The Gatwick Airport (Northern Runway Project) Development Consent Order 2025
- (4) Any agreement or consent granted by SGN under paragraph 69 (retained apparatus: protection of SGN) or any other paragraph of this Part of this Schedule shall not be taken to constitute agreement under sub-paragraph (1).
- (5) As a condition of any agreement between the parties in sub-paragraph (1) that involves de-commissioned apparatus being left in situ in any land of the undertaker, the undertaker must accept a surrender of any existing easement and/or other interest of SGN in such decommissioned apparatus and consequently acquire title to such decommissioned apparatus and release SGN from all liabilities in respect of such de-commissioned apparatus from the date of such surrender.
- (6) Where the undertaker acquires land which is subject to any SGN right or interest (including, without limitation, easements and agreements relating to rights or other interests) and the provisions of paragraph 67 (removal of apparatus) do not apply, the undertaker must (where the undertaker reasonably considers it compatible with the carrying out of the authorised works)—
- (a) retain any notice of SGN’s easement, right or other interest on the title to the relevant land when registering the undertaker’s title to such acquired land; and
- (b) where no such notice of SGN’s easement, right or other interest exists in relation to such acquired land or any such notice is registered only on the Land Charges Register) include (with its application to register title to the undertaker’s interest in such acquired land at the Land Registry) a notice of SGN’s easement, right or other interest in relation to such acquired land; and
- (c) upon request from SGN, provide up to date official entry copies to SGN as soon as reasonably practicable.
- (7) If the undertaker acquires land which is subject to any SGN right or interest and the undertaker reasonably considers that it cannot retain SGN’s easement, right or other interest, the undertaker must provide replacement rights to SGN.
Removal of apparatus
67
- (1) If, in the exercise of an agreement reached in accordance with paragraph 66 (acquisition of land) or in any other authorised manner, the undertaker acquires any interest in any land in which any apparatus is placed, that apparatus must not be decommissioned or removed under this Part of this Schedule, and any right of SGN to maintain that apparatus in that land must not be extinguished, until alternative apparatus has been constructed, is in operation, and the rights and facilities referred to in sub-paragraph (2) have been provided, to the reasonable satisfaction of SGN and in accordance with sub-paragraphs (2) to (5) inclusive.
- (2) If, for the purpose of executing any works in, on, under or over any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it must give to SGN advance written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order SGN reasonably needs to move or remove any of its apparatus) the undertaker must afford to SGN to its reasonable satisfaction (taking into account paragraph 68(1) (facilities and rights for alternative apparatus)) the necessary facilities and rights—
- (a) for the construction of alternative apparatus;
- (b) subsequently for the maintenance of that apparatus; and
- (c) to allow access to that apparatus,
in each case including appropriate working areas required to reasonably and safely undertake necessary works by SGN in respect of the apparatus.
- (3) If the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2) in the land in which the alternative apparatus or part of such apparatus is to be constructed, SGN must, on receipt of a written notice to that effect from the undertaker, take such steps as are reasonable in the circumstances in an endeavour to assist the undertaker in obtaining the necessary facilities and rights in the land in which the alternative apparatus is to be constructed, save that this obligation is not to extend to the requirement for SGN to use its compulsory purchase powers to this end unless it (in its absolute discretion) elects to do so.
- (4) Any alternative apparatus to be constructed in land of, or land secured by, the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between SGN and the undertaker.
- (5) SGN must, after the alternative apparatus to be provided or constructed has been agreed, and subject to the prior grant to SGN of such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to decommission or remove any apparatus required by the undertaker to be decommissioned or removed under the provisions of this Part of this Schedule.
Facilities and rights for alternative apparatus
68
- (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to or secures for SGN facilities and rights in land for the access to, and construction and maintenance of, alternative apparatus in substitution for apparatus to be decommissioned or removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and SGN (both acting reasonably), and must be no less favourable on the whole to SGN than the facilities and rights enjoyed by it in respect of the apparatus to be decommissioned or removed unless otherwise agreed by SGN.
- (2) If the facilities and rights to be afforded by the undertaker and agreed with SGN under sub paragraph (1) in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are less favourable on the whole to SGN than the facilities and rights enjoyed by SGN in respect of the apparatus to be decommissioned or removed (in SGN’s reasonable opinion), then the terms and conditions to which those facilities and rights are subject in the matter will be referred to arbitration in accordance with paragraph 74 (arbitration) of this Part of this Schedule and the arbitrator shall make such provision for the payment of compensation by the undertaker to SGN as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.
Retained apparatus: protection of SGN
69
- (1) Not less than 56 days before the carrying out of any specified works the undertaker must submit to SGN a plan and, if reasonably required by SGN, a ground monitoring scheme in respect of those works.
- (2) The plan to be submitted to SGN under sub-paragraph (1) must include a method statement and describe—
- (a) the exact position of the works;
- (b) the level at which these are proposed to be constructed or renewed;
- (c) the manner of their construction or renewal including details of excavation, positioning of plant etc.;
- (d) the position of all apparatus;
- (e) by way of detailed drawings, every alteration proposed to be made to or close to any such apparatus; and
- (f) any intended maintenance regimes.
- (3) The undertaker must not carry out any works to which sub-paragraphs (1) and (2) apply until SGN has given written approval of the plan so submitted.
