiptree, and a fixed speed camera covering the southbound carriageway north of the Inworth Road roundabout;
- (d) widening of pinch points between Perrywood Garden Centre and the B1022 to a minimum carriageway width of 6.1m in line with the approach to other pinch point widening proposals;
- (e) measures to improve provision for walking, cycling and horse riding users, as identified in the assessment under subparagraph (2);
- (f) narrowing of the entries to Oak Road (both the eastern and western ends), through tightening of entry radii and appropriate landscaping;
- (g) priority narrowing measures on Oak Road; and
- (h) improved signage at either end of Oak Road to guide through traffic to the B1022/B1023 junction.
- (3) The scheme of operation phase traffic mitigation for Messing must be implemented in accordance with the approved details.
- (4) No part of the authorised development is to open for public use until the approved scheme has been implemented by the undertaker.
Operation phase local traffic monitoring
16
- (1) No part of the authorised development is to commence until a survey to assess baseline traffic levels has been undertaken at the following locations—
- (a) B1137 Main Road, Boreham;
- (b) The Street/Maldon Road (Duke of Wellington) junction, Hatfield Peverel;
- (c) Little Braxted Lane, Little Braxted;
- (d) Braxted Road/Braxted Park Road;
- (e) B1023 Kelvedon Road, Inworth;
- (f) Kelvedon Road, Messing;
- (g) B1023 Church Road, Tiptree; and
- (h) any other locations that are agreed between the undertaker and the local highway authority.
- (2) No part of the authorised development is to open to traffic until details of an operation phase local traffic monitoring scheme has been submitted to and approved by the local highway authority, for the locations listed in sub-paragraph (1).
- (3) The operation phase local traffic monitoring scheme to be provided under sub-paragraph (2) must include—
- (a) a survey to assess baseline traffic levels at the locations listed in sub-paragraph (1), or confirmation that such survey has already been undertaken;
- (b) proposals for an operation traffic survey at the locations listed in sub-paragraph (1) to assess the changes in traffic from the baseline carried out—
- (i) within the first year; and
- (ii) prior to the expiry of the third year,
following the date on which the authorised development is fully completed and open for traffic;
- (c) details of the methodology to be used to collect the required data;
- (d) details of the periods over which operation traffic is to be monitored; and
- (e) proposals for the submission of the survey data collected and an interpretative report to be provided to the relevant local highway authority.
- (4) The scheme approved under sub-paragraph (2) must be implemented by the undertaker unless otherwise agreed in writing with the local highway authority.
Pre-commencement works
17
Any pre-commencement works must be carried out in accordance with the pre-commencement plan.
Junction 21
18
- (1) Requirement 10 (detailed design) is to be read subject to the provisions of this requirement.
- (2) The detailed design for the proposed A12 junction 21 (“junction 21”) must contain the revised design detail specified in sub-paragraph (3) of this requirement and submitted to and approved by the relevant local highway authority.
- (3) Subject to sub-paragraph (5) the detailed design for junction 21 must include a two-lane exit from both the junction 21 northern roundabout to the A12 northbound slip road and from the junction 21 southern roundabout to the A12 southern slip road.
- (4) Junction 21 must be constructed in accordance with the approved details.
- (5) No application for approval of the scheme under sub-paragraph (2) may be made in respect of proposals which would give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.
De-trunking
19
- (1) The consent of the Secretary of State pursuant to article 14(7) (classification of roads, etc.) must not be sought until written details of the proposals for the roads to be de-trunked as identified in Part 14 of Schedule 3 has been submitted and approved in writing by the Secretary of State following consultation with the relevant local highway authority and relevant planning authority, such scheme to include—
- (a) drawings and plans showing the proposals;
- (b) details of how the proposals maintain a safe and reliable highway network;
- (c) details of the provision made for non-car transport modes;
- (d) details of how existing accesses will retain access to the de-trunked road;
- (e) details of how existing utilities will be safeguarded;
- (f) details of landscaping and planting;
- (g) details of drainage provision;
- (h) a timetable for implementation of the proposal; and
- (i) the agreement (such agreement not to be unreasonably withheld) of the local highway authority that any highway assets to be transferred to it are in a condition that meets its reasonable satisfaction.
