The Mona Offshore Wind Farm Order 2025
| Document Reference Number | Planning Inspectorate Reference | Document Name | Revision | Date |
|---|---|---|---|---|
| B1 | REP6-004 | Location plan | F02 | December 2024 |
| B2 | REP6-005 | Offshore Order Limits and Grid Coordinates Plan | F04 | December 2024 |
| B3 | REP6-006 | Works Plan - Onshore | F03 | December 2024 |
| B4 | AS-004 | Works Plans - Offshore and Intertidal | F02 | April 2024 |
| B5 | REP7-004 | Land Plan (Onshore) | F05 | January 2025 |
| B6 | REP7-005 | Crown Land Plan (Onshore) | F04 | January 2025 |
| B7 | REP7-006 | Special Category Land Plan | F04 | January 2025 |
| B14 | REP6-012 | Tree and Hedgerow Plan | F04 | December 2024 |
| B15 | REP6-013 | Street Works and Access to Works Plan | F03 | December 2024 |
| B16 | REP6-014 | Temporary stopping up of Public Rights of Way Plan | F03 | December 2024 |
| D4 | REP7-014 | Book of Reference | F07 | January 2025 |
| Document Reference Number | Planning Inspectorate Reference | Document Name | Revision | Date |
| --- | --- | --- | --- | --- |
| F1 | REP7-024 | Non-Technical Summary - Welsh | F02 | January 2025 |
| F1 | REP7-025 | Non-Technical Summary – English | F02 | January 2025 |
| F1.1 | REP7-026 | Volume 1, Chapter 4: Introduction and overarching glossary | F02 | January 2025 |
| F1.2 | APP-049 | Volume 1, Chapter 2: Policy and Legislative Context | F01 | February 2024 |
| F1.3 | REP7-027 | Volume 1, Chapter 3: Project Description | F02 | January 2025 |
| F1.4 | REP7-029 | Volume 1, Chapter 4: Site Selection and Consideration of Alternatives | F03 | January 2025 |
| F1.5 | APP-052 | Volume 1, Chapter 5: Environmental Impact Assessment Methodology | F01 | February 2024 |
| F2.1 | APP-053 | Volume 2, Chapter 1: Physical Processes | F01 | February 2024 |
| F2.2 | REP7-030 | Volume 2, Chapter 2: Benthic Subtidal and Intertidal Ecology | F02 | January 2025 |
| F2.3 | REP7-031 | Volume 2, Chapter 3: Fish and Shellfish Ecology | F02 | January 2025 |
| F2.4 | REP7-032 | Volume 2, Chapter 4: Marine Mammals | F02 | January 2025 |
| F2.5 | REP7-033 | Volume 2, Chapter 5: Offshore Ornithology | F03 | January 2025 |
| F2.6 | APP-058 | Volume 2, Chapter 6: Commercial Fisheries | F01 | February 2024 |
| F2.7 | REP7-035 | Volume 2, Chapter 7 Shipping and Navigation | F02 | January 2025 |
| F2.8 | REP7-036 | Volume 2, Chapter 8: Seascape and Visual Resources | F02 | January 2025 |
| F2.9 | REP7-038 | Volume 2, Chapter 9: Marine Archaeology | F02 | January 2025 |
| F2.10 | APP-062 | Volume 2, Chapter 10: Other Sea Users | F01 | February 2024 |
| F2.11 | REP7-039 | Volume 2, Chapter 11: Inter-related Effects - Offshore | F02 | January 2025 |
| F3.1 | REP7-040 | Volume 3, Chapter 1: Geology, Hydrogeology and Ground Conditions | F02 | January 2025 |
| F3.2 | REP7-041 | Volume 3, Chapter 2: Hydrology and Flood Risk | F02 | January 2025 |
| F3.3 | REP7-042 | Volume 3, Chapter 3: Onshore Ecology | F02 | January 2025 |
| F3.4 | REP7-044 | Volume 3, Chapter 3: Onshore and Intertidal Ornithology | F02 | January 2025 |
| F3.5 | REP7-045 | Volume 3, Chapter 5: Historic Environment | F02 | January 2025 |
| F3.6 | REP7-046 | Volume 3, Chapter 6: Landscape and Visual Resources | F02 | January 2025 |
| F3.7 | REP7-048 | Volume 3, Chapter 7: Land Use and Recreation | F02 | January 2025 |
| F3.8 | REP7-049 | Volume 3, Chapter 8: Traffic and Transport | F02 | January 2025 |
| F3.9 | REP7-050 | Volume 3, Chapter 9: Noise and Vibration | F03 | January 2025 |
| F3.10 | REP7-051 | Volume 3, Chapter 10: Air Quality | F02 | January 2025 |
| F3.11 | APP-074 | Volume 3, Chapter 11: Inter-related Effects - Onshore | F01 | February 2024 |
| F4.1 | REP7-052 | Volume 4, Chapter 1: Aviation and Radar | F02 | January 2025 |
| F4.2 | REP7-053 | Volume 4, Chapter 2: Climate Change | F02 | January 2025 |
| F4.3 | APP-077 | Volume 4, Chapter 3: Socio-economics | F01 | February 2024 |
| F4.4 | REP7-054 | Volume 4, Chapter 4: Human Health Assessment | F02 | January 2025 |
| F5.3.1 | APP-079 | Volume 5, Annex 3.1: Underwater Sound Technical Report | F01 | February 2024 |
| F5.3.2 | APP-080 | Volume 5, Annex 3.2: Sulphur Hexafluoride Report | F01 | February 2024 |
| F5.4.1 | APP-081 | Volume 5, Annex 4.1: Site Selection Area of Search Identification | F01 | February 2024 |
| F5.4.2 | APP-082 | Volume 5, Annex 4.2: Site Selection BRAG Report | F01 | February 2024 |
| F5.4.3 | REP7-055 | Volume 5, Annex 5.3: Onshore Crossing Schedule | F04 | January 2025 |
| F5.5.1 | REP7-056 | Volume 5, Annex 5.1: Cumulative effects screening matrix | F03 | January 2025 |
| F5.5.2 | APP-085 | Volume 5, Annex 5.2: Transboundary impacts screening | F01 | February 2024 |
| F6.1.1 | APP-086 | Volume 6, Annex 1.1: Physical Processes Technical Report | F01 | February 2024 |
| F6.2.1 | APP-087 | Volume 6, Annex 2.1: Benthic Subtidal and Intertidal Ecology Technical Report | F01 | February 2024 |
| F6.2.2 | REP7-057 | Volume 6, Annex 2.2: Water Framework Directive Coastal Waters Assessment | F02 | January 2025 |
| F6.3.1 | APP-089 | Volume 6, Annex 3.1: Fish and Shellfish Ecology Technical Report | F01 | February 2024 |
| F6.4.1 | APP-090 | Volume 6, Annex 4.1: Marine Mammals Technical Report | F01 | February 2024 |
| F6.5.1 | APP-091 | Volume 6, Annex 5.1: Offshore Ornithology Baseline Characterisation Technical Report | F01 | February 2024 |
| F6.5.2 | REP2-018 | Volume 6, Annex 5.2: Offshore Ornithology Displacement Technical Report | F02 | August 2024 |
| F6.5.3 | REP2-020 | Volume 6, Annex 5.3: Offshore Ornithology Collision Risk Modelling Technical Report | F02 | August 2024 |
| F6.5.4 | APP-094 | Volume 6, Annex 5.4: Offshore Ornithology Migratory Bird Collision Risk Modelling Technical Report | F01 | February 2024 |
| F6.5.5 | REP7-058 | Volume 6, Annex 5.5:Offshore Ornithology Apportioning Technical Report | F03 | January 2025 |
| F6.5.6 | REP2-024 | Volume 6, Annex 5.6: Offshore Ornithology Population Viability Analysis Technical Report | F02 | August 2024 |
| F6.6.1 | APP-097 | Volume 6, Annex 6.1: Commercial Fisheries Technical Report | F01 | February 2024 |
| F6.7.1 | REP7-061 | Volume 6, Annex 7.1: Navigational Risk Assessment | F02 | January 2025 |
| F6.8.1 | APP-099 | Volume 6, Annex 8.1: Seascape and Visual Resources Legislation and Planning Policy Context | F01 | February 2024 |
| F6.8.2 | APP-100 | Volume 6, Annex 8.2: Seascape and Landscape Character Baseline Technical Report | F01 | February 2024 |
| F6.8.3 | APP-101 | Volume 6, Annex 8.3: Visual Baseline Technical Report – Offshore Development | F01 | February 2024 |
| F6.8.3 | APP-102 | Volume 6, Annex 8.3: Visual baseline technical report – Offshore Development Appendix – Part 1 | F01 | February 2024 |
| F6.8.3 | APP-103 | Volume 6, Annex 8.3: Visual baseline technical report– Offshore Development Appendix – Part 2 | F01 | February 2024 |
| F6.8.4 | REP7-062 | Volume 6, Annex 8.4: Seascape, Landscape and Visual Resources Impact Assessment Methodology | F02 | January 2025 |
| F6.8.5 | APP-105 | Volume 6, Annex 8.6: International and Nationally Designated Landscape Study | F01 | February 2024 |
| F6.8.6 | APP-106 | Volume 6, Annex 8.6: Seascape Visualisations Part 1 (Figures 1.1 – 9.3) | F01 | February 2024 |