- (4) Any approval of SGN required under sub-paragraph (3)—
- (a) may be given subject to reasonable conditions for any purpose mentioned in sub-paragraphs (5) or (7); and
- (b) must not be unreasonably withheld; and
- (c) if by the end of the period of 56 days from the submission of the plans pursuant to paragraphs (1) and (2) SGN has not intimated their disapproval of those plans and the grounds of such disapproval the undertaker may serve upon SGN written notice requiring SGN to intimate approval or disapproval within a further period of 28 days beginning with the date upon which SGN receives written notice from the undertaker and if by the expiry of the further 28 days SGN has not intimated approval or disapproval, SGN shall be deemed to have approved the plans as submitted.
- (5) In relation to any work to which sub-paragraphs (1) and (2) apply, SGN may require such modifications to be made to the plans as may be reasonably necessary for the purpose of securing apparatus against interference or risk of damage or for the purpose of providing or securing proper and convenient means of access to any apparatus.
- (6) Works to which this paragraph applies must only be executed in accordance with—
- (a) the plan submitted under sub-paragraphs (1) and (2) (or as modified pursuant to sub-paragraphs (4) and (5)); and
- (b) all conditions imposed under sub-paragraph (4)(a),
as approved or as amended from time to time by agreement between the undertaker and SGN, and SGN will be entitled to watch and inspect the execution of those works.
- (7) Where SGN requires any protective works to be carried out by itself or by the undertaker (whether of a temporary or permanent nature) such protective works, inclusive of any measures or schemes required and approved as part of the plan approved pursuant to this paragraph, must be carried out to SGN’s reasonable satisfaction prior to the carrying out of any specified works (or any relevant part thereof) for which protective works are required and SGN must notify the undertaker of any such requirements within 45 days of submission of a plan pursuant to sub-paragraphs (1) and (2).
- (8) If SGN, in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 61 to 63 and 66 to 68 apply as if the removal of the apparatus had been required by the undertaker under sub-paragraph 67(2) (removal of apparatus).
- (9) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 56 days before carrying out the specified works, a new plan, instead of the plan previously submitted, and having done so the provisions of this paragraph will apply to and in respect of the new plan.
- (10) The undertaker will not be required to comply with sub-paragraph (1) where it needs to carry out emergency works, but in that case it must give to SGN notice as soon as is reasonably practicable and a plan of those works and must comply with—
- (a) the conditions imposed under sub-paragraph (4)(a) insofar as is reasonably practicable in the circumstances; and
- (b) sub-paragraph (11) at all times.
- (11) As soon as reasonably practicable after any ground subsidence event attributable to the authorised development which SGN reasonably considers is likely to have adversely affected apparatus, the undertaker is to implement an appropriate ground mitigation scheme save that SGN retains the right to carry out any further necessary protective works for the safeguarding of its apparatus and can recover any such costs in line with paragraph 70 (expenses).
Expenses
70
- (1) Subject to the following provisions of this paragraph, the undertaker must pay to SGN on demand all charges, costs and expenses reasonably anticipated or incurred by SGN (on provision of evidence by SGN to justify their claim and which in all cases must be reasonable in amount) in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of any apparatus or rights or the construction of any new or alternative apparatus which may be required in consequence of the execution of any authorised works as are referred to in this Part of this Schedule including without limitation—
- (a) any costs reasonably incurred by or compensation properly paid by SGN in connection with the negotiation or acquisition of rights or the exercise of statutory powers for such apparatus including without limitation all reasonable and properly incurred costs (including professional fees) incurred by SGN as a consequence of SGN—
- (i) using its own compulsory purchase powers to acquire any necessary rights under paragraph 67(3) (removal of apparatus) if it elects to do so; and/or
- (ii) exercising any compulsory purchase powers in the Order transferred to or benefitting SGN;
- (b) in connection with the cost of the carrying out of any diversion work or the provision of any alternative apparatus;
- (c) the cutting off of any apparatus from any other apparatus or the making safe of redundant apparatus;
- (d) the approval of plans;
- (e) the carrying out of protective works, plus a capitalised sum to cover the cost of maintaining and renewing permanent protective works (provided that the quantum of this sum must be agreed between the undertaker and SGN prior to the protective works being carried out (save in the case of emergency works));
- (f) the survey of any land, apparatus or works, the inspection and monitoring of works or the installation or removal of any temporary works reasonably necessary in consequence of the execution of any such works referred to in this Part of this Schedule; and
- (g) any watching brief pursuant to paragraph 69(6) (retained apparatus: protection of SGN).
- (2) There will be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule which is not re-used as part of the alternative apparatus, that value being calculated after removal.
- (3) If in accordance with the provisions of this Part of this Schedule—
- (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
- (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,
and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 52 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to SGN by virtue of sub-paragraph (1) will be reduced by the amount of that excess save where it is not possible in the circumstances (including due to statutory or regulatory changes) to obtain the existing type of apparatus at the same capacity and dimensions or place at the existing depth in which case full costs will be borne by the undertaker.
- (4) For the purposes of sub-paragraph (3)—
- (a) an extension of apparatus to a length greater than the length of existing apparatus will not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
- (b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole will be treated as if it also had been agreed or had been so determined.
- (5) An amount which apart from this sub-paragraph would be payable to SGN in respect of works by virtue of sub-paragraph (1), if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on SGN any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, is to be reduced by the amount which represents that benefit.
Enactments and agreements
71
Save to the extent provided for to the contrary elsewhere in this Part of this Schedule or by agreement in writing between SGN and the undertaker, nothing in this Part of this Schedule shall affect the provisions of any enactment or agreement regulating the relations between the undertaker and SGN in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.