- (2) No application for approval of the scheme under sub-paragraph (1) may be made in respect of proposals which would give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.
- (3) The scheme approved under sub-paragraph (1) must be implemented by the undertaker and in accordance with the approved timetable for implementation, unless otherwise agreed in writing with the Secretary of State following consultation with the relevant local highway authority.
Walking, cycling and horse-riding bridges
20
- (1) Requirement 10 (detailed design) is to be read subject to the provisions of this requirement.
- (2) The detailed design for the works must accord with the Walking, Cycling, Horse-riding bridge specifications in Appendix B of the design principles.
- (3) The authorised development must be constructed in accordance with the Walking, Cycling, Horse-riding bridge specifications in Appendix B of the design principles.
Approvals and amendments to approved details
21
With respect to any requirement which requires the authorised development to be carried out in accordance with the details approved under this Schedule, the approved details are taken to include any amendments that may subsequently be approved or agreed in writing by the approving authority.
PART 2 — PROCEDURE FOR DISCHARGE OF REQUIREMENTS
Applications made under requirements
22
- (1) Where an application has been made to the approving authority for any consent, agreement or approval required by a requirement (including agreement or approval in respect of part of a requirement) included in this Order, the approving authority must give notice to the undertaker of the decision on the application within a period of 8 weeks beginning with—
- (a) the day immediately following that on which the application is received by the approving authority;
- (b) the day immediately following that on which further information has been supplied by the undertaker under paragraph 23 (further information); or
- (c) such longer period as may be agreed between the parties.
- (2) Subject to paragraph (3), in the event that the approving authority does not determine an application within the period set out in paragraph (1), the approving authority is taken to have granted all parts of the application (without any condition or qualification) at the end of that period.
- (3) Where—
- (a) an application has been made to the approving authority for any consent, agreement or approval required by a requirement included in this Order;
- (b) the approving authority does not determine such application within the period set out in sub-paragraph (1); and
- (c) the application is accompanied by a report from a body required to be consulted under that requirement that considers it likely that the subject matter of the application is to give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement,
the application is taken to have been refused by the approving authority at the end of that period.
Further information
23
- (1) In relation to any part of an application made under this Schedule, the approving authority has the right to request such further information from the undertaker as is necessary to enable the approving authority to consider the application.
- (2) In the event that the approving authority considers such further information to be necessary, the approving authority must, within 21 business days of receipt of the application, notify the undertaker in writing specifying the further information required and (if applicable) to which part of the application it relates. In the event that the approving authority does not give such notification within that 21 business day period the approving authority is deemed to have sufficient information to consider the application and is not subsequently entitled to request further information without the prior agreement of the undertaker.
- (3) Where further information is requested under this paragraph in relation to part only of an application, that part is treated as separate from the remainder of the application for the purposes of calculating the time periods referred to in paragraph 22 (applications made under requirements) and in this paragraph.
- (4) In this paragraph, “business day” means a day other than Saturday or Sunday which is not Christmas Day, Good Friday or a bank holiday under section 1 (bank holidays) of the Banking and Financial Dealings Act 1971105.
Register of requirements
24
- (1) The undertaker must, as soon as practicable following the making of this Order, establish and maintain in an electronic form suitable for inspection by members of the public a register of those requirements contained in Part 1 of this Schedule that provide for further approvals to be given by the approving authority.
- (2) The register must set out in relation to each such requirement the status of the requirement, in terms of whether any approval to be given by the approving authority has been applied for or given, providing an electronic link to any document containing any approved details.
- (3) The register must be maintained by the undertaker for a period of 3 years following completion of the authorised development.