| F6.8.6 | APP-107 | Volume 6, Annex 8.6: Seascape Visualisations Part 2 (Figures 9.4 – 17.1) | F01 | February 2024 |
| F6.8.6 | APP-108 | Volume 6, Annex 8.6: Seascape Visualisations Part 3 ( Figures 18.1 – 27.2) | F01 | February 2024 |
| F6.8.6 | APP-109 | Volume 6, Annex 8.6: Seascape Visualisations Part 4 ( Figures 28.1 – 32.2) | F01 | February 2024 |
| F6.8.6 | APP-110 | Volume 6, Annex 8.6: Seascape Visualisations Part 5 ( Figures 33.1 – 38.3) | F01 | February 2024 |
| F6.8.6 | APP-111 | Volume 6, Annex 8.6: Seascape Visualisations Part 6 ( Figures 38.4 – 46.2) | F01 | February 2024 |
| F6.8.6 | APP-112 | Volume 6, Annex 8.6: Seascape Visualisations Part 7 ( Figures 47 – 56) | F01 | February 2024 |
| F6.9.1 | APP-113 | Volume 6, Annex 9.1: Marine Archaeology Technical Report | F01 | February 2024 |
| F6.10.1 | APP-114 | Volume 6, Annex 10.1: Radar Early Warning Systems and Microwave Communication Links Technical Report | F01 | February 2024 |
| F7.1.1 | APP-115 | Volume 7, Annex 1.1: Aquifers, Groundwater Abstractions and Ground Conditions | F01 | February 2024 |
| F7.1.2 | APP-116 | Volume 7, Annex 1.2: Groundwater Sources of Supply – Hydrogeological Risk Assessment | F01 | February 2024 |
| F7.2.1 | REP7-063 | Volume 7, Annex 2.1: Flood Consequences Assessment | F02 | January 2025 |
| F7.2.2 | APP-118 | Volume 7, Annex 2.2: Surface Watercourses and NRW Flood Zones | F01 | February 2024 |
| F7.2.3 | APP-119 | Volume 7, Annex 2.3: Surface Water Abstraction Licences, Discharge Consents and Pollution Incidents | F01 | February 2024 |
| F7.2.4 | REP7-064 | Volume 7, Annex 2.4: Water Framework Directive Surface Water and Groundwater Assessment | F02 | January 2025 |
| F7.3.1 | APP-121 | Volume 7, Annex 3.1: Onshore Ecology Desk Study | F01 | February 2024 |
| F7.3.2 | APP-122 | Volume 7, Annex 3.2: Extended Phase 1 Habitat Survey Technical Report | F01 | February 2024 |
| F7.3.3 | APP-123 | Volume 7, Annex 3.3: Great Crested Newt Survey Technical Report | F01 | February 2024 |
| F7.3.4 | APP-124 | Volume 7, Annex 3.4: Hedgerow Survey Technical Report | F01 | February 2024 |
| F7.3.5 | APP-125 | Volume 7, Annex 3.5: Terrestrial Invertebrates Survey | F01 | February 2024 |
| F7.3.6 | APP-126 | Volume 7, Annex 3.6: Aquatic Invertebrates (inc White Clawed Crayfish) Survey | F01 | February 2024 |
| F7.3.7 | APP-127 | Volume 7, Annex 3.7: Reptile Survey | F01 | February 2024 |
| F7.3.8 | APP-128 | Volume 7, Annex 3.8: Water Vole Survey | F01 | February 2024 |
| F7.3.9 | APP-129 | Volume 7, Annex 3.9: Bat Roost Survey (Part 1) | F01 | February 2024 |
| F7.3.9 | APP-130 | Volume 7, Annex 3.9: Bat Roost Survey (Part 2) | F01 | February 2024 |
| F7.3.9 | APP-131 | Volume 7, Annex 3.9: Bat Roost Survey (Part 3) | F01 | February 2024 |
| F7.3.10 | APP-132 | Volume 7, Annex 3.10: Bat Activity Survey | F01 | February 2024 |
| F7.3.11 | APP-133 | Volume 7, Annex 3.11: Otter Survey Technical Report | F01 | February 2024 |
| F7.3.12 | APP-135 | Volume 7, Annex 3.12: Badger Survey Technical Report (Confidential) | F01 | February 2024 |
| F7.3.12 | APP-134 | Volume 7, Annex 3.12: Badger Survey Technical Report (Public) | F01 | February 2024 |
| F7.3.13 | APP-136 | Volume 7, Annex 3.13: Hazel Dormouse Survey Technical Report | F01 | February 2024 |
| F7.3.14 | APP-137 | Volume 7, Annex 3.14: National Vegetation Classification and Invasive Non-Native Species Technical Report | F01 | February 2024 |
| F7.3.15 | APP-138 | Volume 7, Annex 3.15: Fish and Eel Survey Technical Report | F01 | February 2024 |
| F7.4.1 | APP-139 | Volume 7, Annex 4.1: Onshore Ornithology- Wintering and Migratory Birds Technical Report | F01 | February 2024 |
| F7.4.2 | APP-140 | Volume 7, Annex 4.2: Intertidal Ornithology - Wintering and Migratory Birds | F01 | February 2024 |
| F7.4.3 | APP-142 | Volume 7, Annex 4.3: Onshore Ornithology- Breeding Birds Technical Report (Confidential) | F01 | February 2024 |
| F7.5.1 | REP7-065 | Volume 7, Annex 5.1: Desk-Based Assessment | F02 | January 2025 |
| F7.5.2 | APP-144 | Volume 7, Annex 5.2: Historic Environment Policy and Guidance | F01 | February 2024 |
| F7.5.3 | APP-145 | Volume 7, Annex 5.3: Onshore Geophysical Survey Report -Part 1 | F01 | February 2024 |
| F7.5.3 | APP-146 | Volume 7, Annex 5.3: Onshore Geophysical Survey Report -Part 2 | F01 | February 2024 |
| F7.5.4 | APP-147 | Volume 7, Annex 5.4: Intertidal Survey Report | F01 | February 2024 |
| F7.5.5 | APP-148 | Volume 7, Annex 5.5: Trial Trenching Report – Part 1 | F01 | February 2024 |
| F7.5.5 | APP-149 | Volume 7, Annex 5.5: Trial Trenching Report – Part 2 | F01 | February 2024 |
| F7.5.6 | APP-150 | Volume 7, Annex 5.6: Settings Assessment (onshore infrastructure) | F01 | February 2024 |
| F7.5.7 | APP-151 | Volume 7, Annex 5.7: Settings Assessment (offshore infrastructure) | F01 | February 2024 |
| F7.6.1 | APP-152 | Volume 7, Annex 5.7: Landscape and Visual Resources Planning Policy Context | F01 | February 2024 |
| F7.6.2 | APP-153 | Volume 7, Annex 6.2: Landscape and Seascape Character Baseline Technical Report – Part 1 | F01 | February 2024 |
| F7.6.2 | APP-154 | Volume 7, Annex 6.2: Landscape and Seascape Character Baseline Technical Report – Part 2 | F01 | February 2024 |
| F7.6.3 | APP-155 | Volume 7, Annex 6.3: Visual Baseline Technical Report - Onshore Development | F01 | February 2024 |
| F7.6.4 | APP-156 | Volume 7, Annex 6.4: Landscape, Seascape and Visual Resources Impact Assessment Methodology | F01 | February 2024 |
| F7.6.5 | APP-157 | Volume 7, Annex 6.5: Landscape Visualisations Part 1 (viewpoint 1 – viewpoint 8) | F01 | February 2024 |
| F7.6.5 | APP-158 | Volume 7, Annex 6.5: Landscape Visualisations Part 2 (viewpoint 9 – viewpoint 15) | F01 | February 2024 |
| F7.6.5 | APP-159 | Volume 7, Annex 6.5: Landscape Visualisations (viewpoint 16 – viewpoint 30) | F01 | February 2024 |
| F7.6.6 | APP-160 | Volume 7, Annex 6.6: Tree Survey and Arboriculture Impact Assessment Part 1 | F01 | February 2024 |
| F7.6.6 | REP7-066 | Volume 7, Annex 6.6: Tree Survey and Arboriculture Impact Assessment Part 2 – Appendix A | F02 | January 2025 |
| F7.6.6 | REP7-067 | Volume 7, Annex 6.6: Tree Survey and Arboriculture Impact Assessment Part 3 – Appendix B | F02 | January 2025 |
| F7.6.6 | REP7-068 | Volume 7, Annex 6.6: Tree Survey and Arboriculture Impact Assessment Part 4 – Appendix B | F02 | January 2025 |
| F7.6.6 | REP7-069 | Volume 7, Annex 6.6: Tree Survey and Arboriculture Impact Assessment Part 5 – Appendix B | F02 | January 2025 |
| F7.6.6 | REP7-070 | Volume 7, Annex 6.6: Tree Survey and Arboriculture Impact Assessment Part 6 – Appendix C | F02 | January 2025 |
| F7.6.6 | REP7-071 | Volume 7, Annex 6.6: Tree Survey and Arboriculture Impact Assessment Part 7 – Appendix C | F02 | January 2025 |
| F7.6.6 | REP7-072 | Volume 7, Annex 6.6: Tree Survey and Arboriculture Impact Assessment Part 8 – Appendix C | F02 | January 2025 |
| F7.7.1 | APP-168 | Volume 7, Annex 7.1: Published Soil and Agricultural Land Classification Data Technical Report | F01 | February 2024 |
| F7.7.2 | REP5-014 | Volume 7, Annex 7.2: Soil Survey Data Technical Report | F02 | December 2024 |