Co-operation
72
- (1) Where in consequence of the proposed construction of any of the authorised works, the undertaker or SGN requires the removal of apparatus under paragraph 67(2) (removal of apparatus) or SGN makes requirements for the protection or alteration of apparatus under paragraph 69 (retained apparatus: protection of SGN), the undertaker must use its best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of SGN’s undertaking and SGN must co-operate with the undertaker for that purpose.
- (2) For the avoidance of doubt, whenever SGN’s consent, agreement or approval is required in relation to plans, documents or other information submitted by SGN or the taking of action by SGN, it must not be unreasonably withheld or delayed.
Access
73
If in consequence of the agreement reached in accordance with paragraph 66(1) (acquisition of land) or the powers granted under this Order the access to any apparatus (including appropriate working areas required to reasonably and safely undertake necessary works by SGN in respect of the apparatus) is materially obstructed, the undertaker must provide such alternative rights and means of access to such apparatus as will enable SGN to maintain or use the apparatus no less effectively than was possible before such obstruction.
Arbitration
74
- (1) Any difference or dispute arising between the undertaker and SGN under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and SGN, be determined by arbitration in accordance with article 52 (arbitration).
- (2) In determining any difference or dispute to which sub-paragraph (1) applies, the arbitrator must give full weight to the position expressed by SGN in relation to a dispute or difference as to the safe and efficient operation of its network.
Notices
75
The plans submitted to SGN by the undertaker pursuant to paragraph 69(1) (retained apparatus: protection of SGN) must be sent to SGN at 1 Forbury Place, 43 Forbury Road, Reading, Berkshire RG1 3JH or such other address as SGN may from time to time appoint instead for that purpose and notify to the undertaker.
PART 6 — FOR THE PROTECTION OF THAMES WATER UTILITIES LIMITED
Application
76
For the protection of Thames Water Utilities Limited (hereinafter referred to as “TWUL”) (Company Registration No. 02366661) whose registered office address is at Clearwater Court, Vastern Road, Reading, Berkshire, RG1 8DB the following provisions have effect, unless otherwise agreed in writing between the undertaker and TWUL.
Interpretation
77
In this Part of this Schedule—
- “alternative apparatus” means alternative apparatus adequate to enable TWUL to fulfil its statutory functions in a manner no less efficient and effective than previously;
- “apparatus” means— any sewer, drain or disposal works vested in TWUL under the Water Industry Act 1991132; and any sewer, drain or disposal works which are the subject of a notice of intention to adopt given under section 102(4)133 (adoption of sewers and disposal of works) of that Act or an agreement to adopt made under section 104134 (agreements to adopt sewer, drain or sewage disposal works, at a future date) of that Act, and includes a sludge main, disposal main (within the meaning of section 219 (general interpretation) of that Act) or sewer outfall and any manholes, ventilating shafts, pumps, inspection chambers or other accessories (as defined in section 219(1) (general interpretation) of that Act) forming part of any such sewer, drain or works, and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;
- “functions” includes powers and duties;
- “in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land; and
- “plan” includes all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe the works to be executed.
On street apparatus
78
This Part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and TWUL are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act.
Apparatus in stopped up streets and public rights of way
79
- (1) Where any street is stopped up under article 13 (stopping up of streets) or any public right of way is stopped up under article 15 (public rights of way – creation, diversion and stopping up), TWUL has the same powers and rights in respect of any apparatus in the land in which the street or public right of way subsists as it enjoyed immediately before the stopping up and the undertaker must grant to TWUL legal easements reasonably satisfactory to TWUL in respect of such apparatus and access to it, but nothing in this paragraph affects any right of the undertaker or of TWUL to require the removal of that apparatus under paragraph 82 (removal of apparatus) or the power of the undertaker to carry out works under paragraph 84 (retained apparatus).
- (2) Regardless of the temporary alteration, diversion or restriction of any street under the powers conferred by article 14 (temporary stopping up of streets), TWUL is at liberty at all times to take all necessary access across any such stopped up street and to execute and do all such works and things in, upon or under any such street as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the stopping up or diversion was in that street.
Protective works to buildings
80
The undertaker, in the case of the powers conferred by article 23 (protective work to buildings), must exercise those powers so as not to obstruct or render less convenient the access to any apparatus.
Acquisition of land or interests
81
Regardless of any provision in this Order or anything shown on the land plans, the undertaker must not:
- (a) acquire any apparatus of TWUL otherwise than by agreement;
- (b) appropriate, acquire, extinguish, interfere with or override any interest in land, easement or other interest or right of TWUL so as to prevent access to the Crawley Sewage Treatment Works otherwise than by agreement; or
- (c) appropriate, acquire, extinguish, interfere with or override any interest in land, easement, other interest or right of TWUL that would:
- (i) prevent access to any TWUL apparatus (that is not to be removed pursuant to paragraph 82 (removal of apparatus)); or
- (ii) impair TWUL’s ability to carry out its statutory function in connection with any of that apparatus,
without having first provided such alternative means of access to that apparatus or alternative rights in connection with that apparatus as will enable TWUL to maintain or use the apparatus or carry out its statutory functions in connection with the apparatus no less effectively than was possible before the undertaker’s exercise of powers.
Removal of apparatus
82
- (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or requires that TWUL’s apparatus is relocated or diverted, that apparatus must not be removed under this Part of this Schedule, and any right of TWUL to maintain that apparatus in that land must not be extinguished, until alternative apparatus has been constructed and is in operation to the reasonable satisfaction of TWUL in accordance with sub-paragraphs (2) to (6).