Anticipatory steps towards compliance with any requirement
25
If before the coming into force of this Order the undertaker or any other person has taken any steps that were intended to be steps towards compliance with any provision of Part 1 of this Schedule, those steps may be taken into account for the purpose of determining compliance with that provision if they would have been valid steps for that purpose had they been taken after this Order came into force.
Timing of consultation
26
- (1) With respect to any requirement which requires the undertaker to consult another party (“the consultee”), the undertaker must, subject to sub-paragraph (2), provide the consultee with not less than 28 days beginning with the start date to respond to the consultation.
- (2) If no later than the expiry of 21 days beginning with the start date, a consultee requests more time to respond to the consultation than was given under paragraph (1), the undertaker may consent (such consent not to be unreasonably withheld) to an extension of that period so that the consultee has a longer period to respond (such period to be not less than 42 days but no more than 56 days, beginning with the start date).
- (3) In this paragraph, “the start date” is the day following the date on which the consultee received the document being consulted on.
Details of consultation
27
- (1) With respect to any requirement which requires details to be submitted to the Secretary of State for approval under this Schedule following consultation with another party, the details submitted must be accompanied by—
- (a) a summary report setting out the consultation undertaken by the undertaker to inform the details submitted and the undertaker’s response to that consultation; and
- (b) copies of all consultation responses received.
- (2) At the time of submission to the Secretary of State for approval, the undertaker must provide a copy of the summary report referred to under sub-paragraph (1) to the relevant consultees referred to in the requirement in relation to which approval is being sought from the Secretary of State.
- (3) The undertaker must ensure that any consultation responses are reflected in the details submitted to the Secretary of State for approval under this Schedule, but only where it is appropriate, reasonable and feasible to do so, taking into account considerations including, but not limited to, cost and engineering practicality.
- (4) Where the consultation responses are not reflected in the details submitted to the Secretary of State for approval, the undertaker must state in the summary report referred to under sub-paragraph (1), the reasons why the consultation responses have not been reflected in the submitted details.
SCHEDULE 3 — CLASSIFICATION OF ROADS, ETC.
PART 1 — TRUNK ROADS
| (1)Area | (2)Length of road |
|---|---|
| Classification of roads plans – Sheet No. 1 (and 2) | Classification of roads plans – Sheet No. 1 (and 2) |
| Springfield CP, Boreham CP | The widened A12 dual carriageway (southbound) between point 1/1 and 1/8, a distance of 875 metres. |
| Springfield CP, Boreham CP | The widened A12 dual carriageway (northbound) between point 1/2 and 1/9, a distance of 875 metres. |
| Springfield CP, Boreham CP | The junction 19 existing northbound off-slip road between points 1/4 and 1/7, a distance of 514 metres. |
| Springfield CP, Boreham CP | The junction 19 southbound on-slip road between points 1/3 and 2/21 (sheet 2), a distance of 1,113 metres. |
| Classification of roads plans – Sheet No. 2 | Classification of roads plans – Sheet No. 2 |
| Boreham CP | The junction 19 southbound off-slip road between points 2/17 and 2/28, a distance of 666 metres. |