| F7.7.3 | APP-170 | Volume 7, Annex 7.3: Published Recreational Resources Plan Technical Report | F01 | February 2024 |
| F7.8.1 | APP-171 | Volume 7, Annex 7.3: Description of Network Links and Sensitivity | F01 | February 2024 |
| F7.8.2 | APP-172 | Volume 7, Annex 8.2: Base Traffic Flows | F01 | February 2024 |
| F7.8.3 | APP-173 | Volume 7, Annex 8.3: Personal Injury Accident Locations | F01 | February 2024 |
| F7.8.4 | APP-174 | Volume 7, Annex 8.4: Public Transport Networks | F01 | February 2024 |
| F7.8.5 | APP-175 | Volume 7, Annex 8.5: Construction Vehicle Trip Generation Assumptions | F01 | February 2024 |
| F7.8.6 | APP-176 | Volume 7, Annex 8.6: Traffic Flows with Construction Traffic | F01 | February 2024 |
| F7.8.7 | APP-177 | Volume 7, Annex 8.7: Traffic and Transport Figures | F01 | February 2024 |
| F7.9.1 | APP-178 | Volume 7, Annex 9.1: Baseline Noise Survey | F01 | February 2024 |
| F7.9.2 | REP5-016 | Volume 7, Annex 9.2: Construction Noise and Vibration Technical Report | F02 | December 2024 |
| F7.9.3 | APP-180 | Volume 7, Annex 9.3: Operation Noise Assessment Technical Report | F01 | February 2024 |
| F8.1.1 | REP7-073 | Volume 8, Annex 1.1: Aviation and Radar Technical Report | F02 | January 2025 |
| F8.2.1 | APP-182 | Volume 8, Annex 2.1: Technical Greenhouse Gas Assessment Technical Report | F01 | February 2024 |
| F8.2.2 | APP-183 | Volume 8, Annex 2.2: Climate Change Risk Assessment | F01 | February 2024 |
| F8.3.1 | APP-184 | Volume 8, Annex 3.1: Socio-economics Technical Impact Report | F01 | February 2024 |
| S_D3_15 | REP3-046 | Seascapes and Visual Resources: Cumulative Wirelines | F01 | September 2024 |
| S_D3_16.1 | REP3-047 | Landscape and Visual Resources – Cumulative Visualisations Part 1 | F01 | September 2024 |
| S_D3_16.2 | REP3-048 | Landscape and Visual Resources – Cumulative Visualisations Part 2 | F01 | September 2024 |
| S_D4_6.2 | REP4-038 | Appendix to HAP ISH3_20: Updated Visualisations Part 1 | F01 | November 2024 |
| S_D4_6.3 | REP4-039 | Appendix to HAP ISH3_20: Updated Visualisations Part 2 | F01 | November 2024 |
| S_D4_15 | REP4-046 | Zone of Theoretical Visibility and representative viewpoint locations at 1:50,000 Scale | F01 | November 2024 |
| Document Reference Number | Planning Inspectorate Reference | Document Name | Revision | Date |
| --- | --- | --- | --- | --- |
| S_RFI1_03 | C1-008c | Outline Code of Construction Practice | F01 | May 2025 |
| J26.1 | REP6-036 | Outline Spillage and Emergency Response Plan | F03 | December 2024 |
| J26.2 | REP6-038 | Outline Dust Management Plan | F03 | December 2024 |
| S_RFI1_04 | C1-008e | Outline Construction Noise and Vibration Management Plan | F01 | May 2025 |
| J26.4 | REP6-042 | Outline Communications Plan | F03 | December 2024 |
| J26.5 | REP6-044 | Outline Construction Fencing Plan | F03 | December 2024 |
| J26.6 | REP6-046 | Outline Construction Surface Water and Drainage Management Plan | F03 | December 2024 |
| J26.7 | REP6-048 | Outline Flood Management Plan | F03 | December 2024 |
| J26.8 | REP6-050 | Outline Soil Management Plan | F03 | December 2024 |
| J26.9 | REP6-052 | Outline Site Waste Management Plan | F03 | December 2024 |
| J26.10 | REP6-054 | Outline Artificial Light Emissions Plan | F03 | December 2024 |
| J26.11 | REP6-056 | Outline Biosecurity Protocol | F03 | December 2024 |
| J26.12 | REP6-058 | Outline Discovery Strategy for Contaminated Land | F03 | December 2024 |
| S_RFI1_05 | C1-008g | Outline Construction Traffic Management Plan | F01 | May 2025 |
| J26.14 | REP7-089 | Outline Landfall Construction Method Statement | F05 | January 2025 |
| S_RFI1_06 | C3-004, pdf pages 22 to 37 | Outline Onshore Construction Method Statement | F02 | June 2025 |
| S_RFI1_07 | C1-008k | Outline Highways Access Management Plan | F01 | May 2025 |
| J26.17 | REP6-064 | Outline Public Rights of Way Management Strategy | F03 | December 2024 |
| J26.18 | REP6-066 | Outline Arboriculture Method Statement | F03 | December 2024 |
| Document Reference Number | Planning Inspectorate Reference | Document Name | Revision | Date |
| --- | --- | --- | --- | --- |
| J3 | REP6-024 | Design Principles | F04 | December 2024 |
| J10 | REP7-077 | Mitigation and Monitoring Schedule | F07 | January 2025 |
| J12 | APP-198 | Outline Offshore Operations and Maintenance Plan | F01 | February 2024 |
| J13 | REP7-079 | Outline Fisheries Liaison and Co-existence Plan | F03 | January 2025 |
| J14 | REP6-028 | Outline Vessel Traffic Management Plan | F03 | December 2024 |
| J15 | REP7-081 | Offshore In-principle Monitoring Plan | F03 | January 2025 |
| J16 | REP5-028 | Outline Underwater Sound Management Strategy | F02 | December 2024 |
| J17 | REP5-030 | Measures to Minimise Disturbance to Marine Mammals and Rafting Birds from Transiting Vessels | F03 | December 2024 |
| J18 | REP7-083 | Outline Offshore Written Scheme of Investigation and Protocol for Archaeological Discoveries | F03 | January 2025 |
| J21 | REP5-032 | Outline Marine Mammal Mitigation Protocol | F02 | December 2024 |
| J22 | REP7-085 | Outline Landscape and Ecology Management Plan | F05 | January 2025 |
| J23 | REP6-032 | Outline Onshore Written Scheme of Investigation | F03 | December 2024 |
| J24 | REP4-015 | Outline Skills and Employment Plan | F02 | November 2024 |
| J27 | REP6-068 | Outline Operation Drainage Management Strategy | F02 | December 2024 |
| S_D4_8 | REP4-041 | Greenhouse Gas Reduction Strategy | F01 | November 2024 |
| S_D7_30 | REP7-136 | Landscape Enhancement Scheme Principles | F01 | January 2025 |
Signed
Signed by authority of the Secretary of State for Energy Security and Net Zero
David Wagstaff — Deputy Director for Energy Infrastructure Planning — Department for Energy Security and Net Zero — 4th July 2025
Explanatory note
(This note is not part of the Order)
EXPLANATORY NOTE
This Order grants development consent for, and authorises the construction, operation and maintenance of an offshore wind farm generating station located in the Irish Sea approximately 28 kilometres from the coast of North Wales, together with associated development. This Order imposes requirements in connection with the development and authorises the compulsory purchase of land (including rights in land) and the right to use land and to override easements and other rights.
A copy of the plans and book of reference referred to in this Order and certified in accordance with article 41 (certification of plans) together with a copy of any guarantee or alternative form of security approved by the Secretary of State pursuant to article 32 (funding), may be inspected free of charge at the offices of Mona Offshore Wind Limited, Chertsey Road, Sunbury On Thames, Middlesex, United Kingdom, TW16 7BP.
Footnotes
[^f00001]: 2008 c. 29. Section 37 was amended by section 128(2) and Schedule 13, Part 1, paragraphs 1 to 5 of the Localism Act 2011 (c. 20).
[^f00002]: S.I. 2010/103. This instrument was amended by S.I. 2012/635.
[^f00003]: S.I. 2017/572.
[^f00004]: 1961 c. 33.
[^f00005]: 1965 c. 56.
[^f00006]: 1980 c. 66.
[^f00007]: 1981 c. 66.
[^f00008]: 1989 c. 29.
[^f00009]: 1990 c. 8.
[^f00010]: 1991 c. 22.
[^f00011]: 2003 c. 21.
[^f00012]: 2004 c. 20. Section 105 was amended by section 69 of the Energy Act 2008 (c. 32).