- (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, the undertaker must give to TWUL 56 days’ written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed for approval by TWUL in accordance with sub-paragraph (4) and in that case (or if in consequence of the exercise of any of the powers conferred by this Order TWUL reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to TWUL the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus.
- (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2) in the land in which the alternative apparatus or part of such apparatus is to be constructed TWUL must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably possible use its best endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed save that this obligation shall not extend to the requirement for TWUL to use its compulsory purchase powers to this end unless it elects (in its absolute discretion) to so do.
- (4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between TWUL and the undertaker or in default of agreement settled by arbitration in accordance with article 52 (arbitration).
- (5) TWUL must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 52 (arbitration), and after the grant to TWUL of any such facilities and rights as are referred to in sub-paragraphs (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.
- (6) Regardless of anything in sub-paragraph (5), and subject to sub-paragraph (7), if the undertaker gives notice in writing to TWUL that the undertaker desires itself to execute any work, or part of any work in connection with the construction or removal of apparatus in any land of the undertaker, and TWUL gives its consent in writing (which is not to be unreasonably withheld or delayed and is to be subject to the provisions of sub-paragraph (7)), that work, instead of being executed by TWUL, may be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of TWUL.
- (7) If by the end of the period of 56 days from the submission of the details relating to required removal works under sub-paragraphs (2) and (4) or the carrying out of works pursuant to sub-paragraph (6) TWUL has not intimated their disapproval of those details and the grounds of such disapproval, the undertaker may give TWUL written notice requiring TWUL to intimate approval or disapproval within a further period of 28 days beginning with the date upon which TWUL receives written notice from the undertaker and if by the expiry of the further 28 days TWUL has not intimated approval or disapproval, TWUL is deemed to have approved the details as submitted provided that such notification has been made in accordance with paragraph 94 (notices and applications).
- (8) Any deemed approval under sub-paragraph (7) does not extend to the actual undertaking of the removal works, which remains the sole responsibility of TWUL or its contractors.
Facilities and rights for alternative apparatus
83
- (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to TWUL facilities and rights for the construction and maintenance of alternative apparatus in substitution for apparatus to be removed, those facilities and rights are to be granted upon such terms and conditions as may be agreed between the undertaker and TWUL or in default of agreement settled by arbitration in accordance with article 52 (arbitration).
- (2) In settling those terms and conditions in respect of alternative apparatus to be constructed in the land of the undertaker, the arbitrator will—
- (a) give effect to all reasonable requirements of the undertaker for ensuring the safety and efficient operation of the authorised development and for securing any subsequent alterations or adaptions of the alternative apparatus which may be required to prevent interference with the proposed works of the undertaker;
- (b) so far as it may be reasonable and practicable to do so in the circumstances of the particular case, give effect to the terms and conditions, if any, applicable to the apparatus constructed in or on the land for which the alternative apparatus is to be substituted; and
- (c) give effect to the statutory obligations of TWUL and the undertaker.
- (3) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to TWUL than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to TWUL as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.
Retained apparatus
84
- (1) Not less than 56 days before starting the execution of any works in, on or under any land purchased, held, appropriated or used under this Order that are within 5 metres of the outside face of any apparatus the removal of which has not been required by the undertaker under paragraph 82(2) (removal of apparatus), the undertaker must submit to TWUL a plan of the works to be executed.
- (2) The undertaker must not commence any works to which sub-paragraph (1) applies until TWUL has given written approval of the plan so submitted and such approval may be given subject to reasonable requirements for the purposes mentioned in sub-paragraph (3).
- (3) Those works must be executed only in accordance with the plan submitted under sub-paragraph (1) and in accordance with such reasonable requirements or modifications as may be made in accordance with sub-paragraph (4) by TWUL for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and TWUL is entitled to watch and inspect the execution of those works.
- (4) Any requirements made by TWUL as a condition of the approval under sub-paragraph (2) must be notified to the undertaker within a period of 35 days beginning with the date on which a plan under sub-paragraph (1) is submitted to it.
- (5) If by the end of the period of 35 days from the submission of the details relating to required works under sub-paragraph (1) TWUL has not intimated their disapproval of those details and the grounds of such disapproval, the undertaker may give TWUL written notice requiring TWUL to intimate approval or disapproval within a further period of 21 days beginning with the date upon which TWUL receives written notice from the undertaker and if by the expiry of the further 21 days TWUL has not intimated approval or disapproval, TWUL is deemed to have approved the details as submitted provided that such notification has been made in accordance with paragraph 94 (notices and applications).
- (6) If TWUL in accordance with sub-paragraph (3) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 77 to 79 and 82 to 84 apply as if the removal of the apparatus had been required by the undertaker under paragraph 82(2) (removal of apparatus).
- (7) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 56 days before commencing the execution of any works (unless otherwise agreed with TWUL), a new plan instead of the plan previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan.
- (8) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency works but in that case must:
- (a) give TWUL notice in accordance with paragraph 94 (notices and applications) as soon as is reasonably practicable;
- (b) provide TWUL with a plan of those works as soon as reasonably practicable subsequently;
- (c) carry out the works in accordance with industry best practice and guidelines on safe working near utilities;
- (d) comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances; and
- (e) keep the impact of those emergency works on TWUL’s apparatus to a minimum.
- (9) In this Part of this Schedule “emergency works” means works whose execution at the time when they are executed is required in order to put an end to, or to prevent the occurrence of, circumstances then existing or imminent which are likely to cause danger to persons or serious damage to property. Where works comprise items some of which fall within this definition, the expression “emergency works” shall be taken to include such of the items as do not fall within that definition as cannot reasonably be severed from those that do.