| Boreham CP | The junction 19 northbound on-slip road between points 2/4 and 2/33, a distance of 119 metres. |
| Boreham CP | The junction 19 northbound on-slip link from the Beaulieu Park radial distributor road left turn between points 2/6 and 2/27, a distance of 557 metres. |
| Boreham CP | The junction 19 northbound on-slip link from A138 between points 2/32 and 2/29, a distance of 1,225 metres. |
| Boreham CP | The widened A12 dual carriageway (southbound) between point 2/24 and 2/31, a distance of 568 metres. |
| Boreham CP | The widened A12 dual carriageway (northbound) between point 2/25 and 2/30, a distance of 435 metres. |
| Classification of roads plans – Sheet Nos. 4 to 19 | Classification of roads plans – Sheet Nos. 4 to 19 |
| Hatfield Peverel CP, Witham CP, Rivenhall CP, Kelvedon CP, Great Braxted CP, Messing-cum-Inworth CP, Feering CP, Copford CP, Marks Tey CP | The A12 dual carriageway (northbound) between point 4/1 (sheet 4) and 19/12 (sheet 19), a distance of 20,787 metres. |
| Hatfield Peverel CP, Witham CP, Rivenhall CP, Kelvedon CP, Great Braxted CP, Messing-cum-Inworth CP, Feering CP, Copford CP, Marks Tey CP | The A12 dual carriageway (southbound) between point 4/2 (sheet 4) and 19/13 (sheet 19), a distance of 21,332 metres. |
| Classification of roads plans – Sheet No. 5 (and 6) | Classification of roads plans – Sheet No. 5 (and 6) |
| Hatfield Peverel CP | The junction 21 northbound off-slip road between points 5/6 and 6/2 (sheet 6), a distance of 823 metres. |
| Classification of roads plans – Sheet No. 6 | Classification of roads plans – Sheet No. 6 |
| Hatfield Peverel CP | The junction 21 northbound on-slip road between points 6/5 and 6/16, a distance of 560 metres. |
| Hatfield Peverel CP | The junction 21 southbound off-slip road between points 6/11 and 6/17, a distance of 511 metres. |
| Hatfield Peverel CP | The junction 21 southbound on-slip road between points 6/1 and 6/13, a distance of 617 metres. |
| Classification of roads plans – Sheet No. 9 (and 10) | Classification of roads plans – Sheet No. 9 (and 10) |
| Witham CP | The junction 22 northbound off-slip road between points 9/1 and 10/14 (sheet 10), a distance of 956 metres. |
| Rivenhall CP | The junction 22 southbound on-slip road between points 9/2 and 10/20 (sheet 10), a distance of 706 metres. |
| Classification of roads plans – Sheet No. 10 (and 11) | Classification of roads plans – Sheet No. 10 (and 11) |
| Rivenhall CP | The junction 22 northbound on-slip road between points 10/11 and 11/1 (sheet 11), a distance of 871 metres. |
| Rivenhall CP | The junction 22 southbound off-slip road between points 10/18 and 11/2 (sheet 11), a distance of 696 metres. |
| Classification of roads plans – Sheet No. 13 (and 14) | Classification of roads plans – Sheet No. 13 (and 14) |
| Kelvedon CP, Messing-cum-Inworth CP | The junction 24 northbound off-slip road between points 13/5 and 14/1 (sheet 14), a distance of 701 metres. |
| Kelvedon CP, Messing-cum-Inworth CP | The junction 24 southbound on-slip road between points 13/6 and 14/11 (sheet 14) a distance of 768 metres. |
| Classification of roads plans – Sheet No. 14 | Classification of roads plans – Sheet No. 14 |
| Messing-cum-Inworth CP | The junction 24 northbound on-slip road between points 14/2 and 14/12, a distance of 565 metres. |
| Messing-cum-Inworth CP | The junction 24 southbound off-slip road between points 14/8 and 14/13, a distance of 555 metres. |
| Messing-cum-Inworth CP | The new Inworth link between points 14/9 and 14/14, a distance of 412 metres. |
| Messing-cum-Inworth CP | The junction 24 northern roundabout, with reference 14/3, a distance of 226 metres. |
| Kelvedon CP, Messing-cum-Inworth CP | The junction 24 southern roundabout, with reference 14/10, a distance of 226 metres. |