[^f00013]: 2008 c. 29.
[^f00014]: 2009 c. 23.
[^f00015]: 1971 c. 80.
[^f00016]: “highway” is defined in section 328(1) for “highway authority” see section 1. Relevant amendments are as follows: section 1 was amended by sections 8 and 102 and Schedule 4, paragraph 1 and Schedule 17 of the Local Government Act 1985 (c. 51), by section 21 of the 1991 Act and by section 1(6) and Schedule 1, paragraph 2 of the Infrastructure Act 2015 (c. 7), by S.I. 2015/481, and by S.I. 1991/2288.
[^f00017]: Section 48 was amended by sections 124 and 134 of the Local Transport Act 2008 (c. 26).
[^f00018]: “Street authority” is defined in section 49, which was amended by section 57(1) and paragraph 117 of Schedule 1 to the Infrastructure Act 2015, and S.I. 2015/481.
[^f00019]: Section 6 was amended by sections 89, 136, 198, 143, and 145, Part 1 of Schedule 23 and paragraphs 3 and 5 of Schedule 19 to the Energy Act 2004 (c. 20), sections 72 and 121 and Schedule 1 to the Energy Act 2011 (c. 16), sections 166, 186, 334 and 205 to the Energy Act 2023 (c. 52), S.I. 2012/2400 and S.I. 2011/2704. There are other amendments to section 6 which are not relevant to the Order.
[^f00020]: 1991 c. 57. Paragraph 5 was amended by section 100(1) and (2) of the Natural Environment and Rural Communities Act 2006 (c. 16), section 84 of, and paragraph 3 of Schedule 11 to, the Marine and Coastal Access Act 2009 (c. 23), paragraph 49 of Schedule 2 to the Flood and Water Management Act 2010 (c. 29), paragraph 32 of Schedule 10 to the Fisheries Act 2020 and S.I. 2013/755. Paragraph 6 was amended by paragraph 26 of Schedule 15 to the Environment Act 1995 (c. 25), section 224 of, and paragraphs 20 and 24 of Schedule 16, and Part 5(B) of Schedule 22, to, the Marine and Coastal Access Act 2009 and S.I. 2013/755. Paragraph 6A was inserted by section 103(3) of the Environment Act 1995.
[^f00021]: 1991 c. 59. As substituted by section 49 of, and paragraph 38 of Schedule 2 to the Flood and Water Management Act 2010 (c. 29), section 22(2) and paragraph 14 of schedule 2 to the Local Government Byelaws (Wales) Act 2012 (2012 anaw 2) and section 86 (3) of the Water Act 2014 (c. 21).
[^f00022]: 1991 c. 59. Section 23 has been amended by paragraph 32 of Schedule 2 to the Flood and Water Management Act 2010, section 120 of and paragraph 192 of Schedule 22 to the Environment Act 1995 and paragraph 322 of Schedule 2 to the Natural Resources Body for Wales (Functions) Order 2013 (No.755); section 30 has been amended by S.I. 2013/1036.
[^f00023]: 2017 c. 20.
[^f00024]: 1990 c. 43. Relevant amendments are as follows: section 82 was amended by section 107 and Schedule 17 paragraph 6 of the Environment Act 1995 (c. 25) and section 5(2) of the Noise and Statutory Nuisance Act 1993 (c. 40), and section 79 was amended by sections 101 and 102 of the Clean Neighbourhoods and Environment Act 2005 (c. 16), by section 2 of the Noise and Statutory Nuisance Act 1993 and by section 120 and Schedule 22 paragraph 89 of the Environment Act 2005.
[^f00025]: 1974 c. 40. Section 61 was amended by Schedule 7 to the Building Act 1984 (c. 55), paragraph 15 of Schedule 15 to the Environmental Protection Act 1990 and Schedule 24 to the Environment Act 1995. There are other amendments to the 1974 Act which are not relevant to the Order.
[^f00026]: 1974 c. 40. Section 61 was amended by Schedule 7 to the Building Act 1984 (c. 55), paragraph 15 of Schedule 3 to the Environmental Protection Act 1990 and Schedule 24 to the Environment Act 1995.
[^f00027]: Section 48 is amended by sections 124 and 134 of the Local Transport Act 2008 (c. 26), and section 51 was amended by sections 40 and 99 and Schedule 1 to the Traffic Management Act 2004 (c. 18).
[^f00028]: Sections 55, 57, 60, 68 and 69 were amended by the Traffic Management Act 2004 (c. 18).
[^f00029]: 1991 c. 56. Section 106 was amended by sections 43(2) and 35(8)(a) and paragraph 1 of Schedule 2 to the Competition and Service (Utilities) Act 1992 (c. 43) and sections 99(2), (4), (5)(a), (5)(b) and (5)(c) of the Water Act 2003 (c. 37) and Schedule 3, paragraph 16(1) of the Flood and Water Management Act 2010 (c. 29).
[^f00030]: S.I. 2016/1154.
[^f00031]: Section 13 has been amended by section 139 and Schedules 13 and 23 to the Tribunals, Courts and Enforcement Act 2007 (c. 15).
[^f00032]: Section 125 is amended by section 216 and paragraph 17 of Schedule 16 to the Housing and Planning Act 2016.
[^f00033]: Section 4 was amended by sections 184 and 185 of, and paragraph 2 of Schedule 18 to, the Housing and Planning Act 2016 (c. 22).
[^f00034]: Section 8 was amended by section 216 of and paragraph 2 of Schedule 17 to the Housing and Planning Act 2016 and S.I. 2009/1307 and Schedule 2A was amended by section 216 of and paragraph 3 of Schedule 17 to the Housing and Planning Act 2016.
[^f00035]: 1981 c. 67.
[^f00036]: Section 11(1) was amended by section 186 of the Housing and Planning Act 2016, paragraph 14 of Schedule 4 to the Acquisition of Land Act 1981 and S.I. 2006/2.
[^f00037]: Section 152 was amended by S.I. 2009/1307.
[^f00038]: Section 138 was amended by section 23(4) of the Growth and Infrastructure Act 2013 (c. 27) and S.I. 2017/1285.
[^f00039]: Section 13 was amended by Tribunals Courts and Enforcement Act 2007 (c. 15).
[^f00040]: 2003 c. 21. There are amendments to this section which are not relevant to this Order.
[^f00041]: S.I. 1997/1160.
[^f00042]: Section 105(2) was substituted by section 69(3) of the Energy Act 2008 (c. 32).
[^f00043]: 1978 c. 30.
[^f00044]: S.I. 2016/765.
[^f00045]: 1973 c. 26.
[^f00046]: Section 11A was inserted by section 186(3) of the Housing and Planning Act 2016 (c. 22).
[^f00047]: Section 11B was inserted by section 187(2) of the above Act (c. 22).
[^f00048]: 1991 c. 56.
[^f00049]: 1993 c. 43.
[^f00050]: 2006 c. 46.
[^f00051]: S.I. 2015/1522 (W.179).
[^f00052]: 2004 c. 20. Section 105 was amended by section 69 of the Energy Act 2008 (c. 32).
[^f00053]: 2009 c. 23.