Expenses and costs
85
- (1) Subject to the following provisions of this paragraph, the undertaker must repay to TWUL all expenses reasonably incurred and any compensation properly paid by TWUL in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in paragraphs 82(2) (removal of apparatus) or 84(2) or 84(3) (retained apparatus).
- (2) There must be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule that value being calculated after removal.
- (3) If in accordance with the provisions of this Part of this Schedule—
- (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
- (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,
and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 52 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to TWUL by virtue of sub-paragraph (1) must be reduced by the amount of that excess.
- (4) For the purposes of sub-paragraph (3)—
- (a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
- (b) where the provision of a joint in a pipe is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.
- (5) An amount which apart from this sub-paragraph would be payable to TWUL in respect of works by virtue of sub-paragraph (1), if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on TWUL any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, is to be reduced by the amount which represents that benefit.
Indemnity
86
- (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction, maintenance or failure of any of the works referred to in paragraph 84(2) (retained property), any damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works), or there is any interruption in the service provided by such apparatus or alternative apparatus, the undertaker must—
- (a) bear and pay the cost reasonably and properly incurred by TWUL in making good such damage or restoring the service; and
- (b) indemnify TWUL against all reasonable claims, penalties, demands, proceedings, costs, damages and expenses which are made or taken against or recovered from, or reasonably and properly incurred by, TWUL, by reason or in direct consequence of any such damage or interruption.
- (2) The fact that any act or thing may have been done by TWUL on behalf of the undertaker or in accordance with a plan approved by TWUL or in accordance with any requirement of TWUL or under its supervision does not, subject to sub-paragraph (3), excuse the undertaker from liability under the provisions of sub-paragraph (1) unless TWUL fails to carry out and execute the works properly with due care and attention and in a skilful and professional like manner or in a manner that does not accord with the approved plan.
- (3) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of TWUL, its officers, servants, contractors or agents.
- (4) TWUL must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of the undertaker who, if withholding such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
- (5) The undertaker must not commence any works of removal or diversion of TWUL’s apparatus carried out in accordance with paragraph 82 (removal of apparatus) or any works under paragraph 84 (retained property) unless and until TWUL is satisfied that the undertaker has first provided the bond and TWUL has confirmed the same to the undertaker in writing.
- (6) The undertaker must maintain such bond for the construction period of such works from the proposed date of commencement of construction of those works.
- (7) The total amount payable by the undertaker pursuant to this paragraph and paragraph 87 of this Part of this Schedule shall not exceed £20 million per event (and such cap will rise in line with the Consumer Prices Index rate of inflation).
Co-operation
87
Where in consequence of the proposed construction of any of the authorised development, the undertaker or TWUL requires the removal of apparatus under paragraph 82(2) (removal of apparatus) or TWUL makes requirements for the protection or alteration of apparatus under paragraph 84 (retained property), the undertaker must use best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of TWUL’s undertaking and TWUL must use its best endeavours to co-operate with the undertaker for that purpose.
88
Where, under this Part of this Schedule, TWUL is required to give its consent, approval or agreement in respect of any matter, that consent, approval or agreement must not be unreasonably withheld or delayed.
89
Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and TWUL in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.
90
At all times the undertaker shall procure that its employees, contractors and subcontractors take all reasonable and proper precautions in exercise of powers conferred by this Order to ensure that as little damage, obstruction or interference is caused is caused to TWUL’s undertaking as is reasonably practicable save that this obligation is not to prevent the construction or operation of the authorised development.
Use of statutory powers
91
In the event that TWUL carries out any works involving apparatus under its own statutory powers at the express written request of the undertaker then this Part of this Schedule is to apply to such works and TWUL covenants to observe and comply with this Part of this Schedule irrespective of whether it is carrying out the works under its own statutory powers or in reliance on the powers conferred by the Order.
Ground works and surveys
92
The undertaker must provide written notice to TWUL as soon as reasonably practicable in the event they determine to alter the ground level more than 300mm within 5 metres laterally of the outside face of any apparatus. Subsequently TWUL will determine if works under paragraphs 82(2) (removal of apparatus) or 84(2) (retained apparatus) are necessary.
93
The undertaker must provide written notice to TWUL as soon as reasonably practicable if they intend to survey using ground intrusive methods within 5 metres laterally of the outside face of any apparatus. Subsequently TWUL will determine if works under paragraphs 82(2) or 84(2) are necessary.
Notices and applications
94
Notwithstanding any other provision of this Order, any—
- (a) written notice to TWUL provided for in this Order; or
- (b) application for the approval of TWUL made pursuant to article 22(3) (discharge of water),
must be made by email to devcon.team@thameswater or developer.services@thameswater.co.uk or such other contact details as may be provided by TWUL to the undertaker from time to time. In the case of emergencies, notice must also be given via the Thames Water website or such other contact details as may be provided by TWUL to the undertaker from time to time.
PART 7 — FOR THE PROTECTION OF ESSO PETROLEUM COMPANY, LIMITED
Application
95
The provisions of this Part of this Schedule have effect for the protection of Esso unless otherwise agreed in writing between the undertaker and Esso.