| Messing-cum-Inworth CP | The new junction 24 overbridge road (westbound) between points 14/4 and 14/6, a distance of 166 metres. |
| Messing-cum-Inworth CP | The new junction 24 overbridge road (eastbound) between points 14/5 and 14/7, a distance of 166 metres. |
| Classification of roads plans – Sheet No. 18 | Classification of roads plans – Sheet No. 18 |
| Marks Tey CP | The junction 25 northbound off-slip road between points 18/2 and 18/10, a distance of 525 metres. |
| Marks Tey CP | The junction 25 southbound on-slip road between points 18/3 and 18/19, a distance of 588 metres. |
| Marks Tey CP | The new London Road between points 18/9 and 18/15, a distance of 404 metres. |
| Marks Tey CP | The realigned A120 Coggeshall Road between points 18/22 and 18/23, a distance of 110 metres. |
| Marks Tey CP | The new London Road roundabout, with reference 18/8, a distance of 156 metres. |
| Marks Tey CP | The realigned Old Rectory Junction, with reference 18/21, a distance of 166 metres. |
| Classification of roads plans – Sheet No. 19 | Classification of roads plans – Sheet No. 19 |
| Marks Tey CP | The realigned A120 Coggeshall Road (northbound) between points 19/15 and 19/5, a distance of 412 metres. |
| Marks Tey CP | The realigned A120 Coggeshall Road (southbound) between points 19/16 and 19/4, a distance of 406 metres. |
| Marks Tey CP | The realigned Prince of Wales roundabout, with reference 19/9, a distance of 190 metres. |
| Marks Tey CP, Copford CP | The junction 25 northbound on-slip road between points 19/3 and 19/11, a distance of 715 metres. |
| Marks Tey CP, Copford CP | The junction 25 southbound off-slip road between points 19/7 and 19/14, a distance of 1,106 metres. |
PART 2 — CLASSIFIED A ROADS
| (1)Area | (2)Length of road |
|---|---|
| Classification of roads plans – Sheet No. 1 (and 2) | Classification of roads plans – Sheet No. 1 (and 2) |
| Boreham CP | The existing Drovers Way roundabout, with reference 1/5, a distance of 207 metres. |
| Boreham CP | The realigned A130 (southbound) road between points 1/6 and 2/9 (sheet 2), a distance of 306 metres. |
| Classification of roads plans – Sheet No. 2 | Classification of roads plans – Sheet No. 2 |
| Boreham CP | The realigned A130 (northbound) road between points 2/36 and 2/10, a distance of 293 metres. |
| Boreham CP | The left turn lane from Boreham bridge to A130 between points 2/14 and 2/13, a distance of 100 metres. |
| Boreham CP | The realigned A138 Road Link (northbound) between points 2/2 and 2/3, a distance of 124 metres. |
| Boreham CP | The realigned A138 Road Link (southbound) between points 2/1 and 2/11, a distance of 124 metres. |
| Boreham CP | The realigned Generals Lane roundabout, with reference 2/12, a distance of 184 metres. |
| Boreham CP | The realigned Beaulieu Park radial distributor road between points 2/5 and 2/26, a distance of 147 metres. |
| Boreham CP | The realigned junction 19 Boreham Road Bridge (westbound) between points 2/8 and 2/15, a distance of 173 metres. |
| Boreham CP | The realigned junction 19 Boreham Road Bridge (eastbound) between points 2/7 and 2/16, a distance of 178 metres. |
| Boreham CP | The realigned Generals Farm roundabout, with reference 2/19, a distance of 184 metres. |
| Boreham CP | The existing Generals Farm Junction Link between points 2/22 and 2/23, a distance of 43 metres. |
PART 3 — CLASSIFIED B ROADS
| (1)Area | (2)Length of road |
|---|---|
| Classification of roads plans – Sheet No. 2 | Classification of roads plans – Sheet No. 2 |
| Boreham CP | The realigned B1137 Main Road between points 2/18 and 2/20, a distance of 235 metres. |