Editorial notes
[^key-dbed5d635d5594d8c000d67709dd7b40]: Art. 1 in force at 28.7.2025, see art. 1
[^key-e9462f2bc6aed9849023bf3ff732d2e8]: Art. 2 in force at 28.7.2025, see art. 1
[^key-5e4e32da5551a5be7961e0afbaf28e41]: Art. 3 in force at 28.7.2025, see art. 1
[^key-daf866585c50d9d407bc47987d05a9c1]: Art. 4 in force at 28.7.2025, see art. 1
[^key-e70a11b1d6cdc357bf7b242f98aa41a2]: Art. 5 in force at 28.7.2025, see art. 1
[^key-48f6412f47d929743de7aba67d11c520]: Art. 6 in force at 28.7.2025, see art. 1
[^key-8bc887b037ad6bd8c3fadd0e7eea3014]: Art. 7 in force at 28.7.2025, see art. 1
[^key-1623aeda1abeb61b2edd79835414fadc]: Art. 8 in force at 28.7.2025, see art. 1
[^key-0aef97a8dd021581b2e38dfb11ef22b8]: Art. 9 in force at 28.7.2025, see art. 1
[^key-03b74d4a86f942db0b72fdf16207016b]: Art. 10 in force at 28.7.2025, see art. 1
[^key-f2ea01d37da5f3775dff8eb2bb63ccfc]: Art. 11 in force at 28.7.2025, see art. 1
[^key-0123581582ae36a033832aadf95633ec]: Art. 12 in force at 28.7.2025, see art. 1
[^key-327d915ef23e4dac21da8d2ae7ec9a96]: Art. 13 in force at 28.7.2025, see art. 1
[^key-6fde6c9b6ac302c4cf2cdc24e080a39a]: Art. 14 in force at 28.7.2025, see art. 1
[^key-fff38aaf83ff0d3da317a25fa30f6932]: Art. 15 in force at 28.7.2025, see art. 1
[^key-8ae2cbfc3fc6ee0b88ee06d189ed40ac]: Art. 16 in force at 28.7.2025, see art. 1
[^key-731b29591de1089aae4d9ff0fdf8eeb3]: Art. 17 in force at 28.7.2025, see art. 1
[^key-4d1f5e79ce4a6ba307afb10d177ac077]: Art. 18 in force at 28.7.2025, see art. 1
[^key-4234e8891f01db3d50eed94c051865f2]: Art. 19 in force at 28.7.2025, see art. 1
[^key-e57307a6623325a6a649de64fbb87a3e]: Art. 20 in force at 28.7.2025, see art. 1
[^key-8b85841c3aa7acf81b4cb9835e531777]: Art. 21 in force at 28.7.2025, see art. 1
[^key-d0925f147106195b1892e29191e506e9]: Art. 22 in force at 28.7.2025, see art. 1
[^key-50ebf67cd7c16d8e54c330722c757f10]: Art. 23 in force at 28.7.2025, see art. 1
[^key-10070771339150e2a091c3f1a1b1d61d]: Art. 24 in force at 28.7.2025, see art. 1
[^key-46afb31be0875e5e6f1b36fa8a76e993]: Art. 25 in force at 28.7.2025, see art. 1
[^key-d2ceef1c38113b53037d2da030b0ca26]: Art. 26 in force at 28.7.2025, see art. 1
[^key-28ee2ab12b51d83f73b1b00dca0ec621]: Art. 27 in force at 28.7.2025, see art. 1
[^key-109f1e878bfd27632d4599324fc93587]: Art. 28 in force at 28.7.2025, see art. 1
[^key-f34658920ef11cd8c53d7e378dbe0ca5]: Art. 29 in force at 28.7.2025, see art. 1
[^key-d99b30ecd175d24489e7e4d97f7ad6e2]: Art. 30 in force at 28.7.2025, see art. 1
[^key-a29da0a0437c7ab200f830d81a599eb6]: Art. 31 in force at 28.7.2025, see art. 1
[^key-f2f12e61b774c6ecf7f96bf8474cd46a]: Art. 32 in force at 28.7.2025, see art. 1
[^key-11cd92a2c1b73bd9670cd3b546e0a195]: Art. 33 in force at 28.7.2025, see art. 1
[^key-4181f5df8b52506f3e9be8ad0b01bbe8]: Art. 34 in force at 28.7.2025, see art. 1
[^key-1cdee3b009a54be0ffc372388720c10d]: Art. 35 in force at 28.7.2025, see art. 1
[^key-8f9384e76068315e38587f41f177f2f9]: Art. 36 in force at 28.7.2025, see art. 1
[^key-3737febdf48c6218a9ec3c32046c9a99]: Art. 37 in force at 28.7.2025, see art. 1
[^key-25a2de94780fca31aaf38a851fc2b65c]: Art. 38 in force at 28.7.2025, see art. 1
[^key-78f06191d4b980868874fe6f1b9c9f8f]: Art. 39 in force at 28.7.2025, see art. 1
[^key-6b93c842a5a167869bf2987e449e62c0]: Art. 40 in force at 28.7.2025, see art. 1
[^key-f0ad6336ef05f4abb1e930b771eb765a]: Art. 41 in force at 28.7.2025, see art. 1
[^key-14b4be30a031cb11988630cd2541c8f2]: Art. 42 in force at 28.7.2025, see art. 1
[^key-1bed3d816f152dfb3dd1b5178a63d204]: Art. 43 in force at 28.7.2025, see art. 1
[^key-01ec94bc534bffc54352a89d0c5655c2]: Art. 44 in force at 28.7.2025, see art. 1
[^key-059a6ca718e24008730bcf86d4119e2c]: Art. 45 in force at 28.7.2025, see art. 1
[^key-96cfc76327cf807513c10da79548b0a3]: Sch. 1 para. 1 in force at 28.7.2025, see art. 1
[^key-902a883591e96a44cfef1821d43eff2f]: Sch. 1 para. 2 in force at 28.7.2025, see art. 1
[^key-2203a6061c265ecf854a1a2532ee8250]: Sch. 2 para. 1 in force at 28.7.2025, see art. 1
[^key-03c26e1e208fd738534e732c99cb8b76]: Sch. 2 para. 2 in force at 28.7.2025, see art. 1
[^key-ec69a39afdce3b0775ccca449e5c17e7]: Sch. 2 para. 3 in force at 28.7.2025, see art. 1
[^key-bd2e9be9b7436a6387d0fabc6f2874ae]: Sch. 2 para. 4 in force at 28.7.2025, see art. 1
[^key-fc87fa12fde00a005a1e68ade032ce9a]: Sch. 2 para. 5 in force at 28.7.2025, see art. 1
[^key-f2667a344709422121416a01cffece00]: Sch. 2 para. 6 in force at 28.7.2025, see art. 1
[^key-828e598135939dfdaaad50f3813d0fe1]: Sch. 2 para. 7 in force at 28.7.2025, see art. 1
[^key-5ba24529f1f779854d3cd4834f4458b5]: Sch. 2 para. 8 in force at 28.7.2025, see art. 1
[^key-fc26b67d7642bc0c0fdafee8d5a30896]: Sch. 2 para. 9 in force at 28.7.2025, see art. 1
[^key-03abe4a9781013adfbb0801cae4ba1ff]: Sch. 2 para. 10 in force at 28.7.2025, see art. 1
[^key-ad29ea0670a3cdc3ab7094c523db26e1]: Sch. 2 para. 11 in force at 28.7.2025, see art. 1
[^key-c79d87db53893467fffc6c757c3582cb]: Sch. 2 para. 12 in force at 28.7.2025, see art. 1
[^key-b1e49a40bdf03efe923db1e5936d4b2a]: Sch. 2 para. 13 in force at 28.7.2025, see art. 1
[^key-33088d46699ddb7632995f7c34906f5d]: Sch. 2 para. 14 in force at 28.7.2025, see art. 1
[^key-d88afe89c2d7058753b6c137f8339f02]: Sch. 2 para. 15 in force at 28.7.2025, see art. 1
[^key-07c64227eae55e3c3c5b3dc848be6bde]: Sch. 2 para. 16 in force at 28.7.2025, see art. 1
[^key-3b95d8ad1bf2cc409edb711bd64d7179]: Sch. 2 para. 17 in force at 28.7.2025, see art. 1
[^key-4bf55a33247c1cd0bcc05c258394301c]: Sch. 2 para. 18 in force at 28.7.2025, see art. 1
[^key-04f2c4e384c9f478d02c3f6b3e8f3b00]: Sch. 2 para. 19 in force at 28.7.2025, see art. 1
[^key-8d8c911b3162969dce8f79c686ec50ff]: Sch. 2 para. 20 in force at 28.7.2025, see art. 1
[^key-e16485ab7de8f6bae709285956afbf31]: Sch. 2 para. 21 in force at 28.7.2025, see art. 1
[^key-39fbd0cd6217eea482d52f8419f43179]: Sch. 2 para. 22 in force at 28.7.2025, see art. 1
[^key-bc69eb226596a1e82ec4d1b0735a7ca4]: Sch. 2 para. 23 in force at 28.7.2025, see art. 1
[^key-b8cf46a38608e2730a3759f0ae832a49]: Sch. 2 para. 24 in force at 28.7.2025, see art. 1
[^key-5c091aa5a1efbe41485ba2e4d88071c0]: Sch. 2 para. 25 in force at 28.7.2025, see art. 1
[^key-bfa55862503b4f3c8ed7120f75edc2d7]: Sch. 2 para. 26 in force at 28.7.2025, see art. 1
[^key-4063f69973c66fad30d4f9a1675ecb4e]: Sch. 2 para. 27 in force at 28.7.2025, see art. 1
[^key-5358d23c7250b5abb85cfee33a5067f2]: Sch. 2 para. 28 in force at 28.7.2025, see art. 1