Interpretation
96
In this Part of this Schedule—
- “alternative apparatus” means alternative apparatus adequate to enable Esso to fulfil its functions as a pipe-line operator in a manner no less efficient than previously and having regard to Esso’s standards for the construction and operation of its pipelines;
- “alternative rights” means new rights for the construction of and for access to and for the use, protection, inspection, maintenance, repair and renewal of apparatus or alternative apparatus including any restrictions on the landowner and occupiers for the protection of the apparatus or alternative apparatus and to allow Esso to perform its functions in a manner no less efficient than under the existing rights and having regard to Esso’s standards for the construction and operation of its pipelines;
- “apparatus” means the pipeline and storage system owned by Esso within or adjacent to the Order limits and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus and includes any ancillary works and apparatus all protective wrappings, valves, sleeves and slabs, cathodic protection units, together with ancillary cables and markers and, where the context allows, includes alternative apparatus;
- “Esso” means Esso Petroleum Company, Limited and any successor in title;
- “existing rights” means the rights and benefits of covenants enjoyed by Esso in land within the Order limits;
- “functions” includes powers and duties;
- “in” in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land;
- “plan” includes all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary to describe the works to be executed;
- “specified work” means any works that are near to, or will or are likely to affect any apparatus or power supply to any apparatus including— all intrusive or non-intrusive works within 15metres of any apparatus, the crossing of apparatus by other utilities, the use of explosives within 400metres of any apparatus (to an extent likely to affect any apparatus), and piling, undertaking of a 3Dseismic survey or the sinking of boreholes within 30metres of any apparatus; whether carried out by the undertaker or by any third party at the direction of the undertaker in connection with the authorised development; and
- “works agreement” means an agreement containing sufficient detail as to responsibilities for the design, programming, supervision and carrying out of works under this Part of this Schedule or in connection with the authorised development which affect the apparatus.
Acquisition of apparatus
97
- (1) Despite any provision in this Order or anything shown on the land plans or if the Order covers any interest in any land in which any apparatus is placed or over which existing rights are enjoyed by Esso, the undertaker must not—
- (a) acquire any apparatus otherwise than by agreement with Esso; or
- (b) acquire, suspend or extinguish any of the existing rights so as to hinder Esso’s ability to access, maintain or repair its apparatus, otherwise than in accordance with this Part of this Schedule, by agreement with Esso or having first provided alternative rights.
- (2) Where the undertaker acquires land which is subject to any existing rights and the provisions of paragraph 98 (removal of apparatus and rights for alternative apparatus) do not apply, the undertaker must retain any notice of the existing rights on the title to the relevant land when registering the undertaker’s title to such acquired land, provided that this does not hinder the delivery of the authorised development.
Removal of apparatus and rights for alternative apparatus
98
- (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or requires that any apparatus is relocated or diverted, that apparatus must not be removed by the undertaker and any right of Esso to maintain and use that apparatus in that land and to gain access to it must not be extinguished until alternative apparatus has been constructed and is in operation, and access to it has been provided, to the reasonable satisfaction of Esso.
- (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it must give Esso 56 days’ written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order Esso reasonably needs to remove any apparatus) the undertaker must, subject to sub-paragraph (3), afford to Esso the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently grant alternative rights for the maintenance of that apparatus in accordance with paragraph 99 (facilities and rights for alternative apparatus).
- (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2) in the land in which the alternative apparatus or part of such apparatus is to be constructed, the undertaker must, to the extent reasonable, acquire for the benefit of Esso the necessary facilities and rights for the construction, maintenance and use of the alternative apparatus and access to it.
- (4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between Esso and the undertaker or in default of agreement settled by arbitration in accordance with article 52 (arbitration).
- (5) Esso must, after the alternative apparatus to be provided or constructed has been agreed or settled in accordance with article 52 (arbitration), and after the grant to Esso of any such facilities and rights as are referred to in sub-paragraph (2), proceed as soon as reasonably practicable using reasonable endeavours to construct and bring into operation the alternative apparatus and subsequently to remove (or if agreed between the parties allow the undertaker to remove) any redundant apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.
- (6) Irrespective of sub-paragraph (5), if the undertaker gives notice in writing to Esso that it desires itself to execute any work, or part of any work in connection with the construction, removal or decommissioning of apparatus in the land of the undertaker or the construction of alternative apparatus, that work, instead of being executed by Esso, must be executed by the undertaker without unnecessary delay under the superintendence, if required, and to the reasonable satisfaction of Esso.
- (7) Nothing in sub-paragraph (6) authorises the undertaker to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 3000 millimetres of the apparatus without Esso’s consent unless that apparatus is redundant and disconnected from Esso’s remaining system and is more than 3000 millimetres from any live apparatus.
- (8) If Esso fails either reasonably to approve, or to provide reasons for its failure to approve along with an indication of what would be required to make acceptable, any proposed details relating to required removal works under sub-paragraph (2) within 28 days of receiving notice of the required works from the undertaker, then such details are deemed to have been approved, provided the undertaker has first taken all reasonable steps to contact the relevant representatives of Esso in order to elicit such a response.
Facilities and rights for alternative apparatus
99
- (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to Esso facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights are to be granted upon such terms and conditions as may be agreed between the undertaker and Esso in accordance with this paragraph or in default of agreement settled by arbitration in accordance with article 52 (arbitration).
- (2) Alternative rights must be granted before any alternative apparatus is brought into use or any existing rights extinguished.
- (3) Alternative rights shall where reasonably practicable be granted to Esso by way of a deed of grant of easement, substantially in the form of Esso’s precedent from time to time. If any third party is required to be involved for the grant of alternative rights, the undertaker must secure their agreement, at its own cost.