| Classification of roads plans – Sheet No. 4 (and 5) | Classification of roads plans – Sheet No. 4 (and 5) |
| Hatfield Peverel CP | The realigned B1137 Main Road between points 4/3 and 5/1 (sheet 5), a distance of 365 metres. |
| Classification of roads plans – Sheet No. 5 (and 6) | Classification of roads plans – Sheet No. 5 (and 6) |
| Hatfield Peverel CP | The realigned Hatfield Peverel link road between points 5/7 and 6/3 (sheet 6), a distance of 894 metres. |
| Classification of roads plans – Sheet No. 6 | Classification of roads plans – Sheet No. 6 |
| Hatfield Peverel, Witham CP | The realigned Witham Link Road between points 6/4 and 6/15, a distance of 496 metres. |
| Hatfield Peverel CP | The new junction 21 northern roundabout, with reference 6/8, a distance of 218 metres. |
| Hatfield Peverel CP | The new junction 21 southern roundabout, with reference 6/14, a distance of 218 metres. |
| Hatfield Peverel CP | The Hatfield Road overbridge (westbound) between points 6/7 and 6/9, a distance of 90 metres. |
| Hatfield Peverel CP | The Hatfield Road overbridge (eastbound) between points 6/6 and 6/10, a distance of 91 metres. |
| Classification of roads plans – Sheet No. 10 (and 11) | Classification of roads plans – Sheet No. 10 (and 11) |
| Witham CP, Rivenhall CP | The realigned Colchester Road (northbound) between points 10/2 and 10/7, a distance of 612 metres. |
| Witham CP, Rivenhall CP | The realigned Colchester Road (southbound) between points 10/1 and 10/8, a distance of 605 metres. |
| Rivenhall CP | The new junction 22 northern roundabout, with reference 10/15, a distance of 224 metres. |
| Rivenhall CP | The new junction 22 southern roundabout, with reference 10/21, a distance of 219 metres. |
| Rivenhall CP | The Little Braxted Lane overbridge (westbound) between points 10/13 and 10/16, a distance of 104 metres. |
| Rivenhall CP | The Little Braxted Lane overbridge (eastbound) between points 10/12 and 10/17, a distance of 106 metres. |
| Rivenhall CP | Existing A12 (northbound) between points 10/9 and 11/3 (sheet 11), a distance of 692 metres. |
| Rivenhall CP | Existing A12 (southbound) between points 10/10 and 11/8 (sheet 11), a distance of 685 metres. |
| Classification of roads plans – Sheet No. 11 (and 12) | Classification of roads plans – Sheet No. 11 (and 12) |
| Rivenhall CP | The Rivenhall End West roundabout, with reference 11/4, a distance of 138 metres. |
| Rivenhall CP | Existing A12 (northbound) between points 11/5 and 11/18, a distance of 647 metres. |
| Rivenhall CP | Existing A12 (southbound) between points 11/6 and 11/21, a distance of 650 metres. |
| Rivenhall CP | The Rivenhall End East roundabout, with reference 11/19, a distance of 157 metres. |
| Rivenhall CP, Kelvedon CP | The B1024 Road between points 11/20 and 12/5 (sheet 12), a distance of 1,438 metres. |
| Classification of roads plans – Sheet Nos. 14 to 20 | Classification of roads plans – Sheet Nos. 14 to 20 |
| Messing-cum-Inworth CP | The new Inworth roundabout, with reference 14/15, a distance of 117 metres. |
| Messing-cum-Inworth CP | The widened B1023 Kelvedon Road between points 14/19 (sheet 14) and 20/1 (sheet 20), a distance of 1,080 metres. |
| Messing-cum-Inworth CP | The realigned north B1023 Kelvedon Road between points 14/17 and 14/16, a distance of 81 metres. |
| Classification of roads plans – Sheet No. 15 (and 16) | Classification of roads plans – Sheet No. 15 (and 16) |
| Feering CP | The realigned London Road between points 15/5 and 15/6, a distance of 353 metres. |
| Feering CP | The Feering East roundabout, with reference 15/7, a distance of 162 metres. |
| Feering CP | Existing A12 (northbound) between points 15/1 and 16/1 (sheet 16), a distance of 1,784 metres. |