[^key-8bd3a099f23d147b01f9d326f4757f8d]: Sch. 2 para. 29 in force at 28.7.2025, see art. 1
[^key-2d3255989770be30062454d88ac991ee]: Sch. 2 para. 30 in force at 28.7.2025, see art. 1
[^key-b99ae900de5176a5d05404a8f07b85b8]: Sch. 2 para. 31 in force at 28.7.2025, see art. 1
[^key-02c596ba7f2bee73b5667a7a82970698]: Sch. 2 para. 32 in force at 28.7.2025, see art. 1
[^key-89defbd4aa4965769e7febbaa9cb8ed7]: Sch. 9 para. 1 in force at 28.7.2025, see art. 1
[^key-5202c5a978c6a85ca0bf56cf3a659669]: Sch. 9 para. 2 in force at 28.7.2025, see art. 1
[^key-91b6adcc42e7f9e3db28c34c6603701b]: Sch. 9 para. 3 in force at 28.7.2025, see art. 1
[^key-4f91079ad75ec9433e05c422ca007c50]: Sch. 9 para. 4 in force at 28.7.2025, see art. 1
[^key-8c53df98773cc824d56121e91c9003ae]: Sch. 9 para. 5 in force at 28.7.2025, see art. 1
[^key-4d04da9aa9871a1edacd5d6315181721]: Sch. 10 para. 1 in force at 28.7.2025, see art. 1
[^key-2ff4d60c5bbe84b627d24c88764a358a]: Sch. 10 para. 2 in force at 28.7.2025, see art. 1
[^key-48675b19b6f34b9c006f9c1167ef0b16]: Sch. 10 para. 3 in force at 28.7.2025, see art. 1
[^key-503fa4b6e63bae5c4731a556df494c8f]: Sch. 10 para. 4 in force at 28.7.2025, see art. 1
[^key-605f222c6d97e9a7c151bc8885ac9f54]: Sch. 10 para. 5 in force at 28.7.2025, see art. 1
[^key-b395f65afddcebc45ae47a5018d8f36d]: Sch. 10 para. 6 in force at 28.7.2025, see art. 1
[^key-8d120828ddcc07b44be6de9982119608]: Sch. 10 para. 7 in force at 28.7.2025, see art. 1
[^key-1048a59704c89a46a61917a863174e7c]: Sch. 10 para. 8 in force at 28.7.2025, see art. 1
[^key-d33c6bdc13264871cd278b5848c8b4cd]: Sch. 10 para. 9 in force at 28.7.2025, see art. 1
[^key-fa90fec363fda6d1f632458805b173bf]: Sch. 10 para. 10 in force at 28.7.2025, see art. 1
[^key-799917670b1e931f5e1ea0d1ee2861a3]: Sch. 10 para. 11 in force at 28.7.2025, see art. 1
[^key-91bb314d143d549238453ae90734a528]: Sch. 10 para. 12 in force at 28.7.2025, see art. 1
[^key-72c0b915bfe69727558b600562d4665b]: Sch. 10 para. 13 in force at 28.7.2025, see art. 1
[^key-8e4d33cf993b3f8e06b353a02698ff81]: Sch. 10 para. 14 in force at 28.7.2025, see art. 1
[^key-1ee25ac0c141e0ac0a257d7944c9e715]: Sch. 10 para. 15 in force at 28.7.2025, see art. 1
[^key-58d838e1cad2349caf38d93761670c72]: Sch. 10 para. 16 in force at 28.7.2025, see art. 1
[^key-7bb7eae24beacd89a7aeafd58d0467e7]: Sch. 10 para. 17 in force at 28.7.2025, see art. 1
[^key-5a705ab3a0a81c36b1e07c7b5ee2b096]: Sch. 10 para. 18 in force at 28.7.2025, see art. 1
[^key-55196487e0a51f04011f9028bf3fa12f]: Sch. 10 para. 19 in force at 28.7.2025, see art. 1
[^key-121179a0c41f577e26705d6578b06a4e]: Sch. 10 para. 20 in force at 28.7.2025, see art. 1
[^key-66e26be0dd2bed3ef0bed98a2a562ca4]: Sch. 10 para. 21 in force at 28.7.2025, see art. 1
[^key-8123061ba0494dc79f0f83fff7a246f1]: Sch. 10 para. 22 in force at 28.7.2025, see art. 1
[^key-30a4ec0159d396ee7b600527e812c713]: Sch. 10 para. 23 in force at 28.7.2025, see art. 1
[^key-9f5d9dd9e2a2be446efbfcd1e10a8e7e]: Sch. 10 para. 24 in force at 28.7.2025, see art. 1
[^key-bb3414db258b14e94698f78f48b21a1c]: Sch. 10 para. 25 in force at 28.7.2025, see art. 1
[^key-c0b78af7fd2de186db723bc2c13e2852]: Sch. 10 para. 26 in force at 28.7.2025, see art. 1
[^key-6429ac9486bec6f5e536bb4d68ab7506]: Sch. 10 para. 27 in force at 28.7.2025, see art. 1
[^key-3c58044205c78f0a5120c62b9df0d110]: Sch. 10 para. 28 in force at 28.7.2025, see art. 1
[^key-6f7cbf4331e004f9ce299886a85552c4]: Sch. 10 para. 29 in force at 28.7.2025, see art. 1
[^key-71bb42be9da1c3ba16583244b697fa83]: Sch. 10 para. 30 in force at 28.7.2025, see art. 1
[^key-67cb57ed82a911450037c5922061d064]: Sch. 10 para. 31 in force at 28.7.2025, see art. 1
[^key-bf678f4b0fd15a9814de34d58b39a67e]: Sch. 10 para. 32 in force at 28.7.2025, see art. 1
[^key-22f501d0ea82bbff7e33c6d76d81f999]: Sch. 10 para. 33 in force at 28.7.2025, see art. 1
[^key-e0e092235281092c93cc73211da13485]: Sch. 10 para. 34 in force at 28.7.2025, see art. 1
[^key-a1cf25067b7b41536225c48ada1b1ed2]: Sch. 10 para. 35 in force at 28.7.2025, see art. 1
[^key-2f8f853c2e75e7e766f690e6d69bc652]: Sch. 10 para. 36 in force at 28.7.2025, see art. 1
[^key-13ff37a43df764976ec876f2bbc6dac1]: Sch. 10 para. 37 in force at 28.7.2025, see art. 1
[^key-7246f556360286029d36e7fc4b79834e]: Sch. 10 para. 38 in force at 28.7.2025, see art. 1
[^key-c2a4c41b20d472abfd3bcf7e6a34c179]: Sch. 10 para. 39 in force at 28.7.2025, see art. 1
[^key-1fdefe109f14a1d9bac24a8b90b8d58d]: Sch. 10 para. 40 in force at 28.7.2025, see art. 1
[^key-32e27888cf58eb2f45fa5af245c80e2b]: Sch. 10 para. 41 in force at 28.7.2025, see art. 1
[^key-d70b9f00e75174d7baeb1482b4cd940e]: Sch. 10 para. 42 in force at 28.7.2025, see art. 1
[^key-88918f0fd295ae2c90ec76abaca20200]: Sch. 10 para. 43 in force at 28.7.2025, see art. 1
[^key-7859401e2b3b7da11126f3754d5fd8a6]: Sch. 10 para. 44 in force at 28.7.2025, see art. 1
[^key-dc847d3ef214001b1b764ad810c34e08]: Sch. 10 para. 45 in force at 28.7.2025, see art. 1
[^key-584f633f2811ce5030ee0c6f2ae5ffe5]: Sch. 10 para. 46 in force at 28.7.2025, see art. 1
[^key-65169d406b33f6da1c8a140db89d4138]: Sch. 10 para. 47 in force at 28.7.2025, see art. 1
[^key-bc1bd49881916cb83243c66d1fe7c718]: Sch. 10 para. 48 in force at 28.7.2025, see art. 1
[^key-53ff0bab002330aa763b02ebdedf67b2]: Sch. 10 para. 49 in force at 28.7.2025, see art. 1
[^key-88c7249141cd14d6e0dbaadf2b60eb7b]: Sch. 10 para. 50 in force at 28.7.2025, see art. 1
[^key-35441088b911bb89c80c1b79b781c853]: Sch. 10 para. 51 in force at 28.7.2025, see art. 1
[^key-810333ab4f9d771b20b220937d3bb501]: Sch. 10 para. 52 in force at 28.7.2025, see art. 1
[^key-fe00611d80449e8709395ce2237be23e]: Sch. 10 para. 53 in force at 28.7.2025, see art. 1
[^key-d74a287a5582c8d06c645cc766c85820]: Sch. 10 para. 54 in force at 28.7.2025, see art. 1
[^key-6c8ddfb09822d04b484cc42ecbf8b1d3]: Sch. 10 para. 55 in force at 28.7.2025, see art. 1
[^key-832f8165643477a2762fb215b58e48f2]: Sch. 10 para. 56 in force at 28.7.2025, see art. 1
[^key-c7daf6566d85c9f617eb93f8839d54c3]: Sch. 10 para. 57 in force at 28.7.2025, see art. 1
[^key-81391e29ea15209f160b0a987895a4d6]: Sch. 10 para. 58 in force at 28.7.2025, see art. 1
[^key-63cf0f9d94ff896db367262027af81e5]: Sch. 10 para. 59 in force at 28.7.2025, see art. 1
[^key-b8fbb3dbf84ef6fae7a08a0d73991c52]: Sch. 10 para. 60 in force at 28.7.2025, see art. 1
[^key-4c7d2a352969d8dfcde6e6c0a3dadbfb]: Sch. 10 para. 61 in force at 28.7.2025, see art. 1