- (4) In settling those terms and conditions for the alternative rights in respect of alternative apparatus the arbitrator—
- (a) must give effect to all reasonable requirements of the undertaker and Esso for ensuring the safety and efficient operation of the authorised development and the apparatus respectively; and
- (b) so far as it may be reasonable and practicable to do so in the circumstances of the particular case, give effect to the terms and conditions, if any, applicable to the apparatus constructed in or on the land for which the alternative apparatus is to be substituted.
- (5) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to Esso than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to Esso as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.
Retained apparatus: protection
100
- (1) Unless a shorter period is otherwise agreed in writing between the undertaker and Esso, not less than 35 days before commencing any specified work in relation to apparatus the removal of which has not been required by the undertaker under sub-paragraph 98(2) (removal of apparatus and rights for alternative apparatus) the undertaker must submit to Esso a plan of the works to be executed.
- (2) The plan to be submitted to Esso under sub-paragraph (1) must include a method statement and describe—
- (a) the exact position of the works;
- (b) the level at which these are proposed to be constructed or renewed;
- (c) the manner of their construction or renewal including details of excavation, positioning of plant etc.;
- (d) the position of all apparatus;
- (e) by way of detailed drawings, every alteration proposed to be made to or close to any such apparatus;
- (f) any intended maintenance regime; and
- (g) and any other information reasonably required by Esso to assess the works.
- (3) The specified work must be executed only in accordance with the plan submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (4) by Esso for the alteration or otherwise for the protection of the apparatus, or for securing access to it; and Esso is entitled to watch and inspect the execution of the specified work and the undertaker must follow any reasonable instructions from Esso for the safety of the apparatus and those working nearby.
- (4) Any reasonable requirements made by Esso under sub-paragraph (2) must be made within a period of 14 days (unless a shorter period is otherwise agreed in writing between the undertaker and Esso) beginning with the date on which a valid plan under sub-paragraph (1) is submitted to it.
- (5) If Esso in accordance with sub-paragraph (2) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, this paragraph applies as if the removal of the apparatus had been required by the undertaker under paragraph 98(2) (removal of apparatus and rights for alternative apparatus) but for the avoidance of doubt the undertaker shall not be required to serve Esso with a new notice under paragraph 98.
- (6) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time but (unless otherwise agreed in writing between the undertaker and Esso) in no case less than 28 days before commencing any specified work, a new plan, instead of the plan previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan.
- (7) The undertaker is not required to comply with sub-paragraph (1) where it needs to carry out emergency works as defined in the 1991 Act but in that case it must give to Esso notice of the works it intends to carry out to remedy the emergency together with a plan as soon as is reasonably practicable and must comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances.
- (8) In relation to any works which will or may be situated on, over, under or within 15metres measured in any direction of apparatus, or (wherever situated) impose any load directly upon the apparatus or involve embankment works within 15metres of the apparatus, the plan to be submitted to Esso under sub-paragraph (1) must include a material statement describing—
- (a) the exact position of the work;
- (b) the level at which the work is to be constructed or renewed;
- (c) the manner of its construction or renewal;
- (d) the position of the apparatus; and
- (e) by way of detailed drawings, every alteration proposed to be made to the apparatus.
Cathodic protection testing
101
Where in the reasonable opinion of the undertaker or Esso—
- (a) the authorised development might interfere with the existing cathodic protection forming part of any apparatus; or
- (b) any apparatus might interfere with the proposed or existing cathodic protection forming part of the authorised development,
Expenses
102
- (1) Subject to the following provisions of this paragraph, the undertaker must pay to Esso the reasonable costs and expenses incurred by Esso in, or in connection with—
- (a) the inspection, removal, making safe, abandonment, alteration or protection of any apparatus;
- (b) the execution of any works required by this Part of this Schedule including the purchase, installation and commission of alternative apparatus and re-commissioning of existing apparatus;
- (c) the review and assessment of plans;
- (d) the watching and inspecting the execution of any specified work, any associated works and any works undertaken by third parties as a result of any specified work (including the assessment of plans); or
- (e) imposing reasonable requirements for the protection or alteration of apparatus affected by the authorised development or works as a consequence of the authorised development,
which may reasonably be required in consequence of the execution of any such works as are required under this Part of this Schedule or are authorised by the Order.
- (2) The scrap value of any apparatus removed under the provisions of this Part of this Schedule is to be deducted from any sum payable under sub-paragraph (1), that value being calculated after removal.
- (3) Upon the submission of proper and reasonable estimates of costs and expenses to be incurred by Esso, the undertaker must pay Esso sufficiently in advance to enable Esso to undertake its obligations under this Part of this Schedule in a manner that is neutral to its cashflow provided that in the event that the costs incurred by Esso are less than the amount paid by the undertaker pursuant to this sub-paragraph then Esso shall promptly repay any overpayment to the undertaker.
- (4) Where reasonably required by either party, in view of the complexity of any proposed works, timescales, phasing or costs, the parties must with due diligence and good faith negotiate a works agreement.
- (5) If in accordance with the provisions of this Part of this Schedule—
- (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
- (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,
and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or in default of agreement settled by arbitration in accordance with article 52 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to Esso by virtue of sub-paragraph (1) shall be reduced by the amount of that excess save where it is not possible in the circumstances to obtain the existing type of operations, capacity, dimensions or place at the existing depth in which case full costs will be borne by the undertaker.
- (6) For the purposes of sub-paragraph (5)—
- (a) an extension of apparatus to a length greater than the length of existing apparatus must not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
- (b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole shall be treated as if it also had been agreed or had been so determined.