| Feering CP | Existing A12 (southbound) between points 15/2 and 16/6 (sheet 16), a distance of 1,780 metres. |
| Classification of roads plans – Sheet No. 16 (and 17) | Classification of roads plans – Sheet No. 16 (and 17) |
| Feering CP, Copford CP | The Easthorpe Road roundabout, with reference 16/4, a distance of 126 metres. |
| Copford CP, Marks Tey CP | Existing A12 (northbound) between points 16/2 and 17/1 (sheet 17), a distance of 1,444 metres. |
| Copford CP, Marks Tey CP | Existing A12 (southbound) between points 16/3 and 17/2 (sheet 17), a distance of 1,443 metres. |
| Classification of roads plans – Sheet No. 17 (and 18) | Classification of roads plans – Sheet No. 17 (and 18) |
| Copford CP, Marks Tey CP | The Wishingwell Farm roundabout, point 17/3, a distance of 126 metres. |
| Copford CP, Marks Tey CP | Existing A12 (northbound) between points 17/4 and 18/4 (sheet 18), a distance of 1,234 metres. |
| Copford CP, Marks Tey CP | Existing A12 (southbound) between points 17/5 and 18/5 (sheet 18), a distance of 1,229 metres. |
| Classification of roads plans – Sheet No. 18 (and 19) | Classification of roads plans – Sheet No. 18 (and 19) |
| Marks Tey CP | The realigned Hall Chase roundabout, with reference 18/20, a distance of 62 metres. |
| Marks Tey CP | The realigned Hall Chase Link between points 18/18 and 19/8 (sheet 19), a distance of 512 metres. |
PART 4 — CLASSIFIED C ROADS
| (1)Area | (2)Length of road |
|---|---|
| Classification of roads plans – Sheet No. 5 | Classification of roads plans – Sheet No. 5 |
| Hatfield Peverel CP | The realigned Bury Lane between points 5/2 and 5/3, a distance of 87 metres. |
| Hatfield Peverel CP | The realigned Station Road between points 5/4 and 5/5, a distance of 106 metres. |
| Classification of roads plans – Sheet No. 10 | Classification of roads plans – Sheet No. 10 |
| Rivenhall CP | The realigned Little Braxted Lane between points 10/22 and 10/19, a distance of 546 metres. |
| Classification of roads plans – Sheet No. 11 | Classification of roads plans – Sheet No. 11 |
| Rivenhall CP | The realigned Henry Dixon Road between points 11/9 and 11/10, a distance of 252 metres. |
| Rivenhall CP | The realigned Braxted Road between points 11/7 and 11/15, a distance of 519 metres. |
| Classification of roads plans – Sheet No. 13 | Classification of roads plans – Sheet No. 13 |
| Great Braxted CP, Kelvedon CP | The realigned Braxted Road and realigned Highfields Lane between points 13/1 and 13/2, a distance of 597 metres. |
| Great Braxted CP, Kelvedon CP | The realigned Maldon Road between points 13/3 and 13/4, a distance of 318 metres. |
| Classification of roads plans – Sheet No. 14 | Classification of roads plans – Sheet No. 14 |
| Messing-cum-Inworth CP | The realigned Kelvedon Road between points 14/18 and 14/20, a distance of 89 metres. |
| Classification of roads plans – Sheet No. 19 | Classification of roads plans – Sheet No. 19 |
| Marks Tey CP | The realigned Station Road between points 19/1 and 19/2, a distance of 56 metres. |
PART 5 — UNCLASSIFIED ROADS
| (1)Area | (2)Length of road |
|---|---|
| Classification of roads plans – Sheet No. 6 | Classification of roads plans – Sheet No. 6 |
| Hatfield Peverel CP | The cul-de-sac extension of B1137 between points 6/19 and 6/20, a distance of 137 metres. |
| Hatfield Peverel CP, Witham CP | The realigned kennel access between points 6/12 and 6/18, a distance of 597 metres. |
| Classification of roads plans – Sheet No. 7 | Classification of roads plans – Sheet No. 7 |
| Witham CP | The realigned Howbridge Hall Road between points 7/1 and 7/2, a distance of 26 metres. |
| Witham CP | The realigned Howbridge Hall Road link between points 7/3 and 7/4, a distance of 13 metres. |