[^key-4a2f830f4bcce142adf9611f28d14c96]: Sch. 10 para. 62 in force at 28.7.2025, see art. 1
[^key-689159ef1e527a4a73743ee768634ea5]: Sch. 10 para. 63 in force at 28.7.2025, see art. 1
[^key-e9d11e8228b8411a6367bd2516fc0ed3]: Sch. 10 para. 64 in force at 28.7.2025, see art. 1
[^key-f7b877953826fe3498a03352affba2a5]: Sch. 10 para. 65 in force at 28.7.2025, see art. 1
[^key-28c7931019fcbcb35bdadce69bc02028]: Sch. 10 para. 66 in force at 28.7.2025, see art. 1
[^key-9e3ed14747200681e499f05bd3820b7e]: Sch. 10 para. 67 in force at 28.7.2025, see art. 1
[^key-518149c0ecc8538034b378b60677c9cd]: Sch. 10 para. 68 in force at 28.7.2025, see art. 1
[^key-375fc216e839d121be9fa3f7686096cb]: Sch. 10 para. 69 in force at 28.7.2025, see art. 1
[^key-bd6275fb538d4abe3b38264ae84acf99]: Sch. 10 para. 70 in force at 28.7.2025, see art. 1
[^key-88902f7f40a532281aea7c2b5f50e603]: Sch. 10 para. 71 in force at 28.7.2025, see art. 1
[^key-b1106fb23787d7e1568c2ed69a33cecf]: Sch. 10 para. 72 in force at 28.7.2025, see art. 1
[^key-0dcae1a3a470cbcadb230d8f9867987a]: Sch. 10 para. 73 in force at 28.7.2025, see art. 1
[^key-b821d6e07a08c5873deb6a3216dbcaa3]: Sch. 10 para. 74 in force at 28.7.2025, see art. 1
[^key-de5160c8bb62dc164780829ae65b5f07]: Sch. 10 para. 75 in force at 28.7.2025, see art. 1
[^key-4701ae0e40128014cb8312731c4aba59]: Sch. 10 para. 76 in force at 28.7.2025, see art. 1
[^key-1deeb5786c2b5a6012c0573ac5dec0de]: Sch. 10 para. 77 in force at 28.7.2025, see art. 1
[^key-019df6707946063805d97feb1ae4b424]: Sch. 10 para. 78 in force at 28.7.2025, see art. 1
[^key-08383510a7f541e469ae456a9c17c3f1]: Sch. 10 para. 79 in force at 28.7.2025, see art. 1
[^key-da2b86acad99ee2e867bd0c69a61abab]: Sch. 10 para. 80 in force at 28.7.2025, see art. 1
[^key-046c87c27f4424df4945696c3dbc0890]: Sch. 10 para. 81 in force at 28.7.2025, see art. 1
[^key-5e0b3c643131dbede3b8758b71a84caf]: Sch. 10 para. 82 in force at 28.7.2025, see art. 1
[^key-d5ed6aa7071fc4c5b39c11139203eafb]: Sch. 10 para. 83 in force at 28.7.2025, see art. 1
[^key-97fd1b0ea240426414f9846eb7464dc9]: Sch. 10 para. 84 in force at 28.7.2025, see art. 1
[^key-4d130247523426c6739bdccc9c3a4500]: Sch. 10 para. 85 in force at 28.7.2025, see art. 1
[^key-10e976dcaa1eeca486274e5e6d1de848]: Sch. 10 para. 86 in force at 28.7.2025, see art. 1
[^key-cba0b77737bba32d9311a82cffaacc0c]: Sch. 10 para. 87 in force at 28.7.2025, see art. 1
[^key-30eb775e206a96e71c84df804c9b47b7]: Sch. 10 para. 88 in force at 28.7.2025, see art. 1
[^key-a22659e7f1af7fbdff0833352061d3a3]: Sch. 10 para. 89 in force at 28.7.2025, see art. 1
[^key-346b2e9cd2aaebf86b8653a4dd8fd9d7]: Sch. 10 para. 90 in force at 28.7.2025, see art. 1
[^key-b62f09d7d66953be2d50f2c290c1dfff]: Sch. 10 para. 91 in force at 28.7.2025, see art. 1
[^key-9071bd90a2e5855975fdb2df493b8b90]: Sch. 10 para. 92 in force at 28.7.2025, see art. 1
[^key-4535e9e1d7a52dd126824824204616d5]: Sch. 10 para. 93 in force at 28.7.2025, see art. 1
[^key-44d901691ca528466c6e7c5d08a8bcc0]: Sch. 10 para. 94 in force at 28.7.2025, see art. 1
[^key-224ba76cdb17f1e4c48efe59f9036ecb]: Sch. 10 para. 95 in force at 28.7.2025, see art. 1
[^key-ae012ead5c7eb71668c222d2f344ac80]: Sch. 10 para. 96 in force at 28.7.2025, see art. 1
[^key-cbe959e92bef90c543a3c4306d1bec56]: Sch. 10 para. 97 in force at 28.7.2025, see art. 1
[^key-9940377d887fdea218b523194be0e134]: Sch. 10 para. 98 in force at 28.7.2025, see art. 1
[^key-30cf22b0e79b434c8c68a78cfbeb76f4]: Sch. 10 para. 99 in force at 28.7.2025, see art. 1
[^key-af683756b390256e994f1dfc2f6348dc]: Sch. 10 para. 100 in force at 28.7.2025, see art. 1
[^key-be0ea447cdcf668b27ef05d57475b353]: Sch. 10 para. 101 in force at 28.7.2025, see art. 1
[^key-903f5d1f4e6192612b08815a15bec073]: Sch. 10 para. 102 in force at 28.7.2025, see art. 1
[^key-c08f3d8dd6006c9c0b45f7f35db78777]: Sch. 10 para. 103 in force at 28.7.2025, see art. 1
[^key-1316fcacd74a900d68458e8373cc02be]: Sch. 10 para. 104 in force at 28.7.2025, see art. 1
[^key-7360dbcad734d399572964565d686636]: Sch. 10 para. 105 in force at 28.7.2025, see art. 1
[^key-8174bb7a278bcfa4ca4dc1b26371387f]: Sch. 10 para. 106 in force at 28.7.2025, see art. 1
[^key-fe045112823140d44563a63af27f79b8]: Sch. 10 para. 107 in force at 28.7.2025, see art. 1
[^key-5f0d66531de0bafc2e0f5cbe7bd355f3]: Sch. 10 para. 108 in force at 28.7.2025, see art. 1
[^key-d656bb95320a7f410c1ab01f65b9c430]: Sch. 10 para. 109 in force at 28.7.2025, see art. 1
[^key-994b869cb666b3dd021fb426850a9e68]: Sch. 10 para. 110 in force at 28.7.2025, see art. 1
[^key-3f1e243f16b2f7ad8ca6361fb04f58e5]: Sch. 10 para. 111 in force at 28.7.2025, see art. 1
[^key-352e99989c18468889e1e24bdd34a1dc]: Sch. 10 para. 112 in force at 28.7.2025, see art. 1
[^key-829574967ac87c7f06d439e23de6f40a]: Sch. 10 para. 113 in force at 28.7.2025, see art. 1
[^key-8896aabc14646bf9f61a934a281fc761]: Sch. 10 para. 114 in force at 28.7.2025, see art. 1
[^key-d482be17571bf317d234741b671e92e9]: Sch. 10 para. 115 in force at 28.7.2025, see art. 1
[^key-ab95129a87e2fed0d53c110b94009474]: Sch. 10 para. 116 in force at 28.7.2025, see art. 1
[^key-a7314fefb7eb10550738fd1139f02ebe]: Sch. 10 para. 117 in force at 28.7.2025, see art. 1
[^key-7d00f8a61960de3b4b37cd8df0e375b1]: Sch. 10 para. 118 in force at 28.7.2025, see art. 1
[^key-05252887fb023fcc7c8b81c0f084fd38]: Sch. 10 para. 119 in force at 28.7.2025, see art. 1
[^key-73cee274a6c343b696ec2b442e17dd21]: Sch. 10 para. 120 in force at 28.7.2025, see art. 1
[^key-2a54c09a4e22c829fc90892ac616b11c]: Sch. 10 para. 121 in force at 28.7.2025, see art. 1
[^key-10881426057997de91555c1037dbc6f4]: Sch. 10 para. 122 in force at 28.7.2025, see art. 1
[^key-536efc17b0bb77b3cd5cc7df7038caa3]: Sch. 10 para. 123 in force at 28.7.2025, see art. 1
[^key-1248d747d847465e68b719d8d5cbf3ee]: Sch. 10 para. 124 in force at 28.7.2025, see art. 1
[^key-35420ae58ad273e9bb87813a49c6b125]: Sch. 10 para. 125 in force at 28.7.2025, see art. 1
[^key-121afd908944ca7b78291b7e8e07d433]: Sch. 10 para. 126 in force at 28.7.2025, see art. 1
[^key-25867923be1db0ff2e0b99a14ef5b818]: Sch. 10 para. 127 in force at 28.7.2025, see art. 1
[^key-8c217ac84d74fe5fb29f7938e95ceff0]: Sch. 10 para. 128 in force at 28.7.2025, see art. 1
[^key-adefdee81f420e12192d46d818a07e22]: Sch. 10 para. 129 in force at 28.7.2025, see art. 1
[^key-1d35abf8d398c634f221f7ad18b415cf]: Sch. 10 para. 130 in force at 28.7.2025, see art. 1
[^key-26d287b81eb8d23ddd33c48bb27eca5f]: Sch. 10 para. 131 in force at 28.7.2025, see art. 1