Damage to property and other losses
103
- (1) Subject to the following provisions of this paragraph, the undertaker must make reasonable compensation to Esso—
- (a) for all loss, damage, liability, costs and expenses reasonably suffered or incurred by Esso for which Esso is legally liable as a result of legally sustainable claims brought against Esso by any third party solely arising out of the carrying out of any relevant works;
- (b) for the cost reasonably incurred by Esso in making good any damage to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal or abandonment) arising from or caused by the carrying out of any relevant works and the authorised development; and
- (c) for the cost reasonably incurred by Esso in stopping, suspending and restoring the supply through its pipe-line and make reasonable compensation to Esso for any other expenses, losses, damages, penalty or costs incurred by Esso by reason or in consequence of any such damage or interruption provided that the same arises in consequence of the carrying out of any relevant works and the authorised development.
- (2) The fact that any act or thing may have been done by Esso on behalf of the undertaker or in accordance with a plan approved by Esso or in accordance with any requirement of Esso or under its supervision does not, subject to sub-paragraph (3), excuse the undertaker from liability under the provisions of sub-paragraph (1).
- (3) Irrespective of anything to the contrary elsewhere in this Part of this Schedule—
- (a) the undertaker and Esso must at all times take reasonable steps to prevent and mitigate any loss, damage, liability, claim, cost or expense recoverable from the other under this Part of this Schedule; and
- (b) neither the undertaker nor Esso are liable for any loss, damage, liability, claim, cost or expense suffered or incurred by the other to the extent that the same are incurred as a result of or in connection with the sole, partial or complete breach of this Part of this Schedule or negligence arising out of an act, omission, default or works of the other, its officers, servants, contractors or agents.
- (4) Esso must give to the undertaker reasonable notice of any claim or demand to which this paragraph applies. If Esso agrees (such agreement not to be unreasonably withheld or delayed), the undertaker may at its own expense conduct all negotiations for the settlement of the same and any litigation that may arise therefrom. Esso must not compromise or settle any claim or demand make any admission which might be prejudicial to the claim or demand without the undertaker’s consent (such consent not to be unreasonably withheld). Esso must, at the request of the undertaker, afford all reasonable assistance for the purpose of contesting any such claim or action, and is entitled to be repaid all reasonable expenses incurred in so doing.
- (5) Nothing in this Part of this Schedule excludes or limit the liability of the undertaker for death or personal injury resulting from the negligence of the undertaker or any of its officers, employees or agents.
- (6) The total liability of the undertaker to Esso under this Part of this Schedule is not to exceed £15 million.
- (7) In this paragraph “relevant works” means such of the authorised development as—
- (a) does, will or is likely to affect any apparatus; or
- (b) involves a physical connection or attachment to any apparatus.
Co-operation
104
- (1) Where in consequence of the proposed construction of any of the authorised development, the undertaker requires the removal of apparatus under this Part of this Schedule or Esso makes requirements for the protection or alteration of apparatus under this Part of this Schedule, the undertaker must use reasonable endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of Esso’s undertaking and Esso must use its reasonable endeavours to co-operate with the undertaker for that purpose.
- (2) The undertaker and Esso must act reasonably in respect of any given term of this Part of this Schedule and, in particular, (without prejudice to generality) where any consent or expression of satisfaction is required by this Part of this Schedule it must not be unreasonably withheld or delayed.
Miscellaneous
105
Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and Esso in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made provided that the terms of the relevant enactment or agreement are not inconsistent with the provisions of this Order, including this Part of this Schedule. In the case of any inconsistency, the provisions of this Order, including this Part of this Schedule, prevail.
SCHEDULE 10 — SPECIAL CATEGORY LAND
PART 1 — SPECIAL CATEGORY LAND TO BE PERMANENTLY ACQUIRED
| Plot reference number shown on Special Category Land Plans and in the book of reference | Plot reference number shown on Special Category Land Plans and in the book of reference |
|---|---|
| (1) Special Category Land Plan | (2) Plot number |
| Special Category Land Plans – APFP Regulation 5(2)(i) | 1/008, 1/020, 1/038, 1/039, 1/047, 1/053, 1/059, 1/070, 1/071, 1/094, 1/095, 1/096, 1/105, 1/139, 1/150, 1/165, 1/166, 1/211, 1/226A, 1/243 |
PART 2 — LAND TO BE LAID OUT AS REPLACEMENT OPEN SPACE
| Plot reference number shown on Special Category Land Plans and in the book of reference | Plot reference number shown on Special Category Land Plans and in the book of reference |
|---|---|
| (1) Special Category Land Plan | (2) Plot number |
| Special Category Land Plans – APFP Regulation 5(2)(i) | 1/013, 1/200, 1/220, 1/289, 1/290A, 1/292 |
PART 3 — SPECIAL CATEGORY LAND OVER WHICH RIGHTS WILL BE ACQUIRED
| Plot reference number shown on Special Category Land Plans and in the book of reference | Plot reference number shown on Special Category Land Plans and in the book of reference |
|---|---|
| (1) Special Category Land Plan | (2) Plot number |
| Part 3A | Part 3A |
| Special Category Land Plans – APFP Regulation 5(2)(i) | 1/036, 1/050, 1/052, 1/093, 1/164, 1/212, 1/226, 1/242A |
| Part 3B | Part 3B |
| Special Category Land Plans – APFP Regulation 5(2)(i) | 1/007 |
SCHEDULE 11 — MAXIMUM PARAMETER HEIGHTS
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.