| Classification of roads plans – Sheet No. 10 | Classification of roads plans – Sheet No. 10 |
| Witham CP | The realigned Coleman’s Bridge Trade Park access road between points 10/5 and 10/6, a distance of 23 metres. |
| Witham CP | The realigned Eastways junction between points 10/3 and 10/4, a distance of 35 metres. |
| Classification of roads plans – Sheet No. 11 | Classification of roads plans – Sheet No. 11 |
| Rivenhall CP | The realigned Oak Road between points 11/11 and 11/12, a distance of 24 metres. |
| Rivenhall CP | The realigned access road between points 11/16 and 11/17, a distance of 267 metres. |
| Rivenhall CP | The realigned Rivenhall access between points 11/13 and 11/14, a distance of 155 metres. |
| Classification of roads plans – Sheet No. 12 | Classification of roads plans – Sheet No. 12 |
| Kelvedon CP | The realigned Sniveller’s Lane between points 12/6 and 12/7, a distance of 50 metres. |
| Kelvedon CP | The realigned Essex Fire & Rescue access road between points 12/1 and 12/2, a distance of 704 metres. |
| Kelvedon CP | The realigned Essex Fire & Rescue access road between points 12/3 and 12/4, a distance of 50 metres. |
| Classification of roads plans – Sheet No. 15 | Classification of roads plans – Sheet No. 15 |
| Feering CP | The realigned Prested Hall access road between points 15/3 and 15/4, a distance of 771 metres. |
| Feering CP | The realigned New Lane between points 15/8 and 15/9, a distance of 28 metres. |
| Classification of roads plans – Sheet No. 16 | Classification of roads plans – Sheet No. 16 |
| Feering CP, Copford CP | The realigned Easthorpe Road between points 16/5 and 16/7, a distance of 537 metres. |
| Classification of roads plans – Sheet No. 17 (and 18) | Classification of roads plans – Sheet No. 17 (and 18) |
| Marks Tey CP, Copford CP | The realigned Easthorpe Green access road between points 17/7 and 18/1 (sheet 18), a distance of 800 metres. |
| Marks Tey CP, Copford CP | The new Wishingwell Bridge Road between points 17/6 and 17/8, a distance of 256 metres. |
| Classification of roads plans – Sheet No. 18 | Classification of roads plans – Sheet No. 18 |
| Marks Tey CP | The realigned Old London Road between points 18/11 and 18/14, a distance of 1139 metres. |
| Marks Tey CP | The realigned Old London Road access between points 18/6 and 18/7, a distance of 26 metres. |
| Marks Tey CP | The cul-de-sac extension of Old London Road between points 18/16 and 18/17, a distance of 12 metres. |
PART 6 — SPEED LIMITS
Note: where speed limits are indicated on the plans relating to this Part (the traffic regulation measures speed limits plan) but are not referenced in this Schedule, they indicate that national speed limits apply in accordance with either—
- (a) the national speed limit set out in—
- (i) section 86 (speed limits for particular classes of vehicles)106 of and Schedule 6 (speed limits for particular classes of vehicles)107 to the 1984 Act; and
- (ii) the 70 miles per hour, 60 miles per hour and 50 miles per hour (Temporary Speed Limit) Order 1977 as varied by the 70 miles per hour, 60 miles per hour and 50 miles per hour (Temporary Speed Limit) (Variation) Order 1978 and continued indefinitely by Regulation 2 of the 70 Miles Per Hour, 60 Miles Per Hour and 50 Miles Per Hour (Temporary Speed Limit) (Continuation) Order 1978108; or
- (b) sections 81 (general speed limits for restricted roads) and 82109 (what roads are restricted roads) of the 1984 Act (which make provision about speed limits on ‘restricted roads’ by reference to street lighting),
and are not subject to this Order. For details of the scheme lighting design, refer to the general arrangement plans.
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.