[^key-511b9a1f83db971fea5fc7dc4efa7794]: Sch. 10 para. 132 in force at 28.7.2025, see art. 1
[^key-dc2c56efd2e069735eb1351a630c5abd]: Sch. 10 para. 133 in force at 28.7.2025, see art. 1
[^key-ef0d06b1eeb825c5dc9e485c06c21d6a]: Sch. 10 para. 134 in force at 28.7.2025, see art. 1
[^key-68d314597b9c1840f922d22c72948bf4]: Sch. 10 para. 135 in force at 28.7.2025, see art. 1
[^key-8c42f248e105164d4c3d85aabc1e6426]: Sch. 10 para. 136 in force at 28.7.2025, see art. 1
[^key-a45499d6c4f0373b5d84b1db0415fe83]: Sch. 12 para. 1 in force at 28.7.2025, see art. 1
[^key-d85fe165fc49b017844a080f4817f5f8]: Sch. 12 para. 2 in force at 28.7.2025, see art. 1
[^key-957042209dd1224851af7c843bd8a43c]: Sch. 12 para. 3 in force at 28.7.2025, see art. 1
[^key-f6deed3568567dfe1fc48fde8c6c727e]: Sch. 12 para. 4 in force at 28.7.2025, see art. 1
[^key-003e18bd100995bfe7dbb46454ec088c]: Sch. 12 para. 5 in force at 28.7.2025, see art. 1
[^key-ef3345d4942b30223972c360b44479fd]: Sch. 12 para. 6 in force at 28.7.2025, see art. 1
[^key-408365a92b072e9d3ab20ba870085004]: Sch. 12 para. 7 in force at 28.7.2025, see art. 1
[^key-e45f4bd099165073f2dc332170df152d]: Sch. 13 para. 1 in force at 28.7.2025, see art. 1
[^key-5e852ab220e3eaf76e3924e7707eb75d]: Sch. 13 para. 2 in force at 28.7.2025, see art. 1
[^key-6b24aaa4e5f8bb7e73210339e8a6e8ec]: Sch. 13 para. 3 in force at 28.7.2025, see art. 1
[^key-73531a85385f7f4b66243c11fe884e68]: Sch. 13 para. 4 in force at 28.7.2025, see art. 1
[^key-369795b40db6446a55f3be40d738dac4]: Sch. 13 para. 5 in force at 28.7.2025, see art. 1
[^key-492b09a411381e1ac5d07af7ace80164]: Sch. 13 para. 6 in force at 28.7.2025, see art. 1
[^key-33a09f731e01ab6e1b454b6b4d81beb7]: Sch. 13 para. 7 in force at 28.7.2025, see art. 1
[^key-06f2fb8a394d264f6ddf293345e1f7dd]: Sch. 14 para. 1 in force at 28.7.2025, see art. 1
[^key-246dd314d82b97359c8cabb20a492878]: Sch. 14 para. 2 in force at 28.7.2025, see art. 1
[^key-ef100cd7dd0ffb7c6f2e4d2d5ed3f609]: Sch. 14 para. 3 in force at 28.7.2025, see art. 1
[^key-16165cf69c4922b38f5c88629fa12d73]: Sch. 14 para. 4 in force at 28.7.2025, see art. 1
[^key-0df2ede7eccd835703664aff1d2c4a5e]: Sch. 14 para. 5 in force at 28.7.2025, see art. 1
[^key-3fa11b67dba1e57191921991231e8d58]: Sch. 14 para. 6 in force at 28.7.2025, see art. 1
[^key-ebab7081f34830d1ef427ca5286ad3d3]: Sch. 14 para. 7 in force at 28.7.2025, see art. 1
[^key-8c113c01943af2f15d6fb21b7aa1e7fc]: Sch. 14 para. 8 in force at 28.7.2025, see art. 1
[^key-974e094553e2217c166ff154daf6f843]: Sch. 14 para. 9 in force at 28.7.2025, see art. 1
[^key-9e307ca9058e46632db2c66949327cba]: Sch. 14 para. 10 in force at 28.7.2025, see art. 1
[^key-e74e4e3f6205032a93daf56bd37a9c5f]: Sch. 14 para. 11 in force at 28.7.2025, see art. 1
[^key-866a2c6c8d1729c2c40fa42c45985985]: Sch. 14 para. 12 in force at 28.7.2025, see art. 1
[^key-54e44d43d663987c6526383e22780b02]: Sch. 14 para. 13 in force at 28.7.2025, see art. 1
[^key-09a273e2de87bf4346b354811fda2d9f]: Sch. 14 para. 14 in force at 28.7.2025, see art. 1
[^key-b7a01d3c210ceac08c2a45a8bc9c88ee]: Sch. 14 para. 15 in force at 28.7.2025, see art. 1
[^key-c4f23ebda9d1ff0d737dfc82b5bc7395]: Sch. 14 para. 16 in force at 28.7.2025, see art. 1
[^key-61ddb7b38efce5bea8253ad56199c10d]: Sch. 14 para. 17 in force at 28.7.2025, see art. 1
[^key-1c5700cabb72bf0263f5c08ba166ea52]: Sch. 14 para. 18 in force at 28.7.2025, see art. 1
[^key-c12007fc2ce6b10246832444a6689ac8]: Sch. 14 para. 19 in force at 28.7.2025, see art. 1
[^key-a2e072e42ce0e7b283fad5ba9e78d6af]: Sch. 14 para. 20 in force at 28.7.2025, see art. 1
[^key-9dae4b5813475acc3a21f3970ab0afca]: Sch. 14 para. 21 in force at 28.7.2025, see art. 1
[^key-cd62ee9476a6f894a09d044098571da8]: Sch. 14 para. 22 in force at 28.7.2025, see art. 1
[^key-5a21c7e705d9252c2e497d91b23e5226]: Sch. 14 para. 23 in force at 28.7.2025, see art. 1
[^key-74eaa17e76c95affaa2a5383c1a2e8ef]: Sch. 14 para. 24 in force at 28.7.2025, see art. 1
[^key-247e18e5f6c029c14ccebe97237bbf10]: Sch. 14 para. 25 in force at 28.7.2025, see art. 1
[^key-650c5832a2b1112decf70c147e9f0ef8]: Sch. 14 para. 26 in force at 28.7.2025, see art. 1
[^key-fc1961f0f65870be4c207de326e79bc0]: Sch. 14 para. 27 in force at 28.7.2025, see art. 1
[^key-217ea976c30a707a63a845ee4f36e019]: Sch. 14 para. 28 in force at 28.7.2025, see art. 1
[^key-66307af52a9b82e3758ac8558c7fcee7]: Sch. 14 para. 29 in force at 28.7.2025, see art. 1
[^key-2ef50c56103ca83f78df32e24a1ef9f3]: Sch. 3 in force at 28.7.2025, see art. 1
[^key-04ddfb6aa42e91b635648a056a39a511]: Sch. 4 in force at 28.7.2025, see art. 1
[^key-9624d0acdab9d62ab827097fc68e937e]: Sch. 5 in force at 28.7.2025, see art. 1
[^key-f34d8da882d0d49a8a99939b55f20afc]: Sch. 6 in force at 28.7.2025, see art. 1
[^key-1b444f46dd99505f719eae5dfe812eaf]: Sch. 7 in force at 28.7.2025, see art. 1
[^key-7fa51b57b4ab5412cc46eb456b4133fc]: Sch. 8 in force at 28.7.2025, see art. 1
[^key-fa3409245058ec9a66f3ee1cd63afd16]: Sch. 11 Pt. 1 in force at 28.7.2025, see art. 1
[^key-e7fcc2d13be3c0a0126b19abf6057c0a]: Sch. 11 Pt. 2 in force at 28.7.2025, see art. 1
[^key-88a7e19684f4508d52fd269ee6780cab]: Sch. 11 Pt. 3 in force at 28.7.2025, see art. 1
[^key-5bba05c32b5bde7825f8cf4c4942ae9b]: Sch. 15 in force at 28.7.2025, see art. 1
[^key-95b11ff4a2bd6bd2b4791b59527e4fb0]: Word in Sch. 8 substituted (24.10.2025) by The Mona Offshore Wind Farm (Correction) Order 2025 (S.I. 2025/1123), art. 1, Sch.
[^key-0c76fade662f4a7b7b86b7ebabde4a9c]: Word in Sch. 15 Table 7 substituted (24.10.2025) by The Mona Offshore Wind Farm (Correction) Order 2025 (S.I. 2025/1123), art. 1, Sch.
[^key-1229ca20145d7d69a91d20311b6beeb5]: Words in Sch. 15 Table 7 substituted (24.10.2025) by The Mona Offshore Wind Farm (Correction) Order 2025 (S.I. 2025/1123), art. 1, Sch.
[^key-5cd0e780458b86b2f29874938e39efb6]: Words in art. 2(1) substituted (24.10.2025) by The Mona Offshore Wind Farm (Correction) Order 2025 (S.I. 2025/1123), art. 1, Sch.
[^key-f233f6795429da900793560bf221a206]: Word in art. 2(1) inserted (24.10.2025) by The Mona Offshore Wind Farm (Correction) Order 2025 (S.I. 2025/1123), art. 1, Sch.
[^key-6dc45b84e3d3657028adaeb02c7c985f]: Words in art. 7(3) inserted (24.10.2025) by The Mona Offshore Wind Farm (Correction) Order 2025 (S.I. 2025/1123), art. 1, Sch.
[^key-1041f3007f31ed505346571dc85448d5]: Words in art. 35(3) substituted (24.10.2025) by The Mona Offshore Wind Farm (Correction) Order 2025 (S.I. 2025/1123), art. 1, Sch.
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.